CCAP – China Certification Center for Automotive Products
G&M Compliance, Inc.
Introduction to G&M and CCAP1
Changes Implementation Rules ‐ Old vs. New Rules2
3 Parts Requirements ‐ Interior Trimming Parts, Brake Hoses, Fuel Tanks & Latches/Hinges, Safety Belts, Child Restraints (CRS), Seats & Headrest, Lamps, Indirect Vision Device & Horn
4
5
Overview of CCC Certification Process
Maintenance of CCC Certification ‐ CATS5 Maintenance of CCC Certification CATS
d i & dIntroduction to G&M and CCAP1
Introduction to G&M and CCAP
G&M specializes in getting certifications fast. Our expertise, service, and i h ib h ll i d k f
Introduction to G&M
consistency are three attributes that allow us to improve speed to market for our clients. The following points detail the G&M Way:
• Custom Certification Strategies• Custom Certification Strategies. • Full “Cradle to Grave” Service. • Champion the manufacturer’s best interests • Maintain Proven Relationships Between Staff and Client.Maintain Proven Relationships Between Staff and Client.• Utilize Proprietary Certificate Alert and Tracking System (CATS)
G&M has been in business since 1997. In that time we have developed an pexperienced team. Our goal is to use that experience to get products certified as quickly as possible. Our team is always available to answer questions. We feel that good communication is the key to faster certifications.
CCAP Company Overview
1、China Certification Center for Automotive Products (CCAP)1、China Certification Center for Automotive Products (CCAP) was founded in August, 1998.
2 CCC B i i I D b 2002 CCAP i d th2、CCC Beginning: In December, 2002, CCAP gained the certificate authority approval document authorized by Certification and Accreditation Administration of the People's R bli f Chi (CNCA) CCAP i f th i i lRepublic of China (CNCA). CCAP is one of the original automotive certification bodies in China
CCAP Company Overview
In 2005, CCAP established an automotive test laboratory covering an area of 37,000 m2. Construction area on the first phase is 9521.5 m2 located in Beijing
CCAP Company Overview
CCAP Certification Mark
Number Certification – Authorized by CNAS (95 Types of Products)
I 4912 Parts and components of chassis for motor vehicle
II 4921 Carriage accessories of motor vehicle
III 4994 Parts and components of motorcycle and mopeds
IV 469 Lighting and electric equipment of motor vehicle and motorcycle
V 4312 Engine and its components
CCAP Company Overview
CCAP Company Overview
CCAP Test Center For Motor Vehicle is a test laboratory designated by CCAP to conduct test for CCC certification.
Designated test programs:
Exterior lighting assembly and light‐signaling devices Seatbelt Motor Vehicles devices for indirect vision Interior trimming material Door lock products, door retention components Brake hose Brake hose
More than 7,000 test reports have been issued by CCAP.
CCAP Company Overview
G&M/CCAP Partnership
‐There are only two automotive certification bodies in China (CQC and CCAP)
G&M has more than 9 years of established working relationship with CCAP‐G&M has more than 9 years of established working relationship with CCAP
‐Reasons why G&M works exclusively with CCAP :
① CCAP specializes in automotive compliance while CQC handles hundreds of categories
② CCAP maintains an in‐house test facility while CQC outsources all testing
③ CCAP exercises flexibility in technical requirements, factory inspections and revision issues
④ CCAP maintains a high level of technical competency
⑤ Established payment clearance process to reduce delays in certification
⑥ CCAP is proactive in disseminating information regarding upcoming requirements and changes
O t ff h t bli h d l ti hi ith CCAP t thi thl‐Our staff has an established relationship with CCAP to ensure things go smoothly
‐G&M’s relationship with CCAP enables a fast and consistent certification process
G&M/CCAP Partnership
G&M has found that CCAP (like other certification bodies) is very good at executing their coreservice, but face some challenges in the logistics required for successful and timely completionof certification programs particularly for North American manufacturers G&M provides theof certification programs particularly for North American manufacturers. G&M provides thenecessary logistics to ensure a seamless certification process.
G&M provides the following logistics to compliment with CCAP core service:
• Provide templates and assistance for expediting required documentation• Clear samples through China Customs and deliver them to the lab• Utilize in‐house engineering expertise to assist with technical issues that may arise• Coordinate with CCAP to schedule a timely initial factory inspection• Track and alert you of upcoming renewals for CCC certificates, label/mark certificates,
and annual factory inspections with our proprietary Certificate Alert and Tracking ( )System (CATS)
• Support initial and on‐going annual factory inspections with accredited auditors fluent in both Mandarin and English
Implementation Rulesh ld
2Changes Old vs. New
CNCA – Certification and Accreditation Administration
CNCA Notices – Notices sent by CNCA to alert the public of impeding changes to implementation rules.
General Implementation Rules: – Seven implementation rules written by CNCA that apply to all products
CCC Implementation Rules: Basic rules written by CNCA about specific product categoriesCCC Implementation Rules: – Basic rules written by CNCA about specific product categories.
Detailed Implementation Rules – Rules interpreted by CCAP for each automotive component category that describe the following:1 Scope of components covered1. Scope of components covered2. Follow‐up inspection requirements3. Control Plan for production of parts4. Factory Grading requirements
COP – Control Plan for production of parts
Ann al Verification Testing Ann al testing cond cted b the man fact rer a q alified thirdAnnual Verification Testing – Annual testing conducted by the manufacturer, a qualified third party lab, or a Chinese lab. These tests consist of a subset of the original type test requirements of the GB standard, as specified in the implementation rules for that specific product type.
GB Standard Chinese test specification and technical requirements for a specific componentGB Standard – Chinese test specification and technical requirements for a specific component type.
Sample Testing – Randomly selected by CCAP as a part of the CCC surveillance program. This could occur during the factory inspection or from samples in the China marketplace This testingcould occur during the factory inspection or from samples in the China marketplace. This testing consists of full type testing.
Initial Factory Inspection – The first factory inspection after product certification for a new product categoryproduct category
Type Test – Testing required from the GB Standard.
Routine Test – Production line testing typically on 100% of components that leave the manufacturing floor.
Implementation Rules – Changes Old vs. New
It has been 10+ years since the China Compulsory Certification (CCC) scheme has been implemented. CNCA recently reviewed and evaluated the entire CCC vehicle and safety components certification process. After the review was completed in 2014, an updated policy was established, and Implementation rules for vehicle component categories were revised across the board.
The purpose of establishing the new guideline is to deepen reforms and provide continuous improvements to the CCC certification process.
The new policy is official starting on Jan 1st, 2015, and will replace the old policy for all new CCC applications. The new policy will be fully implemented by December 31st, 2016 for legacy products.
All certificates, regardless of whether or not they are affected by the new changes, must be updated to reflect the new implementation rules by December 31st, 2016 or they will be suspended.
Implementation Rules – Changes Old vs. New
CNCA revised the eleven (11) implementation rules for vehicle component categories to include the following seven (7) new guidelines:
Factory classification Factory can perform testing (with few exceptions)y p g ( p ) Requirements for Conformity of Production Control (COP) Spare/service parts certification requirements better defined Scope change of some vehicle partsp g p Certification bodies can implement CCC certification rules differently Annual renewal of CCC Mark is cancelled (same time frame as CCC certificate)
These guidelines are common across all component categories with the exception of scope changes.
Horn for Motor Vehicles l kVehicles
Brake hose for vehicles
Interior trimming
Fuel tank for motor
Door lock and door retention
components
Safety belt
Extenalr lighting and
light
trimming material
motor vehicle Seat and Seat
Headrest for Motor
Old ImplementationSafety belt
Motor
gsignaling devices for vehicles
Vehicles
Motor Vehicles
Vehicles devices for indirect vision
Child restraintsystem
Motorcycle Engine
Motorcycle
Implementation Rules – Changes Old vs. New
New CNCA Version New Name Old CNCA Number Old NameCNCA‐C11‐04: 2014 Same as old name CNCA‐02C‐026:2005 Safety Belts of Vehicles
CNCA‐C11‐05: 2014 Same as old name CNCA‐02C‐055: 2005 Horns for Motor Vehicles
CNCA‐C11‐06: 2014 Braking Hoses for Motor Vehicles CNCA‐02C‐057: 2005
Braking Hose Assemblies for Motor Vehicles‐Braking Hoses for Vehicles
C C 02C 0 6 200
Retro Reflector for Motor Vehicles
CNCA‐C11‐07: 2014 Exterior Lighting and Light‐SignalDevice for Motor Vehicles
CNCA‐02C‐056: 2005CNCA‐02C‐058: 2005CNCA‐02C‐065: 2005
VehiclesExterior Lighting & Light‐Signal Device for Motor VehiclesExterior Lighting & Light‐Signal Device for Motor Cycles
CNCA‐C11‐08: 2014 Indirect Vision Device for Motor Vehicles
CNCA‐02C‐059: 2005CNCA‐02C‐064: 2005
Rear View Mirrors for VehiclesRear View Mirrors for Motor Cycles
CNCA‐C11‐09: 2014 Interior Trimming Material of Vehicles CNCA‐02C‐060: 2005 Interior Trimming of Vehicles &
Interior Trimming Material
Implementation Rules – Changes Old vs. New
New CNCA Version New Name Old CNCA Number Old Name
CNCA‐C11‐10: 2014 Door Lock & Door Retention CNCA‐02C‐061: 2005
Door Lock & Door Retention Components of Vehicles – Door CNCA‐C11‐10: 2014 Components of Vehicles CNCA‐02C‐061: 2005 Lock & Door Retention Components
CNCA‐C11‐11: 2014 Same as old name CNCA‐02C‐062: 2005 Fuel Tank for Vehicles
CNCA‐C11‐12: 2014 Seats & Head Restraints for Vehicles CNCA‐02C‐063: 2005
Seats & Head Restraints for Vehicles – Seats & Head Restraints
CNCA C11 13: 2014 Same as old name CNCA 02C 067: 2005 Reflecting Signs of Vehicle BodyCNCA‐C11‐13: 2014 Same as old name CNCA‐02C‐067: 2005 Reflecting Signs of Vehicle Body
CNCA‐C11‐14: 2014 Same as old name CNCA‐02C‐066: 2005 Vehicle Traveling Data Recorder
Implementation Rules – Changes Old vs. New
Under the new CCC policy, factories will be classified in accordance with CCAP metrics (based on new implementation rule), and will be given a grade of A, B, C, or D
The grading effects the number of factory follow‐up inspections required and random selection testing methods
As an example, for grade A, a manufacturer will no longer be required to perform annual follow‐up inspections, but will be allowed to conduct inspections once every other year
For grade D, a manufacturer will require a scheduled annual factory inspection plus another un‐announced inspection every year
CCAP will assign the factory classification prior to the next follow‐up factory inspection. The assignment will be based on high risk to low risk. Example: D→C→B→A
Implementation Rules – Changes Old vs. New
CCAP will inform the factory of the classification assignment
A
before the next follow‐up inspection
B
C
Classification levels may be adjusted depending on the risk
fi di f h
C
D
assessment findings after the factory inspection
Implementation Rules – Changes Old vs. New
Level A: No serious failure found during initial and follow‐up factory inspections for the last 2 years
Pass random sample tests during the follow‐up inspection (if required)
Manufacturer has good independent design ability, test facilities approved to ISO/IEC 17025 (third party approval – with mutual recognition such as ILAC or meet the technical requirements equal to GB/T 27025 – Chapter 5) and has in‐house test capabilities to conduct all sample testing requirements
No non‐conformances with China national or state market survey (if required).
Level A Classification cannot be achieved in the first or second year of factory inspections.
Implementation Rules – Changes Old vs. New
Level B:
Factories other than Level A, C and D – New factories are typically assigned Level B to start and may be upgraded to Level A after the second year
Level C:
Initial factory inspection and follow up inspection failure caused by product quality and can be corrected via on‐site verification
Product quality disqualification but not to a point that would cause certificate suspension
Implementation Rules – Changes Old vs. New
lLevel D: Failure of Initial factory inspection or follow up inspection
Fails to conduct follow up factory inspection or initial factory inspection Fails to conduct follow‐up factory inspection or initial factory inspection
Serious quality issue which can cause certificate suspension
Non‐conformance in the state or national market survey (if applicable)
Certificate suspended or withdrawn for other reasons
Negative market feed‐back or accident reports (product recalls, etc.)
Implementation Rules – Changes Old vs. New
Follow-up inspection
Routine testing
Annual verification testing
Sample testing
Note: l f h f d l l d l d• Sample testing for each factory is randomly selected. Testing is currently done
only in China by designated laboratories.• Annual verification testing may be done locally or in China
Implementation Rules – Changes Old vs. New
Follow-up inspection (no change)
Routine testing (no change)
Annual verification testing (no change)
Sample testing (changed)
Note: l f h f ll d l l d b• Sample testing for each factory is still randomly selected. Testing can now be
done by the manufacturer, if lab meets requirements, or in the China market place.
Implementation Rules – Changes Old vs. New
Old Certification Method
NEW Surveillance Options
Type Test
Initialfactory
InspectionFollow-up inspection+ + +
On-site sample testing
Market sample testing
or
Note:
Implementation Rules‐Changes Old vs. New
On‐site sample testing and testing for GB standard d b d d l f d fupdates can now be conducted in qualified factory
laboratories
Two methods of on‐site testing:Two methods of on‐site testing:‐TMP: Conducted by CCAP engineer during follow‐up inspection
d b d f ll
N t
‐WMT: Witnessed by CCAP engineer during follow‐up inspection
Note: • Class A factories must have one of these capabilities• Process is the same for either TMP or WMT capabilities
Implementation Rules‐Changes Old vs. New
How to apply?-Self evaluation based on CNCA-00C-004 -Fill out CCAP application form, and submit-CCAP will assess the laboratory on the following annual audity g-CCAP will accept application or issue a report of findings
How to maintain the qualification?How to maintain the qualification?CCAP will conduct relevant supervision along with annual follow up
factory inspection. Factory also can apply for TMP or WMP test just for one time. Therefore,
no need to maintain the qualification every year.
Implementation Rules‐Changes Old vs. New
5 years5 years
CCAP approves the validity of CCC certificate(s) after the
Expire after 5 years
follow‐up inspection
90 days before E i ti t t d th
After the 5th inspection
Expiration to extend the validity (submit application to CCAP)
inspection
Renew the certificate
Implementation Rules – Changes Old vs. New
Factory can perform testing with few exceptions (CNCA‐00C‐004)
This directive pertains to the test capability of the manufacturer. Random sample selection testing (now is once every 5 years and has to be performed by China localselection testing (now is once every 5 years and has to be performed by China local lab) can be done by the manufacturer as long they have a valid ISO/IEC 17025 accreditation certificate
Implementation Rules – Changes Old vs. New
Production Control requires controlled procedures for the construction and testing of automotive components. The following are the three major areas: Processing: Production of product Purchasing: Controlling quality from vendors Testing: Routine and annual verification testing
Documentation rules made by the plant to effectively control the Documentation rules made by the plant to effectively control the conformity of the structure and technical parameters of certified products in mass production, as well as those of the samples for type test;
Following documents are made by the plant for different products Following documents are made by the plant for different products, aiming at different structure and production procedure, complying with all corresponding standards in Implementation Rules:
Implementation Rules – Changes Old vs. New
□样品试制Sample □试生产Trial
□生产Production生产厂factory:
编制/日期:Compiler/Date 审核 /日期
Checker/Date: 批准/日期: Approver/Date
COP Control Plan (COP Test and Inspect)
□生产Production Checker/Date: 批准/日期: Approver/Date
产品系列名称Product name: 地址Add.:部门Department: 联系人Contact:
联系电话Tel.:
适用产品型号Model of Product:
测量仪器和
样本Sample
试验和检查的场所执行的文件名称及
不一致时的
追溯和处理措
施
Measures taken序号
No.项目
Item
设备
Equipment and facility
试验和检查的场
所
Site
编号
Name and No. of executed document
责任部门
Dept.
Measures taken for treatment
and trace in case where non-
conformity is found
容量
Capacity频次
Frequency
found
Copyright of CCAP
Implementation Rules – Changes Old vs. New
样品试制 试生产 编制/日期 / 审核/日期
COP Control Plan (Key Purchased Components and Material)
□样品试制Sample □试生产Trial□生产Production
生产厂factory:编制/日期Compiler/Date: 审核/日期Checker/Date : 批 准 / 日 期Approver/Date:
产品系列名称Product name: 地址Add.:部门Department: 联系人Contact:联系电话Tel:
适用产品型号Model of product:
CCC/自愿 适用产品系列 单元 产品
所执行的文件名称及编号
(含进货检验和确认检
序号No.
零部件或材料名称
Name of component or
material
型号规格Model and
Specification
生产厂factory
性产品认证证书编号CCC or
voluntary certification
No
列/单元/产品型号
Applicable product
series/unit/md l
(含进货检验和确认检验)
Name and No. of executed document (including incoming
i t d ifi ti
备注Remark
No. odel inspect and verification test)
Copyright of CCAP
Implementation Rules – Changes Old vs. New
□ 样 品 试 制
COP Control Plan (Key Processes Production/Assembly/Test)编号:No. 修订次数/版本:Edition/Version No.
Sample □试生产Trial□ 生 产Production
生产厂factory:编制/日期Compiler/Date: 审核/日期Checker/Date:批准/日期Approver/Date:
产品系列名称P d
地址Add.:部门Department: 联系人Contact:联系电话T lProduct name :
地址Add.:联系电话Tel:
适用产品型号Model of product:
序号No.
名称Process
制造/装配/检验的场所Site of production/assembly/test
Name and No. of
executed document
责任部门Dept.
不一致时的追溯和处理措施 Measures taken for treatment and trace in case where non-
conformity is found
Copyright of CCAP
Implementation Rules – Changes Old vs. New
Related rules for the change, application, and implementation of theCOP t l l f th l tCOP control plan of the plant Rules for the control of CCC certificate and CCC mark Rules for traceability and treatment measures adopted when the plantfind any nonconformity of the product and related rules for thefind any nonconformity of the product, and related rules for theimplementation to adopt all necessary measures under the supervision ofthe certification body so as to recover COP as soon as possible.
Note:Detailed information on COP procedure can be found in the Implementation Rules for
each specific product category.If the enterprise has owned a control plan of which contents cover all the
requirements it can submit the available control plan to CCAP and use it after therequirements, it can submit the available control plan to CCAP, and use it after theapproval by CCAP.
Implementation Rules – Changes Old vs. New
The implementation report of COP control plan is a documentary description of the implementation of
f hImplementation
the COP control plan for each year. It should be submitted to CCAP inspectors during the follow-up inspection on-site.
report of COP control plan
Implementation report of COP control planMain points including:△Summary of basic situation of the plant for the year△ Basic information of the plant:△ Basic information of the plant: △ Changes of the certification certificate of the product this year △ Use of the CCC mark this year△ Implementation of COP control plan△ Recovery, traceability and treatment measures on nonconformities of
products Note: More detailed information on implementation reports can be found in the Implementation Rules for specific product categoriesImplementation Rules for specific product categories
Implementation Rules – Changes Old vs. New
Spare parts are individual parts sent to China for repair or replacement
Does the spare part need to be CCC certified?
How to certified the spare parts?p p
How to deal with the inspection?
- Spare part for vehicle out-of-production
-Will execute as Appendix 3 of new CNCA implementation rules.
Implementation Rules – Changes Old vs. New
▲ Th h d CCC ti k d i i▲ The purchased CCC stickers and permissions are still valid until the old certificates expire.
▲ In CNCA 2014 No 36 notice from Jan 1st 2015 CCC mark approval will▲ In CNCA 2014 No.36 notice, from Jan. 1 2015, CCC mark approval will be expired at the same date as the related CCC certificate, and does not need to renew annually.
▲On May 31st, 2015, CCAP was authorized by CNCA as one of certification bodies who can accept the application of CCC mark approval directly.y
Implementation Rules – Changes Old vs. New
Based on TC11-2014-003 technical resolutions, CCAP made transition
procedure and published on www.cccap.org.cn.
For initial CCC application of vehicle parts From Jan.1st ,2015, CCAP will
execute certification according to new implementation rules and issue
certificate accordingly. Existing factories have until December 31st, 2016 to
convert
For product certified prior to new implementation ruleVersion updating is suggested to be combined with other changes such asVersion updating is suggested to be combined with other changes, such as follow‐up inspection, GB standard update, product change or expiration of certificate.
Implementation Rules – Changes Old vs. New
A two day factory inspection is required when transitioning from the old implementation to the new!
How to meet the requirement of new implementation rules?
from the old implementation to the new!
How to meet the requirement of new implementation rules?
Based on CCAP detailed implementation rules, applicant shall submit below document: A li ti f f Ch h it i i l t ti l i Application form of Change; change item is: implementation rule version update. Product description Key components and raw material list unless if it has been in COP control
lplan. COP control plan; how to compile Cop control plan please refer to CCAP relevant instructions( must approved by Dec. 31, 2016)
Interior TrimmingDoor Locks & Hinges
B k H3 Brake HoseFuel TankSafety Belts
3
Child Restraints (CRS)Seats & Headrest
LampsLampsIndirect Vision
Horn
Scope of Change
CCC Certificate CNCA Permission of Printing
New GB StandardNew GB Standard
CNCA Implementation Rule: New Number
CNCA ImplementationCNCA Implementation Rule: New Name
CNCA Permission of Printing: Harmonisation of Expiration Date, CNCA Permission no longer mentions expiration date.
3.1 Regulatory Changes: Interior Trimming
Regulatory Changes Required Changes by 2015
Update of CCC certificates to CNCA standard File application for change
CNCA‐C11‐09:2014CNCA‐02C‐060:2005
Important Changes
Random sample tests One set of samples (one certificate) needs to be tested in a CNCA accredited test laboratory in China
GB 8410‐2006GB 8410‐2006
Annual verification tests Product tests in internal or external test laboratory according to GB‐Standard
CNCA marking permission Update expiration date to match CCC
According to the new version, one unit will be classified for all components which are manufactured by the same manufacturer at the same plant and do not differ essentially in: 1)structure (number of layers or parts)
Update expiration date to match CCC certificate Remove factory code from CCC marking
Follow‐Up inspection • Update control procedures to meet new
2)materials, thickness and manufacturing process of the respective layers 3)Connection type of the various layers or parts
The scope of the CCC certification has been extended to several new interior automotive parts that have been exempted prior to the standards
• Include „random sample tests“ into control plan
• Install COP‐Plan for inspection
interior automotive parts that have been exempted prior to the implementation of the CNCA implementation rule.
Please note that currently valid rejection letters (e.g. from CCAP or CQC) lose their validity as soon as the new implementation rules are enforced.
3.1 Regulatory Changes: Interior Trimming (Cockpit)
Overview Compulsory CCC Interior Parts
Dashboard• All components ≥ 356mm x 100 mm
Dimming and Isolation mats
New Compulsory Parts 2015
Dimming and Isolation mats• Engine compartment
• Air conditioning system
• Dimming materials door panel, side panel, floor carpetsfloor carpets
Sun blinderSun visorRoller blindCenter consoleCenter consoleDoor panelsHeadlinerRemovable floor matAi d t
1. Dashboard Air ducts
Only interior parts that fulfill the minimum size requirement of 356mm x 100mm need a CCC certification.
2. Sun visor 3. Center Console 4. Isolation/Dimming
356mm x 100mm need a CCC certification.
3.1 Regulatory Changes: Interior Trimming (Trunk)
Overview Compulsory CCC Interior Parts
SunshadeParcel shelf
New Compulsory Parts 2015
Closed Trunk Interior• Trunk carpet• Trunk side panel• Dimming and isolation materials
below carpet/side panelScuff plateLuggage netReplacement tire compartment
Since the changes in the implementation rules will be enforced on January 1st, 2015 there is still
t i t b t t tiParcel Shelf
uncertainty about many automotive parts. We highly recommend to check every part directly with CCAP.
Only interior parts that fulfill the minimum size requirement of 356mm x 100mm need a CCC certification.
(Closed) Trunk carpet(Closed) Trunk side carpetScuff plate
356mm x 100mm need a CCC certification.
3.1 Regulatory Changes: (Interior Trimming) Canopy
Overview Compulsory CCC Interior Parts
Canopy (outer)Canopy (inner lining)
New Compulsory Parts 2015
Insulation layer/ Insulation between canopy (outer) and canopy (inner lining)
Si th h i thSince the changes in the implementation rules will be enforced on January 1st, 2015 there is still uncertainty about many automotive parts. We highly recommend to check p g yevery part directly with CCAP and/or CQC.
Canopy (outer)
Only interior parts that fulfill the minimum size requirement of 356mm x 100mm need a CCC certification.
Canopy (inner lining)Insulation layer
356mm x 100mm need a CCC certification.
3.1 Regulatory Changes: Interior Trimming
Interior trimming products
◆made of organic materials or organic composite materials◆ installed in below site of motor vehicles under M, N and O categories◆sample size can meet the requirement<refer to item 6.1.2 of CCAP‐1109‐2014>
Including:
1. Interior trim parts in passenger compartment, driver cab and luggagecompartment
2. Heat-proof interior trim parts in engine compartment3. Sound-proof material in engine compartment of public bus, as well as road
buses and tourist buses with rear-mounted engine
3.1 Regulatory Changes: Interior Trimming
Excluding: g!!! Periphery size of interior trimming product can not comply with standard samplenot comply with standard sample dimension(L:356mm, W:100mm)
!!!Interior trimming product has been certified along with other products such as
t &h d t f t b lt tseat &headrest or safety belts, etc…
3.1 Regulatory Changes: Interior Trimming
Applicable standard:GB8410-2006
Burning speed of interior trimming parts in bus with category M2 M3-Burning speed of interior trimming parts in bus with category M2,M3 should be no more than 70mm/min.
-Sound proof interior trimming in public bus, as well as road buses andSound proof interior trimming in public bus, as well as road buses and tourist buses with rear-mounted engine shall comply with the requirement in 4.6 of GB 8410-2006: Grade A(non burning)
For other interior trimming no h ! b i d till bchange! burning speed still be no more
than 100mm/min.
3.2 Door Lock and Door Hinges
Regulatory Changes Required Changes by 2015
Update of CCC certificates to CNCA standard File application for change CNCA‐C11‐10:2014CNCA‐02C‐061:2005
Important Changes
Update of CCC certificates to GB standard File application for changeDepending on CQC, CCAP, CNCA additional testing in a CNCA accredited test laboratory in China is needed
GB‐15086‐2013 GB 16086‐2006
Random sample testsOne set of samples (one certificate) needs to be tested in a CNCA accredited test laboratory in China
Annual verification testsProduct tests in internal or external test
New requirements regarding unit classification:Door locks•structure of the door locks and open contacts (or fork‐bolt) •material of key components
laboratory according to GB‐Standard
CNCA marking permissionUpdate expiration date to match CCC certificate Remove factory code from CCC marking
Follow‐Up inspection
•type of fixing on the vehicle partsDoor retention components•structure and material of key components of door retention components •if lengths and internal diameters are less than 20% safety belts Follow‐Up inspection
• Update control procedures to meet new standards
• Include „random sample tests“ into control plan
• Install COP‐Plan for inspection
safety belts
Door locks and door retention components of trunk lids which can be used to enter and exit a car, might need CCC certification. We highly recommend to check every part directly with CCAP and/or CQC. y p y
3.3 Brake Hoses
Regulatory Changes Required Changes by 2015
Update of CCC certificates to CNCA standard Fil li ti f h
CNCA‐C11‐06‐2014CNCA‐02C‐057: 2005
Important Changes
File application for change
Random sample testsOne set of samples (one certificate) needs to be tested in a CNCA accredited test laboratory in China
GB 16897‐2010 GB 16897‐2010
Annual verification testsProduct tests in internal or external test laboratory according to GB‐Standard
CNCA marking permission
The new implementation rules apply to:
• Hydraulic, pneumatic and vacuum brake hose assemblies
• Pneumatic and vacuum brake hose Update expiration date to match CCC certificate Remove factory code from CCC marking
Follow‐Up inspection • Update control procedures to meet
• Pneumatic and vacuum brake hose assemblies which are installed in class M, N, O and L motor vehicles without permanent fittings.
For new application additional Update control procedures to meet new standards
• Include „random sample tests“ into control plan
• Install COP‐Plan for inspection
For new application, additional information as the nominal outer diameter, total length, structure, protective sheath, connector information and materials of the connectors of the brake hose assemblies are mandatory. y
3.4 Automobile Fuel Tank
Regulatory Changes Required Changes by 2015
Update of CCC certificates to CNCA standard Fil li ti f h
CNCA‐C11‐11:2014CNCA‐02C‐062:2005
Important Changes
File application for change
Random sample testsOne set of samples (one certificate) needs to be tested in a CNCA accredited test laboratory in China
GB 18296‐2001 GB 18296‐2001
Annual verification testsProduct tests in internal or external test laboratory according to GB‐Standard
CNCA marking permission
Additional product information is needed: • Description of the fuel tanks (structure and shape, number of layers
and its material) • Air inlet valves
Update expiration date to match CCC certificate Remove factory code from CCC marking
Follow‐Up inspection • Update control procedures to meet
• Venting valves • Fuel tank caps • Hoses and tubes • Ventilation of fuel tank • Description and explanation of the products‘ differences within the Update control procedures to meet
new standards • Include „random sample tests“ into
control plan • Install COP‐Plan for inspection
p p psame unit (if one unit contains several models)
Pictures and drawings are required: • Assembly drawing showing the key aspect of the products • Fixing type of fuel tank on automotive
3.5 Regulatory Changes:Indirect Vision Devices
Regulatory Changes Required Changes by 2015
Update of CCC certificates to CNCA standard File application for change
CNCA‐C11‐08:2014CNCA‐02C‐059:2005
Important Changes
Review unit classifications from the pastAccording to the new implementation rules, already certified seats of one unit might need to be classified into different units. Existing certifications should be reviewed, new applications and testing in China could be necessary
GB 15084‐2013 GB 15084‐2006
China could be necessary.
Random sample testsOne set of samples (one certificate) needs to be tested in a CNCA accredited test laboratory in China
l f
Rear view cameras were added to the CCC product catalogue and will become CCC mandatory starting January 1st, 2015
Annual verification testsProduct tests in internal or external test laboratory according to GB‐Standard
CNCA marking permissionUpdate expiration date to match CCC certificate
g y ,
The minimum allowable dishing radius of Class II exterior rear
Remove factory code from CCC marking
Follow‐Up inspection • Update control procedures to meet new standards • Include „random sample tests“ into control plan • Install COP‐Plan for inspection
view mirror was reduced from 1,800mm to 1,200mm
Install COP Plan for inspection
3.6 Seat Belts
Regulatory Changes Required Changes by 2015
Update of CCC certificates to CNCA standard Fil li ti f h
CNCA‐C11‐04:2014CNCA‐02C‐026:2001
Important Changes
File application for change
Random sample testsOne set of samples (one certificate) needs to be tested in a CNCA accredited test laboratory in China
GB 14166‐2013 GB 14166‐2003
Annual verification testsProduct tests in internal or external test laboratory according to GB‐Standard
CNCA marking permission
Requirements and instructions regarding Airbag Warning Label for safety belts
Update expiration date to match CCC certificate Remove factory code from CCC marking
Follow‐Up inspection • Update control procedures to meet
Requirements and instructions regarding Airbag Warning Label for safety belts
Update control procedures to meet new standards
• Include „random sample tests“ into control plan
• Install COP‐Plan for inspection
3.7 Regulatory Changes: Seat and Headrest
Regulatory Changes Required Changes by 2015
Update of CCC certificates to CNCA standard File application for change
CNCA‐C11‐12:2014CNCA‐02C‐063:2005
Important Changes
Review unit classifications from the pastAccording to the new implementation rules, already certified seats of one unit might need to be classified into different units. Existing certifications should be reviewed, new applications and testing in China could be necessary.
GB 15083‐2006 GB 15083‐2006
Random sample testsOne set of samples (one certificate) needs to be tested in a CNCA accredited test laboratory in China
Annual verification testsP d i i l l
New requirements regarding unit classification: The way of anchorage headrest and seat (respectively headrest and chassis)
Product tests in internal or external test laboratory according to GB‐Standard
CNCA marking permissionUpdate expiration date to match CCC certificate Remove factory code from CCC marking
as well as the size of the connection device become relevant for unit classification.
Follow‐Up inspection • Update control procedures to meet new
standards • Include „random sample tests“ into control
plan • Install COP‐Plan for inspection
The variance of seat structure, size and weight should be not more than 5%. Seats that differ more than 5% in weight must be classified in two certification unitscertification units.
3.8 Vehicle Horn
Regulatory Changes Required Changes by 2015
Update of CCC certificates to CNCA standard Fil li ti f h
CNCA‐C11‐05‐2014CNCA‐02C‐055‐2005
Important Changes
File application for change
Random sample testsOne set of samples (one certificate) needs to be tested in a CNCA accredited test laboratory in China
GB 15742‐2001 GB 15742‐2001
Annual verification testsProduct tests in internal or external test laboratory according to GB‐Standard
CNCA marking permission
The new Implementation Rules apply to motor vehicles and motorcycles. For new applications the following information is mandatory:
Update expiration date to match CCC certificate Remove factory code from CCC marking
Follow‐Up inspection • Update control procedures to meet
• Classification of vehicle types and power (Motor vehicles and Motorcycles (power > 7Kw or ≤ 7Kw)
• Mode of operation • Type of sound leak notch(es) Update control procedures to meet
new standards • Include „random sample tests“ into
control plan • Install COP‐Plan for inspection
• Manufacturer name and model specification of the vehicles • Description and explanation of the differences between the
models within the same unit • Pictures showing the main characters of the horns
3.9 Regulatory Changes: Lighting
Regulatory Changes Required Changes by 2015
Update of CCC certificates to CNCA standard File application for change
CNCA‐C11‐07:2014CNCA‐02C‐056:2005 CNCA‐02C‐058:2005
Important Changes
Update of CCC certificates to GB standardFile application for change (side marker, parking lamps)Depending on CQC CCAP, CCNA additional testing in a CNCA accredited test laboratory in China is needed
GB 18409‐2013 GB 18099‐2013
GB 18409‐2001 GB 18099‐2000
Random sample testsOne set of samples (one certificate) needs to be tested in a CNCA accredited test laboratory in China
Annual verification testsProduct tests in internal or external test
CNCA‐02C‐056:2005 and CNCA‐02C‐058:2005 are combined to only one implementation rule for Product tests in internal or external test
laboratory according to GB‐Standard
CNCA marking permissionUpdate expiration date to match CCC certificate Remove factory code from CCC marking
Follow Up inspection
lighting: CNCA‐C11‐07:2014
New requirements regarding unit classification:
Follow‐Up inspection • Update control procedures to meet new
standards • Include „random sample tests“ into control
plan • Install COP‐Plan for inspection
Optical units of retro reflectors are relevant for unit classification
3.10 New Regulations: Child Restraints (CRS)
Regulatory Changes Required Changes by 2015
New initial application at CQC or CCAPFile application for initial certification2 day factory inspection
CNCA‐C22‐032014No CCC
Important Changes
2 day factory inspection Product testing in the P.R. China Issue of CCC certificate Apply for CNCA marking permission
Annual requirements after initial certification
GB 27887‐2011 No GB
Random sample testsOne set of samples (one certificate) needs to be tested in a CNCA accredited test laboratory in China
Annual verification testsP d t t t i i t l t l t t
Requirements regarding unit classification: ‐Structure of the child seat ‐Affixing method ‐ISOFIX Yes/No
Product tests in internal or external test laboratory according to GB‐Standard
CNCA marking permissionUpdate expiration date to match CCC certificate Remove factory code from CCC marking
‐Usable age for child seat
Also relevant are: ‐Color of the seat covers ‐Material of the trim covers
Follow‐Up inspection • Update control procedures to meet new
standards • Include „random sample tests“ into control
plan • Install COP‐Plan for inspection
‐Material of the seat belt ‐Supplier of the seat belt ‐Locking device Please note that marking of the child seat and especially the ISOFIX should be deeply discussed with CNCA
Overview of CCC Certification Process4
CCC Certification Process
1. Application Submit CCC application Submit CCC application Submit CCC Factory Questionnaire CCC agency assigns a unique plant code to each manufacturing facility upon
application
2. Testing Supplier provides test samples to a CCC agency designated test laboratory in China Authorized lab conducts certification testing (only Govt lab in China) Authorized lab conducts certification testing (only Govt. lab in China)
3. Evaluation CCC agency reviews and approves the test results (or failure and retesting)
S b it T t t t CQC/CCAP Submit Test report to CQC/CCAP
CCC Certification Process
4. Factory Inspection (Major change Jan. 1st, 2015)
Supplier requests CCC agency for initial inspection of the factory where parts are manufactured
CCC agency conducts the initial inspection
CCC agency requests to re‐inspect the factory every 12‐18 months to maintain the parts certification
5. CCC Logo Approval
CCC agency issues CCC certificate documentation approving supplier factory and partsp
Upon receipt of CCC certificate, supplier submits “CCC usage plan”application to CCC agency
6. Final Approval ( CCC Logo Usage, Factory, and Part)6. Final Approval ( CCC Logo Usage, Factory, and Part)
Parts can be legally marked
Parts can be ordered & used for their intended purpose
CCC Certification Process
I DOCUMENTATIONI. DOCUMENTATION
II. SUBMITTING SAMPLES & TESTING
III. INITIAL FACTORY INSPECTION (if applicable)( pp )
IV. CCC MARK and LABELING
CCC Certification Process
• CCC Application and Factory Questionnaire forms must be completed correctlyCCC Application and Factory Questionnaire forms must be completed correctly• Production flow chart for the product• Quality manual (title of contents pages, if the document is too big)• List of documented procedures associated with the product (title of contentsList of documented procedures associated with the product (title of contents
pages, if the document is too big)• Applicant and manufacturing facility’s business license• Name plate or label in Chinese (Simplified Chinese)Name plate or label in Chinese (Simplified Chinese)• Factory’s organization chart• Once all of the documentations are received, specifically the signed Application &
Factory Questionnaire, then everything will be submitted to CQC for review. An application number will be generated by CQC/CCAP for the Applicant and then samples can be sent to China for evaluation and testing
CCC Certification Process
• Once CQC/CCAP issues a formal Application number to the Applicant, samples can now be sent to China for evaluation and testingnow be sent to China for evaluation and testing
• CQC/CCAP has the option to send or assign testing of your product to various laboratories in China based on the category of the equipment as well as other factors (*discuss in further details)
• Currently there are between 18 20 various testing laboratories in China that are• Currently, there are between 18 – 20 various testing laboratories in China that are designated by CNCA (China National Certification and Accreditation Agency) to perform CCC Mark testing
• Generally, representative samples are required to be sent to China. However, depending on the product the actual test samples to be provided may varydepending on the product, the actual test samples to be provided may vary
• Preparing test samples as well as having all of the proper information when shipping products to China for testing may be a bit confusing
• Generally, a Custom Agent is required to pick up test sample and deliver to testing l blaboratory
• Once the test report has been approved by CQC/CCAP, then Initial Factory Inspection can be scheduled (IFI) – Major change after Jan. 1st, 2015!
CCC Certification Process
• Initial Factory Inspection (IFI) is required for a manufacturer that does not have a valid CCC Factory Inspection report or it is the first time going through the CCC certificationCCC Factory Inspection report or it is the first time going through the CCC certification process ‐ Starting Jan. 1st, 2015: Grading scales A, B, C & D
• One of the biggest unknowns or challenges for scheduling a CCC IFI is obtaining U.S. Visas for the inspectorsVisas for the inspectors
• CQC/CCAP sends 2 auditors for a period of 2 days to audit each factory. However, the time frame may vary based on the number of products to be certified
• During the Factory Inspection, the auditors will be primarily looking at the company’s existing quality system
• Auditors will request to witness applicable tests to be performed on the product(s) during the audit
CCC Certification Process
• Auditors follow CNCA Implementation Rules for Compulsory Certification for specific type of product categories
• For other product categories, there are other Implementation rules, however the ll hprocess is generally the same
• If discrepancies are found, manufacturer has 30 days to address non‐compliances
• Factory will be assigned an ID if the audit is successful. The ID number can be placed under the CCC logo but not mandatory
CCC Certification Process
• Once CQC/CCAP has obtained test reports from the test laboratory and an IFI audit (w/no major non‐compliances), then the CCC certificate can be issued for the product
h l f h k d b l d• Last step is the approval of the CCC Mark and Labeling procedure
CCC Certification Process
Typical discrepancies found during audits are:yp p g
Daily functional check on the equipment used for the routine and verification tests is not being performed as required. A functional check is to be performed on a daily basis and record maintainedand record maintained.
Calibration of test equipment is outdated or non‐functional.
The manufacturer has not established the documented procedure which ensure the appropriate keeping and using of the Certification Mark.
d d li l i l d l ifi d ( k d) A documented quality plan or equivalent documents relevant to certified (CCC marked) products has not been established.
CCC Certification Process
Typical audit agenda:
Day 18:00AM Arrive/Opening Meeting8:30AM Responsibility and Authority &
Day 28:00AM Arrive/Review Outstanding Issues from Day 18:30AM Process Control and Inspection
DocumentationControl of the CCC mark
10:00AM Internal Audits11:00AM Purchasing
Routine and Verification TestsPacking Handling and Storage
1:00PM Consistency of ProductAppendix 4 Testing
1:00PM Changes to Certified Product2:00PM Receiving Inspection3:00PM Calibration4:00PM Open issues and daily wrap up
pp gCompletion of Product Description Form
3:00PM Report Writing4:30PM Closing Meeting 5:00PM Departp y p p
5:00PM Depart5:00PM Depart
CCC Certification Process
• Manufacturer has the option to purchase “A sticker” from CNCA or they may submit a drawing to CNCA for approval in order to print their own CCC label
• The manufacturer cannot apply for CCC Mark and labeling until the CCC certificate for the product has been issued. The certificate number for the product is included in the application for printing the CCC Markapplication for printing the CCC Mark
• The CCC label artwork must be submitted along with the CCC application. The artwork needs to display the dimensions of the CCC Mark and location on the main product label
• The manufacturer has the option, in some cases, to print the CCC Mark on the outside packaging, manual, etc. however they must provide a design scheme
• The CCC Mark must be linear proportional to the size of the standard CCC Mark• The background and color of the CCC Mark can be chosen reasonably according to the• The background and color of the CCC Mark can be chosen reasonably according to the
appearance of the product and/or nameplate• Generally, it takes about 1 – 2 weeks to obtain the CCC Mark approval from CNCA
CCC Certification Process
Plant code near CCC mark
5 sizes are available
Supplier chooses the applicable size for their products
Print/mold/etch/label CCC marking on the parts
CCC Certification Process
• Generally, the entire CCC Certification process may take between 2 – 4 months (if the manufacturing location has not been CCC approved)
• In order to label and ship your product, these conditions need to be met:1. All documentations, including applications, need to be , g pp ,
submitted2. Samples must be evaluated and found to be in compliance3. Initial Factory inspection must be performed and approved (90
days)4. CQC/CCAP must review and approved the test and IFI reports5. CCC Mark authorization to label certificate
• Annual follow‐up inspection will be required which is similar to IFI
Maintenance of CCC Approvals5 ppwith CATS
Certificate Alert & Tracking System
5
Certificate Alert & Tracking System
Maintenance of CCC Approvals with (CATS)Certificate Alert & Tracking System
The new cloud based Certificate Alert and Tracking System (CATS), developed by G&M, is
g y
able to store and track all of your regulatory certificates and reports. Active maintenance of your reports and certificates avoids untimely expiration of vital certificates and unnecessary maintenance of obsolete certifications. CATS provides the following features:
On‐line repository for quick access to all certification documentationfrom anywhere
Searchable to find the right documentation fast Searchable to find the right documentation fast Alerts users of expiring certificates Alerts users of expiring standards Easy 3‐click renewal process
Maintenance of CCC Approvals with (CATS)Certificate Alert & Tracking Systemg y
Review companywide certification status at a glance – The Dashboard view allows you to review the status of all certifications for the upcoming quarter. The graph shows how many certificates have expired, how many are within 30 days to expiration, how many within 60, and how many within 90 days. The reason for expiration is shown by color. If the certificate is expiring due to a pre‐determined expiration date, it is represented by a light blue bar. If the certificate is expiring due to the expiration of a test standard, it is represented by a dark blue bar.
Maintenance of CCC Approvals with (CATS)Certificate Alert & Tracking System
Quick access to all certification documentation from anywhere ‐ All certificates can be searched and accessed in the Certificate view. Certificates can be searched via the filter bars located directly above the green header row of the table.
Maintenance of CCC Approvals with (CATS)Certificate Alert & Tracking System
On‐line repository for certification information ‐ Click on Individual Certificates to view applicable information, including PDFs of certificates and reports.
Maintenance of CCC Approvals with (CATS)Certificate Alert & Tracking System
Alerts user of expiring certificates – An email is sent to the user notifying him of upcoming certificate expirations at 90 days, 60 days, and 30 days prior to expiration. The following is a sample notification:
You have a certificate expiring.Certificate number: Donald‐001Days to expiration: 90 DaysExpiration Date: Tue, 10/20/2015 ‐ 15:00To renew this certificate, please Click Here http://cms.gmcompliance.com/l/oTVDDxxzzyyqq/client/certificates/renew
Maintenance of CCC Approvals with (CATS)Certificate Alert & Tracking System
Easy 3‐click renewal process – After clicking the link in the email above, you are taken to the certificate renewal page. Simply click on the checkbox next to the certificate number, and then click the renew certificates button. A confirmation email will be sent to you to let you know that we have received your request. A quotation or invoice will follow to initiate the project.
lG&M Compliance, Inc.
154 South Cypress StreetypOrange, CA 92866
Tel. 714.628.1020www.gmcompliance.com
For more information on our automotive certification services, please click on the following link:
http://www.gmcompliance.com/home/certification/international/china‐automotive‐ccc/