39
INAI - in iiiiiiinii 52 GAUTHIER 010 GAUTHIER REPORT NO: 52 WORK PERFORMED FOR: Panthco Resources RECORDED HOLDER: SAME AS ABOVE H t t OTHER l J CLAIM NO. HOtg NO. fOOTAGE PATE ^4OTE L599137 FLP 92-20 151.2 m June 92 ' (1) NOTES; (i) Report of Work # 9330 00028

GAUTHIER REPORT NO: 52 WORK PERFORMED FOR: Panthco ...€¦ · assessment report on the diamond lake project panthco mary-ann option/jv diamond drill hole flp-92-20 claim l-599137

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: GAUTHIER REPORT NO: 52 WORK PERFORMED FOR: Panthco ...€¦ · assessment report on the diamond lake project panthco mary-ann option/jv diamond drill hole flp-92-20 claim l-599137

INAI- in iiiiiiinii52 GAUTHIER 010

GAUTHIER REPORT NO: 52

WORK PERFORMED FOR: Panthco Resources

RECORDED HOLDER: SAME AS ABOVE Ht

t OTHER l J

CLAIM NO. HOtg NO. fOOTAGE PATE ^4OTE

L599137 FLP 92-20 151.2 m June 92 ' (1)

NOTES; (i) Report of Work # 9330 00028

Page 2: GAUTHIER REPORT NO: 52 WORK PERFORMED FOR: Panthco ...€¦ · assessment report on the diamond lake project panthco mary-ann option/jv diamond drill hole flp-92-20 claim l-599137

l i l l l l l

l

l

l

l

l

l

l

l

l

ASSESSMENT REPORT

ON

THE DIAMOND LAKE PROJECT

PANTHCO MARY-ANN OPTION/JV

DIAMOND DRILL HOLE FLP-92-20

CLAIM L-599137

GAUTHIER TOWNSHIP

******************************************

PREPARED FOR

SUDBURY CONTACT MINES LTD.

BY

W.A. HUBACHECK CONSULTANTS LTD.

JANUARY 27, 1993

SUBMITTED BY

DAVID W. CHRISTIE, B. Se,

c:\AGE\SC\193\4-4JAN93

Page 3: GAUTHIER REPORT NO: 52 WORK PERFORMED FOR: Panthco ...€¦ · assessment report on the diamond lake project panthco mary-ann option/jv diamond drill hole flp-92-20 claim l-599137

lll l

l l ll l l l l l l l

3aD*tNW!M06 52 GAUTHIER

W. A. HUBACHECK CONSULTANTS LTD.

TABLE OF CONTENTS

SUMMARY . . . . . . . . . . . . . . . . . . . . . . . . . . . l

Introduction . . . . . . . . . . . . . . . . . . . . . . . . l

Figure l - Kirkland Lake Area Geology . . . . . . . . . . . . 3

l Project Staff . . . . . . . . . . . . . . . . . . . . . . . 4

Figure 2 - Claim Map Showing Project Location and Access . . . 5

IB Panthco Mary-Ann Option . . . . . . . . . . . . . . . . . . 6

j Location . . . . . . . . . . . . . . . . . . . . . . . . . . 6

Diamond Drilling . . . . . . . , . . . . . . . . . . . . . . 6

l DRILL HOLE SUMMARIES . . . . . . . . . . . . . . . . . . . . 6

DISCUSSION OF 1991-1992 PROGRAM RESULTS . . . . . . . . . . . 7

RECOMMENDATIONS . . . . . . . . . . . . . . . . . . . . . . . 7

CERTIFICATE . . . . . . . . . . . . . . . . . . . . . . . . . 8

BIBLIOGRAPHY . . . . . . . . . . . . . . . . . . . . . . . . 9

APPENDIX "A" - DIAMOND DRILL HOLE LOGS

APPENDIX "B" - DIAMOND DRILL SECTION

APPENDIX "C" - DRILL HOLE LOCATION MAP

APPENDIX "D" - PETROGRAPHIC REPORT

APPENDIX "E" - ASSAYS

APPENDIX "F" - PROJECT EXPENDITURE STATEMENT

Page 4: GAUTHIER REPORT NO: 52 WORK PERFORMED FOR: Panthco ...€¦ · assessment report on the diamond lake project panthco mary-ann option/jv diamond drill hole flp-92-20 claim l-599137

l l l l l lIl l lll l l l l l l l

SUMMARY

Sudbury Contact Mines Ltd. Diamond Lake Project consists of 235 claims totalling 9,400 acres in Mcvittie, Hearst, Gauthier, and McElroy Townships, of which the Panthco Mary-Ann Property is an integral part. The exploration effort on the Diamond Lake Project is directed towards the discovery of an economic diamondiferous kimberlite deposit.

An agreement was signed between Panthco Resources and Sudbury Contact Mines Ltd. on June 6, 1991, structured on an option to joint venture basis.

Work commenced during the summer of 1991 with a field crew compiling data, mapping the Diamond Lake Project Properties, and field checking airborne geophysical features from a previously flown survey. This work fundamentally outlined many targets to follow up, and is presented under separate cover(Hughes, T; 1992).

As noted in the recommendations from the " Geological and Geophysical Compilation Report", the grids already existing on other properties within the Diamond Lake Project were extended onto the Panthco Mary-Ann Property in two phases. The first phase took place in November 1991, and the second phase was in March and April 1992, completing a total of 41.75 kilometres of linecutting. The grid was surveyed with blanket coverage of magnetics, VLF-EM and isolated gravity test lines (Vickers, A.; JVX; 1992). This geophysical program outlined many potential kimberlite targets which were proposed for drilling.

The diamond drilling program, like the geophysics, was divided into two stages; first in November-December 1991 and then in June- July 1992. An interesting sulphidized rhyolitic tuff with crackle brecciation infilled with 2-1095 pyrite, was intersected in FLP-92- 20. Three gold assays from this hole are considered to be slightly above background levels.

To follow up the interesting mineralization intersected in hole FLP-92-20, a phase IP program is proposed to test the Gauthier/Temiskaming Contact for disseminated sulphide mi neralizat ion.

IntroductionThis report summarizes Diamond Drill Hole FLP-92-20 completed

by Sudbury Contact Mines Ltd. on the Panthco Mary-Ann Option/JV in June 1992.

The Panthco property is part of the larger Sudbury Contact Diamond Lake Project, which has an ongoing exploration focus on kimberlites. This property acquisition followed the successful discovery of diamonds in kimberlite on the Diamond Lake Option (Optionor: Skead Holdings).

W. A. HUBACHECK CONSULTANTS LTD.

Page 5: GAUTHIER REPORT NO: 52 WORK PERFORMED FOR: Panthco ...€¦ · assessment report on the diamond lake project panthco mary-ann option/jv diamond drill hole flp-92-20 claim l-599137

l l l l ll l l l ll l l l l l l l l

The neighbouring properties were acquired after an airborne magnetic survey was flown over a larger area, outlining a number of potential targets.

One agreement with Panthco Resources Inc. includes 51 claims and three licenses of occupation totalling 2,040 acres in both Mcvittie and Gauthier Townships.

The coordination and implementation of the various technical tasks was conducted by W.A. Hubacheck Consultants Ltd. under the supervision of D. W. Christie.

W. A. HUBACHECK CONSULTANTS LTD,

Page 6: GAUTHIER REPORT NO: 52 WORK PERFORMED FOR: Panthco ...€¦ · assessment report on the diamond lake project panthco mary-ann option/jv diamond drill hole flp-92-20 claim l-599137

MNXXC

Jtfot *K*Mntary Bod. i

W. Mille IMc*.* Fkx*i

7 OuMw Vote**;i

6 MX*** aoup

S Lwdci UM

f. Stratigraphy ol the Kkkland i akt aicn (P'p/t-r l f

IMtHMfc Md IWk Vgkw*c Hook*

Mwk lo *4x**lr MrMfc. Hot*.

Kt*H*k hkuttr* ftOCti

frtowd U*i* BMHMW

Sb

4 SkMdOraup

3

-f-

— J~

Mtfctatfty

- - InJI

-' ni*(ui l** lonm

- 'Ir rawti Md H/iwayn

M nhM

9 town.

SUDBURY CONTACT MINKS LTD.

KIRKLAND LAKE AREA OROLOGY

FROM: L.S. JENSKN, J 985.

DATK: Fcb/92 F1GURK NO.l

Page 7: GAUTHIER REPORT NO: 52 WORK PERFORMED FOR: Panthco ...€¦ · assessment report on the diamond lake project panthco mary-ann option/jv diamond drill hole flp-92-20 claim l-599137

l ll~ Project Staff (W.A.Hubacheck Consultants Ltd.)

• Senior Geologist: Peter C. Hubacheck, B.Eng.Geol., P. Geol 2401 Pyramid Cres.

l

l

l

l

l

l

l

l

l

l

l

l

l

Mississauga, Ontario L5K 1E1

Project Geologist: David W. Christie, B.Se.1412 - 88 Redpath Ave.

l Toronto, OntarioM48 2J8

W. A. HUBACHECK CONSULTANTS LTD.

Page 8: GAUTHIER REPORT NO: 52 WORK PERFORMED FOR: Panthco ...€¦ · assessment report on the diamond lake project panthco mary-ann option/jv diamond drill hole flp-92-20 claim l-599137

OA

DT

HIZ

R

TO

WN

SHIP

MC

VIT

EC

E

TO

WN

SHIP

Page 9: GAUTHIER REPORT NO: 52 WORK PERFORMED FOR: Panthco ...€¦ · assessment report on the diamond lake project panthco mary-ann option/jv diamond drill hole flp-92-20 claim l-599137

l l l l l l l l l l l l l l l l l l l

Panthco Mary-Ann OptionThe property consists of 51 claims (patented and unpatented)

with three licenses of occupation totalling 2040 acres straddling the boundary between Gauthier and Mcvittie Townships, Larder Lake Mining Di vi s ion.

Unpatented Claims; 599135, 599137, 599000-599003, 859153-859156, 859612-859615, 884525-884528, 884026-884028, 982246-982249

Patented Claims; JS-134, 7732, 7914, 8793-8796, 9430, 9611, 9698, 11787, 11788, 87, 19690, 34740, 22931, 12881-12883, 13142, 13497, 22930, 22932, 31366.

Licenses of Occupation; 10933 (re. claim 34740)10934 (re. claim 33696)10937 (re. claim 34739)

Locat ionThe property is situated in the east-central part of Gauthier

Township, and the west-central part of adjoining Mcvittie Township about 4 km west of Larder Lake, Ontario. The gravel road to the Upper Beaver Mine provides convenient access to the western and northern portion of the property from Highway 66. The Fork Lake Road turn off from Highway 66 follows the east bank of the Misema River and provides access to the eastern portion of the property. The hydro electric transmission line through the southern part of the property serves as a walking trail westward to the Little Larder Lake access road coming from Dobie.

Diamond Drilling

Diamond Drill Hole FLP-92-20 was drilled in June 1992 as part of a larger drilling program, in six holes. All Drill holes are referenced to the new East West JVX grid.

Currently, all of the core is stored at the Sudbury Contact Mines Core Storage Facilities in Cobalt, Ontario.

Diamond Drill Hole sections, logs, location map, assays and petrography reports are provided in the appendixes of this report.

DRILL HOLE SUMMARIES DDH FLP-92-20

LOCATION: CLAIM: L 599137 L33+13N 2+08W AZIMUTH! 2700 DIP: -700 LENGTH: 151.2 METRES

TARGET: Mag high linear, gravity low, and the Misema River Fault.

W. A. HUBACHECK CONSULTANTS LTD.

Page 10: GAUTHIER REPORT NO: 52 WORK PERFORMED FOR: Panthco ...€¦ · assessment report on the diamond lake project panthco mary-ann option/jv diamond drill hole flp-92-20 claim l-599137

l l l l l l

SUMMARY: A total of 2.1 metres of overburden was intersected followed by a rhyolitic crystal tuff breccia with quartz eyes and 2-1095 pyrite(fine to course) in crackle brecciation fractures to 61.96 metres, a silicified lapilli tuff with quartz eyes and strong alteration was intersected to 80.71 met res(epidote, silicification, and carbonatization) giving the rock a very mottled appearance as well l-5ifc pyrite was present, a fine grained ash tuff with bleaching and very blocky nature was intersected to 81.42 metres, an altered lapilli tuff was intersected to 82.75 metres with 1-29; pyrite, a fine grained ash tuff bleached with 295 tetrahedrite and 195 pyrite was intersected to 84.02 metres, this in turn was followed by a mafic intrusion (diabasic) with gradual chill margins

I to 136.28 metres(magnetic susceptibility = 25 x 10 ) with a fault zone at 132.28-133.95 metres, the hole ended in rhyolitic chlorite- hornblende lapilli tuff at 151.2 metres, with a contact aureole

^ from 136.28-136.58 metres with the overlying diabase. l All assays received so far have been negative.

DISCUSSION OF 1991-1992 PROGRAM RESULTS

Extensive till materials of the Misema Esker Complex, overlie a major portion of the project area, hence geological mapping was greatly restricted. Generally, the massive pyroclastic flow sequences of the Temiskaming Group outcrop as topographic highs with recessive weathering, chloritic tuffs and wackes occupying topographic lows. The majority of the Panthco Property has been previously mapped at a good level.

In FLP-92-20 a diabasic dyke trend explained the magnetic high targets and bounding faults explained the VLF-EM anomalies.

Drill hole FLP-92-20 intersected extremely interesting rhyolites. A sulphidized rhyolitic crystal quartz eyed tuff with crackle brecciation and 2-1095 pyrite of two generations was intersected however all assays were generally negative with only three assays above 50 ppb Au ranging up to 84 ppb, and all other gold and base metal assays running below background. This area is proximal to the "Gauthier/Temiskaming Contact" which trends southeasterly towards previous Mary-Ann drill holes, and a five channel airborne input anomaly. In addition numerous cross cutting structures in confluence with the contact deserve more attention from a gold point of view.

RECOMMENDATIONS

A phase IP survey (frequency domain) is recommended to test the Gauthier /Temiskaming contact on the Panthco grid bracketing DDH FLP-92-20 and the five channel AEM anomaly from Line O to Line 9 E, north of the hydro line(OGS P.2266)

l l l l l l l l l l l

W. A. HUBACHECK CONSULTANTS LTD.

Page 11: GAUTHIER REPORT NO: 52 WORK PERFORMED FOR: Panthco ...€¦ · assessment report on the diamond lake project panthco mary-ann option/jv diamond drill hole flp-92-20 claim l-599137

l l l l l l l l l l l l l l l l l l l

CERTIFICATE

I, David W. Christie, of the City of Toronto, in the Province of Ontario, Canada, do hereby certify that:

(1) I am an Exploration Geologist, residing at88 Redpath Ave., Apt. 1412, Toronto, Ontario, employed by W.A. Hubacheck Consultants Ltd., 141 Adelaide St. West, Suite 603, Toronto, Ont.

(2) I ara a graduate of McMaster University and received my Bachelor of Science degree in Geology in 1986, and have been practising my profession as an Exploration Geologist continuously since graduation.

(3) I am a Member of the Canadian Institute of Mining andMetallurgy - National, Kirkland Lake and Toronto Branch, the Prospectors and Developers Association of Canada, and the Association of Quebec Prospectors. I am also an examinee candidate to become a P.Geol with APEGGA and NAPEGG.

(4) This report is based on personal examination of theproperties since 1991 and supervision and implementation of work carried out on the properties during the period June l, 1992 - July 30, 1992 on behalf of Sudbury Contact Mines Ltd..

(5) I have no personal interest, either directly or indirectly in the properties or securities of Sudbury Contact Mines Ltd.

Signed at Toronto, Ontario,This 27th Day of Jan. 1993. 'DA^D W.! jfeHRISTIE, B.Se.

W. A. HUBACHECK CONSULTANTS LTD.

Page 12: GAUTHIER REPORT NO: 52 WORK PERFORMED FOR: Panthco ...€¦ · assessment report on the diamond lake project panthco mary-ann option/jv diamond drill hole flp-92-20 claim l-599137

l l l l l l l l l l l l l l l l l l l

Bar r i e, 1987:

C.Q.

BIBLIOGRAPHY

Report on an Airborne Magnetic and VLF-EM Survey in the Larder Lake Area: Hearst, McElroy, Gauthier and Mcvittie Townships; Terraquest Ltd.

Barrie, C.Q.; 1991 :

Easton, 1986:

Report on a High Sensitivity Magnetic and VLF-EM Airborne Survey; Larder Lake North, Gauthier, Mcvittie, McElroy and Hearst Townships. Larder Lake Mining Division, Ontario, for Sudbury Contact Mines Ltd., by Terraquest Ltd., Toronto, Ontario, 1991.

R.M.,Johns, G.W.;Volcanology and Mineral Exploration: The Application of Physical Volcanology and Facies Studies, Part One of Volcanology and Mineral Deposits, OGS MP 129, pp 4-40.

Hughes, 1992

T.N.J

Jackson, 1990:

Jackson, 1988:

S.L.

S.L

Jensen, 1985:

L.S.

Geological Mapping Compilation and Airborne Geophysical Assessment Report on the Diamond Lake Project Area, prepared for Sudbury Contact Mines Ltd. by W.A. Hubacheck Consultants Ltd. Nov. 1991.

Kimmerly, C.T., Wilkinson, L.P., Xiangdong, J.; Project Unit 88-33. Southern Abitibi Greenstone Belt: Structural And Stratigraphic Studies in the Larder Lake Area, Summary of Field Work and other Activities, 1990, OGS MP 151.

Project Number 88-33. The Abitibi Greenstone Belt Near Larder Lake: Structural and Stratigraphic Studies, OGS M.P. 141, Summary of Field Work and Other Activities,1988, pp 206-211.

Synoptic Mapping of the Kirkland Lake - Larder Lake Areas, District of Timiskaming; OGS MP 126.

Jensen and Langford;1985: Geology and Petrogenesis of the Archean Abitibi

in the Kirkland Lake Area; OGS MP 123.Belt

W. A. HUBACHECK CONSULTANTS LTD.

Page 13: GAUTHIER REPORT NO: 52 WORK PERFORMED FOR: Panthco ...€¦ · assessment report on the diamond lake project panthco mary-ann option/jv diamond drill hole flp-92-20 claim l-599137

l l l l l l l l l l l l l l l l l l l

10Mitchell, R.H,;1991: Kimberlites and Lamproites: Primary Sources of

Diamond, Geoscience Canada, Volume 18, Number l,March 1991.

Mi tchell, Roger H.;1986: Kimberlites: mineralogy, geochemistry, and

petrology, Plenum Press, New York, NY, April 1986.

Vickers, A.;1992: Report on Sudbury Contact Mines Ltd. Magnetic-VLF

and Gravity Survey on the Fork Lake Property by JVXLtd., December 1991.

Webster, B. ;1991: Report on Sudbury Contact Mines Ltd. Magnetic-VLF

Survey in the Larder Lake Area, by JVX Ltd.

W. A. HUBACHECK CONSULTANTS LTD.

Page 14: GAUTHIER REPORT NO: 52 WORK PERFORMED FOR: Panthco ...€¦ · assessment report on the diamond lake project panthco mary-ann option/jv diamond drill hole flp-92-20 claim l-599137

l l

APPENDIX "A""

l DIAMOND DRILL HOLE LOGS

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

W. A. HUBACHECK CONSULTANTS LTD.

Page 15: GAUTHIER REPORT NO: 52 WORK PERFORMED FOR: Panthco ...€¦ · assessment report on the diamond lake project panthco mary-ann option/jv diamond drill hole flp-92-20 claim l-599137

SCALE

GRAPHICLOG DIAMOND DRILL LOG

PROPERTY DISTRICT

COMMENCED

COMPLETED

Sudbury Contact Mines NTS 31 M/13

Panthco (193)

June 17, 1992

June 19, 1992

Mag high linear

Larder Lake

OBJECTIVE ""e "*e" ""—— CO-ORDINATES

gravity low, VLF-Edy

TWP/LAT LONG Gauthier Twp.

CLAIM L599137"3+13S 2+08W

CORE SIZE NQ

CONTRACTOR Heath S Sherwood

DATE LOGGED June 24, 1992

LOGGEDBY D.W. Christie

DDH COMMENTS

.HUBACHECK CONSULTANTS LTD.TORONTO. ONTARIO. CANADA

DEPTH* OIP AZ' M UTH Hole NO. FLP 92-20 PAGE l 7

INTERVAL i y

M Q Ft D i S

FROM TO f j if

O 2.1 j2.1 61.96!

i Overburden 99:90 Rhyolitic

i Tuff ; Breccia

DESCRIPTION

GEOLOGY:(colour,gra e.minerals,alteration etc )

201

end

Casing left in - possible downhole geophysicsYellow white greyFine grained with lapilli sized feldspar (I4mm) up to(usually 103)Qtz eyes (grey)increasing down unit from 1-21 to 101? atof unitGradual lower contactHighly silicifiedMany fractures with pyrite black,chlorite and possibly somesphalerit infilling brecciatatlon 5-10* v. fine pyriteusually associated with fractures and brecciation, withtwo generations of pyrite,, one very fine grained pyritewhich is browner coloured and are more bronzed (gold) coarserpyrite (C 2mm)Mineralization is most intense from 14.14-26.62 where thereis 10* pyrite throughout (v.fine pyrite is almost black),this area is also the most brecciated, with the intersectionat which is severely brecciated and is matrix supported

with 20Z pyrite with black chl, and sphr^av|fya| The entire unit however is brecciated with clast support for the most part with clasts angular for most part CaC03 vein and qtz. veins local butcminor up to 10cm pink-white 7470 Magnetic susceptibility^ 1x10 3 SI units Chlorite slips and striationson some fracture surfaces Consistent fracture (py filled) at 45" to CA at 4.9m,. 15" at 7.9m, 30" to CA at 14.14m 25" to CA at 21.1m, 300 to

CA at 26.0m and 30" to CA at 44.5m 20"

CA at 23.2m at 30" to40" to CA at 38m, 30" to CA at 44.5m 20" to CA at 80.6m,20" to CA at 56.7Foliation becomes developed starting at 50.6m and lessfractures also qtz. eyes Cc3mm, ave. 1mm) start at 50.6up to 152 by 61.96

30.5 73 COLLAR AZIMUTH 270

68.9 67" 288" COLLARDIP -70"

91.46 65"15' ELEVATION 3^5.

151.2 65" 291.5" LENGTH 151.2

SAMPLE ASSAYS

SA NoPLE FROM TO LENG D'" SUL AU Ag , C" ^ , Zn ^ , Pb AN0 (ppb) (ppm) (ppm) (ppm) (ppm)

7451

74527453

i 7454li 7455|! 7456[t 7457i, 7458'l 7459

7460174617462746374647465

i 7466T74677468

'7469tie 7470

7471747274737474

on, 747574767477747874797480

4.9

6.407.99.411.9012.4013.9015. 40;16.918.4020.221.7023.2024,7026.2027.729.230.7032.2033.7035.236.738.239.741.20

42.7044.2045.7047.2048.70

6.4

7.99.411.12.13.15.16.18.20.21.23.24.26.27.29.30.32.33.35.36.38.39.41.

4244.45.47.48.50.

904090409040270207020727020702072720.702070207020

11111111111111111111111

11111

.5

.5

.5

.5

.5

.5

.5

.5

.8

.5

.5

.5

.5

.5

.5

.5

.5

.5

.5

.5

.5

.5

.51.5.5.5.5.5.5

3S Py -

3Zpy2%-py2%py .22py22py '6%pyBZpy8% Py .15Zpy ,lOZpy7!?py6!SpylOJSpy5-^pyl-2ZpyHpy2-3%py

tr-lXpyI2pyi*pyl-2Zpyl^py4Zpy3UpyIZpy3Zpytr-IZpyIX py

15

81i5*5'568C5i.5955557655

55558426

1010

5238

0.5

0.50.40.30.20.20.50.30.30.60.50.30.20.20.20.20.20.50.20.3020.50.40.1NDNDND0.10.1NT)

14

22976611991212813B832613310371498474139

220

2823068679453527369935441015140244232443138362534354133303132

4

9862499111610133222

2424444

O24^

2^- 2•^ 2

Page 16: GAUTHIER REPORT NO: 52 WORK PERFORMED FOR: Panthco ...€¦ · assessment report on the diamond lake project panthco mary-ann option/jv diamond drill hole flp-92-20 claim l-599137

SCALE

GRAPHIC LOG

Qm i(2S, [NOl liMS.w 3^

DIAMOND DRILL LOG W.A.HUBACHECK CONSULTANTS LTD.

COMMENCED

COMPLETED

OBJECTIVE

NTS

DISTRICT

TWP /LAT LONG

CLAIM

CO-ORDINATES

CORE SIZE

CONTRACTOR

DATE LOGGED

LOGGED BY

DDH COMMENTS

DUEPTHY D1P AZIMUTH

TORONTO. ONTARIO. CANADA

Hole NO. F

COLLAR AZIMUTH

COLLAR DIP

ELEVATION

LENGTH

92-20 PAGE 2 7

INTERVAL '

MQ Ft D !

FROM TO ;

61.96 80.71

O j D

S i i

98 90 Strongly ' altered

80.71 81.42 60 ! 50

DESCRIPTION

GEOLOGY:(colour,grain aize.texture.minerals.alteration etc.)l

'Foliation at 40" to CA. at 50.6m , 50 " to CA at 53.7m cross- putting fracture system at 90" to each other. ;400 to CA at 56.7m, 40" to CA at 59.4m, 400 to CA at 61.7m, all are marked by thin chl. smears (green)

' Fine grained, strongly silicified, has a glassy appearances i Mottled appearance

lapilli Tuft Med green grey (blueish).Silicification is most intense in blue, coloured areas.

h Qtz eyes are present in beginning up to 10Z but disappearquickly as silicification intensifies.

!. Chl-Amph lapillis up to 3mm angular to rounded 10-20Z 1 throughout although sometimes obscured due to prevasive ;, silicificationji Also epidotization locally on fracture surface ; Local bleached zones associated with qtz-CaC03 veins, le

69.86-70.75, 72.14-72.48m (ave. 2Z)1-5Z fine pyrite finely dissemated and on fractures planes Non magneticFractures marked by CaC03 veinlets and black chlorite are found at 40" to CA at 62.8m, 50" to CA at 69m, 20" to CA

i at 75m, chloritic veinlets are convoluted and usually present with most mineralization. Grey brown V. fn. grained to fn. grained2-3Z pyrite disseminatedand on fracture surfacesCalcite filled vugs and fracture with crystal up to 3mm

Bleached due Very crumbly, fragments<5mm plentifulto under- HardlyingIntrusive

Fine grained Cherty Ash

Tuff

SAMPLE

SAMPLE No

74817482748374847485748674877488

H 7489749074917492749374947495749674977498749975007501

FROM

50.51.53.54.56.57.59.60.61.63.6566.6869.71.72.7475.7778.80.

2070207207020709650

5

505

5

571

TO

51.53.54.

LENGTH

70

20

7St*57.59.60.61.63.65.66.6869.71.72.7475.7778.80.82.

702070965005

505

5

57109

1.51.51.5l. S1.51.51.51.261.541.51.51.51.51.51.51.5L. Z1.51.52.211.38

"'o SUL

2lvylZ?yl-2Zpy

llpyIZpyiz?yI/Spy ^tr-Upytr-IZpytr-Upyl-2ZPy2Z?y2Zpy2Zpy2%py ^@Zpy *2SJpy tl-25Spy'2Zpy '2%py '

Au

96103217583', 5

231816

3061935

: 5:5;515i5-5

Ag

ND0.20.1NDND4NDNDNDNDNDNDNDND0.10.10.10.1NDND0.1

ASSAYS

Cu

2056827377175972686782218861.2

Zn

3230333842

2413732303130312534333637293164

Pb

^~ 24. 2* 2*- 2 ^ 2

c. 2< 2^ 2-t- 2*~ 2

2< 2^ 2 i 24 2

•^ 22

^ 2^ 2^2

Page 17: GAUTHIER REPORT NO: 52 WORK PERFORMED FOR: Panthco ...€¦ · assessment report on the diamond lake project panthco mary-ann option/jv diamond drill hole flp-92-20 claim l-599137

SCALE GRAPHIC

LOG

0 '> 1 g ! jjJ2 5 -

? ' l !|^j io i^

DIAMOND

COMPANY

PROPERTY

COMMENCED

COMPLETED

OBJECTIVE

INTERVAL o

M D F" D S.

FROM i TO ''f

D

DRILL LOG

NTS

DISTRICT

TWP /LAT LONG

CLAIM

CO-ORDINATES

2 , LITHOTYPEtt RFDI no',

W.A.HUBACHECK CONSULTANTS LTD.

81.42 82.75 70

CORE SIZE

CONTRACTOR

DATE LOGGED

LOGGED BY

DDH COMMENTS

DESCRIPTION

GEOLOGY:(colour,grain size.texture.minerals.alteration etc )

DIP AZIMUTH

TORONTO. ONTARIO. CANADA

Hole No. FLP 92- 20 PAGE 3 7

COLLAR AZIMUTH

COLLAR DIP

ELEVATION

LENGTH

SAMPLE

SAMPLE FROM TO LENGTH "A. SUL Au

60: AlteredLapilli ! ,Tuff j

:82.75 ! 84.02 60 50iFine! Grained Ash'Tuff i

l Bleached ; t due to Underlying ,

j Intrusive

, 84.02 136.218 90 75 Gabbroic ;

j ' l ! fn.-med. i : l ' grained '

intrusiveil| with wide i t j ' gradual and

l i chl11 i l margins

90 70

As in 61.96-80.71 1-22 py f. diss. 82.09-82.40 is very broken up. Grey brown, fine grained, sandy feelVery blocky for entire unit [j 22 silver soft blady crystals up to 5mm long, very soft Euhedral crystals are probably tedrahedrife which is ! Brittle and soft, dk. grey streak i Hard rockCaCOj as calcite vugs, veins and or fractures ' Sharp lower contact Also 12 pyrite present84.02-102.85 gradual chilled margin of mafic intrusive Dk. grey green, fn-med. grained (12mm) usually (*Jmm) Strongly magnetic with wispy magnetite veinlets visible locally (dk. steel grey) Intergranular equigranular texture K-spar and plag. fills intersticesHornblende makes up most mafics with minor chlorite alteration can scratch with knife Blocky area 84.02-84.44 fragments 43cmEpidote CaC03 veinlets at 60" to CA and 30" to CA (opposite direction at 84.47m 55" to CA and 30e to CA (opp) at 90.2m 70" to CA at 102.4m - 1-22 epidote CaC03 veinlets 12 py diss. throughout.Softer than steel due to mafic alteration. No volcanic texture 102.85-103.97

Med. coarse gabbroic Intrusive with biotite chlorite

shears.102.85-103.13m's a carbonated (CaCO,) , . . . .,,a biotite chill

7502 82.09 84.02 1.93 12py

Ag

ND

ASSAYS

Cu Zn Pb

149 34 -C 2

7503 108.5 110 1.5 tr py ND 171 80

Page 18: GAUTHIER REPORT NO: 52 WORK PERFORMED FOR: Panthco ...€¦ · assessment report on the diamond lake project panthco mary-ann option/jv diamond drill hole flp-92-20 claim l-599137

GRAPHIC DIAMOND DRILL LOG

8 jjj

l l

Q

3 Q COMPANY

25 PROPERTY

2* COMMENCED

: COMPLETED

1 OBJECTIVE

: 'j INTERVAL Q

i 1 JMQ R D s. 1 ;i FROM i TO f

- || 11

, 1

NTS

DISTRICT

TWR /LAT LONG

CLAIM

CO-ORDINATES

CORE SIZE

CONTRACTOR

DATE LOGGED

LOGGED BY

DDH COMMENTS

DESCRIPTION

GEOLOGY;(colour,grain Bize.texture.minerals,alteration etc.) S

101 biotite flake's k3mm) with no orientation, CaCO,fracture fills at 40" to CA.

iSub Sub Unitfp 103.13-103.48, 103.63-103.82 iMed coarse gabbroic intrusive CI-50 'Non carbonated fairly leucocratic1111 with plagioclase

j Minor CaC03 pods and veinlets at 50* to CA. j j 103.48-103.63Med Coarse Gabbroic Intrusive with a majority of chloritic ;biotite shears up to 2cm wide (always lcm) with coarse 'biotite (C5mm) in a chloritic matrix at 40" to CA. always

95 85 i j 103.97-115.33 [ i Gabbroic Intrusive - med coarse ; !CI-50-60 intergranular, green S whitel* PX interstitial ''.Amphibole {hb) 50Z-40Z -feldspar (plag) brown-greenrock, hematite stains locallyMS-20-30xlO"3 SI units \.Thin section takenQtz CaC03 veinlets at consistent angles and convolutedfilling fractures with hematite sometimes and epidote

j : |j oftenl Veinlets at 70" to CA at 107.50 70" to CA at 110m 70" to

i l H CA and 115m i Finer hematized epidotized sub unit at 107.13-107.69 metres.

32! frequency of epidote/CaCOg/Qtz veinlets 95 ^75 115.33-122.22 metres i Fn-med. grained gabbroic intrusive

V. similar to 84.02-102.85Much more epidote in veinlets and right near end of sub-unitbrecciaVeinlets at 30 and 70" to CA.Many more fractures.

W.A.HUBACHECK CONSULTANTS LTD.TORONTO, ONTARIO, CANADA

DUERPTHY DIP AZIMUTH HOlO NO. FLP 92~ 20 PAGE A 1

COLLAR AZIMUTH

COLLAR DIP

ELEVATION

LENGTH

SAMPLE ASSAYS

SAMPLE FROM TO LENGTH la SUL

Page 19: GAUTHIER REPORT NO: 52 WORK PERFORMED FOR: Panthco ...€¦ · assessment report on the diamond lake project panthco mary-ann option/jv diamond drill hole flp-92-20 claim l-599137

SCALE

GRAPHICLOG

^ i — "-*,l lilDIAMOND DRILL LOG W.A.HUBACHECK CONSULTANTS LTD.

COMPANY

PROPERTY

COMMENCED

COMPLETED

OBJECTIVE

NTS

DISTRICT

TWP /LAT LONG

CLAIM

CO-ORDINATES

CORE SIZE

CONTRACTOR

DATE LOGGED

LOGGED BY

DDH COMMENTS

SURVEY DEPTH DIP AZIMUTH

TORONTO. ONTARIO CANADA

72-2() pAQE 5

COLLAR AZIMUTH

COLLAR DIP

ELEVATION

LENGTH

INTERVAL l Q

l M Q Ft Q j g

i FROM ! TO j f

\ l Iso 20 j

50 20l

80

80

90

15

90 Fault

DESCRIPTION

GEOLOGY:(colour.gram size.texture. minerals. alteration etc ) S

122.22-128.44V ery blocky fn.med grained mafic intrusive fining fromabove to fn. grained (*Jmm)Dk. green to black green colourCaCOj on fractures and in small veinletsBad seam hit at 123.6, probably ground j foot of core(15cm)tr-1% pyriteRock is easily crumbled i;128.44-129.40 j;Altered mafic intrusive .Black chloritized rock with CaC03 veinlets (white) and :fractures.Very crumbly blocky with fragments from lcm-5cm i;Sharp lower contact and upper contact.Trace py _Very magnetic MS"21x 10~3 SI units129.40-129.97 metres i!Contact metamorphic aureole in rhyolitic rock, contact j;is undulated, drill hole intersected a short undulation iin contact. |Contact can be seen nearly parallel to core and rock is :silicic, hematized (red grey colour) with sections of mafic(altered) intrusive very fn. grained.CaC0 3 veins and fractures are numerousLower contact at 40" to CA,129.97-136.28Progressive chilled zone, with progressively more biotiteup to 20Z in last 2m, and chlorite alteration.Fault gouge zone from 132. 28-133. 95m very crumbly, chloriterich rock very breccia-like with soft chlorite gouge fillingbetween harder fragments.

SAMPLE

FROM TO LENGTH "/oSUL

Page 20: GAUTHIER REPORT NO: 52 WORK PERFORMED FOR: Panthco ...€¦ · assessment report on the diamond lake project panthco mary-ann option/jv diamond drill hole flp-92-20 claim l-599137

SCALE

GRAPHICLOG

Q

DIAMOND DRILL LOG W.A. HUBACHECK CONSULTANTS LTD.

j g COMPANY(5u5 PROPERTY

Z< COMMENCED

COMPLETED

OBJECTIVE

NTS

DISTRICT

TWP /LAT LONG

CLAIM

CO-ORDINATES

CORE SIZE

CONTRACTOR

DATE LOGGED

LOGGED BY

DDH COMMENTS

SURVEY DEPTH

TORONTO. ONTARIO. CANADA

DIP AZIMUTH Ho|e No FLp 92-20 pAQE6 7

COLLAR AZIMUTH

COLLAR DIP

ELEVATION

LENGTH

INTERVAL

M D * D

li 136.38136.ii : 90

Qg l LITHOTYPE

t

Contact 10 Metamorphic

Aureole in iRhyolitic

DESCRIPTION

GEOLOGY:(colour,grain size.lexture,minerals,alteration etc l SAMPLENo

Becomes smoother and finer grained chilled zone with biotite in last 2 metres towards 136.28 Tr-lZ pyrite finely disseminated.Beige to green beigeWeak hematizationLapilli 20TL Amph-Hb are present (43mm) : !V. S harp upper contact marked by pink CaC03 veinlsts

SAMPLE

TO LENGTH "/o SUL

ASSAYS

C^ So /*b

Volcaniclastic Fairly silicic

•136. 58151.2170 30'Rhyolitic li Chlorite-Hb 1

' lapilli Tuftf

90 85

Blocky with fractures at 60" to CA. and 20" to GA. inopposite directionsUpper contact at 60" to CACherty appearance.Chlorite sericite slip planes on fracturesurfacesTr. py. 136.58-146.00Strongly friable fragile (brittle) Rhyolitic chlorite Hb lapilli tuff probably due to abvove fault zone and weak sericite alteration fractures of which there are many. -251 Hb altered to chlorite lapilli evenly distributed up to 3mm (ave. 2mm) Also feldspathic lapilli up to 3mm Will break up in your hand.l-2% fn. diss. py and py in fracture with local hematite alteration associated with upper contact 146.00-151.2Sili cified lapilli rhyolitic chlorite-Hb Tuff Much more silicic and competent Glassy lookSimilar to rhyolite tuff intersected earlier in hole. Bleached due to silicification

2/S Pyrite infractures with very fine pyrite (dk. brown) and coarser pyrite (bronze) as before at various unconslstent angles.

75** O.I

Page 21: GAUTHIER REPORT NO: 52 WORK PERFORMED FOR: Panthco ...€¦ · assessment report on the diamond lake project panthco mary-ann option/jv diamond drill hole flp-92-20 claim l-599137

SCALE

GRAPHIC LOG

1 -

i : 1 JiJ15 KGC.

i w) 5^

; j

: t

| j

i

DIAI

COMPANY

PROPERTY

COMMENCEC

COMPLETED

OBJECTIVE

INTERVAL

M Q Ft D FROM TO

1

,151.2

i

Metres2.1-62.3762.37j-84.02

84.02i 85.5 87.088.5 [90 i91.5 i 93.094.5 i

i 97 98.599.4 i101 102103.4104.0

M

3

"*,REC

.

1

ONDDI

^ i LITHOTYPE

f

i E. O.K.

MSi 0.22-0.50

0

33.5 j 34.5 i

39.8 130.2

| 24.31 26.9

23.221.022.3

j 27.7i 20.0i 245.8 !

' ' 24.75.67

| 26

W.A.HUBACHECK CONSULTANTS LTD.

NTS

DISTRICT

TWP /LAT LONG

CLAIM

CO-ORDINATES

CORE SIZE

CONTRACTOR

DATE LOGGED

LOGGED BY

DDH COMMENTS

DESCRIPTION

GEOLOGY:(colour.grain size.texture.minerals,alteration etc )

SURVEY DEPTH DIP AZIMUTH Ho(e

COLLAR AZIMUTH

COLLAR DIP

ELEVATION

LENGTH

TORONTO. ONTARIO. CANADA

FLP 92.20 PAGE 7 7

SAMPLE

TO LENGTH "/o SUL

Foliation seen at 40" to CA at 148.5 metres Local Quartz - CaC03 veins

Magnetic Susceptibility(xlO-3 SI Units)

Meterage MS

104.8106107.8109110.5112113.5115116.5117.7119120.5122125128.3129.5130.5132133.5134.5136136.6137139140.5

19.27.20.31.28.13.826.224.317.927.424.28.19.26.22.82.021.418.117.824.022.4O0.78OO

Meterage142143.5145146.5148149151

MS !|O l OO !|O :iO iO l!O '

Page 22: GAUTHIER REPORT NO: 52 WORK PERFORMED FOR: Panthco ...€¦ · assessment report on the diamond lake project panthco mary-ann option/jv diamond drill hole flp-92-20 claim l-599137

l Il l I l I l l l l l ll l l l l l

APPENDIX "B"

DIAMOND DRILL, SECTION

W. A. HUBACHECK CONSULTANTS LTD.

Page 23: GAUTHIER REPORT NO: 52 WORK PERFORMED FOR: Panthco ...€¦ · assessment report on the diamond lake project panthco mary-ann option/jv diamond drill hole flp-92-20 claim l-599137

l l l l l i i i i i i i i i i i i i i

3+00 8+75 l

2+50 2+25 l l

2+OO t

1+75 l

. W-270"DDH FLP -92-2O

•70'

Strongly altered lapilli tuff (1-2* py)

Rhyolit* tuff breccia (2-1 O* py)

Fin* grained cherty ash tuft-bleached Altered laplllii tuff Fine grained ash tuff-bleached

Diabase

Fault gouge breccia Diabase

Contact metamorphic aureole In rhyolitic volcaniclastic

EOH 151 2m

Rhyolite tuft breccia (1-2* py) Rhyolitic chtortte-hornblendelapilli tuft

1+50 l

E-90*

— 25m

— 50m

— 75m

— 10Om

— 125m

— 15Om

SUDBURY CONTACT '

DIAMOND LAKE PROJECTDIAMOND DRILL SECTION LOOKING NORTH

DDH FLP —92-2O L33+13N - 2+O8W

PANTHCO MARY ANN J/V OPTIONGAUTHIER TOWNSHIP

SCALE 1 : 1000• 50

METRES

August 1982 Claim L-S9B137 W A.HUBACHECK CONSULTANTS LTD

Page 24: GAUTHIER REPORT NO: 52 WORK PERFORMED FOR: Panthco ...€¦ · assessment report on the diamond lake project panthco mary-ann option/jv diamond drill hole flp-92-20 claim l-599137

APPENDIX "C"

DRILL HOLE LOCATION MAP

l Il l l l l l ll l l l I l l i

W. A. HUBACHECK CONSULTANTS LTD.

l

Page 25: GAUTHIER REPORT NO: 52 WORK PERFORMED FOR: Panthco ...€¦ · assessment report on the diamond lake project panthco mary-ann option/jv diamond drill hole flp-92-20 claim l-599137
Page 26: GAUTHIER REPORT NO: 52 WORK PERFORMED FOR: Panthco ...€¦ · assessment report on the diamond lake project panthco mary-ann option/jv diamond drill hole flp-92-20 claim l-599137

l ll APPENDIX "D"

^ PETROGRAPHIC REPORT

l

l

l

l

l

l

l

l

l

l

l

l

l

l

lW. A. HUBACHECK CONSULTANTS LTD.

Page 27: GAUTHIER REPORT NO: 52 WORK PERFORMED FOR: Panthco ...€¦ · assessment report on the diamond lake project panthco mary-ann option/jv diamond drill hole flp-92-20 claim l-599137

1iiiiiiiiiiiiiiiiii

*SAMPLE NO. FL92-20-1 PTS NO. 1782

Minerals Est 1fo By Volume

Feldspar 30 - 35

Quartz 6-8

Clinopyroxene 15-20

Tremolite ~1

Carbonate *:1

Chlorite 10 - 12

Sericite 12 - 15

Epidote 2 - 3

Ilmenite y Leucoxene 8-10

Pyrite 1 Chalcopyrite Trace

DESCRIPTION:

Quite similar in appearance to 92-23-5, this rock is a much fresher example of diabase . Itconsists of plagioclase laths interspersed with elongate and blocky clinopyroxene. Partial alteration of the feldspar to sericite/saussurite and alteration of the pyroxene to tremolite andchlorite is present. Where quartz is present in interstitial areas it often forms granophyrictextures with the feldspar. Late veinlets consist of quartz, epidote, chlorite and carbonate.

The rock is classified as an altered diabase.

Page 28: GAUTHIER REPORT NO: 52 WORK PERFORMED FOR: Panthco ...€¦ · assessment report on the diamond lake project panthco mary-ann option/jv diamond drill hole flp-92-20 claim l-599137

ll l l l l l l l l l l l ll l l l l

SAMPLE NO. FL92-20-2 PTS NO, 1783

Minerals

Feldspar

Quartz

Amphibole

Chlorite

Epidote

Sericite

Carbonate

Ilmenite l Leucoxene

Pyrite l Chalcopyrite

Est K By Volume

40-45

4-6

12-15

8-10

5-6

6-8

1-2

8-10

-l

DESCRIPTION:

The texture of PTS 1783 is very similar to that of the previous sample except that all of theoriginalclinopyroxene has been altered to amphibole and chlorite. Quartz is less abundant and there isgreater alteration of ilmenite to leucoxene. A wide vein crosses the section and consists ofchlorite, epidote and carbonate.

The rock is classified as an altered diabase.

Page 29: GAUTHIER REPORT NO: 52 WORK PERFORMED FOR: Panthco ...€¦ · assessment report on the diamond lake project panthco mary-ann option/jv diamond drill hole flp-92-20 claim l-599137

l

l

l

l

l

ll

l

""APPENDIX "E

l ASSAYS l

l

l

l

l

W. A. HUBACHKIJK. CUH 5L1/1ANT5 L,TU.

Page 30: GAUTHIER REPORT NO: 52 WORK PERFORMED FOR: Panthco ...€¦ · assessment report on the diamond lake project panthco mary-ann option/jv diamond drill hole flp-92-20 claim l-599137

l l l l l l l l l l l l l l l l l l l

ASSAYERSLABORATOIRES/LABORATORIESDIVISION DE/OF ASSAYERS CORPORATION LTD.780, AV, DU CUIVRE, C.P. 665, ROUYN-NORANDA (QUEBEC) J9X 5C6 TEL.: (819) 797-4653 FAX: (819) 797-4501

Proj: Attn:

Certtfjcat/CertificateW.A. HUBACHECK CONSULTANT193DAVE CHRISTIE

2R-1119-RG1

Date: JUIL/JUL-14-92

Nombre D'Echantillons/No. of Samples: Soumis le/Submitted: JUIL/JUL-02-92

No. D'Echantillon Sample Number7451 7452 7453 7454 74557456 7457 7458 7459 74607461 7462 7463 7464 74657466 7467 7468 7469 74707471 7472 7473

ALI PPB^8 7 ^ ^^ 6 8 ^ ^9 5 5 5 57 6 5 5 55 5 5

A3 PIM0.5 0.5 0.4 0.3 0.20.2 0.5 0.3 0.3 0.60.5 0.3 0.2 0.2 0.20.2 0.2 0.5 0.2 0.30.2 0.5 0.4

di PIM14 22 9 7 66 11 9 9 1212 8

13 8 8

32 6 13 3 103 7

14

PB PIM

4 9 8 6 24 9 9

11 1610 13 32 22 ^4 2

t:l4 4 4

ZNPIM220 252 306 86 7945 35 27 36 9935 44 101 51 4024 42 32 44 3138 36 25

Certifie par/Certified by-

"AU SERVICE DE L'lNDUSTRIE DEPUIS PLUS DE 60 ANS" "SERVING INDUSTRY FOR OVER 60 YEARS"

CTA

Page 31: GAUTHIER REPORT NO: 52 WORK PERFORMED FOR: Panthco ...€¦ · assessment report on the diamond lake project panthco mary-ann option/jv diamond drill hole flp-92-20 claim l-599137

1111111111111111111

SENT BY: XEROX Telecopier 7017i 7-16-92 ; 4'.Q2PM ;

ASSAYERS LABORATOIRE8/LABORATORIE8DIVISION DE /OF AMAYCRt CORPORATION LTD.780. AV. DU CUIVRE. C-P. 666, ROUYN-NORANDA IQUtlEC) JflX 6C6

C ertificatl Certificatecomp: W.A.HUBACHECK CONSULTANTProj: #193 Copii/Copy i. Ana: DAVE CHRISTIE

Nombr* D'EehMtUioni/No. of Sample*: 22 SPLIT CORESoumulv/Submittod: JUIL/JUL- 14-92

No. D'Echantiilon AU All CH'KS AU CH'KSSaopU Nuober PPB PPB PPB7474 847475 267476 56 7477 10 10 97478 107479 52 7480 387481 97482 67483 107484 327485 17 12 227486 57487 837488 437489 237490 187491 167492 307493 67494 197495 35

Cenifte mr/Ctrtified bv

8197974501 4163645384 i* 2/ 2

TEL: (S19) 797-46B3 FAX: (819) 797-4901

2R-1196-RA1

ftrtc; JUIL/JUt-16-92D.CHJUSTTE PAX 4 16-364-3314

A3PIM0.1WW W

0.10.1 (CK)

0.20.1roM)

0.1N)roN)hDhOM)10hD

0.1

CXJ PBPIM PIM

9 428 24 42 7 K24 2

13 ^ 9 42

20 4256 42

8 422 427 424 427 421 42

7 425 429 427 22 426 428 K2

ZNPIM

343541 333031 32333033384237413732303130312534

"AU *f RVICC Off L'fNDt/STRie Of WJI* W.U* DB 10 AMI- er*

Page 32: GAUTHIER REPORT NO: 52 WORK PERFORMED FOR: Panthco ...€¦ · assessment report on the diamond lake project panthco mary-ann option/jv diamond drill hole flp-92-20 claim l-599137

1111111111111111111

-m y,. Acnwv .ciccgpisr /UT/, v-18-82 , 1 C M 5 AM I 8197974501* 4163545384!

ASSAYERS LABORATOIRES/IABORATORIESDIVISION DI/OF AStAYERS CORPORATION LTD.780, AV, DU CUIVRE, C.P 666, ROUYN-NORANDA (QUtBEC) J9X 6C8 T*L: (819) 787-4M3 PAX: (819) 797-4601

Certifical/Certiflcale ZR-1196-RA2

co^ W.A.HUBACHECK CONSULTANT DM JUIL/JUL-16-92ho}: 1193 Copie/Cbpy l, D.CHWST1B FAX 416-364-3314Ann: DAVE CHRISTIE

Nombrt D'EehuMilloiumo. of Suiplet: 9 SPLIT CORE Sountii IWSubialnwt: JUIL/JUL- 14-92

No. D'Echantillon AU AU CH'KS AU CH'KS A3 AS OJ PBSample Number PPB PPB PPB PIM PIM PIM PIM7496 ^ 0.1 67 ^7497 ^ ^ ^ 0.1 8 *27498 ^ 0.1 22 2 7499 ^ M) 18 ^7500 ^ ^D 8 ^7501 ^ 0.1 166 612 ^ 7502 ^ M) 440 149 ^7503 ^ N) 171 ^7504 ^ 0.1 10 2

CerrW* par/Certifad to

tt 3/

ZNPIM

333637 293164 348025

"AU 9MVICC DC DIPUI8) M.U* 01 10 AN*" or*

Page 33: GAUTHIER REPORT NO: 52 WORK PERFORMED FOR: Panthco ...€¦ · assessment report on the diamond lake project panthco mary-ann option/jv diamond drill hole flp-92-20 claim l-599137

HUBACHECKP.O.BOX 129 VIROINA TOWN

ATTMsDAVE CHRISTIE

PROJ.:193

Laboir a to ires TSL Iav AX. ratories780 AV. DU CUIVRE C.P. 665 ROUYN-NORMIDA QUEBEC J9X 5C6

PHONE #: 819-797-4653 FAX *: 819-797-4501

I.C.A.P. TOTAL OXIDE ANALYSISLithium MataBorata Fusion

REPORT No.

Page No.

ril* No.

Data

T1694l of l

JY13RA

JUL-15-1992

SAMPLE #

7451

7455

7459

74637467

7471

3 -14. S2I!lM| 3.4:m*

llpl 15.03fjjl| 3.1:

;:||Sli l*-85fSlM 3.70|

III li iiiii •II ".59iiMi

LOI TOTAL

TSL/92SIGNED :

Page 34: GAUTHIER REPORT NO: 52 WORK PERFORMED FOR: Panthco ...€¦ · assessment report on the diamond lake project panthco mary-ann option/jv diamond drill hole flp-92-20 claim l-599137

W.A. HUBACHEKATTN:DAVI CHRISTIE

PROJ:193

2R-1196-RA1

SWASTIKA LABORATORIESP.O. BOX 10, SWASTIKA ONTARIO

PHONE *: 705-642-3244 FM *: 705-642-3300

I.C.A.P. WHOLE ROCK ANALYSISLi thill* MetaBorate Fuaion

REPORT No.

Page No.

rile No.

Date

T1720l of l

JY25RA

JUL-27-1992

SAMPLE f

7475

7479

748374877491

7494

7498

7503

7504

TSL/92

8108 A1203lilli * i

14.4

11111 14 - 421

14.59|

1|6||0 13.8:

31111 14.65;

M i4.56

P205

2.

3.411

0.16J|f||l||||

0.24i||f||J||"v"-""~"""'"" o.

O.lf^^fi. 0.141S

8r iBllfl pKlHlB

100||^^|

93|^^^

95!!||||||92v:fflilsi

881

72i

36lt

7*1

1111

HI

i|ll I

SIGNED :

LOI TOTAL

* ...v-,'*'.'.

4.i4:: ;i;;:97.794.71 100.26

2.38

lo

Page 35: GAUTHIER REPORT NO: 52 WORK PERFORMED FOR: Panthco ...€¦ · assessment report on the diamond lake project panthco mary-ann option/jv diamond drill hole flp-92-20 claim l-599137

l ll APPENDIX "F"

l PROJECT EXPENDITURE STATEMENT

l

l

l

l

l

l

l

l

l

l

l

l

l

l

lW. A. HUBACHECK CONSULTANTS LTD.

Page 36: GAUTHIER REPORT NO: 52 WORK PERFORMED FOR: Panthco ...€¦ · assessment report on the diamond lake project panthco mary-ann option/jv diamond drill hole flp-92-20 claim l-599137

l l l l l l l l l l l l l l l l l l l

Sudbury Contact Mines Ltd. Certified Statement of Expenditures

For DDH FLP-92-20 on the Panthco Mary-Ann Option/JV

Project Geologist $250/day X 4 days 11,000.00

Diamond Drilling 547.92/metre X 151.2 metres 17,244.81

Magnetic Susceptibility Meter Rental54/31 X mo/month

Truck Rental

Gas

Fax Rental

Microscope Rental

4/31 X 51121/month

4/31 X 539/month

4/31 X 5110/month

Core shack incl. core saw 4/31 x 52750/month

Accomodation 4/31 X 51000/month

Meals 4 days X 525/day

Petrography 2 sections X (ISO/each

Assays

Mob-Demob.

Draft ing

54 samples X 515/sample 15 samples X 519/sample

Total

I, David W. Christie, certify the above/ Jlo be Geologist for Sudbury Contact Mines Lt

January 27, 1993

536.13

5144.65

551.00

55.03

514.19

5354.84

5129.03

5100.00

5300.00

5345.005285.00

5200.00

5200.00 *104O9.18

eject

-id W. thristieSTB.Sc.

W. A. HUBACHECK CONSULTANTS LTD.

Page 37: GAUTHIER REPORT NO: 52 WORK PERFORMED FOR: Panthco ...€¦ · assessment report on the diamond lake project panthco mary-ann option/jv diamond drill hole flp-92-20 claim l-599137

"Ci

Ministry ofNorthern Development

MinesOntario

andjdlReport of Work Co After Recording CI

Mining Act 32D*4NW9ee6 52 GAUTHIER 900

Personal Information collected on this form is obtained under the authority of the Mil. . .... . . ....,....,...., ......, , — ... ......r...,..,w. v ..,..w..uwvy.this collection should be directed to the Provincial Manager, Mining Lands, Ministry of Northern Development and Mines, Fourth Floor, 159 Cedar Street, Sudbury, Ontario, P3E 6A5, telephone (705) 670-7264.

instructions: - Please type or print and submit in duplicate.- Refer to the Mining Act and Regulations for requirements of filing assessment work or consult the Mining

Recorder.- A separate copy of this form must be completed for each Work Group.- Technical reports and maps must accompany this form in duplicate.- A sketch, showing the claims the work is assigned to, must accompany this form.

Recorded HoWer(s) PANTHCO RESOURCES INC.,

Address903 - 55 UNIVERSITY AVE. , TORONTO, ONT. M5J 2H7

Mining Division LARDER LAKEDates Performed ^ JUNE 17, 1992

Township/Area GAUTHIER TOWNSHIP

Client No. 179267

Telephone No. (416) 777-2524

M or Q Plan No. G 3211

To: JUNE 20, 1992

Work Performed (Check One Work Group Only)

Physical Work, Including Drilling

Assignment from Reserve

Total Assessment Work Claimed on the Attached Statement of Costs SNote: The Minister may reject for assessment work credit all or part of the assessment work submitted if the recorded

holder cannot verify expenditures claimed in the statement of costs within 30 days of a request for verification.

Persons and Survey Company Who Performed the Work (Give Name and Address of Author of Report)Name

DAVID W. CHRISTIE

Heath S Sherwood

Drilling (1986) Inc.

Address

M . HUBACHECK CONSULTANTS LTD., Adelaide St. West, Ste. 603, Toronto, Ont. M5H 3L5

P.O. Box 998, 34 Duncan Ave. , North,

Kirkland Lake, Ont. P2N 3L3

(attach i schedule If necessary)

Certification of Beneficial Interest * See Note No. 1 on reverse side1 certify that at the time the work was performed, the claims covered in this w report were recorded In the current holder's name or held under a beneficial Inte by the current recorded holder.

Certification of Work Report

. Date Recorded/Holder or AQentyfSlgnaturak .

n* Feb. 8,1993 1 f .*. j f J ^\///Urf? \AL , Jy ^ ' ^x~~

1 certify that 1 have a personal knowledge of the facts set forth in this Work report, having performed the work or witnessed same during and/or after Its completion and annexed report is true.

Name and Address of Pereon Certifying David W. Christie, 141 Adelaide St. West, Ste.

Telepone No. Date (433 364-2895 Feb. 8, 1993

For Office Use Onlytotal Value Cr. Recorded

cPDate Recorded . . j MinjpoJ

fiaa.Ujk/ra;^Deemed Approval Dale . Date Ap

Date Notice for Amendments Sent

603, Torotf?o, Ont/MSH 3L5

Certified By (Signature)/ *.

i l***,/. ,-Rji ny ^

^^^(^Cproved '

FF!3 ;.S 1993

7 '/ft 6- ^0241 103/91J

Page 38: GAUTHIER REPORT NO: 52 WORK PERFORMED FOR: Panthco ...€¦ · assessment report on the diamond lake project panthco mary-ann option/jv diamond drill hole flp-92-20 claim l-599137

599137599135

599003599002

59900599000

i ir fi l?

M

0

*- K O S .p* s

H

O

*- (-"

O l-1

-~4

W

Ul

M

~-J

W

Ui

l-1

^J

U)

Ul

M

^-4

W

Ul

M ~vl

Ul

UT

t-'

-~J

U)

Ul

ill! QS

fs11

1!

00

ON

~J Ul

00

CT\

•~J

Ul

Cred

its y

ou a

re c

laim

ing

in th

is re

port

may

be

cut b

ack.

In or

der t

o m

inim

ize th

e ad

vers

e ef

fect

s of

suc

h de

letio

ns, p

lease

indi

cate

from

wh

ich c

laim

s yo

u wi

sh to

prio

rize

the

dele

tion

of c

redi

ts.

Plea

se m

ark

(^)

one

of th

e fo

llowi

ng:

1. G

Cre

dits

are

to b

e cu

t bac

k st

artin

g wi

th th

e cla

im li

sted

last,

wor

king

back

ward

s.2.

© C

redi

ts a

re to

be

cut b

ack

equa

lly o

ver a

ll cla

ims

cont

aine

d in

this

repo

rt of

wor

k.3.

D C

redi

ts a

re to

be

cut b

ack

as p

rloriz

ed o

n th

e at

tach

ed a

ppen

dix.

In th

e ev

ent t

hat y

ou h

ave

not s

pecif

ied

your

cho

ice o

f prio

rity,

opt

ion

one

will

be im

plem

ente

d.

Note

1:

Exam

ples

of b

enef

icia

l Int

eres

t are

unr

ecor

ded

trans

fers

, opt

ion

agre

emen

ts, m

emor

andu

m o

f agr

eem

ents

, etc

., wi

th re

spec

t to

the

min

ing

clai

ms.

Note

2:

If wo

rk h

as b

een

perfo

rmed

on

pate

nted

or l

ease

d la

nd, p

leas

e co

mpl

ete

the

follo

wing

:

l cer

tify

that

the

reco

rded

bol

der h

ad a

ben

efici

al in

tere

st in

the

pate

nted

or

leas

ed la

nd a

t the

tim

e th

e wo

rk w

as p

erfo

rmed

.Si

gnat

ure

Date

Feb.

8/

93

Page 39: GAUTHIER REPORT NO: 52 WORK PERFORMED FOR: Panthco ...€¦ · assessment report on the diamond lake project panthco mary-ann option/jv diamond drill hole flp-92-20 claim l-599137

Ontario

Ministry ofNorthern Developmentand Mines

^irmlinistere duveloppement du Nord

i des mines

Statement of Costs for Assessment Credit6tat des coOts aux fins du credit devaluation

Mining Act/Lol sur les mines

Transaction No /N", de transacti:iln

Personal information collected on this form is obtained under the authority of the Mining Act. This information will be used to maintain a record and ongoing status of the mining claim(s), Questions about this collection should be directed to the Provincial Manager, Minings Lands, Ministry of Northern Development and Mines, 4th Floor, 159 Cedar Street, Sudbury, Ontario P3E 6A5, telephone (70S) 670-7264.

Les renseignements personnels contenus dans la presente formule sont recueillis en vertu de la Lol sur lea mlnea at serviront a tenir a jour un registre des concessions minieres. Adresser toute queslton sur la collece de ces renseignements au chef provincial des terrains miniers, ministere du Developpement du Nord et des Mines. 159, rue Cedar, 4* etage. Sudbury (Ontario) P3E 6A5, telephone (705) 670-7264.

1. Direct Costs/Couts directs

Type

Wages Salalres

Contractor'a and Conaultant'a FeesDrottsde ('entrepreneur •t de ('expert- conaell

Supplies Used Foumlturea utlllsees

Equipment Rental Location de materiel

Description

Labour Main-d'oeuvreField Supervision Supervision sur le terrain

Typ* Diamond Drilling

PetrographyAssays Drafting

Typ* Gas

Typ* tax Machine Mag.Suscept.Mete:

Microscope

Core Shack

Amount Montan!

1,000

7,244.81

300. OC

Totals Total global

1,000.00

630 200 8,374.8151. OC

5. Oj - 36.13

14.19

354.84•r*.*..! r\tm^—* r*^**i~

•51.00

ruiSj

2. Indirect Costs/Couts Indlrects* * Note: When claiming Rehabilitation work Indirect costs are not

allowable as assessment work. Pour le remboursement des travaux de rehabilitation, ies couts indirects ne sont pas admlsslbies en tant que travaux d'evaluation.

Total des coOts directs

Type

Transportation Transport

Food and Lodging Nourritura et

Demobilization Mobilisation etOvfHOOlllSeniOn

DescriptionType Truck Rental

Meals S Accotnoda tion

Mob 6. Demob.

Amount Montant

144.65

- 229.03

200.00

Sub Total of Indirect Costs Total partial des couts Indlrects

Amount Allowable (not greater than 20* of Direct Coats) Montant admissible (n'sxcMant pas 20 H des couts directs)Total Value of Assessment Credit Valeur totale du credit (Total of Direct and ANowaMe d'tvetoatton Indirect costa) (Tow dss coOM tfnds

Totals Total global

144.15

229.03

200.00

573.18

573.18

0,409. U

Note: The recorded holder will be required to verify expenditures claimed in this statement of costs within 30 days of a request for verification. If verification is not made, the Minister may reject for assessment work all or part of the assessment work submitted.

Note : Le tttulalre enregistre sera tenu de verifier tea depenses demandees dans le present etat des coots dans les 30 jours suivant une demand* a cet effet. SI la verification n'est pas effectuee, le ministre peut rejeter tout ou une partie des travaux d'evaluation presentee.

Filing Discounts

1. Work filed within two years of completion Is claimed at 1OWb of the above Total Value of Assessment Credit.

2. Work filed three, four or five years after completion is claimed at SOWo of the above Total Value of Assessment Credit. See calculations below:

Total Value of Assessment Credit Total Assessment Claimedx 0.50

Remises pour dtpot

1. Les travaux deposes dans les deux ans suivant leur achevement sont rembourses A100 * de la valeur totale susmenttonnee du crtdKd'*valuation.

2. Les travaux deposes trois, quatre ou cinq ans apres leur achevement sont rembourses A 50 M de la valeur totale du credit d'evaluation susmentionne. Voir les calculs cl-dessous.

Valeur totale du credit devaluationx 0,50 -

Evaluation totale demandee

Certification Verifying Statement of Costs

l hereby certify:that the amounts shown are as accurate as possible and these costs were incurred while conducting assessment work on the lands shown on the accompanying Report of Work form.

that as Project Geologist(Recorded Holder, Agent, Position in Company)

to make this certification

Attestation de I'etat des coots

J'atteste par la presente :que les montants indiques sont le plus exact possible et que ces depenses ont ete engagees pour effectuer les travaux d'evaluation sur les terrains indiques dans la formule de rapport de travail ci-joint.

l am authorized Et qu'a titre de je suis autorise(litulaire anregistr*. r.pr***ntant, pout occup* dans la compagm.)

a faire e attestation.

0212(04/91)

Feb. 8, 1993

Nota : Dans cane formule, lorsqu'il designe das parsonnes, le masculin ast utilise au sens neutre