Gujarat International Finance Tec‐City (GIFT)

Presentation at

1

Regional Best Practices Seminar

Manila, Philippines29 – 30 April, 2009

Click Here DownLoad

Page 2: Gift City PDF 4246

8/6/2019 Gift City PDF 4246

http://slidepdf.com/reader/full/gift-city-pdf-4246 2/41

Transport

Gujarat International Finance Tec‐City

u ara s  reng s

Traditional Business Community

High Growth Economy‐‐ >10 % over last five years

Pool of  Trained Manpower

CAs

Commerce Graduates

‐‐ 

capitalization

2

2

 

Click Here DownLoad

Page 3: Gift City PDF 4246

8/6/2019 Gift City PDF 4246

http://slidepdf.com/reader/full/gift-city-pdf-4246 3/41

Need for Finance City in India

 

• Financial Services

• IT/ITeS

• BPO/KPO

• As  er McKinse   Stud   b   2020   : 

• The sector could provide a potential 10 million to 11 million  jobs

• About 

800 

mn 

sq 

ft 

of  

off ice 

space 

• GDP contribution could out erform at a rate of  15 to 20  er cent 

• Opportunities are constrained:

• n rastructure  ott enec s 

• Overcrowded Cities

• Solution: Settin   u   Self ‐sustainin   Cities 

3

3

Click Here DownLoad

Page 4: Gift City PDF 4246

8/6/2019 Gift City PDF 4246

http://slidepdf.com/reader/full/gift-city-pdf-4246 4/41

Need for Finance City in India

 International financialcenter, with suitable rules

and regulations theearnings out of financial

that of IT”

 – Percy Mistry, (Fmr) World Bank

“Offshoring industryneeds at least fivenew ‘Gur aon’ andfive to seven new‘Pune plus’”

4

4

 – –

report

Click Here DownLoad

Page 5: Gift City PDF 4246

8/6/2019 Gift City PDF 4246

http://slidepdf.com/reader/full/gift-city-pdf-4246 5/41

5Financial Services Opportunities

u ara as o en a o ccess a arge nanc a erv ces ppor un y

Estimated No

Sr.

No. Financial Services

o o s

(Thousands)Year 2020

1Core

Financial

Financial Services Operations 125-150

2

Financial Services Corporate

Centr e 100-125

3 Select Product Markets 10-15

4 Capital Markets & Tr ading 2-4

-6 ITeS for Financial Services 75-100

Total 500-600

5

5

An additional 5,00,000 indirect  jobs is expected to be created by 2020

Click Here DownLoad

Page 6: Gift City PDF 4246

8/6/2019 Gift City PDF 4246

http://slidepdf.com/reader/full/gift-city-pdf-4246 6/41

Transport

Gujarat International Finance Tec‐City Company Limited 

Gujarat International Finance Tec‐City

(GIFTCL) incorporated  in June 2007

50: 50 Joint Venture between

Gujarat Urban Development Co. Ltd. (GUDC) and 

.  . 

Management

4 Directors nominated by Government of  Gujarat

4 Directors nominated by IL&FS 

6

6

4 Independent Directors

Click Here DownLoad

Page 7: Gift City PDF 4246

8/6/2019 Gift City PDF 4246

http://slidepdf.com/reader/full/gift-city-pdf-4246 7/41

Location of GIFT

12 km from Ahmedabad

 

GIFT Area: 550 acres 

7

7

Click Here DownLoad

Page 8: Gift City PDF 4246

8/6/2019 Gift City PDF 4246

http://slidepdf.com/reader/full/gift-city-pdf-4246 8/41

8Master Planning

30 Building Blocks

125 Buildings

3 Landmark Buildings above 350 mt

27 Buildings above 150 mt

46 Buildings above 100 mt

3 Schools

200 Bed Hospital

8

8

4 Hotels  (~2500 rooms)

Click Here DownLoad

Page 9: Gift City PDF 4246

8/6/2019 Gift City PDF 4246

http://slidepdf.com/reader/full/gift-city-pdf-4246 9/41

Landmark Buildings

34

4

5Diamond

 

Tower1

12

River front2

Convention Centre3

Gateway Towers4

Transit Node5

9

9

Crystal Tower6

Click Here DownLoad

Page 10: Gift City PDF 4246

8/6/2019 Gift City PDF 4246

http://slidepdf.com/reader/full/gift-city-pdf-4246 10/41

Diamond Tower

Plot Area (Sq. Mt) 28,628

Total Area (Sq. ft) 4,286,056

- Above Ground (Sq. ft) 2,721,372

- Below Ground (Sq. ft) 1,564,684

Max Hei ht in Meters 405 

Max No. of Floors 86

Building Usece w  

support facilities

10

10

Package – D / Diamond Tower

Click Here DownLoad

Page 11: Gift City PDF 4246

8/6/2019 Gift City PDF 4246

http://slidepdf.com/reader/full/gift-city-pdf-4246 11/41

Gateway Towers

Plot Area (Sq. Mt) 39,864

Total Area (Sq. ft) 7,184,602

- Above Ground (Sq. ft) 5,356,978

- Below Ground (Sq. ft) 1,827,624

Max Height in Meters 350

Max No. of Floors 75

Building UseOffice with

support facilities

11

11

Package – C / Gateway Towers

Click Here DownLoad

Page 12: Gift City PDF 4246

8/6/2019 Gift City PDF 4246

http://slidepdf.com/reader/full/gift-city-pdf-4246 12/41

Transit Node

Plot Area (Sq. Mt) 28,628

Total Area (Sq. ft) 4,286,056

- Above Ground (Sq. ft) 2,721,372

- Below Ground (Sq. ft) 1,564,684

Max Hei ht in Meters 231 

Max No. of Floors 55

Building Use

,&

Commercial

12

12

Package – G / Transit Node

Click Here DownLoad

Page 13: Gift City PDF 4246

8/6/2019 Gift City PDF 4246

http://slidepdf.com/reader/full/gift-city-pdf-4246 13/41

Crystal Towers

Plot Area (Sq. Mt) 45,390

Total Area (Sq. ft) 8,484,407

- Above Ground (S . ft) 6,502,149

- Below Ground (Sq. ft) 1,982,258

Max Height in Meters 276

Max No. of Floors 65

Building UseOffice with

support facilities

13

13

Package – H / Crystal Towers

Click Here DownLoad

Page 14: Gift City PDF 4246

8/6/2019 Gift City PDF 4246

http://slidepdf.com/reader/full/gift-city-pdf-4246 14/41

Convention Centre 

Package – W/Convention Centre/ Museum

PlotArea(Sq. Mt)

Total Area

(Sq. ft)

Above Ground

(Sq. ft)

BelowGround (Sq.

ft)

Max

Height in

Meters

Max No. of 

Floors

Building Use

14

14

214,550 6,545,388 3,548,233 2,997,165 65 16 Convention

Center** Musuem, Auditorium, Cultural Center, Exhibition spaces with Support Facilities

Click Here DownLoad

Page 15: Gift City PDF 4246

8/6/2019 Gift City PDF 4246

http://slidepdf.com/reader/full/gift-city-pdf-4246 15/41

River Front

Packa e – V1 Dream River

Plot Area(Sq. Mt)

Total

Area (Sq.

ft)

Above

Ground

(Sq. ft)

BelowGround(Sq. ft)

Max Height

in Meters

Max No. of 

Floors

Building Use

15

15

31, 540 2,493,662 216,333 2,277,329 17 4 Recreational Place

with support facilities

Click Here DownLoad

Page 16: Gift City PDF 4246

8/6/2019 Gift City PDF 4246

http://slidepdf.com/reader/full/gift-city-pdf-4246 16/41

The GIFT Real Estate Component comprises Office, Service and Residential facilities

37%

11%

19%

GIFT Land use (in %)

Residential+ Commercial

Green space + Water bodies

PSP

Transpotation

BUA ComponentArea (Million

Sq.Ft.)*In %

Residential 20.94 23%

33%Commercial 54.0 5 60%

Hotel 2.05 2%

Retail 4.78 5% 1%

Built-up Area

Public Building 7.49 9%

Recreation 1.02 1%

23%

5%

2% Residential

Commercial

Retail

Hotel.  

60%

Public BuildingsRecreationalFor  ~91 Mn. Sq.Ft., balance area is  basement 

16

16

Click Here DownLoad

Page 17: Gift City PDF 4246

8/6/2019 Gift City PDF 4246

http://slidepdf.com/reader/full/gift-city-pdf-4246 17/41

Compared to the best CBD’s of the world

Paris La Defense Tokyo London Pudong GIFT

Paris LaDefense

Tokyo London Pudong GIFT

Land use Scale (sqkm) 1.6 1.6 1.05 1.7 2.04Construction

Scale(sqm)

2.5 mn 1.6 mn 1.1mn 4.5 mn 8.48 mn

Floor-area Ratio 1.56 1.00 1.05 2.65 4.13

reen e sqm , , , , ,

Height (m) 200 250 250 490 405

17

17

Click Here DownLoad

Page 18: Gift City PDF 4246

8/6/2019 Gift City PDF 4246

http://slidepdf.com/reader/full/gift-city-pdf-4246 18/41

GIFT Infrastructure Development Overview

Core Infrastructure

‐ Site Development

‐ Maintenance Systems

Transportation & Utilities

‐ Roads and Transportation

‐ Water Systems

‐ Waste Management Systems

‐ Power Generation and Distribution

‐ District Cooling System

‐ ICT

‐ Domestic Gas Distribution

18

18

Click Here DownLoad

Page 19: Gift City PDF 4246

8/6/2019 Gift City PDF 4246

http://slidepdf.com/reader/full/gift-city-pdf-4246 19/41

TRANSPORT CONNECTIVITY

Transportation  ………………………………………………………….  (1/8)

Direct Access from

all directions

Extension of BRTS

to GIFTExternal planned Road Network for GIFT connectivity

MRTS Plan

• External Connectivity at 6

19

19EXTERNAL ROAD CONNECTIVITY

p o n s

• Grade Separators to

support the network• Proposed RoW: 60-80m

Click Here DownLoad

Page 20: Gift City PDF 4246

8/6/2019 Gift City PDF 4246

http://slidepdf.com/reader/full/gift-city-pdf-4246 20/41

Transportation  ……………………………………………………….  (2/8)

Extension of  BRTS upto 

GIFT City

20

20

PHASE 1

BRTS Extension  – 37 km

Click Here DownLoad

Page 21: Gift City PDF 4246

8/6/2019 Gift City PDF 4246

http://slidepdf.com/reader/full/gift-city-pdf-4246 21/41

Transportation  ……………………………………………………………  (3/8)

• Additional link of  25 km 

,  , 

Ahmedabad and Gandhinagar

•  

by GIFT between Ahmedabad 

& Gandhinagar

• 2.5 lakhs trips per day one way 

by Year 2012 

• 5 lakhs trips per day one way by 

Year 

2018THALTEJ

KALUPUR

21

21

Click Here DownLoad

Page 22: Gift City PDF 4246

8/6/2019 Gift City PDF 4246

http://slidepdf.com/reader/full/gift-city-pdf-4246 22/41

Transport

Transportation  …………………………………………………………….  (4/8)

Segregating vehicular & pedestrian 

movement to maximum

 

Surface Roads (2/4 lane  – 14 km)

Modal Split of  10:90 between private 

and public transport

Walk to work concept

ecesse   oa s ‐ un ergroun   .  

km)Intelligent Transport System

Aiming Zero Fatal Accident City

Transit Oriented Development

  ameras 

96 HR Cameras

22

22

Recessed Road

Click Here DownLoad

Page 23: Gift City PDF 4246

8/6/2019 Gift City PDF 4246

http://slidepdf.com/reader/full/gift-city-pdf-4246 23/41

23Transportation  …………………………………………………………….  (5/8)

PARKING HUBS

 

Total Car parks capacity 85,000 cars

• 4 External Parking Hubs: 

•   ,  

■ Serve to receive – store – distribute supplies to

the city

■ Area = 12 acreCa acit : 800 ton

Logistic 

Centre

■ Located at junction of NH8 & main arterial

road to GIFT

23

23

NH 8

Click Here DownLoad

Page 24: Gift City PDF 4246

8/6/2019 Gift City PDF 4246

http://slidepdf.com/reader/full/gift-city-pdf-4246 24/41

Living Bridge:

Transportation  …………………………………………………………….  (6/8)

The ‘Living Bridge’ would have a length of 600 m,

8 lanes of divided carriageway with vertical

segregation of public transport and pedestrian

walkwa

24

24

Click Here DownLoad

Page 25: Gift City PDF 4246

8/6/2019 Gift City PDF 4246

http://slidepdf.com/reader/full/gift-city-pdf-4246 25/41

Page 26: Gift City PDF 4246

8/6/2019 Gift City PDF 4246

http://slidepdf.com/reader/full/gift-city-pdf-4246 26/41

Transport

Transportation  ………………………………………………………….  (8/8)

  –  

Innovative Technology 

■ Intelligent vehicle

■ Available on demand 24 x 7

■ Dedicated guide‐way network

Non stop travel direct to destination

■ Stations are offline

26

26

Video

Click Here DownLoad

Page 27: Gift City PDF 4246

8/6/2019 Gift City PDF 4246

http://slidepdf.com/reader/full/gift-city-pdf-4246 27/41

Water Source, Promenade and Water Front Development

 

Water Sources: 

Recycling and Reuse of  Wastewater 

Rainwater Harvesting

GIFT Master Reservoir

 

Perennial Water Front ensured through 

construction of  three barra es on river Sabarmati

Proposed Landscaped promenade at the river 

bank along GIFT

27

27

Click Here DownLoad

Page 28: Gift City PDF 4246

8/6/2019 Gift City PDF 4246

http://slidepdf.com/reader/full/gift-city-pdf-4246 28/41

Sewage treatment

oncep o ero sc arge yStage I: Primary treatment

Screening and Degritting

Stage 2: Secondary 

treatment 

Includes biological process 

and BOD

Stage 3: Tertiary 

treatment 

Polish the treated sewage 

after secondary treatment 

to brin   the water  ualit  

38 MLD (8.44

ewage reatment

Plant

o u ar es gnRecycled Water Use

Treated Water would be used for Flushing,

-

up to the level of  reuse

 

28

28

 

Cooling Towers

Click Here DownLoad

Page 29: Gift City PDF 4246

8/6/2019 Gift City PDF 4246

http://slidepdf.com/reader/full/gift-city-pdf-4246 29/41

Solid Waste Management

 

Minimize impact on environment, human intervention, space 

requirement, impact on health hazard

Automatic Collection and Transportation System

11

33

2

1. The waste is thrown into a disposal chute

2. Computer controlled access

29

29

. as e suc e   roug   p pes a   a spee   o   m r

Plasma Technology would be used for Waste Treatment

Video

Click Here DownLoad

Page 30: Gift City PDF 4246

8/6/2019 Gift City PDF 4246

http://slidepdf.com/reader/full/gift-city-pdf-4246 30/41

Power

 

Underground cabling for power distribution within the area of  GIFT

Substation and Distribution Automation

 

Reliability  – 99.999% which means 

.  

.   .

2. UG (Underground cabling system) 584 km.

3. ASS (Area Sub station) 14 nos.

4. PSS(Package 

Substation) 850 

nos.

5. CCR ( Central Control Room) 1 nos.

30

30

 

Central Control 

Centre 

Click Here DownLoad

Page 31: Gift City PDF 4246

8/6/2019 Gift City PDF 4246

http://slidepdf.com/reader/full/gift-city-pdf-4246 31/41

District Cooling

 

• Conventional AC System not Required

• Efficiency through economies of  scale

 

• Reduces 

maintenance 

costs• Improves air quality and temperature control 

• Total Capacity : 3.25 Lakh Ton

31

31

Click Here DownLoad

S i h

Page 32: Gift City PDF 4246

8/6/2019 Gift City PDF 4246

http://slidepdf.com/reader/full/gift-city-pdf-4246 32/41

Service Trenches

• 7.5 Km in length,6.5 mt height and 

width var in from 24 to 36 mts

n egra e   n ergroun   erv ce  renc es

 

• Supply of  services in a sub‐surface 

regular grid

• Bu ngs to tap  n t e gr   w erever required

• All services housed in various 

v s ons o   su ‐sur ace  c

• No service lines aboveground

•  

used for resource management  –water & power in particular

32

32

Click Here DownLoad

S i T h

Page 33: Gift City PDF 4246

8/6/2019 Gift City PDF 4246

http://slidepdf.com/reader/full/gift-city-pdf-4246 33/41

Service Trenches

Integrated Underground Service Trenches

33

33

Click Here DownLoad

Information and Communication Technology (ICT)

Page 34: Gift City PDF 4246

8/6/2019 Gift City PDF 4246

http://slidepdf.com/reader/full/gift-city-pdf-4246 34/41

Information and Communication Technology (ICT)

•   ccupants wou   ave access to  o ow ng  erv ces 

Infrastructure Platforms Services

High Speed Fibre *

Network 

Financial

 

ExtranetsCUG to Exchanges

DataVoice

Diverse Local and 

International 

Connectivity

Voice

Industry Specific 

Platforms

Wi‐Fi

Tier‐4 Data Centres

Pervasive Wireless and 

Mobile Network

Data Centres

City e‐Portal

Sensor Networks

 

Security 

High Speed Internet 

ccess 

Monitoring

*  About  8000 km  fibre (  equivalent  to  Ahmedabad  – Chicago Distance!  )

34

34

Click Here DownLoad

35Information & Communication Technology (ICT)

Page 35: Gift City PDF 4246

8/6/2019 Gift City PDF 4246

http://slidepdf.com/reader/full/gift-city-pdf-4246 35/41

35

GIFT  will  exceed  the ICT  capabilities of  comparator  cities

Information & Communication Technology (ICT)

Com etitive

All Fibre 

Platform

 

Connectivity

 

Centre

 

Wireless

1 GIFT

2 DIFC

Triple Play 

Buildings

 

Set‐up

 

Service 

Provision

 

"Place"

4

5

6

SONGDO

New WTC  – New York

Canary Wharf ‐ London

7

8

9

10

Pudong ‐ Shanghai

La‐Defense Paris

Singapore

London Stock Exchange

Source: Study  by  British TelecomPoor Reasonable Excellent Not Applicable

12

11 New York Stock Exchange

Tokyo

35

35

Click Here DownLoad

Construction Work Force Development

Page 36: Gift City PDF 4246

8/6/2019 Gift City PDF 4246

http://slidepdf.com/reader/full/gift-city-pdf-4246 36/41

20,000 workers can be employed during construction at peak

Construction Work Force Development

Specialized workforce required for

Construction of tunnel & Under ground roads

Construction of building having height of 300 ‐ 400 Mt

Specialized experts f or Survey, Quantity & Lab testing

Installation of huge Glass work/facades

Meetings held with various stakeholders for skill set development of construction

workforce

State Government to strengthen ITI’s

A separate institution to be set up for specialized construction work force

36

36

Click Here DownLoad

Talent Development Road Map

Page 37: Gift City PDF 4246

8/6/2019 Gift City PDF 4246

http://slidepdf.com/reader/full/gift-city-pdf-4246 37/41

Talent Development Road Map

Talent Development and Preference Study was undertaken by Hewitt Associates. 

Talent Demand in the State of  Gujarat. 

• To act as integrator for all Talent Development Initiatives

• To Liaise with Education Department and Universities• To Create of  Long Term Talent Development Plan

Finishing Schools–  

Training Schools– Skill Augmentation Courses f or Specific Domains for Entry & Middle level Management Talent

uca on  y  eve opmen– Development of  Education City that would offer Courses to ensure Sustainable  Supply of  Talent

School Education Infrastructure Development

37

37

– Development of  School Education Infrastructure in the State to ensure Long Term Talent Availability

Click Here DownLoad

Project Cost and Structuring

Page 38: Gift City PDF 4246

8/6/2019 Gift City PDF 4246

http://slidepdf.com/reader/full/gift-city-pdf-4246 38/41

Project Cost and Structuring

Core Infrastructure User Pay Utilities Real Estate

 

• Power Generation

• Power Distribution• Office

• Commercial

• Site Development

• Landscape

Rs.10,475Cr Rs. 25,021 Cr Rs. 34,774Cr

• as e  gm   ys em

• District Cooling

• Gas System

• ICT

• Resi entia

• Hotels

• oa s

• Storm Water Drainage

• River Training

• ar ng  ys em

To be developed 

PPP basis  To be developed by 

by GIFTCL

w t   equ ty 

by GIFTCL

occupiers 

developers

38

38

Click Here DownLoad

Means of Finance

Page 39: Gift City PDF 4246

8/6/2019 Gift City PDF 4246

http://slidepdf.com/reader/full/gift-city-pdf-4246 39/41

Means of  Finance

Source of  Fund Rs. Crores

GIFT Unit Fund 12,426

Strategic Investors 5,555

Debt 17,514

,

Total 70,270

39

39

Click Here DownLoad

Page 40: Gift City PDF 4246

8/6/2019 Gift City PDF 4246

http://slidepdf.com/reader/full/gift-city-pdf-4246 40/41

Implementation

• Phased: 1st

phase 20m sq feet•

• Agreement with IL&FS to build 7.3 m sq’

• es gn eve opmen or core

infrastructur e completed

• Proposed bond issue by June end