Upload
lakanph
View
244
Download
0
Embed Size (px)
Citation preview
8/8/2019 GK Operation Kalinga Sa Bayan Build Invitation Letter
1/2
October 22, 2010
Fellow GK Builder,
Since super typhoon Juan unleashed its fury, there has been an urgent need to help the families
affected in the provinces devastated. Taking on the challenge of Kalinga sa Bayan, Gawad Kalinga is
organizing a massive relief and rehabilitation efforts in the North Luzon provinces especially to our
affected GK communities in the province of Isabela.
GK OPERATION KALINGA SA BAYAN:Laban kay Juan, Para kay Juan is a mobilization campaign to
bring volunteers to Tumauini, Isabela to rebuild and rehabilitate GK communities and nearby areas in
one of the areas greatly affected by the super typhoon. From October 27 to 31, 2010, our volunteers will
work on cleaning and clearing operations and re-roofing, re-painting and landscaping of our GK houses
and infrastructures. Schedule is as follows:
October 26, 2010 6PM, Departure from MLA
Meeting place: Pure Gold Shaw Blvd (for the 1st 200)
October 27-30, 2010
Build activities, interaction with families, sessions, fellowships, etc
October 31, 2010 9AM, Departure to MLA
Drop off point: Cubao, Quezon City
We would like to invite you in this exciting five day event of rebuilding homes and hopes for our Isabela
typhoon victims. Register your group (fifteen members) including your team members name to our
Secretariat, contact Coach Hipol 0917-888-8596 or email [email protected]. Transportation
(MLA-ISA-MLA) will be provided for the first 200 individuals who will confirm. Attached is the copy ofour build mechanics. Hope you can join us in this exciting five days build. The power of many Juan is
more powerful than Juan!
Kalinga sa Bayan, Sigaw ng Kabataan!
For God and country,
JOSE MARI OQUINENA
GK Operations Head
8/8/2019 GK Operation Kalinga Sa Bayan Build Invitation Letter
2/2
GK GLOBAL HEADQUARTERS: 4/F PROFRIENDS CENTER, 55 TINIO ST., BARANGAY ADDITION HILLS, MANDALUYONG PHILIPPINES 1552
TEL. NO. (+632) 718 1738 to 41 / FAX NO. (+632) 726 7405
GK OPERATION KALINGA SA BAYAN
ISABELA BUILD
Laban kay Juan, Para kay JuanDate: October 27-31, 2010
MECHANICS
Location:
- Build site: KL Tumauini GK Village, Brgy. Arcon, Tumauini, Isabela- Camp site (Accommodation): Camp Samal (BSP Camp site), Brgy. Arcon, Tumauini, Isabela1. Each team is asked to bring the following:
a. Food for the duration of the build
(Preorder meals are available: breakfast, lunch and dinner; confirm your order with Secretariat)
b. Cooking and Eating Utensils
c. Tents and sleeping bags, flashlight with extra batteries, lamp
d. Clothes, toiletries, raincoat or jacket, and necessary medicines per individual
e. Pails and Tabo (for the bath area)
f. First aid kit per group
g. Documentation (digital camera and/or video camera)*h. Construction tools: [*Optional]
LANDSCAPING ROOFING PAINTING
i. Pick or Piko vi. Leveling tool xi.Paint roller
ii. Shovel or Pala vii. Electric drill with bits xii. paint brush and tray
iii. Kutsara viii. Hammer
iv. Gardening materials ix. Saw
v. 1 Pair hand gloves per member
2. The following will be provided on-site:a. Male/Female toilets and bathing stalls
b. Area to set up tents
c. Cooking area , first Aid and primary care facilities
d. Water Station (mineral water will be for sale)
e. Food stalls (for food order: breakfast, lunch and dinner, please confirm to Secretariat)
f. Security in the area
g. One (1) Build marshal per team
h. All Other Construction Materials (wood, GI sheets, paint, gardening materials, etc)
3. Important Notes:a. THERES NO ELECTRICITY IN TUMAUINI. Please let your parents and guardian contact these numbers
09064122288, 09178888596 should they wish to talk to you
b. For North and Central Luzon participants, please coordinate with Secretariat regarding transportation. Wewill assign pick up points where the bus from Manila will pass by. Only CONFIRMED participants will be
allowed to get inside.