5/18/01 Generation Customer Meeti ng 1 Generation Interconnection Cost Allocation Policy Teresa Mogensen Director of Transmission Planning and Service

Generation Interconnection Cost Allocation Policy

  • Upload
    iona

  • View
    38

  • Download
    0

Embed Size (px)

DESCRIPTION

Generation Interconnection Cost Allocation Policy. Teresa Mogensen Director of Transmission Planning and Service. ATC Objectives. Strengthen ATC transmission network Improve access of ATC customers to competitive energy market Additional generation interconnections - PowerPoint PPT Presentation

Citation preview

Page 1: Generation Interconnection Cost Allocation Policy

5/18/01 Generation Customer Meeting 1

Generation Interconnection Cost Allocation Policy

Teresa Mogensen

Director of Transmission Planning

and Service

Page 2: Generation Interconnection Cost Allocation Policy

5/18/01 Generation Customer Meeting 2

ATC Objectives

• Strengthen ATC transmission network

• Improve access of ATC customers to competitive energy market– Additional generation interconnections– Impacts on import capability

Page 3: Generation Interconnection Cost Allocation Policy

5/18/01 Generation Customer Meeting 3

Policy

• Include the costs of transmission network facilities associated with generation interconnections in the network costs of the ATC system

• Subject to tests:– Network facilities

– Reasonableness

– Eligibility

Page 4: Generation Interconnection Cost Allocation Policy

5/18/01 Generation Customer Meeting 4

Network Facilities

• Facilities must carry network flow and be judged beneficial to network

• Radial generation leads to network interconnection point are not included

Page 5: Generation Interconnection Cost Allocation Policy

5/18/01 Generation Customer Meeting 5

Example: Interconnecting to an ATC Line

X SUB C

relay 

SUBB

relay

SUBA 

SUBD

X

Stability

? Miles

____ Interconnection Facilities (new facilities necessary to interconnect generation)____ Required Upgrades (breakers, system protection and control) resulting from short circuit and stability studies____ Subset of Required Upgrades – line addition due to stability____ Optional Upgrades (thermal and associated upgrade)____ Existing Facilities

 

Page 6: Generation Interconnection Cost Allocation Policy

5/18/01 Generation Customer Meeting 6

Example: Interconnecting to an ATC Substation

____ Interconnection Facilities (new facilities necessary to interconnect generation)____ Required Upgrades (breakers, system protection and control) resulting from short circuit and stability studies____ Subset of Required Upgrades – line addition due to stability____ Optional Upgrades (thermal and associated upgrade)____ Existing Facilities 

Line 3

Line 4 Line 5

Line 1Line 2

 

Page 7: Generation Interconnection Cost Allocation Policy

5/18/01 Generation Customer Meeting 7

Reasonableness Tests

• ATC will assess factors including, but not limited to:– Distance from generator to existing ATC

system– Application of general least cost planning

principles– Point-to-point revenue to annual revenue

requirement comparison

Page 8: Generation Interconnection Cost Allocation Policy

5/18/01 Generation Customer Meeting 8

Eligibility Requirements

• Financial screening of generating firm

• Guarantee to cover ATC costs expended if project fails or does not proceed as planned

• Executed interconnection agreement

Page 9: Generation Interconnection Cost Allocation Policy

5/18/01 Generation Customer Meeting 9

Policy Subject to Change

• Policy may be changed at some time in the future as generation becomes more plentiful, system configuration changes, RTO congestion management systems are implemented or other relevant conditions occur.

Page 10: Generation Interconnection Cost Allocation Policy

5/18/01 Generation Customer Meeting 10

Least Cost Redispatch

• I want to suggest a method that will combine most effective use of generation to solve a constraint along with selecting the Least Cost.

Page 11: Generation Interconnection Cost Allocation Policy

5/18/01 Generation Customer Meeting 11

Least Cost Redispatch Process

Mike Zahorik

Page 12: Generation Interconnection Cost Allocation Policy

5/18/01 Generation Customer Meeting 12

Least Cost Redispatch

• This method will provide Least Cost Plans for 10 of the most probable flowgates that could be subjected to TLR 5 each day.

• These plans will be made available to the ATC System Operators Prior to any TLR 5 event.

Page 13: Generation Interconnection Cost Allocation Policy

5/18/01 Generation Customer Meeting 13

Least Cost Redispatch

• The ATC Operator will control the TLR 5 Redispatch. – All Non Firm transactions with >5% PTDF have been curtailed.

– If the overloaded element is in the WEP, WPS or UPP Control Area, the Pewaukee ATC Operator will be responsible.

– If the overloaded element is in the ALTE or MGE Control Area, the Cottage Grove ATC Operator will be responsible.

– The responsible ATC Operator will request the needed relief.

Page 14: Generation Interconnection Cost Allocation Policy

5/18/01 Generation Customer Meeting 14

Least Cost Redispatch

• The ATC Operator will control the TLR 5 Redispatch. – MAIN issues Firm transaction curtailment list.

– MAIN also issues Load curtailments, these load curtailments may be accomplished by redispatch of generation.

– The responsible ATC Operator will combine the needed load curtailments and issue the Least Cost Redispatch.

Page 15: Generation Interconnection Cost Allocation Policy

5/18/01 Generation Customer Meeting 15

Least Cost Redispatch

• Least Cost Redispatch Plans– Will use Unit Costs.

– Will provide plans for the 10 most probable TLR flowgates.

– Will use NERC Generation Shift Factors.

– These probable plans will be updated daily.

Page 16: Generation Interconnection Cost Allocation Policy

5/18/01 Generation Customer Meeting 16

Unit Costs

• Generation Information will be communicated to ATC each day/week.– General Cost, to the nearest dollar.

– Unit availability.

– ATC will provide a spreadsheet to be filled out.

Page 17: Generation Interconnection Cost Allocation Policy

5/18/01 Generation Customer Meeting 17

Unit Costs

Wisconsin Electric Unit Costs

Unit Availablity Cost/Mw

WEC_GER GT1 13.8_1 Y $75.00

WEC_GER GT2 13.8_2 Y $75.00

WEC_GER GT3 13.8_3 Y $75.00

WEC_GER GT4 13.8_4 Y $75.00

WEC_GER GT5 13.8_5 Y $75.00

WEC_PL PRG1 24.0_1 Y $10.00

WEC_PL PRG2 24.0_2 Y $10.00

WEC_POW G1 W22.0_1 Y $25.00

WEC_POW G2 E22.0_2 Y $25.00

WEC_POW G3 W22.0_3 Y $25.00

WEC_PRS GT1 13.8_1 Y $50.00

WEC_PRS GT2 13.8_2 Y $50.00

WEC_PRS GT3 13.8_3 Y $50.00

WEC_PRS GT4 13.8_4 Y $50.00

WEC_PT BHG1 19.0_1 Y $5.00

WEC_PT BHG2 19.0_2 Y $5.00

WEC_UNIV GT 13.8_1 Y $65.00

• Each Control Area would provide Generation Costs to ATC.

• Example of Wisconsin Electric's costs.

Page 18: Generation Interconnection Cost Allocation Policy

5/18/01 Generation Customer Meeting 18

10 Most Probable TLR's

• Each Night Shift, ATC System Operator will select 10 possible Flowgates that could be subjected to TLR 5.– Based on Knowledge of System Topology

– Recent Past History

• ATC System Operator will gather NERC GSF's for the selected flowgates.

Page 19: Generation Interconnection Cost Allocation Policy
Page 20: Generation Interconnection Cost Allocation Policy

5/18/01 Generation Customer Meeting 20

Least Cost Redispatch Plans

Page 21: Generation Interconnection Cost Allocation Policy

5/18/01 Generation Customer Meeting 21

Least Cost Redispatch Plans

MW Relief Required 50 Paris Albers 138 Kv 3503

Redispatch Redispatch

Increment Unit Inc Decrement Unit Dec GSF Delta Cost Needed Cost

Cost Cost

WEC_PRS GT2 13.8_2 $50.00 WEC_PL PRG2 24.0_2 $10.00 -50.8 $40.00 98.43 $3,937.01

WEC_UNIV GT 13.8_1 $65.00 WEC_PL PRG2 24.0_2 $10.00 -19.4 $55.00 257.73 $14,175.26

Delta Cost = Inc Cost - Dec Cost

Redispatch Needed = Mw Relief Required / GSF

Redispatch Cost = Redispatch Needed * Delta Cost

Page 22: Generation Interconnection Cost Allocation Policy

5/18/01 Generation Customer Meeting 22

Least Cost Redispatch Plans

• Items the responsible ATC Operator will have to consider during TLR 5 event.– ATC Operator may not know the current dispatch of

units and/or the availability to move them.

– ATC Operator will have to inquire if a generator pair is available.

– If the Least Cost Redispatch spans two control areas, the control areas will have to enter schedules.

Page 23: Generation Interconnection Cost Allocation Policy

5/18/01 Generation Customer Meeting 23

Summary

• ATC Operator controls Redispatch• MAIN issues Firm curtailment lists and Load

Relief numbers• Control Area's supply Unit Costs• ATC Operator calculates and issues Redispatch

orders.• If Redispatch is not available, load shedding will

be necessary.

Page 24: Generation Interconnection Cost Allocation Policy

5/18/01 Generation Customer Meeting 24

Update on Single System ATC

Teresa Mogensen

Director of Transmission Planning and Service

Page 25: Generation Interconnection Cost Allocation Policy

5/18/01 Generation Customer Meeting 25

Single System ATC: Non-Firm

• The “Proposed Changes to the Calculation of Non-firm ATC for the ATCLLC Transmission System” document was approved by the MAIN ATCSC on April 10, 2001 and implemented on April 25, 2001

Page 26: Generation Interconnection Cost Allocation Policy

5/18/01 Generation Customer Meeting 26

Single System ATC:Non-Firm (cont.)

• A single ATCLLC non-firm ATC value is calculated and shared by all network customers of the ATCLLC for each of the interconnected directions – CEWUMS, DPCWUMS, NSPWUMS,

UPPCoWUMS and MECSWUMS.

– Note that WUMS is a proxy for “ATCLLC”

– UPPCo will be added to this group when they become a network customer

Page 27: Generation Interconnection Cost Allocation Policy

5/18/01 Generation Customer Meeting 27

Single System ATC: Firm

• There are several issues associated with a single zone approach to granting firm transmission service including:– Identification of true source/sink

– Impacts on the transmission system based on the true source/sink

– The work group has been unable to reach consensus

• The work group is drafting a proposal titled “Single Zone Firm ATC” for executive review

Page 28: Generation Interconnection Cost Allocation Policy

5/18/01 Generation Customer Meeting 28

Single Zone Firm ATC: Latest Proposal

• Only applies to studies within the next 13 months• Continue to calculate every control area to control area

path• Calculate the Firm Service Load Ratio Share (FSLRS),

based on each network customers’ load in proportion to total ATCLLC network load

• Determine which path is most constrained, taking into account the FSLRS

• Constrain all directions based on the most constrained path and FSLRS

• Please refer to the draft proposal for details

Page 29: Generation Interconnection Cost Allocation Policy

5/18/01 Generation Customer Meeting 29

Single System ATC:Congestion Management

• In order to track ATCLLC customer costs due to “Zero ATC” or TLR events, we have asked all customers impacted by TLR and/or denied transmission requests (based on “No ATC”) to report their estimated replacement costs and summarize by event

• This data will be summarized by constraint (flowgate) and used, in part, to justify new projects

• ATCLLC is also exploring ways to facilitate use of the NERC Market Redispatch program for our customers

Page 30: Generation Interconnection Cost Allocation Policy

5/18/01 Generation Customer Meeting 30

Single System ATC:Next Steps

• Next SSATC Working Group meeting is June 5 at ATC HQ– Main goal of June 5 meeting is to finalize “best”

proposal(s) for implementation of single zone ATC for firm

• Ongoing series of biweekly meetings (June 5, June 19 etc.) to continue to discuss issues

• Your ongoing input and participation is requested and appreciated.

Page 31: Generation Interconnection Cost Allocation Policy

5/18/01 Generation Customer Meeting 31

Maintenance Scheduling Process

Don Morrow

Page 32: Generation Interconnection Cost Allocation Policy

5/18/01 Generation Customer Meeting 32

Who Do I Talk To?

On the old WEP system: ATC-Pewaukee

On the old WPS system: WPS Operating

On the old ALTE system: ATC-CG

On the old MGE system: MGE

Page 33: Generation Interconnection Cost Allocation Policy

5/18/01 Generation Customer Meeting 33

Who Is ATC-Pewaukee?

• Manager: Mike Zahorik 262-544-7002

• Team Leader: Eric Solberg 262-544-7228

• Security Coordinator: Darrel Yohnk 262-544-7106

• Outage Coordinator: Ed Funk

• Outage Coordinator: Liz Gehrt

• Real Time Operator: 262-544-7008

Page 34: Generation Interconnection Cost Allocation Policy

5/18/01 Generation Customer Meeting 34

Who Is ATC-Cottage Grove?

• Manager: Kurt Dickinson 608-877-8237

• Security Coordinator: Francis Esselman 608-877-8172

• Outage Coordinator: Jon Staff 608-877-8208

• Outage Coordinator: Bill Hoesly 608-877-8209

• Real Time Operator: 608-877-8233

Page 35: Generation Interconnection Cost Allocation Policy

5/18/01 Generation Customer Meeting 35

Upcoming Changes

• ATC-Pewaukee Control Center Move – New Phone #’s

• ATC-CG Assumes Functional Control of Old MGE System

• ATC-Pewaukee Assumes Functional Control of Old WPS System

Page 36: Generation Interconnection Cost Allocation Policy

5/18/01 Generation Customer Meeting 36

Load Shedding Subcommittee

Kurt Dickinson

Manager, System Control

Cottage Grove

Page 37: Generation Interconnection Cost Allocation Policy

5/18/01 Generation Customer Meeting 37

LSS - Members

• The following ATC customers have volunteered to discuss Load Shedding procedures:• Chuck Spargo – ACEC

• Phil Hansen & Pat Conners – WPPI

• Dale Koch – Manitowoc Public Utilities

• Paul Roehr – MGE

• Tony Jankowski – WE

• Jim Maenner (or Chris Plante) – WPS

• Ron Graber – Alliant

• Kurt Dickinson – ATCLLC – 608.877.8237

Page 38: Generation Interconnection Cost Allocation Policy

5/18/01 Generation Customer Meeting 38

LSS – To Date

The LSS has NOT met yet.

• E-mail sent recently asking for concurrence on the issues.

• Conference call scheduled Tuesday, June 5, 2001. Kurt will contact everyone with details.

Page 39: Generation Interconnection Cost Allocation Policy

5/18/01 Generation Customer Meeting 39

LSS – The Issues

• Load shedding due to capacity deficiency. Rolling blackouts/distribution load shedding. This would be the responsibility of the individual control areas/local distribution companies or load balancing areas. There would be little or no involvement by ATCLLC.

• Underfrequency load shedding and manual load shedding due to frequency decline as required by NERC/MAIN. This issue will be a little different for each customer and will have to be discussed.

Page 40: Generation Interconnection Cost Allocation Policy

5/18/01 Generation Customer Meeting 40

LSS – The Issues

• Load shedding orders as a result of a Transmission Loading Relief (TLR) procedure, i.e. TLR level 5. We will definitely have to determine an acceptable procedure for this situation. If we run out of Redispatch and Schedule curtailment options, the act of shedding load to provide relief on a flowgate may get a bit complicated.

• Specific load shedding as a result of a local transmission problem. If TLR could not help a particular situation, the ATCLLC System Control Operator may order shedding of some specific/local loads to prevent a worse problem (e.g.low voltage, voltage collapse or major overloads).

Page 41: Generation Interconnection Cost Allocation Policy

5/18/01 Generation Customer Meeting 41

LSS – Temporary Measures

• Until there are specific procedures and processes developed by ATCLLC and its customers, we will continue to operate within the procedures and practices already in place by the utility or control area.