GEOTECHNICAL INVESTIGATION 5-STORY MIXED-USE BUILDING
2100 SAN PABLO AVENUE BERKELEY, CALIFORNIA
September 9, 2015 2790-1, L-30339 Mr. Ali Kia Shabahangi Spirit Living Group 126 Haight Street San Francisco, CA 94102 RE: Geotechnical Investigation 5-Story Mixed-Use Building 2100 San Pablo Avenue Berkeley, California Dear Mr. Shabahangi: At your request, we have performed a geotechnical engineering investigation for the proposed new mixed-use building to be constructed at 2100 and 2120 San Pablo Avenue, in Berkeley, California. The approximate site coordinates (WGS84) for this location are 37.868°N, 122.292°W. The project location is shown on the Vicinity Map, Figure 1. 1.00 PROPOSED CONSTRUCTION We understand that the proposed project consists of a new five-story, mixed-use building with an underground parking garage. The street level story will most likely be concrete construction (to be used as retail space) and the upper four levels will be wood-framed construction (to be used as residential units). The below grade parking garage may extend up to about 14 feet below the street level to accommodate parking stackers. Plans or details for the proposed new building were not provided to us at the time of our investigation. However, building loads are anticipated to be typical for this type of construction based on buildings in the area having similar characteristics. 2.00 PURPOSE The purpose of our investigation was to evaluate the suitability of the site for the proposed mixed-use development from a geotechnical standpoint and to provide geotechnical design and construction criteria for the following aspects of the work:
Site preparation and earthwork;
Building foundation system;
Building code seismic design parameters;
A L A N K R O P P & A S S O C I A T E S , I N C .
G E O T E C H N I C A L C O N S U L T A N T S
2140 Shattuck Avenue Berkeley, CA 94704 Tel 510.841.5095 Fax 510.841.8357 www.akropp.com
Alan Kropp, CE, GE
James R. Lott, CE, GE
Thomas M. Brencic, CE
Alma G. Luna, CE
Jose R. Serrano, CE
Page 2 2790-1
Retaining walls; and
Site drainage;
3.00 SCOPE As outlined in our proposal dated July 28, 2015, the scope of our work to accomplish the stated purpose included:
A reconnaissance of the site and portions of the immediate surrounding properties to evaluate general geotechnical and site conditions;
A review of published geotechnical materials with data relevant to the site;
A field subsurface exploration program consisting of drilling two exploratory borings at the site to evaluate the properties of the materials recovered;
Laboratory index, classification, and strength tests on samples recovered;
Geotechnical engineering analyses of the collected data; and
Preparation of this geotechnical investigation report for the proposed development.
The scope of our services did not include an environmental assessment or investigation for the presence of hazardous or toxin materials in the soil, groundwater, or air on, below, or around the site. An evaluation of the potential presence of sulfates in the soil, or other corrosive, naturally-occurring elements was beyond our scope. 4.00 SITE INVESTIGATION 4.01 Existing Geotechnical Data Review A variety of published materials were reviewed to evaluate geotechnical data relevant to the subject site. These sources included geotechnical literature, reports, and maps published by various public agencies. Maps which were reviewed included topographic, geologic, and preliminary photointerpretive landslide maps prepared by the United States Geological Survey, as well as geologic, landslide, and fault maps prepared by the California Geological Survey (formerly the California Division of Mines and Geology). A detailed citation of materials reviewed is presented in the References section at the end of this report. 4.02 Review of Previous Investigations We reviewed subsurface information from previous investigations conducted by our firm and by other firms in the immediate vicinity of the subject site. Specifically, we reviewed information for investigations conducted at 1122 University Avenue, University Avenue between 9th and 10th Streets, and 1800 San Pablo Avenue. A summary of our review is presented in “Section 5.01, Data from Previous Investigations”. A detailed citation of these reports is also included in the References section at the end of this report.
Page 3 2790-1
4.03 Surface Reconnaissance Visits Surface reconnaissance visits were performed at various times between July and August 2015. These visits were intended to make observations of surface conditions present, to note whether any obvious geotechnical concerns were exposed, and to mark the proposed boring locations. 4.04 Subsurface Exploration Our subsurface exploration program was performed on August 10, 2015, to investigate and sample the subsurface materials at the site. Two borings were drilled at the site to a depth of about 31½ feet at the locations shown on the Site Plan, Figure 2. The two borings were drilled within the existing property on the parking lot. The borings were drilled using truck-mounted drill rig equipment with solid stem flight augers. An Alan Kropp & Associates (AKA) engineer directed the drilling operations, logged the subsurface materials encountered, and obtained samples at frequent intervals. Soil samples of the materials encountered were obtained using a 2-inch outside diameter (O.D.) Standard Penetration Test (SPT) and a 3-inch O.D. California Modified sampler. The samplers were driven with a 140-pound hammer falling 30 inches. The hammer blows required to drive the sampler the final 12 inches of each 18-inch drive are presented on the attached boring logs. Following the drilling operations, the borings were grouted in accordance with the drilling permit requirements of the City of Berkeley, Toxics Management Division. The samples obtained were transported to our laboratory for subsequent visual observation and geotechnical testing. Approximate measurements of the unconfined strength of selected soil samples were performed during the drilling operations using a pocket penetrometer testing device. These values are shown on the boring logs at their respective depths. Detailed boring logs are included in Appendix A. 4.05 Laboratory Testing Our geotechnical laboratory testing program was directed toward a quantitative and qualitative evaluation of the physical and mechanical properties of the soils underlying the site. The following geotechnical laboratory tests were performed on selected soil samples:
Water content per ASTM Test Designation D-2216; Dry Density per ASTM Test Designation D-2937; Atterberg Limits per ASTM Test Designation D-4318; and Percent passing No. 200 sieve per ASTM Test Designation D-1140.
The tests were conducted in general accordance with the current edition of the referenced standards at the time the tests were performed. The results of these tests are presented on the boring logs at the appropriate sample depths. 5.00 SITE CONDITIONS The topographic map for this area (the Oakland West Quadrangle) prepared by the United States Geological Survey indicates the site is located at an elevation of approximately 55 feet on the gently sloping flatland between the Berkeley Hills and the San Francisco Bay.
Page 4 2790-1
A geologic map of the area by Radbruch (1957) indicates the site is underlain by the Temescal Formation. This formation is typically described as clayey gravel, sandy and silty clay, and sand-clay-silt mixtures of a pale to dark yellowish-orange color. Gravel in this unit consists of quartz, soft sandstone, shale, chert and other igneous rock fragments. The Temescal Formation covers most of the surface between the Berkeley Hills and the San Francisco Bay and is estimated to extend anywhere from 5 to 60 feet in thickness. A more recent geologic map by Witter (2006) indicates the site is underlain by Holocene alluvial fan deposits. The accompanying text of the map indicates this unit typically includes sand, gravel, silt, and clay and is moderately to poorly sorted, and moderately to poorly bedded. These deposits are mapped on the west side of the East Bay hills from Oakland to Richmond and their liquefaction susceptibility is typically moderate where the ground water is within 15 feet of the ground surface. Deposits where the ground water is considerably lower may be less susceptible. A creeks and watershed map of the area by Sowers (2009) indicates the nearest creek is Strawberry Creek which formerly flowed about 500 feet north from the site toward the bay and which currently flows within an underground culvert below city streets. The California Geologic Survey has released a map covering this area which indicates areas (Seismic Hazard Zones) that may be prone to earthquake-induced ground failure (landsliding and/or liquefaction) during a major earthquake. The map (CGS, 2003) indicates areas where sufficient concern exists to merit a site-specific evaluation, not necessarily that the hazard is actually present. The site is located immediately adjacent to the boundary of a State of California designated Seismic Hazard Zone (SHZ) for potential liquefaction hazards. The City of Berkeley website indicates the site is NOT within the liquefaction hazard zone but lots immediately south and west of the site are within the hazard zone which requires additional investigation. If the site were determined to be within this zone, significant addition investigative and analysis efforts would be required to meet state standards. The site is approximately 2.1 miles west of the nearest active trace of the Hayward fault (California Division of Mines and Geology, 1982; Lienkaemper, 1992). The site is also located about 16.4 miles northeast and 15.8 miles southwest of the active San Andreas and Concord faults, respectively (USGS, 2006). The site is not located within any Alquist-Priolo Earthquake Fault Zone designated by the State of California. 5.01 Data from Previous Investigations Materials reported from previous investigations by AKA and other firms at nearby sites are summarized in the following section. 5.01.1 1122 University Avenue In 2004, Lawrence B. Karp Consulting Engineer (LBK) conducted a geotechnical investigation for the University Condominium at 1122 University Avenue. The site is located less than 400 feet northwest from the subject site. University Condominium has a full size underground basement and is supported on a mat foundation. Three exploratory borings were drilled to depths between 14½ and 23 feet below ground surface. The materials encountered generally consisted of soft to very stiff clays and loose to medium dense clayey sands with varying amounts of silts and trace gravel. Groundwater was observed at about 6 feet below the ground surface.
Page 5 2790-1
5.01.2 University Avenue between 9th and 10th Street In 2005, AKA conducted a preliminary geotechnical investigation for a proposed five-story building to be constructed at University Avenue between 9th and 10th Streets. The site is located about 600 feet northeast from the subject site. Two exploratory borings were drilled to depths between 41 and 51 feet. In general, the materials encountered consisted of fill and native soils. The fill materials consisted of firm to soft clay and very loose clayey sands with some silt. The native soils were generally described as firm to hard lean clays and fat clays, loose to medium dense clayey sands and some layers of clayey gravels. Groundwater levels were measured at about 8 feet below the ground surface. 5.01.3 1800 San Pablo Avenue In 2003, AKA conducted a geotechnical investigation for Delaware Court project, constructed at 1800 San Pablo Avenue. This site is about 1300 feet north of the subject site. Three exploratory borings were drilled to depths between 21 and 31 feet below ground surface. The materials encountered generally consisted of up to 3 feet of fill soils, classified as stiff, lean clay with sand and silt, underlain by native materials. The native soils consisted of firm to hard lean, silty clays with varying amounts of sands and fine gravel and interbedded layers of dense to medium dense clayey gravel. Groundwater was observed at depths between 11 and 13 feet during drilling and at 8½ feet below ground surface several hours after drilling. 5.02 Surface The site is roughly rectangular in shape with maximum plan dimensions of approximately 125 feet by 200 feet. The site is located at the southwest corner of the intersection of San Pablo Avenue and Addison Street. The property is bordered on the west by two-story houses and on the south by a single-story building. The parcel at 2100 San Pablo is currently occupied by a single story building, which is located on the northeast corner of the lot and has plan dimensions of about 40 feet by 40 feet. The parcel at 2120 San Pablo consists of a narrow strip of land along the southern side and it contains a single story building with approximate plan dimensions of 40 feet by 25 feet. The rest of the site is currently a parking lot and an unpaved driveway along the western side of the property. The parking lot area and the rear driveway are separated by a 2- to 3-foot-high retaining wall. A topographic survey was not available at the time of our investigation. However, approximate surface elevation data obtained from Google Earth Pro suggests the terrain varies in elevation from about 55 feet at the northeast corner to 51 feet at the southwest. During our reconnaissance, no areas of major instability were observed in the vicinity of the proposed new building. 5.03 Subsurface The materials encountered in our exploratory borings generally consisted of clays with sand, sandy clays and clayey sands, with some layers containing significant amounts of fine, angular gravel. The top 4½ to 5½ feet of the surficial materials appear to have characteristics of artificial fill with a stiff to very stiff consistency. The fill material is underlain by native firm to very stiff lean and fat clayey soils with
Page 6 2790-1
varying amounts of silt, sand and fine gravel that extend to the maximum depth explored of about 31½ feet. Some interbedded clayey, sand layers of loose consistency were also encountered. These native soils are relatively consistent with materials observed at nearby locations during previous investigations. Atterberg Limits tests conducted on samples at about 1½ and 15½ feet below existing grade resulted in Plasticity Indices (PI) of 31 and 48, respectively; these values are indicative of soils having a high to critical potential for expansive behavior. Detailed descriptions of the materials encountered in the borings are found on the boring logs presented in Appendix A. Soil classifications were adapted from ASTM D2488 and Caltrans Soil and Rock Classification Manual, which are based on the Unified Soil Classification System (USCS). A Key to Exploratory Boring Logs, Figure A-1, is also included in Appendix A. The attached logs and related information depict subsurface conditions only at the specific locations shown on the Site Plan and on the particular date designated on the logs. These logs may have been modified from the original logs recorded during drilling as a result of further study on the collected samples, laboratory tests, or other efforts. Also, the passage of time may result in changes in the subsurface conditions due to environmental changes. The locations of the borings were approximately determined by measuring off of existing structures at the site and the ground surface elevations at the boring locations were approximately determined by interpolation of topographic data. The location and elevation should be considered accurate only to the degree implied by the method used. Groundwater was encountered at a depth of 30½ feet in Boring 1 one hour after drilling. Groundwater in Boring 2 was encountered at a depth of 25 feet and it was at a depth of about 17 feet, 30 minutes after drilling. It should be noted that groundwater measurements in the borings might have been made prior to allowing a sufficient period of time for the equilibrium groundwater conditions to become established. In addition, fluctuations in the groundwater level may occur due to variations in rainfall, temperature, and other factors not evident at the time the measurements were made. 6.00 EVALUATIONS AND CONCLUSIONS 6.01 General Site Suitability Based on our investigation, it is our opinion the site is suitable for the construction of the proposed mixed-use development from a geotechnical standpoint. However, all of the conclusions and recommendations presented in this report should be incorporated in the design and construction of the project to minimize possible geotechnical problems. The primary considerations for geotechnical design at the site are:
The shrink/swell behavior of the surficial soils;
The presence of existing fill soils at the site;
Groundwater considerations;
Excavations and temporary shoring;
Earthquake hazards; and
Page 7 2790-1
Foundation selection. Each of these conditions is discussed individually below. 6.02 Expansive Surficial Soils The surficial clay soils are highly expansive, and are prone to significant volume changes (shrinkage and swelling) with seasonal fluctuations in soil moisture. Such shrink/swell behavior can damage shallow foundation elements or other elements located directly on them such as sidewalks and driveways. To help minimize tilting and cracking of these we recommend they be underlain by a layer of imported, non-expansive material and compacted in accordance with the compaction recommendations provided in Section 7.01.4. 6.03 Existing Fill Based on the results of our subsurface exploration, it appears that the site is underlain by about 5 feet of fill soils. The proposed excavations for the parking garage are anticipated to be in the order of 14 feet and will extend through the fill layer. However, if any other critical elements are to be supported within the fill layer, we recommend these old fill soils be over-excavated and replaced with engineered fill placed in accordance with the recommendations provided in this report. 6.04 Groundwater Considerations Groundwater was encountered in Boring 2 at about 25 feet below the existing grade during drilling, and it was measured at about 17 feet before grouting. Data from the nearby sites indicate groundwater levels were encountered at approximate depths between 6 and 13 feet. We believe the variations in the groundwater level observed during our investigation versus those reported at the nearby sites can be attributed to the proximity of those sites to the Strawberry Creek. A map of the area with approximate depths of historically highest ground water levels (CGS, 2003) indicates the depth to ground water at the site may be as shallow as 5 feet. Considering that the subsurface exploration was completed in mid-August of one of the driest years in the history of California, the observed groundwater may be at the lower end of any anticipated range of seasonal fluctuations. Based upon the information obtained in our subsurface exploration, we judge that a design groundwater level at 10 feet below the existing grade may be used for design purposes. We understand that excavations for the parking garage will extend to a depth of approximately 14 feet below grade. The contractor should be made aware of the potential for high groundwater and a temporary de-watering method during construction may still become necessary. Temporary construction dewatering methods may include sumps and pumps placed in a low spot within the excavations. Several sumps and pumps may be required depending on the magnitude of water encountered. The design and implementation of temporary construction de-watering is considered the responsibility of the contractor. Caution should be exercised to prevent softening of the subgrade soils exposed within the excavations. Equipment operated upon saturated subgrade soils tends to cause rutting and weakening, which will required over-excavation of the weakened subgrade. Standing water within the excavation can also cause weakening of the subgrade soils. A temporary mud slab or gravel pad may needed at the base of the garage and/or parking lifts excavations to provide a clean, dry working area.
Page 8 2790-1
Given the potential for an increase in the groundwater level over the life of the building, we recommend the garage be design to resist lateral and uplift hydrostatic pressures and appropriate waterproofing of the walls and floor be installed. A waterproofing expert should be consulted to provide recommendations. 6.05 Excavations and Temporary Shoring Excavations of up to 14 feet below existing grade are anticipated as part of this project. Temporary shoring and/or underpinning should be implemented by the contractor to protect adjacent improvements during site excavations. Existing improvement that may be affected by the proposed development include, but are not limited to, adjacent structures, sidewalks, curbs, pavements, and underground utilities. The contractor is responsible for installation and performance of all shoring and underpinning measures. 6.06 Building Foundation A concrete mat bearing on native materials or engineered fill is suitable for support of the proposed structure. Where foundation elevations are near or below the design groundwater level and drainage provisions do not provide for lowering of groundwater within the structure footprint, foundation and floor will be subjected to hydrostatic uplift forces. Hydrostatic uplift can be resisted by a combination of the weight of the structure itself and structural hold-downs. 6.07 Earthquake Hazards As noted earlier, the subject site is located in the highly seismic San Francisco Bay Area, and there is a strong probability that a moderate to severe earthquake will occur during the life of the structure. The site is not mapped in the immediate proximity of any active or inactive faults; therefore, the likelihood of fault rupture directly below the proposed home is very remote. During strong earthquakes, various forms of ground failure can occur, such as liquefaction and/or landsliding. Due to the relatively level topography on the site and in the site vicinity, earthquake-induced landsliding is not considered a site hazard. Liquefaction generally occurs in relatively loose granular (and sometime silty) soils that are below the groundwater table. The site is located immediately adjacent to the boundary of a State of California designated Seismic Hazard Zone (SHZ) for potential liquefaction hazards. However, we performed a preliminary screening evaluation of liquefaction potential for the granular soils encountered below the groundwater table and our results suggest that soil liquefaction could occur within the clayey sand layers. The most likely consequence of soil liquefaction occurring at the site would be several inches settlement of the ground below the mat foundation. Our recommendation to support the proposed building on a reinforced mat foundation was done taking into consideration the results of our preliminary screening evaluation of liquefaction potential. The proposed development will very likely experience strong ground shaking during a major earthquake in the life of the structure. The California Building Code has adopted provisions for incorporation of strong ground shaking into the design of all structures. Our recommendations for geotechnical parameters to be used in the structural design for the project are presented in “Section 7.06, California Building Code Seismic Design Parameters”.
Page 9 2790-1
7.00 RECOMMENDATIONS It is the responsibility of you or your representative to confirm that the recommendations presented in this report are called to the attention of the contractor, subcontractors, and any governmental body which may have jurisdiction and that these recommendations are carried out in the field. 7.01 Site Preparation and Earthwork 7.01.1 Clearing and Site Preparation The area of the proposed development should initially be cleared of selected surface and subsurface obstructions including existing foundations. Underground utilities that interfere with the proposed construction should be re-routed or abandoned. Holes resulting from the removal of underground obstructions extending below the proposed finished grade should be cleared and backfilled with suitable materials compacted in accordance with our recommendations presented in “Section 7.015, Compaction”. 7.01.2 Excavations and Shoring As previously mentioned, it appears that excavations at the site will extend to a depth of approximately 14 feet below existing grade. Due to the depth of the anticipated excavations and the potential for presence of relatively shallow groundwater at the site it is anticipated that temporary shoring will be required for this project. Temporary shoring should be used as required to prevent the movement of materials exposed in the face of the excavations. We recommend the excavations and subsequent parking structure construction be continuous in order to minimize the length of time the excavations is exposed. However, since we have no control over the methods and timing used by the contractor, the stability of any excavation is solely the responsibility of the contractor. It is however, recommended that our firm review the shoring plans in order to evaluate the potential interaction between the temporary shoring and the permanent structure. 7.01.3 Subgrade Preparation Following site preparation and completion of proposed excavations, a representative of our firm should observe the base of the excavations to determine if problematic areas exist. The exposed soils in those areas to receive structural fill, slabs-on-grade, or mats should be firm, unyielding, and compacted to the requirements for structural fill. Soft or yielding subgrade soils should be excavated to expose firm, non-yielding materials. Proof–rolling may be helpful in identifying soft or yielding subgrade areas. The subgrade soils should be scarified to a depth of 6 inches. The scarified soils should them be moisture conditioned to at least 3 percent above optimum water content and compacted to the specified relative compaction. It is possible that exposed subgrade soils may be excessively wet or dry depending on the moisture content at the time of construction. If the subgrade soils are too wet, they may be dried by aeration, mixing with drier materials, or lime/cement treatment. 7.01.4 Material for Fill On-site soils below the cleared site having an organic content of less than 3 percent by volume are suitable for use as fill except in areas where specific fill materials are recommended. Fill placement at the
Page 10 2790-1
site should not contain rocks or lumps greater than 6 inches in greatest dimension with not more than 15 percent larger than 2.5 inches. In addition, imported select fill used at the site should be a non-expansive material with a plasticity index of 12 or less. 7.01.5 Compaction Clayey soils should be moisture conditioned to at least 3 percent over optimum water content and compacted to at least 90 percent relative compaction by mechanical means only as determined by ASTM Test Designation D1557 (latest revision). Sandy soils should be moisture conditioned to near optimum water content and compacted to at least 95 percent relative compaction. The upper 6 inches of subgrade soils and base rock materials should be compacted to at least 95 percent relative compaction. Fill should be placed on a firm, unyielding surface in lifts not exceeding 8 inches in uncompacted thickness. 7.01.6 Trench Backfill Pipeline trenches should be backfilled with fill placed in lifts not exceeding 8 inches in uncompacted thickness. Native backfill materials should be compacted to at least 90 percent relative compaction and granular import material should be compacted to at least 95 percent relative compaction. These compaction recommendations assume a reasonable “cushion” layer around the pipe. If imported granular soil is used, sufficient water should be added during the trench backfilling operations to prevent the soil from “bulking” during compaction. 7.02 Mat Slab Foundation We recommend that the new building be supported on a reinforced concrete mat slab foundation system. The mat slab should be a minimum of 18 inches thick and the base of the mat slab should extend at least 12 inches below the adjacent ground surface. The mat can be designed assuming an allowable bearing pressure of 1,000 pounds per square foot for dead plus live loads, with a one-third increase for all loads including wind or seismic. This allowable bearing pressure is a new value; therefore, the weight of the mat can be neglected for design purposes. The mat should be integrally connected to all portion of the structure so the entire foundation system moves as a unit. The mat should be reinforced with top and bottom steel in both directions to allow the foundation to span local irregularities that may result from potential differential settlement. As a minimum, we recommend that the mat be reinforced with sufficient top and bottom steel to span as a simple beam an unsupported distance of at least 10 feet. The mat can be designed using a modulus of subgrade reaction of 100 kips per cubic foot. The mat foundation should also be designed to resist uplift pressures resulting from hydrostatic loading due to groundwater. The design groundwater can be considered at 10 feet below existing ground surface. Lateral loads on the structure may be resisted by passive pressures acting against the sides of the mat. We recommend an allowable passive pressure equal to an equivalent fluid weighing 300 psf per foot of depth (factor of safety 2). Alternatively, an allowable friction coefficient of 0.20 (factor of safety 2) can be used between the bottom of the mat and the subgrade soils. If the perimeter of the mat is poured neat against the soils, the passive pressure and friction coefficient may be used in combination. It is recommended that a waterproofing expect be consulted in regards to waterproofing details for this project. We also recommend that the specifications for the mat require moisture emission tests to be performed on the mat prior to the installation of the flooring. No flooring should be installed until safe moisture emission levels are recorded for the type of flooring to be used.
Page 11 2790-1
7.03 Driveway Ramp & Slabs on Grade We recommend that portions of the driveway ramp underlain by highly expansive surficial soils be supported on 12 inches non-expansive compacted fill. A representative of our firm should observe subgrade conditions to assist with identifying areas requiring over-excavation. Prior to final construction of the driveway ramp, the subgrade surface should be proof-rolled to provide a smooth, firm surface for driveway support. Exterior slabs-on-grade should be supported on a minimum of 12 inches of imported, compacted, non-expansive fill. The surficial soils beneath the non-expansive fill should scarified to a depth of at least 6 inches, moisture conditioned, and compacted in accordance with compaction recommendations presented in Section 7.01.5. 7.04 Retaining Walls Retaining walls should be designed to resist both lateral earth pressures and any additional lateral loads caused by surcharge loads on the adjoining ground surface. Undrained retaining walls should be designed to resist lateral earth pressures, hydrostatic loads, surcharge loads, and seismic loading. We recommend walls be designed using an equivalent fluid pressure (not including surcharge loading) of 60 pounds per cubic foot (pcf) above the groundwater level and 95 pcf below the groundwater level. For retaining wall design, we recommend assuming a design groundwater depth of 10 feet below the currently existing grade. Basement walls 6 feet or greater in height should also be designed for a temporary seismic load. The temporary seismic load can be modeled as a uniform lateral pressure applied over the height of the wall of 10H psf, where H is the height in feet. The provisional recommendations for seismic earth pressures on building basement wall, as provided by Lew, et al. (2010), were considered in development of the seismic load criteria given. The values given above assume level backfill behind the wall with no surcharge loads. For additional surcharge loads, such as heavy slab loads, concentrated loads, or vehicular loading; design pressures should be increased by an additional uniform pressure equivalent to one-half of the maximum anticipated surcharge load applied to the surface behind the wall. Structural backfill placed behind the retaining wall should be compacted in accordance with the requirements provided in Section 7.01.5. Retaining walls should be supported on mat slab foundations designed in accordance with “Section 7.02, Mat Slab Foundation”. 7.05 Surface Drainage We recommend that collected surface water be transmitted through gutters and downspout to closed pipes that discharge to an appropriate discharge facility. Flexible pipe (flexline), 2,000-pound crush pipe, leachfield, and ASTM F810 pipe are NOT recommended for use in these drainage systems because of the likelihood of damage to the pipe during installation due the weak strength of these pipes. In addition, these drainpipes are sometime difficult to clean with mechanical equipment without damaging the pipe. We recommend the use of Schedule 40 PCV, SDR 35 PVC or ABS, Contech A-2000 PCV drainpipe, or approved equivalent for the drain system.
Page 12 2790-1
Positive surface gradient of at least 2 percent should be provided adjacent to the structure to direct water away from the foundations and slabs toward a suitable discharge facility. Ponding of surface water should not be allowed adjacent to the structure or on pavements. The project civil engineer should develop the provisions necessary to conform to current city/county regulations. Such measures may include retention basins, grassy swales, or other provisions, which may allow some water to eventually flow onto the street and into nearby inlet leading to the storm drain systems. We should note that suitable discharge facilities do not include so called “dry wells” and these should be avoided. 7.06 California Building Code Seismic Design Parameters Based on our review of the site location, assumed soil conditions, and the 2013 California Building Code (CBC), we recommend the following parameters be used for seismic design of the building:
Site Class = D Mapped Spectral Acceleration for Short Period (SS, Site Class B) = 2.034g Mapped Spectral Acceleration for 1-Second Period (S1, Site Class B) = 0.831g Maximum Considered Earthquake (MCE) Spectral Response Acceleration for Short Period (SMS,
Site Class D) = 2.034g MCE Spectral Response Acceleration for 1-Second Period (SM1, Site Class D) = 1.246g Design Spectral Response Acceleration for Short Period (SDS, Site Class D) = 1.356g Design Spectral Response Acceleration for 1-Second Period (SD1, Site Class D) = 0.831g
7.07 Supplemental Recommendations As previously mentioned, at the time of our investigation project plans or detail had not been developed. Once the project layout and dimensions are established supplemental recommendations may be necessary. If necessary, please contact us when near final plans have been completed. 7.08 Plan Review We recommend our firm be provided the opportunity for a general review of the geotechnical aspects of the final plans and specifications for this project in order that the geotechnical recommendations may be properly interpreted and implemented. If our firm is not accorded the privilege of making the recommended review, we can assume no responsibility for misinterpretation of our recommendations. 7.09 Construction Observation The analyses and recommendations submitted in this report are based in part upon the data obtained from the two soil borings. The nature and extent of variations across the site may not become evident until construction. If variations then become apparent, it will be necessary to re-examine the recommendations of this report. We recommend our firm be retained to provide geotechnical engineering services during the earthwork, foundation construction, and drainage phases of the work. This is to observe compliance with the design concepts, specifications, and recommendations and to allow design changes in the event that subsurface conditions differ from those anticipated prior to the start of construction.
Page 13 2790-1
It should be noted that earthwork and foundation observations by our firm, as the project geotechnical engineer of record, are required by most cities and counties. Drainage observations by our firm are not typically required, but in our experience, we have often discovered adverse drainage installations that otherwise would have created problems following construction, and this is why we recommend our services be utilized. Nonetheless, it is usually the owner's prerogative whether they wish to engage our services or simply rely on the quality of their contractor's work regarding drainage improvements. In order to effectively accomplish our observations during the project construction, we recommend that a pre-construction meeting be held to develop a mechanism for proper communications throughout the project. We also request that the client or the client's representative (the contractor) contact our firm at least two working days prior to the commencement of any of the items listed above. If our representative makes a site visit in response to a request from the client or the client's representative and it turns out that the visit was not necessary, our charges for the visit will still be forwarded to the client. 7.10 Wet Weather Construction Although it is possible for construction to proceed during or immediately following the wet winter months, a number of geotechnical problems may occur which may increase costs and cause project delays. The water content of on-site soils may increase during the winter and rise significantly above optimum moisture content for compaction of subgrade or backfill materials. If this occurs, the contractor may be unable to achieve the recommended levels of compaction without using special measures and would likely have to:
Wait until the materials are dry enough to become workable; Dispose of the wet soils and import dry soils; or Use lime or cement on the native materials to absorb water and achieve workability.
If utility trenches or excavations are open during winter rains, then caving of the trenches or excavations may occur. Also, it the trenches fill with water during construction, or if saturated materials are encountered at the anticipated bottom of the excavations, excavations may need to be extended to greater depths to reach adequate support capacity than would be necessary if dry weather construction took place. We should also note that it has been our experience that increased clean-up costs will occur, and greater safety hazards will exist, if the work proceeds during the wet winter months. Furthermore, engineering costs to observe construction are increased because of project delays, modifications, and rework. If you have any questions concerning this letter, please call us.
Very truly Alan KropPrincipal AL/AK/jc Copies: A 2790-1 2100
y yours,
pp, G.E. Engineer
c
Addressee (3+
San Pablo GI Rep
+PDF) - aksd
port
developmentg
AlmProje
group@gmail.
ma Luna, C.E.ect Engineer
.com
Pa2age 14 790-1
Page 15 2790-1
REFERENCES
Published Data California Division of Mines and Geology, 1982, Special Studies Zone Map, Oakland West Quadrangle. California Geological Survey, 2003, “Seismic Hazard Zone Report of the Oakland West 7.5-Minute Quadrangle, Alameda County, California,” Seismic Hazards Zone Report 081. Lew, M., Sitar, N., Atik, L., Pourzanjani, M., Hudson, M., 2010, “Seismic Earth Pressures on Deep Building Basements,” SEAOC 2010 Convention Proceedings. Lienkaemper, J. J., 1992, “Map of Recently Active Traces of the Hayward Fault, Alameda and Contra Costa Counties, California,” United States Geological Survey, Map MF-2196. Radbruch, Dorothy H., 1957, “Areal and Engineering Geology of the Oakland West Quadrangle,” U.S. Geological Survey, Miscellaneous Geologic Investigations, Map I-239. Sowers, Janet M., Henkle, Jameson E., and Grossinger, Robin, 2009, “Creek & Watershed Map of Morgan Hill & Gilroy,” Oakland Museum of California. U.S. Geological Survey, 1959, Topographic Map of the Oakland West Quadrangle. Photorevised 1968, 1973 and 1980. U.S. Geological Survey and California Survey, 2006, Quaternary fault and fold database for the United States, accessed October 17, 2008, from USGS web site:http//earthquake.usgs.gov/hazards/qfaults/. Witter, Robert C., et al., 2006, “Maps of Quaternary Deposits and Liquefaction Susceptibility in the Central San Francisco Bay Region, California,” U.S. Geological Survey, Open File Report 2006-1037. Unpublished Reports Alan Kropp & Associates, 2003, titled “Geotechnical Investigation, 1800 San Pablo Avenue, Berkeley, California,” prepared for Mr. Said Adeli, dated April 11, 2003, Job Number 2244-1. Alan Kropp & Associates, 2005, titled “Preliminary Geotechnical Investigation, Townhouse/Condominium and Commercial Center, University Avenue between 9th and 10th Streets, Berkeley, California,” prepared for Mr. Lyman Jee, dated May 24, 2005, Job Number 2332-2A. Lawrence B. Karp Consulting Engineer, 2004, titled “Condominium Project, 1122 University Avenue, Berkeley, Soil & Foundation Investigation,” prepared for Alexander Varum, dated January 27, 2004.
FIGURES
SAN FRANCISCOBAY
GILMAN ST
MARIN AV
HOPKI
NS ST
SOLANO AV
T
OLLIS ST7TH S
6TH S
M
HLAMEDA
OLUSA AV
E A
CST
H
ADEL
INE
ST
FOLGER AV
ALCATRAZ AV
DWIGHT WY
CEDAR ST
UNIVERSITY AV
T
T
D WIGHT CRES
MARTI N L U T H E R KIN G JR WYU
R
S A C RAMENTO
SE
TTST
RKET ST
A
3RD ST
13
123
580
80PE
RALTA
O
AV
SANTA
POSEN
FE
R
ST
ESIERRA
ROSE
ST
ST2ND
POLK
LNCEDARWOOD
ST3RD
CURTIS
IDAHO
ST
SALEMHERZOG
STMABEL
OAKRED
S
64TH
AV
AV
59TH
ST
S
AV
TM
AE
OHLONE
STOREGON
BANCROFTWY
BANCROFTALLSTON
WY
ST
ADDISON
BERKELEYWY
HEARSTAV
FRANCISCO ST
WY
ALLSTON
ST
BERKELEY
VIRGINIAST
ST
BERRYMAN
ST
ST
ST
JULIA
ST
60TH
62ND
ST
ST
ST
63RD62ND
60TH
ST
61ST
HARMON
WOOLSEY
TYLER
PRINCE
WYPARK
BURNETT
T
ST
67TH
POTTER
ALLSTON
ADDISON
CUTTERWY
WY
ST
T
ST
ST
ST
ST
HASKELL
ST
CARRISON
66TH
ST
ST
ST
ST
ST
STACTON
DRDR
BOLIVAR
BOLIVAR
FRESNOAV
AV
MABEL
ST
STWEST
VALLEY
ST
BONAR
BYRON
PARKST
ST
BAKER
ST
CALIFORNIA
ST COLUSALOWELL
AVTULR
AV
NAPABEVERLY
PAV L
AV
GRAN
TMCGE
E
CALI
FORN
IAST
ST
BONI
TA
MILV
IA
STHA
RPER
AVST
PARDEE ST
ST
61ST
ADDISON
WY
LINCOLN
58TH
ST
ST
ST
S
ST
RAMO
NACA
RMEL
POMO
NA
V
RAMONA AVCARMEL
POMONA
KEY
STANNAGE
KAINS
AV
AV
ROUTEAV
10TH
AVAVAV
AV
ST
AVST
5THST
ST4TH
6THST
RCERRITO
ST5TH
3RDST
ST4TH
ST2ND
STST
2NDGE
ST
ST
SHELLMOUND
CHRISTIEST
ST8TH
9TH7TH
ST5TH
ST4TH
STST
STST
7TH
9THST
ST
8TH
10TH
7TH
STST
ST
ST
10TH
9TH
VALLEJO
ASONOMA
STST
PERALTA
ORDWAY
CURTIS
NEILSON
ST ST
AV MERCED
ER
ST
CARLETON
ST
ST
ST
DARTMOUTH
ST
ST
ST
JONES
PAGE
HARRISON
CEDAR
AV
ST
HEINZ
GRAYSON
CAMELIA
ST
ST
CHANNING
MONROE
BANCROFT
HEARST
VIRGINIA
PARKER
WY
WY
AV
ST
ST
ST67TH
65TH
ST
VENTURA
E
BLVD
W
ST
ADA
DRBOLIVAR
WFRONTAGE
EASTSHORE
RDFRONTA
8THST
D
W
HWY
EA S T S H OR
ST
E
STSTST
BROWNING
CURTIS
ACTON
ST
AVMCGEE
GRANT
IDAHO
T
65TH
TACOMA
AV
ST62ND
ST
AVAV
MONT
Y
WARD
BLAKE
CHANNINGWY
ST
ST STWARD
STDERBYST
CARLETON
PARKERSTST
DELAWARE
FRANCISCO
VINE
STUART
ST
OREGON
ST
61ST ST
FAIRVIEW
ST
ACTON
MATHEWS
MABEL
ST
S
ST
CALIFORN
IA
CHESTNUT
ACTON
ST
ST
JEFFERSON
MCKINLEYMC
GEE ROOSEVELT
GRAN
T
ST
AV
AV AV
ST
ST
ST
ST
ELLIS
KING
ST
AV
MILVIA
AVAV
CARLOTTA
MCGEE
ST
RUSSELL
ST
66TH
ST
TELVIN
STST
STTEVLIN
AV
ACTON
NORTHSIDE
AV
ALBANYTER
MANORTERRACE
WYFRANCIS
ST
WATKINSST
ST
STFRANCIS
TEVL
ADELINE
ST
IN
CT
STAC
TON
DR
STST
WEST
AVRO
OSEV
ELT
STPAGE
ST
STFAIRVI
EWCIR
CITY
DR
CATH
ERIN
E
KEON
CRES
T
KEON-CREST
ROCK
COWPER ST
DR
MILVIA
TOMLEE
DRJAYN
ESWYA
DR
STCYPRESS
J
A
UN
FRONT
B O L
STWEST
ITA
TAYLOR
STSUNSET
FILLMOREWK
ST
VAR
ST
LA
AV
BELVEDERE
S
STANTON
DR
LIQUID
SUGAR
WYGULF
WYSHIP
LIBERTY
I
I
ST
KULA
ORDWAY
ST
JOHNSON
CALHOUN
ST
ST
H
STWFRONTAGE
RD
S
STATIONPL
AE
WESTPL
CTMIRAMONTE
R
VN
K
O
ST S
PTH
STCHAUCER
WEST
NORTH
ST
JAYNES
OP
N
AMD
DEL
LP
LIMITS
AV
ALB
V
I
A
N
R
A
U
STROSE
STPOE
CTACROFT
ACTON
DELAWAREST
STLINCOLN
LINCOLN
HEARST
AV
61STST
ORDWAYST
CT
F
KAINSAV
WY
ST9TH
ST5TH
ST
WYGOODING
6TH ST
O
AV
AV
AVKAINS
STANNAGECORNELL
IST
BOISE
AV
HELEN CT
OVERLAND
KINKEAD
WYEND
WEST
STWALLACE
N
L
HERZOG
ST
STST
DOHR
ST
KING
STANTON
CAMELIA
WASHINGTON
STANTHON
Y
T
AV
DWIGHT
BATAAN
ST
WY
DELAWARE
ST
GRACEAV
ST
AV
STMATHEWS
STBYRON
ADOHR
ESSEX
ST
ST
S
AVLN
COSTE
STSHORT
STSHORT
ST
C
LA
POTTER
ST
ST60TH
AVANGELES1
AVENT
AV
YOLO
ST
VALL
EY
STN
FRAN
KLIN
ST
EOLA
ST
EDIT
H
JOSE
PHINE
ST
STHO
LLY ST
EDIT
H
HOLL
YST
JOSE
PHINE
CRES
ST
WGDNS
VIRGINIA
ST
COMS
TOCK
CT
A
CRES
AV
ACTO
NCI
R
TRUTHSOJOURNER
RCT
BUENA
AV
STST
ONIA
PEABODY
RR
RR
UP
BART
POPO
BERKELEY
DOUBLETREE
MARINA
HOTEL
EASTSHORE
PARK
STATE
EASTSHORE
STATE
PARK
FSPS
FS
CH
MID
FS
GATE
FIELDS
INDIAN ROCKPARK
OCEANVIEWPARK
UNIVERSITYPARK
HEALTHCTR
CHRISTIEPARK
61ST
ROSECEDAR
PARK
PARKST
TERRACEPARK
PARK
GOLDENGATE
OHLONEPARK
PARKLIB
THEATER
BERKCOMM
GROVE
CTR
REGIONALU.S.D.A.
WESTERN
LABRESEARCH
VISTA
VETERANS
REC
COMM
HOUSEBOAT
STA
RADIOKRE
STA
KENNEYJAMES
CTRREC
RAMADAINN
FS
LIB
CTR
PARK
RIDE&
BOWLINGGREENS
COLLEGEST
STA
MARYSHS
PLGD
MID
CENTER
HS
HSBERKELEY
CIVIC
EASTSHORE
STATE
BERKELEY
PARK
AQUATICPARK
FS
PO
LIB
MID
PABLOSAN
PARK
PO
PS
13B
14
13B13A
13
12
12
11
11
10
10
2800
2700
2600
2500
1400
1600
1800
1500
1900
2100
20 00
1600
600 1100
1200
1100
1300
700
9001000
15001700
12001400 1600
1600
1600
6200
1100 15001300 1700
12001400
11001300
12001400
16001500 1800
17001900
1100
1400
1700
1100
14001500
1000
800
1800
1500
1500
1500
1300
2600
2500
2300
2300
2200
2200
2100
2100
1900
2000
19001800
1800
1800
1700
1700
1600
1600
1600
1600
1500
1500
14001300
1200
1100
1000
1000
900
900
900
900
800
6600
800
1000
900700
600
800
1000700
800600
1000
700
900
900
600
7001800
1800
1600
1600
1400
1200
1100
1000
1700
1500
1700
1500
1900
1000
190009 0
1900
609
629
C D E F G
C D E F G
6
7
1
2
3
4
5
6
7
1
2
3
4
5
©2008 Rand McNally & Company0 ft 1200 2400
Source: 2009 Thomas Brothers Maps
PROJECT NO. DATEFIGURE 12790-1 September 2015
2100 SAN PABLO AVENUEBerkeley, California
VICINITY MAPALAN KROPP& ASSOCIATES
GeotechnicalConsultants
When making a vicinity map:
Open the Thomas Brothers digital mapSearch for your addressZoom to zoom 7Print using Adobe PDF or PDF 995 as your printerSet the paper size to 11x17, landscape - save in drafted figures folderOpen the Master 2009 Vicinity Map file in illustratorFile -> Place, browse for the Thomas Brother pdfRotate the pdf - right click on image, Transform, Rotate (usually 270 degrees)Scale the PDF - right click on image, Transform, Scale - 99.1%Send the TB map to the back - Edit -> Cut, Edit -> Paste in BackSelect both the map and the rectangle on the screen, Make a clipping mask, Right click, Make clipping maskPut it on layer 2 - Edit Cut, Select layer 2, Edit Paste in BackMove the site identifiier (star, circle, etc.) to the correct locationUpdate Job Name, number and datePrint PageWhen the map is printed, check the scale
SITE
01000 1000 2000
APPROXIMATE SCALE (FEET)
!A
!A
Addison Street
San
Pab
lo A
ven
ue
B-1
B-2
SITE PLAN
2100 SAN PABLO AVENUEBerkeley, California
2790-1 September 2015FIGURE 2
PROJECT NO. DATE
³
Original figure produced in color.Base: Pictometry Online, 6/19/14.
LEGEND
0 40 80
APPROXIMATE SCALE (FEET)
Approximate location of exploratory boring
Approximate limits of proposed project
!A B-1
APPENDIX A
Boring Logs
PROJECT NO. DATEFIGURE
ALAN KROPP& ASSOCIATES
GeotechnicalConsultants
KEY TO EXPLORATORY BORING LOGS
A-12790-1 September 2015
2100 SAN PABLO AVENUEBerkeley, California
SILTS AND CLAYSSAND GRAVEL
COBBLES BOULDERSFINE MEDIUM COARSE FINE COARSE
200 40 10 4 3/4" 3" 12"U. S. STANDARD SERIES SIEVE CLEAR SQUARE SIEVE OPENINGS
GRAIN SIZES
GROUPSYMBOL
SECONDARY DIVISIONS
GROUP NAMECRITERIA *GW
GP
GM
GC
SW
SP
SM
SC
CL
ML
OL
CH
MH
OH
PT
PRIMARY DIVISIONS
CLEAN GRAVELSLESS THAN5% FINES
GRAVELS WITHFINES - MORE
THAN 12% FINES
CLEAN SANDSLESS THAN5% FINES
SANDS WITHFINES - MORE
THAN 12% FINES
INORGANIC
ORGANIC
INORGANIC
ORGANIC
CO
AR
SE
-GR
AIN
ED
SO
ILS
MO
RE
TH
AN
50%
RE
TAIN
ED
ON
NO
.200
SIE
VE
FIN
E-G
RA
INE
D S
OIL
S50
% O
R M
OR
E P
AS
SE
S T
HE
NO
.200
SIE
VE
Well-graded gravel
Poorly-graded gravel
Silty gravel
Clayey gravel
Well-graded sand
Poorly-graded sand
Silty sand
Clayey sand
Lean clay
Silt
Fat clay
Elastic silt
Peat
Organic Clay & Organic Silt
Organic Clay & Organic Silt
Cu ≥ 4 AND 1 ≤ Cc ≤ 3 A
Cu < 4 AND/OR 1 > Cc > 3
FINES CLASSIFY AS ML OR MH
FINES CLASSIFY AS CL OR CH
Cu ≥ 6 AND 1 ≤ Cc ≤ 3
Cu < 6 AND/OR 1 > Cc > 3
FINES CLASSIFY AS ML OR MH
FINES CLASSIFY AS CL OR CH
PI > 7 AND PLOTS ON OR ABOVE "A" LINE
PI < 4 OR PLOTS BELOW "A" LINE
LIQUID LIMIT - OVEN DRIED
LIQUID LIMIT - NOT DRIED< 0.75
PI PLOTS ON OR ABOVE "A" LINE
PI PLOTS BELOW "A" LINE
PRIMARILY ORGANIC MATTER, DARKIN COLOR, AND ORGANIC ODOR
LIQUID LIMIT - OVEN DRIED
LIQUID LIMIT - NOT DRIED< 0.75
REFERENCE: Unified Soil Classification System (ASTM D 2487-11)
SOIL CLASSIFICATION CHART
A – Cu = D60/D100 & Cc = (D30)2 / (D10 x D60)
SYMBOLS
Bag Sample
Standard PenetrationTest Split Spoon(2-inch O.D.)
Modified CaliforniaSampler(3-inch O.D.)
Thin-walled SamplerTube (either Pitcher orShelby) (3-inch O.D.)
Rock Core
Groundwater Levelafter drilling
ABBREVIATIONS
INDEX TESTSLL - Liquid Limit (%) (ASTM D 4318-10E1)PI - Plasticity Index (%) (ASTM D 4318-10E1)-200 - Passing No. 200 Sieve (%) (ASTM D 1140-14)STRENGTH TESTSPP - Field Pocket Penetrometer test of unconfined compressive strength (tsf)TV - Field Torvane test of shear strength (psf)UC - Laboratory unconfined compressive strength (psf) (ASTM D 2166/2166M-13)TXUU - Laboratory unconsolidated, undrained triaxial test of undrained shear strength (psf) (ASTM D 2850-03a)MISCELLANEOUSATOD - At time of drillingpsf/tsf - pounds per square foot / tons per square footpsi - pounds per square inch (indicates relative force required to advance Shelby tube sampler)
* Criteria may be done on visual basis, not necessarily based on lab testing
GRAVELSMORE THAN 50% OFCOARSE FRACTION
RETAINED ON NO.4 SIEVE
SANDS50% OR MORE OF
COARSE FRACTIONPASSES NO. 4 SIEVE
SILTS AND CLAYSLIQUID LIMIT LESS
THAN 50%
SILTS AND CLAYSLIQUID LIMIT 50%
OR MORE
HIGHLY ORGANIC SOILS
Groundwater Levelduring drilling
FILL
86
88
92
92
105
99
85
PP = 4.5 tsfLL = 19PI = 31
-200 = 62%
PP = 4.5 tsf
PP = 2.0 tsf
PP = 3.0 tsfLL = 69PI = 48
-200 = 82%
PP = 3.0-3.25 tsf
-200 = 46%
NOTES:
15
12
21
26
18
21
35
LOGGED BY: AL
DATE DRILLED: 8/10/15BORING DIAMETER: 4 in. inches
DRILL RIG: B-24, Solid Flight Auger SURFACE ELEVATION: 55 (see notes)
DEPTH TO GROUNDWATER: 30.5 feet (see notes)
SO
IL T
YP
E
SA
MP
LE
R T
YP
E
DE
PT
H(f
t)
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
DR
Y D
EN
SIT
Y(p
cf)
(Continued on Next Page)
DESCRIPTION AND REMARKS
CO
LO
R
CO
NS
IST
EN
CY
OT
HE
R T
ES
TS
EXPLORATORY BORING LOG
SA
MP
LE
RB
LO
W C
OU
NT
S
MO
IST
UR
EC
ON
TE
NT
(%
)
1 of 2 1BORING NO.2790-1PROJECT NO.
2100 SAN PABLO AVENUEBerkeley, California
SHEETDATESeptember 2015A
KA
BO
RIN
G L
OG
27
90-1
BO
RIN
G L
OG
S.G
PJ
AK
A_
TE
MP
LAT
E.G
DT
9/9
/15
CL
CL
CL
CH
CH
SC
CL
AC/ Base rock - small amount of lightbrown sandy siltCLAY, Lean, Sandy - with silt, fine-grainedsand, some fine, angular gravel (FILL)
CLAY, Lean - with fine to medium-grainedsand, some silt, some thin lense of clayeysand, trace fine gravel, moist
CLAY, Lean - with sand to sandy, mediumplasticity, with fine to coarse-grained sand,trace fine sub-angular gravel, trace silt
CLAY, Fat - with rounded, coarse-grainedsand, some silt, moist
CLAY, Fat - with sand, trace fine gravel,moist
-sandy, some wet pocketsSAND, Clayey - fine to medium-grained,trace coarse sand, trace silt, moist, somewet pocketsCLAY, Lean - with silt to silty, trace finesand, wet
Bottom of boring at 31.5 feet.
Dark Gray &Black
Brown to ReddishBrown
Reddish Brown
Brown to Reddish& YellowishBrown
Reddish Brown,trace Bluish Gray,trace Black
Brown to ReddishBrown
Brown toYellowish Brown
Reddish Brown &Gray
Very Stiff
Very Stiff
Stiff to Very Stiff
Very Stiff
Very Stiff
Medium Dense
Stiff
[26]
17
[26]
[23]
[28]
[37]
[24]
[21]
1. Groundwater was encountered at approximately 31 feet at the time of drilling and was at a depth of about 30.5 feet 1 hour afterdrilling. (See report for discussion.)
2. Stratification lines represent the approximate boundaries between material types and the transitions may be gradual.
3. Penetration resistance values (blow counts) enclosed in brackets ([ ]) were recorded with a 3.0-inch O.D. Modified Californiasampler; these are not standard penetration resistance values.
4. Elevations were determined from Google Earth Pro data, dated May 11, 2015.
5. Approximate unconfined compressive strength values were recorded in the field using a pocket penetrometer. These valuesare shown on the logs and are preceded by the symbol "PP".
SO
IL T
YP
E
SA
MP
LE
R T
YP
E
DE
PT
H(f
t)
DR
Y D
EN
SIT
Y(p
cf)
(Continued from Previous Page)
DESCRIPTION AND REMARKS
CO
LO
R
CO
NS
IST
EN
CY
OT
HE
R T
ES
TS
EXPLORATORY BORING LOG
SA
MP
LE
RB
LO
W C
OU
NT
S
MO
IST
UR
EC
ON
TE
NT
(%
)
2 of 2 1BORING NO.2790-1PROJECT NO.
2100 SAN PABLO AVENUEBerkeley, California
SHEETDATESeptember 2015A
KA
BO
RIN
G L
OG
27
90-1
BO
RIN
G L
OG
S.G
PJ
AK
A_
TE
MP
LAT
E.G
DT
9/9
/15
FILL
88
94
90
104
102
87
PP = 4.0 tsf
PP = 1.5 tsf
PP = 2.75 tsf
LL = 31PI = 15
-200 = 40%
NOTES:
25
18
24
14
20
30
LOGGED BY: AL
DATE DRILLED: 8/10/15BORING DIAMETER: 4 in. inches
DRILL RIG: B-24, Solid Flight Auger SURFACE ELEVATION: 52 (see notes)
DEPTH TO GROUNDWATER: 17 feet (see notes)
SO
IL T
YP
E
SA
MP
LE
R T
YP
E
DE
PT
H(f
t)
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
DR
Y D
EN
SIT
Y(p
cf)
(Continued on Next Page)
DESCRIPTION AND REMARKS
CO
LO
R
CO
NS
IST
EN
CY
OT
HE
R T
ES
TS
EXPLORATORY BORING LOG
SA
MP
LE
RB
LO
W C
OU
NT
S
MO
IST
UR
EC
ON
TE
NT
(%
)
1 of 2 2BORING NO.2790-1PROJECT NO.
2100 SAN PABLO AVENUEBerkeley, California
SHEETDATESeptember 2015A
KA
BO
RIN
G L
OG
27
90-1
BO
RIN
G L
OG
S.G
PJ
AK
A_
TE
MP
LAT
E.G
DT
9/9
/15
CL
SC
CL
CH
CH
SC
CL
-crushed gravel asphaltCLAY, Lean, Silty - trace sand, moist(FILL)
-with silt, trace medium grained sand(Possible FILL)SAND, Clayey - medium tocoarse-grained, some silt, trace fine gravel,moist
CLAY, Lean - medium plasticity, some silt,trace fine to medium grained sand, moist
CLAY, Fat, Sandy - some silt, trace finegravel, moist
CLAY, Fat - medium plasticity, some silt,some fine to coarse sand, moist
SAND, Clayey - fine to coarse-grained, wet
-thin lenses of poorly graded,medium-grained sand
CLAY, Lean, Sandy - with silt, wet
Bottom of boring at 31.5 feet.
Dark Gray &Black
Dark Gray
Brown
Brown to ReddishBrown
Brown &Yellowish Brown
Brown to ReddishBrown
Brown to ReddishBrown
Brown
Stiff
Loose
Stiff
Very Stiff
Very Stiff
Loose
Firm
[23]
10
[13]
[18]
[34]
[27]
[12]
7
1. Groundwater was encountered at approximately 25 feet at the time of drilling and was at a depth of about 17 feet .5 hours afterdrilling. (See report for discussion.)
2. Stratification lines represent the approximate boundaries between material types and the transitions may be gradual.
3. Penetration resistance values (blow counts) enclosed in brackets ([ ]) were recorded with a 3.0-inch O.D. Modified Californiasampler; these are not standard penetration resistance values.
4. Elevations were determined from Google Earth Pro data, dated May 11, 2015.
5. Approximate unconfined compressive strength values were recorded in the field using a pocket penetrometer. These valuesare shown on the logs and are preceded by the symbol "PP".
SO
IL T
YP
E
SA
MP
LE
R T
YP
E
DE
PT
H(f
t)
DR
Y D
EN
SIT
Y(p
cf)
(Continued from Previous Page)
DESCRIPTION AND REMARKS
CO
LO
R
CO
NS
IST
EN
CY
OT
HE
R T
ES
TS
EXPLORATORY BORING LOG
SA
MP
LE
RB
LO
W C
OU
NT
S
MO
IST
UR
EC
ON
TE
NT
(%
)
2 of 2 2BORING NO.2790-1PROJECT NO.
2100 SAN PABLO AVENUEBerkeley, California
SHEETDATESeptember 2015A
KA
BO
RIN
G L
OG
27
90-1
BO
RIN
G L
OG
S.G
PJ
AK
A_
TE
MP
LAT
E.G
DT
9/9
/15