80
Quick Start ST Geomative Co., Ltd www.geomative.com 2016.6.26 GD-10 D.C. GEO-ELECTRICAL SYSTE Built for Field

Geomative GD-10 Geophysical Resistivity/IP Equipment Quick Start

  • Upload
    mai-di

  • View
    32

  • Download
    1

Embed Size (px)

DESCRIPTION

The mainframe GD-10 Res/IP meter supports following functions with different accessories: 1D Resistivity/Induced Polarization(Res/IP) VES Sounding 2D Resistivity/Induced Polarization(Res/IP) Imaging Survey 3D Resistivity/Induced Polarization(Res/IP) Imaging Survey 2D/3D Rolling Measurement High-Power Induced Polarization Survey Real-time Environmental Monitoring Self-potential Method Rock sample measure Survey on Water Cross-hole Survey

Citation preview

  • ST Geomative Co., Ltdwww.geomative.com2016.6.26GD-10 D.C. GEO-ELECTRICAL SYSTEMBuilt for Field

    ContentST Geomative Co., Ltdwww.geomative.com

    1. Overview of GD-10 system 1. Overview of GD-10 system1.1 GD-10 Mainframe1.2 CL-10 Cable Leader1.3 12 Take-outs Cable1.4 Winch and Starlike Electrode1.5 BP-145 DC Power Source

    2. Registration

    3. Operation of Geomative Studio3.1 Project Management3.2 Script Management

    4. Upload files to GD-10 Mainframe

    5. Operation of GD-10 Mainframe5.1 Start GD-10 Mainframe5.2 Device Management5.3 Create New Measurement5.4 Get GPS Coordinates 5.5 1D VES Measurement5.6 2D ERI Measurement5.7 3D Measurement

    6. Data Management6.1 Download Data to Database6.2 View the Data File in the Database6.3 Output RES2D Data6.4 Add Terrian Data

    Appendix 1 Charging* Charging GD-10 Mainframe* Charging CL-10 Cable Leader* Charging BP-145 Power Source

    ContentST Geomative Co., Ltdwww.geomative.com

    Control PanelLeft Side PanelRight Side PanelPortable Handle1.1 GD-10 MainframeNameplateUSB InterfaceCharging/External Battery InterfacePower SwitchInterface for groundPositive/Negative Interface for InputInterface for A (C1) and B (C2)

    Fuse BoxM (P1) and N (P2) interfaceInterface for Multi-cable SocketShortcut Button:F1, F2, F3, F4Knob:Turn Left DownTurn Right UpPress - EnterFunction Button:Page UpMenuBackPage DownLCD Screen1. Overview of GD-10 system1.1 GD-10 Mainframe1.2 CL-10 Cable Leader1.3 12 Take-outs Cable1.4 Winch and Starlike Electrode1.5 BP-145 DC Power Source

    2. Registration

    3. Operation of Geomative Studio3.1 Project Management3.2 Script Management

    4. Upload files to GD-10 Mainframe

    5. Operation of GD-10 Mainframe5.1 Start GD-10 Mainframe5.2 Device Management5.3 Create New Measurement5.4 Get GPS Coordinates 5.5 1D VES Measurement5.6 2D ERI Measurement5.7 3D Measurement

    6. Data Management6.1 Download Data to Database6.2 View the Data File in the Database6.3 Output RES2D Data6.4 Add Terrian Data

    Appendix 1 Charging* Charging GD-10 Mainframe* Charging CL-10 Cable Leader* Charging BP-145 Power Source

    ContentST Geomative Co., Ltdwww.geomative.com

    Usage of Shortcut buttonF1F2F3F4Using shortcut button to switch the items on the bottom of screen, F1~F4 will have different functions in different menu.Control Panel1.1 GD-10 Mainframe Control Panel1. Overview of GD-10 system1.1 GD-10 Mainframe1.2 CL-10 Cable Leader1.3 12 Take-outs Cable1.4 Winch and Starlike Electrode1.5 BP-145 DC Power Source

    2. Registration

    3. Operation of Geomative Studio3.1 Project Management3.2 Script Management

    4. Upload files to GD-10 Mainframe

    5. Operation of GD-10 Mainframe5.1 Start GD-10 Mainframe5.2 Device Management5.3 Create New Measurement5.4 Get GPS Coordinates 5.5 1D VES Measurement5.6 2D ERI Measurement5.7 3D Measurement

    6. Data Management6.1 Download Data to Database6.2 View the Data File in the Database6.3 Output RES2D Data6.4 Add Terrian Data

    Appendix 1 Charging* Charging GD-10 Mainframe* Charging CL-10 Cable Leader* Charging BP-145 Power Source

    ContentST Geomative Co., Ltdwww.geomative.com

    1.1 GD-10 Mainframe general parameters1. Overview of GD-10 system1.1 GD-10 Mainframe1.2 CL-10 Cable Leader1.3 12 Take-outs Cable1.4 Winch and Starlike Electrode1.5 BP-145 DC Power Source

    2. Registration

    3. Operation of Geomative Studio3.1 Project Management3.2 Script Management

    4. Upload files to GD-10 Mainframe

    5. Operation of GD-10 Mainframe5.1 Start GD-10 Mainframe5.2 Device Management5.3 Create New Measurement5.4 Get GPS Coordinates 5.5 1D VES Measurement5.6 2D ERI Measurement5.7 3D Measurement

    6. Data Management6.1 Download Data to Database6.2 View the Data File in the Database6.3 Output RES2D Data6.4 Add Terrian Data

    Appendix 1 Charging* Charging GD-10 Mainframe* Charging CL-10 Cable Leader* Charging BP-145 Power Source

    Transmitting ChannelMax. Power (W)7200Max. Voltage (V)1200Max. Current (A)6ProtectionOver current and short-circuitPulse Duration (S)1, 2, 4, 8, 16, SelectableAccuracy0.1% 1uAInput impedance50MPotential ChannelPotential Range (V)24Accuracy0.05% 1uVSP compensation range10VSuppression95dB, for 50Hz or 60Hz selectableGeneralLCD Screen480x272, full colorMemory Storage4G ByteBattary12V, 7.8Ah Li-Ion BatteryExternal DC Power12V ~ 60VWorking temperature-10~+55Storage temperature-30~+60

    ContentST Geomative Co., Ltdwww.geomative.com

    CL-10 Cable leader is used in 2D or 3D ERI electrical measurement. It is used as a switcher and repeater. One cable leader can control the cables on the both sides.Length: 300mmDiameter: 65mmWeight: 1KgMaterial: aluminum alloyProtection level: IP66Working battery: 5200mAh1.2 CL-10 Bi-directions Intelligent Cable Leader

    Generally, we put cable leader inside the winch to protect it.1. Overview of GD-10 system1.1 GD-10 Mainframe1.2 CL-10 Cable Leader1.3 12 Take-outs Cable1.4 Winch and Starlike Electrode1.5 BP-145 DC Power Source

    2. Registration

    3. Operation of Geomative Studio3.1 Project Management3.2 Script Management

    4. Upload files to GD-10 Mainframe

    5. Operation of GD-10 Mainframe5.1 Start GD-10 Mainframe5.2 Device Management5.3 Create New Measurement5.4 Get GPS Coordinates 5.5 1D VES Measurement5.6 2D ERI Measurement5.7 3D Measurement

    6. Data Management6.1 Download Data to Database6.2 View the Data File in the Database6.3 Output RES2D Data6.4 Add Terrian Data

    Appendix 1 Charging* Charging GD-10 Mainframe* Charging CL-10 Cable Leader* Charging BP-145 Power Source

    ContentST Geomative Co., Ltdwww.geomative.com

    Take-outs: 12Cores: 26pinsCable spacing: 5m, 10m or CustomWeight/length5m spacing - 6Kg/65m 10m spacing - 11Kg/130mWaterproof: IP6612 take-outs ERI cable is used to connect electrodes , transmittingand receiving signal.For each take-out there are two joints. These two joints are separated, they are controlled by two different cable leaders on each side.1.3 12 Take-outs Bi-directions Multicore Cable 1. Overview of GD-10 system1.1 GD-10 Mainframe1.2 CL-10 Cable Leader1.3 12 Take-outs Cable1.4 Winch and Starlike Electrode1.5 BP-145 DC Power Source

    2. Registration

    3. Operation of Geomative Studio3.1 Project Management3.2 Script Management

    4. Upload files to GD-10 Mainframe

    5. Operation of GD-10 Mainframe5.1 Start GD-10 Mainframe5.2 Device Management5.3 Create New Measurement5.4 Get GPS Coordinates 5.5 1D VES Measurement5.6 2D ERI Measurement5.7 3D Measurement

    6. Data Management6.1 Download Data to Database6.2 View the Data File in the Database6.3 Output RES2D Data6.4 Add Terrian Data

    Appendix 1 Charging* Charging GD-10 Mainframe* Charging CL-10 Cable Leader* Charging BP-145 Power Source

    ContentST Geomative Co., Ltdwww.geomative.com

    Usage of winch:Carry cable and cable leader,Layout cable,Protect cable leader.Wight : Net Weight - 1.5KgWith 5m spacing cable 7.5KgWith 5m spacing cable 11.5KgLaunch the electrodes and the receiving electrode resistivity method1.4 Winch and Starlike Electrode1. Overview of GD-10 system1.1 GD-10 Mainframe1.2 CL-10 Cable Leader1.3 12 Take-outs Cable1.4 Winch and Starlike Electrode1.5 BP-145 DC Power Source

    2. Registration

    3. Operation of Geomative Studio3.1 Project Management3.2 Script Management

    4. Upload files to GD-10 Mainframe

    5. Operation of GD-10 Mainframe5.1 Start GD-10 Mainframe5.2 Device Management5.3 Create New Measurement5.4 Get GPS Coordinates 5.5 1D VES Measurement5.6 2D ERI Measurement5.7 3D Measurement

    6. Data Management6.1 Download Data to Database6.2 View the Data File in the Database6.3 Output RES2D Data6.4 Add Terrian Data

    Appendix 1 Charging* Charging GD-10 Mainframe* Charging CL-10 Cable Leader* Charging BP-145 Power Source

    ContentST Geomative Co., Ltdwww.geomative.com

    ParametersOutput Voltage: 48V96V144VMax Output Current: 2ACharging Voltage: 100V ~ 240V ACOutput Pattern: DC outputWorking Temperature: -20 ~ +60Store Temperature: -30/+60Capacity: 2 AHwith 48V output is 6AHBP-145 is a digital DC rechargeable power source, it is designed for field work. 1.5 BP-145 DC Rechargeable Power Source1. Overview of GD-10 system1.1 GD-10 Mainframe1.2 CL-10 Cable Leader1.3 12 Take-outs Cable1.4 Winch and Starlike Electrode1.5 BP-145 DC Power Source

    2. Registration

    3. Operation of Geomative Studio3.1 Project Management3.2 Script Management

    4. Upload files to GD-10 Mainframe

    5. Operation of GD-10 Mainframe5.1 Start GD-10 Mainframe5.2 Device Management5.3 Create New Measurement5.4 Get GPS Coordinates 5.5 1D VES Measurement5.6 2D ERI Measurement5.7 3D Measurement

    6. Data Management6.1 Download Data to Database6.2 View the Data File in the Database6.3 Output RES2D Data6.4 Add Terrian Data

    Appendix 1 Charging* Charging GD-10 Mainframe* Charging CL-10 Cable Leader* Charging BP-145 Power Source

    ContentST Geomative Co., Ltdwww.geomative.com

    a. Connect GD-10 with PC;b. Start Geomative on PC;c. There will be a message come out;d. Select OK, GD-10 and Geomative have been connected;a. Select Manage Device Main View to enter to the main page of divice management;b. Select the serial number of this new device under New device;c. Right click to open the menu;d. Select Register device to register GD-10 on Geomative;Wait a few seconds, finish registration.2.2 Register Geomative Software2. RegistrationThe GD-10 which has been registered is in the Registered device list.2.1 Connect GD-10 and Geomative Software1. Overview of GD-10 system1.1 GD-10 Mainframe1.2 CL-10 Cable Leader1.3 12 Take-outs Cable1.4 Winch and Starlike Electrode1.5 BP-145 DC Power Source

    2. Registration

    3. Operation of Geomative Studio3.1 Project Management3.2 Script Management

    4. Upload files to GD-10 Mainframe

    5. Operation of GD-10 Mainframe5.1 Start GD-10 Mainframe5.2 Device Management5.3 Create New Measurement5.4 Get GPS Coordinates 5.5 1D VES Measurement5.6 2D ERI Measurement5.7 3D Measurement

    6. Data Management6.1 Download Data to Database6.2 View the Data File in the Database6.3 Output RES2D Data6.4 Add Terrian Data

    Appendix 1 Charging* Charging GD-10 Mainframe* Charging CL-10 Cable Leader* Charging BP-145 Power Source

    ContentST Geomative Co., Ltdwww.geomative.com

    Select the registered GD-10, right click to open the menu;Select Modify parameter, there will be an window come out;Modify the parameters for GD-10 in this window;Select OK to save the parameters. 2.3 Modify parameter of GD-102. Registration1. Overview of GD-10 system1.1 GD-10 Mainframe1.2 CL-10 Cable Leader1.3 12 Take-outs Cable1.4 Winch and Starlike Electrode1.5 BP-145 DC Power Source

    2. Registration

    3. Operation of Geomative Studio3.1 Project Management3.2 Script Management

    4. Upload files to GD-10 Mainframe

    5. Operation of GD-10 Mainframe5.1 Start GD-10 Mainframe5.2 Device Management5.3 Create New Measurement5.4 Get GPS Coordinates 5.5 1D VES Measurement5.6 2D ERI Measurement5.7 3D Measurement

    6. Data Management6.1 Download Data to Database6.2 View the Data File in the Database6.3 Output RES2D Data6.4 Add Terrian Data

    Appendix 1 Charging* Charging GD-10 Mainframe* Charging CL-10 Cable Leader* Charging BP-145 Power Source

    ContentST Geomative Co., Ltdwww.geomative.com

    Preparation on Geomative Studio3. Operation of Geomative StudioStart Geomative Studio Software on PC1. Overview of GD-10 system1.1 GD-10 Mainframe1.2 CL-10 Cable Leader1.3 12 Take-outs Cable1.4 Winch and Starlike Electrode1.5 BP-145 DC Power Source

    2. Registration

    3. Operation of Geomative Studio3.1 Project Management3.2 Script Management

    4. Upload files to GD-10 Mainframe

    5. Operation of GD-10 Mainframe5.1 Start GD-10 Mainframe5.2 Device Management5.3 Create New Measurement5.4 Get GPS Coordinates 5.5 1D VES Measurement5.6 2D ERI Measurement5.7 3D Measurement

    6. Data Management6.1 Download Data to Database6.2 View the Data File in the Database6.3 Output RES2D Data6.4 Add Terrian Data

    Appendix 1 Charging* Charging GD-10 Mainframe* Charging CL-10 Cable Leader* Charging BP-145 Power Source

    ContentST Geomative Co., Ltdwww.geomative.com

    Home Page of Project ManagementSelectManage Project Main view to enter to the Home Page of Project Management.1. Overview of GD-10 system1.1 GD-10 Mainframe1.2 CL-10 Cable Leader1.3 12 Take-outs Cable1.4 Winch and Starlike Electrode1.5 BP-145 DC Power Source

    2. Registration

    3. Operation of Geomative Studio3.1 Project Management3.2 Script Management

    4. Upload files to GD-10 Mainframe

    5. Operation of GD-10 Mainframe5.1 Start GD-10 Mainframe5.2 Device Management5.3 Create New Measurement5.4 Get GPS Coordinates 5.5 1D VES Measurement5.6 2D ERI Measurement5.7 3D Measurement

    6. Data Management6.1 Download Data to Database6.2 View the Data File in the Database6.3 Output RES2D Data6.4 Add Terrian Data

    Appendix 1 Charging* Charging GD-10 Mainframe* Charging CL-10 Cable Leader* Charging BP-145 Power Source

    3.1 Project Management3. Operation of Geomative Studio

    ContentST Geomative Co., Ltdwww.geomative.com

    Select Manage Project Operate Create project locally in the toolbarSelect Create project locally in right-click menu1. Overview of GD-10 system1.1 GD-10 Mainframe1.2 CL-10 Cable Leader1.3 12 Take-outs Cable1.4 Winch and Starlike Electrode1.5 BP-145 DC Power Source

    2. Registration

    3. Operation of Geomative Studio3.1 Project Management3.2 Script Management

    4. Upload files to GD-10 Mainframe

    5. Operation of GD-10 Mainframe5.1 Start GD-10 Mainframe5.2 Device Management5.3 Create New Measurement5.4 Get GPS Coordinates 5.5 1D VES Measurement5.6 2D ERI Measurement5.7 3D Measurement

    6. Data Management6.1 Download Data to Database6.2 View the Data File in the Database6.3 Output RES2D Data6.4 Add Terrian Data

    Appendix 1 Charging* Charging GD-10 Mainframe* Charging CL-10 Cable Leader* Charging BP-145 Power Source

    3.1 Project Management create New Project3. Operation of Geomative Studio

    ContentST Geomative Co., Ltdwww.geomative.com

    Project ID - Press New, Geomative will automatically generate a Project ID,Input Project Name,Input Project Location,Select Create Date,Input Duration Days,Input Project Supervisor,Input On-site Manager,Input Project Manager,Input QA,Input Standard,Input Remark Information,Press OK to save New Project.1. Overview of GD-10 system1.1 GD-10 Mainframe1.2 CL-10 Cable Leader1.3 12 Take-outs Cable1.4 Winch and Starlike Electrode1.5 BP-145 DC Power Source

    2. Registration

    3. Operation of Geomative Studio3.1 Project Management3.2 Script Management

    4. Upload files to GD-10 Mainframe

    5. Operation of GD-10 Mainframe5.1 Start GD-10 Mainframe5.2 Device Management5.3 Create New Measurement5.4 Get GPS Coordinates 5.5 1D VES Measurement5.6 2D ERI Measurement5.7 3D Measurement

    6. Data Management6.1 Download Data to Database6.2 View the Data File in the Database6.3 Output RES2D Data6.4 Add Terrian Data

    Appendix 1 Charging* Charging GD-10 Mainframe* Charging CL-10 Cable Leader* Charging BP-145 Power Source

    3.1 Project Management set Project Parameters3. Operation of Geomative Studio

    ContentST Geomative Co., Ltdwww.geomative.com

    Select Manage Project Operate Delete local project in the toolbarSelect Delete local project in right-click menuSelect Yes to delete the projectWarning: The deleted project can not be recovered;When you delete a project, the test zones and data files in the project will be deleted, too. 1. Overview of GD-10 system1.1 GD-10 Mainframe1.2 CL-10 Cable Leader1.3 12 Take-outs Cable1.4 Winch and Starlike Electrode1.5 BP-145 DC Power Source

    2. Registration

    3. Operation of Geomative Studio3.1 Project Management3.2 Script Management

    4. Upload files to GD-10 Mainframe

    5. Operation of GD-10 Mainframe5.1 Start GD-10 Mainframe5.2 Device Management5.3 Create New Measurement5.4 Get GPS Coordinates 5.5 1D VES Measurement5.6 2D ERI Measurement5.7 3D Measurement

    6. Data Management6.1 Download Data to Database6.2 View the Data File in the Database6.3 Output RES2D Data6.4 Add Terrian Data

    Appendix 1 Charging* Charging GD-10 Mainframe* Charging CL-10 Cable Leader* Charging BP-145 Power Source

    3.1 Project Management Delete Project3. Operation of Geomative Studio

    ContentST Geomative Co., Ltdwww.geomative.com

    Select Manage Project Operate Create zone locally in the toolbarSelect Create zone locally in right-click menu1. Overview of GD-10 system1.1 GD-10 Mainframe1.2 CL-10 Cable Leader1.3 12 Take-outs Cable1.4 Winch and Starlike Electrode1.5 BP-145 DC Power Source

    2. Registration

    3. Operation of Geomative Studio3.1 Project Management3.2 Script Management

    4. Upload files to GD-10 Mainframe

    5. Operation of GD-10 Mainframe5.1 Start GD-10 Mainframe5.2 Device Management5.3 Create New Measurement5.4 Get GPS Coordinates 5.5 1D VES Measurement5.6 2D ERI Measurement5.7 3D Measurement

    6. Data Management6.1 Download Data to Database6.2 View the Data File in the Database6.3 Output RES2D Data6.4 Add Terrian Data

    Appendix 1 Charging* Charging GD-10 Mainframe* Charging CL-10 Cable Leader* Charging BP-145 Power Source

    3.1 Project Management Create New Test Zone3. Operation of Geomative Studio

    ContentST Geomative Co., Ltdwww.geomative.com

    Input Zone name,Select Creation Date,Input Zone Location,Input Remark Information,Select OK to save New Zone.1. Overview of GD-10 system1.1 GD-10 Mainframe1.2 CL-10 Cable Leader1.3 12 Take-outs Cable1.4 Winch and Starlike Electrode1.5 BP-145 DC Power Source

    2. Registration

    3. Operation of Geomative Studio3.1 Project Management3.2 Script Management

    4. Upload files to GD-10 Mainframe

    5. Operation of GD-10 Mainframe5.1 Start GD-10 Mainframe5.2 Device Management5.3 Create New Measurement5.4 Get GPS Coordinates 5.5 1D VES Measurement5.6 2D ERI Measurement5.7 3D Measurement

    6. Data Management6.1 Download Data to Database6.2 View the Data File in the Database6.3 Output RES2D Data6.4 Add Terrian Data

    Appendix 1 Charging* Charging GD-10 Mainframe* Charging CL-10 Cable Leader* Charging BP-145 Power Source

    3.1 Project Management Set Parameters of Test Zone3. Operation of Geomative Studio

    ContentST Geomative Co., Ltdwww.geomative.com

    Select Manage Project Operate Delete local zone in the toolbarSelect Delete local zone in right-click menuSelect Yes to delete the test zoneWarning: The deleted test zone can not be recovered;When you delete a test zone, the data files in the test zone will be deleted, too. 1. Overview of GD-10 system1.1 GD-10 Mainframe1.2 CL-10 Cable Leader1.3 12 Take-outs Cable1.4 Winch and Starlike Electrode1.5 BP-145 DC Power Source

    2. Registration

    3. Operation of Geomative Studio3.1 Project Management3.2 Script Management

    4. Upload files to GD-10 Mainframe

    5. Operation of GD-10 Mainframe5.1 Start GD-10 Mainframe5.2 Device Management5.3 Create New Measurement5.4 Get GPS Coordinates 5.5 1D VES Measurement5.6 2D ERI Measurement5.7 3D Measurement

    6. Data Management6.1 Download Data to Database6.2 View the Data File in the Database6.3 Output RES2D Data6.4 Add Terrian Data

    Appendix 1 Charging* Charging GD-10 Mainframe* Charging CL-10 Cable Leader* Charging BP-145 Power Source

    3.1 Project Management Delete "Test Zone3. Operation of Geomative Studio

    ContentST Geomative Co., Ltdwww.geomative.com

    Home Page of Script ManagementSelectManage Script Main view to enter to the Home Page of Script Management.1. Overview of GD-10 system1.1 GD-10 Mainframe1.2 CL-10 Cable Leader1.3 12 Take-outs Cable1.4 Winch and Starlike Electrode1.5 BP-145 DC Power Source

    2. Registration

    3. Operation of Geomative Studio3.1 Project Management3.2 Script Management

    4. Upload files to GD-10 Mainframe

    5. Operation of GD-10 Mainframe5.1 Start GD-10 Mainframe5.2 Device Management5.3 Create New Measurement5.4 Get GPS Coordinates 5.5 1D VES Measurement5.6 2D ERI Measurement5.7 3D Measurement

    6. Data Management6.1 Download Data to Database6.2 View the Data File in the Database6.3 Output RES2D Data6.4 Add Terrian Data

    Appendix 1 Charging* Charging GD-10 Mainframe* Charging CL-10 Cable Leader* Charging BP-145 Power Source

    3. Operation of Geomative Studio3.2 Script Management

    ContentST Geomative Co., Ltdwww.geomative.com

    Select Manage Project Operate Create New Script in the toolbarSelect Create New Script in right-click menu1. Overview of GD-10 system1.1 GD-10 Mainframe1.2 CL-10 Cable Leader1.3 12 Take-outs Cable1.4 Winch and Starlike Electrode1.5 BP-145 DC Power Source

    2. Registration

    3. Operation of Geomative Studio3.1 Project Management3.2 Script Management

    4. Upload files to GD-10 Mainframe

    5. Operation of GD-10 Mainframe5.1 Start GD-10 Mainframe5.2 Device Management5.3 Create New Measurement5.4 Get GPS Coordinates 5.5 1D VES Measurement5.6 2D ERI Measurement5.7 3D Measurement

    6. Data Management6.1 Download Data to Database6.2 View the Data File in the Database6.3 Output RES2D Data6.4 Add Terrian Data

    Appendix 1 Charging* Charging GD-10 Mainframe* Charging CL-10 Cable Leader* Charging BP-145 Power Source

    3.2 Script Management create 1D new script3. Operation of Geomative Studio

    ContentST Geomative Co., Ltdwww.geomative.com

    3.2 Script Management general parameters of 1D scriptInput Script Name,Input Operator,Select Creation date,Input Remark Information.Note: The item with * in front is required.1. Overview of GD-10 system1.1 GD-10 Mainframe1.2 CL-10 Cable Leader1.3 12 Take-outs Cable1.4 Winch and Starlike Electrode1.5 BP-145 DC Power Source

    2. Registration

    3. Operation of Geomative Studio3.1 Project Management3.2 Script Management

    4. Upload files to GD-10 Mainframe

    5. Operation of GD-10 Mainframe5.1 Start GD-10 Mainframe5.2 Device Management5.3 Create New Measurement5.4 Get GPS Coordinates 5.5 1D VES Measurement5.6 2D ERI Measurement5.7 3D Measurement

    6. Data Management6.1 Download Data to Database6.2 View the Data File in the Database6.3 Output RES2D Data6.4 Add Terrian Data

    Appendix 1 Charging* Charging GD-10 Mainframe* Charging CL-10 Cable Leader* Charging BP-145 Power Source

    3. Operation of Geomative Studio

    ContentST Geomative Co., Ltdwww.geomative.com

    Input a = 1/2 * AB,Input b = 1/2 * MN,Select Iteration number: 1~100,Select Add to add one record,Select Update to replace the selected record,Select Delete to delete the selected record.3.2 Script Management 1D VES script (4P VES array)1. Overview of GD-10 system1.1 GD-10 Mainframe1.2 CL-10 Cable Leader1.3 12 Take-outs Cable1.4 Winch and Starlike Electrode1.5 BP-145 DC Power Source

    2. Registration

    3. Operation of Geomative Studio3.1 Project Management3.2 Script Management

    4. Upload files to GD-10 Mainframe

    5. Operation of GD-10 Mainframe5.1 Start GD-10 Mainframe5.2 Device Management5.3 Create New Measurement5.4 Get GPS Coordinates 5.5 1D VES Measurement5.6 2D ERI Measurement5.7 3D Measurement

    6. Data Management6.1 Download Data to Database6.2 View the Data File in the Database6.3 Output RES2D Data6.4 Add Terrian Data

    Appendix 1 Charging* Charging GD-10 Mainframe* Charging CL-10 Cable Leader* Charging BP-145 Power Source

    3. Operation of Geomative Studio

    ContentST Geomative Co., Ltdwww.geomative.com

    Input a = AB = MN,Input b = OO,Select Iteration number: 1~100,Select Add to add one record,Select Update to replace the selected record,Select Delete to delete the selected record.1. Overview of GD-10 system1.1 GD-10 Mainframe1.2 CL-10 Cable Leader1.3 12 Take-outs Cable1.4 Winch and Starlike Electrode1.5 BP-145 DC Power Source

    2. Registration

    3. Operation of Geomative Studio3.1 Project Management3.2 Script Management

    4. Upload files to GD-10 Mainframe

    5. Operation of GD-10 Mainframe5.1 Start GD-10 Mainframe5.2 Device Management5.3 Create New Measurement5.4 Get GPS Coordinates 5.5 1D VES Measurement5.6 2D ERI Measurement5.7 3D Measurement

    6. Data Management6.1 Download Data to Database6.2 View the Data File in the Database6.3 Output RES2D Data6.4 Add Terrian Data

    Appendix 1 Charging* Charging GD-10 Mainframe* Charging CL-10 Cable Leader* Charging BP-145 Power Source

    3.2 Script Management 1D VES script (Dipole-dipole array)3. Operation of Geomative Studio

    ContentST Geomative Co., Ltdwww.geomative.com

    Input a = OA = OB,Input b = 1/2*MN = OM = ON,Select Iteration number: 1~100,Select Add to add one record,Select Update to replace the selected record,Select Delete to delete the selected record.1. Overview of GD-10 system1.1 GD-10 Mainframe1.2 CL-10 Cable Leader1.3 12 Take-outs Cable1.4 Winch and Starlike Electrode1.5 BP-145 DC Power Source

    2. Registration

    3. Operation of Geomative Studio3.1 Project Management3.2 Script Management

    4. Upload files to GD-10 Mainframe

    5. Operation of GD-10 Mainframe5.1 Start GD-10 Mainframe5.2 Device Management5.3 Create New Measurement5.4 Get GPS Coordinates 5.5 1D VES Measurement5.6 2D ERI Measurement5.7 3D Measurement

    6. Data Management6.1 Download Data to Database6.2 View the Data File in the Database6.3 Output RES2D Data6.4 Add Terrian Data

    Appendix 1 Charging* Charging GD-10 Mainframe* Charging CL-10 Cable Leader* Charging BP-145 Power Source

    3.2 Script Management 1D VES script (3P VES array)3. Operation of Geomative Studio

    ContentST Geomative Co., Ltdwww.geomative.com

    Input a = 1/2 * AB,Input b = 1/2 * MN,Input Gridding x*y,Input Row Spacing,Input Col Spacing,Select Iteration number: 1~100,Select Add to add one record,Select Update to replace the selected record,Select Delete to delete the selected record.1. Overview of GD-10 system1.1 GD-10 Mainframe1.2 CL-10 Cable Leader1.3 12 Take-outs Cable1.4 Winch and Starlike Electrode1.5 BP-145 DC Power Source

    2. Registration

    3. Operation of Geomative Studio3.1 Project Management3.2 Script Management

    4. Upload files to GD-10 Mainframe

    5. Operation of GD-10 Mainframe5.1 Start GD-10 Mainframe5.2 Device Management5.3 Create New Measurement5.4 Get GPS Coordinates 5.5 1D VES Measurement5.6 2D ERI Measurement5.7 3D Measurement

    6. Data Management6.1 Download Data to Database6.2 View the Data File in the Database6.3 Output RES2D Data6.4 Add Terrian Data

    Appendix 1 Charging* Charging GD-10 Mainframe* Charging CL-10 Cable Leader* Charging BP-145 Power Source

    3. Operation of Geomative Studio3.2 Script Management 1D VES script (RECTGL array)

    ContentST Geomative Co., Ltdwww.geomative.com

    Input a,Input b,Input x,Input y,Input K,Select Iteration number: 1~100,Select Add to add one record,Select Update to replace the selected record,Select Delete to delete the selected record.1. Overview of GD-10 system1.1 GD-10 Mainframe1.2 CL-10 Cable Leader1.3 12 Take-outs Cable1.4 Winch and Starlike Electrode1.5 BP-145 DC Power Source

    2. Registration

    3. Operation of Geomative Studio3.1 Project Management3.2 Script Management

    4. Upload files to GD-10 Mainframe

    5. Operation of GD-10 Mainframe5.1 Start GD-10 Mainframe5.2 Device Management5.3 Create New Measurement5.4 Get GPS Coordinates 5.5 1D VES Measurement5.6 2D ERI Measurement5.7 3D Measurement

    6. Data Management6.1 Download Data to Database6.2 View the Data File in the Database6.3 Output RES2D Data6.4 Add Terrian Data

    Appendix 1 Charging* Charging GD-10 Mainframe* Charging CL-10 Cable Leader* Charging BP-145 Power Source

    3. Operation of Geomative Studio3.2 Script Management 1D VES script (Custom array)

    ContentST Geomative Co., Ltdwww.geomative.com

    Select Manage Script Operate Create New Script in the toolbarSelect Create New Script in right-click menu1. Overview of GD-10 system1.1 GD-10 Mainframe1.2 CL-10 Cable Leader1.3 12 Take-outs Cable1.4 Winch and Starlike Electrode1.5 BP-145 DC Power Source

    2. Registration

    3. Operation of Geomative Studio3.1 Project Management3.2 Script Management

    4. Upload files to GD-10 Mainframe

    5. Operation of GD-10 Mainframe5.1 Start GD-10 Mainframe5.2 Device Management5.3 Create New Measurement5.4 Get GPS Coordinates 5.5 1D VES Measurement5.6 2D ERI Measurement5.7 3D Measurement

    6. Data Management6.1 Download Data to Database6.2 View the Data File in the Database6.3 Output RES2D Data6.4 Add Terrian Data

    Appendix 1 Charging* Charging GD-10 Mainframe* Charging CL-10 Cable Leader* Charging BP-145 Power Source

    3. Operation of Geomative Studio3.2 Script Management create 2D new script

    ContentST Geomative Co., Ltdwww.geomative.com

    Script display by imageScript displayed in formParameters of Script1. Overview of GD-10 system1.1 GD-10 Mainframe1.2 CL-10 Cable Leader1.3 12 Take-outs Cable1.4 Winch and Starlike Electrode1.5 BP-145 DC Power Source

    2. Registration

    3. Operation of Geomative Studio3.1 Project Management3.2 Script Management

    4. Upload files to GD-10 Mainframe

    5. Operation of GD-10 Mainframe5.1 Start GD-10 Mainframe5.2 Device Management5.3 Create New Measurement5.4 Get GPS Coordinates 5.5 1D VES Measurement5.6 2D ERI Measurement5.7 3D Measurement

    6. Data Management6.1 Download Data to Database6.2 View the Data File in the Database6.3 Output RES2D Data6.4 Add Terrian Data

    Appendix 1 Charging* Charging GD-10 Mainframe* Charging CL-10 Cable Leader* Charging BP-145 Power Source

    3. Operation of Geomative Studio3.2 Script Management set parameter for 2D Script

    ContentST Geomative Co., Ltdwww.geomative.com

    Input Script Name,Input Operator,Select Creation date,Input Remark Information.Select Electrode number,Select Array,Press OK to generate preview script.Note: The item with * in front is required.1. Overview of GD-10 system1.1 GD-10 Mainframe1.2 CL-10 Cable Leader1.3 12 Take-outs Cable1.4 Winch and Starlike Electrode1.5 BP-145 DC Power Source

    2. Registration

    3. Operation of Geomative Studio3.1 Project Management3.2 Script Management

    4. Upload files to GD-10 Mainframe

    5. Operation of GD-10 Mainframe5.1 Start GD-10 Mainframe5.2 Device Management5.3 Create New Measurement5.4 Get GPS Coordinates 5.5 1D VES Measurement5.6 2D ERI Measurement5.7 3D Measurement

    6. Data Management6.1 Download Data to Database6.2 View the Data File in the Database6.3 Output RES2D Data6.4 Add Terrian Data

    Appendix 1 Charging* Charging GD-10 Mainframe* Charging CL-10 Cable Leader* Charging BP-145 Power Source

    3. Operation of Geomative Studio3.2 Script Management general parameter of 2D Script

    ContentST Geomative Co., Ltdwww.geomative.com

    Select points in the form by add in front of the point. Select points in the image, the selected points will turn to green. 1. Overview of GD-10 system1.1 GD-10 Mainframe1.2 CL-10 Cable Leader1.3 12 Take-outs Cable1.4 Winch and Starlike Electrode1.5 BP-145 DC Power Source

    2. Registration

    3. Operation of Geomative Studio3.1 Project Management3.2 Script Management

    4. Upload files to GD-10 Mainframe

    5. Operation of GD-10 Mainframe5.1 Start GD-10 Mainframe5.2 Device Management5.3 Create New Measurement5.4 Get GPS Coordinates 5.5 1D VES Measurement5.6 2D ERI Measurement5.7 3D Measurement

    6. Data Management6.1 Download Data to Database6.2 View the Data File in the Database6.3 Output RES2D Data6.4 Add Terrian Data

    Appendix 1 Charging* Charging GD-10 Mainframe* Charging CL-10 Cable Leader* Charging BP-145 Power Source

    3. Operation of Geomative Studio3.2 Script Management choose the 2D Script you need

    ContentST Geomative Co., Ltdwww.geomative.com

    Effective range:Current point,Current layor,Current and all below layors,Current and to specified layers

    Iteration number 1~100 times selectableSelect Modify iteration number in right-click menu.1. Overview of GD-10 system1.1 GD-10 Mainframe1.2 CL-10 Cable Leader1.3 12 Take-outs Cable1.4 Winch and Starlike Electrode1.5 BP-145 DC Power Source

    2. Registration

    3. Operation of Geomative Studio3.1 Project Management3.2 Script Management

    4. Upload files to GD-10 Mainframe

    5. Operation of GD-10 Mainframe5.1 Start GD-10 Mainframe5.2 Device Management5.3 Create New Measurement5.4 Get GPS Coordinates 5.5 1D VES Measurement5.6 2D ERI Measurement5.7 3D Measurement

    6. Data Management6.1 Download Data to Database6.2 View the Data File in the Database6.3 Output RES2D Data6.4 Add Terrian Data

    Appendix 1 Charging* Charging GD-10 Mainframe* Charging CL-10 Cable Leader* Charging BP-145 Power Source

    3. Operation of Geomative Studio3.2 Script Management modify iteration of 2D Script

    ContentST Geomative Co., Ltdwww.geomative.com

    There are 6 kinds of 2D arrays available in Geomative now.Wenner Wenner Wenner A array ;B array;Schlumberger.Note: There will be more arrays can be used for GD-10 in the future, we will update Geomative continuously.1. Overview of GD-10 system1.1 GD-10 Mainframe1.2 CL-10 Cable Leader1.3 12 Take-outs Cable1.4 Winch and Starlike Electrode1.5 BP-145 DC Power Source

    2. Registration

    3. Operation of Geomative Studio3.1 Project Management3.2 Script Management

    4. Upload files to GD-10 Mainframe

    5. Operation of GD-10 Mainframe5.1 Start GD-10 Mainframe5.2 Device Management5.3 Create New Measurement5.4 Get GPS Coordinates 5.5 1D VES Measurement5.6 2D ERI Measurement5.7 3D Measurement

    6. Data Management6.1 Download Data to Database6.2 View the Data File in the Database6.3 Output RES2D Data6.4 Add Terrian Data

    Appendix 1 Charging* Charging GD-10 Mainframe* Charging CL-10 Cable Leader* Charging BP-145 Power Source

    3. Operation of Geomative Studio3.2 Script Management available arrays of 2D Script

    ContentST Geomative Co., Ltdwww.geomative.com

    AM=MN=NBk=2a MN=a1. Overview of GD-10 system1.1 GD-10 Mainframe1.2 CL-10 Cable Leader1.3 12 Take-outs Cable1.4 Winch and Starlike Electrode1.5 BP-145 DC Power Source

    2. Registration

    3. Operation of Geomative Studio3.1 Project Management3.2 Script Management

    4. Upload files to GD-10 Mainframe

    5. Operation of GD-10 Mainframe5.1 Start GD-10 Mainframe5.2 Device Management5.3 Create New Measurement5.4 Get GPS Coordinates 5.5 1D VES Measurement5.6 2D ERI Measurement5.7 3D Measurement

    6. Data Management6.1 Download Data to Database6.2 View the Data File in the Database6.3 Output RES2D Data6.4 Add Terrian Data

    Appendix 1 Charging* Charging GD-10 Mainframe* Charging CL-10 Cable Leader* Charging BP-145 Power Source

    3. Operation of Geomative Studio3.2 Script Management available arrays of 2D Script (Wenner )

    ContentST Geomative Co., Ltdwww.geomative.com

    AB=BM=MN k=6a AB=BM=MN=a1. Overview of GD-10 system1.1 GD-10 Mainframe1.2 CL-10 Cable Leader1.3 12 Take-outs Cable1.4 Winch and Starlike Electrode1.5 BP-145 DC Power Source

    2. Registration

    3. Operation of Geomative Studio3.1 Project Management3.2 Script Management

    4. Upload files to GD-10 Mainframe

    5. Operation of GD-10 Mainframe5.1 Start GD-10 Mainframe5.2 Device Management5.3 Create New Measurement5.4 Get GPS Coordinates 5.5 1D VES Measurement5.6 2D ERI Measurement5.7 3D Measurement

    6. Data Management6.1 Download Data to Database6.2 View the Data File in the Database6.3 Output RES2D Data6.4 Add Terrian Data

    Appendix 1 Charging* Charging GD-10 Mainframe* Charging CL-10 Cable Leader* Charging BP-145 Power Source

    3. Operation of Geomative Studio3.2 Script Management available arrays of 2D Script (Wenner )

    ContentST Geomative Co., Ltdwww.geomative.com

    AM=MB=BN k=3a AM=MB=BN=a1. Overview of GD-10 system1.1 GD-10 Mainframe1.2 CL-10 Cable Leader1.3 12 Take-outs Cable1.4 Winch and Starlike Electrode1.5 BP-145 DC Power Source

    2. Registration

    3. Operation of Geomative Studio3.1 Project Management3.2 Script Management

    4. Upload files to GD-10 Mainframe

    5. Operation of GD-10 Mainframe5.1 Start GD-10 Mainframe5.2 Device Management5.3 Create New Measurement5.4 Get GPS Coordinates 5.5 1D VES Measurement5.6 2D ERI Measurement5.7 3D Measurement

    6. Data Management6.1 Download Data to Database6.2 View the Data File in the Database6.3 Output RES2D Data6.4 Add Terrian Data

    Appendix 1 Charging* Charging GD-10 Mainframe* Charging CL-10 Cable Leader* Charging BP-145 Power Source

    3. Operation of Geomative Studio3.2 Script Management available arrays of 2D Script (Wenner )

    ContentST Geomative Co., Ltdwww.geomative.com

    B to infinityAM=MB=BN k=4a AM=MN=a1. Overview of GD-10 system1.1 GD-10 Mainframe1.2 CL-10 Cable Leader1.3 12 Take-outs Cable1.4 Winch and Starlike Electrode1.5 BP-145 DC Power Source

    2. Registration

    3. Operation of Geomative Studio3.1 Project Management3.2 Script Management

    4. Upload files to GD-10 Mainframe

    5. Operation of GD-10 Mainframe5.1 Start GD-10 Mainframe5.2 Device Management5.3 Create New Measurement5.4 Get GPS Coordinates 5.5 1D VES Measurement5.6 2D ERI Measurement5.7 3D Measurement

    6. Data Management6.1 Download Data to Database6.2 View the Data File in the Database6.3 Output RES2D Data6.4 Add Terrian Data

    Appendix 1 Charging* Charging GD-10 Mainframe* Charging CL-10 Cable Leader* Charging BP-145 Power Source

    3. Operation of Geomative Studio3.2 Script Management available arrays of 2D Script (A array)

    ContentST Geomative Co., Ltdwww.geomative.com

    MN=NB k=3a MN=NB =aA to infinity1. Overview of GD-10 system1.1 GD-10 Mainframe1.2 CL-10 Cable Leader1.3 12 Take-outs Cable1.4 Winch and Starlike Electrode1.5 BP-145 DC Power Source

    2. Registration

    3. Operation of Geomative Studio3.1 Project Management3.2 Script Management

    4. Upload files to GD-10 Mainframe

    5. Operation of GD-10 Mainframe5.1 Start GD-10 Mainframe5.2 Device Management5.3 Create New Measurement5.4 Get GPS Coordinates 5.5 1D VES Measurement5.6 2D ERI Measurement5.7 3D Measurement

    6. Data Management6.1 Download Data to Database6.2 View the Data File in the Database6.3 Output RES2D Data6.4 Add Terrian Data

    Appendix 1 Charging* Charging GD-10 Mainframe* Charging CL-10 Cable Leader* Charging BP-145 Power Source

    3. Operation of Geomative Studio3.2 Script Management available arrays of 2D Script (B array)

    ContentST Geomative Co., Ltdwww.geomative.com

    AM=MN=NB k=3a AM=NB=na, MN=a1. Overview of GD-10 system1.1 GD-10 Mainframe1.2 CL-10 Cable Leader1.3 12 Take-outs Cable1.4 Winch and Starlike Electrode1.5 BP-145 DC Power Source

    2. Registration

    3. Operation of Geomative Studio3.1 Project Management3.2 Script Management

    4. Upload files to GD-10 Mainframe

    5. Operation of GD-10 Mainframe5.1 Start GD-10 Mainframe5.2 Device Management5.3 Create New Measurement5.4 Get GPS Coordinates 5.5 1D VES Measurement5.6 2D ERI Measurement5.7 3D Measurement

    6. Data Management6.1 Download Data to Database6.2 View the Data File in the Database6.3 Output RES2D Data6.4 Add Terrian Data

    Appendix 1 Charging* Charging GD-10 Mainframe* Charging CL-10 Cable Leader* Charging BP-145 Power Source

    3. Operation of Geomative Studio3.2 Script Management available arrays of 2D Script (Schlumberger)

    ContentST Geomative Co., Ltdwww.geomative.com

    Select Manage Script Operate Delete script in the toolbar.Select Delete script in the right click menu.Select Yes to delete the script.1. Overview of GD-10 system1.1 GD-10 Mainframe1.2 CL-10 Cable Leader1.3 12 Take-outs Cable1.4 Winch and Starlike Electrode1.5 BP-145 DC Power Source

    2. Registration

    3. Operation of Geomative Studio3.1 Project Management3.2 Script Management

    4. Upload files to GD-10 Mainframe

    5. Operation of GD-10 Mainframe5.1 Start GD-10 Mainframe5.2 Device Management5.3 Create New Measurement5.4 Get GPS Coordinates 5.5 1D VES Measurement5.6 2D ERI Measurement5.7 3D Measurement

    6. Data Management6.1 Download Data to Database6.2 View the Data File in the Database6.3 Output RES2D Data6.4 Add Terrian Data

    Appendix 1 Charging* Charging GD-10 Mainframe* Charging CL-10 Cable Leader* Charging BP-145 Power Source

    3.2 Script Management Delete Script 3. Operation of Geomative Studio

    ContentST Geomative Co., Ltdwww.geomative.com

    Select Manage Script Operate Create New Script in the toolbarSelect Create New Script in right-click menu1. Overview of GD-10 system1.1 GD-10 Mainframe1.2 CL-10 Cable Leader1.3 12 Take-outs Cable1.4 Winch and Starlike Electrode1.5 BP-145 DC Power Source

    2. Registration

    3. Operation of Geomative Studio3.1 Project Management3.2 Script Management

    4. Upload files to GD-10 Mainframe

    5. Operation of GD-10 Mainframe5.1 Start GD-10 Mainframe5.2 Device Management5.3 Create New Measurement5.4 Get GPS Coordinates 5.5 1D VES Measurement5.6 2D ERI Measurement5.7 3D Measurement

    6. Data Management6.1 Download Data to Database6.2 View the Data File in the Database6.3 Output RES2D Data6.4 Add Terrian Data

    Appendix 1 Charging* Charging GD-10 Mainframe* Charging CL-10 Cable Leader* Charging BP-145 Power Source

    3.2 Script Management Create 3D new Script 3. Operation of Geomative Studio

    ContentST Geomative Co., Ltdwww.geomative.com

    Input Script Name,Select Creation date,Input Remark Information.Input Operator,Select Array,InputElectrode number X,InputElectrode number Y,Input"gradient Pos in X",when Array select "gradient".Input"gradient Pos in Y",whenArray select "gradient".Press OK to generate preview script.Note: The item with * in front is required.1. Overview of GD-10 system1.1 GD-10 Mainframe1.2 CL-10 Cable Leader1.3 12 Take-outs Cable1.4 Winch and Starlike Electrode1.5 BP-145 DC Power Source

    2. Registration

    3. Operation of Geomative Studio3.1 Project Management3.2 Script Management

    4. Upload files to GD-10 Mainframe

    5. Operation of GD-10 Mainframe5.1 Start GD-10 Mainframe5.2 Device Management5.3 Create New Measurement5.4 Get GPS Coordinates 5.5 1D VES Measurement5.6 2D ERI Measurement5.7 3D Measurement

    6. Data Management6.1 Download Data to Database6.2 View the Data File in the Database6.3 Output RES2D Data6.4 Add Terrian Data

    Appendix 1 Charging* Charging GD-10 Mainframe* Charging CL-10 Cable Leader* Charging BP-145 Power Source

    3.2 Script Management General Parameters of 3D Script 3. Operation of Geomative Studio

    ContentST Geomative Co., Ltdwww.geomative.com

    There are 7 kinds of 3D arrays available in Geomative now.Pole-PolePole-DipoleDipole-DipoleSchlumberger ;WennerAlfa;WennerBetaGradient.

    Note: There will be more arrays can be used for GD-10 in the future, we will update Geomative continuously.1. Overview of GD-10 system1.1 GD-10 Mainframe1.2 CL-10 Cable Leader1.3 12 Take-outs Cable1.4 Winch and Starlike Electrode1.5 BP-145 DC Power Source

    2. Registration

    3. Operation of Geomative Studio3.1 Project Management3.2 Script Management

    4. Upload files to GD-10 Mainframe

    5. Operation of GD-10 Mainframe5.1 Start GD-10 Mainframe5.2 Device Management5.3 Create New Measurement5.4 Get GPS Coordinates 5.5 1D VES Measurement5.6 2D ERI Measurement5.7 3D Measurement

    6. Data Management6.1 Download Data to Database6.2 View the Data File in the Database6.3 Output RES2D Data6.4 Add Terrian Data

    Appendix 1 Charging* Charging GD-10 Mainframe* Charging CL-10 Cable Leader* Charging BP-145 Power Source

    3.2 Script Management Available Arrays of 3D Script 3. Operation of Geomative Studio

    ContentST Geomative Co., Ltdwww.geomative.com

    Script NameScript TypeScript propertiesScript details1. Overview of GD-10 system1.1 GD-10 Mainframe1.2 CL-10 Cable Leader1.3 12 Take-outs Cable1.4 Winch and Starlike Electrode1.5 BP-145 DC Power Source

    2. Registration

    3. Operation of Geomative Studio3.1 Project Management3.2 Script Management

    4. Upload files to GD-10 Mainframe

    5. Operation of GD-10 Mainframe5.1 Start GD-10 Mainframe5.2 Device Management5.3 Create New Measurement5.4 Get GPS Coordinates 5.5 1D VES Measurement5.6 2D ERI Measurement5.7 3D Measurement

    6. Data Management6.1 Download Data to Database6.2 View the Data File in the Database6.3 Output RES2D Data6.4 Add Terrian Data

    Appendix 1 Charging* Charging GD-10 Mainframe* Charging CL-10 Cable Leader* Charging BP-145 Power Source

    3.2 Script Management details of 3D Script 3. Operation of Geomative Studio

    ContentST Geomative Co., Ltdwww.geomative.com

    4. Upload files to GD-10 mainframe4.1 Synchronization GeomatIve Studio and GD-10 MainframeConnect GD-10 and computer by communication cable,Start Geomative and power on GD-10,Wait for a few seconds, Geomative shows a message Find GD-10 on com ,Wait for another few seconds, Geomative is synchronization data from GD-10 (in these few seconds, please dont control Geomative),Select Function Synchronization to enter to the GD-10 management page on Geomative.1. Overview of GD-10 system1.1 GD-10 Mainframe1.2 CL-10 Cable Leader1.3 12 Take-outs Cable1.4 Winch and Starlike Electrode1.5 BP-145 DC Power Source

    2. Registration

    3. Operation of Geomative Studio3.1 Project Management3.2 Script Management

    4. Upload files to GD-10 Mainframe

    5. Operation of GD-10 Mainframe5.1 Start GD-10 Mainframe5.2 Device Management5.3 Create New Measurement5.4 Get GPS Coordinates 5.5 1D VES Measurement5.6 2D ERI Measurement5.7 3D Measurement

    6. Data Management6.1 Download Data to Database6.2 View the Data File in the Database6.3 Output RES2D Data6.4 Add Terrian Data

    Appendix 1 Charging* Charging GD-10 Mainframe* Charging CL-10 Cable Leader* Charging BP-145 Power Source

    ContentST Geomative Co., Ltdwww.geomative.com

    4. Upload files to GD-10 mainframe4.2 Upload Project and test zoneSelect device in the list, then the data files in GD-10 will show in the synchronization window.

    2. Press New project to enter to the project and test zone list in Geomative;

    3. Select the Project and Test Zone which you want to upload;Note: You can not upload empty project into GD-10, which means there should be at least one test zone under the project.

    4. Select OK to start uploading Project and Test Zone.Note: It will take few seconds to upload each Project and Test Zone, please wait.1. Overview of GD-10 system1.1 GD-10 Mainframe1.2 CL-10 Cable Leader1.3 12 Take-outs Cable1.4 Winch and Starlike Electrode1.5 BP-145 DC Power Source

    2. Registration

    3. Operation of Geomative Studio3.1 Project Management3.2 Script Management

    4. Upload files to GD-10 Mainframe

    5. Operation of GD-10 Mainframe5.1 Start GD-10 Mainframe5.2 Device Management5.3 Create New Measurement5.4 Get GPS Coordinates 5.5 1D VES Measurement5.6 2D ERI Measurement5.7 3D Measurement

    6. Data Management6.1 Download Data to Database6.2 View the Data File in the Database6.3 Output RES2D Data6.4 Add Terrian Data

    Appendix 1 Charging* Charging GD-10 Mainframe* Charging CL-10 Cable Leader* Charging BP-145 Power Source

    ContentST Geomative Co., Ltdwww.geomative.com

    Select the device again to refresh the status of GD-10, then you can see the new project and test zone in the list.If you want to see the new project in GD-10, please restart GD-10 to refresh the list, then you can check the projects, test zones which you uploaded in the GD-10.4. Upload files to GD-10 mainframe4.2 Upload Project and test zone1. Overview of GD-10 system1.1 GD-10 Mainframe1.2 CL-10 Cable Leader1.3 12 Take-outs Cable1.4 Winch and Starlike Electrode1.5 BP-145 DC Power Source

    2. Registration

    3. Operation of Geomative Studio3.1 Project Management3.2 Script Management

    4. Upload files to GD-10 Mainframe

    5. Operation of GD-10 Mainframe5.1 Start GD-10 Mainframe5.2 Device Management5.3 Create New Measurement5.4 Get GPS Coordinates 5.5 1D VES Measurement5.6 2D ERI Measurement5.7 3D Measurement

    6. Data Management6.1 Download Data to Database6.2 View the Data File in the Database6.3 Output RES2D Data6.4 Add Terrian Data

    Appendix 1 Charging* Charging GD-10 Mainframe* Charging CL-10 Cable Leader* Charging BP-145 Power Source

    ContentST Geomative Co., Ltdwww.geomative.com

    Select Script to enter to the script uploading page.There are two list of script:The first list Script in local shows the scripts in geomative,The second list Script in device shows the scripts in GD-10.4. Upload files to GD-10 mainframe4.3 upload script1. Overview of GD-10 system1.1 GD-10 Mainframe1.2 CL-10 Cable Leader1.3 12 Take-outs Cable1.4 Winch and Starlike Electrode1.5 BP-145 DC Power Source

    2. Registration

    3. Operation of Geomative Studio3.1 Project Management3.2 Script Management

    4. Upload files to GD-10 Mainframe

    5. Operation of GD-10 Mainframe5.1 Start GD-10 Mainframe5.2 Device Management5.3 Create New Measurement5.4 Get GPS Coordinates 5.5 1D VES Measurement5.6 2D ERI Measurement5.7 3D Measurement

    6. Data Management6.1 Download Data to Database6.2 View the Data File in the Database6.3 Output RES2D Data6.4 Add Terrian Data

    Appendix 1 Charging* Charging GD-10 Mainframe* Charging CL-10 Cable Leader* Charging BP-145 Power Source

    ContentST Geomative Co., Ltdwww.geomative.com

    Select the scripts which you want to upload in Script in local,Click Download to download them to GD-10,Check the script in GD-10.4. Upload files to GD-10 mainframe4.3 upload script1. Overview of GD-10 system1.1 GD-10 Mainframe1.2 CL-10 Cable Leader1.3 12 Take-outs Cable1.4 Winch and Starlike Electrode1.5 BP-145 DC Power Source

    2. Registration

    3. Operation of Geomative Studio3.1 Project Management3.2 Script Management

    4. Upload files to GD-10 Mainframe

    5. Operation of GD-10 Mainframe5.1 Start GD-10 Mainframe5.2 Device Management5.3 Create New Measurement5.4 Get GPS Coordinates 5.5 1D VES Measurement5.6 2D ERI Measurement5.7 3D Measurement

    6. Data Management6.1 Download Data to Database6.2 View the Data File in the Database6.3 Output RES2D Data6.4 Add Terrian Data

    Appendix 1 Charging* Charging GD-10 Mainframe* Charging CL-10 Cable Leader* Charging BP-145 Power Source

    ContentST Geomative Co., Ltdwww.geomative.com

    2. The LCD screen will show the boot screen for about 3s;1. Power on GD-10 by switching the switcher on left panel.3. It will turn to the main page of Project management after boot screen.5. Operation of GD-10 Mainframe5.1 Start GD-10 Mainframe1. Overview of GD-10 system1.1 GD-10 Mainframe1.2 CL-10 Cable Leader1.3 12 Take-outs Cable1.4 Winch and Starlike Electrode1.5 BP-145 DC Power Source

    2. Registration

    3. Operation of Geomative Studio3.1 Project Management3.2 Script Management

    4. Upload files to GD-10 Mainframe

    5. Operation of GD-10 Mainframe5.1 Start GD-10 Mainframe5.2 Device Management5.3 Create New Measurement5.4 Get GPS Coordinates 5.5 1D VES Measurement5.6 2D ERI Measurement5.7 3D Measurement

    6. Data Management6.1 Download Data to Database6.2 View the Data File in the Database6.3 Output RES2D Data6.4 Add Terrian Data

    Appendix 1 Charging* Charging GD-10 Mainframe* Charging CL-10 Cable Leader* Charging BP-145 Power Source

    ContentST Geomative Co., Ltdwww.geomative.com

    Select device, enter to the device and view the specification of your device.Press F2 to enter home page of device management.5. Operation of GD-10 Mainframe5.2 Device management1. Overview of GD-10 system1.1 GD-10 Mainframe1.2 CL-10 Cable Leader1.3 12 Take-outs Cable1.4 Winch and Starlike Electrode1.5 BP-145 DC Power Source

    2. Registration

    3. Operation of Geomative Studio3.1 Project Management3.2 Script Management

    4. Upload files to GD-10 Mainframe

    5. Operation of GD-10 Mainframe5.1 Start GD-10 Mainframe5.2 Device Management5.3 Create New Measurement5.4 Get GPS Coordinates 5.5 1D VES Measurement5.6 2D ERI Measurement5.7 3D Measurement

    6. Data Management6.1 Download Data to Database6.2 View the Data File in the Database6.3 Output RES2D Data6.4 Add Terrian Data

    Appendix 1 Charging* Charging GD-10 Mainframe* Charging CL-10 Cable Leader* Charging BP-145 Power Source

    ContentST Geomative Co., Ltdwww.geomative.com

    5. Operation of GD-10 Mainframe5.2 Device ManagementNote: Please fill the environment parameter as detailed as you can, it will be very helpful for the after work.Especially the electrode spacing, please set it before create new measurement. If not, the Ro will be wrong.Press "F2 to enter to " environmental parameters" page.In " environmental parameters" page, you can set environmental parameters.1. Overview of GD-10 system1.1 GD-10 Mainframe1.2 CL-10 Cable Leader1.3 12 Take-outs Cable1.4 Winch and Starlike Electrode1.5 BP-145 DC Power Source

    2. Registration

    3. Operation of Geomative Studio3.1 Project Management3.2 Script Management

    4. Upload files to GD-10 Mainframe

    5. Operation of GD-10 Mainframe5.1 Start GD-10 Mainframe5.2 Device Management5.3 Create New Measurement5.4 Get GPS Coordinates 5.5 1D VES Measurement5.6 2D ERI Measurement5.7 3D Measurement

    6. Data Management6.1 Download Data to Database6.2 View the Data File in the Database6.3 Output RES2D Data6.4 Add Terrian Data

    Appendix 1 Charging* Charging GD-10 Mainframe* Charging CL-10 Cable Leader* Charging BP-145 Power Source

    ContentST Geomative Co., Ltdwww.geomative.com

    Press Menu, then select Update device to connect GPS and refresh the status of GD-10.Select Cable-layout parttern,Input Electrode step,Input Electrode spacing,Input Weather,Input Wind,Input Temperature,Input Humidity,Set Max Rg.5. Operation of GD-10 Mainframe5.2 Device Management - set environmental parameters 1. Overview of GD-10 system1.1 GD-10 Mainframe1.2 CL-10 Cable Leader1.3 12 Take-outs Cable1.4 Winch and Starlike Electrode1.5 BP-145 DC Power Source

    2. Registration

    3. Operation of Geomative Studio3.1 Project Management3.2 Script Management

    4. Upload files to GD-10 Mainframe

    5. Operation of GD-10 Mainframe5.1 Start GD-10 Mainframe5.2 Device Management5.3 Create New Measurement5.4 Get GPS Coordinates 5.5 1D VES Measurement5.6 2D ERI Measurement5.7 3D Measurement

    6. Data Management6.1 Download Data to Database6.2 View the Data File in the Database6.3 Output RES2D Data6.4 Add Terrian Data

    Appendix 1 Charging* Charging GD-10 Mainframe* Charging CL-10 Cable Leader* Charging BP-145 Power Source

    ContentST Geomative Co., Ltdwww.geomative.com

    5. Operation of GD-10 Mainframe5.3 Create new measurementBack to the project main page.Select project, press "Menu" to show the pop-up Menu.1. Overview of GD-10 system1.1 GD-10 Mainframe1.2 CL-10 Cable Leader1.3 12 Take-outs Cable1.4 Winch and Starlike Electrode1.5 BP-145 DC Power Source

    2. Registration

    3. Operation of Geomative Studio3.1 Project Management3.2 Script Management

    4. Upload files to GD-10 Mainframe

    5. Operation of GD-10 Mainframe5.1 Start GD-10 Mainframe5.2 Device Management5.3 Create New Measurement5.4 Get GPS Coordinates 5.5 1D VES Measurement5.6 2D ERI Measurement5.7 3D Measurement

    6. Data Management6.1 Download Data to Database6.2 View the Data File in the Database6.3 Output RES2D Data6.4 Add Terrian Data

    Appendix 1 Charging* Charging GD-10 Mainframe* Charging CL-10 Cable Leader* Charging BP-145 Power Source

    ContentST Geomative Co., Ltdwww.geomative.com

    In the menu select "new test" to show the "new test" attribute editor page.Set "new testing" parameters- Name- Zone- Site- Script- Method- Waveform- Frequency- Sample rateModeOperator QA5. Operation of GD-10 Mainframe5.3 Create new measurement1. Overview of GD-10 system1.1 GD-10 Mainframe1.2 CL-10 Cable Leader1.3 12 Take-outs Cable1.4 Winch and Starlike Electrode1.5 BP-145 DC Power Source

    2. Registration

    3. Operation of Geomative Studio3.1 Project Management3.2 Script Management

    4. Upload files to GD-10 Mainframe

    5. Operation of GD-10 Mainframe5.1 Start GD-10 Mainframe5.2 Device Management5.3 Create New Measurement5.4 Get GPS Coordinates 5.5 1D VES Measurement5.6 2D ERI Measurement5.7 3D Measurement

    6. Data Management6.1 Download Data to Database6.2 View the Data File in the Database6.3 Output RES2D Data6.4 Add Terrian Data

    Appendix 1 Charging* Charging GD-10 Mainframe* Charging CL-10 Cable Leader* Charging BP-145 Power Source

    ContentST Geomative Co., Ltdwww.geomative.com

    Press F4 to save the measurement which you createdIf you created a VES task, it will be saved in the VES list,If you created a ERI task, it will be saved in ERI list.You can view the new task in the task list.5. Operation of GD-10 Mainframe5.3 Create new measurement - Save new measurement1. Overview of GD-10 system1.1 GD-10 Mainframe1.2 CL-10 Cable Leader1.3 12 Take-outs Cable1.4 Winch and Starlike Electrode1.5 BP-145 DC Power Source

    2. Registration

    3. Operation of Geomative Studio3.1 Project Management3.2 Script Management

    4. Upload files to GD-10 Mainframe

    5. Operation of GD-10 Mainframe5.1 Start GD-10 Mainframe5.2 Device Management5.3 Create New Measurement5.4 Get GPS Coordinates 5.5 1D VES Measurement5.6 2D ERI Measurement5.7 3D Measurement

    6. Data Management6.1 Download Data to Database6.2 View the Data File in the Database6.3 Output RES2D Data6.4 Add Terrian Data

    Appendix 1 Charging* Charging GD-10 Mainframe* Charging CL-10 Cable Leader* Charging BP-145 Power Source

    ContentST Geomative Co., Ltdwww.geomative.com

    Enter to the main page,Press "F2" into the "device management" interface,Press "F2" into the "environment parameter" interface,Press "Menu" to show the menu,Select "update device", GD - 10 began to search the GPS signals, the coordinates for the GD-10If search signal failed, then repeat the operation of 4, 5.5. Operation of GD-10 Mainframe5.4 Get GPS Coordinates1. Overview of GD-10 system1.1 GD-10 Mainframe1.2 CL-10 Cable Leader1.3 12 Take-outs Cable1.4 Winch and Starlike Electrode1.5 BP-145 DC Power Source

    2. Registration

    3. Operation of Geomative Studio3.1 Project Management3.2 Script Management

    4. Upload files to GD-10 Mainframe

    5. Operation of GD-10 Mainframe5.1 Start GD-10 Mainframe5.2 Device Management5.3 Create New Measurement5.4 Get GPS Coordinates 5.5 1D VES Measurement5.6 2D ERI Measurement5.7 3D Measurement

    6. Data Management6.1 Download Data to Database6.2 View the Data File in the Database6.3 Output RES2D Data6.4 Add Terrian Data

    Appendix 1 Charging* Charging GD-10 Mainframe* Charging CL-10 Cable Leader* Charging BP-145 Power Source

    ContentST Geomative Co., Ltdwww.geomative.com

    Select the measurement you want in VES list.Press Knob to enter to the measurement and view the parameters of the measurement, to make sure all the parameters are OK.5. Operation of GD-10 Mainframe5.5 1D VES Measurement1. Overview of GD-10 system1.1 GD-10 Mainframe1.2 CL-10 Cable Leader1.3 12 Take-outs Cable1.4 Winch and Starlike Electrode1.5 BP-145 DC Power Source

    2. Registration

    3. Operation of Geomative Studio3.1 Project Management3.2 Script Management

    4. Upload files to GD-10 Mainframe

    5. Operation of GD-10 Mainframe5.1 Start GD-10 Mainframe5.2 Device Management5.3 Create New Measurement5.4 Get GPS Coordinates 5.5 1D VES Measurement5.6 2D ERI Measurement5.7 3D Measurement

    6. Data Management6.1 Download Data to Database6.2 View the Data File in the Database6.3 Output RES2D Data6.4 Add Terrian Data

    Appendix 1 Charging* Charging GD-10 Mainframe* Charging CL-10 Cable Leader* Charging BP-145 Power Source

    ContentST Geomative Co., Ltdwww.geomative.com

    Press "F3" into the "data detail " page.Select the point you want, then press F4 to measure this point,Turn the knob to choose next point, continue to measure,Test each measurement data points on the list, until the VES is finished.5.5 1D VES Measurement5. Operation of GD-10 Mainframe1. Overview of GD-10 system1.1 GD-10 Mainframe1.2 CL-10 Cable Leader1.3 12 Take-outs Cable1.4 Winch and Starlike Electrode1.5 BP-145 DC Power Source

    2. Registration

    3. Operation of Geomative Studio3.1 Project Management3.2 Script Management

    4. Upload files to GD-10 Mainframe

    5. Operation of GD-10 Mainframe5.1 Start GD-10 Mainframe5.2 Device Management5.3 Create New Measurement5.4 Get GPS Coordinates 5.5 1D VES Measurement5.6 2D ERI Measurement5.7 3D Measurement

    6. Data Management6.1 Download Data to Database6.2 View the Data File in the Database6.3 Output RES2D Data6.4 Add Terrian Data

    Appendix 1 Charging* Charging GD-10 Mainframe* Charging CL-10 Cable Leader* Charging BP-145 Power Source

    ContentST Geomative Co., Ltdwww.geomative.com

    If the repeated measurement of a point, the point will generate a plurality of data;Each measurement data is automatically saved, after the measurement of direct exit.Select a measurement point, press the "knob", enter the point data detail page, view the details of the data point.5. Operation of GD-10 Mainframe5.5 1D VES Measurement1. Overview of GD-10 system1.1 GD-10 Mainframe1.2 CL-10 Cable Leader1.3 12 Take-outs Cable1.4 Winch and Starlike Electrode1.5 BP-145 DC Power Source

    2. Registration

    3. Operation of Geomative Studio3.1 Project Management3.2 Script Management

    4. Upload files to GD-10 Mainframe

    5. Operation of GD-10 Mainframe5.1 Start GD-10 Mainframe5.2 Device Management5.3 Create New Measurement5.4 Get GPS Coordinates 5.5 1D VES Measurement5.6 2D ERI Measurement5.7 3D Measurement

    6. Data Management6.1 Download Data to Database6.2 View the Data File in the Database6.3 Output RES2D Data6.4 Add Terrian Data

    Appendix 1 Charging* Charging GD-10 Mainframe* Charging CL-10 Cable Leader* Charging BP-145 Power Source

    ContentST Geomative Co., Ltdwww.geomative.com

    Inject the electrodes in to the ground.Layout the cables by using the winches.Connect the electrodes to the cable take-outs.Note: Please connect to the side which is nearer to the GD-10 main frame.Connect the cables and cable leaders.Note: The input side of cable leader (with a GD-10 mark on the side) should be close to GD-10 main frame.5.6 2D ERI Measurement- Layout5. Operation of GD-10 MainframeThe electrode should be connected to the side which is nearer to the GD-10 main frame.1. Overview of GD-10 system1.1 GD-10 Mainframe1.2 CL-10 Cable Leader1.3 12 Take-outs Cable1.4 Winch and Starlike Electrode1.5 BP-145 DC Power Source

    2. Registration

    3. Operation of Geomative Studio3.1 Project Management3.2 Script Management

    4. Upload files to GD-10 Mainframe

    5. Operation of GD-10 Mainframe5.1 Start GD-10 Mainframe5.2 Device Management5.3 Create New Measurement5.4 Get GPS Coordinates 5.5 1D VES Measurement5.6 2D ERI Measurement5.7 3D Measurement

    6. Data Management6.1 Download Data to Database6.2 View the Data File in the Database6.3 Output RES2D Data6.4 Add Terrian Data

    Appendix 1 Charging* Charging GD-10 Mainframe* Charging CL-10 Cable Leader* Charging BP-145 Power Source

    ContentST Geomative Co., Ltdwww.geomative.com

    5.6 2D ERI Measurement - Check cable leaderSelect Device Cable Head, to renew the status of cable leader.You can check if every cable leader is connecting well. If not, you can check the wrong connection point in time.Select update equipment state in the right click menu.Note: Check the internal power for each cable leader, make sure that the voltage of each cable leader is higher than 7.2V, better to make the voltage higher than 7.5V.5. Operation of GD-10 Mainframe1. Overview of GD-10 system1.1 GD-10 Mainframe1.2 CL-10 Cable Leader1.3 12 Take-outs Cable1.4 Winch and Starlike Electrode1.5 BP-145 DC Power Source

    2. Registration

    3. Operation of Geomative Studio3.1 Project Management3.2 Script Management

    4. Upload files to GD-10 Mainframe

    5. Operation of GD-10 Mainframe5.1 Start GD-10 Mainframe5.2 Device Management5.3 Create New Measurement5.4 Get GPS Coordinates 5.5 1D VES Measurement5.6 2D ERI Measurement5.7 3D Measurement

    6. Data Management6.1 Download Data to Database6.2 View the Data File in the Database6.3 Output RES2D Data6.4 Add Terrian Data

    Appendix 1 Charging* Charging GD-10 Mainframe* Charging CL-10 Cable Leader* Charging BP-145 Power Source

    ContentST Geomative Co., Ltdwww.geomative.com

    5.6 2D ERI Measurement - Measure RG5. Operation of GD-10 MainframeMeasure the Rg (Grounding Resistivity) to make sure that all the electrodes are in the good connection with the ground.If the Rg is high than the Max Rg which you set in the enviroment parameters, there will be a * in front of the electrode, that means there are some bad connection for that electrode, then you need to do something with that to reduce the Rg.Get latest data Refresh Rg,Pre cable measure the Rg of previous cable,Next cable measure the Rg of next cable,Remeasure current cable,Remeasure electrode,Remeasure faulty electrode, Remeasure all,1. Overview of GD-10 system1.1 GD-10 Mainframe1.2 CL-10 Cable Leader1.3 12 Take-outs Cable1.4 Winch and Starlike Electrode1.5 BP-145 DC Power Source

    2. Registration

    3. Operation of Geomative Studio3.1 Project Management3.2 Script Management

    4. Upload files to GD-10 Mainframe

    5. Operation of GD-10 Mainframe5.1 Start GD-10 Mainframe5.2 Device Management5.3 Create New Measurement5.4 Get GPS Coordinates 5.5 1D VES Measurement5.6 2D ERI Measurement5.7 3D Measurement

    6. Data Management6.1 Download Data to Database6.2 View the Data File in the Database6.3 Output RES2D Data6.4 Add Terrian Data

    Appendix 1 Charging* Charging GD-10 Mainframe* Charging CL-10 Cable Leader* Charging BP-145 Power Source

    ContentST Geomative Co., Ltdwww.geomative.com

    5.6 2D ERI Measurement5. Operation of GD-10 MainframeEnter to the main page;Select project in the project list, press the knob into project;Press "F2" into the test zone list;Select test zone in the test zone list, press the knob into the test zone;Press F3 to enter to the ERI list;1. Overview of GD-10 system1.1 GD-10 Mainframe1.2 CL-10 Cable Leader1.3 12 Take-outs Cable1.4 Winch and Starlike Electrode1.5 BP-145 DC Power Source

    2. Registration

    3. Operation of Geomative Studio3.1 Project Management3.2 Script Management

    4. Upload files to GD-10 Mainframe

    5. Operation of GD-10 Mainframe5.1 Start GD-10 Mainframe5.2 Device Management5.3 Create New Measurement5.4 Get GPS Coordinates 5.5 1D VES Measurement5.6 2D ERI Measurement5.7 3D Measurement

    6. Data Management6.1 Download Data to Database6.2 View the Data File in the Database6.3 Output RES2D Data6.4 Add Terrian Data

    Appendix 1 Charging* Charging GD-10 Mainframe* Charging CL-10 Cable Leader* Charging BP-145 Power Source

    ContentST Geomative Co., Ltdwww.geomative.com

    Select the measurement you want in ERI list.Press Knob to enter to the data point and view the parameters of the data point, to make sure all the parameters are OK.5.6 2D ERI Measurement5. Operation of GD-10 Mainframe1. Overview of GD-10 system1.1 GD-10 Mainframe1.2 CL-10 Cable Leader1.3 12 Take-outs Cable1.4 Winch and Starlike Electrode1.5 BP-145 DC Power Source

    2. Registration

    3. Operation of Geomative Studio3.1 Project Management3.2 Script Management

    4. Upload files to GD-10 Mainframe

    5. Operation of GD-10 Mainframe5.1 Start GD-10 Mainframe5.2 Device Management5.3 Create New Measurement5.4 Get GPS Coordinates 5.5 1D VES Measurement5.6 2D ERI Measurement5.7 3D Measurement

    6. Data Management6.1 Download Data to Database6.2 View the Data File in the Database6.3 Output RES2D Data6.4 Add Terrian Data

    Appendix 1 Charging* Charging GD-10 Mainframe* Charging CL-10 Cable Leader* Charging BP-145 Power Source

    ContentST Geomative Co., Ltdwww.geomative.com

    Press F3 to enter to data detail.Press Menu and select the measurement way you want:Re-measure cur measure the current point,Continue continue the measurement from current point,Re-measure all measure all the points.5.6 2D ERI Measurement5. Operation of GD-10 Mainframe1. Overview of GD-10 system1.1 GD-10 Mainframe1.2 CL-10 Cable Leader1.3 12 Take-outs Cable1.4 Winch and Starlike Electrode1.5 BP-145 DC Power Source

    2. Registration

    3. Operation of Geomative Studio3.1 Project Management3.2 Script Management

    4. Upload files to GD-10 Mainframe

    5. Operation of GD-10 Mainframe5.1 Start GD-10 Mainframe5.2 Device Management5.3 Create New Measurement5.4 Get GPS Coordinates 5.5 1D VES Measurement5.6 2D ERI Measurement5.7 3D Measurement

    6. Data Management6.1 Download Data to Database6.2 View the Data File in the Database6.3 Output RES2D Data6.4 Add Terrian Data

    Appendix 1 Charging* Charging GD-10 Mainframe* Charging CL-10 Cable Leader* Charging BP-145 Power Source

    ContentST Geomative Co., Ltdwww.geomative.com

    5.6 2D ERI Measurement5. Operation of GD-10 MainframeWhen the measurement is finished, GD-10 will save the data automatically.If you want to stop the measurement, please press Back, then wait for few seconds until screen shows measure has been stopped. Then you can operate GD-10.1. Overview of GD-10 system1.1 GD-10 Mainframe1.2 CL-10 Cable Leader1.3 12 Take-outs Cable1.4 Winch and Starlike Electrode1.5 BP-145 DC Power Source

    2. Registration

    3. Operation of Geomative Studio3.1 Project Management3.2 Script Management

    4. Upload files to GD-10 Mainframe

    5. Operation of GD-10 Mainframe5.1 Start GD-10 Mainframe5.2 Device Management5.3 Create New Measurement5.4 Get GPS Coordinates 5.5 1D VES Measurement5.6 2D ERI Measurement5.7 3D Measurement

    6. Data Management6.1 Download Data to Database6.2 View the Data File in the Database6.3 Output RES2D Data6.4 Add Terrian Data

    Appendix 1 Charging* Charging GD-10 Mainframe* Charging CL-10 Cable Leader* Charging BP-145 Power Source

    ContentST Geomative Co., Ltdwww.geomative.com

    Select Device Cable Head, to renew the status of cable leader.You can check if every cable leader is connecting well. If not, you can check the wrong connection point in time.Select update equipment state in the right click menu.

    Note: Check the internal power for each cable leader, make sure that the voltage of each cable leader is higher than 7.2V, better to make the voltage higher than 7.5V.5.7 3D Measurement- Check cable leader5. Operation of GD-10 Mainframe1. Overview of GD-10 system1.1 GD-10 Mainframe1.2 CL-10 Cable Leader1.3 12 Take-outs Cable1.4 Winch and Starlike Electrode1.5 BP-145 DC Power Source

    2. Registration

    3. Operation of Geomative Studio3.1 Project Management3.2 Script Management

    4. Upload files to GD-10 Mainframe

    5. Operation of GD-10 Mainframe5.1 Start GD-10 Mainframe5.2 Device Management5.3 Create New Measurement5.4 Get GPS Coordinates 5.5 1D VES Measurement5.6 2D ERI Measurement5.7 3D Measurement

    6. Data Management6.1 Download Data to Database6.2 View the Data File in the Database6.3 Output RES2D Data6.4 Add Terrian Data

    Appendix 1 Charging* Charging GD-10 Mainframe* Charging CL-10 Cable Leader* Charging BP-145 Power Source

    ContentST Geomative Co., Ltdwww.geomative.com

    Measure the Rg (Grounding Resistivity) to make sure that all the electrodes are in the good connection with the ground.If the Rg is high than the Max Rg which you set in the enviroment parameters, there will be a * in front of the electrode, that means there are some bad connection for that electrode, then you need to do something with that to reduce the Rg.Get latest data Refresh Rg,Pre cable measure the Rg of previous cable,Next cable measure the Rg of next cable,Remeasure current cable,Remeasure electrode,Remeasure faulty electrode, Remeasure all,5.7 Measure for 3D - Measure RG5. Operation of GD-10 Mainframe1. Overview of GD-10 system1.1 GD-10 Mainframe1.2 CL-10 Cable Leader1.3 12 Take-outs Cable1.4 Winch and Starlike Electrode1.5 BP-145 DC Power Source

    2. Registration

    3. Operation of Geomative Studio3.1 Project Management3.2 Script Management

    4. Upload files to GD-10 Mainframe

    5. Operation of GD-10 Mainframe5.1 Start GD-10 Mainframe5.2 Device Management5.3 Create New Measurement5.4 Get GPS Coordinates 5.5 1D VES Measurement5.6 2D ERI Measurement5.7 3D Measurement

    6. Data Management6.1 Download Data to Database6.2 View the Data File in the Database6.3 Output RES2D Data6.4 Add Terrian Data

    Appendix 1 Charging* Charging GD-10 Mainframe* Charging CL-10 Cable Leader* Charging BP-145 Power Source

    ContentST Geomative Co., Ltdwww.geomative.com

    Enter to the main page;Select project in the project list, press the knob into project;Press "F2" into the test zone list;Select test zone in the test zone list, press the knob into the test zone;Press F4 to enter to the ERI list;5.7 Measure for 3D5. Operation of GD-10 Mainframe1. Overview of GD-10 system1.1 GD-10 Mainframe1.2 CL-10 Cable Leader1.3 12 Take-outs Cable1.4 Winch and Starlike Electrode1.5 BP-145 DC Power Source

    2. Registration

    3. Operation of Geomative Studio3.1 Project Management3.2 Script Management

    4. Upload files to GD-10 Mainframe

    5. Operation of GD-10 Mainframe5.1 Start GD-10 Mainframe5.2 Device Management5.3 Create New Measurement5.4 Get GPS Coordinates 5.5 1D VES Measurement5.6 2D ERI Measurement5.7 3D Measurement

    6. Data Management6.1 Download Data to Database6.2 View the Data File in the Database6.3 Output RES2D Data6.4 Add Terrian Data

    Appendix 1 Charging* Charging GD-10 Mainframe* Charging CL-10 Cable Leader* Charging BP-145 Power Source

    ContentST Geomative Co., Ltdwww.geomative.com

    6. Data Management6.1 Download data to databaseEnter to the synchronization page as we did when upload data from Geomative to GD -10.1. Overview of GD-10 system1.1 GD-10 Mainframe1.2 CL-10 Cable Leader1.3 12 Take-outs Cable1.4 Winch and Starlike Electrode1.5 BP-145 DC Power Source

    2. Registration

    3. Operation of Geomative Studio3.1 Project Management3.2 Script Management

    4. Upload files to GD-10 Mainframe

    5. Operation of GD-10 Mainframe5.1 Start GD-10 Mainframe5.2 Device Management5.3 Create New Measurement5.4 Get GPS Coordinates 5.5 1D VES Measurement5.6 2D ERI Measurement5.7 3D Measurement

    6. Data Management6.1 Download Data to Database6.2 View the Data File in the Database6.3 Output RES2D Data6.4 Add Terrian Data

    Appendix 1 Charging* Charging GD-10 Mainframe* Charging CL-10 Cable Leader* Charging BP-145 Power Source

    ContentST Geomative Co., Ltdwww.geomative.com

    Enter to the project test zone you want, the measurement files will show in the right box test data in device.6. Data Management6.1 Download data to database1. Overview of GD-10 system1.1 GD-10 Mainframe1.2 CL-10 Cable Leader1.3 12 Take-outs Cable1.4 Winch and Starlike Electrode1.5 BP-145 DC Power Source

    2. Registration

    3. Operation of Geomative Studio3.1 Project Management3.2 Script Management

    4. Upload files to GD-10 Mainframe

    5. Operation of GD-10 Mainframe5.1 Start GD-10 Mainframe5.2 Device Management5.3 Create New Measurement5.4 Get GPS Coordinates 5.5 1D VES Measurement5.6 2D ERI Measurement5.7 3D Measurement

    6. Data Management6.1 Download Data to Database6.2 View the Data File in the Database6.3 Output RES2D Data6.4 Add Terrian Data

    Appendix 1 Charging* Charging GD-10 Mainframe* Charging CL-10 Cable Leader* Charging BP-145 Power Source

    ContentST Geomative Co., Ltdwww.geomative.com

    Select the measurement files in the box test data in device which you want to download.Press Add, the measurement files will show in the below box test data to be uploaded6. Data Management6.1 Download data to database1. Overview of GD-10 system1.1 GD-10 Mainframe1.2 CL-10 Cable Leader1.3 12 Take-outs Cable1.4 Winch and Starlike Electrode1.5 BP-145 DC Power Source

    2. Registration

    3. Operation of Geomative Studio3.1 Project Management3.2 Script Management

    4. Upload files to GD-10 Mainframe

    5. Operation of GD-10 Mainframe5.1 Start GD-10 Mainframe5.2 Device Management5.3 Create New Measurement5.4 Get GPS Coordinates 5.5 1D VES Measurement5.6 2D ERI Measurement5.7 3D Measurement

    6. Data Management6.1 Download Data to Database6.2 View the Data File in the Database6.3 Output RES2D Data6.4 Add Terrian Data

    Appendix 1 Charging* Charging GD-10 Mainframe* Charging CL-10 Cable Leader* Charging BP-145 Power Source

    ContentST Geomative Co., Ltdwww.geomative.com

    Select the files which you want to download in the box test data to be uploaded, select upload, then wait for few seconds, the data is loading. When the data loading is finished, the box test data to be uploaded will become empty.6. Data Management6.1 Download data to database1. Overview of GD-10 system1.1 GD-10 Mainframe1.2 CL-10 Cable Leader1.3 12 Take-outs Cable1.4 Winch and Starlike Electrode1.5 BP-145 DC Power Source

    2. Registration

    3. Operation of Geomative Studio3.1 Project Management3.2 Script Management

    4. Upload files to GD-10 Mainframe

    5. Operation of GD-10 Mainframe5.1 Start GD-10 Mainframe5.2 Device Management5.3 Create New Measurement5.4 Get GPS Coordinates 5.5 1D VES Measurement5.6 2D ERI Measurement5.7 3D Measurement

    6. Data Management6.1 Download Data to Database6.2 View the Data File in the Database6.3 Output RES2D Data6.4 Add Terrian Data

    Appendix 1 Charging* Charging GD-10 Mainframe* Charging CL-10 Cable Leader* Charging BP-145 Power Source

    ContentST Geomative Co., Ltdwww.geomative.com

    Go to the project management page, you can view the data files in the database in the right box.6. Data Management6.2 View the data file in the database1. Overview of GD-10 system1.1 GD-10 Mainframe1.2 CL-10 Cable Leader1.3 12 Take-outs Cable1.4 Winch and Starlike Electrode1.5 BP-145 DC Power Source

    2. Registration

    3. Operation of Geomative Studio3.1 Project Management3.2 Script Management

    4. Upload files to GD-10 Mainframe

    5. Operation of GD-10 Mainframe5.1 Start GD-10 Mainframe5.2 Device Management5.3 Create New Measurement5.4 Get GPS Coordinates 5.5 1D VES Measurement5.6 2D ERI Measurement5.7 3D Measurement

    6. Data Management6.1 Download Data to Database6.2 View the Data File in the Database6.3 Output RES2D Data6.4 Add Terrian Data

    Appendix 1 Charging* Charging GD-10 Mainframe* Charging CL-10 Cable Leader* Charging BP-145 Power Source

    ContentST Geomative Co., Ltdwww.geomative.com

    Choose to output data file,Right-click to show the menu,Select Export DAT, there will be a massage,If you dont want to add terrian data, select No.If you want to add terrian data, select Yes, then go to next page.6. Data Management6.3 Output RES2D Data1. Overview of GD-10 system1.1 GD-10 Mainframe1.2 CL-10 Cable Leader1.3 12 Take-outs Cable1.4 Winch and Starlike Electrode1.5 BP-145 DC Power Source

    2. Registration

    3. Operation of Geomative Studio3.1 Project Management3.2 Script Management

    4. Upload files to GD-10 Mainframe

    5. Operation of GD-10 Mainframe5.1 Start GD-10 Mainframe5.2 Device Management5.3 Create New Measurement5.4 Get GPS Coordinates 5.5 1D VES Measurement5.6 2D ERI Measurement5.7 3D Measurement

    6. Data Management6.1 Download Data to Database6.2 View the Data File in the Database6.3 Output RES2D Data6.4 Add Terrian Data

    Appendix 1 Charging* Charging GD-10 Mainframe* Charging CL-10 Cable Leader* Charging BP-145 Power Source

    ContentST Geomative Co., Ltdwww.geomative.com

    Select Distance type,Input Distance,Input Elevation,Select Insert to add one record,Select Update to replace the selected record,Select Delete to delete the selected record,Select the serial number of first electrode,Select OK to save the terrian data.6. Data Management6.4 Add terrian data1. Overview of GD-10 system1.1 GD-10 Mainframe1.2 CL-10 Cable Leader1.3 12 Take-outs Cable1.4 Winch and Starlike Electrode1.5 BP-145 DC Power Source

    2. Registration

    3. Operation of Geomative Studio3.1 Project Management3.2 Script Management

    4. Upload files to GD-10 Mainframe

    5. Operation of GD-10 Mainframe5.1 Start GD-10 Mainframe5.2 Device Management5.3 Create New Measurement5.4 Get GPS Coordinates 5.5 1D VES Measurement5.6 2D ERI Measurement5.7 3D Measurement

    6. Data Management6.1 Download Data to Database6.2 View the Data File in the Database6.3 Output RES2D Data6.4 Add Terrian Data

    Appendix 1 Charging* Charging GD-10 Mainframe* Charging CL-10 Cable Leader* Charging BP-145 Power Source

    ContentST Geomative Co., Ltdwww.geomative.com

    Appendix 1 ChargingGD-10Charger GD-10 BC-121 Power110-220V1. Connect the charger to the interface on the Left-side Panel and power source,2. Turn on the Charger GD-10, charging is beginning,3. The indicator light on charger GD-10 should be red in the charging,4. After indicator light on charger GD-10 turned green for 3 hour, the GD-10 is full chargedCharging GD-10 Mainframe1. Overview of GD-10 system1.1 GD-10 Mainframe1.2 CL-10 Cable Leader1.3 12 Take-outs Cable1.4 Winch and Starlike Electrode1.5 BP-145 DC Power Source

    2. Registration

    3. Operation of Geomative Studio3.1 Project Management3.2 Script Management

    4. Upload files to GD-10 Mainframe

    5. Operation of GD-10 Mainframe5.1 Start GD-10 Mainframe5.2 Device Management5.3 Create New Measurement5.4 Get GPS Coordinates 5.5 1D VES Measurement5.6 2D ERI Measurement5.7 3D Measurement

    6. Data Management6.1 Download Data to Database6.2 View the Data File in the Database6.3 Output RES2D Data6.4 Add Terrian Data

    Appendix 1 Charging* Charging GD-10 Mainframe* Charging CL-10 Cable Leader* Charging BP-145 Power Source

    ContentST Geomative Co., Ltdwww.geomative.com

    1. Connect the charger to the cable leader,2. Turn on the Charger GD-10, charging is beginning,3. The indicator light on charger GD-10 should be red in the charging,4. After indicator light on charger GD-10 turned green for 3 hour, the GD-10 is full chargedAppendix 1 ChargingCharging CL-10 cable leaderCharger GD-10 BC-121 Power110-220V1. Overview of GD-10 system1.1 GD-10 Mainframe1.2 CL-10 Cable Leader1.3 12 Take-outs Cable1.4 Winch and Starlike Electrode1.5 BP-145 DC Power Source

    2. Registration

    3. Operation of Geomative Studio3.1 Project Management3.2 Script Management

    4. Upload files to GD-10 Mainframe

    5. Operation of GD-10 Mainframe5.1 Start GD-10 Mainframe5.2 Device Management5.3 Create New Measurement5.4 Get GPS Coordinates 5.5 1D VES Measurement5.6 2D ERI Measurement5.7 3D Measurement

    6. Data Management6.1 Download Data to Database6.2 View the Data File in the Database6.3 Output RES2D Data6.4 Add Terrian Data

    Appendix 1 Charging* Charging GD-10 Mainframe* Charging CL-10 Cable Leader* Charging BP-145 Power Source

    ContentST Geomative Co., Ltdwww.geomative.com

    Appendix 1 ChargingCharging BP-145 Power SourceAC PowerDedicator110~240VConnect the charger to the interface on the Left-side Panel and power source,Turn on the BP-145, charging is beginning,The dedicator on charger should be red in the charging,After the dedicator on charger turned green for 1 hour, the BP-145 is full charged.1. Overview of GD-10 system1.1 GD-10 Mainframe1.2 CL-10 Cable Leader1.3 12 Take-outs Cable1.4 Winch and Starlike Electrode1.5 BP-145 DC Power Source

    2. Registration

    3. Operation of Geomative Studio3.1 Project Management3.2 Script Management

    4. Upload files to GD-10 Mainframe

    5. Operation of GD-10 Mainframe5.1 Start GD-10 Mainframe5.2 Device Management5.3 Create New Measurement5.4 Get GPS Coordinates 5.5 1D VES Measurement5.6 2D ERI Measurement5.7 3D Measurement

    6. Data Management6.1 Download Data to Database6.2 View the Data File in the Database6.3 Output RES2D Data6.4 Add Terrian Data

    Appendix 1 Charging* Charging GD-10 Mainframe* Charging CL-10 Cable Leader* Charging BP-145 Power Source