Gas Handling Options for Gas Handling Options for Associated Gas in Deepwater Associated Gas in Deepwater Developments in the Gulf of Developments in the Gulf of
MexicoMexico
Project for theProject for the Minerals Management ServiceMinerals Management Service
byby
Offshore Technology Research Offshore Technology Research Center Center
with assistance of with assistance of
Offshore Operators Committee Offshore Operators Committee
Gas Handling Option StudyGas Handling Option StudyGas Flange
Oil Flange
Shuttle Tanker
Gas Pipeline
FPSO
Gas Handling Options
Gas Product Ports
MMS ObjectivesMMS Objectives
Objective technical assessment of technology Objective technical assessment of technology options for handling gas associated with for options for handling gas associated with for deepwater oil developments in the GOMdeepwater oil developments in the GOM
Assessment results to be used by MMSAssessment results to be used by MMS Reviews readiness & safety of gas handing options Reviews readiness & safety of gas handing options
proposed for deepwater FPSO projectsproposed for deepwater FPSO projects Studies pertaining to deepwater oil & gas Studies pertaining to deepwater oil & gas
developmentsdevelopments
Gas Handling OptionsGas Handling Options
Study to consider Study to consider PipelinesPipelines LNG – Liquefied Natural Gas LNG – Liquefied Natural Gas CNG – Compressed Natural GasCNG – Compressed Natural Gas GTL – Gas-to-Liquid ProductsGTL – Gas-to-Liquid Products Injection Injection GTW – Gas to Wire (offshore power GTW – Gas to Wire (offshore power
generation)generation) Gas to Solids (hydrates)Gas to Solids (hydrates) OthersOthers
PipelinesPipelines to be considered as the to be considered as the baselinebaseline in assessing options in assessing options
Gas Handling Option
DescriptionsTransport
Delivery Point & Process
Efficiency Metric
Source : High Pressure
Separator 1200 psi, 100FOption
CNG
LNG
CNG
ChemicalConversion
LoadChemicalsGTL Unload
Subsea HVDC CableGTW
Pipe Dehydration
Chiller
Treater
Gas Plant
Gas Plant
Gas Plant
Condition Feedstock
Power Plant
INJ ReservoirDeferred Gas Production
Gas Handling Options
Gas Pipeline
Power Plant
-1
Gas Pipeline
Product Pipeline
BTU
BTU
BTU
BTU
BTU
BTU
Condition Feedstock
Condition Feedstock
Condition Feedstock
Condition Feedstock
Condition Feedstock
BTU
BTU
BTU
BTU
BTU
BTU
Technical Assessment Technical Assessment MetricsMetrics
Technical, Commercial, & Technical, Commercial, & Regulatory Feasibility & Regulatory Feasibility & ReadinessReadiness
HSEHSE Costs (CAPEX, OPEX)Costs (CAPEX, OPEX) Process EfficiencyProcess Efficiency
Technology (“Process”) StepsTechnology (“Process”) Steps
CNG
LNG
CNG
ChemicalConversion
LoadChemicalsGTL Unload
GTW
Pipe Dehydration
FeedstockConditioning
FeedstockConditioning
FeedstockConditioning
FeedstockConditioning
Chiller
Treater
Gas Plant
Gas Plant
Gas Plant
FeedstockConditioning
Power Plant
FeedstockConditioningINJ Reservoir
Deferred Gas Production
Gas Handling Options
Gas Pipeline
Power Plant
-
Gas Pipeline
Product Pipeline
CNG
LNG
CNG
ChemicalConversion
LoadChemicalsGTL Unload
Subsea HVDC CableGTW
Pipe Dehydration
FeedstockConditioning
FeedstockConditioning
FeedstockConditioning
FeedstockConditioning
Chiller
Treater
Gas Plant
Gas Plant
Gas Plant
FeedstockConditioning
Power PlantPower Plant
FeedstockConditioningINJ Reservoir
Deferred Gas Production
Gas Handling Options
Gas Pipeline
Power PlantPower Plant
-
Gas Pipeline
Product Pipeline
11
Dehyd
ratio
n &
Treat
men
t
Convert
to
Transp
ort Sta
te
Load
Transp
ort
Unload
Convert
to S
ales
State
Turret
OIL PROCESS
VESSEL
Gas Process
Assume FPSO-based system using parameters from EIS/CRA
Establish Key System Interfaces & Requirements
Feed to gas process : 1,200 psig 100 deg. F
Subsurface ParametersSubsurface Parameters
Central GOMWestern GOM
1000-2000
100A
300B
600C
Maximum Gas CaseD
GOR
(MMSCF/BO)
Recoverable Reserves
(MMBO)
Reservoir Case
Assumed Destinations for Assumed Destinations for Gas/Gas ProductsGas/Gas Products
PL
CNG
LNG
GTL
PowerCentral GOMWestern GOM
Study ProcessStudy Process
Study Design Mtg
Complete Assessment
Final Report
PL OtherCNGGTLLNG
FJ M A M J J A S O N D J MF
Final Project Meeting
Workshops
INJ