48
VP*(S18-4141-01) MLP GCSE 4141/01 DESIGN AND TECHNOLOGY UNIT 1 FOCUS AREA: Product Design WEDNESDAY, 23 MAY 2018 – MORNING 2 hours plus your additional time allowance Surname Other Names Centre Number Candidate Number 0 © WJEC CBAC Ltd.

GCSE DESIGN AND TECHNOLOGY UNIT 1 WEDNESDAY, 23 MAY …pastpapers.download.wjec.co.uk › s18-4141-01-18-mlp.pdf · 2019-03-05 · technical details that are needed to manufacture

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: GCSE DESIGN AND TECHNOLOGY UNIT 1 WEDNESDAY, 23 MAY …pastpapers.download.wjec.co.uk › s18-4141-01-18-mlp.pdf · 2019-03-05 · technical details that are needed to manufacture

VP*(S18-4141-01) MLP

GCSE

4141/01

DESIGN AND TECHNOLOGY

UNIT 1

FOCUS AREA: Product Design

WEDNESDAY, 23 MAY 2018 – MORNING

2 hours plus your additional time allowance

Surname

Other Names

Centre Number

Candidate Number 0

© WJEC CBAC Ltd.

Page 2: GCSE DESIGN AND TECHNOLOGY UNIT 1 WEDNESDAY, 23 MAY …pastpapers.download.wjec.co.uk › s18-4141-01-18-mlp.pdf · 2019-03-05 · technical details that are needed to manufacture

2

For Examiner’s use only

Question MaximumMark

MarkAwarded

Section A 1. 15

2. 10

3. 10

4. 25

Section B 5. 10

6. 15

7. 20

8. 15

Total 120

Page 3: GCSE DESIGN AND TECHNOLOGY UNIT 1 WEDNESDAY, 23 MAY …pastpapers.download.wjec.co.uk › s18-4141-01-18-mlp.pdf · 2019-03-05 · technical details that are needed to manufacture

3

ADDITIONAL MATERIALS

You will need basic drawing equipment, coloured pencils and a calculator for this examination.

INSTRUCTIONS TO CANDIDATES

Use black ink, black ball-point pen or your usual method.

Write your name, centre number and candidate number in the spaces provided on the front cover.

Answer ALL questions.

Write your answers in the spaces provided in this booklet. Where the space is not sufficient for your answer, continue at the back of the book, taking care to number the continuation correctly.

You are reminded of the necessity for good English and orderly presentation in your answers.

INFORMATION FOR CANDIDATES

The number of marks is given in brackets at the end of each question or part-question.

Page 4: GCSE DESIGN AND TECHNOLOGY UNIT 1 WEDNESDAY, 23 MAY …pastpapers.download.wjec.co.uk › s18-4141-01-18-mlp.pdf · 2019-03-05 · technical details that are needed to manufacture

1997 Mobile Phone

– External aerial– Single colour screen– Multi-touch keypad

2016 Mobile Phone

– Built in camera, GPS, Wi-Fi, Apps– Full colour, 4.7 inch touch screen– Fingerprint recognition technology

Page 5: GCSE DESIGN AND TECHNOLOGY UNIT 1 WEDNESDAY, 23 MAY …pastpapers.download.wjec.co.uk › s18-4141-01-18-mlp.pdf · 2019-03-05 · technical details that are needed to manufacture

4

SECTION A

MARKED OUT OF 60 60 MINUTES

1. This question is about Product Analysis. It is worth a total of 15 marks.

The images opposite show the changes in mobile phone technology.

(a) Discuss how the 2016 mobile phone has been changed from the 1997 mobile phone in relation to the following areas.

(i) Size [2]

Page 6: GCSE DESIGN AND TECHNOLOGY UNIT 1 WEDNESDAY, 23 MAY …pastpapers.download.wjec.co.uk › s18-4141-01-18-mlp.pdf · 2019-03-05 · technical details that are needed to manufacture

5

1(a) (ii) Function [2]

(iii) Aesthetics [2]

Page 7: GCSE DESIGN AND TECHNOLOGY UNIT 1 WEDNESDAY, 23 MAY …pastpapers.download.wjec.co.uk › s18-4141-01-18-mlp.pdf · 2019-03-05 · technical details that are needed to manufacture

6

1(b) The casing on the 1997 mobile phone is made from ABS plastic. Explain why this is a suitable material for the casing. [2]

Page 8: GCSE DESIGN AND TECHNOLOGY UNIT 1 WEDNESDAY, 23 MAY …pastpapers.download.wjec.co.uk › s18-4141-01-18-mlp.pdf · 2019-03-05 · technical details that are needed to manufacture

7

1(c) Explain how new or improved technology has influenced developments of mobile phones in the following areas:

Wireless Connectivity [2]

Touch Screen [2]

Page 9: GCSE DESIGN AND TECHNOLOGY UNIT 1 WEDNESDAY, 23 MAY …pastpapers.download.wjec.co.uk › s18-4141-01-18-mlp.pdf · 2019-03-05 · technical details that are needed to manufacture

02000400060008000100001200014000

MonthDec

-16

Nov-16

Oct-16

Sep-16

Aug-16

Jul-1

6

Jun-

16

May-16

Apr-16

Feb-

16

Jan-

16

Mar-16

Mobile Phone Monthly Sales Figures

Sale

s pe

r Mon

th

Page 10: GCSE DESIGN AND TECHNOLOGY UNIT 1 WEDNESDAY, 23 MAY …pastpapers.download.wjec.co.uk › s18-4141-01-18-mlp.pdf · 2019-03-05 · technical details that are needed to manufacture

8

1(d) The chart opposite shows monthly sales figures for a mobile phone.

(i) State in which month the most sales were made. [1]

(ii) Calculate the mean / average number of sales for the five month period of August to December. [2]

(Show all workings.)

Page 11: GCSE DESIGN AND TECHNOLOGY UNIT 1 WEDNESDAY, 23 MAY …pastpapers.download.wjec.co.uk › s18-4141-01-18-mlp.pdf · 2019-03-05 · technical details that are needed to manufacture

9

2. This question is about the general issues of Design and Technology. It is worth a total of 10 marks.

(a) State the correct R for EACH of the statements below.

(i) Consider an alternative way to make a product more sustainable. [1]

(ii) Reprocess a material to make a new product. [1]

Page 12: GCSE DESIGN AND TECHNOLOGY UNIT 1 WEDNESDAY, 23 MAY …pastpapers.download.wjec.co.uk › s18-4141-01-18-mlp.pdf · 2019-03-05 · technical details that are needed to manufacture

10

2(b) The Energy Star label shown below is an international standard applied to energy efficient products which use 20-30% less energy than the regulation standards.

Explain ONE winner and ONE loser when purchasing products displaying this logo.

Winner:

[2]

Page 13: GCSE DESIGN AND TECHNOLOGY UNIT 1 WEDNESDAY, 23 MAY …pastpapers.download.wjec.co.uk › s18-4141-01-18-mlp.pdf · 2019-03-05 · technical details that are needed to manufacture

11

2(b) Loser:

[2]

(c) Describe how considering ‘Life Cycle Analysis’ can give the designer a clear understanding of the environmental impact of a product. [4]

Page 14: GCSE DESIGN AND TECHNOLOGY UNIT 1 WEDNESDAY, 23 MAY …pastpapers.download.wjec.co.uk › s18-4141-01-18-mlp.pdf · 2019-03-05 · technical details that are needed to manufacture

12

3. This question is about the designers that you have studied. It is worth a total of 10 marks.

During your course you have studied the work of Philippe Starck and James Dyson.

(a) State the name of the designer responsible for the following products. [2]

(i) Axor Vortex tap Designer:

(ii) Airblade Designer:

Page 15: GCSE DESIGN AND TECHNOLOGY UNIT 1 WEDNESDAY, 23 MAY …pastpapers.download.wjec.co.uk › s18-4141-01-18-mlp.pdf · 2019-03-05 · technical details that are needed to manufacture

13

3(b) Write a short essay in the space below comparing the work of James Dyson and Philippe Starck with reference to the form, function and innovation of their products. [8]

Marks will be awarded for the content of the answer and the quality of written communication.

Page 16: GCSE DESIGN AND TECHNOLOGY UNIT 1 WEDNESDAY, 23 MAY …pastpapers.download.wjec.co.uk › s18-4141-01-18-mlp.pdf · 2019-03-05 · technical details that are needed to manufacture

14

Page 17: GCSE DESIGN AND TECHNOLOGY UNIT 1 WEDNESDAY, 23 MAY …pastpapers.download.wjec.co.uk › s18-4141-01-18-mlp.pdf · 2019-03-05 · technical details that are needed to manufacture

15

4. This question is about the Design Process and how it is used. It is worth a total of 25 marks.

(a) Complete the table by inserting the correct design stage for EACH of the descriptions below.

(One example has been done for you.) 3 × [1]

Description Design Stage

A number of initial design sketches. Design Ideas

A list of criteria that the product should meet.

Gathering useful information for the project.

Assessing the performance of the finished product.

Page 18: GCSE DESIGN AND TECHNOLOGY UNIT 1 WEDNESDAY, 23 MAY …pastpapers.download.wjec.co.uk › s18-4141-01-18-mlp.pdf · 2019-03-05 · technical details that are needed to manufacture

16

4(b) (i) Before manufacturing a product, technical details are needed. State TWO important technical details that are needed to manufacture a product effectively.

Technical detail 1: [1]

Technical detail 2: [1]

(ii) Describe the important features that should be included in the plan for manufacture. [2]

Page 19: GCSE DESIGN AND TECHNOLOGY UNIT 1 WEDNESDAY, 23 MAY …pastpapers.download.wjec.co.uk › s18-4141-01-18-mlp.pdf · 2019-03-05 · technical details that are needed to manufacture

17

4(c) The images below show a range of everyday household products that have been designed to have a modern and fun style.

Egg Cup Cork Screw Citrus Fruit Squeezer

You have been asked to redesign the traditional set of salt and pepper shakers shown below, using a modern and fun style.

Use notes and sketches to present your idea for the salt and pepper shakers in the space provided on the pages 19 and 20.

Page 20: GCSE DESIGN AND TECHNOLOGY UNIT 1 WEDNESDAY, 23 MAY …pastpapers.download.wjec.co.uk › s18-4141-01-18-mlp.pdf · 2019-03-05 · technical details that are needed to manufacture

18

4(c) Specification

THE DESIGN MUST:

– be inspired by the modern and fun style of design;

– include a salt and a pepper shaker; – include a suitable way to dispense the salt

and pepper; – have a suitable way to refill the salt and

pepper shakers.

MARKS WILL BE AWARDED FOR:

(i) reflecting the modern and fun style of design; [5]

(ii) including a suitable way to dispense the salt and pepper; [2]

(iii) a suitable method of refilling the salt and pepper shakers; [3]

(iv) naming and justifying a suitable material; [2]

(v) presenting suitable sizes for the product; [2]

(vi) quality of communication. [4]

Page 21: GCSE DESIGN AND TECHNOLOGY UNIT 1 WEDNESDAY, 23 MAY …pastpapers.download.wjec.co.uk › s18-4141-01-18-mlp.pdf · 2019-03-05 · technical details that are needed to manufacture

19

Draw fully labelled details for the salt and pepper shakers in the box below.

Page 22: GCSE DESIGN AND TECHNOLOGY UNIT 1 WEDNESDAY, 23 MAY …pastpapers.download.wjec.co.uk › s18-4141-01-18-mlp.pdf · 2019-03-05 · technical details that are needed to manufacture

20

Draw fully labelled details showing how the salt and pepper is dispensed and how the (salt and pepper) shakers are refilled.

Page 23: GCSE DESIGN AND TECHNOLOGY UNIT 1 WEDNESDAY, 23 MAY …pastpapers.download.wjec.co.uk › s18-4141-01-18-mlp.pdf · 2019-03-05 · technical details that are needed to manufacture

Product Manufacturing Process

Kayak

Water Bottle

BlisterPackaging

Toothbrush Handle

Page 24: GCSE DESIGN AND TECHNOLOGY UNIT 1 WEDNESDAY, 23 MAY …pastpapers.download.wjec.co.uk › s18-4141-01-18-mlp.pdf · 2019-03-05 · technical details that are needed to manufacture

21

SECTION B

MARKED OUT OF 60 60 MINUTES

5. This question is about Commercial Manufacturing Processes. It is worth a total of 10 marks.

(a) From the list below, select the correct production method for EACH of the products shown opposite.

[4]

Vacuum Forming

Rotational Moulding

Blow Moulding

Casting

Injection Moulding

Page 25: GCSE DESIGN AND TECHNOLOGY UNIT 1 WEDNESDAY, 23 MAY …pastpapers.download.wjec.co.uk › s18-4141-01-18-mlp.pdf · 2019-03-05 · technical details that are needed to manufacture

22

5(b) The aluminium chair pictured below was manufactured using press moulding and bending.

Discuss why this is a suitable manufacturing method when producing batches of 1 000 chairs.

[3]

Page 26: GCSE DESIGN AND TECHNOLOGY UNIT 1 WEDNESDAY, 23 MAY …pastpapers.download.wjec.co.uk › s18-4141-01-18-mlp.pdf · 2019-03-05 · technical details that are needed to manufacture

23

5(c) Discuss the advantages to the manufacturer of using rapid prototyping when developing products such as the next generation games console controller shown below. [3]

Page 27: GCSE DESIGN AND TECHNOLOGY UNIT 1 WEDNESDAY, 23 MAY …pastpapers.download.wjec.co.uk › s18-4141-01-18-mlp.pdf · 2019-03-05 · technical details that are needed to manufacture

24

6. This question is about Materials and Components. It is worth a total of 15 marks.

(a) (i) Complete the table by inserting EACH material listed below under the correct heading. [3]

Corrugated Cardboard Acrylic Parana Pine

Renewable material Non-Renewable Material

Page 28: GCSE DESIGN AND TECHNOLOGY UNIT 1 WEDNESDAY, 23 MAY …pastpapers.download.wjec.co.uk › s18-4141-01-18-mlp.pdf · 2019-03-05 · technical details that are needed to manufacture

25

6(a) (ii) Explain why manufacturers are being encouraged through legislation to use more renewable materials in their products. [2]

Page 29: GCSE DESIGN AND TECHNOLOGY UNIT 1 WEDNESDAY, 23 MAY …pastpapers.download.wjec.co.uk › s18-4141-01-18-mlp.pdf · 2019-03-05 · technical details that are needed to manufacture

26

6(b) Study the material properties below and use lines to connect the property with the correct description. [3]

Property Description

Malleability The ability to be moulded without breaking.

Ductility The ability to withstand indentation and scratching.

Hardness The ability to bend or deform when a force is applied.

Page 30: GCSE DESIGN AND TECHNOLOGY UNIT 1 WEDNESDAY, 23 MAY …pastpapers.download.wjec.co.uk › s18-4141-01-18-mlp.pdf · 2019-03-05 · technical details that are needed to manufacture

27

6(c) Explain the different properties of thermoplastics and thermosetting plastics. [3]

Page 31: GCSE DESIGN AND TECHNOLOGY UNIT 1 WEDNESDAY, 23 MAY …pastpapers.download.wjec.co.uk › s18-4141-01-18-mlp.pdf · 2019-03-05 · technical details that are needed to manufacture

28

6(d) Describe what is meant by the term ‘standard components’ and discuss how using them benefits the manufacturer. [4]

Page 32: GCSE DESIGN AND TECHNOLOGY UNIT 1 WEDNESDAY, 23 MAY …pastpapers.download.wjec.co.uk › s18-4141-01-18-mlp.pdf · 2019-03-05 · technical details that are needed to manufacture

Picture A Picture B Picture C

Page 33: GCSE DESIGN AND TECHNOLOGY UNIT 1 WEDNESDAY, 23 MAY …pastpapers.download.wjec.co.uk › s18-4141-01-18-mlp.pdf · 2019-03-05 · technical details that are needed to manufacture

29

7. This question is about Tools, Equipment and Making. It is worth a total of 20 marks.

(a) (i) Complete the table by stating the correct name for EACH piece of equipment shown opposite. [3]

(ii) Describe ONE health and safety precaution when working with the equipment in PICTURE A. [2]

Page 34: GCSE DESIGN AND TECHNOLOGY UNIT 1 WEDNESDAY, 23 MAY …pastpapers.download.wjec.co.uk › s18-4141-01-18-mlp.pdf · 2019-03-05 · technical details that are needed to manufacture

30

7(a) (iii) Explain what the equipment in PICTURE C is designed to be used for. [2]

Page 35: GCSE DESIGN AND TECHNOLOGY UNIT 1 WEDNESDAY, 23 MAY …pastpapers.download.wjec.co.uk › s18-4141-01-18-mlp.pdf · 2019-03-05 · technical details that are needed to manufacture
Page 36: GCSE DESIGN AND TECHNOLOGY UNIT 1 WEDNESDAY, 23 MAY …pastpapers.download.wjec.co.uk › s18-4141-01-18-mlp.pdf · 2019-03-05 · technical details that are needed to manufacture

31

7(b) Study the picture opposite of a prototype alarm clock that has been modelled using blue modelling foam.

(i) Complete the table below by filling in the missing stages of the modelling process.

[4]

Stage No. Process

1 Glue 2 pieces of blue foam together to create the required depth.

2

3

4

5

6 Finish off any rough edges using various grades of glass paper.

Page 37: GCSE DESIGN AND TECHNOLOGY UNIT 1 WEDNESDAY, 23 MAY …pastpapers.download.wjec.co.uk › s18-4141-01-18-mlp.pdf · 2019-03-05 · technical details that are needed to manufacture

32

7(b) (ii) Discuss the advantages to the designer of using blue modelling foam to create prototypes. [3]

Page 38: GCSE DESIGN AND TECHNOLOGY UNIT 1 WEDNESDAY, 23 MAY …pastpapers.download.wjec.co.uk › s18-4141-01-18-mlp.pdf · 2019-03-05 · technical details that are needed to manufacture

33

7(c) The images below show an acrylic and plywood speaker system that has been manufactured in a school workshop using a bought-in speaker kit. Use notes and sketches to describe in detail the main stages for manufacturing the speaker. [6]

Speaker Kit

Page 39: GCSE DESIGN AND TECHNOLOGY UNIT 1 WEDNESDAY, 23 MAY …pastpapers.download.wjec.co.uk › s18-4141-01-18-mlp.pdf · 2019-03-05 · technical details that are needed to manufacture

34

Page 40: GCSE DESIGN AND TECHNOLOGY UNIT 1 WEDNESDAY, 23 MAY …pastpapers.download.wjec.co.uk › s18-4141-01-18-mlp.pdf · 2019-03-05 · technical details that are needed to manufacture

35

Page 41: GCSE DESIGN AND TECHNOLOGY UNIT 1 WEDNESDAY, 23 MAY …pastpapers.download.wjec.co.uk › s18-4141-01-18-mlp.pdf · 2019-03-05 · technical details that are needed to manufacture

Task

Spre

adsh

eet

Pow

erPo

int

Wor

d Pr

oces

sor

A w

ritte

n re

port

for a

sch

ool

assi

gnm

ent.

A s

lide

show

dis

play

ing

a ra

nge

of

desi

gn in

spira

tion.

A b

reak

dow

n of

mat

eria

l cos

ts fo

r yo

ur G

CSE

pro

ject

.

Page 42: GCSE DESIGN AND TECHNOLOGY UNIT 1 WEDNESDAY, 23 MAY …pastpapers.download.wjec.co.uk › s18-4141-01-18-mlp.pdf · 2019-03-05 · technical details that are needed to manufacture

36

8. This question is about ICT, CAD/CAM, Systems and Processes. It is worth a total of 15 marks.

(a) (i) Place a TICK (√) in the table opposite to match the most suitable software package to the tasks listed. [3]

(ii) Give ONE detailed reason for using ICT to present a report that includes pictures and charts. [2]

Page 43: GCSE DESIGN AND TECHNOLOGY UNIT 1 WEDNESDAY, 23 MAY …pastpapers.download.wjec.co.uk › s18-4141-01-18-mlp.pdf · 2019-03-05 · technical details that are needed to manufacture

37

8(b) Discuss the benefits to the designer of using 3D Computer Aided Design (CAD) modelling to develop products such as the drill below. [3]

Page 44: GCSE DESIGN AND TECHNOLOGY UNIT 1 WEDNESDAY, 23 MAY …pastpapers.download.wjec.co.uk › s18-4141-01-18-mlp.pdf · 2019-03-05 · technical details that are needed to manufacture
Page 45: GCSE DESIGN AND TECHNOLOGY UNIT 1 WEDNESDAY, 23 MAY …pastpapers.download.wjec.co.uk › s18-4141-01-18-mlp.pdf · 2019-03-05 · technical details that are needed to manufacture

38

8(c) Study the images opposite that show a clock and the Computer Aided Drawing (CAD) that was used to manufacture it.

(i) Name a suitable CAD package that could be used to produce the drawing of the clock.

[1]

(ii) The CAD design has been created using a repeated pattern to represent the numbers of the clock. Explain how the repeated pattern has been created. [3]

Page 46: GCSE DESIGN AND TECHNOLOGY UNIT 1 WEDNESDAY, 23 MAY …pastpapers.download.wjec.co.uk › s18-4141-01-18-mlp.pdf · 2019-03-05 · technical details that are needed to manufacture

39

8(c) (iii) Discuss the benefits of using Computer Aided Manufacture (CAM) to manufacture ten clocks. [3]

END OF PAPER

Page 47: GCSE DESIGN AND TECHNOLOGY UNIT 1 WEDNESDAY, 23 MAY …pastpapers.download.wjec.co.uk › s18-4141-01-18-mlp.pdf · 2019-03-05 · technical details that are needed to manufacture

40

FOR CONTINUATION ONLY.

Page 48: GCSE DESIGN AND TECHNOLOGY UNIT 1 WEDNESDAY, 23 MAY …pastpapers.download.wjec.co.uk › s18-4141-01-18-mlp.pdf · 2019-03-05 · technical details that are needed to manufacture

41