Gas Capture of Pierce Smith Converter Off-Gas SAIMM Zambia 25 November 2009 Scharl Laubscher PDF created with pdfFactory trial version www.pdffactory.com

Gas Capture of Pierce Smith Converter Off-Gas

  • Upload
    others

  • View
    3

  • Download
    0

Embed Size (px)

Citation preview

Gas Capture of Pierce Smith Converter Off-GasSAIMM Zambia25 November 2009Scharl Laubscher

PDF created with pdfFactory trial version www.pdffactory.com

08.06.20102

Contents

Process FlowEmission comparisonDesign considerationConverter overviewDesign layoutProfiles used for design

PDF created with pdfFactory trial version www.pdffactory.com

08.06.20103

Process flow Rönnskär Smelter

PDF created with pdfFactory trial version www.pdffactory.com

08.06.20104

“Boliden” Converter Hoods

PDF created with pdfFactory trial version www.pdffactory.com

08.06.20105

Client X Rönnskär

81 kg SO2 / t Cu 9 kg SO2 / t Cu

Converters emission comparison

PDF created with pdfFactory trial version www.pdffactory.com

08.06.20106

0

50000

100000

150000

200000

250000

300000

350000

400000

1930 1935 1940 1945 1950 1955 1960 1965 1970 1975 1980 1985 1990 1995 2001

Tonnes

Emission of SO2

Production of Copper,Lead and Zinc Clinker

Boliden’s Rönnskär Smelter

Reduced Emissions and Increased Production

PDF created with pdfFactory trial version www.pdffactory.com

08.06.20107

Design considerations for new converter hoods

Tight fitLow dilution • Increase in SO2 strength• Better acid plant control

High temperatureWater cooling• Keep water away from your hot metal

Easy to install and maintained

PDF created with pdfFactory trial version www.pdffactory.com

08.06.20108

6/8/20108

Converter overview

PDF created with pdfFactory trial version www.pdffactory.com

08.06.20109

Slidingdoor

Primary hood

PDF created with pdfFactory trial version www.pdffactory.com

08.06.201010

2 Sliding doors

Permanenthood

Secondary hood

PDF created with pdfFactory trial version www.pdffactory.com

08.06.201011

How to prevent build-up

PDF created with pdfFactory trial version www.pdffactory.com

08.06.201012

At Client X, the backside flap is not working

Typical emission concerns

PDF created with pdfFactory trial version www.pdffactory.com

08.06.201013

Typical emission concernsBefore After

PDF created with pdfFactory trial version www.pdffactory.com

08.06.201014

The back-side is not water-cooled, now very deformed

Typical result of water failure

PDF created with pdfFactory trial version www.pdffactory.com

08.06.201015

Water requirements of competition

PDF created with pdfFactory trial version www.pdffactory.com

08.06.201016

Water inlets, two on each sideWater outlets, one on each side

Compared to ours

PDF created with pdfFactory trial version www.pdffactory.com

08.06.201017

COOLING WATER

COOLING WATER

PP

PP

PP

PP

PP

PP

xxxxHL

xxxxLS LE

CHEMICALS

MAKE-UP WATER

HOT WATER

xxxxTIC1

TT1

xxxxTIC2

TT2

xxxxTIC3

TT3

FTxxxxFIC FT

xxxxFIC FT

xxxxFIC

ATMROOF

ATMROOF

ATMROOF

ATM

EXP

xxxxTI TT

xxxxTI

TT

xxxxTI TTxxxx

TI TT

LELS

Typical layout

PDF created with pdfFactory trial version www.pdffactory.com

08.06.201018

6/8/201018

Boiler

To baghouse

Converter aisle at Rönnskär Smelter, Sweden

PDF created with pdfFactory trial version www.pdffactory.com

08.06.201019

Secondary hood

Primary hood

SiO2

Converter aisle at Rönnskär Smelter, Sweden

PDF created with pdfFactory trial version www.pdffactory.com

08.06.201020

Blowing

Maintenance

Waiting

Converter aisle at Rönnskär in full production

PDF created with pdfFactory trial version www.pdffactory.com

08.06.201021

Velocity profile

PDF created with pdfFactory trial version www.pdffactory.com

08.06.201022

6/8/2010

COOLING CHANNEL COOLING CHANNEL

Hot side

Cooling water

Temperature profiling

PDF created with pdfFactory trial version www.pdffactory.com

08.06.201023

Temperature, centre

Temperature profile

PDF created with pdfFactory trial version www.pdffactory.com

08.06.201024

Summary of the best

Good primary hoods design eliminate secondary hood requirementsEliminate build up inside converter hoodReduction in dilution air brings control back to the acid plantsProper water flow modelling, eliminates hot spots, which increase durability (+/- 10 years)Maintenance minimalVery rigid design