Gas Transmission MAOP Verification Integrity Verification Process Oklahoma CC Pipeline Safety Conference U.S. DOT / PHMSA Steve Nanney November 19, 2014 1

Gas Transmission MAOP Verification Integrity Verification ... CC - Pipeline Safety... · Gas Transmission MAOP Verification Integrity Verification Process ... miter bends Welding

  • Upload
    vutruc

  • View
    234

  • Download
    2

Embed Size (px)

Citation preview

Page 1: Gas Transmission MAOP Verification Integrity Verification ... CC - Pipeline Safety... · Gas Transmission MAOP Verification Integrity Verification Process ... miter bends Welding

Gas Transmission

MAOP Verification

Integrity Verification Process

Oklahoma CC

Pipeline Safety Conference

U.S. DOT / PHMSA Steve Nanney

November 19, 2014

1

Page 2: Gas Transmission MAOP Verification Integrity Verification ... CC - Pipeline Safety... · Gas Transmission MAOP Verification Integrity Verification Process ... miter bends Welding

Integrity Verification Process

• Drivers – Overview of Issues

– Statutory Mandates and NTSB Rec.

• Goals – Principles

• IVP Process – IVP Chart

– Definitions

– Records

– Material Documentation

– MAOP Determination

2

Page 3: Gas Transmission MAOP Verification Integrity Verification ... CC - Pipeline Safety... · Gas Transmission MAOP Verification Integrity Verification Process ... miter bends Welding

Overview of Issues

3

Page 4: Gas Transmission MAOP Verification Integrity Verification ... CC - Pipeline Safety... · Gas Transmission MAOP Verification Integrity Verification Process ... miter bends Welding

Pipeline Infrastructure (% by Decade in USA)

- 4 -

0%

5%

10%

15%

20%

25%

< 1940 1940s 1950s 1960s 1970s 1980s 1990s 2000s

Gas Transmission Pipeline Vintage 59% installed prior to 1970

Page 5: Gas Transmission MAOP Verification Integrity Verification ... CC - Pipeline Safety... · Gas Transmission MAOP Verification Integrity Verification Process ... miter bends Welding

Recent Vintage Pipe Failures

- 5 -

ERW Seam Failure

in Carmichael, MS

Submerged Arc

Weld (SAW)

Failure in

San Bruno, CA

Cross-section of defective SAW

longitudinal seam - San Bruno (2010)

Page 6: Gas Transmission MAOP Verification Integrity Verification ... CC - Pipeline Safety... · Gas Transmission MAOP Verification Integrity Verification Process ... miter bends Welding

What are some of the issues?

Construction

No pressure test, < 1.25 times MAOP/MOP

Installation issues – miter bends

Welding – alignment

NDE – on girth welds

Girth weld coating

Depth of cover

Dents during installation, backfill & clean-up

- 6 -

Page 7: Gas Transmission MAOP Verification Integrity Verification ... CC - Pipeline Safety... · Gas Transmission MAOP Verification Integrity Verification Process ... miter bends Welding

What are some of the integrity issues?

• Materials – pipe and coatings Pipe

Seam

Steel Quality

Pipe coatings

Bare pipe

Poorly installed coatings

Disbonded coatings

Tenting over the weld

CP Shielding coatings

Poor Coatings

Corrosion, SCC, & SSC

- 7 -

Page 8: Gas Transmission MAOP Verification Integrity Verification ... CC - Pipeline Safety... · Gas Transmission MAOP Verification Integrity Verification Process ... miter bends Welding

PHMSA R&D Summary • Analysis of the 280 seam failures of ERW and Flash Weld

anomalies w/failures in-service and/or during hydrostatic tests are:

– Cold Welds (99 cases)

– Penetrators (a short cold weld) (8 cases)

– Hook Cracks (76 cases)

– Cold Weld, Hook Crack Combinations (5 cases)

– Stitching (7 cases)

– Woody Fracture (6 cases)

– Selective Seam Weld Corrosion (24 cases)

– Fatigue Enlargement of Seam Defects (37 cases)

– Other Cracking (4 cases)

– Miscellaneous (14 cases)

• Cold welds + Hook Cracks above – 195/280 – 70%

• What has changed between LF-ERW and HF-ERW practices?

8

Sub-Task 1.4 - ERW AND FLASH WELD SEAM FAILURES, Table 1 – Number of Incidents by Cause, Pg. 11

Page 9: Gas Transmission MAOP Verification Integrity Verification ... CC - Pipeline Safety... · Gas Transmission MAOP Verification Integrity Verification Process ... miter bends Welding

Pipeline Seam Welds

• What is required to make a quality

seam weld? – Application of adequate heat and pressure for joining

– Suitable steel quality at seam edges

– Appropriate preparation and fit-up between the abutting

coil/skelp/plate edges

– Quality control – both mill and operator involvement

9

Page 10: Gas Transmission MAOP Verification Integrity Verification ... CC - Pipeline Safety... · Gas Transmission MAOP Verification Integrity Verification Process ... miter bends Welding

DRIVERS

10

Page 11: Gas Transmission MAOP Verification Integrity Verification ... CC - Pipeline Safety... · Gas Transmission MAOP Verification Integrity Verification Process ... miter bends Welding

Congressional Mandates

Pipeline Safety Act of 2011

• PSA §23(a) 60139(a) & (b) – Verification of Records

and Reporting –

– requires operators to identify pipe segments for which they do

not have records to substantiate MAOP for all Gas

Transmission steel pipe (Class 3, 4 and all HCAs);

– exceedance of MAOP build-up allowed by pressure limiting

device must be reported within 5-days.

• PSA §23(a) 60139(c) – Determination of MAOP

– reconfirm MAOP for pipeline segments with insufficient records.

11

Page 12: Gas Transmission MAOP Verification Integrity Verification ... CC - Pipeline Safety... · Gas Transmission MAOP Verification Integrity Verification Process ... miter bends Welding

Congressional Mandates

• PSA §23(a) 60139(d) - “Testing Regulations”

– Requires conducting tests to confirm the material strength

of previously untested gas transmission steel pipelines in

high consequence areas (HCAs) and operating at a

pressure greater than 30 % SMYS that were not

previously pressure tested;

– Tests can be either pressure testing or alternative

equivalent means such as ILI programs.

12

Page 13: Gas Transmission MAOP Verification Integrity Verification ... CC - Pipeline Safety... · Gas Transmission MAOP Verification Integrity Verification Process ... miter bends Welding

NTSB Recommendations

NTSB P-11-14 “Delete Grandfather Clause” -

recommends all grandfathered pipe be pressured

tested, including a “spike” test;

NTSB P-11-15 “Seam Stability” - recommends

pressure test to 1.25 x MAOP before treating latent

manufacturing and construction defects as “stable.”

NTSB P-11-17 “Piggable Lines” - Configure all lines

to accommodate smart pigs, with priority given to

older lines

13

Page 14: Gas Transmission MAOP Verification Integrity Verification ... CC - Pipeline Safety... · Gas Transmission MAOP Verification Integrity Verification Process ... miter bends Welding

How much pipeline mileage will

these mandates and

recommendations effect?

Page 15: Gas Transmission MAOP Verification Integrity Verification ... CC - Pipeline Safety... · Gas Transmission MAOP Verification Integrity Verification Process ... miter bends Welding

Summary by HCA and Class Location

• data as of 7-1-2013 from Part Q

15

Page 16: Gas Transmission MAOP Verification Integrity Verification ... CC - Pipeline Safety... · Gas Transmission MAOP Verification Integrity Verification Process ... miter bends Welding

Decade Installed

data as of 7-1-2013 from Part J 16

Post Code –

49 CFR Part 192

Pre Code

Page 17: Gas Transmission MAOP Verification Integrity Verification ... CC - Pipeline Safety... · Gas Transmission MAOP Verification Integrity Verification Process ... miter bends Welding

Specified Minimum Yield Strength

data as of 7-1-2013 from Part K 17

Page 18: Gas Transmission MAOP Verification Integrity Verification ... CC - Pipeline Safety... · Gas Transmission MAOP Verification Integrity Verification Process ... miter bends Welding

Specified Minimum Yield Strength

data as of 7-1-2013 from Part K

Page 19: Gas Transmission MAOP Verification Integrity Verification ... CC - Pipeline Safety... · Gas Transmission MAOP Verification Integrity Verification Process ... miter bends Welding

Nominal Pipe Size

• data as of 7-1-2013 from Part H

19

Page 20: Gas Transmission MAOP Verification Integrity Verification ... CC - Pipeline Safety... · Gas Transmission MAOP Verification Integrity Verification Process ... miter bends Welding

Incomplete Records for MAOP in

HCAs and Class 3 and 4

data as of 7-1-2013 from Part Q

Record status not collected for Class Locations 1 & 2 outside of HCAs

Page 21: Gas Transmission MAOP Verification Integrity Verification ... CC - Pipeline Safety... · Gas Transmission MAOP Verification Integrity Verification Process ... miter bends Welding

Pressure Test Range – Part R

Gas Transmission 2012 Annual Report data as-of 7-1-2013 21

Page 22: Gas Transmission MAOP Verification Integrity Verification ... CC - Pipeline Safety... · Gas Transmission MAOP Verification Integrity Verification Process ... miter bends Welding

ILI Able vs Not Able

Gas Transmission 2012 Annual Report data as-of 7-1-2013 22

Page 23: Gas Transmission MAOP Verification Integrity Verification ... CC - Pipeline Safety... · Gas Transmission MAOP Verification Integrity Verification Process ... miter bends Welding

Operating Stress Levels over 72%

SMYS & Unknown - Part K

Miles operating between 72 and 80% SMYS are either

Grandfathered, Special Permit, or Alternative MAOP under 619(d)

Miles with Unknown SMYS are Grandfathered

Gas Transmission 2012 Annual Report data as-of 7-1-2013 23

Page 24: Gas Transmission MAOP Verification Integrity Verification ... CC - Pipeline Safety... · Gas Transmission MAOP Verification Integrity Verification Process ... miter bends Welding

HCAs and Est. MCA Mileage

24

• Scope of Proposed IVP Process Estimated to Apply to approx. 76,000 Miles of GT Pipeline

Total Estimated HCA + MCA Mileage = 76,000 miles

HCA MCA

Class 1 1,660 (est.) 24,177

Class 2 1,412 est.) 14,750

Class 3 15,854 (est.) 17,097

Class 4 752 (est.) 210

Total 19,678 (est.) 56,234

Page 25: Gas Transmission MAOP Verification Integrity Verification ... CC - Pipeline Safety... · Gas Transmission MAOP Verification Integrity Verification Process ... miter bends Welding

GOALS

25

Page 26: Gas Transmission MAOP Verification Integrity Verification ... CC - Pipeline Safety... · Gas Transmission MAOP Verification Integrity Verification Process ... miter bends Welding

Integrity Verification Process

• Establishes MAOP verification options that are equivalent

to pressure testing

• Addresses Class 1 and 2 pipe in higher risk locations to

address related NTSB recommendations; these areas are

called moderate consequence areas (MCAs)

• Strategy for addressing/correcting segments without

adequate records;

• Process accommodates actions necessary commensurate

with specific documentation shortcomings on a segment-

specific basis

26

Page 27: Gas Transmission MAOP Verification Integrity Verification ... CC - Pipeline Safety... · Gas Transmission MAOP Verification Integrity Verification Process ... miter bends Welding

Basic Principles of IVP Approach

• IVP is based on 4 principles

1. Apply to higher risk locations

– High Consequence Areas (HCAs) and Moderate

Consequence Areas (MCAs)

2. Screen segments for categories of concern (e.g.,

“Grandfathered” segments)

3. Assure adequate material and documentation

4. Perform assessments to establish MAOP

27

Page 28: Gas Transmission MAOP Verification Integrity Verification ... CC - Pipeline Safety... · Gas Transmission MAOP Verification Integrity Verification Process ... miter bends Welding

Principle #1

Apply to Higher Risk Locations

• High Consequence Areas (HCAs)

• Moderate Consequence Area (MCA):

– an onshore area that is within a potential impact

circle, containing one or more buildings intended for

human occupancy, an occupied site, or a designated

Federal interstate, expressway, or 4-lane highway

right-of-way, and does not meet the definition of high

consequence area, as defined in § 192.903.

28

Page 29: Gas Transmission MAOP Verification Integrity Verification ... CC - Pipeline Safety... · Gas Transmission MAOP Verification Integrity Verification Process ... miter bends Welding

Principle #2

Screen for Categories of Concern

• Apply process to pipeline segments with:

– Grandfathered Pipe

– Lack of Records to Substantiate MAOP

– Lack of Adequate Pressure Test

– Operating pressures over 72% SMYS (pre-Code)

– History of Failures Attributable to M&C Defects

– Legacy materials and construction techniques

29

Page 30: Gas Transmission MAOP Verification Integrity Verification ... CC - Pipeline Safety... · Gas Transmission MAOP Verification Integrity Verification Process ... miter bends Welding

Principle #3

Know & Document Pipe Material

• If Missing or Inadequate Validated Traceable Material

Documentation, then Establish Material Properties

by a new Part 192 process:

– Cut out and Test Pipe Samples (Part 192 process)

– In Situ Non-Destructive Testing (if validated and Part 192

process)

– Field verification of code stamp for components such as

valves, flanges, and fabrications

– Other verifications

30

Page 31: Gas Transmission MAOP Verification Integrity Verification ... CC - Pipeline Safety... · Gas Transmission MAOP Verification Integrity Verification Process ... miter bends Welding

Principle #4

Assessments to Establish MAOP

• Allow Operator to Select Best Option to Establish MAOP

• Candidate IVP Options for Establishing MAOP

– Subpart J Test with Spike Test

– Derate pressure

– Engineering Critical Assessment

– Replace

– Other options PHMSA should consider?

31

Page 32: Gas Transmission MAOP Verification Integrity Verification ... CC - Pipeline Safety... · Gas Transmission MAOP Verification Integrity Verification Process ... miter bends Welding

• IVP Chart • Applicable Segments

– ( Steps 1, 2, 3 and 4)

• MAOP Determination

Methods (Steps 5 – 10)

– Pressure Test

– Pressure Reduction

– Engineering Critical Assessment

(ECA)

– Pipe Replacement

– Pressure Reduction for

Segments w/Small PIR

– Alternative Technology

• Materials Documentation (11)

– Destructive

– Non-destructive

• Continue Operations (12)

32

Page 33: Gas Transmission MAOP Verification Integrity Verification ... CC - Pipeline Safety... · Gas Transmission MAOP Verification Integrity Verification Process ... miter bends Welding

Definitions

• Hard Spot

• Legacy Construction Technique

• Legacy Pipe

• Moderate Consequence Area (MCA)

• Modern Pipe

• Occupied Site

• Significant Seam Cracking (SSC)

• Wrinkle Bend

33

Page 34: Gas Transmission MAOP Verification Integrity Verification ... CC - Pipeline Safety... · Gas Transmission MAOP Verification Integrity Verification Process ... miter bends Welding

Records – Why?

Car Title

Land Deed

Land/Home Deed

34

Page 35: Gas Transmission MAOP Verification Integrity Verification ... CC - Pipeline Safety... · Gas Transmission MAOP Verification Integrity Verification Process ... miter bends Welding

Why are pipeline material records needed?

• To establish design and maximum

operating pressures (MAOP)

• For integrity management (IM)

• Anomaly evaluations for

safe operating pressure

35

Page 36: Gas Transmission MAOP Verification Integrity Verification ... CC - Pipeline Safety... · Gas Transmission MAOP Verification Integrity Verification Process ... miter bends Welding

Why are material records needed?

• NTSB recommendation (San Bruno)

– delete grandfather clause

– require all pre-70 gas transmission pipelines be subjected to

hydrostatic pressure test incorporating spike test

• Act requires PHMSA to:

– direct gas transmission

operators to provide verification

that their records accurately

reflect MAOP of Class 3/4

location and Class 1/2 HCAs

Pipe – 30-inch Seamless?

36

Page 37: Gas Transmission MAOP Verification Integrity Verification ... CC - Pipeline Safety... · Gas Transmission MAOP Verification Integrity Verification Process ... miter bends Welding

Why are pipeline material records

needed?

• §23 PSA of 2011– Statute requires PHMSA to:

– Direct Gas Transmission Operators to provide

verification their records accurately reflect MAOP of

Class 3 and 4 locations and Class 1 and 2 HCAs

– Reconfirm MAOP for pipe with incomplete records

– Strength test all untested pipe in HCA operating at

> 30% SMYS

37

Page 38: Gas Transmission MAOP Verification Integrity Verification ... CC - Pipeline Safety... · Gas Transmission MAOP Verification Integrity Verification Process ... miter bends Welding

Records Management

• Materials must be manufactured in accordance:

– DOT referenced standards

– Able to maintain structural integrity of the pipeline:

• Operating pressure, temperature, and environmental conditions

including outside force loads

• Fracture arrest for 80% SMYS pipelines

• Pipe Design

– Withstand external pressures and anticipated loads

– Designed for service and class location

38

Page 39: Gas Transmission MAOP Verification Integrity Verification ... CC - Pipeline Safety... · Gas Transmission MAOP Verification Integrity Verification Process ... miter bends Welding

Records Management

• What are the first items looked at if a pipeline has a

material related incident? Records!

– Material Records – pipe, fittings & fabrications, etc.

• QA and QC

– Standards – API, ASME, ANSI, MSS, and ASTM

– Tests – mechanical & chemical properties, welding, NDE, and

hydrostatic test

– Design and Construction Records – Hydrostatic Test

– Operations and Maintenance Records

– Integrity Management Records

39

Page 40: Gas Transmission MAOP Verification Integrity Verification ... CC - Pipeline Safety... · Gas Transmission MAOP Verification Integrity Verification Process ... miter bends Welding

Applicable Segments for

Material Documentation Plan

• Verification of Pipeline Material (Step 11)

– Applicable Locations

• HCAs

• Class 3 and 4 locations

• Class 1 and 2 locations in a MCA w/ ≥ 20% SMYS

– Material

• Pipe and fittings – yield strength, composition, & seam type

• Valves – pressure rating and weld end compatibility w/pipe

• Components – pressure rating compatibility

40

Page 41: Gas Transmission MAOP Verification Integrity Verification ... CC - Pipeline Safety... · Gas Transmission MAOP Verification Integrity Verification Process ... miter bends Welding

MAOP Determination

• Onshore, steel pipelines – possible criteria

– Pressure Test (PT)

– Pressure Reduction

– Engineering Critical Assessment

– Pipe Replacement

– Alternative Technology

41

Page 42: Gas Transmission MAOP Verification Integrity Verification ... CC - Pipeline Safety... · Gas Transmission MAOP Verification Integrity Verification Process ... miter bends Welding

MAOP Determination

• Applicable Locations

– Located in HCA, MCA, and meets any of the following:

• Experienced reportable in-service incident since last pressure test due…

• Legacy pipe or constructed with legacy construction techniques and has

not had a PT of the greater of

– 1.25 times MAOP or applicable Class location PT requirement

• Test pressure (TP) for modern pipe with MAOP ≥ 20% SMYS & TP less

than Code (such as below 1.1 times MAOP)

• No PT records

• MAOP established per Grandfather Clause

42

Page 43: Gas Transmission MAOP Verification Integrity Verification ... CC - Pipeline Safety... · Gas Transmission MAOP Verification Integrity Verification Process ... miter bends Welding

PHMSA – links Pipeline Technical Resources

http://primis.phmsa.dot.gov/ptr.htm – Alternative MAOP

– Cased Crossings & Guided Wave Ultrasonics (GWUT)

– Class Location Special Permits

– Control Room Management (CRM)

– Gas Distribution Integrity Management Program (DIMP)

– Gas Transmission Integrity Management (GT IM)

– Hazardous Liquid Integrity Management (HL IM)

– High Volume Excess Flow Valves (EFV)

– Low Strength Pipe

– Operator Qualification (OQ)

– Pipeline Construction

– Research & Development (R&D)

– LNG Facility Siting

– Public Meetings

- 43 -

Page 44: Gas Transmission MAOP Verification Integrity Verification ... CC - Pipeline Safety... · Gas Transmission MAOP Verification Integrity Verification Process ... miter bends Welding

44

Thank you