CHECKED BY: DRAWN BY: FILE: APPROVED BY: Scituate, Massachusetts Well 18B Water Treatment Plant Modifications Town of Scituate DATE: PROJECT NO: Plotted On:May 25, 2021-5:09pm By: GNM Last Saved: 5/25/2021 Tighe & Bond: J:\S\S5001 Scituate DPW\029A Scituate 18B\Drawings_Figures\AutoCAD\Sheet\S5001-029A-G-002.dwg MARK DATE DESCRIPTION 0 3/17/2021 CONSTRUCTION SET 1 5/24/2021 PERMIT DRAWING S5001-029A-G-002.dwg PERMIT DRAWINGS MAY 2021 02/24/2021 S5001-029A SCALE: GNM CJG JNM GENERAL NOTES STREET LINES AND PROPERTY LINES AS SHOWN ON THESE DRAWINGS ARE APPROXIMATE ONLY. 20. 1. REGRADE ALL UNPAVED AREAS DISTURBED BY THE WORK TO ORIGINAL CONTOURS OR PROPOSED CONTOURS AS REQUIRED BY THE DRAWINGS. LOAM AND SEED ALL UNPAVED AREAS DISTURBED BY THE WORK. PROVIDE ACCESS FOR EMERGENCY VEHICLES AT ALL TIMES. COMPOST FILTER TUBES AND EROSION CONTROL MEASURES SHALL BE PROVIDED AS SHOWN ON THE DRAWINGS, MAINTAINED, AND REPLACED AS NECESSARY DURING THE PROJECT. BOLD TEXT AND LINES INDICATE PROPOSED WORK. LIGHT TEXT AND LINES INDICATE APPROXIMATE EXISTING CONDITIONS. SUPPORT AND MAINTAIN ALL EXISTING UTILITIES AND STRUCTURES DURING CONSTRUCTION, IF REMOVAL OR RESTORATION OF ANY PART OF THE UTILITY IS NECESSARY, IT SHALL BE DONE ONLY WITH THE APPROVAL OF THE OWNER'S PROJECT REPRESENTATIVE, AND SHALL BE DONE IN ACCORDANCE WITH STANDARDS OF THE COMMUNITY WHERE WORK IS BEING PERFORMED AND THE STANDARDS OF THE UTILITY OWNER. NO SEPARATE PAYMENT WILL BE MADE FOR THIS WORK AND THE COST OF THIS WORK SHALL BE INCLUDED UNDER THE PRICES BID FOR THE VARIOUS ITEMS OF WORK. NOTIFY DIG SAFE AT 888-344-7233 TO ARRANGE FOR MARKING OUT EXISTING UNDERGROUND UTILITIES AT LEAST 72 HOURS IN ADVANCE OF EXCAVATION AT ANY GIVEN LOCATION. NOTIFY THE TOWN DEPARTMENT OF PUBLIC WORKS (DPW) FOR MARKING OUT EXISTING TOWN OWNED UTILITIES. THE DPW OFFICE PHONE NUMBER IS 781-545-8732. UNDER NO CIRCUMSTANCES SHALL THE CONTRACTOR BE ALLOWED TO START ANY KIND OF EXCAVATION WORK PRIOR TO HIS OBTAINING ALL THE NECESSARY INFORMATION REGARDING THE LOCATION OF UNDERGROUND UTILITIES AT THE SITES. MINIMUM PIPE COVER SHALL BE 4'-6' AS MEASURED FROM THE UNDERSIDE OF THE PAVEMENT, UNLESS OTHERWISE SHOWN ON THE DRAWINGS OR DIRECTED IN THE FIELD BY THE OWNER'S PROJECT REPRESENTATIVE. HORIZONTAL AND VERTICAL LOCATION OF WORK MAY BE MODIFIED TO FIT EXISTING FIELD CONDITIONS UPON APPROVAL OF THE ENGINEER OR OWNER. PERFORM ALL EXCAVATION SO THAT UNDERGROUND UTILITIES OR STRUCTURES ARE NOT DAMAGED. CONTRACTOR SHALL BE RESPONSIBLE FOR ANY DAMAGE INCURRED DURING EXCAVATION OPERATIONS. REPAIR ANY EXISTING PIPE OR UTILITY DAMAGED DURING CONSTRUCTION AT NO ADDITIONAL COST TO THE OWNER. SHORE UTILITY TRENCHES WHERE FIELD CONDITIONS DICTATE AND/OR WHERE REQUIRED BY LOCAL, STATE AND FEDERAL HEALTH AND SAFETY CODES. TAKE NECESSARY MEASURES AND PROVIDE CONTINUOUS BARRIERS OF SUFFICIENT TYPE, SIZE, AND STRENGTH TO PREVENT ACCESS TO ALL WORK AND STAGING AREAS AT THE COMPLETION OF EACH DAYS WORK. STORE FUEL, OIL, PAINT, OR OTHER HAZARDOUS MATERIALS IN A SECONDARY CONTAINER AND REMOVE FROM THE SITE TO A LOCKED INDOOR AREA WITH AN IMPERVIOUS FLOOR DURING NON-WORK HOURS. 2. 6. 7. 8. 9. 10. 11. 12. 5. 13. 14. 15. 16. 17. 18. THE EXISTENCE OF UTILITIES AND APPURTENANCES AS SHOWN ON THESE DRAWINGS ARE FOR REFERENCE ONLY, AND THE EXACT SIZE, TYPE, LOCATION AND ELEVATION SHALL BE THOROUGHLY INVESTIGATED BY THE CONTRACTOR PRIOR TO THE START OF CONSTRUCTION. FIELD MEASURE TO VERIFY EXISTING AND CONTRACT INTERFACE DIMENSIONS, LOCATIONS, AND OTHER CONDITIONS. THE CONTRACTOR SHALL BE FULLY RESPONSIBLE FOR ANY AND ALL DAMAGE WHICH MIGHT BE OCCASIONED BY FAILURE TO EXACTLY LOCATE AND PRESERVE ANY AND ALL UTILITIES. 19. REPAIR/REPLACE PAVED SURFACES DISTURBED BY THE WORK IN-KIND, UNLESS NOTED OTHERWISE. PROVIDE A SUPPLY OF ABSORBENT SPILL RESPONSE MATERIALS, SUCH AS BOOMS, BLANKETS, AND OIL ABSORBENT MATERIALS AT THE CONSTRUCTION SITE AT ALL TIMES TO CLEAN UP POTENTIAL SPILLS OF HAZARDOUS MATERIALS. IMMEDIATELY REPORT SPILLS OF HAZARDOUS MATERIALS TO MASSDEP AT 888-304-1133 AND THE COMMUNITY WHERE THE WORK IS OCCURRING. 3. THE VERTICAL DATUM SHOWN HEREON IS THE NORTH AMERICAN VERTICAL DATUM OF 1988 (NAVD-88). 1. ALL EROSION CONTROL MEASURES SHOWN, SPECIFIED AND REQUIRED BY THE ENGINEER SHALL BE INSTALLED PRIOR TO ANY CONSTRUCTION OR IMMEDIATELY UPON REQUEST. MAINTAIN ALL SUCH CONTROL MEASURES UNTIL FINAL SURFACE TREATMENTS ARE IN PLACE AND/OR UNTIL PERMANENT VEGETATION IS ESTABLISHED. 2. PRIOR TO STARTING WORK, CLEARLY STAKE WORK LIMIT LINE(S). DO NOT DISTURB VEGETATION AND TOPSOIL BEYOND THE PROPOSED LIMIT LINE(S). COORDINATE WITH THE ENGINEER THE LOCATIONS FOR THE TEMPORARY STOCKPILING OF TOPSOIL DURING CONSTRUCTION. 3. ANY SEDIMENT TRACKED ONTO PAVED PUBLIC RIGHT-OF-WAYS BY VEHICLES LEAVING THE PROJECT SITE SHALL BE SWEPT AWAY AT THE END OF EACH DAY. 4. UTILIZE ADDITIONAL CONTROL MEASURES DURING THE CONSTRUCTION PERIOD WHEN APPLICABLE. 5. ALL CATCH BASINS SHALL BE PROTECTED WITH A SILT SACK, HAY BALE RING, SILT FENCE OR BLOCK AND STONE INLET PROTECTION THROUGHOUT THE CONSTRUCTION PERIOD AND UNTIL ALL DISTURBED AREAS ARE THOROUGHLY STABILIZED. 6. ALL DRAINAGE STRUCTURES SHALL BE PERIODICALLY INSPECTED BY THE CONTRACTOR AND CLEANED TO PREVENT THE BUILD-UP OF SILT. 7. DISPOSE OF SEDIMENT REMOVED FROM CONTROL STRUCTURES OFF-SITE. 8. INSPECT AND MAINTAIN CONTROL MEASURES THROUGHOUT THE CONSTRUCTION PERIOD. INSPECT AFTER EACH RAINSTORM AND DURING MAJOR STORM EVENTS TO DETERMINE ALL SEDIMENTATION AND EROSION CONTROL MEASURES ARE ADEQUATELY IN PLACE AND EFFECTIVE. 9. UTILIZE APPROVED METHODS/MATERIALS FOR PREVENTING THE BLOWING AND MOVEMENT OF DUST FROM EXPOSED SOIL SURFACES ONTO ADJACENT PROPERTIES AND SITE AREAS. 10. MAINTAIN AN ADDITIONAL SUPPLY OF EROSION CONTROL MEASURES ON-SITE FOR EMERGENCY REPAIRS. 11. EROSION CONTROL BLANKETS SHALL BE INSTALLED ON SLOPES 3:1 OR GREATER IN ACCORDANCE WITH MANUFACTURER'S INSTRUCTIONS. 12. SIDE SLOPES, SHOULDER AREAS AND DISTURBED VEGETATED AREAS, TO BE A MAXIMUM GRADE OF 2:1, COMPACTED, STABILIZED, LOAMED AND SEEDED AS SHOWN ON PLANS. ALL SIDE SLOPES SHALL BE IMMEDIATELY FINE GRADED AND SEEDED IN ACCORDANCE WITH THE PROJECT SPECIFICATIONS. 13. DEWATER AS NECESSARY TO KEEP CONSTRUCTION AREAS FREE OF WATER. DISCHARGE WATER FROM DEWATERING TO APPROPRIATE UPLAND LOCATION WITHOUT SEDIMENTATION. 14. ALL SILT-LADEN WATER MUST BE SETTLED OR FILTERED TO REMOVE SEDIMENTS PRIOR TO RELEASE IN A SEDIMENTATION OR FILTER BAG LOCATED DOWNGRADIENT OF THE DEWATERED AREA. 15. PLACE EROSION AND SEDIMENTATION CONTROLS ALONG THE DOWNHILL SIDE OF ANY CONSTRUCTION RELATED (TEMPORARY) STOCKPILE OF MATERIAL. SURROUND STAGING AREAS WITH EROSION AND SEDIMENTATION CONTROLS TO LIMIT EROSION AND SEDIMENTATION, OR SECONDARY IMPACT OF WETLAND AREAS. EROSION CONTROL NOTES NOTIFY THE OWNER'S PROJECT REPRESENTATIVE OF ANY EXISTING UTILITY DISCOVERED DURING THE WORK THAT IS NOT SHOWN ON THE DRAWINGS. 21. EQUIPMENT REFUELING AND MAINTENANCE NOTES 1. THE WORK WILL OCCUR WITHIN A PUBLIC WATER SUPPLY AREA. ALL ACTIVITIES OF THE CONTRACTOR SHALL BE IN STRICT CONFORMANCE WITH ALL APPLICABLE REGULATIONS AND GUIDELINES REGARDING STORAGE OR USE OF FUEL PRODUCTS. 2. SECONDARY CONTAINMENT MUST BE PROVIDED AT ALL TIMES DURING THE REFUELING PROCESS. NO TRANSFERRING OR REFUELING WILL BE ALLOWED OUTSIDE OF SECONDARY CONTAINMENT 3. ANY FUEL CONTAINERS BROUGHT ONTO THE SITE SHALL INCLUDE SECONDARY CONTAINMENT AT ALL TIMES. UNDER NO CIRCUMSTANCES SHALL FUEL OR OTHER LUBRICANTS BE STORED AT THE SITE OVERNIGHT. 4. MAINTENANCE OF CONSTRUCTION EQUIPMENT, INCLUDING WASHING OF CONSTRUCTION EQUIPMENT, SHALL NOT BE ALLOWED ON-SITE. CONSTRUCTION EQUIPMENT SHALL BE INSPECTED DAILY TO PREVENT THE ACCIDENTAL DISCHARGE OF OIL OR FUEL ONTO THE GROUND AT THE SITE. 5. ABSORBENT SPILL RESPONSE MATERIAL INCLUDING OIL ABSORBENT MATS AND SPILL BOOMS SHALL BE KEPT ON SITE AT ALL TIMES FOR USE IN THE EVENT OF SPILLS OR ACCIDENTAL DISCHARGES. SORBENT MATERIALS SHALL BE USED TO THE MAXIMUM EXTENT POSSIBLE TO CONTAIN OR REMOVE ANY MATERIALS SPILLED OUTSIDE OF SECONDARY CONTAINMENT STRUCTURES. NOTIFY THE OWNER AND ENGINEER IMMEDIATELY IN THE EVENT OF SPILLS OR ACCIDENTAL DISCHARGES. 6. THE CONTRACTOR SHALL SUBMIT A VEHICLE AND EQUIPMENT FUELING AND MAINTENANCE PLAN FOR THE PROJECT. THE CONTRACTOR SHALL ENSURE THAT ALL WORKERS ON SITE ARE FAMILIAR WITH THE PLAN AND THEIR RESPONSIBILITIES RELATIVE TO THE REFUELING AND MAINTENANCE OF EQUIPMENT AND THE STEPS NECESSARY IN THE EVENT OF SPILLS OR ACCIDENTAL DISCHARGES. NO EXCAVATION SHALL OCCUR ON THE LANDFILL SITE OR WITHIN 150 FEET OF THE LANDFILL CAP SYSTEM. 22. EXISTING PROPOSED EDGE OF PAVEMENT (WITH CURB) LEGEND DRAWING WHERE DETAIL IS DETAIL REFERENCE NUMBER SHOWN OR TAKEN SHOWN OR TAKEN SECTION REFERENCE LETTER DRAWING WHERE SECTION IS DETAIL 1 S102 SECTION S102 A BUILDING/STRUCTURE EDGE OF PAVEMENT (NO CURB) UNDERGROUND WATER MAIN CHAIN LINK FENCE SEDIMENTATION AND EROSION CONTROL EQUIPMENT, STRUCTURES, PIPING, AND/OR CONDUITS TO BE DEMOLISHED TREE OR SHRUB UTILITY POLE UNDERGROUND ELECTRIC OVERHEAD ELECTRIC UNDERGROUND STORM DRAIN SOIL BORING LOCATION E SD TREELINE MAJOR CONTOUR MINOR CONTOUR 50 48 VALVE LIGHT POLE PW STREET SIGN HYDRANT TELEPHONE BOX WATER MANHOLE W EDGE OF DIRT ROAD ABBREVIATIONS HEATING, VENTILATING HVAC INCH OR INCHES KILOWATT JOINT INVERT INTERIOR INSULATION INSTRUMENT OR INSTRUMENTATION INSIDE DIAMETER & AIR CONDITIONING HYDRANT KW JT INV IN INT INSUL INSTR ID HYD HOUSE HORSEPOWER HORIZONTAL GATE VALVE GROUND GRAVEL GRADE GALVANIZED GAUGE FOOTING FOOT OR FEET FLOOR FLANGE GR HSE HP HORIZ GV GRND GRAV GALV GA FTG FT FLR FLG UNDERGROUND BACKWASH WATER UBW WELDED WIRE FABRIC WATER GATE WATER MAIN WATER SUPPLY VERTICAL WS WWF VERT WG WM W W/ V WATER WITH VOLTS TOP OF FOOTING TELEPHONE POLE TYPICAL TOP OF WALL TEMPORARY TOP OF STEEL TOP & BOTTOM TELEPHONE STANDARD STRUCTURE OR STRUCTURAL SPECIFICATION STAINLESS STEEL SQUARE T&B T/FTG TEMP T/STL TYP T/WALL TP TEL STD STRUC SPEC STL SQ SS STEEL B/WALL BOTTOM OF WALL DIA, Ø DRAIN OR DRIVE FLEXIBLE FINISH OR FINISHED EXISTING EACH WAY EQUAL ELECTRIC OR ELECTRICAL ELEVATION EFFLUENT EACH FACE DRAWING DISCHARGE ELEC FLEX FIN. EXIST. EW EQ DR EL EFFL EF EA DWG DISCH EACH BRONZE OR BRICK CLEAN OUT CONCRETE CENTERLINE CONTINUOUS DIAMETER DUCTILE IRON DEMOLITION CONSTRUCTION JOINT CAST IRON CATCH BASIN BALL VALVE OR BUTTERFLY VALVE CO CONT CONC DI DEMO BR CJ CI CB BV C BOTTOM OF FOOTING BOTTOM BUILDING APPROXIMATE ALUMINUM BITUMINOUS ABOVE FINISHED FLOOR B/FTG BTM BLDG APPROX ALUM BIT. AFF @ AT MANHOLE MH PL PROPERTY LINE SIMILAR POLYVINYL CHLORIDE SANITARY SEWER MANHOLE SCHEDULE REQUIRED REINFORCING REDUCER SAN SHT SMH SCH SLV SIM SHEET SLEEVE PVC REQ'D RED REINF NORMALLY CLOSED PREMOLDED JOINT FILLER ON CENTER OUTSIDE DIAMETER MANUFACTURERS ASSOCIATION NUMBER MINIMUM MISCELLANEOUS MECHANICAL JOINT NORMALLY OPEN NOT TO SCALE NATIONAL ELECTRICAL N.T.S. PMF OD NO. OC NO MISC NEMA NC MJ MIN MAXIMUM MANUFACTURER MOTOR CONTROL CENTER LIGHT POLE LINEAL FEET MAX MFR MCC LP LG LF LONG LB POUND RO ROUGH OPENING GRATING GRTG PUMP P FLOOR DRAIN FD OVERHEAD ELECTRIC OE COPPER CU BACKFLOW PREVENTER BFP MASONRY OPENING M.O. VERIFY IN FIELD V.I.F. AV AIR VALVE BITUMINOUS CONCRETE BC ADJUSTABLE FREQUENCY DRIVE AFD AUTOMATIC TRANSFER SWITCH ATS ABOVE GRADE STORAGE TANK AST MANUAL TRANSFER SWITCH MTS ECB EROSION CONTROL BLANKET AMERICAN PLYWOOD ASSOCIATION APA CDX EXTERIOR GRADE PLYWOOD WITH ONE SIDE RATED A `C' GRADE & THE OTHER SIDE RATED A `D' GRADE LAMINATED VENEER LUMBER LVL MOISTURE RESISTANT M.R. HOLLOW STRUCTURAL SECTION HSS ELEVATION ELEV CONDUIT C E ELECTRIC FLOW METER FM PUBLIC WATER PW V VENT MANUAL ON UNIFORM MUTCD TRAFFIC CONTROL DEVICES HIGH POINT H.P. LOW POINT L.P. GROUND FAULT CIRCUIT INTERRUPTER GFI L MAGNETIC SURVEY NAIL MAG SURVEY SPIKE SPK TEMPORARY BENCHMARK TBM NO WORK SHALL OCCUR WITHIN WETLAND RESOURCE AREAS UNLESS NECESSARY PERMITS ARE OBTAINED. 4. H Y D WV CATCH BASIN STORM MANHOLE ACCESS COVER D RIPRAP RETAIN RET REMOVE REM FOOT CANDLE FC BASE MAPPING AND CONTOURS SHOWN ARE BASED ON MASSGIS DATA 200-FOOT RIVERFRONT AREA 100-FOOT BUFFER ZONE LIMIT OF COASTAL DUNE 50-FOOT BUFFER ZONE BORING BOR OUTLET CONTROL STRUCTURE OCS STORM DRAIN SD WETLAND FLAG WF 1 G-002 GENERAL NOTES, ABBREVIATIONS, AND LEGEND AS SHOWN HIGH DENSITY POLYETHYLENE HDPE ABOVE GRADE BACKWASH WATER ABW UTILITY POLE UP UNO UNLESS NOTED OTHERWISE OUTFALL DISCHARGE PIPE OP OUTFALL DISCHARGE PIPE OP OP UNDERGROUND BACKWASH WATER UBW UBW ABOVEGROUND BACKWASH WATER ABW ABW CONTRACTOR SHALL PROVIDE TEMPORARY FENCE 50-FEET EACH SIDE OF OPEN EXCAVATIONS AS SPECIFIED IN SECTION 01560. 23. CONTRACTOR SHALL PROVIDE CONTROLLED DENSITY FILL AT UTILITY CROSSING LOCATIONS AS DIRECTED BY THE ENGINEER. 24. LIMIT OF INLAND BANK MEAN HIGH TIDE LINE A TIGHE & BOND WETLAND SCIENTIST DELINEATED WETLAND RESOURCES AREA BOUNDARIES ON APRIL 7, 2021. THE DELINEATION INCLUDED INLAND BANK, MEAN HIGH TIDE (MHT) LINE, AND COASTAL DUNE. THE LIMITS OF WETLAND RESOURCE AREAS WERE LOCATED USING GLOBAL POSITIONING SYSTEMS (GPS) FOR DEPICTION ON THE PROJECT PLANS. 25. THE LIMIT OF LAND SUBJECT TO COASTAL STORM FLOWAGE (LSCSF) DEPICTED AT ELEVATION 16 FEET (NAVD88) BASED ON THE FEMA FLOOD INSURANCE RATE MAP PANEL NUMBER 25023C0136K (EFFECTIVE 11/4/2016). 26. LAND SUBJECT TO COASTAL STORM FLOWAGE 05/26/2021

GENERAL NOTES EROSION CONTROL NOTES

  • Upload
    others

  • View
    15

  • Download
    0

Embed Size (px)

Citation preview

Page 1: GENERAL NOTES EROSION CONTROL NOTES

CHECKED BY:

DRAWN BY:

FILE:

APPROVED BY:

Scituate,

Massachusetts

Well 18B

Water

Treatment

Plant

Modifications

Town of

Scituate

DATE:

PROJECT NO:

Plotted O

n:M

ay 25, 2021-5:09pm

By: G

NM

Last Saved:

5/25/2021

Tighe &

Bond:J:\S\S5001 Scituate D

PW

\029A Scituate 18B\D

raw

ings_Figures\AutoCAD

\Sheet\S5001-029A-G

-002.dw

g

MARK DATE DESCRIPTION

0 3/17/2021 CONSTRUCTION SET

15/24/2021 PERMIT DRAWING

S5001-029A-G-002.dwg

PERMIT

DRAWINGS

MAY 2021

02/24/2021

S5001-029A

SCALE:

GNM

CJG

JNM

GENERAL NOTES

STREET LINES AND PROPERTY LINES AS SHOWN ON THESE DRAWINGS ARE APPROXIMATE ONLY.20.

1.

REGRADE ALL UNPAVED AREAS DISTURBED BY THE WORK TO ORIGINAL CONTOURS OR PROPOSED CONTOURS

AS REQUIRED BY THE DRAWINGS. LOAM AND SEED ALL UNPAVED AREAS DISTURBED BY THE WORK.

PROVIDE ACCESS FOR EMERGENCY VEHICLES AT ALL TIMES.

COMPOST FILTER TUBES AND EROSION CONTROL MEASURES SHALL BE PROVIDED AS SHOWN ON THE

DRAWINGS, MAINTAINED, AND REPLACED AS NECESSARY DURING THE PROJECT.

BOLD TEXT AND LINES INDICATE PROPOSED WORK.

LIGHT TEXT AND LINES INDICATE APPROXIMATE EXISTING CONDITIONS.

SUPPORT AND MAINTAIN ALL EXISTING UTILITIES AND STRUCTURES DURING CONSTRUCTION, IF REMOVAL OR

RESTORATION OF ANY PART OF THE UTILITY IS NECESSARY, IT SHALL BE DONE ONLY WITH THE APPROVAL OF THE

OWNER'S PROJECT REPRESENTATIVE, AND SHALL BE DONE IN ACCORDANCE WITH STANDARDS OF THE COMMUNITY

WHERE WORK IS BEING PERFORMED AND THE STANDARDS OF THE UTILITY OWNER. NO SEPARATE PAYMENT WILL BE

MADE FOR THIS WORK AND THE COST OF THIS WORK SHALL BE INCLUDED UNDER THE PRICES BID FOR THE VARIOUS

ITEMS OF WORK.

NOTIFY DIG SAFE AT 888-344-7233 TO ARRANGE FOR MARKING OUT EXISTING UNDERGROUND UTILITIES AT

LEAST 72 HOURS IN ADVANCE OF EXCAVATION AT ANY GIVEN LOCATION. NOTIFY THE TOWN DEPARTMENT OF

PUBLIC WORKS (DPW) FOR MARKING OUT EXISTING TOWN OWNED UTILITIES. THE DPW OFFICE PHONE

NUMBER IS 781-545-8732. UNDER NO CIRCUMSTANCES SHALL THE CONTRACTOR BE ALLOWED TO START ANY

KIND OF EXCAVATION WORK PRIOR TO HIS OBTAINING ALL THE NECESSARY INFORMATION REGARDING THE

LOCATION OF UNDERGROUND UTILITIES AT THE SITES.

MINIMUM PIPE COVER SHALL BE 4'-6' AS MEASURED FROM THE UNDERSIDE OF THE PAVEMENT, UNLESS OTHERWISE

SHOWN ON THE DRAWINGS OR DIRECTED IN THE FIELD BY THE OWNER'S PROJECT REPRESENTATIVE.

HORIZONTAL AND VERTICAL LOCATION OF WORK MAY BE MODIFIED TO FIT EXISTING FIELD CONDITIONS UPON

APPROVAL OF THE ENGINEER OR OWNER.

PERFORM ALL EXCAVATION SO THAT UNDERGROUND UTILITIES OR STRUCTURES ARE NOT DAMAGED. CONTRACTOR

SHALL BE RESPONSIBLE FOR ANY DAMAGE INCURRED DURING EXCAVATION OPERATIONS. REPAIR ANY EXISTING

PIPE OR UTILITY DAMAGED DURING CONSTRUCTION AT NO ADDITIONAL COST TO THE OWNER.

SHORE UTILITY TRENCHES WHERE FIELD CONDITIONS DICTATE AND/OR WHERE REQUIRED BY LOCAL, STATE

AND FEDERAL HEALTH AND SAFETY CODES.

TAKE NECESSARY MEASURES AND PROVIDE CONTINUOUS BARRIERS OF SUFFICIENT TYPE, SIZE, AND STRENGTH

TO PREVENT ACCESS TO ALL WORK AND STAGING AREAS AT THE COMPLETION OF EACH DAYS WORK.

STORE FUEL, OIL, PAINT, OR OTHER HAZARDOUS MATERIALS IN A SECONDARY CONTAINER AND REMOVE FROM

THE SITE TO A LOCKED INDOOR AREA WITH AN IMPERVIOUS FLOOR DURING NON-WORK HOURS.

2.

6.

7.

8.

9.

10.

11.

12.

5.

13.

14.

15.

16.

17.

18.

THE EXISTENCE OF UTILITIES AND APPURTENANCES AS SHOWN ON THESE DRAWINGS ARE FOR REFERENCE

ONLY, AND THE EXACT SIZE, TYPE, LOCATION AND ELEVATION SHALL BE THOROUGHLY INVESTIGATED BY THE

CONTRACTOR PRIOR TO THE START OF CONSTRUCTION. FIELD MEASURE TO VERIFY EXISTING AND CONTRACT

INTERFACE DIMENSIONS, LOCATIONS, AND OTHER CONDITIONS. THE CONTRACTOR SHALL BE FULLY

RESPONSIBLE FOR ANY AND ALL DAMAGE WHICH MIGHT BE OCCASIONED BY FAILURE TO EXACTLY LOCATE AND

PRESERVE ANY AND ALL UTILITIES.

19. REPAIR/REPLACE PAVED SURFACES DISTURBED BY THE WORK IN-KIND, UNLESS NOTED OTHERWISE.

PROVIDE A SUPPLY OF ABSORBENT SPILL RESPONSE MATERIALS, SUCH AS BOOMS, BLANKETS, AND OIL ABSORBENT

MATERIALS AT THE CONSTRUCTION SITE AT ALL TIMES TO CLEAN UP POTENTIAL SPILLS OF HAZARDOUS MATERIALS.

IMMEDIATELY REPORT SPILLS OF HAZARDOUS MATERIALS TO MASSDEP AT 888-304-1133 AND THE COMMUNITY

WHERE THE WORK IS OCCURRING.

3.

THE VERTICAL DATUM SHOWN HEREON IS THE NORTH AMERICAN VERTICAL DATUM OF 1988 (NAVD-88).

1. ALL EROSION CONTROL MEASURES SHOWN, SPECIFIED AND REQUIRED BY THE ENGINEER SHALL BE

INSTALLED PRIOR TO ANY CONSTRUCTION OR IMMEDIATELY UPON REQUEST. MAINTAIN ALL SUCH CONTROL

MEASURES UNTIL FINAL SURFACE TREATMENTS ARE IN PLACE AND/OR UNTIL PERMANENT VEGETATION IS

ESTABLISHED.

2. PRIOR TO STARTING WORK, CLEARLY STAKE WORK LIMIT LINE(S). DO NOT DISTURB VEGETATION AND

TOPSOIL BEYOND THE PROPOSED LIMIT LINE(S). COORDINATE WITH THE ENGINEER THE LOCATIONS FOR THE

TEMPORARY STOCKPILING OF TOPSOIL DURING CONSTRUCTION.

3. ANY SEDIMENT TRACKED ONTO PAVED PUBLIC RIGHT-OF-WAYS BY VEHICLES LEAVING THE PROJECT SITE

SHALL BE SWEPT AWAY AT THE END OF EACH DAY.

4. UTILIZE ADDITIONAL CONTROL MEASURES DURING THE CONSTRUCTION PERIOD WHEN APPLICABLE.

5. ALL CATCH BASINS SHALL BE PROTECTED WITH A SILT SACK, HAY BALE RING, SILT FENCE OR BLOCK AND

STONE INLET PROTECTION THROUGHOUT THE CONSTRUCTION PERIOD AND UNTIL ALL DISTURBED AREAS ARE

THOROUGHLY STABILIZED.

6. ALL DRAINAGE STRUCTURES SHALL BE PERIODICALLY INSPECTED BY THE CONTRACTOR AND CLEANED TO

PREVENT THE BUILD-UP OF SILT.

7. DISPOSE OF SEDIMENT REMOVED FROM CONTROL STRUCTURES OFF-SITE.

8. INSPECT AND MAINTAIN CONTROL MEASURES THROUGHOUT THE CONSTRUCTION PERIOD. INSPECT AFTER

EACH RAINSTORM AND DURING MAJOR STORM EVENTS TO DETERMINE ALL SEDIMENTATION AND EROSION

CONTROL MEASURES ARE ADEQUATELY IN PLACE AND EFFECTIVE.

9. UTILIZE APPROVED METHODS/MATERIALS FOR PREVENTING THE BLOWING AND MOVEMENT OF DUST FROM

EXPOSED SOIL SURFACES ONTO ADJACENT PROPERTIES AND SITE AREAS.

10. MAINTAIN AN ADDITIONAL SUPPLY OF EROSION CONTROL MEASURES ON-SITE FOR EMERGENCY REPAIRS.

11. EROSION CONTROL BLANKETS SHALL BE INSTALLED ON SLOPES 3:1 OR GREATER IN ACCORDANCE WITH

MANUFACTURER'S INSTRUCTIONS.

12. SIDE SLOPES, SHOULDER AREAS AND DISTURBED VEGETATED AREAS, TO BE A MAXIMUM GRADE OF 2:1,

COMPACTED, STABILIZED, LOAMED AND SEEDED AS SHOWN ON PLANS. ALL SIDE SLOPES SHALL BE

IMMEDIATELY FINE GRADED AND SEEDED IN ACCORDANCE WITH THE PROJECT SPECIFICATIONS.

13. DEWATER AS NECESSARY TO KEEP CONSTRUCTION AREAS FREE OF WATER. DISCHARGE WATER FROM

DEWATERING TO APPROPRIATE UPLAND LOCATION WITHOUT SEDIMENTATION.

14. ALL SILT-LADEN WATER MUST BE SETTLED OR FILTERED TO REMOVE SEDIMENTS PRIOR TO RELEASE IN A

SEDIMENTATION OR FILTER BAG LOCATED DOWNGRADIENT OF THE DEWATERED AREA.

15. PLACE EROSION AND SEDIMENTATION CONTROLS ALONG THE DOWNHILL SIDE OF ANY CONSTRUCTION

RELATED (TEMPORARY) STOCKPILE OF MATERIAL. SURROUND STAGING AREAS WITH EROSION AND

SEDIMENTATION CONTROLS TO LIMIT EROSION AND SEDIMENTATION, OR SECONDARY IMPACT OF WETLAND

AREAS.

EROSION CONTROL NOTES

NOTIFY THE OWNER'S PROJECT REPRESENTATIVE OF ANY EXISTING UTILITY DISCOVERED DURING THE WORK THAT

IS NOT SHOWN ON THE DRAWINGS.

21.

EQUIPMENT REFUELING AND MAINTENANCE NOTES

1. THE WORK WILL OCCUR WITHIN A PUBLIC WATER SUPPLY AREA. ALL ACTIVITIES OF THE

CONTRACTOR SHALL BE IN STRICT CONFORMANCE WITH ALL APPLICABLE REGULATIONS AND

GUIDELINES REGARDING STORAGE OR USE OF FUEL PRODUCTS.

2. SECONDARY CONTAINMENT MUST BE PROVIDED AT ALL TIMES DURING THE REFUELING PROCESS.

NO TRANSFERRING OR REFUELING WILL BE ALLOWED OUTSIDE OF SECONDARY CONTAINMENT

3. ANY FUEL CONTAINERS BROUGHT ONTO THE SITE SHALL INCLUDE SECONDARY CONTAINMENT AT

ALL TIMES. UNDER NO CIRCUMSTANCES SHALL FUEL OR OTHER LUBRICANTS BE STORED AT THE

SITE OVERNIGHT.

4. MAINTENANCE OF CONSTRUCTION EQUIPMENT, INCLUDING WASHING OF CONSTRUCTION EQUIPMENT,

SHALL NOT BE ALLOWED ON-SITE. CONSTRUCTION EQUIPMENT SHALL BE INSPECTED DAILY TO

PREVENT THE ACCIDENTAL DISCHARGE OF OIL OR FUEL ONTO THE GROUND AT THE SITE.

5. ABSORBENT SPILL RESPONSE MATERIAL INCLUDING OIL ABSORBENT MATS AND SPILL BOOMS SHALL

BE KEPT ON SITE AT ALL TIMES FOR USE IN THE EVENT OF SPILLS OR ACCIDENTAL DISCHARGES.

SORBENT MATERIALS SHALL BE USED TO THE MAXIMUM EXTENT POSSIBLE TO CONTAIN OR REMOVE

ANY MATERIALS SPILLED OUTSIDE OF SECONDARY CONTAINMENT STRUCTURES. NOTIFY THE OWNER

AND ENGINEER IMMEDIATELY IN THE EVENT OF SPILLS OR ACCIDENTAL DISCHARGES.

6. THE CONTRACTOR SHALL SUBMIT A VEHICLE AND EQUIPMENT FUELING AND MAINTENANCE PLAN FOR

THE PROJECT. THE CONTRACTOR SHALL ENSURE THAT ALL WORKERS ON SITE ARE FAMILIAR WITH THE

PLAN AND THEIR RESPONSIBILITIES RELATIVE TO THE REFUELING AND MAINTENANCE OF EQUIPMENT

AND THE STEPS NECESSARY IN THE EVENT OF SPILLS OR ACCIDENTAL DISCHARGES.

NO EXCAVATION SHALL OCCUR ON THE LANDFILL SITE OR WITHIN 150 FEET OF THE LANDFILL CAP SYSTEM.22.

EXISTINGPROPOSED

EDGE OF PAVEMENT (WITH CURB)

LEGEND

DRAWING WHERE DETAIL IS

DETAIL REFERENCE NUMBER

SHOWN OR TAKEN

SHOWN OR TAKEN

SECTION REFERENCE LETTER

DRAWING WHERE SECTION IS

DETAIL

1

S102

SECTION

S102

A

BUILDING/STRUCTURE

EDGE OF PAVEMENT (NO CURB)

UNDERGROUND WATER MAIN

CHAIN LINK FENCE

SEDIMENTATION AND EROSION CONTROL

EQUIPMENT, STRUCTURES, PIPING, AND/OR

CONDUITS TO BE DEMOLISHED

TREE OR SHRUB

UTILITY POLE

UNDERGROUND ELECTRIC

OVERHEAD ELECTRIC

UNDERGROUND STORM DRAIN

SOIL BORING LOCATION

E

SD

TREELINE

MAJOR CONTOUR

MINOR CONTOUR

50

48

VALVE

LIGHT POLE

PW

STREET SIGN

HYDRANT

TELEPHONE BOX

WATER MANHOLE W

EDGE OF DIRT ROAD

ABBREVIATIONS

HEATING, VENTILATINGHVAC

INCH OR INCHES

KILOWATT

JOINT

INVERT

INTERIOR

INSULATION

INSTRUMENT OR INSTRUMENTATION

INSIDE DIAMETER

& AIR CONDITIONING

HYDRANT

KW

JT

INV

IN

INT

INSUL

INSTR

ID

HYD

HOUSE

HORSEPOWER

HORIZONTAL

GATE VALVE

GROUND

GRAVEL

GRADE

GALVANIZED

GAUGE

FOOTING

FOOT OR FEET

FLOOR

FLANGE

GR

HSE

HP

HORIZ

GV

GRND

GRAV

GALV

GA

FTG

FT

FLR

FLG

UNDERGROUND BACKWASH WATERUBW

WELDED WIRE FABRIC

WATER GATE

WATER MAIN

WATER SUPPLY

VERTICAL

WS

WWF

VERT

WG

WM

W

W/

V

WATER

WITH

VOLTS

TOP OF FOOTING

TELEPHONE POLE

TYPICAL

TOP OF WALL

TEMPORARY

TOP OF STEEL

TOP & BOTTOM

TELEPHONE

STANDARD

STRUCTURE OR STRUCTURAL

SPECIFICATION

STAINLESS STEEL

SQUARE

T&B

T/FTG

TEMP

T/STL

TYP

T/WALL

TP

TEL

STD

STRUC

SPEC

STL

SQ

SS

STEEL

B/WALL BOTTOM OF WALL

DIA, Ø

DRAIN OR DRIVE

FLEXIBLE

FINISH OR FINISHED

EXISTING

EACH WAY

EQUAL

ELECTRIC OR ELECTRICAL

ELEVATION

EFFLUENT

EACH FACE

DRAWING

DISCHARGE

ELEC

FLEX

FIN.

EXIST.

EW

EQ

DR

EL

EFFL

EF

EA

DWG

DISCH

EACH

BRONZE OR BRICK

CLEAN OUT

CONCRETE

CENTERLINE

CONTINUOUS

DIAMETER

DUCTILE IRON

DEMOLITION

CONSTRUCTION JOINT

CAST IRON

CATCH BASIN

BALL VALVE OR BUTTERFLY VALVE

CO

CONT

CONC

DI

DEMO

BR

CJ

CI

CB

BV

C

BOTTOM OF FOOTING

BOTTOM

BUILDING

APPROXIMATE

ALUMINUM

BITUMINOUS

ABOVE FINISHED FLOOR

B/FTG

BTM

BLDG

APPROX

ALUM

BIT.

AFF

@ AT

MANHOLEMH

PL PROPERTY LINE

SIMILAR

POLYVINYL CHLORIDE

SANITARY

SEWER MANHOLE

SCHEDULE

REQUIRED

REINFORCING

REDUCER

SAN

SHT

SMH

SCH

SLV

SIM

SHEET

SLEEVE

PVC

REQ'D

RED

REINF

NORMALLY CLOSED

PREMOLDED JOINT FILLER

ON CENTER

OUTSIDE DIAMETER

MANUFACTURERS ASSOCIATION

NUMBER

MINIMUM

MISCELLANEOUS

MECHANICAL JOINT

NORMALLY OPEN

NOT TO SCALE

NATIONAL ELECTRICAL

N.T.S.

PMF

OD

NO.

OC

NO

MISC

NEMA

NC

MJ

MIN

MAXIMUM

MANUFACTURER

MOTOR CONTROL CENTER

LIGHT POLE

LINEAL FEET

MAX

MFR

MCC

LP

LG

LF

LONG

LB POUND

RO ROUGH OPENING

GRATINGGRTG

PUMPP

FLOOR DRAINFD

OVERHEAD ELECTRICOE

COPPERCU

BACKFLOW PREVENTERBFP

MASONRY OPENINGM.O.

VERIFY IN FIELDV.I.F.

AV AIR VALVE

BITUMINOUS CONCRETEBC

ADJUSTABLE FREQUENCY DRIVEAFD

AUTOMATIC TRANSFER SWITCHATS

ABOVE GRADE STORAGE TANKAST

MANUAL TRANSFER SWITCHMTS

ECB EROSION CONTROL BLANKET

AMERICAN PLYWOOD ASSOCIATIONAPA

CDX

EXTERIOR GRADE PLYWOOD WITH

ONE SIDE RATED A `C' GRADE & THE

OTHER SIDE RATED A `D' GRADE

LAMINATED VENEER LUMBERLVL

MOISTURE RESISTANTM.R.

HOLLOW STRUCTURAL SECTIONHSS

ELEVATIONELEV

CONDUITC

E ELECTRIC

FLOW METERFM

PUBLIC WATERPW

V VENT

MANUAL ON UNIFORMMUTCD

TRAFFIC CONTROL DEVICES

HIGH POINTH.P.

LOW POINTL.P.

GROUND FAULT CIRCUIT INTERRUPTERGFI

L

MAGNETIC SURVEY NAILMAG

SURVEY SPIKESPK

TEMPORARY BENCHMARKTBM

NO WORK SHALL OCCUR WITHIN WETLAND RESOURCE AREAS UNLESS NECESSARY PERMITS ARE OBTAINED.

4.

H

Y

D

WV

CATCH BASIN

STORM MANHOLE

ACCESS COVER

D

RIPRAP

RETAINRET

REMOVEREM

FOOT CANDLEFC

BASE MAPPING AND CONTOURS SHOWN ARE BASED ON MASSGIS DATA

200-FOOT RIVERFRONT AREA

100-FOOT BUFFER ZONE

LIMIT OF COASTAL DUNE

50-FOOT BUFFER ZONE

BORINGBOR

OUTLET CONTROL STRUCTUREOCS

STORM DRAINSD

WETLAND FLAGWF

1

G-002

GENERAL NOTES,

ABBREVIATIONS, AND

LEGEND

AS SHOWN

HIGH DENSITY POLYETHYLENEHDPE

ABOVE GRADE BACKWASH WATERABW

UTILITY POLEUP

UNO UNLESS NOTED OTHERWISE

OUTFALL DISCHARGE PIPEOP

OUTFALL DISCHARGE PIPEOP OP

UNDERGROUND BACKWASH WATERUBW UBW

ABOVEGROUND BACKWASH WATERABW ABW

CONTRACTOR SHALL PROVIDE TEMPORARY FENCE 50-FEET EACH SIDE OF OPEN EXCAVATIONS AS SPECIFIED IN

SECTION 01560.

23.

CONTRACTOR SHALL PROVIDE CONTROLLED DENSITY FILL AT UTILITY CROSSING LOCATIONS AS DIRECTED BY THE

ENGINEER.

24.

LIMIT OF INLAND BANK

MEAN HIGH TIDE LINE

A TIGHE & BOND WETLAND SCIENTIST DELINEATED WETLAND RESOURCES AREA BOUNDARIES ON APRIL 7, 2021. THE

DELINEATION INCLUDED INLAND BANK, MEAN HIGH TIDE (MHT) LINE, AND COASTAL DUNE. THE LIMITS OF WETLAND

RESOURCE AREAS WERE LOCATED USING GLOBAL POSITIONING SYSTEMS (GPS) FOR DEPICTION ON THE PROJECT

PLANS.

25.

THE LIMIT OF LAND SUBJECT TO COASTAL STORM FLOWAGE (LSCSF) DEPICTED AT ELEVATION 16 FEET (NAVD88)

BASED ON THE FEMA FLOOD INSURANCE RATE MAP PANEL NUMBER 25023C0136K (EFFECTIVE 11/4/2016).

26.

LAND SUBJECT TO

COASTAL STORM FLOWAGE

CHARLESGORECIVIL38596No.

05/26/2021

Page 2: GENERAL NOTES EROSION CONTROL NOTES

U

B

W

U

B

W

U

B

W

U

B

W

U

B

W

U

B

W

U

B

W

U

B

W

U

B

W

A

B

W

A

B

W

A

B

W

A

B

W

A

B

W

A

B

W

A

B

W

A

B

W

AB

W

AB

W

AB

W

AB

W

AB

W

0

+

0

0

1

+

0

0

2

+

0

0

3

+

0

0

4

+

0

0

5

+

0

0

6

+

0

0

7

+

0

0

8

+

0

0

9

+

0

0

1

0

+

0

0

1

1

+

0

0

CHECKED BY:

DRAWN BY:

FILE:

APPROVED BY:

Scituate,

Massachusetts

Well 18B

Water

Treatment

Plant

Modifications

Town of

Scituate

DATE:

PROJECT NO:

Plotted O

n:M

ay 25, 2021-5:12pm

By: G

NM

Last Saved:

5/24/2021

Tighe &

Bond:J:\S\S5001 Scituate D

PW

\029A Scituate 18B\D

raw

ings_Figures\AutoCAD

\Sheet\S5001-029A-C-101-102.dw

g

MARK DATE DESCRIPTION

0 3/17/2021 CONSTRUCTION SET

15/24/2021 PERMIT DRAWING

S5001-029A-C-101-102.dwg

PERMIT

DRAWINGS

MAY 2021

02/24/2021

S5001-029A

SCALE:

GNM

CJG

JNM

C-101

PROPOSED PLAN FILTER

BACKWASH DISPOSAL 1 OF 2

1" = 40'

N

00 40' 80'

SCALE: 1" = 40'

3" HDPE BACKWASH

PROVIDE AT GRADE

CONCRETE ENCASEMENT

OVER ACCESS ROAD WITH RAMP

(SEE DETAIL ON SHEET C-202)

LIMIT OF WORK

NOTES

1. NO EXCAVATION SHALL OCCUR WITHIN 150 FEET OF LANDFILL BOUNDARY.

2. PROVIDE TRAFFIC BARRIERS TO PROTECT ABOVE GRADE PIPING AS

REQUIRED.

3. CONCRETE ANCHORS SHALL BE PROVIDED FOR ABOVE GROUND PIPING.

4. AIR RELEASE VALVES SHALL BE PROVIDED AT LOCALIZED HIGH POINTS

DRAINS SHALL BE PROVIDED AT LOW POINTS.

5. DAMAGED GOLF COURSE IRRIGATION LINES SHALL BE REPAIRED AT NO

ADDITIONAL COST TO THE OWNER.

6. PEDESTRIAN AND GOLF CART ACCESS TO PARKING AREAS AND GOLF CART

PATHS SHALL BE MAINTAINED AT ALL TIMES. ALL WORK SHALL BE

COORDINATED WITH GOLF COURSE OPERATIONS. PROVIDE TEMPORARY

CONSTRUCTION BARRIERS AS REQUIRED.

7. NO EQUIPMENT SHALL BE ALLOWED ON ABOVE GROUND SECTIONS OF PIPE.

APPROXIMATE LOCATION OF

TRANSITION TO UNDERGROUND PIPING

CROSS OVER ELECTRICAL CONDUITS

AIR RELEASE AT HIGH POINT

(SEE DETAIL ON SHEET C-203)

ROUTE THROUGH BRUSH, CUT BACK AS REQUIRED

LOCATE AND PROTECT

GOLF COURSE

IRRIGATION SYSTEM

LOCATE AND PROTECT

ON-SITE SEPTIC TANK

SYSTEM PIPING

CONNECT TO EXISTING PIPE

PROVIDE 3-INCH BALL VALVE

OUTSIDE CORROSION CONTROL FACILITY

AIR RELEASE AT HIGH POINT (SEE DETAIL ON SHEET C-203)

8 PRECAST CONCRETE

ANCHOR BLOCKS (SEE

DETAIL ON SHEET C-203)

8 PRECAST CONCRETE

ANCHOR BLOCKS (SEE

DETAIL ON SHEET C-203)

8 PRECAST CONCRETE

ANCHOR BLOCKS (SEE

DETAIL ON SHEET C-203)

8 PRECAST CONCRETE

ANCHOR BLOCKS (SEE

DETAIL ON SHEET C-203)

8 PRECAST CONCRETE

ANCHOR BLOCKS (SEE

DETAIL ON SHEET C-203)

8 PRECAST CONCRETE

ANCHOR BLOCKS (SEE

DETAIL ON SHEET C-203)

3" HDPE 45° BEND

3" HDPE 45° BEND

3" HDPE 45° BEND

3" HDPE 45° BEND

3" HDPE 22.5° BEND

3" HDPE 22.5° BEND

200-FOOT RIVERFRONT

100-FOOT BUFFER ZONE

100-FOOT BUFFER ZONE

50-FOOT BUFFER ZONE

LIMIT OF LAND SUBJECT TO

COASTAL STORM FLOWAGE

CHARLESGORECIVIL38596No.

05/26/2021

Page 3: GENERAL NOTES EROSION CONTROL NOTES

U

B

W

U

B

W

U

B

W

U

B

W

U

B

W

U

B

W

U

B

W

U

B

W

U

B

W

U

B

W

U

B

W

U

B

W

U

B

W

O

P

1

5

+

3

0

8

+

0

0

9

+

0

0

1

0

+

0

0

1

1

+

0

0

1

2

+

0

0

1

3

+

0

0

1

4

+

0

0

1

5

+

0

0

CHECKED BY:

DRAWN BY:

FILE:

APPROVED BY:

Scituate,

Massachusetts

Well 18B

Water

Treatment

Plant

Modifications

Town of

Scituate

DATE:

PROJECT NO:

Plotted O

n:M

ay 25, 2021-5:13pm

By: G

NM

Last Saved:

5/24/2021

Tighe &

Bond:J:\S\S5001 Scituate D

PW

\029A Scituate 18B\D

raw

ings_Figures\AutoCAD

\Sheet\S5001-029A-C-101-102.dw

g

MARK DATE DESCRIPTION

0 3/17/2021 CONSTRUCTION SET

15/24/2021 PERMIT DRAWING

S5001-029A-C-101-102.dwg

PERMIT

DRAWINGS

MAY 2021

02/24/2021

S5001-029A

SCALE:

GNM

CJG

JNM

C-102

PROPOSED PLAN FILTER

BACKWASH DISPOSAL 2 OF 2

1" = 40'

N

00 40' 80'

SCALE: 1" = 40'

3" HDPE BACKWASH

8" HDPE OUTLET

TEST PIT (CONFIRM INVERT BEFORE INSTALL OF TANK)

9'x16' PRECAST BACKWASH WATER SETTLING TANK

(SEE SHEET C-201)

EROSION CONTROL (TYP)

LIMIT OF WORK

NOTES

1. NO EXCAVATION SHALL OCCUR WITHIN 150 FEET OF LANDFILL BOUNDARY.

2. VICTAULIC PIPING MAY BE PROVIDED ABOVE GRADE WHERE APPROVED BY THE ENGINEER.

3. EXACT LOCATION OF PIPING AND ROAD CROSSING SHALL BE COORDINATED WITH THE

OWNER.

4. DAMAGED GOLF COURSE IRRIGATION LINES SHALL BE REPAIRED AT NO ADDITIONAL COST

TO THE OWNER.

5. DAMAGED SEPTIC SYSTEM PIPING SHALL BE REPAIRED AT NO ADDITIONAL COST TO THE

OWNER.

6. PEDESTRIAN AND GOLF CART ACCESS TO PARKING AREAS AND GOLF CART PATHS SHALL

BE MAINTAINED AT ALL TIMES. ALL WORK SHALL BE COORDINATED WITH GOLF COURSE

OPERATIONS. PROVIDE TEMPORARY CONSTRUCTION BARRIERS AS REQUIRED

LOCATE AND PROTECT

GOLF COURSE

IRRIGATION SYSTEM

LOCATE AND PROTECT

ON-SITE SEPTIC TANK

SYSTEM PIPING

TRANSITION TO ABOVE GRADE PIPING

43°10'41.40"N

70°44'-3.81"W

YARD HYDRANT

CONTINUOUSLY SLOPE PIPING TO YARD HYDRANT (TYP)

TIE INTO EXISTING 12" HDPE DRAIN OUTLET WITH TEE-WYE AND COUPLINGS

APPROXIMATE LOCATION OF

EXISTING DRAINAGE DITCH

AND 12" HDPE DRAIN OUTLET

3" HDPE 22.5° BEND

3" HDPE 45° BEND

3" HDPE 45° BEND

8" HDPE 45° BEND

LIMIT OF INLAND BANK

(DELINEATED)

50-FOOT BUFFER ZONE

100-FOOT BUFFER ZONE

200-FOOT RIVERFRONT AREA

100-FOOT BUFFER ZONE

50-FOOT BUFFER ZONE

MEAN HIGH TIDE LINE (DELINEATED)

LIMIT OF COASTAL DUNE (DELINEATED)

5'x4'

6-INCH D50 RIP RAP

SPLASH PAD

LIMIT OF LAND SUBJECT TO

COASTAL STORM FLOWAGE

HATHERLY POND

CHARLESGORECIVIL38596No.