14
GCOM-W1,AMSR-E/ADEOS-II Project Update in EORC GCOM Research Group in EORC Masato Yamanashi 29 th June 2011, NCDC,Asheville, NC

GCOM-W1,AMSR-E/ADEOS-II Project Update in EORC GCOM Research Group in EORC Masato Yamanashi 29 th June 2011, NCDC,Asheville, NC

Embed Size (px)

Citation preview

Page 1: GCOM-W1,AMSR-E/ADEOS-II Project Update in EORC GCOM Research Group in EORC Masato Yamanashi 29 th June 2011, NCDC,Asheville, NC

GCOM-W1,AMSR-E/ADEOS-II Project Update in EORC

GCOM Research Group in EORCMasato Yamanashi

29th June 2011, NCDC,Asheville, NC

Page 2: GCOM-W1,AMSR-E/ADEOS-II Project Update in EORC GCOM Research Group in EORC Masato Yamanashi 29 th June 2011, NCDC,Asheville, NC

Japanese FY* FY2009 FY2010 FY2011 FY2012 FY2013 FY2014

MajorMilestones

RA

Algorithm

Homepages&

Data Distribute

Cal/Val

RA #1 (W1) RA #3 (W1+Multi-sensor research) RA #5

Development

Prototyping Implementation Testing/Optimization

Keep(AMSR-E)&Preparation (sites, tools, methodologies)

Operational

Issue RA#3(W1+Multi)

W1 Launch

V.1 GEOV.1 TB

Criteria #1

( Revise every 1.5 or 2 years after launch)

Algorithm selection(standard products)

Preparation Operation/Improvement

EORC GCOM Group main tasks and its schedules

Page 3: GCOM-W1,AMSR-E/ADEOS-II Project Update in EORC GCOM Research Group in EORC Masato Yamanashi 29 th June 2011, NCDC,Asheville, NC

Standard Algorithms

・ 3rd RA announced on 21st January, 2011 and closed on 25th March

・ Research areas(Categories): - GCOM-W1 research: algorithm development, validation, and application research   - Multi-sensor research: multi-sensor algorithm development and application research

Status of 3rd RA

・ The conclusion of Selection will be announced soon, (at early August)

Page 4: GCOM-W1,AMSR-E/ADEOS-II Project Update in EORC GCOM Research Group in EORC Masato Yamanashi 29 th June 2011, NCDC,Asheville, NC

Parameters Algorithm PI

TPW Kazumori

CLW Kazumori

PRR Aonashi

SST Shibata

SSW Shibata

SIC J.Comiso (led by Cho)

SMC Koike

SND R.Kelly

GCOM-W1 L2 Standard algorithms for the first data release.

Standard Algorithms

・ Decided at the last PI WorkShop in Tokyo, on December 2010

Page 5: GCOM-W1,AMSR-E/ADEOS-II Project Update in EORC GCOM Research Group in EORC Masato Yamanashi 29 th June 2011, NCDC,Asheville, NC

EORC HomepagesEORC Home Pages structure (plan now)

Information Details Contents

TopGCOM-W1 IntroductionMission outline Explanation on mission outlineOperation information Schedules of maneuver, Loss of data etc

Data

Product & Algorithms Sort of products and its developerCalibration & Validation Calibration,Validation plan Validation data Provide validation dataTools Product access tools(AMTK)and so onOrganization (after 3rd RA)ATBD Documents of Algorithms

TopicsPress ReleaseImage GrallyToday’s best shot

Page 6: GCOM-W1,AMSR-E/ADEOS-II Project Update in EORC GCOM Research Group in EORC Masato Yamanashi 29 th June 2011, NCDC,Asheville, NC

Top page of Data Distribute SystemDeveloped by GCOM project Group

Data Distribution System

Page 7: GCOM-W1,AMSR-E/ADEOS-II Project Update in EORC GCOM Research Group in EORC Masato Yamanashi 29 th June 2011, NCDC,Asheville, NC

Data Distribution System

• Select the data from the following choices– Data Categories, the sort of physical parameters( like SST,SSW and so

on)– Satellite or Sensors, etc

• Using shopping trolley icons, more user-friendly• Format exchange functions

  AMSR/AMSR-E are HDF4,AMSR2 is HDF5, provided by these original format basically.– GeoTIFF,TIFF– netCDF(netCDF 4 classic model,CF-1.4)– HDF5(for AMSR-E/AMSR only)

Features of this system

Page 8: GCOM-W1,AMSR-E/ADEOS-II Project Update in EORC GCOM Research Group in EORC Masato Yamanashi 29 th June 2011, NCDC,Asheville, NC

Data Distribution System

• We will provide standard products through Data Distribution System( using online ,http,sftp) – Start to provide AMSR-E/AMSR2 soon (plan)– RA research and cooperate organizations

• Start to provide after initial checkout( 3month after the launch)– Other users

• Start to provide after the calibration/validation phase ( 1 year after the launch)

Provide plan

Page 9: GCOM-W1,AMSR-E/ADEOS-II Project Update in EORC GCOM Research Group in EORC Masato Yamanashi 29 th June 2011, NCDC,Asheville, NC

Level Contents

Level-1A• Swath data with geolocation information• Scene counts• ½ orbit starting from northern/southern-most latitudes

Level-1B• Swath data with geolocation information• Brightness temperatures• ½ orbit starting from northern/southern-most latitudes

Level-1R• Swath data with geolocation information• Spatial-resolution matched brightness temperatures• 4 resolution sets (6,10,23,36GHz) and raw swath for 89GHz A/B

Level-2• Swath data with geolocation information• Geophysical parameters (8 parameters)• ½ orbit starting from northern/southern-most latitudes

Leve-3• Grid data with 0.1/0.25 degrees (10/25km) resolution• Brightness temperatures and geophysical parameters• Daily and monthly temporal average• Equidistant Cylindrical and Polar Stereo Projection

• All products are in HDF5 format.

GCOM-W1 Processing Levels

Page 10: GCOM-W1,AMSR-E/ADEOS-II Project Update in EORC GCOM Research Group in EORC Masato Yamanashi 29 th June 2011, NCDC,Asheville, NC

Calibration/Validation• Validation by utilizing the existing observation networks:

– Radiosondes and GPS networks, SST and sea surface wind speed from various buoy system, Ground-based precipitation radar networks, Snow depth and other surface measurements by meteorological agencies, etc.

• Specific field campaigns/monitorings– Soil moisture test sites such as Mongolia, Thailand, and CEOP sites including Australia

Murray-Darling Basin, and Snow depth test site in Yakutsuk.• Potential interaction with other missions

– SMOS and SMAP for soil moisture, GPM GV collaboration for precipitation.

Page 11: GCOM-W1,AMSR-E/ADEOS-II Project Update in EORC GCOM Research Group in EORC Masato Yamanashi 29 th June 2011, NCDC,Asheville, NC

-New AWS testing in Metrological Institute since the beginning of June, untill September- After test, will install to Murry Darling Basin, north-west part of Melbourne, in Australia

Calibration/Validation (new tool)

Page 12: GCOM-W1,AMSR-E/ADEOS-II Project Update in EORC GCOM Research Group in EORC Masato Yamanashi 29 th June 2011, NCDC,Asheville, NC

Next PI meeting

・ PlanAround December or January in Tokyo, together with

other project ,GCOM-C, TRMM/GPM, EarthCARE, setting crosscutting discussion like the last year ,

(only plan, not discussed enoungh, not approved)

choices are - Just after 3rd RA selection, around September or October, 3rd RA

researhers only, introducing work plans each other.- Place ( Tokyo, or western part of Japan because of problems of

reactors and radiation.)

Page 13: GCOM-W1,AMSR-E/ADEOS-II Project Update in EORC GCOM Research Group in EORC Masato Yamanashi 29 th June 2011, NCDC,Asheville, NC

AMSR-E HW Recent Trend (as of 21st,June)ADE B torque

May 1, 2011 - J une 21, 2011

0.0

0.2

0.4

0.6

0.8

1.0

1.2

1.4

1.6

1.8

2.0

2.2

2.4

11/0

5/01

11/0

5/02

11/0

5/04

11/0

5/06

11/0

5/08

11/0

5/10

11/0

5/12

11/0

5/13

11/0

5/15

11/0

5/17

11/0

5/19

11/0

5/21

11/0

5/23

11/0

5/25

11/0

5/26

11/0

5/28

11/0

5/30

11/0

6/01

11/0

6/03

11/0

6/05

11/0

6/07

11/0

6/09

11/0

6/10

11/0

6/12

11/0

6/14

11/0

6/16

11/0

6/18

11/0

6/20

11/0

6/21

Max

/Min

/Ave

[Nm

]

0.0

0.2

0.4

0.6

0.8

1.0

1.2

1.4

1.6

1.8

2.0

2.2

2.4

Max

-Min

[Nm

]

ADE B Torque Max ADE B Torque Min ADE B Torque Ave ADE B Torque (Max-Min)

Amplitude are a little bigger than before(pink)

(Light blue)

(yellow)

(light green)

Page 14: GCOM-W1,AMSR-E/ADEOS-II Project Update in EORC GCOM Research Group in EORC Masato Yamanashi 29 th June 2011, NCDC,Asheville, NC

• The following problem are because of aging

- The antenna torque has been unstable than before - 89GHz-B Detector’s output voltage will reach upper limit soon

( expected, around this December)

• To make life longer - The operation to make the dynamic range of Tb a little narrow

=> details are reported EOC/MELCO

AMSR-E HW information