Giant Mine Remediation Project NATO/CCMS Pilot Study Meeting Ottawa June 2005

Giant Mine Remediation Project - CLU-IN Yellowknife Gold Mine produced ... C-SHAFT Frozen Block Conceptual Design CHANNELIZE ... Giant Mine Remediation Project

  • Upload
    vonhi

  • View
    223

  • Download
    1

Embed Size (px)

Citation preview

Page 1: Giant Mine Remediation Project - CLU-IN Yellowknife Gold Mine produced ... C-SHAFT Frozen Block Conceptual Design CHANNELIZE ... Giant Mine Remediation Project

Giant Mine Remediation Project

NATO/CCMS Pilot Study MeetingOttawa June 2005

Page 2: Giant Mine Remediation Project - CLU-IN Yellowknife Gold Mine produced ... C-SHAFT Frozen Block Conceptual Design CHANNELIZE ... Giant Mine Remediation Project

Giant Mine Location

CON MINE

Original Giant Mine “A” Shaft (1945)

Page 3: Giant Mine Remediation Project - CLU-IN Yellowknife Gold Mine produced ... C-SHAFT Frozen Block Conceptual Design CHANNELIZE ... Giant Mine Remediation Project

1935 – gold discovery! - 21 original claims staked by Burwash Yellowknife

Mines Ltd.

From first production in 1948 until 2004 Giant Yellowknife Gold Mine produced

over 7 million ounces of gold.

Page 4: Giant Mine Remediation Project - CLU-IN Yellowknife Gold Mine produced ... C-SHAFT Frozen Block Conceptual Design CHANNELIZE ... Giant Mine Remediation Project

BackgroundSeveral companies owned and operated Giant Mine for 55 years Legacy of mining activity• Toxic arsenic trioxide dust in underground storage (237,000 tonnes)• Buildings with severe arsenic contamination, asbestos insulation• Decaying mine infrastructure• Tailings impoundments, sludge settling and polishing ponds• Contaminated surficial materials (arsenic and hydrocarbon)• Inadequate Abandonment and Restoration Plan• Negligible financial security in place for remediation

1999 - Royal Oak Mines forced into receivership

Page 5: Giant Mine Remediation Project - CLU-IN Yellowknife Gold Mine produced ... C-SHAFT Frozen Block Conceptual Design CHANNELIZE ... Giant Mine Remediation Project

Background1999: Indian and Northern Affairs Canada (INAC) entered into an agreement with Miramar to provide ongoing care and maintenance of Giant Mine – agreement also allowed Miramar to operate mine on reduced scaleMiramar indemnified for existing condition of mineAgreement allowed INAC to:

Develop options with Technical Advisor for the management of the underground arsenic trioxide Work with community to reach a preferred option Secure funding - Federal Contaminated Sites Accelerated Action PlanNegotiate cooperation agreement between Canada and Government of the NWT

Page 6: Giant Mine Remediation Project - CLU-IN Yellowknife Gold Mine produced ... C-SHAFT Frozen Block Conceptual Design CHANNELIZE ... Giant Mine Remediation Project

Ore ProcessingRefractory ore

Arsenopyrite concentrate was roasted at high temperature (~500oC) to break down the mineral structure and liberate gold

Page 7: Giant Mine Remediation Project - CLU-IN Yellowknife Gold Mine produced ... C-SHAFT Frozen Block Conceptual Design CHANNELIZE ... Giant Mine Remediation Project

Roasting process to extract gold produced 237,000 tonnes of arsenic dust as byproduct – now in underground storage

Page 8: Giant Mine Remediation Project - CLU-IN Yellowknife Gold Mine produced ... C-SHAFT Frozen Block Conceptual Design CHANNELIZE ... Giant Mine Remediation Project

Gold Extraction by Roasting

S 19.96%

As2O3

Common Impurities Au, Ag, Co, Sn, Ni, Sb, B, Cu, Pb

Fe 34.3%

As 46.01%

Arsenopyrite Fe3+ As S

Page 9: Giant Mine Remediation Project - CLU-IN Yellowknife Gold Mine produced ... C-SHAFT Frozen Block Conceptual Design CHANNELIZE ... Giant Mine Remediation Project

Arsenic trioxide dust in storage underground is enclosed completely in rock – all access drifts sealed by thick cement bulkheads

“ C” Headframe

2000

S

1000

S

0 N

1000

N

“ B” ShaftVentilation Intake

UBCPortal

5000

6000

250 LEVEL

425 LEVEL

100 LEVEL

5500575 LEVEL

C212

C10

C9 #15

#14

#12

#11

B230

B234

B208

B233

B235

B236

B214

B213

B212

Arsenic Chambers Long Section: 10 chambers & 5 stopes

Page 10: Giant Mine Remediation Project - CLU-IN Yellowknife Gold Mine produced ... C-SHAFT Frozen Block Conceptual Design CHANNELIZE ... Giant Mine Remediation Project
Page 11: Giant Mine Remediation Project - CLU-IN Yellowknife Gold Mine produced ... C-SHAFT Frozen Block Conceptual Design CHANNELIZE ... Giant Mine Remediation Project

Interior of empty storage chamber

Page 12: Giant Mine Remediation Project - CLU-IN Yellowknife Gold Mine produced ... C-SHAFT Frozen Block Conceptual Design CHANNELIZE ... Giant Mine Remediation Project

11 story office tower in Yellowknife

Page 13: Giant Mine Remediation Project - CLU-IN Yellowknife Gold Mine produced ... C-SHAFT Frozen Block Conceptual Design CHANNELIZE ... Giant Mine Remediation Project

• Surface– Buildings and other infrastructure

• Hazardous waste removal and demolition of contaminated structures

– Contaminated soils (arsenic and hydrocarbon)– Pits and mine openings– 4 tailings impoundments– Effluent treatment, settling and polishing ponds– Baker Creek– Junk equipment/scrap lay down areas

• Underground– Arsenic trioxide dust storage chambers

• Requirement for indefinite period of effluent treatment

Giant Mine Remediation

Page 14: Giant Mine Remediation Project - CLU-IN Yellowknife Gold Mine produced ... C-SHAFT Frozen Block Conceptual Design CHANNELIZE ... Giant Mine Remediation Project

Baker Creek NORTHWEST TAILINGS POND

TREATMENT PLANTBack Bay

C-SHAFT

Frozen Block Conceptual Design

CHANNELIZE BAKER CREEK

BACKFILL BACKFILL

B1 Pit

C1 Pit

Page 15: Giant Mine Remediation Project - CLU-IN Yellowknife Gold Mine produced ... C-SHAFT Frozen Block Conceptual Design CHANNELIZE ... Giant Mine Remediation Project

Water

Freezing and Water Management Sequence

Page 16: Giant Mine Remediation Project - CLU-IN Yellowknife Gold Mine produced ... C-SHAFT Frozen Block Conceptual Design CHANNELIZE ... Giant Mine Remediation Project

Four separate areas of freezing

Page 17: Giant Mine Remediation Project - CLU-IN Yellowknife Gold Mine produced ... C-SHAFT Frozen Block Conceptual Design CHANNELIZE ... Giant Mine Remediation Project
Page 18: Giant Mine Remediation Project - CLU-IN Yellowknife Gold Mine produced ... C-SHAFT Frozen Block Conceptual Design CHANNELIZE ... Giant Mine Remediation Project

Ambientcold air

Heat released

CO2

CondensationCold

Liquid

Heat absorbed(cooling)

Evaporation

LiquidCO2

Warm ground

Passive Freezing

Page 19: Giant Mine Remediation Project - CLU-IN Yellowknife Gold Mine produced ... C-SHAFT Frozen Block Conceptual Design CHANNELIZE ... Giant Mine Remediation Project

Hybrid thermosyphon

conceptual design

Page 20: Giant Mine Remediation Project - CLU-IN Yellowknife Gold Mine produced ... C-SHAFT Frozen Block Conceptual Design CHANNELIZE ... Giant Mine Remediation Project

Hybrid Thermosyphons

Diavik Diamond Mine

Page 21: Giant Mine Remediation Project - CLU-IN Yellowknife Gold Mine produced ... C-SHAFT Frozen Block Conceptual Design CHANNELIZE ... Giant Mine Remediation Project
Page 22: Giant Mine Remediation Project - CLU-IN Yellowknife Gold Mine produced ... C-SHAFT Frozen Block Conceptual Design CHANNELIZE ... Giant Mine Remediation Project

Giant Mine Site – Plan Map of Surface Features

Page 23: Giant Mine Remediation Project - CLU-IN Yellowknife Gold Mine produced ... C-SHAFT Frozen Block Conceptual Design CHANNELIZE ... Giant Mine Remediation Project

Demolition of hazardous buildings prior to contaminated soils removal

Page 24: Giant Mine Remediation Project - CLU-IN Yellowknife Gold Mine produced ... C-SHAFT Frozen Block Conceptual Design CHANNELIZE ... Giant Mine Remediation Project

Northwest Tailings Pond

Tailings graded, covered natural drainage established

Page 25: Giant Mine Remediation Project - CLU-IN Yellowknife Gold Mine produced ... C-SHAFT Frozen Block Conceptual Design CHANNELIZE ... Giant Mine Remediation Project
Page 26: Giant Mine Remediation Project - CLU-IN Yellowknife Gold Mine produced ... C-SHAFT Frozen Block Conceptual Design CHANNELIZE ... Giant Mine Remediation Project

Effluent Treatment Plant and Settling Pond will be covered using design similar to tailings cover

Page 27: Giant Mine Remediation Project - CLU-IN Yellowknife Gold Mine produced ... C-SHAFT Frozen Block Conceptual Design CHANNELIZE ... Giant Mine Remediation Project

Baker Creek Rehabilitation

Page 28: Giant Mine Remediation Project - CLU-IN Yellowknife Gold Mine produced ... C-SHAFT Frozen Block Conceptual Design CHANNELIZE ... Giant Mine Remediation Project

Remediation PlanReview by expert federal departments

• Environment Canada• Fisheries• Health Canada

Regulatory Board Review ( 2 years)• Additional public input• Possible Full Environmental Assessment

Page 29: Giant Mine Remediation Project - CLU-IN Yellowknife Gold Mine produced ... C-SHAFT Frozen Block Conceptual Design CHANNELIZE ... Giant Mine Remediation Project

Giant Mine Remediation Project

Diane WalshAdministrativeCoordinator

Bill MitchellProject Manager

Mark LiskowichHead, Technical andEnvironmental Services

Manny LimProject Specialist

Alex GlowachProject Specialist

Mark CronkEngineer PWGSC

Rosanna MassimiEnvironmental Scientist

For more detailed information:http://giant.gc.ca

Ben NordahnMining Technical

Specialist