2
Gas turbine Typhoon (SGT100) Generator Package 4,4 Mw (iso) Actual State: Dismantled and stored indoor (EEC) Ready to be shipped. Equipement list : one package gas turbine + load gearbox , gas fuel One generator, air cooled Turbine Generator WHB control panels Low Voltage Distribution panels, battery charger Gas fuel skid General information : Year of construction and commissioning : 1992 Fuel gas : Gas Total number of cogeneration plant running hours : 35 227 h Turbine : Manufacturer : Ruston (Siemens) Type : Typhoon single shaft, cold end drive Fuel Gas : Gas Gas Fuel pressure supply : 19.5 barg Output speed : 16 500 rpm Axial compressor : 10 stages Combustion chamber : 6 Last core engine replacement : 2002 Fired hours since last core engine replacement : 12 213 h Number of start since last core engine replacement : 415 starts Equivalent Running hours since last core engine replacement : 15 500 h Power ISO (Pic load) : 4 330 KW Power ISO (base load) : 3 925 KW Exhaust temperature (15°C outside temp.) : 498°C Generator : Manufacturer : GEC ALSTHOM Power : 4 500 kVA Frequency : 50 HZ Speed : 1 500 rpm Voltage : 11 000 V Cos φ : 0.85 Commissioning Year : 1992 Running hours since last major overhaul : 12 213 h Reduction gearbox : Manufacturer : Allen Gear Type : Epicyclic Commissioning year : 1992 Rated Power : 4 800 KW Input RPM : 16 500 Output RPM : 1 500 rpm Running hours since last major overhaul : 12 213 h Gas Turbine Package Specification : Contact us : [email protected] www.turbomep.com Please contact us [email protected]

Gas turbine Typhoon (SGT100) Generator Package 4,4 Mw …turbomep.com/wp-content/uploads/2016/12/typhoon-gas-turbine... · Gallery Gas Turbine Package Exhaust Gas Turbine Engine Control

  • Upload
    buitu

  • View
    306

  • Download
    10

Embed Size (px)

Citation preview

Page 1: Gas turbine Typhoon (SGT100) Generator Package 4,4 Mw …turbomep.com/wp-content/uploads/2016/12/typhoon-gas-turbine... · Gallery Gas Turbine Package Exhaust Gas Turbine Engine Control

Gas turbine Typhoon (SGT100)

Generator Package 4,4 Mw (iso)

Actual State:

Dismantled and stored indoor (EEC) Ready to be shipped.

Equipement list :

one package gas turbine + load gearbox , gas fuel One generator, air cooled Turbine – Generator – WHB control panels Low Voltage Distribution panels, battery charger Gas fuel skid

General information :

Year of construction and commissioning : 1992 Fuel gas : Gas Total number of cogeneration plant running hours : 35 227 h

Turbine :

Manufacturer : Ruston (Siemens) Type : Typhoon single shaft, cold end drive Fuel Gas : Gas Gas Fuel pressure supply : 19.5 barg Output speed : 16 500 rpm Axial compressor : 10 stages Combustion chamber : 6 Last core engine replacement : 2002 Fired hours since last core engine replacement : 12 213 h Number of start since last core engine replacement : 415 starts Equivalent Running hours since last core engine replacement : 15 500 h Power ISO (Pic load) : 4 330 KW Power ISO (base load) : 3 925 KW Exhaust temperature (15°C outside temp.) : 498°C

Generator :

Manufacturer : GEC ALSTHOM Power : 4 500 kVA Frequency : 50 HZ Speed : 1 500 rpm Voltage : 11 000 V Cos φ : 0.85 Commissioning Year : 1992

Running hours since last major overhaul : 12 213 h

Reduction gearbox :

Manufacturer : Allen Gear Type : Epicyclic Commissioning year : 1992 Rated Power : 4 800 KW Input RPM : 16 500 Output RPM : 1 500 rpm

Running hours since last major overhaul : 12 213 h

Gas Turbine Package Specification :

Co

nta

ct u

s : c

on

tact

@tu

rbo

mep

.co

m

ww

w.t

urb

om

ep.c

om

Please contact us [email protected]

Page 2: Gas turbine Typhoon (SGT100) Generator Package 4,4 Mw …turbomep.com/wp-content/uploads/2016/12/typhoon-gas-turbine... · Gallery Gas Turbine Package Exhaust Gas Turbine Engine Control

Gallery

Gas Turbine Package Exhaust

Gas Turbine Engine

Control Panel – Low Voltage panel Battery Chargers

Generator

Co

nta

ct u

s : c

on

tact

@tu

rbo

mep

.co

m

ww

w.t

urb

om

ep.c

om

2

Gas turbine Typhoon (SGT100) Generator package