Embed Size (px)

DESCRIPTION

GENERAL MANAGER –INCHARGE PSSR VISIT TO 2X500W NTPL SITE,TUTICORIN DT:14.06.2013. A WARM WELCOME BY TUTICORIN SITE TO G M-IC,PSSR. GM-IC CHAT WITH GM, TUTICORIN & NEYVELI. - PowerPoint PPT Presentation

Citation preview

Page 1: GENERAL MANAGER –INCHARGE PSSR VISIT TO 2X500W NTPL SITE,TUTICORIN DT:14.06.2013

GENERAL MANAGER –INCHARGE

PSSR

VISIT TO

2X500W NTPL SITE,TUTICORIN

DT:14.06.2013

Page 2: GENERAL MANAGER –INCHARGE PSSR VISIT TO 2X500W NTPL SITE,TUTICORIN DT:14.06.2013

A WARM WELCOME BY TUTICORIN SITE TO GM-IC,PSSR

Page 3: GENERAL MANAGER –INCHARGE PSSR VISIT TO 2X500W NTPL SITE,TUTICORIN DT:14.06.2013

GM-IC CHAT WITH GM, TUTICORIN & NEYVELI

Shri.Durai Raj,Sr.Mgr/Boiler commg,distributing sweets for successful completion of Steam blowing activity

Page 4: GENERAL MANAGER –INCHARGE PSSR VISIT TO 2X500W NTPL SITE,TUTICORIN DT:14.06.2013

Reviewing readiness of intake water channel (NTPL Package) at site

Page 5: GENERAL MANAGER –INCHARGE PSSR VISIT TO 2X500W NTPL SITE,TUTICORIN DT:14.06.2013

Visit at Fuel oil Pump House

Page 6: GENERAL MANAGER –INCHARGE PSSR VISIT TO 2X500W NTPL SITE,TUTICORIN DT:14.06.2013

Visit at compressor house

Page 7: GENERAL MANAGER –INCHARGE PSSR VISIT TO 2X500W NTPL SITE,TUTICORIN DT:14.06.2013

Inspection of power cycle Piping

Page 8: GENERAL MANAGER –INCHARGE PSSR VISIT TO 2X500W NTPL SITE,TUTICORIN DT:14.06.2013

Inspection of TG Floor

Page 9: GENERAL MANAGER –INCHARGE PSSR VISIT TO 2X500W NTPL SITE,TUTICORIN DT:14.06.2013

Inside Common control room

Page 10: GENERAL MANAGER –INCHARGE PSSR VISIT TO 2X500W NTPL SITE,TUTICORIN DT:14.06.2013

Interaction with site staff at TG floor

Page 11: GENERAL MANAGER –INCHARGE PSSR VISIT TO 2X500W NTPL SITE,TUTICORIN DT:14.06.2013

Inspection at Boiler-1 Firing Floor

Page 12: GENERAL MANAGER –INCHARGE PSSR VISIT TO 2X500W NTPL SITE,TUTICORIN DT:14.06.2013

Inspection at Boiler-1 Firing Floor

Page 13: GENERAL MANAGER –INCHARGE PSSR VISIT TO 2X500W NTPL SITE,TUTICORIN DT:14.06.2013

Inspection of Junction Tower 10 & 11

Page 14: GENERAL MANAGER –INCHARGE PSSR VISIT TO 2X500W NTPL SITE,TUTICORIN DT:14.06.2013

GM-IC addressing site staff

Page 15: GENERAL MANAGER –INCHARGE PSSR VISIT TO 2X500W NTPL SITE,TUTICORIN DT:14.06.2013

GM-IC,PSSR discussion with CEO,NTPL Site,Tuticorin