23
Page 1 Atmospheric Chemistry Validation of ENVISAT – ESRIN - 3-7 May 2004 GOMOS level 1b processor improvements Gilbert Barrot ACRI-ST

GOMOS level 1b processor improvements · 2018-05-15 · Atmospheric Chemistry Validation of ENVISAT – ESRIN - 3-7 May 2004 Page 9 Level 1b processor improvements Background correction

  • Upload
    others

  • View
    6

  • Download
    0

Embed Size (px)

Citation preview

Page 1: GOMOS level 1b processor improvements · 2018-05-15 · Atmospheric Chemistry Validation of ENVISAT – ESRIN - 3-7 May 2004 Page 9 Level 1b processor improvements Background correction

Page 1Atmospheric Chemistry Validation of ENVISAT – ESRIN - 3-7 May 2004

GOMOS level 1b processorimprovements

Gilbert BarrotACRI-ST

Page 2: GOMOS level 1b processor improvements · 2018-05-15 · Atmospheric Chemistry Validation of ENVISAT – ESRIN - 3-7 May 2004 Page 9 Level 1b processor improvements Background correction

Page 2Atmospheric Chemistry Validation of ENVISAT – ESRIN - 3-7 May 2004

GOMOS measurement principle

Occultation of stars

30-40 per orbit150.000 per year

Page 3: GOMOS level 1b processor improvements · 2018-05-15 · Atmospheric Chemistry Validation of ENVISAT – ESRIN - 3-7 May 2004 Page 9 Level 1b processor improvements Background correction

Page 3Atmospheric Chemistry Validation of ENVISAT – ESRIN - 3-7 May 2004

GOMOS data processing

GOMOS measurements(star+limb)

from high to low altitudes Atmospheric transmissionsError bars

Photometer signalGeolocation, Datation

Line densities of speciesLocal densities of species

Error bars, HRTP

Level 2

Level 1b

Page 4: GOMOS level 1b processor improvements · 2018-05-15 · Atmospheric Chemistry Validation of ENVISAT – ESRIN - 3-7 May 2004 Page 9 Level 1b processor improvements Background correction

Page 4Atmospheric Chemistry Validation of ENVISAT – ESRIN - 3-7 May 2004

GOMOS level 1b tasks

• Computes the atmospheric transmission andassociated error bars at all tangent pointaltitudes

• Provide the geolocalisation and thedatation of the observations

• Clean the GOMOS measurements fromenvironmental and instrumental perturbations

need the data and an orbital model/data

need calibration tables and algorithm parameters

Page 5: GOMOS level 1b processor improvements · 2018-05-15 · Atmospheric Chemistry Validation of ENVISAT – ESRIN - 3-7 May 2004 Page 9 Level 1b processor improvements Background correction

Page 5Atmospheric Chemistry Validation of ENVISAT – ESRIN - 3-7 May 2004

Instrumental perturbations

Offset

Electronic gainNon-linearity

Dark charge

RTS

Wavelength assignment

Clean spectrum

Level 0 data

Star 029mv=1.67

Page 6: GOMOS level 1b processor improvements · 2018-05-15 · Atmospheric Chemistry Validation of ENVISAT – ESRIN - 3-7 May 2004 Page 9 Level 1b processor improvements Background correction

Page 6Atmospheric Chemistry Validation of ENVISAT – ESRIN - 3-7 May 2004

Dark charge + RTS

Clean spectrum

Level 0 data

Star 106mv=2.65

RTS+noise

Instrumental perturbations

Page 7: GOMOS level 1b processor improvements · 2018-05-15 · Atmospheric Chemistry Validation of ENVISAT – ESRIN - 3-7 May 2004 Page 9 Level 1b processor improvements Background correction

Page 7Atmospheric Chemistry Validation of ENVISAT – ESRIN - 3-7 May 2004

GOMOS level 1b processing status

Current version is defined by level 1b DPM 6.1

Products format defined by IODD 6.0

Prototype GOPR 6.0aIPF processor 5.00 (prev. July)

Page 8: GOMOS level 1b processor improvements · 2018-05-15 · Atmospheric Chemistry Validation of ENVISAT – ESRIN - 3-7 May 2004 Page 9 Level 1b processor improvements Background correction

Page 8Atmospheric Chemistry Validation of ENVISAT – ESRIN - 3-7 May 2004

Level 1b processing improvements

Three sources of improvements

1. Processor improvements (algorithms/parameters)2. Instrument knowledge improvement (calibration)3. New data in the output products

No important modification sinceprevious issue (DPM 5.4 – GOPR 5.4d – IPF 4.x)

Page 9: GOMOS level 1b processor improvements · 2018-05-15 · Atmospheric Chemistry Validation of ENVISAT – ESRIN - 3-7 May 2004 Page 9 Level 1b processor improvements Background correction

Page 9Atmospheric Chemistry Validation of ENVISAT – ESRIN - 3-7 May 2004

Leve

l1b

pro

cess

or impr

ovem

ents Background correction (parameters only)

exponential interpolation between bandsno background correction in full dark limb

PRNU correction (algorithm+calibration)star spectrum location on CCD defined by LUT

Reference star spectrum validity (algo+parameters)no possible negative values

Atmosphere thickness (parameters only)atmosphere width set to 160 km

Ray tracing (parameters)convergence of ray tracing set to 0.1 µrad

Cosmic rays (algorithm+parameters)thresholds function of gain setting

Page 10: GOMOS level 1b processor improvements · 2018-05-15 · Atmospheric Chemistry Validation of ENVISAT – ESRIN - 3-7 May 2004 Page 9 Level 1b processor improvements Background correction

Page 10Atmospheric Chemistry Validation of ENVISAT – ESRIN - 3-7 May 2004Inst

rumen

t kn

owledg

e im

prov

emen

ts

Spectrometer B PRNUfor a better flat-field correction

Star spectrum location on the CCD arrayalso for a better flat-field correction

Reflectivity LUT upgradefor a better transmission computation

Page 11: GOMOS level 1b processor improvements · 2018-05-15 · Atmospheric Chemistry Validation of ENVISAT – ESRIN - 3-7 May 2004 Page 9 Level 1b processor improvements Background correction

Page 11Atmospheric Chemistry Validation of ENVISAT – ESRIN - 3-7 May 2004

New

out

put

data

Illumination conditionssun zenith angles at satellite and tangent pointsun azimuth angle at the tangent pointsun coordinatesillumination condition (PCDillum)classification dark, twilight/straylight, daylightGeometrical information

occultation obliquityLimb signal in the central band

ratio U/C indicates the percentage of limblight mixed to the star signal

Page 12: GOMOS level 1b processor improvements · 2018-05-15 · Atmospheric Chemistry Validation of ENVISAT – ESRIN - 3-7 May 2004 Page 9 Level 1b processor improvements Background correction

Page 12Atmospheric Chemistry Validation of ENVISAT – ESRIN - 3-7 May 2004

Level 1b processing improvementsImpact on LMA minimisation (level 2) below 50 km

Tmeasured versus Tmodel

Level 1b 5.4Chi-2 > 3

Level 1b 6.0Chi-2 < 2

Page 13: GOMOS level 1b processor improvements · 2018-05-15 · Atmospheric Chemistry Validation of ENVISAT – ESRIN - 3-7 May 2004 Page 9 Level 1b processor improvements Background correction

Page 13Atmospheric Chemistry Validation of ENVISAT – ESRIN - 3-7 May 2004

Level 1b processing improvements

Impact on Ozonesmall impactbetween 20and 40 km

noisy below20 km becausestill use level 2issue 5.4d forcomparison

O3 local density∆∆∆∆<0.5%

Page 14: GOMOS level 1b processor improvements · 2018-05-15 · Atmospheric Chemistry Validation of ENVISAT – ESRIN - 3-7 May 2004 Page 9 Level 1b processor improvements Background correction

Page 14Atmospheric Chemistry Validation of ENVISAT – ESRIN - 3-7 May 2004

Level 1b processing improvements

Impact on Ozonebetter catch ofthe O3 secondarypeak at altitude80 to 100 km

O3 secondarypeak

White curve is 6.0

Page 15: GOMOS level 1b processor improvements · 2018-05-15 · Atmospheric Chemistry Validation of ENVISAT – ESRIN - 3-7 May 2004 Page 9 Level 1b processor improvements Background correction

Page 15Atmospheric Chemistry Validation of ENVISAT – ESRIN - 3-7 May 2004

Impact on O2(SPB1)

Level 1b processing improvements

O2 local densities∆∆∆∆ < 1 % (5.4 vs 6.0)

Page 16: GOMOS level 1b processor improvements · 2018-05-15 · Atmospheric Chemistry Validation of ENVISAT – ESRIN - 3-7 May 2004 Page 9 Level 1b processor improvements Background correction

Page 16Atmospheric Chemistry Validation of ENVISAT – ESRIN - 3-7 May 2004

Impact on H2Obetter flat-fieldcorrection

Level 1b processing improvements

H2O transmission∆∆∆∆ > 3 % (5.4 vs 6.0)

Page 17: GOMOS level 1b processor improvements · 2018-05-15 · Atmospheric Chemistry Validation of ENVISAT – ESRIN - 3-7 May 2004 Page 9 Level 1b processor improvements Background correction

Page 17Atmospheric Chemistry Validation of ENVISAT – ESRIN - 3-7 May 2004

Impact on H2O

Level 1b processing improvements

H2O local densities∆∆∆∆ > 15 % (5.4 vs 6.0)

Page 18: GOMOS level 1b processor improvements · 2018-05-15 · Atmospheric Chemistry Validation of ENVISAT – ESRIN - 3-7 May 2004 Page 9 Level 1b processor improvements Background correction

Page 18Atmospheric Chemistry Validation of ENVISAT – ESRIN - 3-7 May 2004

Still some work to do…

Bright limb missioncleaning the starsignal from limblight Central band signal

Shot-noise error oflimb band ≈≈≈≈ 10% of thestar signal at 30 kmFor Star 3 (mv=-0.05)Shot noise error >100%at 30 km for Star 105(mv=2.64)

Star 3

Page 19: GOMOS level 1b processor improvements · 2018-05-15 · Atmospheric Chemistry Validation of ENVISAT – ESRIN - 3-7 May 2004 Page 9 Level 1b processor improvements Background correction

Page 19Atmospheric Chemistry Validation of ENVISAT – ESRIN - 3-7 May 2004

Still some work to do…

Bright limb mission Star signal is not properlycorrectly… transmission is unrealistic

Estimated transmissionStar signal after limb correction

Page 20: GOMOS level 1b processor improvements · 2018-05-15 · Atmospheric Chemistry Validation of ENVISAT – ESRIN - 3-7 May 2004 Page 9 Level 1b processor improvements Background correction

Page 20Atmospheric Chemistry Validation of ENVISAT – ESRIN - 3-7 May 2004

Still some work to do…Reflectivity correction in elevation

How to characterise it ?

Page 21: GOMOS level 1b processor improvements · 2018-05-15 · Atmospheric Chemistry Validation of ENVISAT – ESRIN - 3-7 May 2004 Page 9 Level 1b processor improvements Background correction

Page 21Atmospheric Chemistry Validation of ENVISAT – ESRIN - 3-7 May 2004

Still some work to do…

Spectrometer B PRNU (H2O species)PRNU characterised a posteriori from transmission spectra ?

Page 22: GOMOS level 1b processor improvements · 2018-05-15 · Atmospheric Chemistry Validation of ENVISAT – ESRIN - 3-7 May 2004 Page 9 Level 1b processor improvements Background correction

Page 22Atmospheric Chemistry Validation of ENVISAT – ESRIN - 3-7 May 2004

Still some work to do…

SP-FP discrepancydifferences between SP spectral average andFP temporal average in the same spectral band

Correction of the residual RTS signaluse the transmission model as a « reference »in the level 2 processing

LSF larger than target bandwill imply a modification of the band settingre-calibration needed

and for more details… read the GOMOS data disclaimer

Page 23: GOMOS level 1b processor improvements · 2018-05-15 · Atmospheric Chemistry Validation of ENVISAT – ESRIN - 3-7 May 2004 Page 9 Level 1b processor improvements Background correction

Page 23Atmospheric Chemistry Validation of ENVISAT – ESRIN - 3-7 May 2004

Conclusion

Dark limb cases (algorithms+parameters+calibration) are correctly handled by GOMOS level 1b processing (6.0a)

Bright limb mission must be improved

Level 1b processing and calibration status