Gamma-ray Large Area Space Telescope. GLAST Large Area Telescope: Integration and Test -Electrical Test- Phase 0 TRR Key Requirements Documents Electrical Test procedures and status EGSE Hardware configuration Flight PDU/ EM GASU/ ACD Integration flow Brian Grist Integration and Test - PowerPoint PPT Presentation
Citation preview
GLAST LAT Project November 04, 2005
Phase 0 TRR 1
GLAST Large Area Telescope:GLAST Large Area Telescope:
Integration and Test -Electrical Test- Phase 0 TRR
• Key Requirements Documents • Electrical Test procedures and status• EGSE Hardware configuration• Flight PDU/ EM GASU/ ACD Integration flow
Brian GristBrian GristIntegration and TestIntegration and Test
SLACSLAC
Gamma-ray Large Gamma-ray Large Area Space Area Space TelescopeTelescope
GLAST LAT Project November 04, 2005
Phase 0 TRR 2
DocumentDocument Released Released RevisionRevision
LAT-MD-00408-04c LAT Instrument Performance Verification Plan
4/7/05
LAT-MD-02730-02d2 LAT Performance and Operations Test Plan
6/7/05
LAT-MD-00676-04 LAT Assembly Sequence 9/1/05
LAT-MD-00895-04 LAT Instrument Survey Plan 2/1/05
LAT-DS-05210-52 LAT Systems KIT, Cable Installation 11/2/05
LAT-DS-02563-02 LAT Instrument Assembly 10/28/05
LAT-DS-06721-02 External Cable Assembly Sign-off
Key I&T Requirement DocumentsKey I&T Requirement Documents
Requirements Definition Key to Successful I&TRequirements Definition Key to Successful I&TRequirements Definition Key to Successful I&TRequirements Definition Key to Successful I&T
GLAST LAT Project November 04, 2005
Phase 0 TRR 3
IFCT Electrical Procedures and StatusIFCT Electrical Procedures and Status
25 of 26 electrical 25 of 26 electrical test procedures test procedures
complete complete
25 of 26 electrical 25 of 26 electrical test procedures test procedures
complete complete
1 in draft waiting 1 in draft waiting further test further test definitionsdefinitions
1 in draft waiting 1 in draft waiting further test further test definitionsdefinitions
Document # Status Document TitleLAT-MD-01533 Released EGSE Plan
LAT-PS-03276 Released LAT EGSE Setup and Validation Procedure
LAT-PS-03287 Released Cal Module Test Procedure
LAT-PS-03290 Released Tracker Module Test Procedure
LAT-TD-03875 Released TEM EICIT Procedure
LAT-TD-04097 Released TEM SVT Procedure
LAT-TD-04098 Released TPS SVT Procedure
LAT-TD-04099 Released TPS EICIT Procedure
LAT-TD-04260 Released GASU EICIT Procedure (Manual)
LAT-TD-04325 Released ATP, Break out Boxes and Cables
LAT-TD-04332 Released PDU EICIT Procedure
LAT-TD-04382 Released Flight GASU SVT Procedure
LAT-TD-04384 Released Flight PDU SVT Procedure
LAT-PS-04459 Released Mate and Demate Workmanship Standard
LAT-PS-04511 Released Data Collection Procedure
LAT-PS-04512 Released Single Tower Test Procedure
LAT-PS-05504 Released Computing Infrastructure
LAT-PS-05527 Released I&T Test Stand Setup Procedure
LAT-PS-05736 Released LATTE and Components Installation
LAT-PS-06610 Released GASU EICIT Procedure (Auto)
LAT-PS-06817 Released Electrical Bonding Measurement Procedure
LAT-PS-07074 Released Parallel LAT Testing
LAT-PS-07125 Released ACD STM
LAT-PS-07172 Released ACD CPT
LAT-PS-07469 Draft LAT Trigger Tests
LAT-PS-07575 01 Released, 02 in signoff LAT Integration STM
GLAST LAT Project November 04, 2005
Phase 0 TRR 4
EGSE EGSE Hardware Hardware
configurationconfiguration
Flight Hardware
Phase 0 EGSE Phase 0 EGSE configuration the configuration the same as the past same as the past tower integration, tower integration,
with the addition of a with the addition of a Flight PDU, HIBs, Flight PDU, HIBs,
and cablesand cables
Phase 0 EGSE Phase 0 EGSE configuration the configuration the same as the past same as the past tower integration, tower integration,
with the addition of a with the addition of a Flight PDU, HIBs, Flight PDU, HIBs,
and cablesand cables
GLAST LAT Project November 04, 2005
Phase 0 TRR 5
Flight PDU/EMGASU/ACD Integration SequenceFlight PDU/EMGASU/ACD Integration Sequence
A 93 step Assembly Instruction Data Sheet (#1767) is complete and A 93 step Assembly Instruction Data Sheet (#1767) is complete and approved to perform this sequenceapproved to perform this sequence
A 93 step Assembly Instruction Data Sheet (#1767) is complete and A 93 step Assembly Instruction Data Sheet (#1767) is complete and approved to perform this sequenceapproved to perform this sequence
Install Flight PDURoute and Safe to Mate Cables
Install HIBsRoute and Safe to Mate Cables
Install EM GASU 1120
Route and Safe to Mate Cables
TEM/TPS Connection and
turn on tests
CAL and TKR CPTs
Route ACD Cables
Route Internal ACD Cables
ACD InstallationACD Safe to
Mate
Ready for testing with ACD installed