5

Geometric Distribution In some situations, the critical quantity is the WAITING TIME (Waiting period) number of trials before a specific outcome (success)

Embed Size (px)

Citation preview

Page 1: Geometric Distribution In some situations, the critical quantity is the WAITING TIME (Waiting period)  number of trials before a specific outcome (success)
Page 2: Geometric Distribution In some situations, the critical quantity is the WAITING TIME (Waiting period)  number of trials before a specific outcome (success)

Geometric DistributionIn some situations, the critical quantity is the WAITING TIME (Waiting period) number of trials before a specific outcome (success) occurs has only two outcomes, success or failure the difference is the waiting time, the number of failure trials before success occurs.

Page 3: Geometric Distribution In some situations, the critical quantity is the WAITING TIME (Waiting period)  number of trials before a specific outcome (success)

Apply the product rule to find the probability of successive independent events. Each unsuccessful event adds another factor to the probability, making it look likeP(x) = qxp, where p and q are the same as we know them.

Expectations for a Geometric DistributionE(x) = = but this expectation converges to a simple formula.

0

)(x

xxPp

q

If we are looking for the amount of time before a failure occurs, a success is actually failing something, which means that p becomes q, and q becomes p.

Page 4: Geometric Distribution In some situations, the critical quantity is the WAITING TIME (Waiting period)  number of trials before a specific outcome (success)

Ex. Suppose that an intersection you pass on the way to school has a traffic light that is green for 40s and then amber or red for a total of 60s.What is the probability that the light will be green when you reach the intersection at least once a week?

Remember: there are 5 days in a school week, therefore we need to look at P(0 < x < 4)

Why did we add?

Page 5: Geometric Distribution In some situations, the critical quantity is the WAITING TIME (Waiting period)  number of trials before a specific outcome (success)

HomeworkPg 394 # 1,3,6,7