2

▪Established in 26 November, 1957 as “Estaleiros Navais De

Goa”, during the Portuguese regime

▪ 217 Warships / Patrol Vessels & 157 Composite Vessels

delivered

Shipbuilding related business with several countries

GOA SHIPYARD LTD

❖ State-of-art infrastructure for construction of

vessels up to 135 m long & 23m wide

❖ Can undertake concurrent construction of 14 shipsat various stages

4

GSL – MAIN AREAS OF OPERATIONS

Repairs & Refits (18 in last 1 year)

Missile Frigates Naval OPVs

Coastguard OPVs

Fast Attack Crafts

Indigenous Marine EquipmentAuxiliary Vessels

Simulators (NBC/Damage control/FF)

FICBs

Exports

5

GOA SHIPYARD LTD

World class R&D centre with AVEVA Marine & state of art Softwares for

modeling with in-house design capability

FORAN Software for Frigate Design

IT & ERP

Hydrodynamics Composite Technology

Structural/ Vibration Analysis

Concept , Preliminary and Detailed Design

R&D / TECHNICAL CAPABILITY

GOA SHIPYARD LTD

Collaborations – World Leading OEMS

• Shore Based Test Facility (SBTF)

NDB,

Russia

• Hovercrafts

Griffon ,

UK

• Fin Stabilizers

NAIAD,

UK

• SETT

• IPMS

• CMS

DCNS

France

• CPP Stern Gears

• Waterjets

Wartsila,

France

7

Product Profile - SHIPS

NOPV

AOPV

OPV

FRIGATES

PRODUCTS AT A GLANCE

FPV

HOVERCRAFTS

8

PRODUCTS AT A GLANCE

Product Profile - GRP Boats

COP BOATSSURVEY MOTOR BOATS

5T Boat FIB

9

Damage Control Simulator Sea Survival Training Facility

DIVERSIFIED PRODUCTS ON OFFER

NBC Training Facility

Project Qty Completion Date

Offshore Patrol Vessels (OPVs)

Indian Coast Guard (Yd 1233-37)

5 Feb 2020- Oct 2021

10

KEY ONGOING PROJECTS – 05 CGOPV

• 1st ship delivered - 24 Feb 20

• 2nd ship delivered – 12 Nov 20

• 3rd ship – 80% complete

• 4th ship – 57% complete

• 5th ship – 44% complete

• 70% indigenisation achieved

• On Schedule

• No cost Overrun

Project Contract date Qty

Project 1135.6 Frigates

(Yd 1258 & Yd 1259) (Indian Navy)

25 Jan 2019 2

KEY ONGOING PROJECTS – P11356 FRIGATES

• All contracts signed with Russian Side

• Design & equipment ordering in progress

• Production commenced on 21 Sep 20

20 m 39 m 19 m 14 m ++ +

Contract

Jan 19 Sep 20 Dec 23 May 25 Jul 26

Production Launching Trials Delivery

Project Current Status

Pollution Control Vessel for Indian Coast Guard •New line of Business

• Huge potential in SE

Asia

• 02 vessels to be

constructed for ICG

ORDERS WON THROUGH COMPETITIVE BIDDINGPRESENT MAJOR ORDERS

➢ 02 x 50 m, 35 Kn FAC

➢ 11 x Fast Interceptor Boats

➢ 01 x Damage Control Simulator

➢ 02 x 105 m AOPV

Export of Defence ProductsRECENT EXPORTS

Training on Shipbuilding

& Composites

Export of Defence ProductsRECENT EXPORTS – TRAINING

15

• Indigenization planned over next 03 years

Combat Management System(CMS)

Steering Gear with controls

Auxiliary Control

System(ACS)

Fin Stabilizer with controls

Davit for Boat SWISS APMS+2 MSBsGT intake for boost Engine

GT intake for Cruise Engine

Indigenization plan – Advanced Missile Frigate

• Shipboard equipment condition monitoring system through AI – through Infosys

• Security/ Surveillance through AI based facial recognition and perimeter surveillance – through M/s Vijnalabs

Main Engine and Auxiliaries

Artificial Intelligence

GSL is open to business