Upload
others
View
0
Download
0
Embed Size (px)
Citation preview
Test log for safety testing of electrical equipment of machines
V1.7_19.06.2020
Specifications for safety testing
Insofar as they apply to the installation/machine supplied, performance of the following tests is mandatory:
1. Initial electrical testing in accordance with VDE 0113-1 (DIN EN ISO 60204) and VDE 0100-600 A detailed list of the measurements to be taken is given in the annex.
2. Initial inspection and initial testing of electro-sensitive protective equipment in accordance with DIN EN 62046 / VDE 0113-211 / Provision on Operating Safety (BetrSichV) Stopping performance is to be measured in accordance with DIN EN ISO 13855.
3. Checking of ESD capability in accordance with DIN EN ISO 61340-5-1 The discharge resistances of setting-down surfaces and the field strengths
of individual insulators are to be measured
4. Testing of the closing force of power-operated guards in accordance with DIN EN ISO 14120 The actual closing force is to be measured.
All measurements are to be taken by a person qualified to perform the corresponding test.
Use is to be made of measuring instruments that comply with the applicable standards.
All tests are to be documented with the corresponding measured values and submitted to ebm-papst on acceptance of the installation/machine.
If the installation/machine is fully or partially disassembled for transportation, renewed testing (item 1) must be performed at the assembly location.
ebm-papst Mulfingen GmbH & Co. KG | Bachmühle 2 D-74673 Mulfingen Page 1 of 30
Test log for safety testing of electrical equipment of machines
V1.7_19.06.2020
Annex to item 1The measurement protocol to be supplied must list all the measurements performed (measurement points), as well as the reference point for each measurement. The following measurements are to be performed:
1. Low-resistance measurement (protective earth resistance, equipotential bonding) in accordance with VDE 0113-1/18.2.2Test current: min.10 A
2. Insulation resistance measurement in accordance with VDE 0113-1/18.3 Measurements are to be taken on all the conductors of the main circuit.
3. Voltage measurement (HV) in accordance with VDE 0113-1/18.4 Measurements are to be taken on all the conductors of the main circuit.Assemblies and devices not designed to withstand this test and overvoltage protectors that would probably be triggered during measurement were disconnected before the test. Assemblies and devices subjected to voltage testing on the basis of the applicable product standards can be disconnected during the test.
4. Leakage current measurement Measurement method: Measurement of current difference between phase and neutral conductors.
True RMS measurement.In the case of measured values ≥10 mA TRMS, a connection is to be provided for additional equipotential bonding on or in the switch cabinet.
5. Ground fault loop impedance and system impedance measurement in accordance with VDE 0100-600Measurements are to be taken on all protected current paths of the main circuit. At the connection furthest away in each case.The reference value of the connection point during the measurement is also to be documented.
6. Residual voltage measurement in accordance with VDE 0113-1/6.2.4 If a hazardous residual voltage still remains after the corresponding decay time, this is to be clearly marked on the switch cabinet.
7. RCD measurement in accordance with VDE 0100-600 Measurements are to be taken with the corresponding tripping currents depending on the type of RCD.
ebm-papst Mulfingen GmbH & Co. KG | Bachmühle 2 D-74673 Mulfingen Page 2 of 30
The ebm-papst Mulfingen internal test log is appended to this document. It can be used as a specimen log.
Usage is not obligatory!
Test log for safety testing of electrical equipment of machines
V1.7_19.06.2020
Test log for the safety testing of the electrical equipment of machines
Log number: (Installation number_date)
Details of test objectMachine: Year of manufacture:
Manufacturer: Installation number:
Place of testing: Inventory number:
Type of testing: Initial test Repeat test Testing following modification or repair Only partial testing required
Order number:
General remarks:
Tests carried out:
Yes No Not applicable
Initial electrical testing in accordance with VDE 0113 Annex 1
Initial inspection and testing ofelectro-sensitive protective equipment Annex 2
Testing of ESD capability Annex 3
Testing of closing force of automatically closing guards Annex 4
Completeness of documentation Annex 5
ebm-papst Mulfingen GmbH & Co. KG | Bachmühle 2 D-74673 Mulfingen Page 3 of 30
Test log for safety testing of electrical equipment of machines
V1.7_19.06.2020
Annex 1 Initial electrical testing and repeat testingReferences to laws and standards: Provision on Operating Safety (BetrSichV), § 5 DGUV regulation 3
VDE 0113-1 / DIN EN 60204-1 / IEC 204-1 VDE 0100-600 VDE 0701-0702
Initial test Repeat test
Technical specificationsNominal voltage V: Remarks:
Nominal current A:
Rated output VA:
Back-up fuse A:
This test log confirms the proper performance of all tests prescribed within the scope of the quoted standards on acceptance of the above-mentioned electrical machine / installation.
Testing was performed by a qualified person meeting the requirements as per DIN VDE 0105 Part 1/5.75, item 3.2.1.
The machine/installation tested meets the requirements of DIN VDE 0113/EN 60204-1/IEC 204-1in every respect.
OK Not OK Not applicable
1.1 Visual inspection 1.1.1 General design features 1.1.2 Electrical equipment 1.1.3 Machine/installation
1.2 Measurements 1.2.1 Low-resistance measurement (protective earth resistance, equipotential bonding) 1.2.2 Ground fault loop impedance/system impedance measuring 1.2.3 Insulation resistance measuring 1.2.4 Voltage measuring (HV) 1.2.5 Residual voltage measuring 1.2.6 Leakage current measuring 1.2.7 RCD measuring
1.3 Testing of function and functional safety
ebm-papst Mulfingen GmbH & Co. KG | Bachmühle 2 D-74673 Mulfingen Page 4 of 30
Place SignatureNameDate
Place SignatureNameDate
Test log for safety testing of electrical equipment of machines
V1.7_19.06.2020
Information on place of testing/measurements:
Connection location:
System configuration:
Sub-distribution:
Connection point designation:
Reference measurements:
Measuring instrument used:
Impedance Short-circuit currentFault impedance measurement
L1 – PE mΩ AL2 – PE mΩ AL3 – PE mΩ A
Systemimpedancemeasurement
L1 - L2 mΩ AL2 - L3 mΩ AL1 - L3 mΩ AL1 – N mΩ AL2 – N mΩ AL3 – N mΩ A
ebm-papst Mulfingen GmbH & Co. KG | Bachmühle 2 D-74673 Mulfingen Page 5 of 30
Comments:
Manufacturer:Type:Serial no.:Last calibration:
Test log for safety testing of electrical equipment of machines
V1.7_19.06.2020
Visual inspection1.1.1 General design features
OK Not OK Not Remarks applicable Name plate affixed
Labeling of control elements and emergency stop in local language
Attachment/accessibility of control element
Attachment/accessibility of main switch and emergency stop button
Accessibility of electrical equipment
Cleanliness, general condition
Labeling of pneumatic components
Pneumatic diagram in document pouch
ebm-papst Mulfingen GmbH & Co. KG | Bachmühle 2 D-74673 Mulfingen Page 6 of 30
Comments:
Test log for safety testing of electrical equipment of machines
V1.7_19.06.2020
1.1.2 Electrical equipment (switch cabinet, panel, terminal box)
OK Not OK Not Remarks applicable Equipment marked
Equipment installation location marked
Equipment installed as per manufacturer's specifications
Logical arrangement of equipment
Terminal strips labeled
Terminals labeled
Wires labeled at connection point
Warning notes / signs affixed (in local language)
Plug-in lines labeled
Line dimensioning
Wire colors (in accordance with internal standard)
Marking of non-disconnected circuits
Spatial separation of different voltage levels
Marking of protective earth connections
Electrically conductive parts grounded
Additional grounding of electric drives
Protection against direct contact
Extra-low voltage SELV / PELV
Selectivity of overcurrent protectors
Dimensioning of switch cabinet cooling
Additional equipotential bonding provided and marked
ebm-papst Mulfingen GmbH & Co. KG | Bachmühle 2 D-74673 Mulfingen Page 7 of 30
Bemerkungen:Comments:
Test log for safety testing of electrical equipment of machines
V1.7_19.06.2020
1.1.3 Machine / installation electrical equipment
OK Not OK Not Remarks applicable Equipment marked
Equipment fitted as per manufacturer's specifications
Cables / sheathed cables marked
Warning notes / signs affixed (in local language)
Line dimensioning
Selection of lines and method of laying
Marking of protective earth terminals
Equipotential bonding (item sections and doors) fitted
Electrically conductive parts grounded
Protection against direct contact
Plug-in connection secured against self-opening
Equipotential bonding strip fitted and labeled
ebm-papst Mulfingen GmbH & Co. KG | Bachmühle 2 D-74673 Mulfingen Page 8 of 30
Comments:
Test log for safety testing of electrical equipment of machines
V1.7_19.06.2020
1.2 Measuring
1.2.1 Low-resistance measuring (protective earth resistance,equipotential bonding) in accordance with VDE 0113-1/18.2.2
Measuring instrument used:
Test current: 10A AC ≥200mA AC ≥200mA DC
Test duration: 5 sec.
Measuring instrument offset:
The specified limit value corresponds to values such as length, cross-section and material of the relevant protective earth. The test duration and the limit value for the permissible protective earth resistance are listed for the individual measurement points.
Number of measurements performed:
Measurement reference point:
No. Measurement pointSpecified limit value
in mΩ
Resistance measured value
in mΩ
Assessment
OK Not OK
123456789101112131415161718192021
No. Measurement pointSpecified limit value
in mΩ
Resistance measured value
in mΩ
Assessment
OK Not OK
ebm-papst Mulfingen GmbH & Co. KG | Bachmühle 2 D-74673 Mulfingen Page 9 of 30
mΩ
Manufacturer:Type:Serial no.:Last calibration:
Test log for safety testing of electrical equipment of machines
V1.7_19.06.2020
2223242526272829303132333435363738394041424344454647484950515253545556575859606162636465
1.2.2 Ground fault loop impedance/system impedance measurement VDE 0113-1/18.2.3
Measuring instrument used:
ebm-papst Mulfingen GmbH & Co. KG | Bachmühle 2 D-74673 Mulfingen Page 10 of 30
Manufacturer:Type:Serial no.:Last calibration:
Test log for safety testing of electrical equipment of machines
V1.7_19.06.2020
The connection point and its reference values are listed on Page 2 of the log.Measurement values have been measured at the farthest point of the respective protection device.
Number of measurements performed:
No.
Measurement point/terminal/circuit
Protective deviceType
Nominal Current
IN
K-Facto
r
Tripping currentin A
Ia = K x IN
max. impedance
in mΩ2/3 UL-PE / Ia2/3 UL-L(N) / Ia
Measured valuein mΩ
ZSCH / ZI
Assessment
OK Not OKDesignation Pt.
1Pt.2
123456789
101112131415161718192021222324252627282930
ebm-papst Mulfingen GmbH & Co. KG | Bachmühle 2 D-74673 Mulfingen Page 11 of 30
Comments:
Test log for safety testing of electrical equipment of machines
V1.7_19.06.2020
1.2.3 Insulation resistance measurement in accordance with 0113-1/18.3
Measuring instrument used:
Test voltage: 500V DC 250V DC
The phase conductors of the supply line/supply terminals and the neutral conductor were connected together for the measurement. All main circuit switching devices were actuated.Further measurements are listed in the measured value table.
ebm-papst Mulfingen GmbH & Co. KG | Bachmühle 2 D-74673 Mulfingen Page 12 of 30
Comments:
Manufacturer:Type:Serial no.:Last calibration:
Number of measurements performed:
No.Connection / terminal / circuit Specified
limit valuein MΩ
Resistance measured value in MΩ
Assessment
Designation Connection OK NotOK
1234567891011121314151617181920
Test log for safety testing of electrical equipment of machines
V1.7_19.06.2020
1.2.4 Voltage measurement (HV) in accordance with VDE 0113-1/18.4
Measuring instrument used:
Test voltage: 1000V AC Test duration: 1 second
Assemblies and devices not designed to withstand this test and overvoltage protectors that would probably be triggered during measurement were disconnected before the test. Assemblies and devices subjected to voltage testing on the basis of the applicable product standards can be disconnected during the test.The phase conductors of the supply line/supply terminals and the neutral conductor were connected together for the measurement. All main circuit switching devices were actuated.Further measurements are listed in the measured value table..
Number of measurements performed:
No.Connection / terminal / circuit Measured value
in mAAssessment
Designation Connection OK Not OK
123456789101112131415
ebm-papst Mulfingen GmbH & Co. KG | Bachmühle 2 D-74673 Mulfingen Page 13 of 30
Comments:
Manufacturer:Type:Serial no.:Last calibration:
Test log for safety testing of electrical equipment of machines
V1.7_19.06.2020
1.2.5 Residual voltage measurements in accordance with VDE 0113-1/18.5 (6.2.4)
Measuring instrument used:
Safe isolation of the machine/installation from the supply following shut-off/disconnection of the supply was measured and the time taken for the voltage to decay to a value of less than 60 V DC was determined.
Limit values: 1 sec 5 sec
1 second Plug-in cable, measurement taken at terminals of cable 5 seconds Residual voltage in closed housing, corresponding
measurement point was recorded in measured value table.
Number of measurements performed:
No. Measurement point / terminal / circuit Measured valueTime until U < 60 V
in s
Residual voltageafter 1 s/5 s
in V
Assessment
OK Not OKDesignation Pt. 1 Designation Pt. 2
1234567891011121314151617181920
ebm-papst Mulfingen GmbH & Co. KG | Bachmühle 2 D-74673 Mulfingen Page 14 of 30
Comments:
Manufacturer:Type:Serial no.:Last calibration:
Test log for safety testing of electrical equipment of machines
V1.7_19.06.2020
1.2.6 Leakage current measurement
Measuring instrument used:
Measurement method: Measurement of current difference between phase and neutral conductors.True RMS measurement.
Number of measurements performed:
No. Measurement point / circuit / equipment Measured valuein mA
AssessmentOK Not OK
123456789
101112131415
Highest measured value >3.5 mAA warning notice is required.
Highest measured value ≥ 10 mA,additional equipotential bonding required.A warning notice is required.
ebm-papst Mulfingen GmbH & Co. KG | Bachmühle 2 D-74673 Mulfingen Page 15 of 30
Comments:
Manufacturer:Type:Serial no.:Last calibration:
Test log for safety testing of electrical equipment of machines
V1.7_19.06.2020
1.2.7 RCD measurement
Measuring instrument used:
Test current: 1) AC ramp (0.3 – 1.3 x I∆N) 4) DC ramp (0.3 – 1.3 x I∆N)2) 1 x I∆N AC 5) 1 x I∆N DC3) 5 x I∆N AC 6) 5 x I∆N DC
Note on measurements to be performed: RCD Type A: Test current 1) - 3) RCD Type B: Test current 1) - 6)
Number of measurements performed:
No. Equip. ID Type
Nominal currentIN in A
Nominal fault current
I∆N in mA
Test current1) - 6)
Measured value
Ia in mA
Measured value
ta in ms
Measured value
RE in Ω
Measured value
UB in V
Assessment
OK Not OK
123456789101112131415161718
ebm-papst Mulfingen GmbH & Co. KG | Bachmühle 2 D-74673 Mulfingen Page 16 of 30
Comments:
Manufacturer:Type:Serial no.:Last calibration:
Test log for safety testing of electrical equipment of machines
V1.7_19.06.2020
1.3 Testing of functional safety
OK Not OK Not Remarks applicable Emergency stop function Shut-off
Emergency stop function of main switch (if red-yellow)
Acknowledgment required after emergency stop
All fixed protective devices fitted
All removable protective devices monitored
No start-up with open guard/protective device
Electrical interlocking of guards/protective device
Two-hand control fitted as per normative regulations
Interruption of electro-sensitive protective equipment stops movement
Main circuit voltages tested
Rotating field tested
Control circuit voltages tested (SELV/PELV)
ebm-papst Mulfingen GmbH & Co. KG | Bachmühle 2 D-74673 Mulfingen Page 17 of 30
Comments:
Test log for safety testing of electrical equipment of machines
V1.7_19.06.2020
Annex 2 Initial inspection and testing of electro-sensitive protective equipment
Initial inspection and testing of electro-sensitive protective equipment in accordance with DIN EN 62046 / VDE 0113-211 / DIN EN ISO 13855 /
Provision on Operating Safety (BetrSichV)
Initial inspection and testing successful Initial inspection and testing not successful
The test only relates to proper functioning, fitting and incorporation of the electro-sensitive protective equipment into the control system. It is not a substitute for machine safety testing. Modifications to the electro-sensitive protective equipment or the machine/installation render this initial inspection and test invalid. The initial inspection and test must then be repeated.
Table of contents:2.1. Details of the installation.................................................................................................................................................... 19
2.2. Details of the control system.............................................................................................................................................. 19
2.3. Assessment of protective device and hazard spot(s)......................................................................................................... 20
2.3.1. Details and checking of the protective device.................................................................................................................... 20
2.3.2. Structure and assessment of hazard spots:....................................................................................................................... 21
2.3.3. Stopping performance measurement protocol................................................................................................................... 23
3.1. Definition of dissipation method:........................................................................................................................................ 24
3.2. Visual inspection:............................................................................................................................................................... 24
3.3. Measurement of discharge resistances:............................................................................................................................ 25
3.4. Measuring field strength of insulators:............................................................................................................................... 26
ebm-papst Mulfingen GmbH & Co. KG | Bachmühle 2 D-74673 Mulfingen Page 18 of 30
Place SignatureNameDate
Place SignatureNameDate
Comments:
Test log for safety testing of electrical equipment of machines
V1.7_19.06.2020
2.1. Details of the installationMachine: Installation
number:
Manufacturer: Inventory number:
Cost center: Comments:
Site:
Performance level PL: a b c d e
The performance level (PL) of the downstream peripheral equipment corresponds at least to the performance level (PL) of the installation as a whole.
Yes No
2.2. Details of the control systemType of control: Programmable Conventional Manufacturer:
Programmer: Type:
Mode of operation: Protective mode Single break Double-breakWith parts monitoring Manual Start Other
Restart interlock: OK Not OK Not applicableExternal device monitoring: OK Not OK Not applicable
Equipment ID:
Performance level PL: a b c d e
ebm-papst Mulfingen GmbH & Co. KG | Bachmühle 2 D-74673 Mulfingen Page 19 of 30
Test log for safety testing of electrical equipment of machines
V1.7_19.06.2020
2.3. Assessment of protective device and hazard spot(s)
2.3.1. Details and checking of the protective deviceType of protective device:Manufacturer:Type:Serial number:Performance level: a b c d eResponse time:Detection capability:Equipment ID:Range:Installation position: horizontal vertical diagonalDeflection mirror provided: Yes NoDoes the protective device have a safety-relevant function? Yes No
Cascading: OK Not OK Not applicableMuting: OK Not OK Not applicableBlanking: OK Not OK Not applicableRestart interlock (internal): OK Not OK Not applicableExternal device monitoring (internal): OK Not OK Not applicableProtective device attached as per manufacturer's specifications: OK Not OK Not applicable
Protective device electrically wired as per manufacturer's specifications: OK Not OK Not applicable
Protective device checked for damage: OK Not OK Not applicableNo reflecting surfaces near and around the protective field: OK Not OK Not applicable
Protective device effective in all modes of operation: OK Not OK Not applicableFurther safety measures taken with disconnectable protective device: OK Not OK Not applicable
Test finger adapted to detection capability (incl. instructions) fitted as per manufacturer's specifications: OK Not OK Not applicable
Connection diagram of installation/machine provided: OK Not OK Not applicableProtective device wired as per circuit diagram provided: OK Not OK Not applicableTechnical documentation of protective device provided: OK Not OK Not applicable
Protective device used as:
Protective field for orthogonal approach Protective field for parallel approach Presence-sensing device Access control
ebm-papst Mulfingen GmbH & Co. KG | Bachmühle 2 D-74673 Mulfingen Page 20 of 30
Fig 1: Use as protective field for orthogonal approach and access control
Fig 2: Use as protective field for parallel approach and presence sensing
Test log for safety testing of electrical equipment of machines
V1.7_19.06.2020
2.3.2. Structure and assessment of hazard spots:
Dimensionin mm
A Length of protective field ( A1 – A2 ) Not applicable
A1 Top edge of protective field Not applicable
A2 Bottom edge of protective field Not applicable
B1 Bottom edge of danger zone Not applicable
B2 Top edge of danger zone Not applicable
B3 Height of hazardous point above floor Not applicable
E Distance between protective field and machine body Not applicable
SistProtective field distance from hazardous point Not applicable
C1 Protective field distance on reaching over Not applicable
C2 Protective field distance on reaching under Not applicable
H Height of protective field above floor Not applicable
ebm-papst Mulfingen GmbH & Co. KG | Bachmühle 2 D-74673 Mulfingen Page 21 of 30
Test log for safety testing of electrical equipment of machines
V1.7_19.06.2020
1 Not possible to step behind protective field (dimension E 75 mm) or additional action taken to safeguard the area
OK Not OK Not applic.
2 Not possible to reach over protective field Dimension C1 from DIN EN ISO 13855 Table 1 OK Not OK Not applic.
3 Not possible to reach over protective field Dimension C1 from DIN EN ISO 13855 Table 1 OK Not OK Not applic.
4 Not possible to reach around protective field OK Not OK Not applic.
5 Fixed guard OK Not OK Not applic.
6 Guards with interlock correspond to the performance level (PL) of the machine as a whole OK Not OK Not applic.
6.1 Hazardous movement is stopped after opening a protective device OK Not OK Not applic.
6.2 Restart interlock active after closing the protective device OK Not OK Not applic.
7 Height of danger zone above floor 750 mm or additional access protection provided OK Not OK Not applic.
8Accessible danger zone: Bottom edge of protective field (dimension B1) 200 mm
OK Not OK Not applic.
9 Accessible danger zone: Top edge of protective field (dimension B2) 900 mm OK Not OK Not applic.
10 Resetting of restart interlock not possible from danger zone OK Not OK Not applic.
11 Entire hazardous point visible from place of resetting restart interlock OK Not OK Not applic.
When “cycle operation” mode is possible, the following items must be checked:
12 Work area height 600 mm or work area depth 1000 mm OK Not OK Not applic.
13 Item 1 must be assessed as being OK OK Not OK Not applic.
14 Item 7 must be assessed as being OK OK Not OK Not applic.
15 Detection capability of protective device 30 mm OK Not OK Not applic.
The following items must be checked in the case of a protective field for parallel approach:
16 Height of protective field above floor (dimension H) 200 mm OK Not OK Not applic.
17 Height of protective field above floor (dimension H) 1000 mm OK Not OK Not applic.
18 Further safety measures taken to protect against crawling underneath (dimension H between 200 mm and 1000 mm) OK Not OK Not applic.
ebm-papst Mulfingen GmbH & Co. KG | Bachmühle 2 D-74673 Mulfingen Page 22 of 30
Test log for safety testing of electrical equipment of machines
V1.7_19.06.2020
2.3.3. Stopping performance measurement protocol
Measuring instrument used:
Actuator: Wire draw encoder Friction wheel Light barrier Relay box Not applicable
Measurement direction: Retraction Extension Other Counter-clockwise Clockwise Not applicable
Protective device: Two-hand/door interlock Light curtain for orthogonal approach Light curtain for parallel approach Multi-beam electro-sensitive protective equipment (access control/3D camera system) Scanner/electro-sensitive protective equipment access protection/pressure-sensitive mat Press brake
Tool no. fitted (Designation / WZ.(tool) no.):
Measured Values:
The actual protective field distance SIST from the hazardous point is mm.
The minimum safety distance determined at least corresponds to the actual protective field distance.Yes No
ebm-papst Mulfingen GmbH & Co. KG | Bachmühle 2 D-74673 Mulfingen Page 23 of 30
Manufacturer:Type:Serial no.:Last calibration:
SPM Point in mmMaximum speed in mm/sStopping distance in mmStopping time in msMinimum safety distance SMIN in mm
Test log for safety testing of electrical equipment of machines
V1.7_19.06.2020
Annex 3 Checking of ESD capabilityChecking of ESD capability in accordance with DIN EN 61340-5-1
as well as internal guidelines
Details of test objectMachine: Tester :
Manufacturer: ESD officer :
Installation number:
Year of manufacture:
Test date / period: from: to:
Initial test following completion Repeat test
3.1. Definition of dissipation method: Charge dissipation takes place via protective grounding of the machine. Charge dissipation takes place via a defined equipotential bonding point.
3.2. Visual inspection:OK Not OK Not applicable
1. All setting-down surfaces made of ESD-capable material 2. All surfaces likely to be used for setting-down designed to be ESD-capable 3. All electrically conductive, grounded surfaces covered with dissipative mats 4. All transparent cover panels made of dissipative plastic 5. ESD-capable rollers/feet fitted 6. Grounding point with connection notice provided 7. Low-resistance connection point for wrist-strap provided (pushbutton) 8. All permanently mounted tools (e.g. screwdrivers) grounded 9. All insulators fitted at an adequate distance 10. Dissipative components marked (rests, cover panels)
Overall test result: OK Not OK
ebm-papst Mulfingen GmbH & Co. KG | Bachmühle 2 D-74673 Mulfingen Page 24 of 30
Comments:
Place Date
Signature
Place Date
Signature
Test log for safety testing of electrical equipment of machines
V1.7_19.06.2020
3.3.Measurement of discharge resistances:
Measuring instrument used:
Test voltage: 100 V DC
Limit value: > 1 kΩ und < 1GΩ
Ambient conditions: Temperature: ˚C Relative humidity: %
Number of measurement performed:
Measurement reference point:
No. Measurement point Measured valueAssessmen
tOK Not
OK1234567891011121314151617181920
ebm-papst Mulfingen GmbH & Co. KG | Bachmühle 2 D-74673 Mulfingen Page 25 of 30
Comments:
Manufacturer:Type:Serial no.:Last calibration:
Test log for safety testing of electrical equipment of machines
V1.7_19.06.2020
3.4. Measuring field strength of insulators:
Measuring instrument used:
Before the start of measurement, equipotential bonding (protective earth) was connected to the connection socket of the measuring instrument
Limit value: 50V for every cm from ESD-sensitive component/unit
Number of measurement performed:
No. Measurement pointDistance from
componentin cm
Measured valuein V
Assessment
OK Not OK
123456789
1011121314151617181920
ebm-papst Mulfingen GmbH & Co. KG | Bachmühle 2 D-74673 Mulfingen Page 26 of 30
Comments:
Manufacturer:Type:Serial no.:Last calibration:
Test log for safety testing of electrical equipment of machines
V1.7_19.06.2020
Annex 4 Power-operated guardsTesting of power-operated guards in accordance with
DIN EN ISO 14120 / DIN EN 12453
Details of test objectMachine: Year of
manufacture:
Manufacturer: Installation number:
Place of testing: Inventory number:
General comments:Order number:
4.4.1. Visual inspection:
OK Not OK
Not applicable Remark
No dangerous crushing points
Adjusters (pressure regulator etc.) secured against manipulation
ebm-papst Mulfingen GmbH & Co. KG | Bachmühle 2 D-74673 Mulfingen Page 27 of 30
Comments:
Test log for safety testing of electrical equipment of machines
V1.7_19.06.2020
4.2. Measuring closing force:
Protective device does not open automatically upon contact with a person or object.
Measuring instrument used:
Measured closing force (in Newton): __________________ N
Assessment:Maximum closing force as per DIN EN ISO 14120 may not exceed 75N.
Protective device opens automatically upon contact with a person or an object.
Measuring instrument used:
Measured closing force (in Newton): __________________ N
Measured existing closing force remains in force: longer less than 0.75 seconds
Closing force goes down to <25N in 5 seconds: Yes No
Assessment:Maximum closing force as per DIN EN ISO 12453 (see table)This maximum value as defined in table may only persist for max. 0.75s (= Td).After Td has elapsed, no force <150N is permitted.This force must go down to <25N after no longer than 5 seconds.
ebm-papst Mulfingen GmbH & Co. KG | Bachmühle 2 D-74673 Mulfingen Page 28 of 30
Comments:
Manufacturer:Type:Serial no.:Last calibration:
Manufacturer:Type:Serial no.:Last calibration:
Test log for safety testing of electrical equipment of machines
V1.7_19.06.2020
4.3. Functional test with purely pneumatic systems:
OK Not OK
Not applicable Comment
Testing dual-channel nature of system/device
Overall test results: OK Not OK
ebm-papst Mulfingen GmbH & Co. KG | Bachmühle 2 D-74673 Mulfingen Page 29 of 30
Place SignatureName (Constructor)Date
Place SignatureName (Tester)Date
Comments:
Test log for safety testing of electrical equipment of machines
V1.7_19.06.2020
Annex 5 Documentation
OK Not Not NotOK available applicable
Description of machine/installation
Information on installation and assembly
Operating instructions
Servicing and maintenance plan
Connection diagram
Control programs (PC)
Setting instructions for equipment used
Settings for equipment used
Parts list/spare parts list
CE Declaration of Conformity
Test log: Initial electrical testing in accordance with VDE 0113-1
Test log: Initial inspection and testing of electro-sensitive protective equipment in accordance with Provision on Operating Safety (BetrSichV)
Test log: Stopping performance measurement
Test log: ESD suitability
Test log: Force measurement - Protective devices
Description of procedure in the case of faults/repair
Information on transportation
Information on disposal
Documentation in electronic form
ebm-papst Mulfingen GmbH & Co. KG | Bachmühle 2 D-74673 Mulfingen Page 30 of 30
Comments: