SYMBOLS AND ABBREVIATIONS LEGEND
SEE MECHANICAL, PLUMBING, FIRE PROTECTION, AND ELECTRICAL DRAWINGS FORADDITIONAL SYMBOLS
&&&& AND EX.EX.EX.EX. EXISTINGANGLE SIM.SIM.SIM.SIM. SIMILARCENTER LINE TYP.TYP.TYP.TYP. TYPICAL
ØØØØ DIAMETER N.I.C.N.I.C.N.I.C.N.I.C. NOT IN CONTRACTSQUARE F.D.F.D.F.D.F.D. FLOOR DRAIN
#### POUND OR NUMBER F/DF/DF/DF/D FIRE DOOR±±±± PLUS OR MINUS F/SF/SF/SF/S FLOOR SINKPLPLPLPL PLATE D.F.D.F.D.F.D.F. DRINKING FOUNTAINC/CC/CC/CC/C CENTER TO CENTER E.P.E.P.E.P.E.P. ELECTRICAL PANELO.C.O.C.O.C.O.C. ON CENTER C.G.C.G.C.G.C.G. VINYL CORNER GUARD@@@@ AT F.E.C.F.E.C.F.E.C.F.E.C. FIRE EXTINGUISHER CABINET==== EQUAL F.E.F.E.F.E.F.E. FIRE EXTINGUISHER
F.H.C.F.H.C.F.H.C.F.H.C. FIRE HOSE CABINETH.S.H.S.H.S.H.S. HORN STROBER.D.R.D.R.D.R.D. ROOF DRAINM.L.M.L.M.L.M.L. MATCH LINE
GENERAL NOTES
1. DO NOT SCALE DRAWINGS. USE FIGURED DIMENSIONS ONLY.2. CONTRACTOR SHALL VERIFY ALL DIMENSIONS PRIOR TO ANY WORK.3. ALL WORK SHALL CONFORM TO ALL GOVERNING CODES AND REGULATIONS.
KEY TO DIMENSIONING:DIMENSIONS SHOWN ARE FROM FINISH FACE TO FINISH FACE, FINISH FACE TO COLUMN CENTERLINE, OR COLUMN CENTERLINE TO COLUMN CENTERLINE, UNLESS NOTED OTHERWISE.
GENERAL PROJECT DATA
OWNERS REP: GREATER FLINT MENTAL HEALTH FACILITIES307 EAST COURT STREETFLINT, MI 48503
TENANT: GENESEE COUNTY HEALTH CENTER725 MASON STREETFLINT, MI 48503
ARCHITECT: SEDGEWICK & FERWEDA ARCHITECTS410 EAST COURT STREETFLINT, MI 48503(810) 238-9647
W 5TH AVE.
N GRAND TRAVERSE ST.
MASON ST.
W 4TH AVE.
HURLEY MEDICAL CENTER
STONE ST.
UNIVERSITY AVE.
GARLAND ST.SIX
TH AVE.
2ND AVE.
BEGOLE ST.
GENESEE COMMUNITY HEALTH CENTER725 MASON STFLINT, MI 48503
108'-0"
110'-8"
FIFTH AVENUE
MASON STREET
EXISTING PARKING LOT
EX. CATCH BASIN
EX. CATCH BASIN
EX. LIGHT POLE EX. LIGHT POLE
FOURTH AVENUE
EXISTING BUILDING
4"X 5'0" 3500 PSI AIR ENTRAINED 4" SLUMP CONC SIDEWALK REINF WITH 6X6 1.4X1.4 LBS WELDED WIRE FABRIC
EX 2" WATER SERVICE TO STREET MAIN
NEW 4" D.I. CLASS 54 FIRE SPRINKLER WATER SERVICE TO STREET MAINSPRINKLER CONTRACTOR TO VERIFY LOCATION, SUBMIT PLANS, AND PAYALL PERMITS AND FEES FOR TAPPING CITY WATER MAIN
EX. SIDEWALK
EX SANITARY SEWER TO STREET MAIN
EX STORM SEWER TO CATCH BASIN
EX OVERHEAD ELECTRIC SERVICE
EX SIDEWALK
1
1
SCALE
DATE
PROJECT NUMBER
Pro
ject
Dra
win
g
SEDGEWICK & FERWEDA ARCHITECTS
SEDGEWICK & FERWEDA ARCHITECTS
SEDGEWICK & FERWEDA ARCHITECTS
SEDGEWICK & FERWEDA ARCHITECTS
SHEET NUMBER
AR
CH
ITE
CT
SEAL OF ARCHITECT
41
0 E
ast C
ourt
Str
eet F
lint,
MI
48
503
TE
L: 8
10
-23
8-9
64
7
| F
AX
: 81
0-2
38-4
90
0w
ww
.sfa
rch
.us
GOOD DESIGN. GOOD CLIENTS. GREAT ARCHITECTURE.
R E V I S I O N S
DRAWN BY:
CHECKED BY:
SS SSEE EEDD DDGG GGEE EEWW WWII IICC CCKK KK && && FF FFEE EERR RRWW WWEE EEDD DDAA AA
AA AA RR RR CC CC HH HH II II TT TT EE EE CC CC TT TT SS SS
As indicated
2/1
5/2
017
9:5
9:3
9 A
M
A0.0
TIT
LE
SH
EE
T / D
RA
WIN
GIN
DE
X
1/27/17
16-026
BID SET
GE
NE
SE
E H
EA
LT
H S
YS
TE
M725 M
AS
ON
ST
FL
INT
, M
I 48503
KVN
JSF
GENESEE COMMUNITY HEALTH CENTER 725 MASON ST, FLINT, MICHIGAN
BUILDING CODES: MICHIGAN BUILDING CODE 2012 EDITIONMICHIGAN REHABILITATION CODE FOR EXISTING BUILDINGS 2012MECHANICAL - MICHIGAN MECHANICAL CODE 2012 EDITIONPLUMBING - MICHIGAN PLUMBING CODE 2012 EDITIONELECTRICAL - NATIONAL ELECTRICAL CODE 2011 EDITIONMICHIGAN ENERGY CODE - ASHRAE 90.1-2007NFPA 101 LIFE SAFETY CODE 2006 EDITION
USE GROUP: B - BUSINESS
BUILDING AREA: TOTAL BUILDABLE AREA = 11,641 SQ. FT.
OCCUPANCY LOAD: 117 OCCUPANTS PER CLASSIFICATION (__ ACTUAL)
MINIMUM REQUIRED 2 REQUIRED (2 PROVIDED)OF MEANS OFEGRESS:
CONSTRUCTION TYPE: 2-B (UNPROTECTED)
FIRE PROTECTION: FIRE EXTINGUISHERS (LOCATED PER CODE)SMOKE DETECTION AND FIRE ALARM SYSTEM100% FIRE SUPPRESSED DEFERRED SUBMITTAL BY DESIGN/BUILD FIRE CONTRACTOR
BUILDING DATA
NNNN
SCHEDULE OF DRAWINGSSHEETNO. SHEET NAME
ISSUEDATE
CURRENTREVISION
CURRENTREVISION DATE
A0.0 TITLE SHEET / DRAWING INDEX 01/27/17 ADDENDUM 1 2/14/17
A0.1 GENERAL NOTES / PARTITION DETAILS 01/27/17 ADDENDUM 1 2/14/17
A1.0 EXISTING & DEMOLITION FIRST FLOOR PLAN 01/27/17 ADDENDUM 1 2/14/17
A1.2 PROPOSED FIRST FLOOR PLAN 01/27/17 ADDENDUM 1 2/14/17
A1.3 ROOF PLAN 01/27/17 ADDENDUM 1 2/14/17
A2.0 PROPOSED REFLECTED CEILING PLAN 01/27/17 ADDENDUM 1 2/14/17
A3.0 INT. ELEVS - EXAM, WAITING, RECEPTION, MTG. RMS 01/27/17 ADDENDUM 1 2/14/17
A3.1 INT. ELEVS - MA / NP 01/27/17 ADDENDUM 1 2/14/17
A3.2 INT. ELEVS - S.W., LOUNGE, LAB, MILLWORK DETAILS 01/27/17 ADDENDUM 1 2/14/17
A4.0 BUILDING SECTIONS 01/27/17 ADDENDUM 1 2/14/17
A5.0 SCHEDULES & DOOR INFO 01/27/17 ADDENDUM 1 2/14/17
A6.0 PROPOSED FLOOR FINISH & FURNITURE PLANS 01/27/17 ADDENDUM 1 2/14/17
M1.0 DEMOLITION PLANS AND DETAILS 01/27/17 ADDENDUM 1 2/14/17
M1.1 PROPOSED PLUMBING PLAN 01/27/17 ADDENDUM 1 2/14/17
M1.2 PROPOSED HVAC PLAN 01/27/17 ADDENDUM 1 2/14/17
E1.0 DEMOLITION PLAN AND DETAILS 01/27/17 ADDENDUM 1 2/14/17
E1.1 PROPOSED ELECTRICAL PLAN 01/27/17 ADDENDUM 1 2/14/17
E1.2 PROPOSED LIGHTING PLAN 01/27/17 ADDENDUM 1 2/14/17
LOCATION MAP
NOT TO SCALE
1" = 20'-0"
SITE PLAN
Date Description
2/14/17 ADDENDUM 1
OFFICENOT TO SCALE
SCALE: 1/2" = 1'-0"
SCALE: 1/2" = 1'-0"
NOT TO SCALE
FIG. 703.2.4.4. CHARACTER HEIGHT
TYPICAL SIGNAGE
ELEVATION DETAIL
FIG. 703.2.7. MOUNTING HEIGHT
RESTROOM SIGNS
ELEVATION DETAIL
FIG. 703.2.8 MOUNTING LOCATION AT DOORS
TYPICAL SIGNAGE
PLAN DETAIL
MEN
FIG. 703.6.1 PICTOGRAM FIELD
RESTROOM SIGNS
ELEVATION DETAIL
7"-9"
15" MIN
48" MAX
12"
MIN.
FINISHED FLOOR
GRAB BARS
SCALE: 1/2" = 1'-0"
2'-0"
SCALE: 1/2" = 1'-0"
SCALE: 1/2" = 1'-0"
TYPICAL ELEVATIONS
WALL GRAB BARS
TYPICAL ELEVATIONS
FIXED SIDE
TYPICAL ELEVATIONS
7'-4"
2'-0"
4'-0"
SCALE: 1/2" = 1'-0"
FLOOR PLAN
TYPICAL TOILET
AREA FOR TOILET PAPER DISPENSER
WALL BASE
GRAB BARS
1 1/2" MIN.
12" MAX.
GRAB BAR LENGTH
42" MIN.
39" - 41"
18" MIN.
39" - 41"
33" - 36"12" MAX.
GRAB BAR LENGTH
42" MIN.
GRAB BARS
GOOSENECK SPOUT & WRIST BLADE CONTROLS
18" x 36"MIRROR
17" - 19"
12" MIN.
33"-36"
40" MAX.
29" MIN.
34" MAX.
6'-0" MIN.
60" MAX.
48" MIN.
LINE OF FLOOR
CHARACTER LOCATION
5/8" MIN.
2" MAX.
18" MIN.
18" MIN.
CHARACTER LOCATION
12" MIN.WALL MIRROR ABOVE LAVATORY
GRAB BARS
WATER CLOSET
NURSE CALL EMERGENCY PULL (CORD TO 6" AFF)
60" MIN. CLEAR FLOOR AREA
54" MIN.
42" MIN.
12" MAX.
(16"-18")
17" O.C.
56" MIN.
30" MIN.
60" MIN.
6" MIN.
ICC/ANSI A117.1 12003 - REQUIREMENTS SECTION 703.2 CHARACTERS THAT ARE BOTH TACTILE AND VISUAL CHARACTERS REQUIRED TO BE TACILE SHALL COMPLY WITH SECTIONS 703.2.1
THROUGH 703.2.8. EXCEPTION - TACTILE CHARACTERS COMPLYING WITH SECTION 703.3, WHERE
SEPARATE VISUAL CHARACTERS COMPLYING WITH SECTION 703.4 PROVIDE THE SAME INFORMATION. CHARACTERS ON A LIGHT BACKGROUND.
SECTION 703.2.1 BRAILLE TACTILE CHARACTERS SHALL BE DUPLICATED IN BRAILLE COMPLYING WITH SECTION
703.5. SECTION 703.2.2 FINISH AND CONTRAST CHARACTERS AND THEIR BACKGROUND SHALL HAVE A NON-GLARE FINISH,
CHARACTERS SHALL CONTRAST WITH THEIR BACKGROUND, WITH EITHER LIGHT CHARACTERS ON A DARK BACKGROUND, OR DARK CHARACTERS ON A LIGHT BACKGROUND.
SECTION 703.2.3 TACTILE CHARACTER DEPTH TACTILE CHARACTERS SHALL BE RAISE 1/32" MIN. ABOVE THEIR BACKGROUND.
RAISED BORDERS AND ELEMENTS THAT ARE NOT REQUIRED SHALL BE 3/8" MIN. FROM TACTILE CHARACTERS.
SECTION 703.2.4 CHARACTERS FORMS FONTS SHALL HAVE CHARACTERS COMPLYING WITH SECTIONS 703.2.4.1 THROUGH
703.2.4.5. SECTION 703.2.4.1 CASE CHARACTERS SHALL BE UPPERCASE. SECTION 703.2.4.2 STYLE CHARACTERS SHALL BE SANS SERIF. CHARACTER SHALL NOT BE ITALIC, OBLIQUE,
SCRIPT, HIGHLY DECORATIVE, OR OF OTHER UNUSUAL FORMS. SECTION 703.2.4.3 WIDTH CHARACTERS WIDTH SHALL BE 55 PERCENT MIN. AND 110 PERCENT MAX. OF THE
HEIGHT OF THE CHARACTER, WITH THE WIDTH BASED ON THE UPPERCASE LETTER "O" AND THE HEIGHT BASED ON THE UPPERCASE LETTER "I".
SECTION 703.2.4.4 HEIGHT CHARACTER HEIGHT, MEASURE VERTICALLY FROM THE BASELINE OF THE
CHARACTER, SHALL BE 5/8" MIN. AND 2" MAX., BASED ON THE UPPERCASE LETTER "I".
SECTION 703.2.4.5 STROKE THICKNESS CHARACTERS WITH RECTANGULAR CROSS SECTIONS SHALL HAVE A STROKE
THICKNESS WHICH IS 10 PERCENT MIN. AND 15 PERCENT MAX., OF THE HEIGHT OF THE CHARACTER, BASED ON THE UPPERCASE LETTER "I". CHARACTERS WITH OTHER CROSS SECTIONS SHALL HAVE A STROKE THICKNESS AT THE BASE OF THE CROSS
SECTIONS WHICH IS 10 PERCENT MIN. AND 30 PERCENT MAX., OF THE HEIGHT OF THE CHARACTER, AND A STROKE THICKNESS AT THE TOP OF THE CROSS SECTIONS WHICH IS 15 PERCENT MAXIMUM OF THE HEIGHT OF THE CHARACTER, BASED ON THE UPPERCASE LETTER "I".
SECTION 703.2.5 CHARACTER SPACING SPACING SHALL BE MEASURED BETWEEN THE TWO CLOSEST POINTS OF ADJACENT
CHARACTERS WITHIN A MESSAGE, EXCLUDING WORD SPACES. WHERE CHARACTERS HAVE RECTANGULAR CROSS SECTIONS, SPACING BETWEEN INDIVIDUAL CHARACTERS SHALL BE 1/2" MIN. AND 3/8" MAX. WHERE CHARACTERS HAVE OTHER CROSS
SECTIONS, SPACING BETWEEN INDIVIDUAL CHARACTERS SHALL BE 1/16" MIN. AND 3/8" MAX. AT THE BASE OF THE CROSS SECTIONS, AND 1/8" MIN. AND 3/8" MAX. AT THE TOP OF THE CROSS SECTIONS.
SECTION 703.2.6 LINE SPACING SPACING BETWEEN THE BASELINES OF SEPARATE LINES OF CHARACTERS SHALL BE
135 PERCENT MINIMUM TO 170 PERCENT MAX. OF THE CHARACTER HEIGHT. SECTION 703.2.7 MOUNTING HEIGHT CHARACTERS SHALL BE 48" MIN. AND 60" MAX. ABOVE FLOOR THE ADJACENT
FLOOR OR GROUND SURFACE, MEASURED FROM THE BASELINE OF THE CHARACTERS.
EXCEPTION - ELEVATOR CAR CONTROLS. SECTION 703.2.8 MOUNTING LOCATION WHERE A SIGN CONTAINING TACTILE CHARACTERS IS PROVIDED AT A DOOR, THE
SIGN SHALL BE ALONGSIDE THE DOOR ON THE LATCH SIDE. WHERE A TACTILE SIGN IS PROVIDED AT DOUBLE DOORS, THE IGN SHALL BE TO THE RIGHT OF THE RIGHT HAND DOOR. WHERE THERE IS NO WALL SPACE ON THE LATCH SIDE OF A SINGLE DOOR, OR THE RIGHT SIDE OF DOUBLE DOORS, SIGNS SHALL BE ON THE NEAREST ADJACENT WALL. SIGNS CONTAINING TACTILE CHARACTERS SHALL HAVE AN 18" MIN. BY 18" MIN. SPACE ON THE FLOOR OR GROUND, CENTERED ON THE SIGN, BEYOND THE ARC OF ANY DOOR SWING BETWEEN THE CLOSED POSITION AND AND 45 DEGREE OPEN POSITION.
EXCEPTION - DOOR-MOUNTED SIGNS SHALL BE PERMITTED ON THE PUSH SIDE OF DOORS WITH CLOSERS AND WITHOUT HOLD-OPEN DEVICES.
SECTION 703.6 PICTOGRAMS PICTOGRAMS SHALL COMPLY WITH SECTION 703.6.1 THROUGH 703.6.3 SECTION 703.6.1 PICTOGRAM FIELD PICTOGRAMS SHALL HAVE A FIELD WITH A HEIGHT OF 6" MIN. CHARACTERS OR
BRAILLE SHALL NOT BE IN THE PICTOGRAM FIELD. SECTION 703.6.2 FINISH AND CONTRAST PICTOGRAMS AND THEIR FIELDS SHALL HAVE A NON-GLARE FINISH. PICTOGRAMS
SHALL CONTRAST WITH THEIR FIELDS, WITH EITHER A LIGHT PICTOGRAM ON A DARK FIELD OR A DARK PICTOGRAM ON A LIGHT FIELD.
SECTION 703.6.3 TEXT DESCRIPTORS WHERE TEXT DESCRIPTORS FOR PICTOGRAMS ARE REQUIRED, THEY SHALL BE
DIRECTLY BELOW OR ADJACENT TO THE PICTOGRAM AND COMPLY WITH SECTION 703.2.
TOILET ACCESSORIES
PAPER TOWEL DISPENSER"BOBRICK" MODEL NO. 262
PAPER TOWEL DISPENSER(AT NURSE STATION)"BOBRICK" MODEL NO. 2621
HORIZONTAL GRAB BARS"BOBRICK" MODEL NO. B-6672SERIES X REQUIRED LENGTH (1 1/2" DIA.)
TOILET ROLL TISSUE HOLDER"BOBRICK" MODEL NO. B-667
MIRROR"BOBRICK" MODEL NO. B-165-3636
ALL TOILET ACCESSORY ITEMS TO BE INSTALLED PER ADA REQUIREMENTS.
33"-36"
SOFFIT & BULKHEAD TYP. DETAILSCALE 1 1/2" = 1'-0"
5/8" DRYWALL FINISH
VARIES
VARIES
SUSPENDED ACOUSTICAL CEILINGS TO BE WORKED INTO DRYWALL BULKHEAD
METAL STUD FRAMING @ 2'-0" O.C.
CORNER AND CASING BEADS TYP.
SCALE: 1" = 1'-0"
WALL PLAN/SECTION
TYPICAL
4 5/8"
2'-0" O.C. 2'-0" O.C.
5/8" MOLD AND MOISTURE RESISTANT GYPSUM BOARD, (BOTH SIDES)
3" BATT INSULATION
3 5/8" 20 GAUGE STEEL STUDS, 24" O.C.
SCALE: 1" = 1'-0"
HEIGHT VARIESSUSPENDED
ACOUSTICAL CEILING
METAL TRACK
METAL TRACK(LEVELED)
3 5/8" 20 GAUGE STEEL STUDS, 24" O.C.
EXISTING4" CONCRETE SLAB
METALWIRE TIES
NOTE:REFER TO SHEET A7.1 FOR SPECIFIC WALL TYPES AND SECTION DETAILS
CONTINUOUS BED OF MOLD RESISTANT SILICONE SEALANT UNDER CHANNEL
5/8" MOLD AND MOISTURE RESISTANT GYPSUM BOARD, FULL HEIGHT
EXTEND WALLS TO THE UNDERSIDE OF MTL CORRIGATED ROOF DECK
ACOUSTICALSEALANT
3" BATTINSULATION
4 7/8 "
WALL SECTION
TYPICAL
X X XX X
BTM TRUSS 9' 6" OR 10' 2" OR 10' 10"
12", 16" OR 24" OPEN WEB STL JOIST
MEMBRANE ROOFING OVER RIGID INSULATION AND MTL DECKING
SCALE: 1/2" = 1'-0"SCALE: 1" = 3"
SCALE: 1/4" = 1'-0"
FIG. 404.2.7. DOOR HARDWARE
TYPICAL
ELEVATION DETAIL
FIG. 404.2.5. THRESHOLDS AT DOORWAYS
TYPICAL
ELEVATION DETAIL
TYPICAL DOOR APPROACH DETAILS
PULL SIDE
PULL SIDE
PULL SIDE
PUSH SIDEPUSH SIDE
PUSH SIDE
1/2" MAX.
LINE OF DOOR
STEEL THRESHOLD
LINE OF FLOOR
DOOR JAMB & FRAME
DOOR & FRAME
HANDLE, PULL, LATCHES, LOCKS, & OTHER OPERABLE PARTS ON ACCESSIBLE DOORS, 34" MIN. & 48" MAX. ABOVE THE FLOOR OR GROUND
LINE OF FLOOR
34" MIN.
48" MAX.
5'-0"
MIN.
2'-0"
4'-0"
MIN.
2'-0"
MIN.
3'-0"MIN.
5'-0"
MIN.
4'-6"
MIN.
3'-6"
MIN.1'-0"
MIN.
4'-0"
MIN.
3'-6"
MIN.
2'-0"
5/8" THK. MOLD & MOISTURE RESISTANT GYP. BD. (BOTH SIDES)
REFER TO FINISH PLAN & SCHEDULE FOR SPECIFIED FLOORING & BASE
CONT. BED OF MOLD RESISTANT SEALANT UNDER CHANNEL
CONT. BEAD OF MOLD RESISTANT SILICONE ALONG BOTTOM EDGE OF WALL BD (BOTH SIDES)
3 5/8"
3-5/8" (20 GA.) METAL STUDS @ 24" O.C.
SMOKE BARRIER NOTES:BOTH SIDES OF WALL TO RECEIVE GYP. BD. WHERE WALL TYPE LIES IN SMOKE BARRIER - U.L. DESIGN U419. ANY PENETRATIONS SHALL BE SEALED WITH A U.L. APPROVED FIRE STOP SEALANT.
4 7/8"
5/8" THK. MOLD & MOISTURE RESISTANT GYP. BD. (BOTH SIDES)
REFER TO FLOOR FINISH PLAN & SCHEDULE FOR FLOORING & BASE
CONTINUOUS BEAD OF U.L. LISTED FIRE-STOP SEALANT UNDER CHANNEL
CONT. BEAD OF U.L. LISTED FIRE-STOP SEALANT ALONG EDGE OF GYP. BD. (TYP. @ TOP & BOTT. OF WALL)
6" (20 GA.) METAL STUDS @ 16" O.C.
6"
R-19 BATT INSULATION FULL HT. OF WALL
7 1/4"
U.L. DESIGN U419
5/8" THK. MOLD & MOISTURE RESISTANT GYP. BD.
REFER TO FINISH PLAN & SCHEDULE FOR SPECIFIED FLOORING & BASE
CONT. BEAD OF MOLD RESISTANT SILICONE ALONG BOTTOM EDGE OF WALL BD
1-5/8" (20 GA.) METAL STUDS @ 24" O.C.
2 1/4"
NOTE: 5/8" THK. MOISTURE & MOLD RESISTANT GLASS BD. TO MIN. 42" AFF IN TOILETS/JANITOR
EXTERIOR WALLS PROVIDE 1 1/2" EXTRUDED POLYSTRYENE RIGID INSULATION
SOUND INSULATION FULL HEIGHT OF WALL
42" AFF
5/8" THK. MOLD & MOISTURE RESISTANT GYP. BD. ABOVE GLASS BD
REFER TO FINISH PLAN SCHEDULE FOR SPECIFIED FLOORING & BASE
CONT. BED OF MOLD RESISTANT SEALANT UNDER CHANNEL
CONT. BEAD OF MOLD RESISTANT SILICONE SEALANT @ JOINT BTW FRP & BASE
WALL PROTECTION PANELS (FULL HEIGHT)
5/8" THK. MOISTURE & MOLD RESISTANT GLASS BD. TO MIN. 42" AFF
CONT. BEAD OF MOLD RESIST. SILICONE ALONG BOTTOM EDGE OF WALL BD.
3-5/8" (20 GA.) METAL STUDS @ 16" O.C.
LAB
5/8" THK. MOLD & MOISTURE RESISTANT GYP. BD. ABOVE GLASS BD
REFER TO FINISH PLAN SCHEDULE FOR SPECIFIED FLOORING & BASE
CONT. BEAD OF MOLD RESISTANT SEALANT UNDER CHANNEL
CONT. BEAD OF MOLD RESISTANT SILICONE SEALANT @ JOINT BTW WP & BASE
WALL PROTECTION PANELS TO 48" AFF
5/8" THK. MOISTURE & MOLD RESISTANT GLASS BD. TO MIN. 42" AFF
CONT. BEAD OF MOLD RESIST. SILICONE ALONG BOTTOM EDGE OF WALL BD.
3-5/8" (20 GA.) METAL STUDS @ 16" O.C.
3"W X 6"H RIGID INSULATION W/ SOUND INSULATION ABOVE FULL HEIGHT OF WALL
42" AFF
J.C./TOILET
5/8" THK. MOLD & MOISTURE RESISTANT GYP. BD. (BOTH SIDES)
REFER TO FINISH PLAN & SCHEDULE FOR SPECIFIED FLOORING & BASE
CONT. BEAD OF MOLD RESISTANT SEALANT UNDER CHANNEL
CONT. BEAD OF MOLD RESISTANT SILICONE ALONG BOTTOM EDGE OF WALL BD (BOTH SIDES)
3-5/8" (20 GA.) METAL STUDS @ 16" O.C.
SOUND INSULATION FULL HEIGHT
SCALE
DATE
PROJECT NUMBER
Pro
ject
Dra
win
g
SEDGEWICK & FERWEDA ARCHITECTS
SEDGEWICK & FERWEDA ARCHITECTS
SEDGEWICK & FERWEDA ARCHITECTS
SEDGEWICK & FERWEDA ARCHITECTS
SHEET NUMBER
AR
CH
ITE
CT
SEAL OF ARCHITECT
41
0 E
ast C
ourt
Str
eet F
lint,
MI
48
503
TE
L: 8
10
-23
8-9
64
7
| F
AX
: 81
0-2
38-4
90
0w
ww
.sfa
rch
.us
GOOD DESIGN. GOOD CLIENTS. GREAT ARCHITECTURE.
R E V I S I O N S
DRAWN BY:
CHECKED BY:
SS SSEE EEDD DDGG GGEE EEWW WWII IICC CCKK KK && && FF FFEE EERR RRWW WWEE EEDD DDAA AA
AA AA RR RR CC CC HH HH II II TT TT EE EE CC CC TT TT SS SS
As indicated
2/1
5/2
017
9:5
9:4
0 A
M
A0.1
GE
NE
RA
L N
OT
ES
/ P
AR
TIT
ION
DE
TA
ILS
1/27/17
16-026
BID SET
GE
NE
SE
E H
EA
LT
H S
YS
TE
M725 M
AS
ON
ST
FL
INT
, M
I 48503
LJK
SJS
1 1/2" = 1'-0"2TYPICAL WALL CONSTRUCTION DETAIL
1 1/2" = 1'-0"3TOILET RM WALL CONSTRUCTION DETAIL
1 1/2" = 1'-0"4TYPICAL WALL FURRING CONSTRUCTION DETAIL
1 1/2" = 1'-0"5LAB WALL CONSTRUCTION DETAIL
1 1/2" = 1'-0"6JANITOR/TOILET WALL CONSTRUCTION DETAIL
1 1/2" = 1'-0"7SOUND PROOFING WALL CONSTRUCTION DETAIL
Date Description
2/14/17 ADDENDUM 1
1
1
1
001
002
046
027
026
003
007006
004
005
008
009
011
012
033
035
037
036
038
032
031
039
040
041
025
043
044
045
042
024
021 020 019
022023
015
016
013
29'-4" 18'-5" 20'-6 1/2" 20'-6 1/2" 21'-10"
26'-6"
4X4 STL COL
W14X34 ABOVE
W14X34 ABOVE
W14X34 ABOVE
4X4 STL COL
4X4 STL COL
REMOVE STL LADDER AND ROOF HATCH
2
A1.3
1
A4.0
1
A4.0
COORDINATE WITH PLUMBING CONTRACTOR WHEN REMOVING CONC BLOCK WALLS WITH IMBEDDED WATER AND DRAIN LINES TYP
COORDINATE WITH ELECTRIC CONTRACTOR WHEN REMOVING CONC BLOCK WALLS WITH IMBEDDED ELECTRICAL BOXES AND CONDUIT TYP
CONC BLOCK WALLS
SAWCUT, REMOVE AND REPLACE CONC FLOOR SLAB TO INSTALL PLUMBING SANITARY OR WATER LINES 3000 PSI 4" SLUMP COORDINATE WITH P.C. TYP
SAWCUT NEW DOOR OPENING IN EX CONC. BLOCK WALL PROVIDE 3 1/2"X 3 1/2"X 1/4" STL ANGLE LINTEL EA 4" WIDTH OR 8"X12"X4' 0" CONC. LINTEL TYP
ALL PARTITION WALLS REMOVED STL STUD WITH GYPSUM BOARD EA SIDE TO ABOVE SUSPENDED CEILING BRACED OFF OPEN WEB STL JOIST U.N.O.
REMOVE CER TILE FLOORING
FD
VTRVENT
VENT
VENT
VENT
FD
FD
FD
VENT
VTR
VTR
VTR
FD
SUR MTD ELECTRIC PANEL 'C' TO BE RE-LOCATED/IMBEDDED IN NEW STL STUD WALL
RECESSED ELECTRIC PANEL 'A' TO BE RELOCATED FED FROM BELOW SLAB
SUR MTD ELECTRIC POWER PANEL TO BE RELOCATED FED FROM BELOW SLAB
CONC BLOCK WALLS
REMOVE CER TILE FLOORING
CONC BLOCK WALLS
VTR
CONC BLOCK WALLS
REMOVE FLUE THRU ROOF PATCH MTL DECK
CONC BLOCK WALLS
2
A1.0
034
1
1
18
'-6 5
/8"
017
014
018
019021
022023
024
010
028
030
REMOVE AND RE-INSTALL EX CEILING MTD MOTORIZED PROJECTION SCREEN AND PROJECTOR
REMOVE AND RE-INSTALL EX CEILING MTD MOTORIZED PROJECTION SCREEN AND PROJECTOR
3 5/8" 20 GAUGE STEEL STUD (24" O.C.) PARTITION WITH FRP PANELS OVER 1/2" CDX PLYWOOD OVER 5/8" MOISTURE RESISTANT GYPSUM BOARD (9'-8" IN HEIGHT UNLESS OTHERWISE SPECIFIED) AND CEMENT BACKER BOARD. BATT INSULATION IN WALL CAVITY (TYPICAL REINFORCING FLOOR DETAIL THIS SHEET). DASHED LINE REPRESENTS SIDE OF STUD TO RECEIVE PLYWOOD / MOISTURE GYP AND CEMENT BOARD PROTECTION.
3 5/8" 20 GAUGE STEEL STUD (24" O.C.) NON RATED PARTITION WITH ONE LAYER OF 5/8" DRYWALL, EACH FACE. EXTEND 6" PASS DROP CEILING. PROVIDE BATT INSULATION IN WALL CAVITY, FULL HEIGHT OF STUD.
MOISTURE RESISTANT PARTITION
NON RATED PARTITION
WALL TYPES
EXISTING WALL TO REMAIN
EXISTING WALL TO BE DEMOLISHED
X WALL TAGTYPE 2 - TYP. WALL CONSTRUCTION U.N.O.SEE SHEET A0.1
FINISH FLOOR0"
B.O. TRUSS 19'-6"
8FT CEILING8'-0"
9FT CEILING9'-0"
T.O. WALL 111'-2"
6 1/2"
8'-0"
6"
7'-0"
1 3/4"
10"
1 3/4"
8'-1 1/2"
8'-2"
ALUM WRAP WOOD HEADER
2 - 2X4 WOOD HEADER
2X4 ALUM STORE FRONT FRAMED DOOR AND LITE
BRICK BEYOND
SAWCUT AND REMOVE 1" STONE AGGREGATE EPOXYBINDER PANEL MORTARED TO 6" CONC BLOCK WALL AND ALUM FRAMED WINDOW (NOT SHOWN)TO INSTALL NEW DOOR AND FRAME IN EXISTING WALL
SAWCUT AND REMOVE LIMESTONE SILL
3000 PSI CONC INFILL
NEW 4" X 5' 0" 3500 PSI AIR ENTRAINED CONC REINF WITH 6X6 1.4X1.4 WWF SIDEWALK TO MASON ST SIDEWALK
SUSPENDED CEILING
STL JOIST
NEW 1/2" GYPSUM BOARD OVER 25 GA STL Z CHANNELS AT 2' 0" O.C. 1 1/2" POLYSTYRENE INSULATION
RETURN GYP BRD TO DOOR FRAME PROVIDE PLAS 'J' CHANNEL TO FINISH EDGE CAULK TO FRAME
ALUM THRESHOLD
SCALE
DATE
PROJECT NUMBER
Pro
ject
Dra
win
g
SEDGEWICK & FERWEDA ARCHITECTS
SEDGEWICK & FERWEDA ARCHITECTS
SEDGEWICK & FERWEDA ARCHITECTS
SEDGEWICK & FERWEDA ARCHITECTS
SHEET NUMBER
AR
CH
ITE
CT
SEAL OF ARCHITECT
41
0 E
ast C
ourt
Str
eet F
lint,
MI
48
503
TE
L: 8
10
-23
8-9
64
7
| F
AX
: 81
0-2
38-4
90
0w
ww
.sfa
rch
.us
GOOD DESIGN. GOOD CLIENTS. GREAT ARCHITECTURE.
R E V I S I O N S
DRAWN BY:
CHECKED BY:
SS SSEE EEDD DDGG GGEE EEWW WWII IICC CCKK KK && && FF FFEE EERR RRWW WWEE EEDD DDAA AA
AA AA RR RR CC CC HH HH II II TT TT EE EE CC CC TT TT SS SS
As indicated
2/1
5/2
017
9:5
9:4
1 A
M
A1.0
EX
IST
ING
& D
EM
OL
ITIO
NF
IRS
T F
LO
OR
PL
AN
1/27/17
16-026
BID SET
GE
NE
SE
E H
EA
LT
H S
YS
TE
M725 M
AS
ON
ST
FL
INT
, M
I 48503
BRC, KVN
JSF
3/16" = 1'-0"
EXISTING & DEMOLITION FIRST FLOOR PLAN
3/4" = 1'-0"2SECTION THRU DOOR
Date Description
2/14/17 ADDENDUM 1
1
1
WH
110'-8"
108'-0"
4'-8"
103'-4"
WAITINGWAITINGWAITINGWAITING
101
PVT.PVT.PVT.PVT.
147
RECEPTIONRECEPTIONRECEPTIONRECEPTIONOFFICEOFFICEOFFICEOFFICE
150
MEETING ROOMMEETING ROOMMEETING ROOMMEETING ROOM
158
VESTIBULEVESTIBULEVESTIBULEVESTIBULE
100
TOILETTOILETTOILETTOILET
107
TOILETTOILETTOILETTOILET
108
EXAM 7EXAM 7EXAM 7EXAM 7
118
EXAM 9EXAM 9EXAM 9EXAM 9
120
EXAM 2EXAM 2EXAM 2EXAM 2
112
EXAM 1EXAM 1EXAM 1EXAM 1
110
EXAM 4EXAM 4EXAM 4EXAM 4
114PVT.PVT.PVT.PVT.
106
MAMAMAMA
109
OFFICEOFFICEOFFICEOFFICE
127
EXAM 13EXAM 13EXAM 13EXAM 13
128
EXAM 14EXAM 14EXAM 14EXAM 14
129
EXAM 16EXAM 16EXAM 16EXAM 16
130
EXAM 18EXAM 18EXAM 18EXAM 18
131
EXAM 20EXAM 20EXAM 20EXAM 20
132
EXAM 21EXAM 21EXAM 21EXAM 21
133
OFFICEOFFICEOFFICEOFFICE
134
M.A/N.PM.A/N.PM.A/N.PM.A/N.P
135
EXAM 15EXAM 15EXAM 15EXAM 15
140
EXAM 17EXAM 17EXAM 17EXAM 17
139
EXAM 19EXAM 19EXAM 19EXAM 19
138
OFFICEOFFICEOFFICEOFFICE
136
OFFICEOFFICEOFFICEOFFICE
137
TOILETTOILETTOILETTOILET
104
EXAM 5EXAM 5EXAM 5EXAM 5
115
EXAM 8EXAM 8EXAM 8EXAM 8
119
OFFICEOFFICEOFFICEOFFICE
121
EXAM 10EXAM 10EXAM 10EXAM 10
122
EXAM 11EXAM 11EXAM 11EXAM 11
123
EXAM 12EXAM 12EXAM 12EXAM 12
124
STORAGESTORAGESTORAGESTORAGE
125
OFFICEOFFICEOFFICEOFFICE
116
OFFICEOFFICEOFFICEOFFICE
111
EXAM 3EXAM 3EXAM 3EXAM 3
113
EXAM 6EXAM 6EXAM 6EXAM 6
117
MECHANICALMECHANICALMECHANICALMECHANICAL
159
LOUNGELOUNGELOUNGELOUNGE
157
TOILETTOILETTOILETTOILET
154
MEETINGMEETINGMEETINGMEETINGROOMROOMROOMROOM
151
CONFERENCECONFERENCECONFERENCECONFERENCEROOMROOMROOMROOM
143
OFFICEOFFICEOFFICEOFFICE
141
OFFICEOFFICEOFFICEOFFICE
142M.A/N.PM.A/N.PM.A/N.PM.A/N.P
146
SOCIAL WORK/SOCIAL WORK/SOCIAL WORK/SOCIAL WORK/HEALTH COACHHEALTH COACHHEALTH COACHHEALTH COACH
126
LABLABLABLAB
145
TOILETTOILETTOILETTOILET
153
PVT.PVT.PVT.PVT.
148
CHECK OUTCHECK OUTCHECK OUTCHECK OUT
149 COPY
STORAGESTORAGESTORAGESTORAGE
152
COPY
COPY
QUESTQUESTQUESTQUEST
105
INTAKEINTAKEINTAKEINTAKE
103
CHILD PLAYAREA
EYE CHART
AED WALL MOUNT
EKG
EKG
10'-7 5/8" 4 7/8" 10'-4 1/2" 4 7/8" 15'-0 3/8" 7'-0 7/8" 13'-8 7/8" 7'-0 7/8" 14'-4"
29'-4" 81'-4"
11'-5 1/4"
4 7/8"
10'-1 1/2"
4 7/8"
10'-2 3/8"
4 7/8"
10'-0"
4 7/8"
10'-0"
4 7/8"
10'-0"
4 7/8"
10'-0"
4 7/8"
10'-0"
4 7/8"
10'-0"
4 7/8"
10'-5 1/8"
4 7/8"
10'-0"
4 7/8"
5'-0"
4 7/8"
9'-11 7/8"
4 7/8"
9'-11 7/8"
4 7/8"
9'-11 7/8"
4 7/8"
9'-11 7/8"
4 7/8"
9'-11 7/8"
4 7/8"
9'-11 7/8"
4 7/8"
5'-0"
4 7/8"
10'-5 1/8"
5'-0" 4 7/8" 9'-9" 4 7/8" 11'-4" 4 7/8" 10'-0" 4 7/8" 10'-0" 4 7/8" 10'-0" 4 7/8" 10'-6" 4 7/8" 10'-6 3/8"
5'-0"
3'-5 7/8"
11'-3 3/4"
10'-5 7/8"
1'-4 1/8"5'-0"4 7/8"
9'-4"
4 7/8"
9'-4 1/2"
4 7/8"9'-7 3/8"
4 7/8"5'-0"4 7/8"
9'-8"
4 7/8" 14'-0 1/2" 4 7/8" 7'-2" 4 7/8" 5'-0" 4 7/8" 10'-0" 4 7/8" 10'-0" 4 7/8" 10'-0"4 7/8"5'-0"
4 7/8"
10'-6"
10'-6" 4 7/8" 5'-0" 4 7/8" 10'-6 1/8" 1'-4 1/8" 5'-0" 4 7/8" 21'-7 3/8"4 7/8"
5'-0" 4 7/8" 9'-0" 4 7/8" 12'-0" 4 7/8" 9'-0"
28'-10 1/4"
4 7/8"
11'-8"
4 7/8"
8'-0"
4 7/8" 6'-0"
4 7/8"
23'-0"
4 7/8"
11'-1 1/2"
4 7/8"
9'-10 1/2"
10'-4 5/8"
4 7/8"
10'-6"
4 7/8"
27'-10 3/4"
8'-0" 4 7/8" 13'-4 1/8" 4 7/8" 10'-0" 4 7/8" 7'-1 1/2" 1'-1 7/8" 9'-2 7/8" 4 7/8" 4'-4" 4 7/8" 5'-9 1/8"
7'-4"
4 7/8"
10'-3"
4 7/8"
10'-3"
4 7/8"
20'-6 1/2"
4'-5 1/2"
4 7/8"
15'-7 1/8"
5'-0
"5'-0"
5'-2"
5'-0"
13'-10 1/8"
8'-8 3/4"
3'-4 1/4"
5'-0" 4 7/8" 12'-2 5/8" 1'-4 1/8" 16'-1 7/8" 16'-0"
5'-2 3/8"
26'-8 3/4" 1'-5 1/4" 17'-7 1/2" 1'-4 1/8" 39'-8 1/4" 1'-4 1/8" 19'-11 1/2"
3'-0"
4 7/8"
9'-2 5/8"
13'-8 7/8"
7'-0 3/4"
13'-8 7/8"
7'-0 7/8"
13'-8 7/8"
7'-0 7/8"
6'-8"
8'-6 3/8"
13'-11"
7'-0 7/8"
13'-8 5/8"
7'-0 7/8"
13'-11"
8'-6 3/8"
5'-0"
5'-0"
5'-0"
JANITORJANITORJANITORJANITOR
156
A3.0
1
A3.0
2
001
002
63
47
46
44
43
48
62
61
49
58
59
60
52 50
41
42
40
39
3837
36
3332
34 3524
26
28
29
27
22
31
046
21
20
19
18
17
16
15 14
13
10
12
11
9
7
6
5
8
3
55
56
57
2
30
51
003
45
A3.1
1
2
3
4
A3.2
3
A3.2
6
A3.1
6
5 7
5
A3.19
10
11
8
A3.2 4
A3.07
8
A3.0
6
A3.0 5A3.0
9
A3.0 10
A3.0
3
A3.0
4
2
1
TOILETTOILETTOILETTOILET
144
CORRIDORCORRIDORCORRIDORCORRIDOR
102
SERVICESERVICESERVICESERVICEENTRANCEENTRANCEENTRANCEENTRANCE
155
7'-0"
9'-8 5/8"
2523
6'-10"
4'-0"
3'-2"
9'-8"
4 7/8"
5'-0"
4 7/8"
12'-4 1/4"
4 7/8"
7'-5 5/8"
4 7/8"
8'-6"
4 7/8"
5'-0"
4 7/8"
5'-0"
7 1/4"
5'-0"
4 7/8"
9'-0"
4 7/8"
9'-2 1/2"
4 7/8"
5'-0"
7 1/4"
7'-2 7/8"
4 7/8"
7'-3"
030
2
A1.3
1
A4.0
1
A4.0
4'-0"
ENCLOSE 4x4 STL COL.
7'-4"
5'-0"
5'-4 5/8"
5'-0"
5'-0" 5'-0
"
5'-0"
5'-0"
5'-0"
5'-0"
5'-0"
5'-0"
5'-0"
5'-0"
5'-0"
5'-0"
A3.213
3
3
135°
135°
135°
135°
ENCLOSE 4x4 STL COL.
5'-0"
5'-0"
3
2
A1.0
A3.1
12
PT-03 ENTIRE WALL
PT-02
PT-03
PT-03 PT-03
PT-02ENTIRE WALL
PT-02
PT-02
PT-03
PT-03
PT-02
5'X20' CONC SIDEWALK
WALL FINISHED W/ CHALKBOARD PAINT
LOCATION OF FUTURE MOSAIC WALL
A3.011
A3.0
12DIRTY SINK
1'-6"
R 5'-7 1/2
"
EX. FE CABINET
EX FE CABINET
EX FE CABINET
NEW FE CABINET
1
1
1
5'-0"
5'-0"
RELOCATED EX. PROJECTOR
RELOCATED EX. PROJECTOR
3 5/8" 20 GAUGE STEEL STUD (24" O.C.) PARTITION WITH FRP PANELS OVER 1/2" CDX PLYWOOD OVER 5/8" MOISTURE RESISTANT GYPSUM BOARD (9'-8" IN HEIGHT UNLESS OTHERWISE SPECIFIED) AND CEMENT BACKER BOARD. BATT INSULATION IN WALL CAVITY (TYPICAL REINFORCING FLOOR DETAIL THIS SHEET). DASHED LINE REPRESENTS SIDE OF STUD TO RECEIVE PLYWOOD / MOISTURE GYP AND CEMENT BOARD PROTECTION.
3 5/8" 20 GAUGE STEEL STUD (24" O.C.) NON RATED PARTITION WITH ONE LAYER OF 5/8" DRYWALL, EACH FACE. EXTEND 6" PASS DROP CEILING. PROVIDE BATT INSULATION IN WALL CAVITY, FULL HEIGHT OF STUD.
MOISTURE RESISTANT PARTITION
NON RATED PARTITION
WALL TYPES
EXISTING WALL TO REMAIN
EXISTING WALL TO BE DEMOLISHED
X WALL TAGTYPE 2 - TYP. WALL CONSTRUCTION U.N.O.SEE SHEET A0.1
SCALE
DATE
PROJECT NUMBER
Pro
ject
Dra
win
g
SEDGEWICK & FERWEDA ARCHITECTS
SEDGEWICK & FERWEDA ARCHITECTS
SEDGEWICK & FERWEDA ARCHITECTS
SEDGEWICK & FERWEDA ARCHITECTS
SHEET NUMBER
AR
CH
ITE
CT
SEAL OF ARCHITECT
41
0 E
ast C
ourt
Str
eet F
lint,
MI
48
503
TE
L: 8
10
-23
8-9
64
7
| F
AX
: 81
0-2
38-4
90
0w
ww
.sfa
rch
.us
GOOD DESIGN. GOOD CLIENTS. GREAT ARCHITECTURE.
R E V I S I O N S
DRAWN BY:
CHECKED BY:
SS SSEE EEDD DDGG GGEE EEWW WWII IICC CCKK KK && && FF FFEE EERR RRWW WWEE EEDD DDAA AA
AA AA RR RR CC CC HH HH II II TT TT EE EE CC CC TT TT SS SS
As indicated
2/1
5/2
017
9:5
9:4
3 A
M
A1.2
PR
OP
OS
ED
FIR
ST
FL
OO
RP
LA
N
1/27/17
16-026
BID SET
GE
NE
SE
E H
EA
LT
H S
YS
TE
M725 M
AS
ON
ST
FL
INT
, M
I 48503
BRC, KVN
JSF
3/16" = 1'-0"
PROPOSED FIRST FLOOR PLAN
Date Description
2/14/17 ADDENDUM 1
1
1
1
1
1
1
1
110'-8"
4'-8"
103'-4"
47'-4" 42'-0" 21'-4"
108'-0"
52'-0"
24"x52 1/2" ROOF OPENING
20"x44 1/2" ROOF OPENING
12"x12"EF-2
4" RS
3" RS
24"x52 1/2" ROOF OPENING
24"x52 1/2" ROOF OPENING
24"x52 1/2" ROOF OPENING
12"x12"EF-3
12"x12"EF-1
ROOF OVER REMOVED 30"x36" ROOF HATCH
PATCH ROOF AND INSTALL EF-4 WHERE 20" MTL FLUE REMOVED
4" RS 4" RS
4" RS4" RS
4" RS
12" STL CHANNEL CURB TYP
SLOPE SLOPE SLOPE SLOPESLOPE
SLOPE
RTU-1
RTU-2
RTU-3
RTU-4
RTU-6
51'-4"
SANITARY VENT (SV)
SV
SV
SV
SV
PITCH POCKET GAS/ELECTRIC PIPING THRU ROOF TYP
NEW ROOF ACCESS LADDER(S)
ELECT SERVICE CONDUIT THRU ROOF
12"x12"
NEW 36"x42"ROOF HATCH
EX 6" RAISED ROOF AREA TYP
REMOVE EX ROOFED OVER 12" STL CHANNEL POST WELDED THRU STL DECKING TO JOIST BELOW
REMOVE EX ROOFED OVER 12" STL CHANNEL POST WELDED THRU STL DECKING TO JOIST BELOW
REMOVE EX ROOFED OVER 12" STL CHANNEL POST WELDED THRU STL DECKING TO JOIST BELOW
EX 6" RAISED ROOF AREA TYP
EX 6" RAISED ROOF AREA TYP
CU-1 AC CONDENSING UNIT ON WOL WOOD CURB
FINISH FLOOR0"
8FT CEILING8'-0"
9FT CEILING9'-0"
T.O. WALL 215'-1"
B.O. TRUSS 312'-10"
4'-2"
GASKET ALL AROUND
COVER LINER
COVER
INSULATION THROUGOUT COVER
3X3X1/4 STEEL ANGLES AROUND OPENING
RUNGS
EXISTING WALL
BRACKET
HEAVEY DUTY TUBULAR RAILS ALUM CAGE LADDER BY O'KEEFE'S INC.
2-1/2" SIDE RAIL
ANCHOR INTO FLOOR SLAB
VERIFY TRUSS SPACING IN FIELD
OPTIONAL SAFETY CAGE
TF TAPE
ROOF INSULATION
TPA APPROVEDSEALANT
TPA MEMBRANE MUST BEUNDER COUNTERFLASHING
HEAT WELDED LAP
TPA MEMBRANE PERIMETERSHEET
COUNTERFLASHING
TPA PLATES &SCREWS
NOTES
FLASHING MUST BE A MINIMUM OF 8" HIGH. DO NOT COVER OR BLOCK WEEP HOLES WITH FLASHING OR SEALANT.
ROOF DECK
PRESSURE BAR FASTENED 8"O.C.
ROOFINSULATION
TPAMEMBRANE
DRAIN CLAMPRING
TREMFAST WATERBLOCKSEALANT
NOTES:
A FIELD WELD MUST NOT PASS UNDER THE CLAMPING RINGMEMBRANE MUST EXTEND MINIMUM 1" BEYOND THE BOLTHOLES THE CLAMPING RING BOLT MUST PENETRATE THEMEMBRANE
DRAIN
ROOF DECKTPA UNIVERSALCORNER
ROOFINSULATION
TPAMEMBRANE
FOLD FLASHING OVER CURB AND FASTEN 8" O.C. WITH SPECIFIED FASTENERS
NOTES:THIS DETAIL IS USED WHEN A COUNTERFLASHING IS PARTOF THE CURB MOUNTED EQUIPMENT.
APPROPRIATE SEALANTTOOLED TO FACILITATERUNOFF
APPROPRIATE FASTENERSAPPROX. 12" O.C
ONE-PIECE SHEET METALCOUNTERFLASHING
3" LAP AT JOINT
OPTIONAL 2" WIDECLIP APPROX. 30" O.C2 FASTENERS PER CLIP
WATER-BLOCK SEALANTCOURSE
SPECIFIED FLASHING PLYMECHANICALLY ATTACHEDTO SUBSTRATE WITHTERMINATION BAR ANDFASTENERS
EXISTING WOOD BLOCK COURSE
NEW SPECIFIED INSULATION COURSE FULLY ADHEARED THERMOPLASTIC MEMBRANE
EXTENDED FIELD MEMBRANE PLY TO COVER ALLEXPOSED FACE OF WOOD BLOCKING COURSESSECURE WITH RING-SHANK NAILS 12" O.C
FABRICATE EXTENSION METAL USING 24 GAUGE FLUOROPOLYMER COATED METAL COMPLETE COLOR OF EXTENSION METAL TO MATCH FASCIA METAL
INSTALL ADDITIONAL COURSES OF WOOD BLOCKING AND TAPEREDEDGE STRIP
NOTES:ADHERE TO FACTORY MUTUAL GLOBAL DOCUMENTS FOR PERIMETER WOOD BLOCKING ATTACHMENT TO MASONRYBLOCKING AND/OR WOOD BLOCKING NAILING PATTERNS
REPLACE ALL EXISTING DETERIORATED WOOD BLOCKING PRIOR TO INSTALLATION OF NEW BLOCKING BASED ON UNIT PRICING
ADDITIONAL REQUIRED BLOCKING TO MEET NEW INSULATION THICKNESS AND PROJECT REQUIERMENTS TO BE INSTALLED ASPART OF BASE BID
#10 X 1 1/2" S.S. SCREW @ 12" O.C.
EXTRUDED ALUMINUM RETAINER
FORMED FASCIA COVER 10' LENGHTHSAND CONCEALED 4" WIDE SPLICE PLATES
RETAINER SPLICE GASKET 6" LONG
.032 RETAINER SPLICE 6" LONG
BLOCKING AND MECHANICALFASTENERS BY CONTRACTOR
NOTESREFER TO PERIMETER BLOCKING AND EXTENSION METAL FORINSTALLATION REQUIREMENTS PRIOR TO INSTALLATION OF FASCIA SYSTEM
COLOR SELECTION BY OWNER'S REPRESENTATIVE
3 1/2"
2 1/4"
A
3/4"
COVERAGE= FACE -1 1/4"
FACE HEIGHT
1/2"
1'-4 1/4"1'-0"
1'-0"
1'-0"
3'-0"
10" 2'-2"
EX BRICK VENEER OVER CONC BLOCK
MEMBRANE ROOFING OVER RIGID INSULATION OVER MTL DECK AND STL JOIST
5/8" EXPANSION SHIELD ANCHOR BOLT INTO MASONRY BED JOINT
1/2"X 3" STL BAR FRAMED ROOF ACCESS LADDER
OPEN GRATE MTL LANDING
2'-6"
SCALE
DATE
PROJECT NUMBER
Pro
ject
Dra
win
g
SEDGEWICK & FERWEDA ARCHITECTS
SEDGEWICK & FERWEDA ARCHITECTS
SEDGEWICK & FERWEDA ARCHITECTS
SEDGEWICK & FERWEDA ARCHITECTS
SHEET NUMBER
AR
CH
ITE
CT
SEAL OF ARCHITECT
41
0 E
ast C
ourt
Str
eet F
lint,
MI
48
503
TE
L: 8
10
-23
8-9
64
7
| F
AX
: 81
0-2
38-4
90
0w
ww
.sfa
rch
.us
GOOD DESIGN. GOOD CLIENTS. GREAT ARCHITECTURE.
R E V I S I O N S
DRAWN BY:
CHECKED BY:
SS SSEE EEDD DDGG GGEE EEWW WWII IICC CCKK KK && && FF FFEE EERR RRWW WWEE EEDD DDAA AA
AA AA RR RR CC CC HH HH II II TT TT EE EE CC CC TT TT SS SS
As indicated
2/1
5/2
017
9:5
9:4
4 A
M
A1.3
RO
OF
PL
AN
1/27/17
16-026
BID SET
GE
NE
SE
E H
EA
LT
H S
YS
TE
M725 M
AS
ON
ST
FL
INT
, M
I 48503
KVN
JSF
1/8" = 1'-0"
ROOF PLAN
3/4" = 1'-0"2ROOF LADDER/HATCH DETAIL
1" = 1'-0"3WALLCOUNTERFLASHING
3/4" = 1'-0"4DRAIN FLASHING
3/4" = 1'-0"5CURB FLASHING USING TPA MEMBRANE
1 1/2" = 1'-0"6SURFACE MOUNTED
3/4" = 1'-0"7PERIMETER BLOCK
1" = 1'-0"8EXTRUDED METAL EDGING
1/2" = 1'-0"9ROOF LADDER
Date Description
2/14/17 ADDENDUM 1
1
WAITINGWAITINGWAITINGWAITING
101
PVT.PVT.PVT.PVT.
147
RECEPTIONRECEPTIONRECEPTIONRECEPTIONOFFICEOFFICEOFFICEOFFICE
150
MEETINGMEETINGMEETINGMEETINGROOMROOMROOMROOM
158
VESTIBULEVESTIBULEVESTIBULEVESTIBULE
100
TOILETTOILETTOILETTOILET
107
TOILETTOILETTOILETTOILET
108
EXAM 7EXAM 7EXAM 7EXAM 7
118
EXAM 1EXAM 1EXAM 1EXAM 1
110
EXAM 4EXAM 4EXAM 4EXAM 4
114
EXAM 9EXAM 9EXAM 9EXAM 9
120
EXAM 2EXAM 2EXAM 2EXAM 2
112
PVT.PVT.PVT.PVT.
106
MAMAMAMA
109
EXAM 6EXAM 6EXAM 6EXAM 6
117
EXAM 3EXAM 3EXAM 3EXAM 3
113
OFFICEOFFICEOFFICEOFFICE
127
EXAM 13EXAM 13EXAM 13EXAM 13
128
EXAM 14EXAM 14EXAM 14EXAM 14
129
EXAM 16EXAM 16EXAM 16EXAM 16
130
EXAM 18EXAM 18EXAM 18EXAM 18
131
EXAM 20EXAM 20EXAM 20EXAM 20
132
EXAM 21EXAM 21EXAM 21EXAM 21
133
OFFICEOFFICEOFFICEOFFICE
134
M.A/N.PM.A/N.PM.A/N.PM.A/N.P
135
EXAM 15EXAM 15EXAM 15EXAM 15
140
EXAM 17EXAM 17EXAM 17EXAM 17
139
EXAM 19EXAM 19EXAM 19EXAM 19
138
OFFICEOFFICEOFFICEOFFICE
136
OFFICEOFFICEOFFICEOFFICE
137
TOILETTOILETTOILETTOILET
104
EXAM 5EXAM 5EXAM 5EXAM 5
115
EXAM 8EXAM 8EXAM 8EXAM 8
119
OFFICEOFFICEOFFICEOFFICE
121
EXAM 10EXAM 10EXAM 10EXAM 10
122
EXAM 11EXAM 11EXAM 11EXAM 11
123
EXAM 12EXAM 12EXAM 12EXAM 12
124
STORAGESTORAGESTORAGESTORAGE
125
OFFICEOFFICEOFFICEOFFICE
116
OFFICEOFFICEOFFICEOFFICE
111
MECHANICALMECHANICALMECHANICALMECHANICAL
159
LOUNGELOUNGELOUNGELOUNGE
157
TOILETTOILETTOILETTOILET
154
MEETINGMEETINGMEETINGMEETINGROOMROOMROOMROOM
151
CONFERENCECONFERENCECONFERENCECONFERENCEROOMROOMROOMROOM
143
OFFICEOFFICEOFFICEOFFICE
141
OFFICEOFFICEOFFICEOFFICE
142
M.A/N.PM.A/N.PM.A/N.PM.A/N.P
146
LABLABLABLAB
145
TOILETTOILETTOILETTOILET
153
PVT.PVT.PVT.PVT.
148
CHECKCHECKCHECKCHECKOUTOUTOUTOUT
149
STORAGESTORAGESTORAGESTORAGE
152
QUESTQUESTQUESTQUEST
105
INTAKEINTAKEINTAKEINTAKE
103
A.F.F.2' x 2' ACT System
8'-0" A.F.F.2' x 2' ACT System
8'-0" A.F.F.2' x 2' ACT System
8'-0"
A.F.F.2' x 2' ACT System
8'-0"
A.F.F.2' x 2' ACT System
8'-0"
A.F.F.2' x 2' ACT System
8'-0"
A.F.F.2' x 2' ACT System
8'-0"
A.F.F.2' x 2' ACT System
8'-0"
A.F.F.2' x 2' ACT System
8'-0"
A.F.F.2' x 2' ACT System
8'-0"
A.F.F.2' x 2' ACT System
8'-0"
A.F.F.2' x 2' ACT System
8'-0"
A.F.F.2' x 2' ACT System
8'-0"
A.F.F.2' x 2' ACT System
8'-0"
A.F.F.2' x 2' ACT System
8'-0"
A.F.F.2' x 2' ACT System
8'-0"
A.F.F.2' x 2' ACT System
8'-0"
A.F.F.2' x 2' ACT System
8'-0" A.F.F.2' x 2' ACT System
8'-0" A.F.F.2' x 2' ACT System
8'-0" A.F.F.2' x 2' ACT System
8'-0" A.F.F.2' x 2' ACT System
8'-0" A.F.F.2' x 2' ACT System
8'-0"
A.F.F.2' x 2' ACT System
8'-0"
A.F.F.2' x 2' ACT System
8'-0"
A.F.F.2' x 2' ACT System
8'-0"
A.F.F.2' x 2' ACT System
8'-0"
A.F.F.2' x 2' ACT System
8'-0"
A.F.F.2' x 2' ACT System
8'-0"
A.F.F.2' x 2' ACT System
8'-0"
A.F.F.2' x 2' ACT System
8'-0"
A.F.F.2' x 2' ACT System
8'-0" A.F.F.2' x 2' ACT System
8'-0" A.F.F.2' x 2' ACT System
8'-0"
A.F.F.2' x 2' ACT System
8'-0"
A.F.F.2' x 2' ACT System
8'-0"
A.F.F.2' x 2' ACT System
8'-0"
A.F.F.2' x 2' ACT System
8'-0"
A.F.F.2' x 2' ACT System
8'-0"
A.F.F.2' x 2' ACT System
8'-0"
A.F.F.2' x 2' ACT System
8'-0"
A.F.F.2' x 2' ACT System
8'-0"
A.F.F.2' x 2' ACT System
8'-0"
A.F.F.2' x 2' ACT System
8'-0"
A.F.F.2' x 2' ACT System
8'-0"
A.F.F.2' x 2' ACT System
8'-0"
A.F.F.2' x 2' ACT System
8'-0"
A.F.F.2' x 2' ACT System
8'-0"
A.F.F.2' x 2' ACT System
8'-0"
A.F.F.2' x 2' ACT System
8'-0"
A.F.F.2' x 2' ACT System
8'-0"
A.F.F.2' x 2' ACT System
8'-0"
A.F.F.2' x 2' ACT System
8'-0"
A.F.F.2' x 2' ACT System
8'-0"
A.F.F.2' x 2' ACT System
8'-0"
A.F.F.2' x 2' ACT System
8'-0"
A.F.F.GWB on Mtl. Stud
9'-0"
A.F.F.GWB on Mtl. Stud
9'-9"
JANITORJANITORJANITORJANITOR
156
TOILETTOILETTOILETTOILET
144
CORRIDORCORRIDORCORRIDORCORRIDOR
102
SERVICESERVICESERVICESERVICEENTRANCEENTRANCEENTRANCEENTRANCE
155
2
A1.3
8'-0" 2'-6" 16'-8 1/2"
4'-2"
1
A4.0
1
A4.0
A.F.F.GWB on Mtl. Stud
8'-0"A.F.F.GWB on Mtl. Stud
8'-0"
A.F.F.GWB on Mtl. Stud8'-10"
A.F.F.GWB on Mtl. Stud
11'-9"
EXISTING LIGHT COVE TO REMAIN PATCH AND TIE IN NEW GWB CEILING
GYP BD. BULKHEAD OVER EXAM ROOM & LAB UPPER CABINETS TYP.
A.F.F.2' x 2' ACT System
9'-0"
A.F.F.GWB on Mtl. Stud
7'-0"
A.F.F.GWB on Mtl. Stud
7'-0"
A.F.F.GWB on Mtl. Stud
7'-0"TYP.
A.F.F.GWB on Mtl. Stud
7'-0"
TYP.
A.F.F.GWB on Mtl. Stud
7'-0"
A.F.F.GWB on Mtl. Stud
7'-0"
2
A1.0
A.F.F.2' x 2' ACT System
9'-0"
A.F.F.GWB on Mtl. Stud
9'-0"
A.F.F.2' x 2' ACT System
9'-0"
A.F.F.2' x 2' ACT System
9'-0"
2'X4' RECESSED FLUORESCENT TROFFER LIGHT FIXTURE WITH LINEAR CENTER LENS
2'X4' RECESSED FLUORESCENT TROFFER LIGHT FIXTURE
6 1/2" DIA. ROUND RECESSED LED LIGHT FIXTURE
4 1/2" DIA. ROUND RECESSED LED LIGHT FIXTURE
LIGHTING FIXTURE LEGEND
4' STRIP LIGHT
UNDER CABINET LIGHT FIXTURE
EXHAUST AIR DIFFUSER
SUPPLY AIR DIFFUSER
RETURN AIR DIFFUSER
DRYWALL SOFFIT AND BULKHEADS
2' X 2' SUSPENDED ACOUSTICAL LAY-IN CEILING
1'x4' TROFFER LIGHT
2'X2' RECESSED FLUORESCENT TROFFER LIGHT FIXTURE
SCALE
DATE
PROJECT NUMBER
Pro
ject
Dra
win
g
SEDGEWICK & FERWEDA ARCHITECTS
SEDGEWICK & FERWEDA ARCHITECTS
SEDGEWICK & FERWEDA ARCHITECTS
SEDGEWICK & FERWEDA ARCHITECTS
SHEET NUMBER
AR
CH
ITE
CT
SEAL OF ARCHITECT
41
0 E
ast C
ourt
Str
eet F
lint,
MI
48
503
TE
L: 8
10
-23
8-9
64
7
| F
AX
: 81
0-2
38-4
90
0w
ww
.sfa
rch
.us
GOOD DESIGN. GOOD CLIENTS. GREAT ARCHITECTURE.
R E V I S I O N S
DRAWN BY:
CHECKED BY:
SS SSEE EEDD DDGG GGEE EEWW WWII IICC CCKK KK && && FF FFEE EERR RRWW WWEE EEDD DDAA AA
AA AA RR RR CC CC HH HH II II TT TT EE EE CC CC TT TT SS SS
As indicated
2/1
5/2
017
9:5
9:4
6 A
M
A2.0
PR
OP
OS
ED
RE
FL
EC
TE
DC
EIL
ING
PL
AN
1/27/17
16-026
BID SET
GE
NE
SE
E H
EA
LT
H S
YS
TE
M725 M
AS
ON
ST
FL
INT
, M
I 48503
SJS,LJK
JSF
3/16" = 1'-0"
PROPOSED REFLECTED CEILING PLAN
Date Description
2/14/17 ADDENDUM 1
1
1
FINISH FLOOR0"
8FT CEILING8'-0"
1'-0"
2'-6"
1'-4"
4"
2'-6"
4"
1'-8"
2'-10"
TYP.3/4" REVEAL,2'-6"1'-3"1 1/2"
PLASTIC LAMINATE COUNTERTOP PL-1, TYP.
PLASTIC LAMINATE BASE & UPPER CABINETSPL-2, TYP.
3'-10 1/2"
TYP.3/4" REVEAL,2'-6"1'-3"1 1/2"
SCHEDULED BASE
8
A3.2
10
A3.2
11
A3.234" A.F.F. CHAIR RAIL, TYP. ALL EXAM ROOM WALLS
PAINT PT-01 ABOVE CHAIR RAIL, TYP. ALL EXAM ROOM WALLS
PAINT PT-01 BELOW CHAIR RAIL, TYP. ALL EXAM ROOM WALLS
FINISH FLOOR0"
8FT CEILING8'-0"
PLASTIC LAMINATE COUNTERTOP PL-1
PLASTIC LAMINATE BASE & UPPER CABINETS PL-2
4"
2'-6"
4"
1'-4"
2'-6"
1'-0"
2'-10"
1'-8"
TYP.3/4" REVEAL, 2'-6" 1'-3" 1 1/2"
3'-10 1/2"
1 1/2"1'-3"2'-6"
SCHEDULED BASE
8
A3.2
10
A3.2
11
A3.2
34" A.F.F. CHAIR RAIL, TYP. ALL EXAM ROOM WALLS
PAINT P-02 BELOW CHAIR RAIL, TYP. ALL EXAM ROOM WALLS
PAINT P-02 ABOVE CHAIR RAIL, TYP. ALL EXAM ROOM WALLS
FINISH FLOOR0"
8FT CEILING8'-0"
10"
1'-3"
3"
2'-10"
2"
3'-2"
4"
SLIDING RECEPTION WINDOW
SCHEDULED BASE
37
5'-3"
FINISH FLOOR0"
8FT CEILING8'-0"
10"
1'-3"
3"
2'-10"
2"
3'-2"
4"
SCHEDULED BASE
3737
SLIDING RECEPTION WINDOW
CORNER GUARD
FINISH FLOOR0"
8FT CEILING8'-0"
1'-0"
2'-6"
1'-8"
4"
2'-2"
4"
3'-11" 1'-3" 3'-10"
SCHEDULED BASE
1 1/2" 3'-0" 3'-0" 3'-0"
2'-0"
2'-6"
11
A3.2
9
A3.2
FINISH FLOOR0"
8FT CEILING8'-0"
1'-0"
3" 3"
2'-10"
2"
1'-0"
2'-2"
4"
SCHEDULED BASE
SLIDING RECEPTION WINDOW
37
5'-3 1/2" 1'-6" 1 1/2"
4'-7 5/8"
7
A3.2
FINISH FLOOR0"
8FT CEILING8'-0"
1'-0"
2'-2"
4"
SCHEDULED BASE
SLIDING RECEPTION WINDOW
1'-6"
1'-3" 6'-3" 1'-6" 9 3/4"
37 3737
1'-0"
2'-6"
2'-0"
2'-6"
2'-6"
7
A3.2
9
A3.2
11
A3.2
4'-11" 2'-6" 3 3/4"
FINISH FLOOR0"
8FT CEILING8'-0"
4"
2'-2"
1'-0"
1'-0"
2'-6"
1'-0"
37 37
1 1/2" 1'-6" 1'-3" 6'-3 3/8" 1'-6"
1 1/2" 3'-3" 5'-2 1/8" 0"4 1/8" 2'-9"
3'-8"
2'-6"
2'-0"
2'-6"
1'-0"
SCHEDULED BASE
4'-7 5/8"
7
A3.2
9
A3.2
9
A3.2
TYP.3/4" REVEAL,
FINISH FLOOR0"
8FT CEILING8'-0"
37
SCHEDULED BASE
2'-10"
2"
3'-2"
4"
4'-7 5/8"
FINISH FLOOR0"
8FT CEILING8'-0"
37
SCHEDULED BASE2'-10"
2"
3'-2"
4"
4'-7 5/8"
FINISH FLOOR0"
8FT CEILING8'-0"
WHITE BOARD
34" A.F.F. CHAIR RAIL ALL WALLS MTG. RM.
1'-2"
4'-0"
2'-6"
4"
10'-0"
SCHEDULED BASE
FINISH FLOOR0"
8FT CEILING8'-0"
FLAT SCREEN TV
34" A.F.F. CHAIR RAIL ALL WALLS CONF. RM.
SCHEDULED BASE
SCALE
DATE
PROJECT NUMBER
Pro
ject
Dra
win
g
SEDGEWICK & FERWEDA ARCHITECTS
SEDGEWICK & FERWEDA ARCHITECTS
SEDGEWICK & FERWEDA ARCHITECTS
SEDGEWICK & FERWEDA ARCHITECTS
SHEET NUMBER
AR
CH
ITE
CT
SEAL OF ARCHITECT
41
0 E
ast C
ourt
Str
eet F
lint,
MI
48
503
TE
L: 8
10
-23
8-9
64
7
| F
AX
: 81
0-2
38-4
90
0w
ww
.sfa
rch
.us
GOOD DESIGN. GOOD CLIENTS. GREAT ARCHITECTURE.
R E V I S I O N S
DRAWN BY:
CHECKED BY:
SS SSEE EEDD DDGG GGEE EEWW WWII IICC CCKK KK && && FF FFEE EERR RRWW WWEE EEDD DDAA AA
AA AA RR RR CC CC HH HH II II TT TT EE EE CC CC TT TT SS SS
1/2" = 1'-0"
2/1
5/2
017
9:5
9:4
8 A
M
A3.0
INT
. E
LE
VS
- E
XA
M, W
AIT
ING
,R
EC
EP
TIO
N, M
TG
. R
MS
1/27/17
16-026
BID SET
GE
NE
SE
E H
EA
LT
H S
YS
TE
M725 M
AS
ON
ST
FL
INT
, M
I 48503
LJK
JSF
1/2" = 1'-0"1EXAM RM A
1/2" = 1'-0"2EXAM RM B
1/2" = 1'-0"3WAITING 1
1/2" = 1'-0"4WAITING 2
1/2" = 1'-0"5RECEPTION 1
1/2" = 1'-0"6RECEPTION 2
1/2" = 1'-0"7RECEPTION 3
1/2" = 1'-0"8RECEPTION 4
1/2" = 1'-0"9CHECK OUT 1
1/2" = 1'-0"10
CHECK OUT 2
1/2" = 1'-0"11MEETING ROOM 158
1/2" = 1'-0"12
CONFERENCE ROOM
Date Description
2/14/17 ADDENDUM 1
11
11
1
1
1
1
FINISH FLOOR0"
8FT CEILING8'-0"
1'-0"
2'-6"
1'-8"
4"
2'-2"
4"
2'-0" 3'-7" 1'-5" 3'-7" 1'-5" 3/4"
1 1/2" 2'-9" 2'-9" 2'-9" 2'-9"TYP.
3/4" REVEAL,
SCHEDULED BASE
2'-0"
2'-6"
9
A3.2
7
A3.2 PLASTIC LAMINATE COUNTERTOPPL-1, TYP.
PLASTIC LAMINATE UPPER & BASE CABINETSPL-2, TYP.
FINISH FLOOR0"
8FT CEILING8'-0"
2 5/8" 2'-9" 3'-0" 3'-0" 2"
1'-0"
2'-6"
1'-8"
4"
2'-2"
4"
1 1/2"
1'-5" 5'-4 1/8" 1'-5"
1 1/2"
2'-0"
SCHEDULED BASE
2'-0"
2'-6"
9
A3.2
7
A3.2
FINISH FLOOR0"
8FT CEILING8'-0"
4"
2'-2"
4"
1'-8"
2'-6"
1'-0"
2'-0"
1 1/2"
1'-5" 3'-7" 1'-5" 3'-8" 1'-5" 3/4"
3'-0"3'-0"5 1/4"4'-0"1'-5 5/8"3/4"
SCHEDULED BASE
2'-6"
2'-6"
2'-0" 11
A3.2
9
A3.2
FINISH FLOOR0"
8FT CEILING8'-0"
1 1/2"
1'-5" 5'-4 1/8" 1'-5"
1 1/2"
2'-0"
SCHEDULED BASE
2'-6"
2 1/2" 2'-6" 2'-6" 2'-6" 2'-6" 2 5/8"
9
A3.2
11
A3.2
1'-0"
2'-6"
1'-8"
4"
2'-2"
4"FINISH FLOOR
0"
8FT CEILING8'-0"
1'-0"
2'-6"
1'-8"
4"
2'-2"
4"
1 1/2"
1'-5" 3'-5" 1'-5"
1 1/2"
2'-0"
SCHEDULED BASE
1 1/2" 2'-3" 2'-3" 2'-6" 1"
2'-0"
2'-6"
9
A3.2
11
A3.2
FINISH FLOOR0"
8FT CEILING8'-0"
1'-0"
2'-6"
1'-8"
4"
2'-2"
4"
2'-0"
1 1/2"
1'-5" 3'-10" 1'-5" 4'-0 3/8" 1'-5" 3'-10" 1'-5"
1 1/2"
2'-0"
SCHEDULED BASE
2'-0"
2'-6"
9
A3.2
10
A3.2
1 7/8"2'-3"2'-9"3'-0"2'-9"3'-0"2'-9"2'-3"1 1/2"
FINISH FLOOR0"
8FT CEILING8'-0"
1'-0"
2'-6"
1'-8"
4"
2'-2"
4"
1" 2'-6" 2'-3" 2'-3" 1 1/2"
2'-0"
1 1/2"
1'-5" 3'-5" 1'-5"
1 1/2"
SCHEDULED BASE
2'-0"
2'-6"
9
A3.2
10
A3.2
FINISH FLOOR0"
8FT CEILING8'-0"
1'-0"
2'-6"
1'-8"
4"
2'-2"
4"
3'-0"3'-0"1 1/2"
2'-0"
1 1/2"
1'-5"5'-5"1'-5"
1 1/2"
2'-0"
2'-6"
SCHEDULED BASE
9
A3.2
11
A3.2
FINISH FLOOR0"
8FT CEILING8'-0"
1 1/2" 3'-3" 3'-3" 3'-3"
SCHEDULED BASE
2'-0"
1"
3'-4" 1'-5" 3'-4 1/4" 1'-5"
3/4"
1'-0"
2'-6"
1'-8"
4"
2'-2"
4"
2'-0"
2'-6"
9
A3.2
10
A3.2
FINISH FLOOR0"
8FT CEILING8'-0"
SCHEDULED BASE
4"
2'-2"
4"
1'-8"
2'-6"
1'-0"
3'-3" 3'-3" 1 1/2"
4"
3/4"
1'-5" 5'-0 3/4" 1'-5"
1 1/2"
2'-1"
2'-6"
2'-0"9
A3.2
11
A3.2
FINISH FLOOR0"
8FT CEILING8'-0"
1'-0"
2'-6"
1'-8"
4"
2'-2"
4"
2'-0"
1 1/2"
1'-5" 3'-3 1/8" 1'-5" 3'-3 1/8" 1'-5" 3/4"
SCHEDULED BASE
2" 2'-9" 2'-9" 2'-9" 2'-9"
2'-0"
2'-6"
9
A3.2
10
A3.2
FINISH FLOOR0"
8FT CEILING8'-0"
CERAMIC TILE ALL WALLS
4'-4"
ALUMINUM TRIM
SCALE
DATE
PROJECT NUMBER
Pro
ject
Dra
win
g
SEDGEWICK & FERWEDA ARCHITECTS
SEDGEWICK & FERWEDA ARCHITECTS
SEDGEWICK & FERWEDA ARCHITECTS
SEDGEWICK & FERWEDA ARCHITECTS
SHEET NUMBER
AR
CH
ITE
CT
SEAL OF ARCHITECT
41
0 E
ast C
ourt
Str
eet F
lint,
MI
48
503
TE
L: 8
10
-23
8-9
64
7
| F
AX
: 81
0-2
38-4
90
0w
ww
.sfa
rch
.us
GOOD DESIGN. GOOD CLIENTS. GREAT ARCHITECTURE.
R E V I S I O N S
DRAWN BY:
CHECKED BY:
SS SSEE EEDD DDGG GGEE EEWW WWII IICC CCKK KK && && FF FFEE EERR RRWW WWEE EEDD DDAA AA
AA AA RR RR CC CC HH HH II II TT TT EE EE CC CC TT TT SS SS
1/2" = 1'-0"
2/1
5/2
017
9:5
9:5
0 A
M
A3.1
INT
. E
LE
VS
- M
A / N
P
1/27/17
16-026
BID SET
GE
NE
SE
E H
EA
LT
H S
YS
TE
M725 M
AS
ON
ST
FL
INT
, M
I 48503
LJK
JSF
1/2" = 1'-0"1MA 1
1/2" = 1'-0"2MA 2
1/2" = 1'-0"3MA 3
1/2" = 1'-0"4MA 4
1/2" = 1'-0"5MA/NP 1
1/2" = 1'-0"6MA/NP 2
1/2" = 1'-0"7MA/NP 3
1/2" = 1'-0"8MA/NP 4
1/2" = 1'-0"9MA/NP 5
1/2" = 1'-0"10
MA/NP 6 1/2" = 1'-0"
11MA/NP 7
1/2" = 1'-0"12
TYP. TOILET ELEVATION
Date Description
2/14/17 ADDENDUM 1
1
1111
11
11
1
11111
1111
1
1
11111
FINISH FLOOR0"
8FT CEILING8'-0"
SCHEDULED BASE
1'-3" 5'-0" 2'-0"
1'-6" 2'-6" 2'-6" 1 1/2"
11
A3.2
10
A3.2
1'-0"
2'-6"
1'-8"
4"
2'-2"
4"
2'-0"
2'-6"
FINISH FLOOR0"
8FT CEILING8'-0"
1'-0"
2'-6"
1'-8"
4"
2'-2"
4"
2'-8 1/4" 1'-3" 8'-5"
2'-0"
2'-6"
SCHEDULED BASE
2" 3'-0" 2'-9" 1 1/2"
11
A3.2
10
A3.2
FINISH FLOOR0"
8FT CEILING8'-0"
4"
2'-2"
4"
1'-8"
2'-6"
1'-0"
3 5/8" 3'-0" 3'-0" 3'-0" 3'-0" 3 5/8"
SCHEDULED BASE2'-6"
2'-0"
1'-3" 4'-9" 1'-3" 4'-8"
10
A3.2
11
A3.2
3" RAD. GROMMET THRU COUNTERTOP ALL WORKSTATIONS, TYP.
FINISH FLOOR0"
8FT CEILING8'-0"
1'-0"
2'-6"
1'-4"
4"
2'-6"
4"
SCHEDULED BASE
1'-8"
2'-10"
REF
DW
3'-2" 2'-1" 3'-0" 3'-5"
1" 3'-0" 1" 2'-6" 2'-6"GYP. BD. BULKHEAD OVER UPPER CABINETS
8
A3.2
11
A3.2
12
A3.2
1'-3"
5'-9"
SOLID SURFACE COUNTERTOP SS-1
FINISH FLOOR0"
8FT CEILING8'-0"
1'-0"
2'-6"
1'-4"
4"
2'-6"
4"
1'-8"
2'-10"
2'-6" 2'-6" 1 1/2"
SCHEDULED BASE
3/4"
3'-0" 1'-5"
1 1/2"
2'-0"
8
A3.2
9
A3.2
11
A3.2
SOLID SURFACE COUNTERTOPSS-1
DIRTY SINK
FINISH FLOOR0"
8FT CEILING8'-0"
4"
2'-6"
4"
1'-4"
2'-6"
1'-0"
2'-10"
1'-8"
2'-0"3'-0"3'-0"3'-0"3'-0"3'-0"1 1/2"
SCHEDULED BASE
REF.
2'-1 1/2" 2'-3" 2'-6" 1'-3" 3'-0" 1'-3" 3'-0" 3'-0" 1" 3'-1 7/8"
11
A3.2
7
A3.2
10
A3.2
8
A3.2
9
A3.2SOLID SURFACE COUNTERTOP SS-1
3/4" THK., 4" HIGH BACKSPLASH & SIDE SPLASH WHERE NOTED ON ELEVATIONS
1-1/2" THK. COUNTERTOP PL-1 U.N.O.
3/4" THK. DOOR
NOTE:CABINETS SHALL HAVE SILENCERS, MINIMUM (2) PER DOOR OR DRAWER.
DRAWER W/ ACCURIDE FULL EXTENSION ZINC BOX DRAWER SLIDES SERIES 3832
MILLWORK CONTRACTOR SHALL PROVIDE 24" WIDE X 18" HIGH OPENING IN BACK OF BASE CABINET FOR ACCESS TO TELEPHONE / DATA & POWER OUTLETS WHERE REQ'D - REFER TO POWER PLAN
4" BRUSHED CHROME WIRE PULL
3/4" THK. ADJUSTABLE SHELF -WHITE MELAMINE
PRE-DRILLED HOLES - TYP.
18" OPEN
10"
1 1/2"
**4"HEIGHT PER ELEVATIONS
3"
VARIES
1" OVERHANG1"
** :: 5-1/2" TALL @ 34" HIGH COUNTERS:: 6" TALL @ 36" HIGH COUNTERS
3/4" THK., 4" HIGH BACKSPLASH & SIDE SPLASH WHERE NOTED ON ELEVATIONS
1-1/2" THK. COUNTERTOP PL-1 U.N.O.
3/4" THK. DRAWER PANEL
NOTE:CABINETS SHALL HAVE SILENCERS, MINIMUM (2) PER DOOR OR DRAWER.
DRAWER W/ ACCURIDE FULL EXTENSION ZINC BOX DRAWER SLIDES SERIES 3832
4" BRUSHED CHROME WIRE PULL (TYP.)
2'-1"
1 1/2"
5 1/4"
5 1/4"
30" - 34"
1" OVERHANG
4"
3"
2'-0"
3/4" THK., 4" HIGH BACKSPLASH & SIDE SPLASH WHERE NOTED ON ELEVATIONS
1-1/2" THK. COUNTERTOP PL-1 U.N.O.
3/4" THK. DRAWER PANEL
NOTE:CABINETS SHALL HAVE SILENCERS, MINIMUM (2) PER DOOR OR DRAWER.
DRAWER W/ ACCURIDE FULL EXTENSION ZINC BOX DRAWER SLIDES SERIES 3832
4" BRUSHED CHROME WIRE PULL
EQ
EQ
EQ
EQ
30" - 34"
1" OVERHANG
4"
1 1/2"
2'-1"
3"
2'-0"
KEY LOCK TYP ALL TOP DRAWERS ALL BASE CABINETS
3/4" THK. DOOR
125° FULL OVERLAY 'BLUM' CONCEALED SELF-CLOSING HINGES - (2) PER DOOR
PRE-DRILLED HOLES - TYP.
(2) 3/4" THK. ADJUSTABLE SHELVES - WHITE MELAMINE
4" BRUSHED CHROME WIRE PULL
KEY LOCK
3/4" THK. BACK
1'-3 1/2"
4"6"
4"
2'-6"
NOTE:ALL DIMENSIONS ARE FINISH DIMENSIONS
4" VINYL BASE
SINK - REFER TO PLUMBING SHEETS
1-1/2" THK. SOLID SURFACE COUNTERTOP SS-1
3/4" THK., 4" HIGH BACKSPLASH & SIDE SPLASH WHERE NOTED ON ELEVATIONS
3/4" THK. DOOR
FIXED DRAWER FRONTS
MILLWORK CONTRACTOR SHALL PROVIDE 24" WIDE X 18" HIGH OPENING IN BACK OF BASE CABINET FOR ACCESS TO PLUMBING CONNECTIONS WHERE REQ'D - REFER TO PLUMBING PLAN
4" BRUSHED CHROME WIRE PULL
OPEN
1'-6"
10"
1 1/2"
5 1/2"
4"
2'-10"
3"
2'-0"
1" OVERHANG
2'-1"
3/4" THK. DOOR
125° FULL OVERLAY 'BLUM' CONCEALED SELF-CLOSING HINGES - (2) PER DOOR
4" BRUSHED CHROME WIRE PULL
KEY LOCK
3/4" THK. BACK
1'-3 1/2"
4"6"
4"
1'-3"
FINISH FLOOR0"
9FT CEILING9'-0"
2'-11 1/8"
3'-5 5/8"
CHALKBOARD PAINT
FLAT SCREEN TV
SCHEDULED BASE
SCALE
DATE
PROJECT NUMBER
Pro
ject
Dra
win
g
SEDGEWICK & FERWEDA ARCHITECTS
SEDGEWICK & FERWEDA ARCHITECTS
SEDGEWICK & FERWEDA ARCHITECTS
SEDGEWICK & FERWEDA ARCHITECTS
SHEET NUMBER
AR
CH
ITE
CT
SEAL OF ARCHITECT
41
0 E
ast C
ourt
Str
eet F
lint,
MI
48
503
TE
L: 8
10
-23
8-9
64
7
| F
AX
: 81
0-2
38-4
90
0w
ww
.sfa
rch
.us
GOOD DESIGN. GOOD CLIENTS. GREAT ARCHITECTURE.
R E V I S I O N S
DRAWN BY:
CHECKED BY:
SS SSEE EEDD DDGG GGEE EEWW WWII IICC CCKK KK && && FF FFEE EERR RRWW WWEE EEDD DDAA AA
AA AA RR RR CC CC HH HH II II TT TT EE EE CC CC TT TT SS SS
As indicated
2/1
5/2
017
9:5
9:5
2 A
M
A3.2
INT
. E
LE
VS
- S
.W., L
OU
NG
E,
LA
B, M
ILL
WO
RK
DE
TA
ILS
1/27/17
16-026
BID SET
GE
NE
SE
E H
EA
LT
H S
YS
TE
M725 M
AS
ON
ST
FL
INT
, M
I 48503
LJK
JSF
1/2" = 1'-0"1SOCIAL WORK 1
1/2" = 1'-0"2SOCIAL WORK 2
1/2" = 1'-0"3SOCIAL WORK 3
1/2" = 1'-0"4LOUNGE
1/2" = 1'-0"5LAB 1
1/2" = 1'-0"6LAB 2
3/4" = 1'-0"7BASE CABINET
3/4" = 1'-0"9
BASE CABINET - 30" - 34" TALL W/ (1) FILE & (2)SUPPLY DRAWERS
3/4" = 1'-0"10
BASE CABINET - 30" - 34" TALL W/ (4) SUPPLYDRAWERS
3/4" = 1'-0"11UPPER CABINET - 30" TALL
3/4" = 1'-0"8BASE CABINET - 34" TALL @ SINK
3/4" = 1'-0"12
UPPER CABINET - 15" TALL
1/2" = 1'-0"13
WATER COOLER ELEVATION
Date Description
2/14/17 ADDENDUM 1
1
1
1
1
FINISH FLOOR0"
B.O. TRUSS 19'-6"
8FT CEILING8'-0"
9FT CEILING9'-0"
T.O. WALL 215'-1"
B.O. TRUSS 312'-10"
T.O. WALL 111'-2"
B.O. TRUSS 212'-2"
WAITINGWAITINGWAITINGWAITING
101
MEETING ROOMMEETING ROOMMEETING ROOMMEETING ROOM
158
MAMAMAMA
109
CORRIDORCORRIDORCORRIDORCORRIDOR
102
16" OPEN WEB STL JOIST WITH SLOPED TOP CHORD
12" OPEN WEB STL JOIST WITH SLOPED TOP CHORD
24" OPEN WEB STL JOIST WITH SLOPED TOP CHORD
12" OPEN WEB STL JOIST WITH SLOPED TOP CHORD
29'-4" 18'-5" 20'-6 1/2" 20'-6 1/2" 21'-10"
26'-6"
4X4 STL COL
W14X34 ABOVE
W14X34 ABOVE
W14X34 ABOVE
4X4 STL COL 4X4 STL COL
103'-4"
52'-0"
24'-10"
4'-8"
108'-0"
29'-4" 18'-0" 42'-0" 21'-4"
4'-0"
100'-0"
4'-0"
5'-8"
92'-0"
5'-8"
6'-0"
40'-0"
6'-0"
16" OPEN WEB STL JOIST AT 4'0" O.C.
12" OPEN WEB STL JOIST AT 4'0" O.C.
24" OPEN WEB STL JOIST AT 4'0" O.C.
APPROXIMATE LOCATION OF EX. ROOF OPENINGS TYP
SCALE
DATE
PROJECT NUMBER
Pro
ject
Dra
win
g
SEDGEWICK & FERWEDA ARCHITECTS
SEDGEWICK & FERWEDA ARCHITECTS
SEDGEWICK & FERWEDA ARCHITECTS
SEDGEWICK & FERWEDA ARCHITECTS
SHEET NUMBER
AR
CH
ITE
CT
SEAL OF ARCHITECT
41
0 E
ast C
ourt
Str
eet F
lint,
MI
48
503
TE
L: 8
10
-23
8-9
64
7
| F
AX
: 81
0-2
38-4
90
0w
ww
.sfa
rch
.us
GOOD DESIGN. GOOD CLIENTS. GREAT ARCHITECTURE.
R E V I S I O N S
DRAWN BY:
CHECKED BY:
SS SSEE EEDD DDGG GGEE EEWW WWII IICC CCKK KK && && FF FFEE EERR RRWW WWEE EEDD DDAA AA
AA AA RR RR CC CC HH HH II II TT TT EE EE CC CC TT TT SS SS
As indicated
2/1
5/2
017
9:5
9:5
3 A
M
A4.0
BU
ILD
ING
SE
CT
ION
S
1/27/17
16-026
BID SET
GE
NE
SE
E H
EA
LT
H S
YS
TE
M725 M
AS
ON
ST
FL
INT
, M
I 48503
KVN
JSF
1/4" = 1'-0"1SECTION 1
Date Description
2/14/17 ADDENDUM 1
1/8" = 1'-0"3FIRST FLOOR PLAN
1
1 2
SINGLE FLUSH THERMAL FUSED DOOR
SINGLE FLUSH THERMAL FUSED DOOR
W/ VISION PANEL
7'-0"
2"
2" 3'-0" 2"
7'-0"
2"
2" 3'-0" 2"
2'-1"
6"
5" 6"
ASSA ABLOY MAIMAN DOORS“HIGHLINE” 7970K FINISH
1'-8"4'-8"1'-8"
1'-0"
8'-2"
FINISH FLOOR
LIMESTONE SILL
EX ALUM FRAMED SASH
AGGRAGRITE TILE OVER 6" CONC BLOCK WALL
ROOF OVERHANG
BRICK VENEER
STANDING SEAM MTL SIDING, SOFFIT, AND ROOFING
3'-4"
ELEVATION DOOR 45
PLAN
NEW ALUM DOOR, LITE, AND FRAME
BRICK VENEER
2"
10"
2"
7'-0"
2" 3'-0" 2"
ALUMINUM FRAME MATCH EX COLOR
ALUM INSULATED GLASS DOOR
INSULATED GLASS LITE
2 - 6"X16 GA STL JOIST LINTEL
1X4 OAK TRIM TYP
ALUM FRAME 1/4" TEMPERED SLIDING GLASS PANELS
SOLID SURFACE COUNTERTOP SS-1
1X6 OAK CASING TYP
W3
ALUMINUM SLIDING RECEPTION WINDOW
3'-6"
3'-0"
4'-7 5/8"
SCALE
DATE
PROJECT NUMBER
Pro
ject
Dra
win
g
SEDGEWICK & FERWEDA ARCHITECTS
SEDGEWICK & FERWEDA ARCHITECTS
SEDGEWICK & FERWEDA ARCHITECTS
SEDGEWICK & FERWEDA ARCHITECTS
SHEET NUMBER
AR
CH
ITE
CT
SEAL OF ARCHITECT
41
0 E
ast C
ourt
Str
eet F
lint,
MI
48
503
TE
L: 8
10
-23
8-9
64
7
| F
AX
: 81
0-2
38-4
90
0w
ww
.sfa
rch
.us
GOOD DESIGN. GOOD CLIENTS. GREAT ARCHITECTURE.
R E V I S I O N S
DRAWN BY:
CHECKED BY:
SS SSEE EEDD DDGG GGEE EEWW WWII IICC CCKK KK && && FF FFEE EERR RRWW WWEE EEDD DDAA AA
AA AA RR RR CC CC HH HH II II TT TT EE EE CC CC TT TT SS SS
As indicated
2/1
5/2
017
9:5
9:5
5 A
M
A5.0
SC
HE
DU
LE
S &
DO
OR
IN
FO
1/27/17
16-026
BID SET
GE
NE
SE
E H
EA
LT
H S
YS
TE
M725 M
AS
ON
ST
FL
INT
, M
I 48503
LJK
JSF
DOOR SCHEDULE
MARK PHASE CREATEDROOMNO. ROOM NAME DOOR TYPE STYLE FRAME MATERIAL THICKNESS WIDTH HEIGHT
HRDWRSET COMMENTS
001 EXISTING 100 VESTIBULE 3'-0" 6'-11" 13
2 NEW CONSTRUCTION 102 CORRIDOR SINGLE FLUSH W/ VISION THERMAL FUSED DOOR HOLLOW METAL 1 3/4" 3'-0" 7'-0" 2 NEW CARD READER
002 EXISTING 101 WAITING 2" 3'-4" 7'-0" 1
3 NEW CONSTRUCTION 102 CORRIDOR SINGLE FLUSH THERMAL FUSED DOOR HOLLOW METAL 1 3/4" 3'-0" 7'-0" 3
003 EXISTING 102 CORRIDOR 3'-2" 6'-11" 13
5 NEW CONSTRUCTION 109 MA SINGLE FLUSH W/ VISION THERMAL FUSED DOOR HOLLOW METAL 1 3/4" 3'-0" 7'-0" 6
6 NEW CONSTRUCTION 110 EXAM 1 SINGLE FLUSH THERMAL FUSED DOOR HOLLOW METAL 1 3/4" 3'-0" 7'-0" 3
006 NEW CONSTRUCTION 102 CORRIDOR SINGLE FLUSH THERMAL FUSED DOOR HOLLOW METAL 1 3/4" 3'-0" 7'-0"
7 NEW CONSTRUCTION 112 EXAM 2 SINGLE FLUSH THERMAL FUSED DOOR HOLLOW METAL 1 3/4" 3'-0" 7'-0" 3
8 NEW CONSTRUCTION 111 OFFICE SINGLE FLUSH THERMAL FUSED DOOR HOLLOW METAL 1 3/4" 3'-0" 7'-0" 12
9 NEW CONSTRUCTION 113 EXAM 3 SINGLE FLUSH THERMAL FUSED DOOR HOLLOW METAL 1 3/4" 3'-0" 7'-0" 3
10 NEW CONSTRUCTION 115 EXAM 5 SINGLE FLUSH THERMAL FUSED DOOR HOLLOW METAL 1 3/4" 3'-0" 7'-0" 3
11 NEW CONSTRUCTION 114 EXAM 4 SINGLE FLUSH THERMAL FUSED DOOR HOLLOW METAL 1 3/4" 3'-0" 7'-0" 3
12 NEW CONSTRUCTION 116 OFFICE SINGLE FLUSH THERMAL FUSED DOOR HOLLOW METAL 1 3/4" 3'-0" 7'-0" 12
13 NEW CONSTRUCTION 117 EXAM 6 SINGLE FLUSH THERMAL FUSED DOOR HOLLOW METAL 1 3/4" 3'-0" 7'-0" 3
14 NEW CONSTRUCTION 119 EXAM 8 SINGLE FLUSH THERMAL FUSED DOOR HOLLOW METAL 1 3/4" 3'-0" 7'-0" 3
15 NEW CONSTRUCTION 118 EXAM 7 SINGLE FLUSH THERMAL FUSED DOOR HOLLOW METAL 1 3/4" 3'-0" 7'-0" 3
16 NEW CONSTRUCTION 120 EXAM 9 SINGLE FLUSH THERMAL FUSED DOOR HOLLOW METAL 1 3/4" 3'-0" 7'-0" 3
17 NEW CONSTRUCTION 121 OFFICE SINGLE FLUSH THERMAL FUSED DOOR HOLLOW METAL 1 3/4" 3'-0" 7'-0" 12
18 NEW CONSTRUCTION 122 EXAM 10 SINGLE FLUSH THERMAL FUSED DOOR HOLLOW METAL 1 3/4" 3'-0" 7'-0" 3
19 NEW CONSTRUCTION 123 EXAM 11 SINGLE FLUSH THERMAL FUSED DOOR HOLLOW METAL 1 3/4" 3'-0" 7'-0" 3
20 NEW CONSTRUCTION 124 EXAM 12 SINGLE FLUSH THERMAL FUSED DOOR HOLLOW METAL 1 3/4" 3'-0" 7'-0" 3
21 NEW CONSTRUCTION 125 STORAGE SINGLE FLUSH THERMAL FUSED DOOR HOLLOW METAL 1 3/4" 3'-0" 7'-0" 9
22 NEW CONSTRUCTION 126 SOCIAL WORK/ HEALTHCOACH
SINGLE FLUSH W/ VISION THERMAL FUSED DOOR HOLLOW METAL 1 3/4" 3'-0" 7'-0" 12
23 NEW CONSTRUCTION 127 OFFICE SINGLE FLUSH THERMAL FUSED DOOR HOLLOW METAL 1 3/4" 3'-0" 7'-0" 12
24 NEW CONSTRUCTION 128 EXAM 13 SINGLE FLUSH THERMAL FUSED DOOR HOLLOW METAL 1 3/4" 3'-0" 7'-0" 3
25 NEW CONSTRUCTION 129 EXAM 14 SINGLE FLUSH THERMAL FUSED DOOR HOLLOW METAL 1 3/4" 3'-0" 7'-0" 3
26 NEW CONSTRUCTION 144 TOILET SINGLE FLUSH THERMAL FUSED DOOR HOLLOW METAL 1 3/4" 3'-0" 7'-0" 11
27 NEW CONSTRUCTION 145 LAB SINGLE FLUSH W/ VISION THERMAL FUSED DOOR HOLLOW METAL 1 3/4" 3'-0" 7'-0" 12 NEW CARD READER
28 NEW CONSTRUCTION 141 OFFICE SINGLE FLUSH THERMAL FUSED DOOR HOLLOW METAL 1 3/4" 3'-0" 7'-0" 12
29 NEW CONSTRUCTION 142 OFFICE SINGLE FLUSH THERMAL FUSED DOOR HOLLOW METAL 1 3/4" 3'-0" 7'-0" 12
029 NEW CONSTRUCTION 102 CORRIDOR SINGLE FLUSH THERMAL FUSED DOOR HOLLOW METAL 1 3/4" 3'-0" 7'-0"
30 NEW CONSTRUCTION 146 M.A/N.P SINGLE FLUSH W/ VISION THERMAL FUSED DOOR HOLLOW METAL 1 3/4" 3'-0" 7'-0" 12
030 NEW CONSTRUCTION 101 WAITING SINGLE FLUSH W/ VISION THERMAL FUSED DOOR HOLLOW METAL 1 3/4" 3'-0" 7'-0" NEW CARD READER
31 NEW CONSTRUCTION 145 LAB SINGLE FLUSH W/ VISION THERMAL FUSED DOOR HOLLOW METAL 1 3/4" 3'-0" 7'-0" 12 NEW CARD READER
32 NEW CONSTRUCTION 140 EXAM 15 SINGLE FLUSH THERMAL FUSED DOOR HOLLOW METAL 1 3/4" 3'-0" 7'-0" 3
33 NEW CONSTRUCTION 139 EXAM 17 SINGLE FLUSH THERMAL FUSED DOOR HOLLOW METAL 1 3/4" 3'-0" 7'-0" 3
34 NEW CONSTRUCTION 130 EXAM 16 SINGLE FLUSH THERMAL FUSED DOOR HOLLOW METAL 1 3/4" 3'-0" 7'-0" 3
034 EXISTING 102 CORRIDOR 1 3/4" 3'-0" 7'-0"
35 NEW CONSTRUCTION 131 EXAM 18 SINGLE FLUSH THERMAL FUSED DOOR HOLLOW METAL 1 3/4" 3'-0" 7'-0" 3
36 NEW CONSTRUCTION 138 EXAM 19 SINGLE FLUSH THERMAL FUSED DOOR HOLLOW METAL 1 3/4" 3'-0" 7'-0" 3
37 NEW CONSTRUCTION 132 EXAM 20 SINGLE FLUSH THERMAL FUSED DOOR HOLLOW METAL 1 3/4" 3'-0" 7'-0" 3
38 NEW CONSTRUCTION 133 EXAM 21 SINGLE FLUSH THERMAL FUSED DOOR HOLLOW METAL 1 3/4" 3'-0" 7'-0" 3
39 NEW CONSTRUCTION 134 OFFICE SINGLE FLUSH THERMAL FUSED DOOR HOLLOW METAL 1 3/4" 3'-0" 7'-0" 12
40 NEW CONSTRUCTION 137 OFFICE SINGLE FLUSH THERMAL FUSED DOOR HOLLOW METAL 1 3/4" 3'-0" 7'-0" 12
41 NEW CONSTRUCTION 135 M.A/N.P SINGLE FLUSH W/ VISION THERMAL FUSED DOOR HOLLOW METAL 1 3/4" 3'-0" 7'-0" 6
42 NEW CONSTRUCTION 136 OFFICE SINGLE FLUSH THERMAL FUSED DOOR HOLLOW METAL 1 3/4" 3'-0" 7'-0" 12
43 NEW CONSTRUCTION 155 SERVICE ENTRANCE SINGLE FLUSH W/ VISION THERMAL FUSED DOOR HOLLOW METAL 1 3/4" 3'-0" 7'-0" 8
44 NEW CONSTRUCTION 155 SERVICE ENTRANCE SINGLE FLUSH THERMAL FUSED DOOR HOLLOW METAL 1 3/4" 3'-0" 7'-0" 7
45 NEW CONSTRUCTION 155 SERVICE ENTRANCE SINGLE FLUSH ALUMINUM/GLASS ALUMINUM 1 3/4" 3'-0" 7'-0" 13 RELOCATED CARDREADER FROM DOOR 002
46 NEW CONSTRUCTION 155 SERVICE ENTRANCE SINGLE FLUSH W/ VISION THERMAL FUSED DOOR HOLLOW METAL 1 3/4" 3'-0" 7'-0" 5
046 EXISTING 159 MECHANICAL 1 3/4" 3'-0" 7'-0" 10
47 NEW CONSTRUCTION 157 LOUNGE SINGLE FLUSH W/ VISION THERMAL FUSED DOOR HOLLOW METAL 1 3/4" 3'-0" 7'-0" 6
48 NEW CONSTRUCTION 154 TOILET SINGLE FLUSH THERMAL FUSED DOOR HOLLOW METAL 1 3/4" 3'-0" 7'-0" 11
49 NEW CONSTRUCTION 153 TOILET SINGLE FLUSH THERMAL FUSED DOOR HOLLOW METAL 1 3/4" 3'-0" 7'-0" 11
50 NEW CONSTRUCTION 150 RECEPTION OFFICE SINGLE FLUSH W/ VISION THERMAL FUSED DOOR HOLLOW METAL 1 3/4" 3'-0" 7'-0" 12
51 NEW CONSTRUCTION 143 CONFERENCE ROOM SINGLE FLUSH W/ VISION THERMAL FUSED DOOR HOLLOW METAL 1 3/4" 3'-0" 7'-0" 12
52 NEW CONSTRUCTION 149 CHECK OUT SINGLE FLUSH W/ VISION THERMAL FUSED DOOR HOLLOW METAL 1 3/4" 3'-0" 7'-0" 5
55 NEW CONSTRUCTION 106 PVT. SINGLE FLUSH THERMAL FUSED DOOR HOLLOW METAL 1 3/4" 3'-0" 7'-0" 3
56 NEW CONSTRUCTION 101 WAITING SINGLE FLUSH THERMAL FUSED DOOR HOLLOW METAL 1 3/4" 3'-0" 7'-0" 3
57 NEW CONSTRUCTION 101 WAITING SINGLE FLUSH THERMAL FUSED DOOR HOLLOW METAL 1 3/4" 3'-0" 7'-0" 4
58 NEW CONSTRUCTION 149 CHECK OUT SINGLE FLUSH W/ VISION THERMAL FUSED DOOR HOLLOW METAL 1 3/4" 3'-0" 7'-0" 14 NEW CARD READER
59 NEW CONSTRUCTION 149 CHECK OUT SINGLE FLUSH THERMAL FUSED DOOR HOLLOW METAL 1 3/4" 3'-0" 7'-0" 3
60 NEW CONSTRUCTION 149 CHECK OUT SINGLE FLUSH THERMAL FUSED DOOR HOLLOW METAL 1 3/4" 3'-0" 7'-0" 3
61 NEW CONSTRUCTION 150 RECEPTION OFFICE SINGLE FLUSH THERMAL FUSED DOOR HOLLOW METAL 1 3/4" 3'-0" 7'-0" 9
62 NEW CONSTRUCTION 150 RECEPTION OFFICE SINGLE FLUSH THERMAL FUSED DOOR HOLLOW METAL 1 3/4" 3'-0" 7'-0" 12
63 NEW CONSTRUCTION 151 MEETING ROOM SINGLE FLUSH THERMAL FUSED DOOR HOLLOW METAL 1 3/4" 3'-0" 7'-0" 12
PAINT:
PT-01 FIELD COLOR - FIRST STAR SW 7646PT-02 ACCENT 1 - ARUGULA SW 6446PT-03 ACCENT 2 - SEAWORTHY SW 7620PT-04 KRYLON CHALKBOARD PAINTPT-05 DOOR FRAME - SW 7068 GRIZZLE GREY
WALL COVERINGS:
WT-1 48" A.F.F. STONEPEAK SIMPLY MODERN - SIMPLY GREY 12"x24"
WT-2 ACCENT: ELAINE: LINEAR - GREY MATTE 4"x12"CG CORNER GUARD
FLOORING:
CPT-01 CARPET - INTERFACE: PRARIE GRASS 9321 - STEPPELVT-01 LUXURY VINYL TILE - FIELD
TO MARKET: URBAN 20 3611 FIELDSTONE: GRANITELVT-02 LUXURY VINYL TILE - ACCENT
TO MARKET: URBAN 20 2016 LUMINA: IRONSTONECT-1 MARAZZI - KNOXWOOD - CARAWAY 6X24
LAMINATE SURFACES:
PL-1 COUNTERS: WILSONART NATURAL COTTON 4946-38PL-2 CASEWORK: PIONITE PUMICE SG203 SUEDE
BASE:
B-01 JOHNSONITE 4" - #197 SHADED WGB-02 4" TILE BASE - MATCH FLOOR
CEILING:
ACT-1 24"x24" ACOUSTIC CEILING TILEGYP GYPSUM BOARD CEILING
SOLID SURFACES:
SS-1 CORIAN CLAMSHELL
GROMMETS:
*PROVIDE 3 INCH BLACK PLASTIC GROMMETS AT ALL CUSTOM CASEWORK DESK AREAS
FINISHESFINISHESFINISHESFINISHES
HARDWARE SET NO. 01EACH TO HAVE:1 EA CONT. HINGE 112HD 710 IVE1 SET PUSH/PULL BAR 9190-10"-NO 613 IVE1 EA SURFACE CLOSER SC71 DSHO 695 FAL
HARDWARE SET NO. 02EACH TO HAVE:3 EA HINGE 5BB1 4.5 X 4.5 652 IVE1 EA ENTRY / OFFICE LOCK W511P QUA 30-197 626 FAL1 EA SURFACE CLOSER SC81 HDPA 689 FAL1 EA KICK PLATE 8400 6" X 2" LDW 630 IVE1 EA WALL STOP WS407CCV 630 IVE
HARDWARE SET NO. 03EACH TO HAVE:3 EA HINGE 5BB1 4.5 X 4.5 652 IVE1 EA PASSAGE SET W101S QUA 626 FAL1 EA WALL STOP WS407CCV 630 IVE
HARDWARE SET NO. 04EACH TO HAVE:3 EA HINGE 5BB1 4.5 X 4.5 652 IVE1 EA PRIVACY LOCK W301S QUA 626 FAL1 EA SURFACE CLOSER SC81 RW/PA 689 FAL
(MOUNT PULL SIDE)1 EA KICK PLATE 8400 6" X 2" LDW 630 IVE1 EA WALL STOP WS407CCV 630 IVE
HARDWARE SET NO. 05EACH TO HAVE:3 EA HINGE 5BB1 4.5 X 4.5 652 IVE1 EA PASSAGE SET W101S QUA 626 FAL1 EA SURFACE CLOSER SC81 RW/PA 689 FAL
(MOUNT PULL SIDE)1 EA KICK PLATE 8400 6" X 2" LDW 630 IVE1 EA WALL STOP WS407CCV 630 IVE
HARDWARE SET NO. 06EACH TO HAVE:3 EA HINGE 5BB1 4.5 X 4.5 652 IVE1 EA ENTRY / OFFICE LOCK W511P QUA 30-197 626 FAL1 EA OH STOP 450S J 630 GLY
HARDWARE SET NO. 07EACH TO HAVE:3 EA HINGE 5BB1 4.5 X 4.5 652 IVE1 EA STOREROOM LOCK W581P QUA 626 FAL1 EA SURFACE CLOSER SC81 RW/PA 689 FAL
(MOUNT PULL SIDE)1 EA KICK PLATE 8400 6" X 2" LDW 630 IVE1 EA WALL STOP WS407CCV 630 IVE
HARDWARE SET NO. 08EACH TO HAVE:3 EA HINGE 5BB1 4.5 X 4.5 652 IVE1 EA PUSH PLATE 8200 4" X 16" 630 IVE1 EA PULL PLATE 8302 8" 4" X 16" 630 IVE1 EA SURFACE CLOSER SC81 RW/PA 689 FAL
(MOUNT PULL SIDE)1 EA ARMOR PLATE 8400 36" X 2" LDW 630 IVE1 EA WALL STOP WS407CCV 630 IVE
HARDWARE SET NO. 09EACH TO HAVE:3 EA HINGE 5BB1 4.5 X 4.5 652 IVE1 EA STOREROOM LOCK W581P QUA 626 FAL1 EA WALL STOP WS407CCV 630 IVE
HARDWARE SET NO. 10EACH TO HAVE:3 EA HINGE 5BB1 4.5 X 4.5 652 IVE1 EA STOREROOM LOCK W581P QUA 626 FAL1 EA OH STOP 450S 630 GLY1 EA SURFACE CLOSER SC81 RW/PA 689 FAL
(MOUNT PULL SIDE)1 EA KICK PLATE 8400 6" X 2" LDW 630 IVE
HARDWARE SET NO. 11EACH TO HAVE:3 EA HINGE 5BB1 4.5 X 4.5 652 IVE1 EA PRIVACY LOCK W301S QUA 626 FAL1 EA WALL STOP WS407CCV 630 IVE
HARDWARE SET NO. 12EACH TO HAVE:3 EA HINGE 5BB1 4.5 X 4.5 652 IVE1 EA ENTRY / OFFICE LOCK W511P QUA 30-197 626 FAL1 EA WALL STOP WS407CCV 630 IVE
HARDWARE SET NO. 13EACH TO HAVE:1 EA ELECTRIC STRIKE 5100-3FP FSE 695 VON1 EA ACCESS CONTROL (BY SECURITY CONTRACTOR)
(BALANCE OF EXIST'G HDWE TO REMAIN)
FIELD VERIFY THE EXISTING DOOR AND FRAME PREPARATIONS AND CONDITIONS FOR COMPATIBILITY WITH THE SPECIFIED HARDWARE AND ADJUST IF REQUIRED FOR PROPER FIT AND FUNCTION.PRESENTING AN AUTHORIZED CREDENTIAL WILL ENERGIZE THE ELECTRIC STRIKE AND ALLOW ACCESS. FREE EGRESS IS ALWAYS ALLOWED.COORDINATE SYSTEM OPERATION AND COMPONENT LOCATIONS WITH THE OWNER, THE ARCHITECT AND ALL RELATED TRADES.
HARDWARE SET NO. 14EACH TO HAVE:3 EA HINGE 5BB1 4.5 X 4.5 652 IVE1 EA ENTRY / OFFICE LOCK W511P QUA 30-197 626 FAL1 EA SURFACE CLOSER SC81 DS 689 FAL1 EA KICK PLATE 8400 6" X 2" LDW 630 IVE
HARDWARE SETSHARDWARE SETSHARDWARE SETSHARDWARE SETS
1/2" = 1'-0"
DOOR TYPES
ROOM FINISH SCHEDULE
ROOM FLOORS WALLS CEILINGS
NO. NAME FINISH BASE NORTH EAST SOUTH WEST FINISH SOFFIT
130 EXAM 16 LVP-1 B1 PT-01/PT-02 PT-01/PT-02 PT-01/PT-02 PT-01/PT-02 ACT-1
131 EXAM 18 LVP-1 B1 PT-01/PT-02 PT-01/PT-02 PT-01/PT-02 PT-01/PT-02 ACT-1
132 EXAM 20 LVP-1 B1 PT-01/PT-02 PT-01/PT-02 PT-01/PT-02 PT-01/PT-02 ACT-1
133 EXAM 21 LVP-1 B1 PT-01/PT-02 PT-01/PT-02 PT-01/PT-02 PT-01/PT-02 ACT-1
134 OFFICE CPT-01 B1 PT-01 PT-03 PT-01 PT-01 ACT-1
135 M.A/N.P CPT-01 B1 PT-01 PT-03 PT-01 PT-01 ACT-1
136 OFFICE CPT-01 B1 PT-01 PT-01 PT-01 PT-03 ACT-1
137 OFFICE CPT-01 B1 PT-01 PT-01 PT-01 PT-03 ACT-1
138 EXAM 19 LVP-1 B1 PT-01/PT-02 PT-01/PT-02 PT-01/PT-02 PT-01/PT-02 ACT-1
139 EXAM 17 LVP-1 B1 PT-01/PT-02 PT-01/PT-02 PT-01/PT-02 PT-01/PT-02 ACT-1
140 EXAM 15 LVP-1 B1 PT-01/PT-02 PT-01/PT-02 PT-01/PT-02 PT-01/PT-02 ACT-1
141 OFFICE CPT-01 B1 PT-01 PT-03 PT-01 PT-01 ACT-1
142 OFFICE CPT-01 B1 PT-01 PT-03 PT-01 PT-01 ACT-1
143 CONFERENCEROOM
CPT-1 B1 PT-04 PT-01 PT-03 PT-01 ACT-1
144 TOILET RF-1 -- WT-1/WT-2 WT-1/WT-2 WT-1/WT-2 WT-1/WT-2 ACT-1
145 LAB SV-1 B1 PT-01 PT-01 PT-03 PT-01 ACT-1
146 M.A/N.P CPT-01 B1 PT-03 PT-01 PT-01 PT-01 ACT-1
147 PVT. LVP-1 B1 PT-03 PT-01 PT-01 PT-01 ACT-1
148 PVT. LVP-1 B1 PT-01 PT-01 PT-03 PT-01 ACT-1
149 CHECK OUT SV-1 B1 PT-02 PT-01 PT-01 PT-02 ACT-1
150 RECEPTIONOFFICE
CPT-01 B1 PT-02 PT-03 PT-02 PT-02 ACT-1
151 MEETING ROOM CPT-01 B1 PT-01 PT-01 PT-01 PT-01 ACT-1
152 STORAGE SC-1 B1 PT-01 PT-01 PT-01 PT-01 ACT-1
153 TOILET RF-1 -- WT-1/WT-2 WT-1/WT-2 WT-1/WT-2 WT-1/WT-2 ACT-1
154 TOILET RF-1 -- WT-1/WT-2 WT-1/WT-2 WT-1/WT-2 WT-1/WT-2 ACT-1
155 SERVICEENTRANCE
LVP-1 B1 PT-01 PT-01 PT-01 PT-01 ACT-1
156 JANITOR RF-1 B1 PT-01 PT-01 PT-01 PT-01 ACT-1
157 LOUNGE B1 PT-04 PT-01 PT-01 PT-03 ACT-1
158 MEETING ROOM CPT-01 B1 PT-04 PT-01 PT-03 PT-01 ACT-1
159 MECHANICAL EXISTING -- PT-01 PT-01 PT-01 PT-01
ROOM FINISH SCHEDULE
ROOM FLOORS WALLS CEILINGS
NO. NAME FINISH BASE NORTH EAST SOUTH WEST FINISH SOFFIT
100 VESTIBULE LVT-01 B1 PT-01 - - - GYP
101 WAITING LVT-01/LVT-02
B1 PT-01 PT-01 PT-02 PT-04 GYP PT-02
102 CORRIDOR LVT-01/LVT-02
B1 SEE PLAN SEE PLAN SEE PLAN SEE PLAN GYP
103 INTAKE CPT-01 B1 PT-02 PT-01 PT-01 PT-01 ACT-1
104 TOILET CT-01 -- WT-1/WT-2 WT-1/WT-2 WT-1/WT-2 WT-1/WT-2 ACT-1
105 QUEST LVT-1 B1 PT-01 PT-01 PT-01 PT-02 ACT-1
106 PVT. CPT-1 B1 PT-01 PT-02 PT-01 PT-01 ACT-1
107 TOILET RF-1 -- WT-1/WT-2 WT-1/WT-2 WT-1/WT-2 WT-1/WT-2 ACT-1
108 TOILET RF-1 -- WT-1/WT-2 WT-1/WT-2 WT-1/WT-2 WT-1/WT-2 ACT-1
109 MA CPT-01 B1 PT-01 PT-01 PT-03 PT-01 ACT-1
110 EXAM 1 LVP-1 B1 PT-01/PT-02 PT-01/PT-02 PT-01/PT-02 PT-01/PT-02 ACT-1
111 OFFICE CPT-01 B1 PT-01 PT-03 PT-01 PT-01 ACT-1
112 EXAM 2 LVP-1 B1 PT-01/PT-02 PT-01/PT-02 PT-01/PT-02 PT-01/PT-02 ACT-1
113 EXAM 3 LVP-1 B1 PT-01/PT-02 PT-01/PT-02 PT-01/PT-02 PT-01/PT-02 ACT-1
114 EXAM 4 LVP-1 B1 PT-01/PT-02 PT-01/PT-02 PT-01/PT-02 PT-01/PT-02 ACT-1
115 EXAM 5 LVP-1 B1 PT-01/PT-02 PT-01/PT-02 PT-01/PT-02 PT-01/PT-02 ACT-1
116 OFFICE CPT-01 B1 PT-01 PT-01 PT-01 PT-03 ACT-1
117 EXAM 6 LVP-1 B1 PT-01/PT-02 PT-01/PT-02 PT-01/PT-02 PT-01/PT-02 ACT-1
118 EXAM 7 LVP-1 B1 PT-01/PT-02 PT-01/PT-02 PT-01/PT-02 PT-01/PT-02 ACT-1
119 EXAM 8 LVP-1 B1 PT-01/PT-02 PT-01/PT-02 PT-01/PT-02 PT-01/PT-02 ACT-1
120 EXAM 9 LVP-1 B1 PT-01/PT-02 PT-01/PT-02 PT-01/PT-02 PT-01/PT-02 ACT-1
121 OFFICE CPT-01 B1 PT-01 PT-03 PT-01 PT-01 ACT-1
122 EXAM 10 LVP-1 B1 PT-01/PT-02 PT-01/PT-02 PT-01/PT-02 PT-01/PT-02 ACT-1
123 EXAM 11 LVP-1 B1 PT-01/PT-02 PT-01/PT-02 PT-01/PT-02 PT-01/PT-02 ACT-1
124 EXAM 12 LVP-1 B1 PT-01/PT-02 PT-01/PT-02 PT-01/PT-02 PT-01/PT-02 ACT-1
125 STORAGE SC-1 B1 PT-01 PT-01 PT-01 PT-01 ACT-1
126 SOCIAL WORK/HEALTH COACH
CPT-01 B1 PT-01 PT-01 PT-03 PT-03 ACT-1
127 OFFICE CPT-01 B1 PT-03 PT-01 PT-01 PT-01 ACT-1
128 EXAM 13 LVP-1 B1 PT-01/PT-02 PT-01/PT-02 PT-01/PT-02 PT-01/PT-02 ACT-1
129 EXAM 14 LVP-1 B1 PT-01/PT-02 PT-01/PT-02 PT-01/PT-02 PT-01/PT-02 ACT-1
3/8" = 1'-0"1NEW EXTERIOR DOOR DETAIL
Date Description
2/14/17 ADDENDUM 1
1" = 1'-0"
RECEPTION WINDOW DETAIL 1/4" = 1'-0"
WINDOW TYPES
1
1
1
1
1
1
1
1
1
1
1
1
CG
CG
CG
CG
CG
CG
CG
CG
CG
CG CG
CG
CG
CG
CG
CG
CG
CG
CG
CG
WH
CG
CG
CG
CG
CG
CG
CG
CG
CG
CG CG
CG
CG
CG
CG
CG
CG
CG
CG
CG
WAITINGWAITINGWAITINGWAITING
101
PVT.PVT.PVT.PVT.
147
RECEPTIONRECEPTIONRECEPTIONRECEPTIONOFFICEOFFICEOFFICEOFFICE
150
MEETING ROOMMEETING ROOMMEETING ROOMMEETING ROOM
158
VESTIBULEVESTIBULEVESTIBULEVESTIBULE
100
TOILETTOILETTOILETTOILET
107
TOILETTOILETTOILETTOILET
108
EXAM 7EXAM 7EXAM 7EXAM 7
118
EXAM 1EXAM 1EXAM 1EXAM 1
110
EXAM 4EXAM 4EXAM 4EXAM 4
114
EXAM 9EXAM 9EXAM 9EXAM 9
120
EXAM 2EXAM 2EXAM 2EXAM 2
112
PVT.PVT.PVT.PVT.
106
MAMAMAMA
109
EXAM 6EXAM 6EXAM 6EXAM 6
117
EXAM 3EXAM 3EXAM 3EXAM 3
113
OFFICEOFFICEOFFICEOFFICE
127
EXAM 13EXAM 13EXAM 13EXAM 13
128
EXAM 14EXAM 14EXAM 14EXAM 14
129
EXAM 16EXAM 16EXAM 16EXAM 16
130
EXAM 18EXAM 18EXAM 18EXAM 18
131
EXAM 20EXAM 20EXAM 20EXAM 20
132
EXAM 21EXAM 21EXAM 21EXAM 21
133
OFFICEOFFICEOFFICEOFFICE
134
M.A/N.PM.A/N.PM.A/N.PM.A/N.P
135
EXAM 15EXAM 15EXAM 15EXAM 15
140
EXAM 17EXAM 17EXAM 17EXAM 17
139
EXAM 19EXAM 19EXAM 19EXAM 19
138
OFFICEOFFICEOFFICEOFFICE
136
OFFICEOFFICEOFFICEOFFICE
137
TOILETTOILETTOILETTOILET
104
EXAM 5EXAM 5EXAM 5EXAM 5
115
EXAM 8EXAM 8EXAM 8EXAM 8
119
OFFICEOFFICEOFFICEOFFICE
121
EXAM 10EXAM 10EXAM 10EXAM 10
122
EXAM 11EXAM 11EXAM 11EXAM 11
123
EXAM 12EXAM 12EXAM 12EXAM 12
124
STORAGESTORAGESTORAGESTORAGE
125
OFFICEOFFICEOFFICEOFFICE
116
OFFICEOFFICEOFFICEOFFICE
111
MECHANICALMECHANICALMECHANICALMECHANICAL
159
LOUNGELOUNGELOUNGELOUNGE
157
TOILETTOILETTOILETTOILET
154
MEETING ROOMMEETING ROOMMEETING ROOMMEETING ROOM
151
CONFERENCECONFERENCECONFERENCECONFERENCEROOMROOMROOMROOM
143
OFFICEOFFICEOFFICEOFFICE
141
OFFICEOFFICEOFFICEOFFICE
142
M.A/N.PM.A/N.PM.A/N.PM.A/N.P
146
SOCIAL WORK/SOCIAL WORK/SOCIAL WORK/SOCIAL WORK/HEALTH COACHHEALTH COACHHEALTH COACHHEALTH COACH
126
LABLABLABLAB
145
TOILETTOILETTOILETTOILET
153
PVT.PVT.PVT.PVT.
148
CHECK OUTCHECK OUTCHECK OUTCHECK OUT
149
STORAGESTORAGESTORAGESTORAGE
152
QUESTQUESTQUESTQUEST
105
INTAKEINTAKEINTAKEINTAKE
103
JANITORJANITORJANITORJANITOR
156
TOILETTOILETTOILETTOILET
144
CORRIDORCORRIDORCORRIDORCORRIDOR
102
SERVICESERVICESERVICESERVICEENTRANCEENTRANCEENTRANCEENTRANCE
155
LVT-01
LVT-02
CPT-01
CPT-01
CPT-01
CT-01 LVT-01
CT-01
CPT-01
LVT-01
CPT-01
CPT-01
LVT-01
CT-01
LVT-01
CPT-01
LVT-01
LVT-01
CPT-01
CT-01
CT-01
CPT-01
LVT-01LVT-01LVT-01LVT-01LVT-01LVT-01CPT-01
LVT-01LVT-01 LVT-01
CPT-01
CPT-01
CPT-01
CPT-01
CPT-01
CT-01
CPT-01
LVT-01
CPT-01
LVT-01LVT-01LVT-01
LVT-01
LVT-01
LVT-01
CPT-01
LVT-01
LVT-01
LVT-01
CPT-01
CPT-01
LVT-01
LVT-01
LVT-01
LVT-01
CPT-01
LVT-02
CORRIDORCORRIDORCORRIDORCORRIDOR
102
LVT-02
LVT-01 LVT-01
LVT-01
LVT-01
LVT-02
LVT-01
LVT-02
LVT-01
LVT-02LVT-01
PT-03ENTIRE WALL
PT-02
PT-03 PT-03
PT-02ENTIRE WALL
PT-02
PT-02
PT-03
PT-03
PT-02
WALL FINISHED W/ CHALKBOARD PAINT
LOCATION OF FUTURE MOSAIC WALL
WAITINGWAITINGWAITINGWAITING
101
PVT.PVT.PVT.PVT.
147
RECEPTIONRECEPTIONRECEPTIONRECEPTIONOFFICEOFFICEOFFICEOFFICE
150
MEETING ROOMMEETING ROOMMEETING ROOMMEETING ROOM
158
VESTIBULEVESTIBULEVESTIBULEVESTIBULE
100
TOILETTOILETTOILETTOILET
107
TOILETTOILETTOILETTOILET
108
EXAM 7EXAM 7EXAM 7EXAM 7
118
EXAM 1EXAM 1EXAM 1EXAM 1
110
EXAM 4EXAM 4EXAM 4EXAM 4
114
EXAM 9EXAM 9EXAM 9EXAM 9
120
EXAM 2EXAM 2EXAM 2EXAM 2
112
PVT.PVT.PVT.PVT.
106
MAMAMAMA
109
EXAM 6EXAM 6EXAM 6EXAM 6
117
EXAM 3EXAM 3EXAM 3EXAM 3
113
OFFICEOFFICEOFFICEOFFICE
127
EXAM 13EXAM 13EXAM 13EXAM 13
128
EXAM 14EXAM 14EXAM 14EXAM 14
129
EXAM 16EXAM 16EXAM 16EXAM 16
130
EXAM 18EXAM 18EXAM 18EXAM 18
131
EXAM 20EXAM 20EXAM 20EXAM 20
132
EXAM 21EXAM 21EXAM 21EXAM 21
133
OFFICEOFFICEOFFICEOFFICE
134
M.A/N.PM.A/N.PM.A/N.PM.A/N.P
135
EXAM 15EXAM 15EXAM 15EXAM 15
140
EXAM 17EXAM 17EXAM 17EXAM 17
139
EXAM 19EXAM 19EXAM 19EXAM 19
138
OFFICEOFFICEOFFICEOFFICE
136
OFFICEOFFICEOFFICEOFFICE
137
TOILETTOILETTOILETTOILET
104
EXAM 5EXAM 5EXAM 5EXAM 5
115
EXAM 8EXAM 8EXAM 8EXAM 8
119
OFFICEOFFICEOFFICEOFFICE
121
EXAM 10EXAM 10EXAM 10EXAM 10
122
EXAM 11EXAM 11EXAM 11EXAM 11
123
EXAM 12EXAM 12EXAM 12EXAM 12
124
STORAGESTORAGESTORAGESTORAGE
125
OFFICEOFFICEOFFICEOFFICE
116
OFFICEOFFICEOFFICEOFFICE
111
MECHANICALMECHANICALMECHANICALMECHANICAL
159
LOUNGELOUNGELOUNGELOUNGE
157
TOILETTOILETTOILETTOILET
154
MEETING ROOMMEETING ROOMMEETING ROOMMEETING ROOM
151
CONFERENCECONFERENCECONFERENCECONFERENCEROOMROOMROOMROOM
143
OFFICEOFFICEOFFICEOFFICE
141
OFFICEOFFICEOFFICEOFFICE
142M.A/N.PM.A/N.PM.A/N.PM.A/N.P
146
SOCIAL WORK/SOCIAL WORK/SOCIAL WORK/SOCIAL WORK/HEALTH COACHHEALTH COACHHEALTH COACHHEALTH COACH
126
LABLABLABLAB
145
TOILETTOILETTOILETTOILET
153
PVT.PVT.PVT.PVT.
148
CHECK OUTCHECK OUTCHECK OUTCHECK OUT
149
STORAGESTORAGESTORAGESTORAGE
152
QUESTQUESTQUESTQUEST
105
INTAKEINTAKEINTAKEINTAKE
103
JANITORJANITORJANITORJANITOR
156
TOILETTOILETTOILETTOILET
144
CORRIDORCORRIDORCORRIDORCORRIDOR
102
SERVICESERVICESERVICESERVICEENTRANCEENTRANCEENTRANCEENTRANCE
155
F.E.C.
F.E.C.
F.E.C.
EQ-1
EQ-1
EQ-1
EQ-1
EQ-1
EQ-1
EQ-1
FN-11FN-11
FN-9
FN-13
FN-12FN-12
FN-12FN-12
FN-12FN-12
FN-8
FN-8
FN-6 FN-6
FN-6 FN-6
FN-6
FN-7
FN-6
FN-6
FN-6
FN-8
FN-8
FN-8 FN-8
FN-8
FN-8
FN-6 FN-6
FN-6 FN-6FN-6
FN-6
FN-7
FN-9
EQ-1
FN-8
FN-9
FN-8
FN-8
FN-8
FN-8
FN-8
FN-8
FN-8
FN-8
FN-11FN-11
FN-8
FN-9
FN-8FN-9
FN-8
FN-10
FN-8
FN-8
FN-8
FN-8
FN-8FN-8
FN-14
FN-11
FN-11
FN-11
FN-11
FN-11
FN-11
FN-11
FN-11
FN-8
FN-8FN-8
FN-8FN-8
FN-8
FN-11 FN-11FN-8
FN-8
FN-8
FN-13
FN-12FN-12
FN-12FN-12
FN-12FN-12
FN-8
FN-6
FN-6
FN-6 FN-6
FN-6
FN-7
FN-7
FN-9
FN-9
FN-9
FN-9
FN-10
EQ-1
EQ-1
EQ-1
EQ-1
EQ-1
EQ-1 EQ-1 EQ-1 EQ-1 EQ-1
EQ-1
EQ-1 EQ-1
EQ-1
FN-1
FN-4
FN-3
FN-5
FN-4
FN-4
FN-4
FN-4
FN-4
FN-3
FN-3
FN-3
FN-3 FN-3
FN-5
FN-5
FN-5
FN-5
FN-5
EQ-4
FN-6
FN-6
FN-6
FN-6
FN-6
FN-6 FN-7
FN-7
FN-7
FN-6 FN-6FN-6 FN-7FN-6FN-6FN-7 FN-6
FN-6 FN-6
FN-6 FN-6
FN-6
FN-6
FN-6
FN-6
FN-6 FN-6 FN-6 FN-6
FN-2
FN-2
FN-2
FN-6
FN-6
FN-6
FN-7
FN-6
FN-2
FN-2
EQ-5
EQ-5
EQ-5
FN-2
FN-11
FN-11
FN-11
FN-11
FN-11
FN-11
FN-11
FN-11
FN-14 FN-14
FN-11
FN-11
FN-11
FN-11
FN-11
FN-11
FN-11FN-11FN-11FN-11
FN-7
FN-7
EQ-6
EQ-6
EQ-6
FN-15
FN-15
FN-15
FN-15
FN-16
FN-16
FN-16
FN-16
FN-16
FN-16
FN-16
FN-16
FN-16 FN-16 FN-16 FN-16 FN-16 FN-16
FN-16FN-16FN-16
FN-16
FN-16
FN-16
FN-16
RELOCATED EXISTING PROJECTOR SCREEN
RELOCATED EXISTING PROJECTOR SCREEN
RELOCATED EXISTING PROJECTOR
RELOCATED EXISTING PROJECTOR
FLOOR FINISH PLAN LEGEND
CPT-01CARPET TILE
LVT-01LUXURY VINYL TILE
X-X FLOOR FINISH TAG
BASE NOTE:BASE B-01 UNLESS NOTED OTHERWISE.
CT-01CERAMIC TILE
CG CORNER GUARDLOCATED ON ALL EXTERIOR 90 DEG. CORNERS
LVT-02LUXURY VINYL TILE
U.L. 3A-40BC FIRE EXTINGUISHER
ADA COMPLIANT FLUSH PULL HANDLE
54" AFF (U.N.O.)
FINISH FLOOR
3 1/4"
2 3/4"
ELEVATION SECTION
PLAN
METAL STUD FRAMING
FINISHED WALL
CABINET
FIREEXTINGUISHER
LUXURY VINYL TILE (LVT-01/02) TO CARPET (CPT-01)
LVT CPT-01 CARPET (CPT-01)
LUXURY VINYL TILE
RESILIENT TRANSITION INSTALLED PRIOR TO CARPET INSTALL; REFER TO SPECS FOR COLOR
SCALE
DATE
PROJECT NUMBER
Pro
ject
Dra
win
g
SEDGEWICK & FERWEDA ARCHITECTS
SEDGEWICK & FERWEDA ARCHITECTS
SEDGEWICK & FERWEDA ARCHITECTS
SEDGEWICK & FERWEDA ARCHITECTS
SHEET NUMBER
AR
CH
ITE
CT
SEAL OF ARCHITECT
41
0 E
ast C
ourt
Str
eet F
lint,
MI
48
503
TE
L: 8
10
-23
8-9
64
7
| F
AX
: 81
0-2
38-4
90
0w
ww
.sfa
rch
.us
GOOD DESIGN. GOOD CLIENTS. GREAT ARCHITECTURE.
R E V I S I O N S
DRAWN BY:
CHECKED BY:
SS SSEE EEDD DDGG GGEE EEWW WWII IICC CCKK KK && && FF FFEE EERR RRWW WWEE EEDD DDAA AA
AA AA RR RR CC CC HH HH II II TT TT EE EE CC CC TT TT SS SS
As indicated
2/1
5/2
017
9:5
9:5
9 A
M
A6.0
PR
OP
OS
ED
FL
OO
R F
INIS
H &
FU
RN
ITU
RE
PL
AN
S
1/27/17
16-026
BID SET
GE
NE
SE
E H
EA
LT
H S
YS
TE
M725 M
AS
ON
ST
FL
INT
, M
I 48503
LJK
JSF
1/8" = 1'-0"
PROPOSED FLOOR & WALL FINISH PLAN 1/8" = 1'-0"
PROPOSED FURNITURE PLAN
FLOOR MATERIAL TAKEOFF SCHEDULE
TYPE AREA
CPT-01 3277 SF
CT-01 324 SF
LVT-01 4855 SF
LVT-02 1612 SF
Grand total 10068 SF
SPECIALTY EQUIPMENT SCHEDULE
MARK DESCRIPTION TYPE COUNT
CG CORNER GUARD 4' HEIGHT 20
EQ-1 TREATMENT TABLE RITTER 203-002 22
EQ-3 ROOF HATCH 30" x 36" 1
EQ-4 ALUMINUM CAGE ROOF LADDER STANDARD 1
EQ-5 BATHROOM MIRROR 24" x 36" 4
EQ-6 WHITE BOARD 48" x 120" 3
FURNITURE SCHEDULE
MARK DESCRIPTION COUNT
FN-1 DISHWASHER 1
FN-2 TOILET PAPER DISPENSER 6
FN-3 42" GRAB BARS 6
FN-4 36" GRAB BARS 6
FN-5 18" GRAB BARS 6
FN-6 GUEST CHAIR 47
FN-7 WAITING END TABLE 12
FN-8 DESK CHAIR 36
FN-9 OFFICE DESK 9
FN-10 REFRIGERATOR 2
FN-11 CONFERENCE CHAIR 32
FN-12 LOUNGE CHAIR 12
FN-13 LOUNGE TABLE 2
FN-14 CONFERENCE TABLE 3
FN-15 FLAT SCREEN TELEVISION 4
FN-16 ROLLING STOOL 21
1" = 1'-0"4FIRE EXTINGUISHER CABINET
6" = 1'-0"3FLOORING TRANSITION DETAIL
1
1
Date Description
2/14/17 ADDENDUM 1
1
1
1
1
11
11111
1
1
1
1
1
1
11
1
1
1
1
1
1
1