8
Genova Port Community System Napoli – 26th June 2014 Genova Port Authority Giorgio Cavo Hub Telematica ECASBA – 2014 European Seminar

Genova Port Community System · AIDA 7 di 7 • Enhances and strengthens the Sea-based Customs Clearance effects • Supports the Customs and Logistics Fast Corridors development

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Genova Port Community System · AIDA 7 di 7 • Enhances and strengthens the Sea-based Customs Clearance effects • Supports the Customs and Logistics Fast Corridors development

Genova Port Community System

Napoli – 26th June 2014 Genova Port Authority

Giorgio Cavo Hub Telematica

ECASBA – 2014 European Seminar

Page 2: Genova Port Community System · AIDA 7 di 7 • Enhances and strengthens the Sea-based Customs Clearance effects • Supports the Customs and Logistics Fast Corridors development

Napoli – June 26th 2014 Genova Port Authority

The Telematics Port System E-port

E-port stands for Genova Port Community System

E-port, owned by Genova Port Authority, has been founded in 2005 with the design contribution of the Port Operator Associations and Public Authority involved in the Port process.

Its main objective

The realization of a Telematics platform that is the fundamental element for the inclusion of the call in the Logistics system

The optimization of documentary interchange (dematerialisation) and the consequent fluidity of traffic traceability

The realization of a virtual interface between Port and Systems of the entire Logistics Chain.

1 di 7

Page 3: Genova Port Community System · AIDA 7 di 7 • Enhances and strengthens the Sea-based Customs Clearance effects • Supports the Customs and Logistics Fast Corridors development

More than 20 Km of extension Around 4.000 means of transport in and out per day

More than 300 Freight Forwarders More than 80 Maritime Agencies Around 6.000 Truckers In 2013 have been handled around 2 millions of Teu and around 50.000.000 tons of various goods

3

Genova Port in numbers

Napoli – June 26th 2014 Genova Port Authority 2 di 7

Page 4: Genova Port Community System · AIDA 7 di 7 • Enhances and strengthens the Sea-based Customs Clearance effects • Supports the Customs and Logistics Fast Corridors development

Import Documentation:

• Customs declaration • Arrival Ship’s Manifest • Delivery order • Delivery Updating • Booking Import • Gate in / gate out • A3 discharge (for TC) • Truckload arrival notice

Export Documentation:

• Customs declaration • Departure Ship’s Manifest • Container release order • Container movement order • Loading list • Loading report • Gate in / gate out • Truckload arrival Notice

In 2013 E-port negotiated around 10.000.000 documents The Call Center handled around 90.000 requests with the 80% fixed within 5 minutes from the call.

4

E-port 2013 in numbers

Napoli – June 26th 2014 Genova Port Authority 3 di 7

Page 5: Genova Port Community System · AIDA 7 di 7 • Enhances and strengthens the Sea-based Customs Clearance effects • Supports the Customs and Logistics Fast Corridors development

Il porto di Genova in cifre

Più di 20 Km di estensione

Più di 20 Km di estensione

Import Vte

Import Sech

Export Vte

Export Sech

Export S.Giorgio

Export Rebora

Varco S.Benigno

5

E-port available components and where

Export Messina

Import S.Giorgio

Napoli – June 26th 2014 Genova Port Authority 4 di 7

Page 6: Genova Port Community System · AIDA 7 di 7 • Enhances and strengthens the Sea-based Customs Clearance effects • Supports the Customs and Logistics Fast Corridors development

E-port evolution and the creation of the Informative Patrimony of the Logistics Hub

Arrival Ship’s Manifest

Booking Import

Truckload arrival notice

Gate management

Discharge Authorization acquisition

Delivery Order acquisition

Customs Clearance Acquisition (ODI)

Gate in management

Loading report acquisition

Truckload Arrival notice

Customs Clearance Acquisition (DD)

Goods due Scheduled Goods in exit and in transit + A3

Documentary Green Light

Means of transport and drivers Expected and when

Goods entered

Clearance done

Departure Ship’s Manifest Goods can be embarked

Goods on board

Clearance done

Goods collectable

Means of transport and driver Expected and when

Goods out and delivered

Export Cycle Import Cycle

Goods status and its documentary tracking

Napoli – June 26th 2014 Genova Port Authority 5 di 7

Page 7: Genova Port Community System · AIDA 7 di 7 • Enhances and strengthens the Sea-based Customs Clearance effects • Supports the Customs and Logistics Fast Corridors development

Ports, Inner Harbours, Interports, Airports

• Automatic Arrival Notice • Goods status (operative and authoritative) • Infos and Alerts • Communication • Booking Info

• Just-In-Time (JIT) • To make the operational Port events

completely readable

Napoli – June 26th 2014 Genova Port Authority 6 di 7

Page 8: Genova Port Community System · AIDA 7 di 7 • Enhances and strengthens the Sea-based Customs Clearance effects • Supports the Customs and Logistics Fast Corridors development

Genova Port Community

E-port – Telematics Platform enabling communications with reference Systems

Napoli – June 26th 2014 Genova Port Authority

PMIS

AIDA

7 di 7

• Enhances and strengthens the Sea-based Customs Clearance effects • Supports the Customs and Logistics Fast Corridors development • Interoperates with sea side System (PMIS) • Interoperates with the world of transport