Maintenance OverviewEric C. Pitts, P.E.

State Maintenance EngineerJune 28, 2013

Page 2: GDOT Maintenance Overview Eric C. Pitts, P.E. State Maintenance Engineer June 28, 2013

Current Roadways Maintained

•18,100 centerline miles on the State Route System•47,648 Lane Miles

Page 3: GDOT Maintenance Overview Eric C. Pitts, P.E. State Maintenance Engineer June 28, 2013
Page 4: GDOT Maintenance Overview Eric C. Pitts, P.E. State Maintenance Engineer June 28, 2013

1955

Page 5: GDOT Maintenance Overview Eric C. Pitts, P.E. State Maintenance Engineer June 28, 2013

South from 14th Street in 1953South from 14th Street in 1953

Page 6: GDOT Maintenance Overview Eric C. Pitts, P.E. State Maintenance Engineer June 28, 2013

South from 14th Street in 2004South from 14th Street in 2004

Page 7: GDOT Maintenance Overview Eric C. Pitts, P.E. State Maintenance Engineer June 28, 2013

Identifying Maintenance Needs

• Pavement Condition Evaluation System (PACES)

• Daytime Inspection• Night Inspection• Drainage Inspection• Bridge Inspection• Visual Observation and Reported deficiency

Page 8: GDOT Maintenance Overview Eric C. Pitts, P.E. State Maintenance Engineer June 28, 2013

Pavements - Target Condition Levels

•Maintain interstates with 50,000 or greater ADT at a PACES Rating of 80 or more•Maintain all other interstates at a PACES Rating of 75 or more•Maintain multi-lane non interstate routes with an ADT of 25,000 or greater at a PACES Rating of 75 or more•Maintain other routes at a PACES Rating of 70 or more

Page 9: GDOT Maintenance Overview Eric C. Pitts, P.E. State Maintenance Engineer June 28, 2013

Life Cycle of a Road

DesignConstructionInitial DeteriorationVisible DeteriorationDisintegration and Failure

Page 10: GDOT Maintenance Overview Eric C. Pitts, P.E. State Maintenance Engineer June 28, 2013

Treatment for Initial Deterioration

Page 11: GDOT Maintenance Overview Eric C. Pitts, P.E. State Maintenance Engineer June 28, 2013

Visible Deterioration

Page 12: GDOT Maintenance Overview Eric C. Pitts, P.E. State Maintenance Engineer June 28, 2013

Treatment for Visual Deterioration

Page 13: GDOT Maintenance Overview Eric C. Pitts, P.E. State Maintenance Engineer June 28, 2013

Disintegration and Failure

Page 14: GDOT Maintenance Overview Eric C. Pitts, P.E. State Maintenance Engineer June 28, 2013

Treatment for Disintegration and Failure

Page 15: GDOT Maintenance Overview Eric C. Pitts, P.E. State Maintenance Engineer June 28, 2013
Page 16: GDOT Maintenance Overview Eric C. Pitts, P.E. State Maintenance Engineer June 28, 2013

Target Condition Levels

• Guardrail repairs Interstate repairs to be made within 2 days of notification, divided highways repairs within 5 days and others within 1 month. •Drainage Maintenance 75% of drainage structures are to be maintained with an inspection score of 70 or higher.•Mowing – Interstates mowed 3 times yearly, non – interstates mowed 2 times yearly (all mowable areas)

Page 17: GDOT Maintenance Overview Eric C. Pitts, P.E. State Maintenance Engineer June 28, 2013

Guardrail Repair

Page 18: GDOT Maintenance Overview Eric C. Pitts, P.E. State Maintenance Engineer June 28, 2013

Bridges - Target Condition Levels

•Maintain bridges such that they can carry all legal loads•Maintain bridges such that the decks are in fair condition, or better