General Santos CityExperience with PPP Center
in the development of PPP Projects
Engr. Riza Marie T. Paches, EnP, MEng‘gActing City Government Department Head II
City Economic Management and Cooperative Development OfficeCity Government of General Santos
Presentation Flow
Overview of
Integrated Economic Development
Gensan Partners
SOCCSKSARGEN
for Regional Trade (IEDRT)
SOCSKSARGEN Growth Region
General Santos City
3HRS FLY ZONE
Cotabato City
Cotabato Province
Cotabato City
Area
19,157 sq.km
Total Population
4.55 M
Annual Growth Rate
2.46%South Cotabato
GenSan City
Sultan Kudarat
Sarangani Province
Lanao del Norte
Bukidnon
ARMM Maguindanao
Source: PSA - CY 2015 NSO census
Northern Mindanao Development Corridor
South Central Mindanao Development Corridor
Western Mindanao Development Corridor
9/17/2017
Integrated
Economic
Development for
Regional Trade in
General Santos City
• improve farmer access to food markets;
• improve the access to affordable healthy food for residents;
• provide opportunities for the incubation of small businesses;
• create jobs in the local community; and
• revitalize the local business economy.
PURPOSE OF THE PROJECT
• Integrated Food Terminal (IFT)
• Central Public Market (CPM) redevelopment, including the Queen Tuna Park and surrounding areas
• Support Infrastructure
• Capacity Building on technical and managerial skills of the CGGS officers
9/17/2017
9/17/2017
INTEGRATED FOOD AND TRANSPORT
TERMINAL (IFT)
The existing City Bagsakan Center is essentially a trading post. It has no washing, packaging and processing facilities.
It is currently managed by the City Food Terminal Multi-purpose Cooperative (CFTEMCO), composed of 476 members occupying stalls in the bagsakan.
They have more members who are waiting for stall spaces, thus the suggestion that the proposed IFT be twice the size of the existing bagsakan.
Current Condition
INTEGRATED FOOD AND TRANSPORT
TERMINAL (IFT)
INTEGRATED FOOD AND TRANSPORT
TERMINAL (IFT)
Project Cost Estimates
Project Components PhP (in million)
Food Terminal (with Food
Processing Center) 448.71
AAA Hog Abattoir 182.21
AA Cattle/Goat/Sheep Abattoir 128.08
TOTAL 759.00
Possible PPP Arrangements
Project Components PPP Modalities
Food Terminal (with
Food Processing
Center)
Design-and-Build
AAA Hog AbattoirBuild-Operate-and-
Transfer
AA Cattle/Goat/Sheep
Abattoir
Build-Operate-and-
Transfer
CENTRAL PUBLIC MARKET CPM
The CPM has become an unattractive place to shop
Another reason is the emergence of new shopping malls, satellite markets, and other private grocery stores.
The CPM’s drainage system and toilets are also in need of major improvements and/or repairs.
The waste water treatment plant to which the CPM’s drainage system is connected has not been operational since April.
A major issue is security which is associated with the informal settlement located across AcharonBoulevard, surrounding the mosque.
Current Condition
CENTRAL PUBLIC MARKETCENTRAL PUBLIC MARKET
A. Total Redevelopment of Central Public Market
Project Cost Estimates
Project Components PhP (in million)
A. Total Redevelopment of Central Public Market
2,125.82
B. Partial Redevelopment of Central Public Market
1,307.72
Possible PPP Arrangements
Project Components PPP Modalities
A. Total Redevelopment of
Central Public MarketBuild-Operate-and-Transfer
B. Partial Redevelopment
of Central Public MarketBuild-Operate-and-Transfer
B. Partial Redevelopment of Central Public Market
PROJECT ASSISTANCE
• BOT Center assisted the City through the SOCSKSARGEN ADPO in the preparation of a Pre-FS
• Financing, Construction and Development of 5-hectare area into an Integrated Transport Terminal with a Commercial Complex in Barangay Sinawal, General Santos City
• Did not push: Unfinished Circumferential Road and the Improvement of the Bulaong Terminal concerns on profitability, minimum performance standards and the rate adjustment formula, among others
BOT Center
2001-2004
PROJECT ASSISTANCE
• Assisted by the Cities Development Initiatives in Asia (CDIA) for the preparation of the Pre-FS for the establishment of an Integrated Economic Regional Trade Development Project (IERTD) and the Re-development of the Central Public Market and Queen Tuna Park
• Availability of Project Site and Funding
for the FS were the identified Constraints
CDIAASSISTANCE
PROJECT ASSISTANCE
Internship Agreement between PPP Center and LGU Gen. Santos City – a capability building program designed for personnel of the city government on
(a) Project Development, (b) Project Bidding/ Competition, and (c) Project Implementation
• Entered into an Internship Agreement with the PPP Center
• Presented the IERTD Project in the Global Infrastructure Bassel in Switzerland
• Enacted the PPP Code and its IRR
PPP CENTERASSISTANCE
CHALLENGES ENCOUNTERED
• Changes in the priorities/scope• Obsolete facilities of economic
enterprises• Limited expertise of LGU
personnel• Insufficient LGU fund to finance
public infrastructure• Lack of PPP institutional
mechanism
LESSON LEARNT
• Local Chief Executive‘s commitment is important
• Innovative approaches are necessary in pursuing development goals
• Strong and active participation of stakeholders is essential in PPP
• Policy reforms are necessary in effective institutional development
• Capacity building is critical to the effective implementation of PPP projects
• Third party providers of technical assistance on PPP are available