GOVERNMENT OF ANDHRA PRADESH
Water Resources Department
Pradhan Mantri Krishi Sinchayee Yojana
(PMKSY)
District Irrigation Plan
East Godavari District
ConTec Design And Engineering Solutions (P) Ltd. 1-7-39/5, 2nd Floor, Hema Mansion, Above SBI, Street No.8, Habsiguda, Hyderabad - 500 007, www.contec.co.in
Consultants
Contec Design And Engineering Solutions (P) Ltd.
1-7-39/5, 2nd Floor, Above SBI, Hema Mansion, Street No. 8, Habsiguda,Hyderabad – 500 007, Tel : +91-40-4020 9896,
Email: [email protected], web: www.contec.co.in
GOVERNMENT OF ANDHRA PRADESH
Water Resources Department
District Irrigation Plan
East Godavari District
Pradhan Mantri Krishi Sinchayee Yojana
(PMKSY)
Pradhan Mantri Krishi Sinchayee Yojana Water Resources Department,
Government of Andhra Pradesh
INDEX
PRADHAN MANTRI KRISHI SINCHAYEE YOJANA (PMKSY)
East Godavari District
1
1 3 - 9
1.1 Project Description 3
1.2 Vision of PMKSY 3
1.3 Objectives of PMKSY 3
1.4 Strategy & Focus Area 4
1.5 Components & Responsible Ministries / Departments 5
1.6 District Irrigation Plan (DIP) 7
1.7 Terms of Reference & Scope of Preparation of DIP 8
1.8 Approval 9
2 10 - 23
2.1 Demography 13
2.2 Biomass and Livestock 14
2.3 Agro-Ecology, Climate, Hydrology and Topography 16
2.4 Geomorphology & Soil Types 17
2.5 Land Use Pattern 20
2.6 Drainage 23
3 24- 34
3.1 Water profile 24
3.2 Crop Growing seasons in East Godavari 24
3.3 Crop Pattern 25
3.4 Productivity 32
3.5 Crop Water Requirement 33
LIST OF TABLES
GENERAL INFORMATION OF DISTRICT
LIST OF FIGURES
LIST OF ANNEXURES
DISTRICT WATER PROFILE
INTRODUCTION
EXECUTIVE SUMMARY
ConTec
Pradhan Mantri Krishi Sinchayee Yojana Water Resources Department,
Government of Andhra Pradesh
INDEX
4 35- 40
4.1 Surface Water Availability 35
4.2 Groundwater Scenario 36
4.3 Present Water Utilisation & Irrigation Potential Created 39
5 40 - 47
5.1 Water Demand 40
5.2 Domestic Water Demand 40
5.3 Crop water Demand 43
5.4 Livestock water Demand 44
5.5 Industrial Water Demand 45
5.6 Water demand for Power generation 46
5.7 Water Demand of the district for Various sectors 47
6 48 - 61
6.1 Gap in Irrigation Infrastructure 48
6.2 Gap Ayacut 49
6.3 Potential for development 50
6.4 Water Budget 50
6.5 Bridging water gap 51
6.6 Cost Benefit Analysis 59
STRATEGIC ACTION PLAN – DISTRICT IRRIGATION PLAN
WATER AVAILABILITY
WATER REQUIREMENT/DEMAND
ConTec
Pradhan Mantri Krishi Sinchayee Yojana Water Resources Department,
Government of Andhra Pradesh
List of Tables
PRADHAN MANTRI KRISHI SINCHAYEE YOJANA (PMKSY)
TABLE NO DESCRIPTION PAGE NO
2.1.0 District Profile 11
2.2.3 Water Consumption by different live stock 16
2.4.1 Soil classification 20
2.5.1.1 Land use pattern 22
3.1.1 District water profile 24
3.3.1 Crop wise irrigation Status in the District 29
3.4.1 Crop wise Production and Productivity 32
3.5.1 Crop water Requirement 34
4.1.1 Surface Water Availability 35
4.3.1 Present Water Utilisation 39
4.3.2 Irrigation Potential Created-Project wise 39
5.2.1 Average Domestic Water Consumption 40
5.2.2 Domestic water Demand/Requirement 41
5.3.1 Present Crop water demand/requirement 43
5.3.2 Projected Crop water demand/requirement 43
5.4.1 Water Consumption by animals/ Birds 44
5.4.2 Water consumption by wild life 45
5.4.3 Livestock Water Demand 45
5.5.1 Division wise Industrial Water Demand 45
5.7.1 Water Demand of the District (Present) 46
5.7.2 Water Demand (Projected 2020) 47
6.1.1 Gap in Irrigation infrastructure 49
6.2.1 Gap ayacut 49
6.3.1 Land potential for development 50
6.4.1 Water Budget 50
ConTec
Pradhan Mantri Krishi Sinchayee Yojana Water Resources Department,
Government of Andhra Pradesh
6.5.1 Strategic Action Plan - Bridging Water Gap 51
6.5.1.1 Strategic Action Plan AIBP 52
6.5.2.1 Strategic Action Plan PMKSY - HKKP 54
6.5.3.1 Strategic Action plan - Per Drop More Crop 54
6.5.4.1Strategic Action Plan for IWMP - PMKSY - Watershed Development /
Convergence Action plan with MGNREGS 56
6.5.5.1 State Projects 57
6.5.6.1 Sewage treatment 58
6.6.1 Year wise cost analysis 60
ConTec
Pradhan Mantri Krishi Sinchayee Yojana Water Resources Department,
Government of Andhra Pradesh
List of Figures
PRADHAN MANTRI KRISHI SINCHAYEE YOJANA
(PMKSY)
FIGURE NO DESCRIPTION PAGE NO
2.1.0 Administrative boundaries 12
2.1.1 Revenue Division Wise Population Projection 13
2.2.1 Details of Small Animals 15
2.2.2 Details of Large Animals 15
2.4.1 Soil classification 19
2.5.1 Land use and land cover map 21
2.5.1.1 Land Use Pattern 23
3.3.1 Land use / Land Cover Pattern 26
3.3.2 Cropping Pattern 26
3.3.3 Present Cropping Pattern map 27
3.3.4 Projected Cropping Pattern map 28
3.3.5 Crop wise Kharif Irrigation Status 29
3.3.6 Crop wise Rabi Irrigation Status 30
3.3.7 Crop wise Total Irrigation Status 30
3.3.8 Irrigated & Rain fed Kharif Area 31
3.3.9 Irrigated & Rain fed Rabi Area 31
3.4.1 Crop wise production and Productivity 32
4.2.1 Ground Water Availability 37
4.2.2 Ground water status 38
5.2.1 Per Capita Water Consumption 41
5.2.2 Population Projection 42
5.2.3 Additional Domestic Water Demand 42
5.3.1 Crop Water Demand/requirement 44
5.7.1 Domestic & Crop Water Demand (Present) 46
5.7.2 Domestic & Crop Water Demand (2020) 47
6.4.1 Present & Projected Water Demand Gap 50
6.6.1 East Godavari District Irrigation Map 61
ConTec
Pradhan Mantri Krishi Sinchayee Yojana Water Resources Department,
Government of Andhra Pradesh
List of Annexures
PRADHAN MANTRI KRISHI SINCHAYEE YOJANA
(PMKSY)
ANNEXURE NO DESCRIPTION PAGE NO
2.1.1 Mandal wise Demographic data 62
2.2.1 Details of animals 64
3.1.1.1 Mandal wise breakup of Surface water availabiliy 66
3.3.1 Irrigated and rain-fed area in Kharif season 67
3.3.2 Irrigated and rain-fed area in Rabi season 68
4.1.1.1 Yield calculations 69
4.1.1.2 Mandal wise yield contribution 73
4.2.1 Ground water availability 75
6.5.2.1.1 Proposed schemes under NABARD 84
6.5.3.1.1 Proposed schemes under MIP, Horticulture 85
6.5.3.1.2 Action plan - Other Intervaentions - Agriculture 91
6.5.3.1.3 Budget plan for ATMA 87
6.6.1 BCR Calculation 92
ConTec
Pradhan Mantri Krishi Sinchayee Yojana Water Resources Department, Government of Andhra Pradesh
ConTec District Irrigation Plan - East Godavari 1
EXECUTIVE SUMMARY
“Jal Hai To Kal Hai” – No Future Without Water
With a vision of extending the coverage of irrigation to the entire farm land parcel, optimally
utilising every drop of water; the Union Government of India and the State Government of Andhra
Pradesh are committed to accord high priority to water conservation and its management. The
Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) has been formulated with the focus on end to
end solution for improving water use efficiency, source creation, distribution, management, field
application and extension activities.
Assigning highest priority to water security; with an intention to complete the long pending
irrigation projects, the Union Government and has launched the ‘Pradhan Mantri Krishi Sinchayee
Yojana’ with the motto of ‘Har Khet Ko Paani’. The Union Government is exploring all the options
including inter-linking of rivers, for optimal use of water resources and to prevent the recurrence
of floods and drought; harnessing rain water through ‘Jal Sanchay’ and ‘Jal Sinchan’, to nurture
water conservation and ground water recharge; popularising micro irrigation to ensure ‘Per Drop
More Crop’.
PMKSY has been conceived amalgamating ongoing schemes viz. Accelerated Irrigation Benefit
Programme (AIBP) of the Ministry of Water Resources, River Development & Ganga Rejuvenation
(MoWR, RD&GR), Integrated Watershed Management Programme (IWMP) of Department of Land
Resources (DoLR) and the On Farm Water Management (OFWM) of Department of Agriculture and
Cooperation (DAC). The scheme will be implemented by Ministries of Agriculture, Water Resources
and Rural Development.
Pradhan Mantri Krishi Sinchayee Yojana Water Resources Department, Government of Andhra Pradesh
ConTec District Irrigation Plan - East Godavari 2
Programme architecture of PMKSY intends to adopt a decentralized State level planning and
projectised execution structure to allow States to draw up their own irrigation development plans
based on District Irrigation Plan (DIP) and State Irrigation Plan (SIP). It will be operative as
convergence platform for all water sector activities including drinking water & sanitation,
MGNREGA, application of science and technology etc. through comprehensive plan. State Level
Sanctioning Committee (SLSC) chaired by the Chief Secretary of the State has been vested with the
authority to oversee its implementation and sanction projects. PMKSY has been conceived
amalgamating all ongoing schemes and it will be implemented by Ministries of Agriculture, Water
Resources and Rural Development.
District Irrigation Plans (DIPs) shall be the cornerstone for planning and implementation of PMKSY.
The present District Irrigation Plan outlines the approach and methodology to be adopted for
holistic irrigation development perspective of the East Godavari District with focus on medium to
long term development plans integrating three components viz. water sources, distribution
network and water use applications incorporating all usage of water like drinking & domestic use,
irrigation and industry.
M/s ConTec Design & Engineering Solutions Pvt. Ltd. has been awarded with the consultancy work
for preparation of individual District Irrigation Plans for the thirteen Districts in the State of Andhra
Pradesh and compilation of the DIP’s for preparation of the State Irrigation Plan for the State of
Andhra Pradesh.
Pradhan Mantri Krishi Sinchayee Yojana Water Resources Department, Government of Andhra Pradesh
ConTec District Irrigation Plan - East Godavari 3
1 PRADHAN MANTRI KRISHI SINCHAYEE YOJANA (PMKSY)
1.1 Project Description
The major objective of PMKSY is to expand cultivable area under assured irrigation “Har Khet Ko
Pani”, improve on-farm water use efficiency to reduce wastage of water, enhance the adoption
of precision-irrigation and other water saving technologies “Per Drop More Crop”, enhance
recharge of aquifers and introduce conservation practices by reusing treated municipal waste
water for peri-urban agriculture and achieve convergence of investments in irrigation at the field
level. To this effect the stage government of Andhra Pradesh Government is committed to giving
highest priority to water security and implementation of PMKSY.
The programme architecture of PMKSY will be to adopt a decentralized State level planning and
projectised execution structure that will allow States to draw up their own irrigation
development plans based on District Irrigation Plan (DIP) and State Irrigation Plan (SIP). It will be
operative as convergence platform for all water sector activities including drinking water &
sanitation, MGNREGA, application of science and technology etc. through comprehensive plan.
State Level Sanctioning Committee (SLSC) chaired by the Chief Secretary of the State will be
vested with the authority to oversee its implementation and sanction projects. PMKSY has been
conceived amalgamating all ongoing schemes and it will be implemented by Ministries of
Agriculture, Water Resources and Rural Development.
1.2 Vision of PMKSY
The overreaching vision of Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) is to ensure access
to some means of protective irrigation to all the agricultural farms in the country “Har Khet Ko
Pani”, to produce ‘Per Drop More Crop’, and bringing much desired rural prosperity.
1.3 Objectives of PMKSY
The broad objectives of PMKSY are to:
a) Achieve convergence of investments in irrigation at the field level (preparation of district
level and Mandal level water use plans).
b) Enhance the physical access of water on the farm and expand cultivable area under
assured irrigation “Har Khet Ko Pani”.
Pradhan Mantri Krishi Sinchayee Yojana Water Resources Department, Government of Andhra Pradesh
ConTec District Irrigation Plan - East Godavari 4
c) Integration of water source, distribution and its efficient use, to make best use of water
through appropriate technologies and practices.
d) Improve on-farm water use efficiency to reduce wastage and increase availability both in
duration and in extent.
e) Enhance the adoption of precision-irrigation and other water saving technologies “Per
Drop More Crop”.
f) Enhance recharge of aquifers and introduce sustainable water conservation practices.
g) Ensure the integrated development of rain fed areas using the watershed approach
towards soil and water conservation, regeneration of ground water, arresting runoff,
providing livelihood options and other NRM activities.
h) Promote extension activities relating to water harvesting, water management and crop
alignment for farmers and grass root level field functionaries.
i) Explore the feasibility of reusing treated municipal wastewater for peri-urban agriculture.
j) Attract greater private investments in irrigation.
1.4 Strategy & Focus Area
To achieve above objectives, PMKSY strategizes by focussing on end-to end solution in irrigation
supply chain, viz. water sources, distribution network, efficient farm level applications, extension
services on new technologies & information etc.
a) Creation of new water sources; repair, restoration and renovation of defunct water
sources; construction of water harvesting structures, secondary & micro storage,
groundwater development, enhancing potentials of traditional water bodies.
b) Developing/augmenting distribution network where irrigation sources (both assured and
protective) are available or created;
c) Promotion of scientific moisture conservation and run off control measures to improve
ground water recharge so as to create opportunities for farmer to access recharged water
through shallow tube/dug wells;
d) Promoting efficient water conveyance and field application devices within the farm viz,
underground piping, Drip & Sprinklers, rain-guns and other application devices etc.
e) Encouraging community irrigation through registered user groups/farmer producers’
organisations/NGOs.
Pradhan Mantri Krishi Sinchayee Yojana Water Resources Department, Government of Andhra Pradesh
ConTec District Irrigation Plan - East Godavari 5
1.5 Components & Responsible Ministries / Departments
1. Accelerated Irrigation Benefit Programme (AIBP) by Water Resource Department.
To focus on faster completion of ongoing Major and Medium Irrigation including
National Projects.
2. PMKSY (Har Khet Ko Pani) by Water Resource Department (WRD)
Creation of new water sources through Minor Irrigation (both surface and ground
water).
Repair, Restoration and Renovation (RRR) of water bodies; strengthening carrying
capacity of traditional water sources, construction rain water harvesting structures;
Command area development, strengthening and creation of distribution network from
source to the farm;
Ground water development in the areas where it is abundant, so that sink is created
to store runoff/ flood water during peak rainy season.
Improvement in water management and distribution system for water bodies to take
advantage of the available source which is not tapped to its fullest capacity (deriving
benefits from low hanging fruits). At least 10% of the command area to be covered
under micro/precision irrigation.
Diversion of water from source of different location where it is plenty to nearby water
scarce areas, lift irrigation from water bodies / rivers at lower elevation to supplement
requirements beyond IWMP and MGNREGS irrespective of irrigation command.
Creating and rejuvenating traditional water storage systems under “Neeru Chettu” at
feasible locations.
3. PMKSY (Per Drop More Crop) by Departments of Agriculture & Horticulture
Programme management, approval of annual action plan, Monitoring etc.
Promoting efficient water conveyance and precision water application devices like
drips, sprinklers, pivots, rain-guns in the farm (Jal Sinchan);
Topping up of input cost particularly under civil construction beyond permissible limit
(40%), under MGNREGS for activities like lining inlet, outlet, silt traps, distribution
system etc.
Construction of micro irrigation structures to supplement source creation activities
including tube wells and dug wells (in areas where ground water is available and not
Pradhan Mantri Krishi Sinchayee Yojana Water Resources Department, Government of Andhra Pradesh
ConTec District Irrigation Plan - East Godavari 6
under semi critical /critical /over exploited category of development) which are not
supported under AIBP, PMKSY (Watershed) and MGNREGS as per DIP.
Secondary storage structures at tail end of canal system to store water when available
in abundance (rainy season) or from perennial sources like streams for use during dry
periods through effective on-farm water management;
Water lifting devices like diesel/ electric/ solar pump sets including water carriage
pipes, underground piping system.
Extension activities for promotion of scientific moisture conservation and agronomic
measures including cropping alignment to maximise use of available water including
rainfall and minimise irrigation requirement (Jal Sanrakchan);
Capacity building, training and awareness campaign including low cost publications like
“Neeru Pragathi”, use of pico projectors and low cost films for encouraging potential
use water source through technological, agronomic and management practices
including community irrigation.
The extension workers will be empowered to disseminate relevant technologies under
PMKSY only after requisite training is provided to them especially in the area of
promotion of scientific moisture conservation and agronomic measures, improved/
innovative distribution system like pipe and box outlet system, etc. appropriate
domain experts will act as master trainers.
Information Communication Technology (ICT) interventions to be made use in the field
of water use efficiency, precision irrigation technologies, on farm water management,
crop alignment etc. and also to do intensive monitoring of the Scheme.
4. PMKSY (Watershed) by Rural Development Department
Effective management of runoff water and improved soil & moisture conservation
activities such as ridge area treatment, drainage line treatment, rain water harvesting,
in-situ moisture conservation and other allied activities on watershed basis.
Converging with MGNREGS for creation of water source to full potential in identified
backward rain fed blocks including renovation of traditional water bodies.
Pradhan Mantri Krishi Sinchayee Yojana Water Resources Department, Government of Andhra Pradesh
ConTec District Irrigation Plan - East Godavari 7
1.6 District Irrigation Plan (DIP)
District Irrigation Plans (DIPs) shall be the cornerstone for planning and implementation of
PMKSY. DIPs will identify the gaps in irrigation infrastructure with respect to the deficiency within
the system as also the shortfall in the availability as compared to the present and project future
demands.
DIPs will present holistic irrigation development perspective of the district outlining medium to
long term development plans integrating three components viz. water sources, distribution
network and water use applications incorporating all usage of water like drinking & domestic use,
irrigation and industry. Preparation of DIP will be taken up as joint exercise of all participating
departments.
Pradhan Mantri Krishi Sinchayee Yojana Water Resources Department, Government of Andhra Pradesh
ConTec District Irrigation Plan - East Godavari 8
1.7 Scope of Preparation of DIP
The scope of work of consultant includes compilation of data provided by the various
departments for preparation of individual District Irrigation Plans for the thirteen Districts in the
State of Andhra Pradesh and compilation of the DIP’s for preparation of the State Irrigation Plan.
The scope shall include compilation of following data:
a) Available and potential water resources master plan including information on:
All sources of available water,
Distribution network,
Defunct water bodies,
New potential water sources both surface and sub- surface systems,
Application & conveyance provisions,
Sewage and effluent water generated and treated.
b) Crops and cropping system aligned to available/designed quantity of water, suitable to
local socio economics.
c) Demand and supply assessment of crop water, effective rainfall and potential source of
existing & new water sources considering geo-hydrological and agro ecological scenario.
Pradhan Mantri Krishi Sinchayee Yojana Water Resources Department, Government of Andhra Pradesh
ConTec District Irrigation Plan - East Godavari 9
d) Identification of gaps in irrigation infrastructure currently available.
e) Use of satellite imagery, topo sheets and available database for preparing irrigation plans.
f) Preparation of DIP, considering holistic irrigation development perspective of the district
outlining medium to long term development plans integrating three components viz.
water sources, distribution network and water use applications incorporating all usage of
water like drinking & domestic use, irrigation and industry and considering:
All activities pertaining to water harvesting,
Water augmentation from surface/sub surface sources,
Distribution and application of water including repair renovation and restoration of
water bodies, major medium and minor irrigation works,
Command area development to be taken up within the frame work of this master plan.
Emphasis is to be given for deriving potential benefit from low hanging fruits like
extending the reach/coverage of water source through effective distribution and
application mechanism,
Reducing the gap between potential created and utilized through more focus on
command area development and precision irrigation.
Proper integration of creation of source like dams and water harvesting structures,
distribution system like canals and command area development works and precision
farming to be made for deriving best possible use of water resources.
Steps for use of urban treated waste water for irrigation purpose.
Ten copies of draft DIP’s along with soft copy will be submitted initially, and on
finalisation of DIP ten copies of final DIP’s along with soft copy shall be submitted.
1.8 Approval
The DIPs shall be cleared by the District Level Implementation Committee (DLIC) chaired by the
District Collector taking the suggestions of Hon'ble Members of Parliament & Members of
Legislative Assembly.
The State Level Sanctioning Committee (SLSC) shall approve DIPs and SIP based on
recommendation of DLIC.
Pradhan Mantri Krishi Sinchayee Yojana Water Resources Department, Government of Andhra Pradesh
ConTec District Irrigation Plan - East Godavari 10
2 GENERAL INFORMATION OF DISTRICT
East Godavari District is one of the north eastern coastal districts of Andhra Pradesh which is
situated within the geographic co-ordinates of 160-30' and 180-20' Northern latitude and 810-
30' and 820-36' of eastern longitude. The district is bounded on the North partly by Odisha
State and Visakhapatnam District; on the East by Bay of Bengal; on the South and West by
West Godavari and Khammam Districts. East Godavari district covers vast portion if Delta area
of Godavari river. The main rivers are Godavari, Yeleru, Thandava and Pampa rivers.
The River Godavari enters the district in a mature stage and proceeds to merge into the Bay
of Bengal after dividing into three different rivulets namely Vaista, Vainateyam and Gowthami
Godavari. Thandava and Pampa river channels supply water to a limited area in district.
Out of the total cultivable area of 5.61 lakh Hectares, about 4.27 lakh Hectares of net area is
sown and an irrigation potential of 2.99 lakh Hectares has been created, details of which are
shown under Table 4-3-3. Substantial dependency on rain fall makes cultivation in unirrigated
areas a high risk, less productive profession. Empirical evidences suggest that assured or
protective irrigation encourages farmers to invest more in farming technology and inputs
leading to productivity enhancement and increased farm income.
All the projections have been made considering Revenue Division as a block. East Godavari
District is divided into six Revenue Divisions; Kakinda, Peddapuram, Rampachodavaram,
Rajamundry, Amalapuram and Ramachndrapuram. Figure 2-1 below shows the administrative
boundaries and Table 2-1 below outlines the District Profile. The district can be classified in to
three natural zones, the delta, upland and agency tracks. The headquarters of East Godavari
district is Kakinada, which is well connected by rail and road. Kakinada natural port has a coastal
length of 144.00 Kilo meters.
Pradhan Mantri Krishi Sinchayee Yojana Water Resources Department, Government of Andhra Pradesh
ConTec District Irrigation Plan - East Godavari 11
Table 2-1 : District Profile
Sl. No Description Profile
1 District code 545
2 Geographical area 1260157 Ha / 3112588 Acre
3 Latitude and Longitude Northern: 16°-30’ and 18°-20’
Eastern: 81°-30’ and 82°-36’
4 Area under forest 441311 Ha / 1090038 Acre
5 Cultivable land 561397 Ha / 1387241 Acre
6 Gross sown area 683859 Ha / 1689132 Acre
7 Net sown area 427862 Ha / 1056819 Acre
8 Irrigation Potential Created 299711 Ha / 740286 Acre
9 Net irrigated (Rabi/Kharif) 279932 Ha / 691433 Acre
10 Net rain-fed area 147930 Ha / 365386 Acre
11 Total no of Mandals 64
12 Total no of Panchayat 1069
13 Total no of Villages 1595
14 Total population 52,85,824
15 Population growth rate (Decadal) 5.19%
16 Total male population 2633304
17 Total female population 2652520
18 Total population - SC 957302
19 Total population - ST 297044
20 Total population - General 39,95,832
21 Water availability 4163.37 MCM
22 Water Utilisation 5756.5 MCM
Pradhan Mantri Krishi Sinchayee Yojana Water Resources Department, Government of Andhra Pradesh
ConTec District Irrigation Plan - East Godavari 12
East Godavari
Fig. 2-1 : Administrative Boundaries
Pradhan Mantri Krishi Sinchayee Yojana Water Resources Department, Government of Andhra Pradesh
ConTec District Irrigation Plan - East Godavari 13
2.1 Demography
As per 2015 Census the Population of East Godavari District is 52,85,824, of that Male population
is 26,33,304 while the Female population is 26,52,520. The decennial growth rate from 2001 to
2011 is 5.19 percent for the District, lower than the state average of 9.21 percent. The density of
population for the District is 419 persons per Sq. Km as against the State average of 308. Agency
area shows lesser Density and plain area higher density. The Scheduled Caste and Scheduled
Tribe population of the District is 9,57,302 and 2,97,044 respectively. The literacy rate is 74.1
percent among Males, 66.95 percent among Females and 70.05 percent among total population
of the District. Mandal wise Demographic data is enclosed as per Annexure 2-1-1.
Figure 2-1-1 : Revenue Division Wise Population Projection
2.2 Biomass and Livestock
Water plays an important role in livestock productivity. Providing enough quality water is
essential for good livestock husbandry. Water makes up 80% of the blood, regulates body
temperature and is vital for organ functions such as digestion, waste removal and the absorption
KakindaPeddapura
mRampachod
avaramRajamundr
yAmalapura
mRamachndr
apuramTotal
Population 2015 11,70,095 9,51,633 3,57,177 10,20,992 12,26,529 6,69,132 53,95,558
Population 2020 1205791 980664 368073 1052139 1263946 689545 55,60,158
Population 2025 1230823 1001023 375715 1073981 1290186 703860 56,75,587
Population 2050 1390522 1130906 424464 1213330 1457587 795185 64,11,995
0
10,00,000
20,00,000
30,00,000
40,00,000
50,00,000
60,00,000
70,00,000
Source: Census 2011 for base data
Pradhan Mantri Krishi Sinchayee Yojana Water Resources Department, Government of Andhra Pradesh
ConTec District Irrigation Plan - East Godavari 14
of nutrients. Understanding daily livestock watering needs is key when designing a livestock
watering system.
The daily water requirement of livestock varies significantly among animal species. The animal's
size and growth stage will have a strong influence on daily water intake. Consumption rates can
be affected by environmental and management factors. Air temperature, relative humidity and
the level of animal exertion or production level are examples of these factors. The quality of the
water, which includes temperature, salinity and impurities affecting taste and odour, will also
have an effect. The water content of the animal's diet will influence its drinking habits. Feed with
a relatively high moisture content decreases the quantity of drinking water required.
Assessment of livestock and water requirement is helpful in modelling water and livestock
relationships. The demand for meat, dairy products and eggs rises faster than the demand for
crops; thus both scenarios call for livestock portion to increase relatively more rapidly than crops.
Given that drinking water needs are species, farm and management specific, many producers
today are opting to install water metering equipment to obtain accurate measurements of water
use Livestock and poultry water consumption depend on a number of physiological and
environmental conditions such as:
State (lactating, pregnant or growing)
Activity level.
Type of Type and size of animal or bird.
Physiological diet-dry hay, silage or lush pasture.
Temperature-hot summer days above 250 C can sometimes double the water
consumption of animals.
Water quality - palatability and salt content.
Details of animals is enclosed as per Annexure 2-2-1
Pradhan Mantri Krishi Sinchayee Yojana Water Resources Department, Government of Andhra Pradesh
ConTec District Irrigation Plan - East Godavari 15
Figure 2-2-1 : Details of Small Animals
Figure 2-2-2 : Details of Large Animals
KakindaPeddapura
mRampachod
avaramRajamundry
Amalapuram
Ramachndrapuram
Poultry (Nos.) 445350 5117301 602446 796872 1125407 5900365
Pigs(Nos.) 4620 7765 1294 3645 11050 3779
Goats(Nos.) 23734 75980 138257 24059 26301 3870
Sheeps(Nos.) 29478 86675 25214 70299 22262 12794
others (Nos.) 40829 30724 15260 36286 40280 18469
0
1000000
2000000
3000000
4000000
5000000
6000000
7000000
Kakinda PeddapuramRampachoda
varamRajamundry Amalapuram
Ramachndrapuram
Cow (Nos.) 23846 64963 85902 25007 50407 21546
Buffalo (Nos.) 119414 213781 13882 77490 118582 80408
0
50000
100000
150000
200000
250000
Source: Livestock census 2012
Pradhan Mantri Krishi Sinchayee Yojana Water Resources Department, Government of Andhra Pradesh
ConTec District Irrigation Plan - East Godavari 16
Table 2-2-3 : Water Consumption by different live stock
Water consumption by animals/Birds
S. No Livestock Category Water Requirement range Average water use Lit/day
1 Poultry 0.16-0.24 0.2
2 Small animals 13-20 16.5
3 Large animals 39-59 49
2.3 Agro-Ecology, Climate, Hydrology and Topography
2.3.1 Agro-Ecology
Agroecology is the science of sustainable agriculture; the methods of agroecology have as their
goal achieving sustainability of agricultural systems balanced in all spheres. Agroecologists study
a variety of agroecosystems, and the field of agroecology is not associated with any one particular
method of farming, whether it be organic, integrated, or conventional; intensive or extensive.
Agro-climatic zone is a land unit in terms of major climate, superimposed on length of growing
period (moisture availability period) whereas an agro-ecological zone is the land unit carved out
of agro climatic zone superimposed on landform which acts as modifier to climate and length of
growing period.
It is possible to gain greater insights into agricultural cropping and productivity by studying the
agro-ecology of each zone and by concentrating on smaller cropping belts. Actual development
of distinct agroecosystems and their productivity depends on important geographical
characteristics such as topography, altitude, precipitation pattern in different seasons, soil type,
its fertility status and food crop preferences of the populace. As per National Agricultural
Research project East Godavari District falls partly under Godavari Zone of the Agro Climatic
Zones in India and partly under high altitude & tribal areas zone.
Source: Adapted from Nutrient requirements of poultry, sheep, Cattles. 9th edition. Washington, D.C. : National
Research Council, 1994.
Pradhan Mantri Krishi Sinchayee Yojana Water Resources Department, Government of Andhra Pradesh
ConTec District Irrigation Plan - East Godavari 17
2.3.2 Climate
The climate is comparatively equitable and although it is very warm in May with a maximum
temperature of 38.60C and with a minimum temperature of 19.090C in the month of December.
The District receives annual normal rainfall of 1087.1 MM., of which south-west monsoon
accounts for 471.9 mm of the normal rainfall while North-East monsoon contributes 499.5 mm
of the normal rainfall. The rest is shared by summer showers and winter rains. Agency and inland
Mandals receive larger rainfall from the South West Monsoon, while Coastal Mandals get
similarly larger rainfall from North-East monsoon.
2.3.3 Topography
The District presents five distinct resource regions. The strip of the land along the coast and
interior called the plains division, and hilly area of the Eastern Ghats flanking it on the North and
West called the Agency Division.
i. Hills: This region has gravelly loam, sandy loam soils and southern tropical dry deciduous
vegetation. It also receives an annual rainfall between 1220 and 1285 mm. The general
level of development in this region is poor. This region comprises of seven mandals in
the agency area, namely Rampachodavaram, Devipatnam, Maredumilli, Addatteegala,
Rayavommangi, Y.Ramavaram and Prathipadu
ii. Rolling plain: It has silty clay and loamy soils, and southern tropical thorny forest
vegetation. It receives an annual rainfall between 1075 and 1220 mm. The general level
of development in this region is average. It comprises of 13 mandals ie., Gangavaram,
Gokavaram, Gandepalli, Rajanagaram, Rajahmundry, Rangampeta, Peddapuram,
Jaggampeta, Tuni, Kotananduru, Sankhavaram, Thondangi and Gollaprolu.
iii. Alluvial plain: It has silty clay and loamy sandy soils. It has southern tropical thorny forest
vegetation and receives an annual rainfall between 1025 and 1220 mm. The general level
of development in this region is good. This region comprises of five mandals, namely
Sitanagaram, Korukonda, Eleswaram, Kirlampudi and Pithapuram.
iv. Deltaic plain: It has deep to very deep silty clay loam soils and receives an annual rainfall
between 1080 and 1220 mm. The general level of development in this region is very good.
This region comprises of 21 mandals, namely Samalkot, Pedapudi, Karapa, Biccavolu,
Pradhan Mantri Krishi Sinchayee Yojana Water Resources Department, Government of Andhra Pradesh
ConTec District Irrigation Plan - East Godavari 18
Anaparthi, Rayavaram, Mandapeta, Alamuru, Kapileswarapuram, Kadiam, Ravulapalem,
Kothapeta, Atreyapuram, Gannavaram, Ambajipeta, Amalapuram, Inavilli,
Mummidivaram, Pamarru, Ramachandrapuram and Kajuluru.
v. Coastal plain: It has deep to very deep loamy or clay coastal saline soils and it receives an
annual rainfall between 1025 and 1350 mm. The general level of development in this
region is good. This region comprises of 11 mandals, namely Sakhinetipalli, Malkipuram,
Razole, Mamidikudur, Allavaram, Uppalaguptam, Katrenikona, I.Polavaram, Tallarevu,
Kakinada and Kothapalli.
2.4 Geomorphology & Soil Types
Geomorphologically the district can be divided into three regions, viz Hilly region in the northern
parts of the district, the upland region in the central part and the deltaic plain in the south. The
hilly region in the northern area comprises several denudational, residual hills, inselbergs,
pediments, burried pediments and structural hills. The general trend of the hill ranges is NE-SW
and parallel to the east coast. The upland plain (plateau) of Rajahmundry sandstone raises to a
height of 45m to 70m comprises erosional land forms consisting of structural and residual hills,
pediment, Pedi plain and narrow corridor of piedmont zone. The deltaic region in the south
comprises low-lying deltaic and coastal plains having a gentle easterly slope and are
characterised by landforms of both fluvial and marine origin. Among the fluvial landforms are
active channel of Gautami, Vasista Godavari and associated braided channel bars and levees. The
flood plain is predominantly seen between Vasista and Gowthami channels. The marine
landforms include palaeo beach ridges, palaeotidal flats, active beach and spit. The deltaic plain
shows a relief between 15 m at its apex to 2 m near the coast.
The predominant soils in the district are red clayey soil, deltaic alluvial soil, coastal sandy soil and
lateritic soil. Red clayey soils with sandy loam to clayey loam in texture and occur around
Rampachodavaram, Yeleshwaram, Prathipadu, Peddapuram, Rangampeta, Kakinada,
Rajahmundy, Tuni, Korukonda, Pithapuram and Tallarevu areas. The deltaic alluvium which is
grey brown to black in colour with fine to medium texture, moderate to poorly permeable and
are prevalent in the canal irrigated areas as seen around Kothapeta, P.Gannavaram,
Ramachandrapuram, Rajahmundry, Amalapuram, Razole and Pithapuram areas. The coastal
Pradhan Mantri Krishi Sinchayee Yojana Water Resources Department, Government of Andhra Pradesh
ConTec District Irrigation Plan - East Godavari 19
sandy soils occur all along the coast with a width of about 6 to 10 kms and is highly porous and
lack of binding material. Lateritic soils, deep reddish in colour, but differ from red soils in
composition and are characterised by free drainage condition and acidic in reaction. These soils
are mostly confined to parts of Rajahmundry and Peddapuram areas of the district.
The Godavari Agro climatic region in which East Godavari District falls is suitable to grown Paddy,
sugarcane, coconut, chilli, Mango and Horticulture crops.
Figure 2-4-1 Soil classification
Pradhan Mantri Krishi Sinchayee Yojana Water Resources Department, Government of Andhra Pradesh
ConTec District Irrigation Plan - East Godavari 20
Table 2-4-1 Soil Classification
Sl. No Type of Soil Area in Ha
1 Red loamy soils 1,42,844
2 Red shallow gravelly clay 1,07,418
3 Red clayey soils 83,216
4 Deep black soils 23,882
5 Brown forest soils 2,55,590
6 Alluvio clay 2,759
7 Sandy soils 15,081
8 Red loamy soils 15,964
9 Red clayey soils 89,556
10 Deltaic calc. black soils 10,174
11 Deltaic black soils 2,22,491
12 Alluvial soils 11,471
13 Saline sodic soils 10,782
14 Swamps & marshy soils 27,741
2.5 Land Use Pattern
In East Godavari district, the alluvial red soils, sandy loams, red loamy and sandy clay. Of the total
geographical area of 12.60 lakh ha, 44.55% is arable land, forests occupy 35.02% of the area,
barren and uncultivable area is around 8.12%, and land put to non-agricultural use was around
12.31%. Out of the arable land, net sown area was 4.28 lakh ha that was 33.95% of the total
geographical area of the district. Total cropped area was 6.84 lakh ha constituting 62.57% of net
area sown and 37.43% of the area is sown more than once, while cultivable wastelands, pastures
land and fallow lands constitute only 10.60%.
Source: ICAR, Hyderabad
Pradhan Mantri Krishi Sinchayee Yojana Water Resources Department, Government of Andhra Pradesh
ConTec District Irrigation Plan - East Godavari 21
Figure 2-5-1 : Land use and land cover map
Pradhan Mantri Krishi Sinchayee Yojana Water Resources Department, Government of Andhra Pradesh
ConTec District Irrigation Plan - East Godavari 22
2.5.1 Concept of Land Use
The analysis of land use in the present study is based on data available at Mandal level. Following
categories of land use have been recognised in the study area. In the analysis of land use pattern
study has been adopted at Mandal level: Forest Cover, Barren and cultivable waste land, Current
Fallow land, Other Fallow land, Barren & uncultivable Land, Land put to non-agricultural Use,
Pastures and Grazing Land, Area under bush, forest & garden, Net area sown.
Agriculture and Forest are the two important units of land utilization. The Geographical area of
the District is 12,60,157 Hectares covered by 64 Mandalas under six Revenue Divisions Viz.,
Kakinada, Peddapuram, Rampachodavaram, Rajamundry, Amalapuram and Ramachndrapuram.
During the Year 2012-13 the Cultivable land (i.e., Net area Sown, Current fallows and Other fallow
lands) was 5,61,397 hectares and it accounted for 44.55 percent of the total Geographical area
of the district.
Table 2-5-1-1 : Land use pattern
Revenue Division Geographical
area
Gross sown area
Net area sown
Cultivable land
Area under forest
Kakinda 1,24,046 1,08,886 57,966 65,030 28,968
Peddapuram 1,80,774 1,43,499 1,06,505 1,32,791 3,697
Rampachodavaram 6,22,795 56,101 53,660 1,21,938 4,00,914
Rajamundry 1,04,501 85,021 56,131 69,578 6,167
Amalapuram 1,48,344 1,74,017 95,992 1,11,198 1,565
Ramachndrapuram 79,697 1,16,335 57,608 60,862 0
Total 12,60,157 6,83,859 4,27,862 5,61,397 4,41,311
Pradhan Mantri Krishi Sinchayee Yojana Water Resources Department, Government of Andhra Pradesh
ConTec District Irrigation Plan - East Godavari 23
Figure 2-5-1-1 : Land Use Pattern
2.6 Drainage
Drainage density is the total length of all streams/rivers in a drainage basin divided by total area
of drainage basin. It is measure of how well or poorly a watershed is drained by stream channels.
Drainage density depends on both climate and physical characteristics of drainage basin.
The Godavari river is the major river drain the district, which is perennial and flows along the
western boundary of the district. South of Rajahmundry the river bifurcates into two viz.,
Gautami Godavari in the East and Vasista Godavari in the West. The Godavari River further splits
into smaller arms before it debouches into the Bay of Bengal. The other important rivers and
tributaries of Godavari flowing in the district are Gondiyeru, Pamuleru, Polavaram vagu, Sileru
river, Suddagedda, Yeleru, Madeyeru and Tandava. The general drainage pattern is dendritic to
sub-dendritic. The drainage density varies from less than 0.4 km/sq.km in poorly drained alluvial
areas which covers the entire southern parts of the district to 0.6 km/sq.km in the Northern parts
occupied by crystalline rocks.
KakindaPeddapur
am
Rampachodavara
m
Rajamundry
Amalapuram
Ramachndrapuram
Gross sown area 1,08,886 1,43,499 56,101 85,021 1,74,017 1,16,335
Net area sown 57,966 1,06,505 53,660 56,131 95,992 57,608
Cultivable land 65,030 1,32,791 1,21,938 69,578 1,11,198 60,862
Area under forest 28,968 3,697 4,00,914 6,167 1,565 0
0
50,000
1,00,000
1,50,000
2,00,000
2,50,000
3,00,000
3,50,000
4,00,000
4,50,000
Source: District planning office 2015-16
Pradhan Mantri Krishi Sinchayee Yojana Water Resources Department, Government of Andhra Pradesh
ConTec District Irrigation Plan - East Godavari 24
3 DISTRICT WATER PROFILE
3.1 Water profile
Successful management of any resources requires accurate knowledge of the resource available,
the uses to which it may be put, the competing demands for the resource, measures to processes
and to evaluate the significance and worth of competing demands and mechanisms to translate
policy decisions into actions on the ground.
The water availability from different sources for irrigation in East Godavari District is presented
in table 3-1-1. The Mandal wise breakup of surface water and Ground water is enclosed as per
Annexure 3-1-1-1 and Annexure 4-2-1 respectively. Canals are the most important source of
irrigation in East Godavari District. They have a share of 68.12% in the total irrigated area. Tube
wells occupies the next position with a contribution of 23.12% to the total irrigated area. Tanks
account for 5.09% of the irrigated area, while Lift irrigation have a share of 3.11% in the total
irrigated area. Open wells and other sources have a share of 0.57% in the irrigated area.
Table 3-1-1 : District water profile
S.No Sources Total water availability (MCM)
1 Surface Water 2694.61
2 Ground water 1468.75
Total 4163.37
3.2 Crop Growing seasons in East Godavari
Each crop has its own sowing and harvesting seasons and it is important to have a knowledge of
this which may help to decide the total water demand in a field having mixed crops.
In East Godavari, the northern and north eastern regions have two distinct cropping seasons. The
first coinciding mostly with the South-western monsoon is called Kharif, which spans mostly from
July to October. The other, called Rabi, spans generally over October to March. The summer
season crops are planted sometime between April and June. In southern part of India, there is no
such distinct season, but each region has its own classification of seasons.
Source: Planning &Monitoring cell, Water Resources Department
Pradhan Mantri Krishi Sinchayee Yojana Water Resources Department, Government of Andhra Pradesh
ConTec District Irrigation Plan - East Godavari 25
3.3 Crop Pattern
Paddy is the main crop grown in the district (3,94,117 ha) followed by Coconut (50,301 ha),
Sugarcane (23,187 ha), fresh and dry fruits (78,225 ha), cotton (22,433 ha) and other crops
(1,02,398 ha). The major crops grown in the district are given below:
a) Paddy
b) Coconut
c) Sugarcane
d) Cotton
e) Maize
f) Pulses
Green gram
Black gram
Horse gram
g) Chillies
h) Oil seeds
Groundnut
Sunflower
Sesamum
i) Mango
The crop wise cultivation is given in Table 3-5-1 and crop irrigation status in the district is
tabulated in Table 3-3-1.
Pradhan Mantri Krishi Sinchayee Yojana Water Resources Department, Government of Andhra Pradesh
ConTec District Irrigation Plan - East Godavari 26
Figure 3-3-1 : Land use / Land Cover Pattern
Non-agricultural land : Buildings, Infrastructure, Rivers, Canals etc.
Uncultivable land : Mountains, Cultivable waste and Deserts etc.
Balance cultivable : Permanent pastures, Current and other fallows etc.
Figure 3-3-2 : Cropping Pattern
Forest35%
Uncultivable8%
Non-agricultural12%
Net Sown34%
Balance cultivable 11%
Paddy58%
Fresh and dry fruits 12%
Coconut7%
Sugarcane 3%
Cotton3%
Other oilseeds 2%
Other crops15%
Source: District planning office 2015-16
Pradhan Mantri Krishi Sinchayee Yojana Water Resources Department, Government of Andhra Pradesh
ConTec District Irrigation Plan - East Godavari 27
East Godavari
Figure 3-3-3 Present Cropping Pattern
Paddy86%
Fresh and dry
fruits 3%
Coconut2%
Sugarcane
1%
Cotton4%
Other oilseeds
1%
Other crops
3%
Kakinda
Paddy44%
Fresh and dry
fruits 10%
Coconut
43%
Other oilseed
s 0%
Other crops
3%
Amalapuram
Paddy34%
Fresh and
Coconut2%
Sugarcane 8%
Cotton
12%
Other oilsee
ds 6%
Other crops13%
Peddapuram
Paddy51%Fresh
and dry
fruits 26%
Coconut4%
Sugarcane 4%
Cotton1%
Other oilseed
s 3%
Other crops11%
Rajamundry
Paddy30%
Fresh and dry fruits
28%
Cotton17%
Other oilseeds
1%
Other crops24%
Rampachodavaram
Paddy
92%
Fresh and dry
fruits 3%
Coconut3%
Other
oilseeds 1%
Other
crops1%
Ramachndrapuram
Pradhan Mantri Krishi Sinchayee Yojana Water Resources Department, Government of Andhra Pradesh
ConTec District Irrigation Plan - East Godavari 28
East Godavari
Figure 3-3-4 Projected Cropping Pattern
Paddy86%
Fresh and dry
fruits 3%
Coconut2%
Sugarcane
1%
Cotton4%
Other oilseeds
1%
Other crops
3%
Kakinda
Paddy44%
Fresh and dry
fruits 10%
Coconut
43%
Other oilseed
s 0%
Other crops
3%
Amalapuram
Paddy34%
Fresh and
Coconut2%
Sugarcane 8%
Cotton
12%
Other oilsee
ds 6%
Other crops13%
Peddapuram
Paddy51%Fresh
and dry
fruits 26%
Coconut4%
Sugarcane 4%
Cotton1%
Other oilseed
s 3%
Other crops11%
Rajamundry
Paddy30%
Fresh and dry fruits
28%
Cotton17%
Other oilseeds
1%
Other crops24%
Rampachodavaram
Paddy
92%
Fresh and dry
fruits 3%
Coconut3%
Other
oilseeds 1%
Other
crops1%
Ramachndrapuram
Pradhan Mantri Krishi Sinchayee Yojana Water Resources Department, Government of Andhra Pradesh
ConTec District Irrigation Plan - East Godavari 29
Table 3-3-1 : Crop wise irrigation Status in the District
Crop Type Kharif (Area in ha) Rabi (Area in ha) Total (Area in ha)
Irrigated Rain fed
Total Irrigated Rain fed
Total Irrigated Rain fed
Total
Paddy 216914 9158 226072 168045 0 168045 384959 9158 394117
Fresh and dry fruits
16426 49405 65831 12394 0 12394 28820 49405 78225
Coconut 18219 32082 50301 0 0 0 18219 32082 50301
Sugarcane 12405 0 12405 10782 0 10782 23187 0 23187
Cotton 390 22043 22433 0 0 0 390 22043 22433
Other oilseeds
8845 620 9465 427 3306 3733 9272 3926 13198
Other crops 8433 27050 35483 21061 45854 66915 29494 72904 102398
Total 281632 140358 421990 212709 49160 261869 494341 189518 683859
Figure 3-3-5 : Crop wise Kharif Irrigation Status
PaddyFresh
and dryfruits
Coconut
Sugarcane
CottonOther
oilseedsOthercrops
Kharif (Area in ha) : Irrigated
216914 16426 18219 12405 390 8845 8433
Kharif (Area in ha) : Rainfed
9158 49405 32082 0 22043 620 27050
0
50000
100000
150000
200000
250000
Source: District planning office 2015-16
Pradhan Mantri Krishi Sinchayee Yojana Water Resources Department, Government of Andhra Pradesh
ConTec District Irrigation Plan - East Godavari 30
3-3-6 : Crop wise Rabi Irrigation Status
Figure 3-3-7 : Crop wise Total Irrigation Status
PaddyFresh anddry fruits
Coconut Sugarcane CottonOther
oilseedsOthercrops
Rabi (Area in ha) : Irrigated
168045 12394 0 10782 0 427 21061
Rabi (Area in ha) : Rainfed
0 0 0 0 0 3306 45854
0
20000
40000
60000
80000
100000
120000
140000
160000
180000
PaddyFresh anddry fruits
Coconut Sugarcane CottonOther
oilseedsOthercrops
Total (Area in ha) : Irrigated
384959 28820 18219 23187 390 9272 29494
Total (Area in ha) : Rainfed
9158 49405 32082 0 22043 3926 72904
0
50000
100000
150000
200000
250000
300000
350000
400000
450000
Source: District planning office 2015-16
Pradhan Mantri Krishi Sinchayee Yojana Water Resources Department, Government of Andhra Pradesh
ConTec District Irrigation Plan - East Godavari 31
Figure 3-3-8 : Irrigated & Rain fed Kharif Area
Figure 3-3-9 : Irrigated & Rain fed Rabi Area
Annexure 3-3-1 showing the irrigated and rain-fed area in Kharif season is enclosed.
Annexure 3-3-2 showing the irrigated and rain-fed area in Rabi season is enclosed.
KakindaPeddapura
mRampachodavaram
Rajamundry
Amalapuram
Ramachndrapuram
Gross Sown Area 57,978 1,07,902 40,644 55,140 1,02,505 57,821
Irrigated Area 52,611 57,232 5,696 38,093 72,940 55,060
Rain-fed Area 5,367 50,670 34,948 17,047 29,565 2,761
0
20,000
40,000
60,000
80,000
1,00,000
1,20,000
KakindaPeddapura
mRampachodavaram
Rajamundry
Amalapuram
Ramachndrapuram
Gross Sown Area 50,908 35,597 15,457 29,881 71,512 58,514
Irrigated Area 48,191 20,681 5,856 24,129 59,634 54,218
Rain-fed Area 2,717 14,916 9,601 5,752 11,878 4,296
0
10,000
20,000
30,000
40,000
50,000
60,000
70,000
80,000
Source: District planning office 2013-2014
Pradhan Mantri Krishi Sinchayee Yojana Water Resources Department, Government of Andhra Pradesh
ConTec District Irrigation Plan - East Godavari 32
3.4 Productivity
East Godavari is one of the main Paddy growing District in Andhra Pradesh. Paddy is the main
crop grown contributing 57.63% followed by Coconut (7.36%), Sugarcane (3.39%), Cotton
(3.28%), Fresh and dry fruits (11.44%), Other oil seeds (1.93%), and other crops (14.97%).
Productivity of Paddy is observed to the 3966.00 Kgs/Ha. The total production during 2014-2015
is observed to be 4996.274 T.Mt.
Table 3-4-1 : Crop wise Production and Productivity
Crop Type Area Production (Tonnes) Productivity (Kgs/Ha)
Paddy 394117 1563229 3966
Fresh and dry fruits 78225 229037 2928
Coconut 50301 837361 16647
Sugarcane 23187 1974628 85161
Cotton 22433 22725 1013
Other oilseeds 13198 188370 14273
Other crops 102398 180924 1767
Total 683859 4996274
Figure 3-4-1 : Crop wise production and Productivity
RiceFresh anddry fruits
CoconutSugarcan
eCotton
Otheroilseeds
Othercrops
Production(Tonnes) :
1563229 229037 837361 1974628 22725 188370 180924
Productivity(Kg/Ha) :
3966 2928 16647 85161 1013 14273 1767
0
500000
1000000
1500000
2000000
2500000
Source: District planning office 2013-2014
Pradhan Mantri Krishi Sinchayee Yojana Water Resources Department, Government of Andhra Pradesh
ConTec District Irrigation Plan - East Godavari 33
3.5 Crop Water Requirement
Crop water requirement is the total quantity of water required from crops sowing time up to
harvest. Naturally different crops have different water requirements at different places of the
same country, depending upon the climate, type of soil, method of cultivation, effective rain etc.
The total water required for crop growth is not uniformly distributed over its entire life span
which is also called crop period. The total depth of water required to raise a crop over a unit area
of land is usually called delta. Some typical values of delta for common crops in some regions of
India as per Handbook of Agriculture (fifth edition, 2000) published by the Indian Council of
Agricultural Research are as below:
Paddy
•1000mm to 1500mm for heavy soils or high water table
•1500mm to 2000mm for medium soils
•2000 to 2500 for light soils or deep water table
•1600mm for upland conditions
Wheat
•250mm to 400mm in northern India
•500mm to 600mm in Central India
Barley: 450mm
Maize
•100mm during rainy season
•500mm during winter season
•900mm during summer season
•Cotton: 400 – 500mm
Sugarcane
•1400mm to 1500mm in Bihar
•1600mm to 1700mm in Andhra Pradesh
•1700mm to 1800mm in Punjab
•2200mm to 2400mm in Madhya Pradesh
•2800mm to 3000mm in Maharashtra
Pradhan Mantri Krishi Sinchayee Yojana Water Resources Department, Government of Andhra Pradesh
ConTec District Irrigation Plan - East Godavari 34
Delta values for some of the crops in East Godavari District are as follows:
Paddy – 940 mm
Sugarcane (perineal) – 2156 mm
Pulses – 550mm
Delta values for some of the crops as per WALAMTARI, Andhra Pradesh are given below:
Maize – 452 mm
Groundnut – 663 mm
Crop water requirement is calculated based on water depth (Delta) required for each crop and
area sown given in table 3-5-1. 60 % of whole crop water is consumed by Paddy crop only. Total
crop water demand for 2015 are 3312.32 MCM & 2223.56 MCM.
Table 3-5-1 : Crop water Requirement
Type of Crop Area under cultivation
(Ha) Crop water Demand (mm)
Water Requirement (MCM)
Kharif Rabi Kharif Rabi
Paddy 226072 168045 940 2125.08 1579.62
Fresh and dry fruits 65831 12394 500 329.16 61.97
Coconut 50301 0 550 276.66 0.00
Sugarcane 12405 10782 2156 267.45 232.46
Cotton 22433 0 440 98.71 0.00
Other oilseeds 9465 3733 400 37.86 14.93
Other crops 35483 66915 500 177.42 334.58
Total 421990 261869 3312.32 2223.56
Pradhan Mantri Krishi Sinchayee Yojana Water Resources Department, Government of Andhra Pradesh
ConTec District Irrigation Plan - East Godavari 35
4 WATER AVAILABILITY
Availability of water is highly uneven spatially and temporally. Consequently, water resources
development and management is to be best planned within hydrological units such as drainage
basin as a whole in an integrative manner taking into account all sources of water including
precipitation, surface water and groundwater. Furthermore, for realistic estimation of water
availability, modelling based on long term yield series in the hydrological unit is required.
In the current study water availability, its current use and estimation of potential for increase is
carried out based on detailed hydrological assessment of all sub-basins, cascades and tanks in
the district.
The total water availability for East Godavari District is computed as 4163.37 MCM. The present
potential from surface water and ground water being 2694.61 MCM (64.72%) & 1468.75 MCM
(35.28%) respectively.
4.1 Surface Water Availability
The surface water availability for the East Godavari District is given in table below:
Table 4.1.1 Surface Water Availability
S. No. Name of Revenue Division Surface water availability (MCM)
1 Kakinda 233.97
2 Peddapuram 382.85
3 Rampachodavaram 906.48
4 Rajamundry 363.66
5 Amalapuram 619.40
6 Ramachndrapuram 188.25
Total 2694.61
Pradhan Mantri Krishi Sinchayee Yojana Water Resources Department, Government of Andhra Pradesh
ConTec District Irrigation Plan - East Godavari 36
4.1.1 Surface Water Yield Estimation
Runoff of a basin depends on the spatial distribution of rainfall and its terrain characteristics
such as topography (elevation), soils, land use/land cover, hydro-geomorphology, etc. The
climate of East Godavari District is characterized by good seasonal rainfall. The summer
season from March to May is followed by South-West monsoon season, which continues up
to September. October and November constitute the retreating North-East monsoon season.
The climate of the hilly regions of the district receives heavier rainfall and is observed to be
cooler than the plains.
The Rainfall is being recorded at 64 rain gauge stations in the Mandal headquarters in the
district. The Normal annual rainfall for the district is 1217 MM. The district mostly gets rainfall
during both the monsoon seasons of Southwest and North East. The normal rainfall during
South-west monsoon months, June to September amounts to 38.77 % of the annual rainfall
and that during North East monsoon months of October to December constitutes 41.04 % of
the annual rainfall.
Yield and run-off estimation have been taken up based on Strange’s table for assessment of
yield based on the 56 year observed rainfall data of East Godavari District to assess the
potential yield of the District. The method gives satisfactory results for normal rainfall. Out of
the total observed rainfall, only 79.81% of the rainfall contributed by South-west and North-
east monsoon is considered for computation of yield.
The total geographic area of the district has been subdivided as per Strange’s classification as
“Good”, “Average” and “Bad” catchments as per land use. The 75% dependable yield is
computed as 2998 MCM.
Annexure 4-1-1-1 showing the yield calculations is enclosed.
Annexure 4-1-1-2 showing the Mandal wise yield contribution is enclosed.
4.2 Groundwater Scenario
Based on the details obtained from the Groundwater Department, Government of A.P., the
net annual groundwater availability in East Godavari District is 845.00 MCM. The revenue
division wise ground water availability is given below.
Pradhan Mantri Krishi Sinchayee Yojana Water Resources Department, Government of Andhra Pradesh
ConTec District Irrigation Plan - East Godavari 37
Figure 4-2-1 : Ground Water Availability
Based on groundwater development, the Mandals of East Godavari District are divided into
four categories: Very high groundwater usage with more than 70% draft, High groundwater
usage with draft between 50% to 70%, Moderate groundwater usage with draft between 30%
to 50%, and Low Groundwater usage with draft less than 30%.
a) The very high Groundwater usage Mandals there are Rajanagaram and Gandepalle.
b) The high groundwater usages Mandals are Rajanmundry urban, Rajamundry rural,
kadiam, Korukondam, Peddapuram and Ambajipeta..
c) The moderate groundwater usages Mandals are Yeleswaram, Gokavaram, Kirlampudi,
Pithapuram, Rangampeta and Athrayapuram.
d) The low groundwater usage Mandals are Nellipaka, Kunavaram, Chintur,
Vararamachandram, Maredumilli, Y Ramavaram, Rampachodavaram, Addateegala,
Rajamundry, Devipatnam, Gangavaram, Prathipadu, Jaggampeta, Seethanagaram,
Sankhavaram, Poethulapalli, Katanaduru, Tuni, Thodangi, Gollaporlu, Kothapalle,
Samalkota, Biccavolu, Anaparthy, Alamuru, Ravulapalem, Kapileshwaram,
Ramchandrapuram, Karapa, Kakinada urban, Kakinada Rural, Kojuluru, Pamarru,
Kothapeta, P Gannavaram, Ainavilli, Mummidivaram, Polavaram, Tallaveeru,
Kakinda10%
Peddapuram23%
Rampachodavaram
16%
Rajamundry15%
Amalapuram20%
Ramachndrapuram
16%
Source: Ground water Department, A.P
Pradhan Mantri Krishi Sinchayee Yojana Water Resources Department, Government of Andhra Pradesh
ConTec District Irrigation Plan - East Godavari 38
Amalapuram, Kathrenikona, Uppalagupatnam, Allavaram, Mamidikuduru, Razole,
Sakinetipalle, Mandaprta, Rayavaram, Pedapudi and Malikipuram.
East Godavari District is divided into 42 watersheds, there are no watersheds in the critical,
semi-critical category. All watersheds fall under safe category.
Annexure 4-2-1 showing the ground water availability is enclosed.
GROUND WATER USUAGE
MAP SYMBOL PERCENTAGE(%) CATEGORY
Figure 4-2-2 Ground water status
Source: Ground water Department
Pradhan Mantri Krishi Sinchayee Yojana Water Resources Department, Government of Andhra Pradesh
ConTec District Irrigation Plan - East Godavari 39
4.3 Present Water Utilisation & Irrigation Potential Created
Present water source wise water utilisation for the district is tabulated below in Table 4-3-1.
Table 4-3-1 : Present Water Utilisation
Sources Water Utilisation (MCM)
Surface Irrigation
Canal & Irrigation Schemes 4,920.89
Minor Irrigation Tanks 212.05
Sub Total 5,132.94
Ground water for Irrigation 623.56
Total 5,756.50
From the above statistics, it can be observed that against the present water utilisation of
5132.94 MCM, the surface water availability is 2694.61 MCM. The short fall of 2438.33 MCM
of surface water availability is being supplemented from the share of Andhra Pradesh, from
the Interstate river Godavari and intrastate rivers like Thandava, Pumpa, Suddagedda and
Yeleru rivers.
Table 4-3-2 : Irrigation Potential Created-Project wise
Sl. No Name of the Projects Ayact in Ha Water potential
in MCM
I Major Irrigation Projects
1 Sir Arthur Cotton Barrage (under Godavari Delta System)
1,94,225
1,546.03
2 Yeleru Reservoir (Yeleru Irrigation System 21,464 170.86
3 Thandava Reservoir (Part) 6,861 54.61
II Medium Irrigation Projects
1 Pampa Reservoir 4,860 38.69
2 Torrigedda LIS 5,570 44.34
3 Subbareddy Sagar 4,008 31.90
4 Bhupathipalem Reservoir 4,666 37.14
5 Sri K.V.Ramakrishna Surampalem Reservoir 4,680 37.25
III Minor Irrigation Projects
1 Minor Irrigation Tanks 39,804 316.84
3 Mini L.I. Scheme of APSIDC 3,663 29.16
4 Open Head Channel + Anicut System +Check Dams (Spl.M.I. Division)
9,909 78.87
IV Ground water 623.56
Grand total 2,99,711 3,009
Source: Planning &Monitoring cell, Water Resources Department
Pradhan Mantri Krishi Sinchayee Yojana Water Resources Department, Government of Andhra Pradesh
ConTec District Irrigation Plan - East Godavari 40
5 WATER REQUIREMENT/DEMAND
5.1 Water Demand
System water demand is the total quantity of water potential that is required in order to meet
all water needs including domestic, irrigation, livestock, industrial etc. in the district.
5.2 Domestic Water Demand
Catering to the ever increasing water demand is likely to be the greatest challenge on account of
population rise and economic development, and shrinking supplies due to over-exploitation and
pollution. As a result of development, the demand for water is increasing both in urban and rural
areas. Water demand forecasting is essential to water utilities, both for day-to-day operations
and for long-term planning. A number of factors like climate, culture, food habits, work and
working conditions, level and type of development, and physiology determine the requirement
of water. As per the Bureau of Indian Standards, a minimum water supply of 200 litres per capita
per day (lpcd) should be provided for domestic consumption in cities with full flushing systems.
It also mentions that the amount of water supply may be reduced to 135 lpcd for the LIG and the
economically weaker sections (EWS) of the society and in small towns.
Table 5-2-1 : Average Domestic Water Consumption
Average Domestic Water Consumption Calculated
S.No Usage Consumption in litre per person
per day
1 Drinking 5
2 Cooking 5
3 Bathing 55
4 Washing Cloths 20
5 Washing Utensils 10
6 Cleaning of Houses 10
7 Flushing of closets 30
Total 135
Source: Indian Standard: Code of basic requirements for water supply, drainage and sanitation
Pradhan Mantri Krishi Sinchayee Yojana Water Resources Department, Government of Andhra Pradesh
ConTec District Irrigation Plan - East Godavari 41
Figure 5-2-1 : Per Capita Water Consumption
Total Population for District East Godavari in 2011 was 52,85,824, growth rate for district is 5.19%
per decade, projected population in 2020 is 55,60,158. Average Per capita Domestic water
requirement is 135 litres per day, based on this information Gross Water Demand for Whole
District in current year is 265.87 MCM per annum. The projected gross water demand in 2020 is
273.98 MCM per annum. Thus water gap that need to be bridged is 8.11 MCM per annum for
East Godavari District.
Table 5-2-2 : Domestic water Demand/Requirement
Division Population
2011
Decadal Growth
rate
Projected Population
2015
Projected Population
2020
Present Water
Reqmt per year (MCM)
2015
Gross Water
Demand per year (MCM) 2020
Addition water
demand
Kakinda 11,46,298 5.19 1170095 1205791 57.66 59.42 1.76
Peddapuram 9,32,279 5.19 951633 980664 46.89 48.32 1.43
Rampachodavaram 3,49,913 5.19 357177 368073 17.60 18.14 0.54
Rajamundry 10,00,227 5.19 1020992 1052139 50.31 51.84 1.53
Amalapuram 12,01,584 5.19 1226529 1263946 60.44 62.28 1.84
Ramachandrapuram 6,55,523 5.19 669132 689545 32.97 33.98 1.01
Grand Total 52,85,824 53,95,558 55,60,158 265.87 273.98 8.11
5 5
55
20
10 10
30
0
10
20
30
40
50
60
Drinking Cooking Bathing(includingAbloution)
Washing Cloths Washing ofUtensils
Cleaning ofHouses
Flushing ofLaterines
Water Consumption (liter per person /day)
Source: Bureau of Indian Standards
Pradhan Mantri Krishi Sinchayee Yojana Water Resources Department, Government of Andhra Pradesh
ConTec District Irrigation Plan - East Godavari 42
Figure 5-2-2 : Population Projection
Figure 5-2-3 : Additional Domestic Water Demand
KakindaPeddapura
mRampachod
avaramRajamundry
Amalapuram
Ramachandrapuram
Population 2011 11,46,298 9,32,279 3,49,913 10,00,227 12,01,584 6,55,523
Projected Population 2015 11,70,095 9,51,633 3,57,177 10,20,992 12,26,529 6,69,132
Projected Population 2020 12,05,791 9,80,664 3,68,073 10,52,139 12,63,946 6,89,545
0
2,00,000
4,00,000
6,00,000
8,00,000
10,00,000
12,00,000
14,00,000
0.00
10.00
20.00
30.00
40.00
50.00
60.00
70.00
Present Water Reqmt per year(MCM) 2015
Gross Water Demand per year(MCM) 2020
Addition water demand
Kakinda Peddapuram Rampachodavaram Rajamundry Amalapuram Ramachandrapuram
Source: District planning office 2015-16
Pradhan Mantri Krishi Sinchayee Yojana Water Resources Department, Government of Andhra Pradesh
ConTec District Irrigation Plan - East Godavari 43
5.3 Crop water Demand:
It is essential to know the water requirement of a crop which is the total quantity of water
required from its sowing time up to harvest. Naturally different crops may have different water
requirements at different places of the same country, depending upon the climate, type of soil,
method of cultivation, effective rain etc. The total water required for crop growth is not uniformly
distributed over its entire life span which is also called crop period. Actually, the watering stops
some time before harvest and the time duration from the first irrigation during sowing up to the
last before harvest is called base period. Though crop period is slightly more than the base period
they do not differ from practical purposes.
Crop water demand is estimated with the reference of Table 3-5-1. Total crop water demand for
2015 is 3312.32 MCM. Projected water requirement is 4406. MCM.
Table 5-3-1 : Present Crop water demand/requirement
Type of Crop Net sown area Present water
requirement (MCM) Present water
utilisation (MCM)
Paddy 226072 2125.08 3618.61
Fresh and dry fruits 65831 329.16 144.10
Coconut 50301 276.66 100.20
Sugarcane 12405 267.45 499.91
Cotton 22433 98.71 1.72
Other oilseeds 9465 37.86 37.09
Other crops 35483 177.42 147.47
Total 421990 3312.32 4549.10
Table 5-3-2 : Projected Crop water demand/requirement
Type of Crop Projected water requirement (MCM)
Present water utilisation (MCM)
Water gap (MCM)
Paddy 2827.11 3618.61 -792 Fresh and dry fruits 437.89 144.10 294 Coconut 368.05 100.20 268 Sugarcane 355.81 499.91 -144 Cotton 131.31 1.72 130 Other oilseeds 50.37 37.09 13 Other crops 236.03 147.47 89
Total 4406.56 4549.10 -142.54
Note: Only Kharif area is considered for the calculation of present water requirement and
cultivatable area is considered for the calculation of projected water demand.
Pradhan Mantri Krishi Sinchayee Yojana Water Resources Department, Government of Andhra Pradesh
ConTec District Irrigation Plan - East Godavari 44
Figure 5-3-1 : Crop Water Demand/requirement
5.4 Livestock water Demand:
Global trend in animal production indicates a rapid and massive increase in the consumption of
livestock products. It is predicted that meat and milk consumption will grow at 2.8 and 3.3% per
annum, respectively, in developing countries like India where the whole system of rural economy
has revolved around livestock production. Providing enough quality water is essential for good
livestock husbandry.
Table 5-4-3 gives block water demand for livestock for current year and for 2020. Number of
livestock as per 2011 census is 15635893. Estimation is done based on livestock water demand
which is different for types of animals.
Table 5-4-1 : Water Consumption by animals/ Birds
Sr. no. Livestock Category Water Requirement range
Average water use Lit/day
1 Poultry 0.16 - 0.24 0.2
2 Small Animals 13 - 20 16.5
3 Large Animals 39 - 59 49
-1500.00
-1000.00
-500.00
0.00
500.00
1000.00
1500.00
2000.00
2500.00
3000.00
3500.00
4000.00
Rice Fresh and dryfruits
Coconut Sugarcane Cotton Otheroilseeds
Other crops
Source: District planning office 2015-16
Pradhan Mantri Krishi Sinchayee Yojana Water Resources Department, Government of Andhra Pradesh
ConTec District Irrigation Plan - East Godavari 45
Table 5-4-2 : Water consumption by wild life
Sr. no. Livestock Category Water Requirement range
Average water use Lit/day
1 Small Animals 0 - 20 10
2 Medium Animals 20 - 30 25
3 Large Animals 30 - 60 45
Table 5-4-3 : Livestock Water Demand
Division Total
Livestock 2011
Present Water Reqmt per
year (MCM) 2015
Gross Water Demand per year (MCM)
2020
Existing Water
Potential
Water Potential to be created
Kakinda 687271 3.57 4.05 3.57 0.48
Peddapuram 5597189 7.36 8.34 7.36 0.99
Rampachodavaram 882255 3.26 3.70 3.26 0.44
Rajamundry 1033658 3.02 3.43 3.02 0.41
Amalapuram 1394289 4.15 4.71 4.15 0.56
Ramachandrapuram 6041231 2.79 3.16 2.79 0.37
Grand Total 15635893 24.15 27.39 24.15 3.24
5.5 Industrial Water Demand:
The main sources of water for the industrial sector are groundwater and surface water. Choice
of source of water depends on the availability of sufficient and regular supply of water and the
cost of water from the source. While the running cost of surface water is mainly the price paid to
the supplier the municipal bodies; the cost of groundwater is the extraction cost energy used
(electricity/diesel).
Net water demand for industries in the current year is 185.19 MCM. Industrial water demand for
the year 2020 is estimated at 436.36 MCM.
Table 5-5-1 : Division wise Industrial Water Demand
Sl. No Division
Water Demand Current
Water Demand 2020
Water Potential to be created
MCM MCM MCM
1 Kakinda 20.95 272.12 251.17
2 Peddapuram 109.30 109.30 0.00
3 Rampachodavaram 0.00 0.00 0.00
4 Rajamundry 54.37 54.37 0.00
5 Amalapuram 0.57 0.57 0.00
6 Ramachandrapuram 0.00 0.00 0.00
Total 185.19 436.36 251.17
Source : Adapted from Nutrient requirements of poultry, sheep, Cattles. 9th edition. Washington, D.C.: National Research Council, 1994.
Pradhan Mantri Krishi Sinchayee Yojana Water Resources Department, Government of Andhra Pradesh
ConTec District Irrigation Plan - East Godavari 46
5.6 Water demand for Power generation:
No additional water is required for power generation.
5.7 Water Demand of the district for Various sectors:
Based on calculation it is reflected that total current water requirement is 3787.53 MCM. Highest
water requirement is in Peddapuram Division and lowest requirement is in Ramchodavaram
Division. Due to rapid urbanisation and increasing population in 2020 water requirement demand
is growing to 4996.45 MCM.
5.7.1 Water Demand of the district for Various sectors (Present):
Table 5-7-1 : Water Demand of the District (Present)
Division Domestic Crop Livestock Industrial Power
Generation
Total Water (MCM)
Kakinda 57.66 518 3.57 20.95 0.00 600.19
Peddapuram 46.89 841 7.36 109.30 0.00 1004.92
Rampachodavaram 17.60 254 3.26 0.00 0.00 274.93
Rajamundry 50.31 437 3.02 54.37 0.00 544.53
Amalapuram 60.44 737 4.15 0.57 0.00 801.69
Ramachandrapuram 32.97 526 2.79 0.00 0.00 561.28
Grand Total 265.87 3312.32 24.15 185.19 0.00 3787.53
Figure 5-7-1 : Domestic & Crop Water Demand (Present)
0.00
20.00
40.00
60.00
80.00
100.00
120.00
Present water Demand
Domestic Livestock Industrial
0.00100.00200.00300.00400.00500.00600.00700.00800.00900.00
1000.00
Crop Water Demand (Present)
Pradhan Mantri Krishi Sinchayee Yojana Water Resources Department, Government of Andhra Pradesh
ConTec District Irrigation Plan - East Godavari 47
5.7.2 Water Demand of the district for Various sectors (Projected 2020): Table 5-7-2 : Water Demand (Projected 2020)
Division Domestic Crop Livestock Industrial Power
Generation
Total Water (MCM)
Kakinda 59.42 689.13 4.05 272.12 0.00 1024.72
Peddapuram 48.32 1119.32 8.34 109.30 0.00 1285.29
Rampachodavaram 18.14 338.00 3.70 0.00 0.00 359.83
Rajamundry 51.84 581.13 3.43 54.37 0.00 690.77
Amalapuram 62.28 979.85 4.71 0.57 0.00 1047.41
Ramachandrapuram 33.98 699.13 3.16 0.00 0.00 736.27
Grand Total 273.98 4406.56 27.39 436.36 0.00 5144.29
Figure 5-7-2 : Domestic & Crop Water Demand (2020)
0.0050.00
100.00150.00200.00250.00300.00
Water Demand 2020
Domestic Livestock Industrial
0.0
200.0
400.0
600.0
800.0
1000.0
1200.0
Crop Water Demand (2020)
Pradhan Mantri Krishi Sinchayee Yojana Water Resources Department, Government of Andhra Pradesh
ConTec District Irrigation Plan - East Godavari 48
6 STRATEGIC ACTION PLAN – DISTRICT IRRIGATION PLAN
Water scarcity arises as a consequence of high rate of aggregate demand from all water-using
sectors compared with available supply, under the prevailing institutional arrangements and
infrastructural conditions. Water scarcity is both a relative and dynamic concept, and can occur
at any level of supply or demand, but it is also a social construct: its causes are all related to
human interference with the water cycle. It varies over time as a result of natural hydrological
variability, but varies even more so as a function of prevailing economic policy, planning and
management approaches. Scarcity can be expected to intensify with most forms of economic
development, but, if correctly identified, many of its causes can be predicted, avoided or
mitigated. The District Irrigation Plan aims at provide a conceptual framework for the holistic
irrigation development perspective of the district to meet the present and future water demand
of the district.
6.1 Gap in Irrigation Infrastructure
Irrigation infrastructure covers a wide range of farm level water management support system,
varying from support watering during the Kharif (monsoon) season from a small check dam/
pond/tank/dry well to assured year-round water supply from reservoirs, canals or tube wells
to farmers cultivating more than single crop annually. The method of application has also
evolved, from traditional gravity flow and farm flooding to micro-irrigation where water is
applied close to the root zone of the plant. Irrigation infrastructure caters to the water
requirements from both the surface and sub-surface water sources. Surface irrigation is
largely provided through large and small dams and canal networks, run-off from river, lift
irrigation schemes, small tanks and ponds, whereas groundwater irrigation is accessed by dug
wells, bore wells, tube wells and is powered by electric pumps or diesel engines.
While the general focus is on the supply side approach, huge benefits can be reaped by
improve the efficiency of existing irrigation systems. Therefore, irrigation infrastructure,
which has the potential to insure the farmer against the vagaries of the monsoon and increase
his income from a small (and diminishing) land holding is the most critical infrastructure for
rural India. The status of irrigation infrastructure is represented in the Table 6-1-1.
Pradhan Mantri Krishi Sinchayee Yojana Water Resources Department, Government of Andhra Pradesh
ConTec District Irrigation Plan - East Godavari 49
Table 6-1-1 : Gap in Irrigation infrastructure
S.No Name of Revenue
Division Cultivable
land Net area
sown Irrigated
area
Gap Irrigation infrastructure with respect to
Cultivable land Net sown area
Area in Ha
% Area in
Ha %
1 Kakinda 65,030 57,966 52,611 12,419 19.1% 5,355 9.2%
2 Peddapuram 1,32,791 1,06,505 56,856 75,935 57.2% 49,649 46.6%
3 Rampachodavaram 1,21,938 53,660 10,958 1,10,980 91.0% 42,702 79.6%
4 Rajamundry 69,578 56,131 38,372 31,206 44.9% 17,759 31.6%
5 Amalapuram 1,11,198 95,992 66,284 44,914 40.4% 29,708 30.9%
6 Ramachandrapuram 60,862 57,608 54,851 6,011 9.9% 2,757 4.8%
5,61,397 4,27,862 2,79,932 2,81,465 50.1% 1,47,930 34.6%
6.2 Gap Ayacut
The difference between area targeted for irrigation and actually irrigated in an agricultural
year is called gap ayacut. This is difference between potential created and utilised. The gap
ayacut denotes the efficiency of the irrigation infrastructure created. The gap ayacut in East
Godavari District is observed to be 15% as shown in the Table 6-2-1.
Table 6-2-1 : Gap ayacut
S.No Source Irrigation Potential
Irrigated Gap Ayacut
Area in Ha %
1 Major & Medium Irrigation 2,46,336 1,78,221 68,115 28%
2 Minor Irrigation Tanks 43,466 21,234 22,232 51%
3 Lift Irrigation/ Diversion/Ground water/Other Source
9,909 80,477 -70,568 -712%
Total 2,99,711 2,79,932 19,779 7%
6.3 Potential for development
Pradhan Mantri Krishi Sinchayee Yojana aims at extending the coverage of irrigation to the
entire farm land parcel suitable for cultivation. Agriculture as considered here encompasses
arable use (the growing of the widest possible range of annual crops), horticulture (perennial
crops in general, and fruit trees in particular), pastural use (grassland and fodder crops) and
silviculture (commercial growing of trees).
Pradhan Mantri Krishi Sinchayee Yojana Water Resources Department, Government of Andhra Pradesh
ConTec District Irrigation Plan - East Godavari 50
Table 6-3-1 : Land potential for development
S.No District Cultivable
land Irrigation Potential
Potential for development
Area in Ha %
1 East Godavari 5,61,397 2,99,711 2,61,686 46.6%
Total 5,61,397 2,99,711 2,61,686 46.6%
6.4 Water Budget
A water budget reflects the relationship between input and output of water through a region.
Thus we have a direct comparison of supply of water and the natural demand for water. The
following data provides current water gap and projected water gap for the year 2020.
Table 6-4-1 : Water Budget
Division
Existing Water utilisation
Total
Water Demand (MCM) Water Gap (MCM)
Surface Water (MCM)
Ground Water (MCM) Present
Projected (2020) Present
Projected (2020)
Kakinda 1032.96 66.39 1099.35 600.19 1024.72 -499.16 -74.63
Peddapuram 581.00 154.20 735.20 1004.92 1285.29 269.72 550.09
Rampachodavaram 295.02 50.03 345.05 274.93 359.83 -70.12 14.78
Rajamundry 508.65 126.71 635.36 544.53 690.77 -90.83 55.41
Amalapuram 1704.12 139.50 1843.62 801.69 1047.41 -1041.93 -796.21
Ramachandrapuram 994.84 96.89 1091.73 561.28 736.27 -530.45 -355.46
Grand Total 5116.59 633.72 5750.31 3787.53 5144.29 -1962.78 -606.02
Figure 6-4-1 : Present & Projected Water Demand Gap
-1500.0000
-1000.0000
-500.0000
0.0000
500.0000
1000.0000
1500.0000
Water Demand and Gap (Present)(MCM)
Present Demand Present Gap
-1000.0000
-500.0000
0.0000
500.0000
1000.0000
1500.0000
Projected Water Demand and Gap(MCM)
Projected Demand Projected Gap
Water demand & gap for various sectors Water demand & gap for Crop
Pradhan Mantri Krishi Sinchayee Yojana Water Resources Department, Government of Andhra Pradesh
ConTec District Irrigation Plan - East Godavari 51
6.5 Bridging water gap
The overreaching vision of Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) is to ensure access
to some means of protective irrigation to all the agricultural farms in the country “Har Khet Ko
Pani”, to produce ‘Per Drop More Crop’, and bringing much desired rural prosperity. Table 6-5-1
summarises the component wise strategic plan to realise the vision of PMKSY.
The Government of Andhra Pradesh envisages to implement Neeru-chettu to make Andhra
Pradesh a Drought Proof State in the next 5 years through Water Conservation, Water
Management, Inter-linking of rivers and Plantation.
Table 6-5-1 : Strategic Action Plan - Bridging Water Gap
Sl. No
DIP Programme Component
Department Responsible
Capacity (MCM)
Irrigation Potential (Ha) Estimated Cost
(Crores) Existing Stabilisation
New Ayacut
1 Existing Projects WRD - Maj. &
Med. 3,009 2,99,711
2 State Projects WRD - Maj. &
Med. 0 98,066
-
3 AIBP WRD - Maj. &
Med. 707 7,189 1,01,215
29.04
4 PMKSY - Har Khet ko Pani
WRD - Minor, APIDC, GW
21 5,831
22.06
5 PMKSY - Per Drop More Crop
Agriculture/ Horticulture
58,500
265.15
6 PMKSY - Watershed Development
Rural Development
0 0
80.91
7 Sewage Treatment & Water Front
Muncipal Corporation
55 6,944
189.29
TOTAL 3,793 2,99,711 71,521 2,06,224 586.45
The below mentioned component wise strategic plan breakup and intervention steps have been
initiated for bridging the water gap in East Godavari District as per the program components of
PMKSY.
Pradhan Mantri Krishi Sinchayee Yojana Water Resources Department, Government of Andhra Pradesh
ConTec District Irrigation Plan - East Godavari 52
6.5.1 Accelerated Irrigation Benefits Programme (AIBP)
Under the program component “Accelerated Irrigation Benefits Programme (AIBP)”, the below
mentioned programmes are being taken up, which are tabulated as per Table 6-5-1-1.
Improvements to the existing Projects
Improvements to Maddigedda reservoir and Thorrigedda medium irrigation projects are
proposed to be taken up under APILIP II, with the JICA Assistance. Table 6-5-1-1 gives the
details of the projects proposed under AIBP Program component.
Prioritised Projects
Government of Andhra Pradesh has prioritised seven projects and decided to complete
them during 2016-17 & 2017-18 and reap the benefits. Indira Sagar Polavaram project is
a multipurpose project, which is being taken up as a national project to be funded totally
by the central Government. Indira Sagar left main canal will help in creation/ stabilisation
of 1,01,215 Ha of ayacut in East Godavari district.
Table 6-5-1-1 : Strategic Action Plan Accelerated Irrigation benefits Programme
S.No Department Activity Status Capacity (MCM)
Irrigation Potential
(Ha)
Period of Implement. (5/7 years)
Estimated cost ( in crores)
1
Water Resourses
Department
Major Irrigation:
1.1 Indira Sagar Left
Main Canal 707 1,01,215
2 Medium Irrigation:
2.1
3 Modernisation of Projects
3.1 Moderanisation of Maddigedda
reservoir Project 1,619 5 7.31
3.2 Improvements
Thorrigedda reservoir project
5,570 5 21.73
Total 707 1,08,404 29
Pradhan Mantri Krishi Sinchayee Yojana Water Resources Department, Government of Andhra Pradesh
ConTec District Irrigation Plan - East Godavari 53
6.5.2 PMKSY - Har Khet Ko Pani
Under the program component “PMKSY – Har Khet ko Pani”, following programmes given below
as per Table 6-5-2-1 are proposed to be take-up.
Minor Irrigation Schemes
Improvements to minor irrigation schemes are being taken up under APILIP II with JICA
Assistance for stabilisation of 2,940 Ha.
National Bank for Agriculture and Rural Development (NABARD)
Rerpair, Renovation and Restoration (RRR) of minor irrigation schemes are being taken
up with NABARD financial Assistance. Annexure 6-5-2-1- gives the details of proposals for
taking up of RRR works.
Neeru chettu
Neeru – Chettu brings inter departmental convergence among water conserving
departments like Water Resources Department, Rural Development, Forest, APSAC, and
Water Utilizing Departments like Agriculture, Horticulture, Fisheries, RWS, Municipal
Administration and Urban Development Departments. Annexure 6-5-2-1-3 gives the
details of proposed Neeru - chettu schemes.
De silting of Tanks
De silting of tanks for additional capacity for raising the water table. The silt removed is
being used by farmers for their fields and filling of low lying areas.
Smart Water Grid
Smart Water Grid is being created similar to electric power grids to supply water to needy
areas by transfer of water from water surplus basins to water deficit basins and filling up
of tanks from major assured sources.
Cascade Development
Number of cascades are being developed in all the basins of the state by interlinking all
the tanks within the cascade. Further the interlinking of cascades is being taken up by
identifying the links between tanks and cascades.
Pradhan Mantri Krishi Sinchayee Yojana Water Resources Department, Government of Andhra Pradesh
ConTec District Irrigation Plan - East Godavari 54
Table 6-5-2-1 : Strategic Action Plan PMKSY - Har Khet Ko Pani
S.No Department Activity Status Capacity (MCM)
Irrigation Potential
(Ha)
Period of Implement. (5/7 years)
Estimated cost ( in crores)
1
Water Resourses
Department
Surface minor irrigation
1.1 Minor Irrigation
schemes with JICA Assistance - 24 No's
Existing 21 2,940 5 11.16
2 Lift irrigation
3 MI Schemes - APCWMP World Bank Phase II
1,359 5
4 RRR of water bodies- NABARD
1,533 5 10.90
5 New MI tanks
Construction of Field Channels
6 Field Channels
7 Neeru Chettu
8 Others
Total 21 5,831 22.06
6.5.3 PMKSY – Per Drop More Crop
Under the program component “PMKSY – Per Drop More Crop”, the following activities as
tabulated in Table 6-5-3-1 are proposed to be taken up:
Activities proposed by Horticulture department are enclosed as per annexure 6-5-3-1-1.
Activities proposed by Agriculture Department are enclosed as per annexure 6-5-3-1-2.
Activities proposed by ATMA is enclosed as per annexure 6-5-3-1-3.
Table 6-5-3-1 Strategic Action plan -PMKSY Per Drop More Crop
Sl. No
Department Activity Status Capacity (MCM)
Irrigation potential
(Ha)
Period of
Impl.
Estimated cost (in Crores)
1 Horticulture Drip / Sprinkler Cont. 58500 5 253.31
2 Agriculture Department
Other Interventions Cont. 5 10.619
3 Agriculture (ATMA)
Trainings / farm schools / demonstrations / exposure visits / printing of posters and pamplates / rain gun demonstration
Cont. 1.2193
Total 0 58500 265.1483
Pradhan Mantri Krishi Sinchayee Yojana Water Resources Department, Government of Andhra Pradesh
ConTec District Irrigation Plan - East Godavari 55
Series of Check Dams and Dry Spell Mitigation
Series of Check Dams and sub surface dams at suitable locations are being constructed
on all minor rivers and streams to recharge ground water.
By using Rain guns lifesaving Irrigation will be provided by collecting water from nearby
source for water supplementation to the distressed Ayacut during dry spells.
NTR Jalasiri
NTR Jalasiri aims at providing assured source of irrigation for small and marginal farmers.
This programme is a welfare measure in terms of enhancing the productivity of the lands
thus maximizing their income.
Precision Irrigation & Water Management Methods
Following measures are proposed to be implemented for improvement of water use
efficiency:
Drip Irrigation & Sprinkler Irrigation
Direct Seeding for paddy
Change in crop pattern
Encouraging of ID crops have to be taken up with the convergence department for
efficient use of water.
6.5.4 PMKSY – Watershed Development
Watershed is an area ridge top to the ridge top and common outlet that collects, stores and
releases water to a common point, such as river or lake.
Benefits of watershed development
a) Increased production and higher profits
b) Reduce soil erosion
c) Improved soil quality and better drainage
d) More efficient use of rainfall, with excess water stored for supplemental irrigation
e) Better conservation of natural resources
f) Sustainable income to the village community
g) Improve living standards to rural poor.
Pradhan Mantri Krishi Sinchayee Yojana Water Resources Department, Government of Andhra Pradesh
ConTec District Irrigation Plan - East Godavari 56
Under the program component “PMKSY – Watershed”, following projects as per Table 6-5-4-1
are proposed to be take-up. Annexure 6-5-4-1-1 to 5 show the new proposal of watershed
development schemes.
Panta Sanjeevini (Farm Ponds)
A massive programme for digging of Farm ponds under Panta Sanjivini is being taken up
with sizes of 5 X 5 X 2, 8 X 8 X 2 and 10 X 10 X 2 Mts. These farm ponds will recharge the
ground water and will also be used for supplementation during water scarcity.
Table 6-5-4-1 Strategic Action plan -PMKSY Watershed development/Convergence with MGRNREGS
Sl. No. Component Duration in Years
Total 2016-17 2017-18 2018-19 2019-20 2020-21
1 Admin 0.75 1.98
2 I & CB 0.48 1.12
3 Entry Point Activity 0.75 2.21
4 Detailed Project Report 0.48 0.98
5 Natural Resource Management 10.22 15.31
6 Production Systems Improvement 3.12 5.15
7 Livelihoods 3.28 5.10
8 Monitoring 0.42 1.25
9 Evaluation 0.29 1.54
10 Consolidation 1.17 4.32
Total watershed Development 20.96 8.03 5.02 3.01 1.94 38.96
Convergence Action plan with MGNREGS 7.49 8.42 7.72 9.2 9.12 42.95
Total 28.45 16.45 12.74 12.21 11.06 80.91
Pradhan Mantri Krishi Sinchayee Yojana Water Resources Department, Government of Andhra Pradesh
ConTec District Irrigation Plan - East Godavari 57
6.5.5 State projects
The following projects as per table 6-5-5-1 are being taken up by the state Government of Andhra
Pradesh.
Table 6-5-5-1 State Projects
S.No Department Project /Activity
Description Status
Capacity (MCM)
Irrigation Potential
(Ha)
Period of Implement. (5/7 years)
Estimated
cost ( in crores)
I
Water Resources
Dept
Major Irrigation Projects
Thota Venkatachalam Pushkara Lift Irrigation Scheme
75,266
Venkatanagaram Pumping Scheme
13,765
Medium Irrigation Projects
Musurumilli Reservoir
9,035
Additional ayacut under Vengalarayasagar Project
Formation of reservoir across Gummidigedda
Minor Irrigation Projects
I&CAD, tanks (Above 100 Acres ayacut)
I&CAD, tanks (above 100 Acres Ayacut)
Total 98,066 -
6.5.6 Sewage treatment
It is Proposed to intersect, divert, treat and reuse the domestics sewage for irrigation in the
peripheries of urban areas. This will not only mitigate the problems associated with sewage
disposal but also augment the irrigation potential in peri-urban areas. Sewage treatment
plants are proposed at the urban locations as detailed below.
Benefits of Sewage Treatment
Pradhan Mantri Krishi Sinchayee Yojana Water Resources Department, Government of Andhra Pradesh
ConTec District Irrigation Plan - East Godavari 58
a) Preserving the natural environment
b) Treatment and reuse of water
c) Improved standard of living and economic development
Table 6-5-6 : Sewage treatment
S.No Town Population projected
2020
Water consumption
(MLD)
Proposed STP Capacity (80% of
water consumption) -
MLD
Yearly water saved
(Mcum)
Estimated cost (1.25
crores/MLD)
1 Tuni 55,920 7.55 6.04 2.20 7.55
2 Sankhavaram 5,310 0.72 0.57 0.21 0.72
3 Rampachodavaram 10,417 1.41 1.13 0.41 1.41
4 Peddapuram 51,788 6.99 5.59 2.04 6.99
5 Rajahmundry (Urban) 3,57,798 48.30 38.64 14.10 48.30
6 Rajahmundry Rural 1,41,350 19.08 15.27 5.57 19.08
7 Samalkota 59,520 8.04 6.43 2.35 8.04
8 Pithapuram 57,421 7.75 6.20 2.26 7.75
9 Kakinada (Rural) 1,36,585 18.44 14.75 5.38 18.44
10 Kakinada (Urban) 3,27,137 44.16 35.33 12.90 44.16
11 Mandapeta 58,682 7.92 6.34 2.31 7.92
12 Ramachandrapuram 45,696 6.17 4.94 1.80 6.17
13 Amalapuram 67,723 9.14 7.31 2.67 9.14
14 Vara Ramachandra 26,793 3.62 2.89 1.06 3.62
TOTAL 14,02,140 189 151 55 189
Pradhan Mantri Krishi Sinchayee Yojana Water Resources Department, Government of Andhra Pradesh
ConTec District Irrigation Plan - East Godavari 59
6.6 Cost Benefit Analysis
The viability of the District Irrigation Plan to enhance the irrigation potential shall depend on
the economic benefits accrued as compare to the investment incurred. Whereas, the cost of
irrigation potential development can be classified under the various programme components
of PMKSY, the economic benefits accrued can be grouped under the following three heads:
1. Economic benefits due to enhanced crop productivity.
2. Income from additional employment.
3. Revenue generated from crop production.
4. Municipal waste water/ sewage treatment protects the population and minimises/
eliminates health hazards and provide indirect benefits.
5. Economic benefits from reuse of 55 M cum of sewage water to enhance irrigation
potential by 17,151 Acres.
6. Economic losses saved through flood mitigation and control by providing flood banks.
Indirect benefits to livestock and crops due to flood prevention.
The Benefit Cost Ratio calculations are enclosed as per Annexure 6-6-1. The investment of
574.61 crores on the irrigation potential development would result in an economic value
addition of about 87.56 crores annually. The resultant cost benefit ratio would be 6.37 with
an internal rate of return of 24.04%. This shows a very healthy return on investment.
Pradhan Mantri Krishi Sinchayee Yojana Water Resources Department, Government of Andhra Pradesh
ConTec District Irrigation Plan - East Godavari 60
Table 6-6-1 year wise cost analysis
Cost
A
yacu
tCo
st
Aya
cut
Cost
A
yacu
tCo
st
Aya
cut
Cost
A
yacu
tCo
st
Aya
cut
1Ex
isti
ng P
roje
cts
-
-
-
-
-
-
-
-
-
-
-
-
2St
ate
Proj
ects
-
19,6
13.1
-
19
,613
.1
-
19,6
13.1
-
19
,613
.1
-
19,6
13.1
-
98,0
65.5
9
3AI
BPW
RD -
Maj
. & M
ed.
5.8
21
,680
.8
5.
8
21,6
80.8
5.8
21
,680
.8
5.
8
21,6
80.8
5.8
21
,680
.8
29
.04
1,08
,404
.01
4PM
KSY
- Har
Khe
t ko
Pani
WRD
- M
inor
,
APID
C, G
W4.
4
1,16
6.2
4.4
1,
166.
2
4.4
1,
166.
2
4.
4
1,16
6.2
4.4
1,
166.
2
22
.06
5,83
1.17
5PM
KSY
- Per
Dro
p M
ore
Crop
Agri
cult
ure/
Hor
ticu
ltur
e53
.0
11
,700
.0
53
.0
11
,700
.0
53
.0
11
,700
.0
53
.0
11
,700
.0
53
.0
11
,700
.0
26
5.15
58
,500
.00
6PM
KSY
- Wat
ersh
ed
Dev
elop
men
t
Rura
l
Dev
elop
men
t16
.2
-
16
.2
-
16
.2
-
16
.2
-
16
.2
-
80
.91
-
7Se
wag
e Tr
eatm
ent &
Wat
er F
ront
Mun
icip
al
Corp
orat
ion
37.9
1,38
8.8
37.9
1,38
8.8
37
.9
1,
388.
8
37
.9
1,
388.
8
37
.9
1,
388.
8
18
9.29
6,
943.
76
Sub-
tota
l-
-
TOTA
L11
7.29
55,5
48.9
111
7.29
55,5
48.9
111
7.29
55,5
48.9
111
7.29
55,5
48.9
111
7.29
55,5
48.9
158
6.45
2,77
,744
.53
B C
Rat
io6.
3
IRR
24%
Year
5To
tal
S.N
oD
IP P
rogr
amm
e
Com
pone
nt
Dep
artm
ent
Resp
onsi
ble
Year
1Ye
ar 2
Year
3Ye
ar 4
Pradhan Mantri Krishi Sinchayee Yojana Water Resources Department, Government of Andhra Pradesh
ConTec District Irrigation Plan - East Godavari 61
Command area
Yeluru
ISRMC (Polavaram)
Godavari Central Delta System
Chagalnad IS
Godavari Eastern Delta System
Pushkara LIS
Medium Command area
WEST GODAVARI
KHAMMAM
VISAKHAPATANAM
BAY
EAST GODAVARI
OF BENGAL
Figure 6-6-1 : East Godavari District Irrigation Map
Pradhan Mantri Krishi Sinchayee Yojana Water Resources Department,
Government of Andhra Pradesh
Annexure 2-1-1 : Demographic data
Male Female Children Total Members House holds Members House holds No of members No of house
holdsNo of members House holds
1 Gollaprolu 39,773 39,153 8,606 78,926 12,752 3,419 179 49 65,995 18,540 78,926 22,008
2 Samalkota 68,663 69,316 8,377 1,37,979 26,657 4,377 1,184 88 1,10,138 34,424 1,37,979 38,889
3 Pithapuram 64,906 64,376 8,099 1,29,282 25,408 4,389 683 50 1,03,191 31,837 1,29,282 36,276
4 Kothapalle 41,466 41,322 8,691 82,788 13,544 3,750 189 54 69,055 19,771 82,788 23,575
5 Kakinada Rural 87,018 87,111 17,978 1,74,129 19,207 1,427 1,170 83 1,53,752 44,812 1,74,129 46,322
6 Kakinada Urban 1,52,571 1,59,967 3,12,538 27,197 3,412 1,693 217 2,83,648 78,704 3,12,538 82,333
7 Pedapudi 35,883 35,576 6,988 71,459 11,459 3,242 351 93 59,649 17,841 71,459 21,176
8 Karapa 38,460 37,938 8,259 76,398 11,755 3,327 374 104 64,269 18,474 76,398 21,905
9 Thallarevu 41,438 41,361 9,111 82,799 17,303 4,567 487 123 65,009 17,685 82,799 22,375
10 Kotananduru 24,096 24,416 5,109 48,512 10,967 2,921 699 173 36,846 10,103 48,512 13,197
11 Tuni 67,734 70,345 9,482 1,38,079 22,177 3,107 1,495 245 1,14,407 33,417 1,38,079 36,769
12 Sankhavaram 28,575 28,442 6,286 57,017 9,418 2,480 5,474 1,549 42,125 11,564 57,017 15,593
13 Yeleswaram 38,471 39,494 8,763 77,965 17,064 4,109 4,202 926 56,699 15,207 77,965 20,242
14 Jaggampeta 39,422 40,218 8,884 79,640 11,324 2,927 1,383 392 66,933 18,862 79,640 22,181
15 Kirlampudi 37,255 37,124 8,230 74,379 10,380 2,676 223 50 63,776 17,407 74,379 20,133
16 Prathipadu 39,501 39,575 9,127 79,076 15,491 4,059 4,406 1,287 59,179 16,225 79,076 21,571
17 Thondangi 44,412 43,180 9,774 87,592 15,743 4,207 147 45 71,702 19,415 87,592 23,667
18 Peddapuram 61,713 61,686 7,761 1,23,399 18,022 3,886 788 39 1,04,589 31,176 1,23,399 35,101
19 Gandepalle 27,075 27,203 5,591 54,278 10,168 2,830 470 127 43,640 12,976 54,278 15,933
20 Rangampeta 28,913 28,193 6,258 57,106 11,868 3,201 295 86 44,943 12,842 57,106 16,129
21 Rowthulapudi 28,050 27,186 6,203 55,236 9,255 2,305 4,616 1,271 41,365 11,152 55,236 14,728
22 Maredumilli 10,166 9,341 2,578 19,507 89 26 18,199 4,411 1,219 364 19,507 4,801
23 Devipatnam 13,669 14,509 2,998 28,178 1,683 534 16,394 5,055 10,101 3,122 28,178 8,711
24 Y. Ramavaram 13,757 14,857 4,019 28,614 206 59 26,210 6,733 2,198 626 28,614 7,418
25 Addateegala 18,686 18,555 3,991 37,241 2,030 576 24,663 7,090 10,548 3,145 37,241 10,811
26 Rajavommangi 19,102 20,480 3,868 39,582 821 250 22,786 6,469 15,975 4,449 39,582 11,168
27 Gangavaram 12,393 13,519 2,950 25,912 1,682 471 17,422 5,026 6,808 2,053 25,912 7,550
28 Rampachodavaram 19,185 20,166 4,220 39,351 1,090 283 31,206 8,213 7,055 2,058 39,351 10,554
29 Chintur 19,899 20,826 40,725 1,326 31,239 2,059 32,565 2,059
30 Nellipaka 19,195 19,766 38,961 6,833 20,612 2,060 27,445 2,060
31 Kanavaram 12,351 13,894 26,245 3,187 15,886 2,061 19,073 2,061
32 Vara ramachandra puram 12,171 13,426 25,597 687 16,112 2,062 16,799 2,062
33 Seethanagaram 35,728 35,937 7,206 71,665 14,907 4,292 1,579 424 55,179 16,330 71,665 21,046
34 Gokavaram 34,352 35,244 7,297 69,596 12,268 3,421 3,012 881 54,316 15,622 69,596 19,924
35 Korukonda 39,620 39,933 8,784 79,553 17,891 4,904 1,068 281 60,594 17,487 79,553 22,672
36 Rajamundry Urban 1,68,735 1,73,096 3,41,831 43,260 5,010 2,050 241 2,96,521 86,123 3,41,831 91,374
37 Rajahmundry Rural 82,544 84,429 17,423 1,66,973 28,591 2,479 1,569 114 1,36,813 42,099 1,66,973 44,692
38 Rajanagaram 53,345 52,740 11,748 1,06,085 16,882 4,553 550 134 88,653 24,317 1,06,085 29,004
39 Kadiam 45,066 45,433 9,364 90,499 14,135 3,950 749 195 75,615 21,015 90,499 25,160
40 Alamuru 36,955 37,070 7,521 74,025 11,090 3,064 811 207 62,124 17,651 74,025 20,922
41 Atreyapuram 33,096 32,484 6,312 65,580 15,056 4,275 348 100 50,176 14,792 65,580 19,167
42 Ravulapalem 41,862 41,498 7,921 83,360 12,914 3,371 915 240 69,531 19,782 83,360 23,393
43 Kothapeta 39,053 38,806 7,588 77,859 20,517 5,545 642 170 56,700 16,017 77,859 21,732
44 I. Polavaram 33,977 33,457 6,675 67,434 18,081 5,016 292 82 49,061 14,155 67,434 19,253
45 Mummidivaram 34,389 34,197 6,401 68,586 19,319 5,230 576 151 48,691 14,078 68,586 19,459
46 Ainavilli 32,858 32,303 6,153 65,161 21,949 5,909 456 105 42,756 12,107 65,161 18,121
47 P.Gannavaram 38,097 37,209 7,223 75,306 25,833 6,770 622 157 48,851 13,484 75,306 20,411
Population
Rampachodavaram
Peddapuram
Kakinda
Rajamundry
Amalapuram
Total
S.No Revenue Division Name of the Mandal
Coverd
SC ST General
ConTec District Irrigation Plan - East Godavari 62
Pradhan Mantri Krishi Sinchayee Yojana Water Resources Department,
Government of Andhra Pradesh
Male Female Children Total Members House holds Members House holds No of members No of house
holdsNo of members House holds
Population Total
S.No Revenue Division Name of the Mandal
Coverd
SC ST General
48 Ambajipeta 31,662 31,472 5,556 63,134 19,844 5,274 513 128 42,777 11,662 63,134 17,064
49 Mamidikuduru 35,506 35,133 6,526 70,639 18,943 5,078 809 205 50,887 13,951 70,639 19,234
50 Razole 35,468 35,965 6,639 71,433 21,672 5,617 572 151 49,189 13,619 71,433 19,387
51 Malikipuram 37,989 37,858 6,645 75,847 21,763 5,679 374 94 53,710 14,553 75,847 20,326
52 Sakhinetipalle 36,403 36,157 6,192 72,560 21,849 5,683 411 93 50,300 13,438 72,560 19,214
53 Allavaram 34,034 34,208 6,275 68,242 22,224 5,661 487 116 45,531 12,076 68,242 17,853
54 Amalapuram 71,098 70,595 8,183 1,41,693 32,623 7,060 1,499 167 1,07,571 32,012 1,41,693 39,239
55 Uppalaguptam 30,285 29,646 6,014 59,931 23,541 6,373 402 107 35,988 10,298 59,931 16,778
56 Katrenikona 37,764 37,055 8,065 74,819 24,479 6,612 445 113 49,895 13,510 74,819 20,235
57 Biccavolu 34,695 35,582 6,952 70,277 11,426 3,172 682 185 58,169 17,545 70,277 20,902
58 Anaparthy 35,395 35,464 6,570 70,859 8,207 2,069 477 120 62,175 18,813 70,859 21,002
59 Mandapeta 65,724 66,955 8,022 1,32,679 17,682 3,256 1,123 156 1,13,874 35,238 1,32,679 38,650
60 Rayavaram 32,982 33,474 6,408 66,456 10,262 2,989 505 147 55,689 17,097 66,456 20,233
61 Kajuluru 35,825 35,078 7,331 70,903 15,812 4,251 590 156 54,501 15,578 70,903 19,985
62 Ramachandrapuram 57,410 57,117 7,192 1,14,527 20,284 3,870 1,020 122 93,223 28,638 1,14,527 32,630
63 Kapileswarapuram 33,583 33,226 6,613 66,809 13,915 4,083 347 97 52,547 15,778 66,809 19,958
64 Pamarru 31,835 31,178 6,234 63,013 13,290 3,737 312 81 49,411 14,574 63,013 18,392
26,33,304 26,52,520 4,25,234 52,85,824 9,57,302 2,21,070 2,97,044 55,768 39,95,832 11,59,932 52,50,178 14,36,770 Total
Ramachndrapuram
Amalapuram
ConTec District Irrigation Plan - East Godavari 63
Pradhan Mantri Krishi Sinchayee Yojana Water Resources Department,
Government of Andhra Pradesh
Annexure 2-2-1 : Details of Livestock
Male over 3
years
Female over 3
years
Young
Stock Total
Male over
3 years
Female over 3
years Young Stock Total
1 Gollaprolu 112056 0 425 8301 11198 1837 509 568 699 1776 228 8545 6259 15032
2 Samalkota 49107 0 357 3429 5658 3267 431 2223 2547 5201 24 11858 10630 22512
3 Pithapuram 57093 0 463 2563 2965 3776 452 1147 1304 2903 96 12557 11091 23744
4 Kothapalle 88027 0 326 2457 3631 1851 498 384 515 1397 15 4341 3584 7940
5 Kakinada Rural 49040 0 1253 2577 2371 13806 312 762 910 1984 12 6111 4003 10126
6 Kakinada Urban 19432 0 511 856 918 7532 221 381 455 1057 7 1524 1312 2843
7 Pedapudi 33126 0 362 294 44 2936 583 615 589 1787 36 6707 4206 10949
8 Karapa 28963 0 395 988 790 3038 328 1470 1053 2851 11 7163 4173 11347
9 Thallarevu 8506 0 528 2269 1903 2786 410 2602 1878 4890 142 8701 6078 14921
10 Kotananduru 163724 0 1205 2836 3795 2275 924 2053 1553 4530 984 6799 4402 12185
11 Tuni 104392 0 645 10388 6482 3885 808 2028 2191 5027 623 10538 8450 19611
12 Sankhavaram 169242 0 860 9049 6230 2533 1206 2324 1606 5136 539 6005 4367 10911
13 Yeleswaram 44618 0 571 4155 3727 2620 508 1054 1087 2649 31 7494 4274 11799
14 Jaggampeta 348441 0 855 4543 7341 3170 870 3053 2557 6480 13 10961 6221 17195
15 Kirlampudi 35627 0 484 3486 3522 2719 240 452 470 1162 168 11778 6147 18093
16 Prathipadu 46862 0 481 6068 4857 2787 907 1527 1599 4033 158 5225 3975 9358
17 Thondangi 177035 0 448 14790 26647 2284 1243 7143 5649 14035 1736 29334 20587 51657
18 Peddapuram 1360716 0 471 6279 9956 2913 440 2115 1381 3936 32 10356 10209 20597
19 Gandepalle 1713398 0 430 2977 4532 1949 540 1576 1379 3495 139 7965 6793 14897
20 Rangampeta 857579 0 696 3139 3679 1392 1346 3707 5560 10613 33 6213 6179 12425
21 Rowthulapudi 95667 0 619 8270 5907 2197 944 1589 1334 3867 852 8687 5514 15053
22 Maredumilli 21458 0 365 6163 0 2588 2495 1050 1803 5348 78 224 60 362
23 Devipatnam 31128 0 345 9436 2123 2702 4429 3835 3118 11382 163 1584 1307 3054
24 Y. Ramavaram 31037 0 241 14145 0 1917 7834 7148 4215 19197 56 386 69 511
25 Addateegala 36694 0 190 7107 565 2351 4425 5391 3681 13497 142 1366 1255 2763
26 Rajavommangi 22238 0 0 7117 2115 1941 2848 5101 6018 13967 474 1707 1857 4038
27 Gangavaram 18995 0 0 6274 1977 1982 4778 3368 2096 10242 9 992 702 1703
28 Rampachodavaram 54877 0 153 15804 758 1779 436 5821 6012 12269 205 642 604 1451
29 Nellipaka 75266 0 0 12625 9962 5630 8297 6032 956 2616 2276
30 Kunavaram 72890 0 0 10697 2352 5277 7916 5654 330 1506 787
31 Chintur 153419 0 0 36176 2228 12831 19248 13748 803 3658 1912
32 Vararamachandrapuram 84444 0 0 12713 3134 5304 7956 5683 480 2185 1142
33 Seethanagaram 162002 0 164 3145 3252 2491 394 1190 1136 2720 20 9352 5745 15117
S.No Revenue Division Mandal name Poultry (No) Ducks (No)
Buffalo
Pigs (No)Other
(Nos.)Goats (No) Sheeps (No)
Cow
Kakinda
Peddapuram
Rajamundry
Rampachodavaram
ConTec District Irrigation Plan - East Godavari 64
Pradhan Mantri Krishi Sinchayee Yojana Water Resources Department,
Government of Andhra Pradesh
Male over 3
years
Female over 3
years
Young
Stock Total
Male over
3 years
Female over 3
years Young Stock Total
S.No Revenue Division Mandal name Poultry (No) Ducks (No)
Buffalo
Pigs (No)Other
(Nos.)Goats (No) Sheeps (No)
Cow
34 Gokavaram 51865 0 190 5342 12382 2856 717 1873 1521 4111 52 5078 2714 7844
35 Korukonda 200888 0 897 5368 9011 2558 1349 1879 1710 4938 3 7924 3477 11404
36 Rajamundry Urban 6226 0 0 247 0 16128 269 150 189 608 5 887 260 1152
37 Rajahmundry Rural 99361 0 798 2320 12628 6084 469 28 762 1259 9 4374 2168 6551
38 Rajanagaram 68380 0 583 6534 31608 2647 363 4715 3049 8127 0 12864 6123 18987
39 Kadiam 7811 0 455 574 719 1906 247 622 481 1350 12 3932 1997 5941
40 Alamuru 200339 0 558 529 699 1616 519 687 688 1894 0 6980 3514 10494
41 Atreyapuram 268961 0 643 786 1245 2023 264 557 862 1683 30 4850 3450 8330
42 Ravulapalem 483529 0 615 713 523 1789 521 536 539 1596 20 3659 2825 6504
43 Kothapeta 12411 0 635 865 990 2728 562 841 931 2334 64 4520 3283 7867
44 I. Polavaram 17328 0 615 2021 1103 1257 619 2043 1657 4319 2 4816 3410 8228
45 Mummidivaram 23567 0 639 2077 2591 3590 825 2338 1646 4809 82 3352 3731 7165
46 Ainavilli 43646 0 747 945 1946 2179 560 2213 1686 4459 56 5217 4128 9401
47 P.Gannavaram 18564 0 907 1065 2251 2023 222 938 1742 2902 1 4930 2816 7747
48 Ambajipeta 19908 0 700 531 1326 1751 564 144 915 1623 19 3736 2670 6425
49 Mamidikuduru 12056 0 768 1209 931 1785 330 968 1110 2408 10 3601 2575 6186
50 Razole 44355 0 585 1113 1444 2800 580 981 1451 3012 18 3275 2266 5559
51 Malikipuram 29698 0 527 3064 629 2112 436 555 878 1869 30 3271 2875 6176
52 Sakhinetipalle 66682 0 538 3148 1532 1809 502 903 873 2278 4 5327 3321 8652
53 Allavaram 24164 0 410 2043 1352 2406 401 1403 1534 3338 1 4198 3456 7655
54 Amalapuram 23119 0 1281 1708 1512 8472 916 1868 1719 4503 12 3153 2942 6107
55 Uppalaguptam 21007 0 744 955 425 1919 569 1817 1611 3997 3 4190 2728 6921
56 Katrenikona 16412 0 696 4058 2462 1637 535 2867 1875 5277 73 4994 4592 9659
57 Biccavolu 16698 0 377 695 3660 2197 559 401 648 1608 76 6696 4062 10834
58 Anaparthy 2450052 0 348 481 3104 2255 508 558 422 1488 2 6381 3967 10350
59 Mandapeta 2987222 0 615 632 1434 2973 327 606 862 1795 1 6478 5320 11799
60 Rayavaram 118289 0 502 63 29 2377 576 378 506 1460 5 4728 2749 7482
61 Kajuluru 44560 0 462 488 733 2673 354 2543 1925 4822 7 5171 3768 8946
62 Ramachandrapuram 167723 0 423 361 52 3125 513 1204 1178 2895 0 5721 3470 9191
63 Kapileswarapuram 98371 0 517 425 2169 1417 544 987 1068 2599 0 8356 4528 12884
64 Pamarru 17450 0 535 725 1613 1452 568 2992 1319 4879 0 5808 3114 8922
Total 13987741 0 32153 292201 246722 181848 86689 155689 132869 271671 10192 373547 258469 623557
Ramachndrapuram
Rajamundry
Amalapuram
ConTec District Irrigation Plan - East Godavari 65
Pradhan Mantri Krishi Sinchayee Yojana Water Resources Department,
Government of Andhra Pradesh
Annexure 3-1-1-1 : Surface water availability
Sl. No Revenue Division Mandal Name Surface water availbility (MCM)
1 Gollaprolu 20.16
2 Samalkota 25.82
3 Pithapuram 19.22
4 Kothapalle 9.09
5 Kakinada Rural 8.68
6 Kakinada Urban 4.91
7 Pedapudi 18.23
8 Karapa 19.52
9 Thallarevu 108.34
10 Kotananduru 31.31
11 Tuni 42.54
12 Sankhavaram 37.82
13 Yeleswaram 24.56
14 Jaggampeta 34.42
15 Kirlampudi 16.3562
16 Prathipadu 41.57
17 Thondangi 24.02
18 Peddapuram 24.06
19 Gandepalle 39.088
20 Rangampeta 30.0332
21 Rowthulapudi 37.074
22 Maredumilli 338.29
23 Devipatnam 146.56
24 Y. Ramavaram 25.52
25 Addateegala 79.45
26 Rajavommangi 74.87
27 Gangavaram 96.76
28 Rampachodavaram 145.03
29 Seethanagaram 71.58
30 Gokavaram 67.81
31 Korukonda 65.96
32 Rajamundry Urban 0
33 Rajahmundry Rural 52.13
34 Rajanagaram 62.86
35 Kadiam 15.58
36 Alamuru 27.74
37 Atreyapuram 57.21
38 Ravulapalem 23.12
39 Kothapeta 28.97
40 I. Polavaram 63.96
41 Mummidivaram 30.64
42 Ainavilli 34.29
43 P.Gannavaram 43.53
44 Ambajipeta 19.57
45 Mamidikuduru 27.64
46 Razole 31.05
47 Malikipuram 31.77
48 Sakhinetipalle 41.2
49 Allavaram 40.4894
50 Amalapuram 30.27
51 Uppalaguptam 42.31
52 Katrenikona 73.38
53 Biccavolu 17.3
54 Anaparthy 12.3
55 Mandapeta 25.68
56 Rayavaram 21.48
57 Kajuluru 40.27
58 Ramachandrapuram 26.54
59 Kapileswarapuram 44.68
60 Pamarru 0
2694.61Grand Total
Amalapuram
Ramachndrapuram
Kakinda
Peddapuram
Rampachodavaram
Rajamundry
ConTec District Irrigation Plan - East Godavari 66
Pradhan Mantri Krishi Sinchayee Yojana Water Resources Department,
Government of Andhra Pradesh
Area in Ha.
S.No Name of Revenue Division Name of Mandal Sown Area
1 Gollaprolu 8,965.00 5,464.00 60.95% 3,501.00 39.05%
2 Samalkota 10,105.00 10,105.00 100.00% - 0.00%
3 Pithapuram 9,438.00 9,066.00 96.06% 372.00 3.94%
4 Kothapalle 5,673.00 5,192.00 91.52% 481.00 8.48%
5 Kakinada Rural 2,200.00 2,167.00 98.50% 33.00 1.50%
6 Kakinada Urban 367.00 367.00 100.00% - 0.00%
7 Pedapudi 8,403.00 8,358.00 99.46% 45.00 0.54%
8 Karapa 7,182.00 6,970.00 97.05% 212.00 2.95%
9 Thallarevu 5,645.00 4,922.00 87.19% 723.00 12.81%
10 Kotananduru 6,766.00 3,908.00 57.76% 2,858.00 42.24%
11 Tuni 10,169.00 5,010.00 49.27% 5,159.00 50.73%
12 Sankhavaram 5,932.00 1,875.00 31.61% 4,057.00 68.39%
13 Yeleswaram 6,022.00 4,897.00 81.32% 1,125.00 18.68%
14 Jaggampeta 10,993.00 5,721.00 52.04% 5,272.00 47.96%
15 Kirlampudi 6,565.00 6,064.00 92.37% 501.00 7.63%
16 Prathipadu 11,152.00 5,079.00 45.54% 6,073.00 54.46%
17 Thondangi 10,496.00 6,902.00 65.76% 3,594.00 34.24%
18 Peddapuram 9,315.00 5,077.00 54.50% 4,238.00 45.50%
19 Gandepalle 10,285.00 5,796.00 56.35% 4,489.00 43.65%
20 Rangampeta 11,617.00 3,925.00 33.79% 7,692.00 66.21%
21 Rowthulapudi 8,590.00 2,978.00 34.67% 5,612.00 65.33%
22 Maredumilli 2,882.00 105.00 3.64% 2,777.00 96.36%
23 Devipatnam 2,582.00 525.00 20.33% 2,057.00 79.67%
24 Y. Ramavaram 3,348.00 171.00 5.11% 3,177.00 94.89%
25 Addateegala 6,072.00 1,010.00 16.63% 5,062.00 83.37%
26 Rajavommangi 6,209.00 1,750.00 28.18% 4,459.00 71.82%
27 Gangavaram 5,757.00 603.00 10.47% 5,154.00 89.53%
28 Rampachodavaram 2,466.00 429.00 17.40% 2,037.00 82.60%
Nellipaka 4,292.00 189.00 4.40% 4,103.00 95.60%
Kunavaram 2,813.00 344.00 12.23% 2,469.00 87.77%
Chintur 2,509.00 103.00 4.11% 2,406.00 95.89%
Vara Ramachandra
puram 1,714.00 467.00 27.25% 1,247.00 72.75%
29 Seethanagaram 7,268.00 6,632.00 91.25% 636.00 8.75%
30 Gokavaram 7,836.00 4,096.00 52.27% 3,740.00 47.73%
31 Korukonda 11,974.00 7,112.00 59.40% 4,862.00 40.60%
32 Rajamundry Urban 115.00 63.00 54.78% 52.00 45.22%
33 Rajahmundry Rural 2,701.00 2,515.00 93.11% 186.00 6.89%
34 Rajanagaram 14,974.00 7,475.00 49.92% 7,499.00 50.08%
35 Kadiam 4,674.00 4,602.00 98.46% 72.00 1.54%
36 Alamuru 5,598.00 5,598.00 100.00% - 0.00%
37 Atreyapuram 5,218.00 5,208.00 99.81% 10.00 0.19%
38 Ravulapalem 5,132.00 4,865.00 94.80% 267.00 5.20%
39 Kothapeta 7,281.00 6,607.00 90.74% 674.00 9.26%
40 I. Polavaram 7,652.00 4,244.00 55.46% 3,408.00 44.54%
41 Mummidivaram 6,989.00 4,369.00 62.51% 2,620.00 37.49%
42 Ainavilli 10,605.00 9,094.00 85.75% 1,511.00 14.25%
43 P.Gannavaram 7,526.00 7,526.00 100.00% - 0.00%
44 Ambajipeta 6,069.00 5,105.00 84.12% 964.00 15.88%
45 Mamidikuduru 6,178.00 2,493.00 40.35% 3,685.00 59.65%
46 Razole 5,716.00 2,871.00 50.23% 2,845.00 49.77%
47 Malikipuram 4,723.00 1,490.00 31.55% 3,233.00 68.45%
48 Sakhinetipalle 3,470.00 743.00 21.41% 2,727.00 78.59%
49 Allavaram 6,059.00 3,596.00 59.35% 2,463.00 40.65%
50 Amalapuram 6,680.00 4,751.00 71.12% 1,929.00 28.88%
51 Uppalaguptam 6,474.00 5,435.00 83.95% 1,039.00 16.05%
52 Katrenikona 6,733.00 4,543.00 67.47% 2,190.00 32.53%
53 Biccavolu 7,562.00 6,878.00 90.95% 684.00 9.05%
54 Anaparthy 4,368.00 4,017.00 91.96% 351.00 8.04%
55 Mandapeta 7,908.00 7,320.00 92.56% 588.00 7.44%
56 Rayavaram 6,030.00 5,992.00 99.37% 38.00 0.63%
57 Kajuluru 8,801.00 8,560.00 97.26% 241.00 2.74%
58 Ramachandrapuram 8,413.00 8,340.00 99.13% 73.00 0.87%
59 Kapileswarapuram 7,546.00 7,366.00 97.61% 180.00 2.39%
60 Pamarru 7,193.00 6,587.00 91.58% 606.00 8.42%
4,21,990.00 2,81,632.00 66.74% 1,40,358.00 33.26%
Annexure 3-3-1 : Irrigated and Rain-fed Area Kharif Season
Irrigated Partially / Total Rainfed
Kakinda
Peddapuram
Rajamundry
Amalapuram
Ramachndrapuram
Rampachodavaram
ConTec District Irrigation Plan - East Godavari 67
Pradhan Mantri Krishi Sinchayee Yojana Water Resources Department,
Government of Andhra Pradesh
Area in Ha.
S.No Name of Division Mandal Name Sown Area
1 Gollaprolu 3,943.00 3,041.00 77.12% 902.00 22.88%
2 Samalkota 9,928.00 9,708.00 97.78% 220.00 2.22%
3 Pithapuram 8,519.00 8,244.00 96.77% 275.00 3.23%
4 Kothapalle 5,845.00 5,056.00 86.50% 789.00 13.50%
5 Kakinada Rural 2,013.00 1,945.00 96.62% 68.00 3.38%
6 Kakinada Urban 367.00 367.00 100.00% - 0.00%
7 Pedapudi 8,561.00 8,228.00 96.11% 333.00 3.89%
8 Karapa 6,863.00 6,824.00 99.43% 39.00 0.57%
9 Thallarevu 4,869.00 4,778.00 98.13% 91.00 1.87%
10 Kotananduru 3,702.00 662.00 17.88% 3,040.00 82.12%
11 Tuni 2,413.00 886.00 36.72% 1,527.00 63.28%
12 Sankhavaram 1,186.00 897.00 75.63% 289.00 24.37%
13 Yeleswaram 4,167.00 3,375.00 80.99% 792.00 19.01%
14 Jaggampeta 2,131.00 1,198.00 56.22% 933.00 43.78%
15 Kirlampudi 5,474.00 4,586.00 83.78% 888.00 16.22%
16 Prathipadu 3,161.00 1,175.00 37.17% 1,986.00 62.83%
17 Thondangi 3,785.00 1,406.00 37.15% 2,379.00 62.85%
18 Peddapuram 3,966.00 3,652.00 92.08% 314.00 7.92%
19 Gandepalle 1,761.00 1,199.00 68.09% 562.00 31.91%
20 Rangampeta 2,084.00 1,067.00 51.20% 1,017.00 48.80%
21 Rowthulapudi 1,767.00 578.00 32.71% 1,189.00 67.29%
22 Maredumilli 113.00 - 0.00% 113.00 100.00%
23 Devipatnam 1,554.00 1,357.00 87.32% 197.00 12.68%
24 Y. Ramavaram 378.00 7.00 1.85% 371.00 98.15%
25 Addateegala 356.00 16.00 4.49% 340.00 95.51%
26 Rajavommangi 549.00 263.00 47.91% 286.00 52.09%
27 Gangavaram 530.00 50.00 9.43% 480.00 90.57%
28 Rampachodavaram 244.00 81.00 33.20% 163.00 66.80%
Nellipaka 2,716.00 1,984.00 73.05% 732.00 26.95%
Kunavaram 3,558.00 1,165.00 32.74% 2,393.00 67.26%
Chintur 3,354.00 328.00 9.78% 3,026.00 90.22%
Vara Ramachandra
puram 2,105.00 605.00 28.74% 1,500.00 71.26%
29 Seethanagaram 6,750.00 5,542.00 82.10% 1,208.00 17.90%
30 Gokavaram 3,028.00 1,766.00 58.32% 1,262.00 41.68%
31 Korukonda 5,944.00 3,770.00 63.43% 2,174.00 36.57%
32 Rajamundry Urban 6.00 6.00 100.00% - 0.00%
33 Rajahmundry Rural 1,047.00 937.00 89.49% 110.00 10.51%
34 Rajanagaram 3,123.00 2,631.00 84.25% 492.00 15.75%
35 Kadiam 4,050.00 3,966.00 97.93% 84.00 2.07%
36 Alamuru 5,933.00 5,511.00 92.89% 422.00 7.11%
37 Atreyapuram 4,951.00 4,622.00 93.35% 329.00 6.65%
38 Ravulapalem 3,884.00 3,576.00 92.07% 308.00 7.93%
39 Kothapeta 5,289.00 4,956.00 93.70% 333.00 6.30%
40 I. Polavaram 4,644.00 4,226.00 91.00% 418.00 9.00%
41 Mummidivaram 4,591.00 3,827.00 83.36% 764.00 16.64%
42 Ainavilli 6,815.00 6,094.00 89.42% 721.00 10.58%
43 P.Gannavaram 5,447.00 4,046.00 74.28% 1,401.00 25.72%
44 Ambajipeta 2,892.00 2,664.00 92.12% 228.00 7.88%
45 Mamidikuduru 2,392.00 1,961.00 81.98% 431.00 18.02%
46 Razole 3,787.00 2,992.00 79.01% 795.00 20.99%
47 Malikipuram 2,035.00 1,348.00 66.24% 687.00 33.76%
48 Sakhinetipalle 2,944.00 2,286.00 77.65% 658.00 22.35%
49 Allavaram 4,453.00 3,353.00 75.30% 1,100.00 24.70%
50 Amalapuram 5,155.00 3,557.00 69.00% 1,598.00 31.00%
51 Uppalaguptam 6,665.00 5,584.00 83.78% 1,081.00 16.22%
52 Katrenikona 5,568.00 4,542.00 81.57% 1,026.00 18.43%
53 Biccavolu 6,711.00 6,173.00 91.98% 538.00 8.02%
54 Anaparthy 4,103.00 3,964.00 96.61% 139.00 3.39%
55 Mandapeta 7,165.00 7,039.00 98.24% 126.00 1.76%
56 Rayavaram 6,332.00 5,986.00 94.54% 346.00 5.46%
57 Kajuluru 10,153.00 8,557.00 84.28% 1,596.00 15.72%
58 Ramachandrapuram 8,711.00 8,340.00 95.74% 371.00 4.26%
59 Kapileswarapuram 7,669.00 7,416.00 96.70% 253.00 3.30%
60 Pamarru 7,670.00 6,743.00 87.91% 927.00 12.09%
2,61,869.00 2,12,709.00 81.23% 49,160.00 18.77%
Rajamundry
Amalapuram
Ramachndrapuram
Kakinda
Peddapuram
Rampachodavaram
Annexure 3-3-2 : Irrigated and Rain-fed Area Rabi Season
Irrigated Partially / Total Rainfed
ConTec District Irrigation Plan - East Godavari 68
Pradhan Mantri Krishi Sinchayee Yojana Water Resource Department,
Government of Andhra Pradesh
Annexure 4-1-1-1 : 75% Dependability Yield Calculations
Yield Calculation Using Strange Tables
Classification of Catchment Area Good Avg Bad
Catchment Contributing to Yield 3232 Sq.Km. 5990 Sq.Km. 3380 Sq.Km.
Total Rainfall Contribution
Rainfall
Contributio
n in MM
Yield Good
catchment
Yield Avg.
catchment
Yield Bad
catchment Total Yield
Dependability
(n/(m+1)) %
100.00% Good Avg. Bad MCUM MCUM MCUM MCUM Year Yield %
1 1958-59 1517 1517 58.90 44.10 29.40 3020 4007 1441 8469 1958-59 6865 2%
2 1959-60 1308 1308 50.22 37.65 25.10 2220 2950 1061 6231 1959-60 5052 4%
3 1960-61 956 956 35.53 26.54 17.71 1148 1520 547 3215 1960-61 2605 5%
4 1961-62 1223 1223 46.51 34.87 23.25 1922 2554 919 5396 1961-62 4375 7%
5 1962-63 1406 1406 54.65 40.94 27.29 2597 3448 1240 7285 1962-63 5906 9%
6 1963-64 978 978 36.51 27.27 18.21 1207 1597 576 3380 1963-64 2739 11%
7 1964-65 1202 1202 45.66 34.22 22.82 1855 2464 887 5205 1964-65 4220 12%
8 1965-66 766 766 27.02 20.23 13.46 699 928 333 1961 1965-66 1589 14%
9 1966-67 1036 1036 38.95 29.11 19.43 1364 1806 651 3821 1966-67 3097 16%
10 1967-68 862 862 31.32 23.42 15.61 912 1209 435 2556 1967-68 2072 18%
11 1968-69 939 939 34.77 25.97 17.33 1103 1461 526 3090 1968-69 2504 19%
12 1969-70 1183 1183 44.89 33.64 22.43 1795 2383 858 5036 1969-70 4083 21%
Total
: 12601.57Sq. Km.
: 100%
S.No Year
Total
Rainfall
in MM
Probable Runoff
coefficient
Yield in Decending Order
(MCM)
ConTec District Irrigation Plan - East Godavari 69
Pradhan Mantri Krishi Sinchayee Yojana Water Resource Department,
Government of Andhra Pradesh
Rainfall
Contributio
n in MM
Yield Good
catchment
Yield Avg.
catchment
Yield Bad
catchment Total Yield
Dependability
(n/(m+1)) %
100.00% Good Avg. Bad MCUM MCUM MCUM MCUM Year Yield %
S.No Year
Total
Rainfall
in MM
Probable Runoff
coefficient
Yield in Decending Order
(MCM)
13 1970-71 1332 1332 51.31 38.46 25.64 2310 3068 1104 6482 1970-71 5255 23%
14 1971-72 799 799 28.50 21.33 14.20 770 1021 367 2157 1971-72 1748 25%
15 1972-73 1076 1076 40.57 30.34 20.25 1475 1955 704 4135 1972-73 3352 26%
16 1973-74 889 889 32.53 24.31 16.21 977 1295 466 2738 1973-74 2219 28%
17 1974-75 1087 1087 41.01 30.68 20.47 1507 1998 719 4224 1974-75 3424 30%
18 1975-76 1361 1361 52.62 39.43 26.29 2420 3214 1156 6791 1975-76 5506 32%
19 1976-77 1426 1426 55.56 41.61 27.74 2678 3554 1279 7511 1976-77 6089 33%
20 1977-78 1159 1159 43.92 32.90 21.94 1721 2284 822 4826 1977-78 3913 35%
21 1978-79 1116 1116 42.19 31.57 21.07 1591 2111 760 4462 1978-79 3617 37%
22 1979-80 897 897 32.89 24.58 16.39 997 1321 475 2793 1979-80 2264 39%
23 1980-81 1230 1230 46.79 35.08 23.39 1945 2585 930 5460 1980-81 4427 40%
24 1981-82 972 972 36.25 27.07 18.07 1191 1576 568 3335 1981-82 2702 42%
25 1982-83 867 867 31.54 23.58 15.72 924 1225 441 2590 1982-83 2099 44%
26 1983-84 1433 1433 55.87 41.85 27.90 2706 3592 1292 7590 1983-84 6153 46%
27 1984-85 743 743 25.98 19.46 12.94 653 866 311 1830 1984-85 1483 47%
28 1985-86 1045 1045 39.32 29.39 19.62 1389 1839 663 3891 1985-86 3153 49%
29 1986-87 1062 1062 40.00 29.91 19.96 1436 1903 685 4024 1986-87 3261 51%
ConTec District Irrigation Plan - East Godavari 70
Pradhan Mantri Krishi Sinchayee Yojana Water Resource Department,
Government of Andhra Pradesh
Rainfall
Contributio
n in MM
Yield Good
catchment
Yield Avg.
catchment
Yield Bad
catchment Total Yield
Dependability
(n/(m+1)) %
100.00% Good Avg. Bad MCUM MCUM MCUM MCUM Year Yield %
S.No Year
Total
Rainfall
in MM
Probable Runoff
coefficient
Yield in Decending Order
(MCM)
30 1987-88 1166 1166 44.21 33.11 22.09 1742 2313 832 4887 1987-88 3962 53%
31 1988-89 1092 1092 41.22 30.83 20.58 1521 2017 726 4264 1988-89 3456 54%
32 1989-90 1988 1988 58.90 44.10 29.40 3958 5251 1889 11098 1989-90 8996 56%
33 1990-91 988 988 36.96 27.60 18.43 1234 1633 589 3456 1990-91 2801 58%
34 1991-92 1283 1283 49.09 36.81 24.54 2129 2829 1018 5975 1991-92 4845 60%
35 1992-93 1084 1084 40.89 30.59 20.41 1498 1986 715 4199 1992-93 3404 61%
36 1993-94 937 937 34.68 25.91 17.29 1098 1454 524 3076 1993-94 2493 63%
37 1994-95 1546 1546 58.90 44.10 29.40 3078 4084 1469 8630 1994-95 6996 65%
38 1995-96 1246 1246 47.44 35.58 23.72 1998 2655 955 5608 1995-96 4547 67%
39 1996-97 1616 1616 58.90 44.10 29.40 3217 4269 1536 9021 1996-97 7313 68%
40 1997-98 1062 1062 40.00 29.91 19.96 1436 1903 685 4024 1997-98 3261 70%
41 1998-99 1692 1692 58.90 44.10 29.40 3368 4469 1608 9445 1998-99 7657 72%
42 1999-00 1012 1012 37.98 28.37 18.94 1299 1720 620 3639 1999-00 2949 74%
43 2000-01 1020 1020 38.31 28.62 19.11 1321 1748 630 3699 2000-01 2998 75%
44 2001-02 997 997 37.37 27.90 18.63 1259 1666 600 3526 2001-02 2857 77%
45 2002-03 707 707 24.36 18.26 12.14 582 773 277 1632 2002-03 1323 79%
46 2003-04 1078 1078 40.65 30.40 20.29 1481 1963 707 4151 2003-04 3365 81%
ConTec District Irrigation Plan - East Godavari 71
Pradhan Mantri Krishi Sinchayee Yojana Water Resource Department,
Government of Andhra Pradesh
Rainfall
Contributio
n in MM
Yield Good
catchment
Yield Avg.
catchment
Yield Bad
catchment Total Yield
Dependability
(n/(m+1)) %
100.00% Good Avg. Bad MCUM MCUM MCUM MCUM Year Yield %
S.No Year
Total
Rainfall
in MM
Probable Runoff
coefficient
Yield in Decending Order
(MCM)
47 2004-05 872 872 31.77 23.75 15.83 936 1240 446 2623 2004-05 2126 82%
48 2005-06 1389 1389 53.88 40.37 26.91 2530 3359 1208 7097 2005-06 5753 84%
49 2006-07 1168 1168 44.29 33.17 22.13 1748 2321 835 4904 2006-07 3976 86%
50 2007-08 1405 1405 54.61 40.91 27.27 2593 3443 1238 7274 2007-08 5897 88%
51 2008-09 1035 1035 38.91 29.08 19.41 1361 1803 649 3813 2008-09 3091 89%
52 2009-10 871 871 31.72 23.72 15.81 934 1237 445 2616 2009-10 2120 91%
53 2010-11 1859 1859 58.90 44.10 29.40 3701 4911 1766 10378 2010-11 8413 93%
54 2011-12 791 791 28.14 21.06 14.02 752 998 358 2108 2011-12 1709 95%
55 2012-13 1511 1511 58.90 44.10 29.40 3008 3991 1436 8435 2012-13 6838 96%
56 2013-14 1087 1087 41.01 30.68 20.47 1507 1998 719 4224 2013-14 3424 98%
ConTec District Irrigation Plan - East Godavari 72
Pradhan Mantri Krishi Sinchayee Yojana Water Resources Department,
Government of Andhra Pradesh
Annexure 4-1-1-2 : Mandal Wise Yield Contribution
Mandal Name Normal Rainfall
(MM )
Mandal area
in Ha % Contribution Yield (MCM)
Gollaprolu 839.7 12154 0.65% 20
Samalkota 1143.7 14664 1.07% 32
Pithapuram 1167.9 12524 0.93% 28
Kothapalle 1070.8 11546 0.79% 24
Kakinada Rural 1182.3 7423 0.56% 17
Kakinada Urban 1186.9 3195 0.24% 7
Pedapudi 1115.9 10662 0.76% 23
Karapa 1167.3 10403 0.78% 23
Thallarevu 1412.6 41475 3.74% 112
Kotananduru 886.5 11484 0.65% 19
Tuni 1153.3 18795 1.38% 41
Sankhavaram 1164.4 13741 1.02% 31
Yeleswaram 1168.3 12130 0.90% 27
Jaggampeta 1138 16059 1.17% 35
Kirlampudi 1105.5 8733 0.62% 18
Prathipadu 1182.3 18094 1.37% 41
Thondangi 1202.8 17662 1.36% 41
Peddapuram 1208.6 14482 1.12% 34
Gandepalle 1095.5 16544 1.16% 35
Rangampeta 1070.3 14510 0.99% 30
Rowthulapudi 1164.4 18540 1.38% 41
Maredumilli 1345.1 91396 7.85% 235
Devipatnam 1228.6 51739 4.06% 122
Y. Ramavaram 1201.5 77323 5.93% 178
Addateegala 1226.5 54038 4.23% 127
Rajavommangi 1503.4 46541 4.47% 134
Gangavaram 1103.9 61271 4.32% 129
Rampachodavaram 1314 61030 5.12% 153
Nellipaka 1158.9 16073 1.19% 36
Kunavaram 1145.3 20382 1.49% 45
Chintur 1313.5 95529 8.01% 240Vara Ramachandra
puram 1307.8 47473 3.96% 119
Seethanagaram 1199.7 15606 1.20% 36
Gokavaram 1194.4 22468 1.71% 51
Korukonda 1217.4 18262 1.42% 43
Rajamundry Urban 1217.1 1749 0.14% 4
Rajahmundry Rural 1184.9 7515 0.57% 17
Rajanagaram 1211.2 23482 1.82% 54
ConTec District Irrigation Plan - East Godavari 73
Pradhan Mantri Krishi Sinchayee Yojana Water Resources Department,
Government of Andhra Pradesh
Mandal Name Normal Rainfall
(MM )
Mandal area
in Ha % Contribution Yield (MCM)
Kadiam 1160.2 7579 0.56% 17
Alamuru 1192.7 7840 0.60% 18
Atreyapuram 1283.5 8611 0.71% 21
Ravulapalem 1175.1 7254 0.54% 16
Kothapeta 1129.8 7957 0.57% 17
I. Polavaram 1406.5 12942 1.16% 35
Mummidivaram 1424.9 9571 0.87% 26
Ainavilli 1316.5 9348 0.79% 24
P.Gannavaram 1359.1 8381 0.73% 22
Ambajipeta 1292.5 5402 0.45% 13
Mamidikuduru 1322.9 7995 0.68% 20
Razole 1354.8 7734 0.67% 20
Malikipuram 1225.9 8955 0.70% 21
Sakhinetipalle 1580.4 10071 1.02% 30
Allavaram 1315.6 10492 0.88% 26
Amalapuram 1309.3 8060 0.67% 20
Uppalaguptam 1317.8 11755 0.99% 30
Katrenikona 1478.9 13816 1.30% 39
Biccavolu 1089.4 10058 0.70% 21
Anaparthy 1112.5 6038 0.43% 13
Mandapeta 1133.4 10994 0.80% 24
Rayavaram 1190.9 7904 0.60% 18
Kajuluru 1186.7 11669 0.88% 27
Ramachandrapuram 1253.6 10669 0.85% 26
Kapileswarapuram 1218.6 10660 0.83% 25
Pamarru 1207.9 11705 0.90% 27
2998Total Yield (75 % Dependability)
ConTec District Irrigation Plan - East Godavari 74
Pradhan Mantri Krishi Sinchayee Yojana Water Resource Department,
Government of Andhra Pradesh
Annexure 4-2-1 : ground water Availability
Name of Revenue
divisionMandal
Command/
Non-command
Recharge
from rainfall
during
monsoon
season
Recharge from
other sources
during
monsoon
season
Recharge from
rainfall during
non-monsoon
season
Recharge from
other sources
during non-
monsoon
season
Total annual
ground water
recharge
[4+5+6+7]
Provision
for natural
discharge
Net annual
ground water
availability
[8-9]
2 3 4 5 6 7 8 9 10
RAMPACHODAVARAM Addateegala Command 0 0 0 0 0 0 0.00
RAMPACHODAVARAM Non-command 2221 33 1183 26 3463 233 3230.00
RAMPACHODAVARAM Poor Quality 0 0 0 0 0 0 0.00
RAMPACHODAVARAM Total (without PQ) 2221 33 1183 26 3463 233 3230.00
RAMACHANDRAPURAM Anaparthi Command 609 825 335 630 2399 120 2279.00
RAMACHANDRAPURAM Non-command 0 0 0 0 0 0 0.00
RAMACHANDRAPURAM Poor Quality 0 0 0 0 0 0 0.00
RAMACHANDRAPURAM Total (without PQ) 609 825 335 630 2399 120 2279.00
RAMACHANDRAPURAM Biccavole Command 843 1786 534 885 4048 357 3691.00
RAMACHANDRAPURAM Non-command 67 7 31 8 113 12 101.00
RAMACHANDRAPURAM Poor Quality 0 0 0 0 0 0 0.00
RAMACHANDRAPURAM Total (without 910 1793 565 893 4161 369 3792.00
RAMPACHODAVARAM Devipatnam Command 0 0 0 0 0 0 0.00
RAMPACHODAVARAM Non-command 1147 84 637 96 1964 136 1828.00
RAMPACHODAVARAM Poor Quality 0 0 0 0 0 0 0.00
RAMPACHODAVARAM Total (without PQ) 1148 85 637 97 1967 139 1828.00
PEDDAPURAM Eleswaram Command 581 565 432 483 2061 207 1854.00
PEDDAPURAM Non-command 732 5 426 4 1167 59 1108.00
PEDDAPURAM Poor Quality 0 0 0 0 0 0 0.00
PEDDAPURAM Total (without PQ) 1313 570 859 486 3228 265 2963.00
PEDDAPURAM Gandepalli Command 1236 1007 894 332 3469 332 3137.00
PEDDAPURAM Non-command 0 0 0 0 0 0 0.00
PEDDAPURAM Poor Quality 0 0 0 0 0 0 0.00
PEDDAPURAM Total (without 1236 1007 894 332 3469 332 3137.00
RAMPACHODAVARAM Gangavaram Command 0 0 0 0 0 0 0.00
RAMPACHODAVARAM Non-command 3006 113 1479 120 4718 471 4247.00
ConTec District Irrigation Plan - East Godavari 75
Pradhan Mantri Krishi Sinchayee Yojana Water Resource Department,
Government of Andhra Pradesh
Name of Revenue
divisionMandal
Command/
Non-command
Recharge
from rainfall
during
monsoon
season
Recharge from
other sources
during
monsoon
season
Recharge from
rainfall during
non-monsoon
season
Recharge from
other sources
during non-
monsoon
season
Total annual
ground water
recharge
[4+5+6+7]
Provision
for natural
discharge
Net annual
ground water
availability
[8-9]
2 3 4 5 6 7 8 9 10
RAMPACHODAVARAM Poor Quality 0 0 0 0 0 0 0.00
RAMPACHODAVARAM Total (without PQ) 3006 113 1479 120 4718 471 4247.00
RAJAHMUNDRY Gokavaram Command 0 0 0 0 0 0 0.00
RAJAHMUNDRY Non-command 1501 104 706 117 2428 206 2222.00
RAJAHMUNDRY Poor Quality 0 0 0 0 0 00.00
RAJAHMUNDRY Total (without PQ) 1501 104 706 117 2428 206 2222.00
KAKINADA Gollaprolu Command 460 489 364 269 1582 159 1423.00
KAKINADA Non-command 554 185 292 190 1221 122 1099.00
KAKINADA Poor Quality 0 0 0 0 0 0 0.00
KAKINADA Total (without 1014 675 656 459 2804 280 2524.00
PEDDAPURAM Jaggampet Command 937 775 750 138 2600 260 2340.00
PEDDAPURAM Non-command 534 12 271 14 831 83 748.00
PEDDAPURAM Poor Quality 0 0 0 0 0 0 0.00
PEDDAPURAM Total (without PQ) 1471 788 1021 152 3432 343 3089.00
RAJAHMUNDRY Kadiam Command 852 1127 511 1122 3612 181 3431.00
RAJAHMUNDRY Non-command 0 0 0 0 0 0 0.00
RAJAHMUNDRY Poor Quality 0 0 0 0 0 0 0.00
RAJAHMUNDRY Total (without PQ) 852 1127 511 1122 3612 181 3431.00
KAKINADA Kakinada Command 745 706 609 271 2331 233 2098.00
KAKINADA Non-command 0 0 0 0 0 0 0.00
KAKINADA Poor Quality 0 0 0 0 0 0 0.00
KAKINADA Total (without PQ) 745 706 609 271 2331 233 2098.00
PEDDAPURAM Kirlampudi Command 663 594 513 315 2085 208 1877.00
PEDDAPURAM Non-command 0 0 0 0 0 0 0.00
PEDDAPURAM Poor Quality 0 0 0 0 0 0 0.00
PEDDAPURAM Total (without PQ) 663 594 513 315 2085 208 1877.00
RAJAHMUNDRY Korukonda Command 1009 765 612 532 2918 292 2626.00
RAJAHMUNDRY Non-command 554 33 258 47 892 56 836.00
ConTec District Irrigation Plan - East Godavari 76
Pradhan Mantri Krishi Sinchayee Yojana Water Resource Department,
Government of Andhra Pradesh
Name of Revenue
divisionMandal
Command/
Non-command
Recharge
from rainfall
during
monsoon
season
Recharge from
other sources
during
monsoon
season
Recharge from
rainfall during
non-monsoon
season
Recharge from
other sources
during non-
monsoon
season
Total annual
ground water
recharge
[4+5+6+7]
Provision
for natural
discharge
Net annual
ground water
availability
[8-9]
2 3 4 5 6 7 8 9 10
RAJAHMUNDRY Poor Quality 0 0 0 0 0 0 0.00
RAJAHMUNDRY Total (without PQ) 1563 798 870 579 3810 348 3462.00
PEDDAPURAM Kotananduru Command 834 538 523 111 2006 137 1869.00
PEDDAPURAM Non-command 0 0 0 0 0 0 0.00
PEDDAPURAM Poor Quality 0 0 0 0 0 0 0.00
PEDDAPURAM Total (without PQ) 832 537 516 111 1996 140 1856.00
RAMACHANDRAPURAM Mandapet Command 1284 1997 603 928 4812 443 4369.00
RAMACHANDRAPURAM Non-command 96 9 44 12 161 16 145.00
RAMACHANDRAPURAM Poor Quality 0 0 0 0 0 0 0.00
RAMACHANDRAPURAM Total (without 1380 2006 647 940 4973 459 4514.00
RAMPACHODAVARAM Maredumilli Command 0 0 0 0 0 0 0.00
RAMPACHODAVARAM Non-command 1627 25 973 20 2645 264 2381.00
RAMPACHODAVARAM Poor Quality 0 0 0 0 0 0 0.00
RAMPACHODAVARAM Total (without 1627 25 973 20 2645 264 2381.00
KAKINADA Pedapudi Command 856 1182 782 938 3758 376 3382.00
KAKINADA Non-command 0 0 0 0 0 0 0.00
KAKINADA Poor Quality 0 0 0 0 0 0 0.00
KAKINADA Total (without 856 1182 782 938 3758 376 3382.00
PEDDAPURAM Peddapuram Command 1120 911 813 268 3112 254 2858.00
PEDDAPURAM Non-command 30 3 14 4 51 6 45.00
PEDDAPURAM Poor Quality 0 0 0 0 0 0 0.00
PEDDAPURAM Total (without 1150 915 827 272 3164 260 2904.00
KAKINADA Pithapuram Command 963 871 759 354 2947 295 2652.00
KAKINADA Non-command 0 0 0 0 0 0 0.00
KAKINADA Poor Quality 0 0 0 0 0 0 0.00
KAKINADA Total (without 963 871 759 354 2947 295 2652.00
PEDDAPURAM Prathipadu Command 442 471 350 259 1522 152 1370.00
PEDDAPURAM Non-command 1105 405 612 419 2541 254 2287.00
PEDDAPURAM Poor Quality 0 0 0 0 0 0 0.00
ConTec District Irrigation Plan - East Godavari 77
Pradhan Mantri Krishi Sinchayee Yojana Water Resource Department,
Government of Andhra Pradesh
Name of Revenue
divisionMandal
Command/
Non-command
Recharge
from rainfall
during
monsoon
season
Recharge from
other sources
during
monsoon
season
Recharge from
rainfall during
non-monsoon
season
Recharge from
other sources
during non-
monsoon
season
Total annual
ground water
recharge
[4+5+6+7]
Provision
for natural
discharge
Net annual
ground water
availability
[8-9]
2 3 4 5 6 7 8 9 10
PEDDAPURAM Total (without 1548 876 962 677 4063 406 3657.00
RAMPACHODAVARAM R.Chodavaram Command 0 0 0 0 0 0 0.00
RAMPACHODAVARAM Non-command 1605 68 882 66 2621 247 2374.00
RAMPACHODAVARAM Poor Quality 0 0 0 0 0 0 0.00
RAMPACHODAVARAM Total (without 1605 68 882 66 2621 247 2374.00
RAJAHMUNDRY Rajahmundry Command 505 404 313 227 1449 144 1305.00
RAJAHMUNDRY Non-command 451 28 207 43 729 49 680.00
RAJAHMUNDRY Poor Quality 0 0 0 0 0 0 0.00
RAJAHMUNDRY Total (without PQ) 955 432 521 270 2178 193 1985.00
RAJAHMUNDRY Rajanagaram Command 1418 1126 861 594 3999 285 3714.00
RAJAHMUNDRY Non-command 675 35 311 58 1079 61 1018.00
RAJAHMUNDRY Poor Quality 0 0 0 0 0 0 0.00
RAJAHMUNDRY Total (without PQ) 2094 1161 1172 652 5079 346 4733.00
RAMPACHODAVARAM Rajvommangi Command 0 0 0 0 0 0 0.00
RAMPACHODAVARAM Non-command 2253 202 1151 201 3807 246 3561.00
RAMPACHODAVARAM Poor Quality 0 0 0 0 0 0 0.00
RAMPACHODAVARAM Total (without PQ) 2253 202 1151 201 3807 246 3561.00
PEDDAPURAM Rangampet Command 883 697 528 352 2460 128 2332.00
PEDDAPURAM Non-command 511 37 235 52 835 63 772.00
PEDDAPURAM Poor Quality 0 0 0 0 0 0 0.00
PEDDAPURAM Total (without PQ) 1394 734 763 404 3295 191 3104.00
PEDDAPURAM Rowtulapudi Command 0 0 0 0 0 0 0.00
PEDDAPURAM Non-command 997 644 801 688 3130 294 2836.00
PEDDAPURAM Poor Quality 0 0 0 0 0 0 0.00
PEDDAPURAM Total (without PQ) 997 644 801 688 3130 294 2836.00
KAKINADA Samalkota Command 1016 829 750 227 2822 239 2583.00
KAKINADA Non-command 0 0 0 0 0 0 0.00
KAKINADA Poor Quality 0 0 0 0 0 0 0.00
KAKINADA Total (without PQ) 1016 829 750 227 2822 239 2583.00
ConTec District Irrigation Plan - East Godavari 78
Pradhan Mantri Krishi Sinchayee Yojana Water Resource Department,
Government of Andhra Pradesh
Name of Revenue
divisionMandal
Command/
Non-command
Recharge
from rainfall
during
monsoon
season
Recharge from
other sources
during
monsoon
season
Recharge from
rainfall during
non-monsoon
season
Recharge from
other sources
during non-
monsoon
season
Total annual
ground water
recharge
[4+5+6+7]
Provision
for natural
discharge
Net annual
ground water
availability
[8-9]
2 3 4 5 6 7 8 9 10
PEDDAPURAM Sankavaram Command 0 0 0 0 0 0 0.00
PEDDAPURAM Non-command 1050 588 744 626 3008 301 2707.00
PEDDAPURAM Poor Quality 0 0 0 0 0 0 0.00
PEDDAPURAM Total (without PQ) 1050 588 744 626 3008 301 2707.00
RAJAHMUNDRY Sithanagaram Command 1174 834 693 725 3426 342 3084.00
RAJAHMUNDRY Non-command 45 2 21 4 72 4 68.00
RAJAHMUNDRY Poor Quality 0 0 0 0 0 0 0.00
RAJAHMUNDRY Total (without PQ) 1219 836 714 729 3498 346 3152.00
PEDDAPURAM Thondangi Command 1767 508 946 219 3440 344 3096.00
PEDDAPURAM Non-command 0 0 0 0 0 0 0.00
PEDDAPURAM Poor Quality 0 0 0 0 0 0 0.00
PEDDAPURAM Total (without PQ) 1767 508 946 219 3440 344 3096.00
PEDDAPURAM Tuni Command 1030 488 596 135 2249 183 2066.00
PEDDAPURAM Non-command 534 158 369 165 1226 86 1140.00
PEDDAPURAM Poor Quality 0 0 0 0 0 0 0.00
PEDDAPURAM Total (without PQ) 1564 647 965 300 3476 269 3207.00
KAKINADA U.Kothapalli Command 799 750 629 338 2516 252 2264.00
KAKINADA Non-command 0 0 0 0 0 0 0.00
KAKINADA Poor Quality 0 0 0 0 0 0 0.00
KAKINADA Total (without PQ) 799 750 629 338 2516 252 2264.00
RAMPACHODAVARAM Y.Ramavaram Command 0 0 0 0 0 0 0.00
RAMPACHODAVARAM Non-command 1614 31 879 23 2547 255 2292.00
RAMPACHODAVARAM Poor Quality 0 0 0 0 0 0 0.00
RAMPACHODAVARAM Total (without PQ) 1614 31 879 23 2547 255 2292.00
AMALAPURAM Ainavilli Command 1350 1048 799 843 4040 404 3636.00
AMALAPURAM Non-command 0 0 0 0 0 0 0.00
AMALAPURAM Poor Quality 0 0 0 0 0 0 0.00
AMALAPURAM Total (without PQ) 1350 1048 799 843 4040 404 3636.00
RAJAHMUNDRY Aalamuru Command 1129 891 555 825 3400 340 3060.00
ConTec District Irrigation Plan - East Godavari 79
Pradhan Mantri Krishi Sinchayee Yojana Water Resource Department,
Government of Andhra Pradesh
Name of Revenue
divisionMandal
Command/
Non-command
Recharge
from rainfall
during
monsoon
season
Recharge from
other sources
during
monsoon
season
Recharge from
rainfall during
non-monsoon
season
Recharge from
other sources
during non-
monsoon
season
Total annual
ground water
recharge
[4+5+6+7]
Provision
for natural
discharge
Net annual
ground water
availability
[8-9]
2 3 4 5 6 7 8 9 10
RAJAHMUNDRY Non-command 0 0 0 0 0 0 0.00
RAJAHMUNDRY Poor Quality 0 0 0 0 0 0 0.00
RAJAHMUNDRY Total (without PQ) 1129 891 555 825 3400 340 3060.00
AMALAPURAM Amalapuram Command 811 442 725 412 2390 239 2151.00
AMALAPURAM Non-command 0 0 0 0 0 0 0.00
AMALAPURAM Poor Quality 0 0 0 0 0 0 0.00
AMALAPURAM Total (without PQ) 811 442 725 412 2390 239 2151.00
AMALAPURAM Ambajipet Command 793 612 456 522 2383 238 2145.00
AMALAPURAM Non-command 0 0 0 0 0 0 0.00
AMALAPURAM Poor Quality 0 0 0 0 0 0 0.00
AMALAPURAM Total (without PQ) 793 612 456 522 2383 238 2145.00
AMALAPURAM Atreyapuram Command 1397 1042 563 1161 4163 416 3747.00
AMALAPURAM Non-command 0 0 0 0 0 0 0.00
AMALAPURAM Poor Quality 0 0 0 0 0 0 0.00
AMALAPURAM Total (without PQ) 1397 1042 563 1161 4163 416 3747.00
RAMPACHODAVARAM K.Gangavaram Command 1212 928 732 450 3322 166 3156.00
RAMPACHODAVARAM Non-command 0 0 0 0 0 0 0.00
RAMPACHODAVARAM Poor Quality 0 0 0 0 0 0 0.00
RAMPACHODAVARAM Total (without PQ) 1212 928 732 450 3322 166 3156.00
AMALAPURAM Kothapet Command 1098 1002 516 1065 3681 368 3313.00
AMALAPURAM Non-command 0 0 0 0 0 0 0.00
AMALAPURAM Poor Quality 0 0 0 0 0 0 0.00
AMALAPURAM Total (without PQ) 1098 1002 516 1065 3681 368 3313.00
RAMACHANDRAPURAM Kpuram Command 1519 1533 771 1114 4937 496 4441.00
RAMACHANDRAPURAM Non-command 0 0 0 0 0 0 0.00
RAMACHANDRAPURAM Poor Quality 0 0 0 0 0 0 0.00
RAMACHANDRAPURAM Total (without PQ) 1519 1533 771 1114 4937 494 4443.00
AMALAPURAM Mummidivaram Command 1008 1760 915 927 4610 461 4149.00
AMALAPURAM Non-command 0 0 0 0 0 0 0.00
ConTec District Irrigation Plan - East Godavari 80
Pradhan Mantri Krishi Sinchayee Yojana Water Resource Department,
Government of Andhra Pradesh
Name of Revenue
divisionMandal
Command/
Non-command
Recharge
from rainfall
during
monsoon
season
Recharge from
other sources
during
monsoon
season
Recharge from
rainfall during
non-monsoon
season
Recharge from
other sources
during non-
monsoon
season
Total annual
ground water
recharge
[4+5+6+7]
Provision
for natural
discharge
Net annual
ground water
availability
[8-9]
2 3 4 5 6 7 8 9 10
AMALAPURAM Poor Quality 0 0 0 0 0 0 0.00
AMALAPURAM Total (without PQ) 1008 1760 915 927 4610 461 4149.00
AMALAPURAM P.Gannavaram Command 831 1387 705 830 3753 375 3378.00
AMALAPURAM Non-command 0 0 0 0 0 0 0.00
AMALAPURAM Poor Quality 0 0 0 0 0 0 0.00
AMALAPURAM Total (without PQ) 831 1387 705 830 3753 375 3378.00
AMALAPURAM Ravulapalem Command 1085 1193 447 1386 4111 411 3700.00
AMALAPURAM Non-command 0 0 0 0 0 0 0.00
AMALAPURAM Poor Quality 0 0 0 0 0 0 0.00
AMALAPURAM Total (without PQ) 1085 1193 447 1386 4111 411 3700.00
RAMACHANDRAPURAM Rayavaram Command 771 1078 559 834 3242 324 2918.00
RAMACHANDRAPURAM Non-command 0 0 0 0 0 0 0.00
RAMACHANDRAPURAM Poor Quality 0 0 0 0 0 0 0.00
RAMACHANDRAPURAM Total (without PQ) 771 1078 559 834 3242 324 2918.00
AMALAPURAM Razole Command 811 1023 718 292 2844 284 2560.00
AMALAPURAM Non-command 0 0 0 0 0 0 0.00
AMALAPURAM Poor Quality 0 0 0 0 0 0 0.00
AMALAPURAM Total (without PQ) 811 1023 718 292 2844 284 2560.00
RAMACHANDRAPURAM RCPuram Command 1700 1556 913 1498 5667 567 5100.00
RAMACHANDRAPURAM Non-command 0 0 0 0 0 0 0.00
RAMACHANDRAPURAM Poor Quality 0 0 0 0 0 0 0.00
RAMACHANDRAPURAM Total (without PQ) 1700 1556 913 1498 5667 567 5100.00
AMALAPURAM Allavaram Command 0 0 0 0 0 0 0.00
AMALAPURAM Non-command 0 0 0 0 0 0 0.00
AMALAPURAM Poor Quality 1168 711 1056 612 3547 355 3192.00
AMALAPURAM Total (without PQ) 0 0 0 0 0 0 0.00
AMALAPURAM I.Polavaram Command 0 0 0 0 0 0 0.00
AMALAPURAM Non-command 0 0 0 0 0 0 0.00
AMALAPURAM Poor Quality 1326 623 1227 563 3739 374 3365.00
ConTec District Irrigation Plan - East Godavari 81
Pradhan Mantri Krishi Sinchayee Yojana Water Resource Department,
Government of Andhra Pradesh
Name of Revenue
divisionMandal
Command/
Non-command
Recharge
from rainfall
during
monsoon
season
Recharge from
other sources
during
monsoon
season
Recharge from
rainfall during
non-monsoon
season
Recharge from
other sources
during non-
monsoon
season
Total annual
ground water
recharge
[4+5+6+7]
Provision
for natural
discharge
Net annual
ground water
availability
[8-9]
2 3 4 5 6 7 8 9 10
AMALAPURAM Total (without PQ) 0 0 0 0 0 0 0.00
RAMACHANDRAPURAM Kajuluru Command 0 0 0 0 0 0 0.00
RAMACHANDRAPURAM Non-command 0 0 0 0 0 0 0.00
RAMACHANDRAPURAM Poor Quality 968 1531 1000 1423 4922 492 4430.00
RAMACHANDRAPURAM Total (without PQ) 0 0 0 0 0 0 0.00
KAKINADA Karapa Command 0 0 0 0 0 0 0.00
KAKINADA Non-command 0 0 0 0 0 0 0.00
KAKINADA Poor Quality 930 954 895 790 3569 178 3391.00
KAKINADA Total (without PQ) 0 0 0 0 0 0 0.00
AMALAPURAM Katernikona Command 0 0 0 0 0 0 0.00
AMALAPURAM Non-command 0 0 0 0 0 0 0.00
AMALAPURAM Poor Quality 2151 811 1429 700 5091 509 4582.00
AMALAPURAM Total (without PQ) 0 0 0 0 0 0 0.00
AMALAPURAM Mamidikuduru Command 0 0 0 0 0 0 0.00
AMALAPURAM Non-command 0 0 0 0 0 0 0.00
AMALAPURAM Poor Quality 751 923 690 513 2877 288 2589.00
AMALAPURAM Total (without PQ) 0 0 0 0 0 0 0.00
AMALAPURAM Sakhinetipalli Command 0 0 0 0 0 0 0.00
AMALAPURAM Non-command 0 0 0 0 0 0 0.00
AMALAPURAM Poor Quality 1182 590 1051 545 3368 168 3200.00
AMALAPURAM Total (without PQ) 0 0 0 0 0 0 0.00
KAKINADA Tallarevu Command 0 0 0 0 0 0 0.00
KAKINADA Non-command 0 0 0 0 0 0 0.00
KAKINADA Poor Quality 1212 828 1384 712 4136 414 3722.00
KAKINADA Total (without PQ) 0 0 0 0 0 0 0.00
AMALAPURAM Uppalaguptam Command 0 0 0 0 0 0 0.00
AMALAPURAM Non-command 0 0 0 0 0 0 0.00
AMALAPURAM Poor Quality 1118 1286 1069 837 4310 431 3879.00
AMALAPURAM Total (without PQ) 0 0 0 0 0 0 0.00
ConTec District Irrigation Plan - East Godavari 82
Pradhan Mantri Krishi Sinchayee Yojana Water Resource Department,
Government of Andhra Pradesh
Name of Revenue
divisionMandal
Command/
Non-command
Recharge
from rainfall
during
monsoon
season
Recharge from
other sources
during
monsoon
season
Recharge from
rainfall during
non-monsoon
season
Recharge from
other sources
during non-
monsoon
season
Total annual
ground water
recharge
[4+5+6+7]
Provision
for natural
discharge
Net annual
ground water
availability
[8-9]
2 3 4 5 6 7 8 9 10
AMALAPURAM Malkipuram Command 0 0 0 0 0 0 0.00
AMALAPURAM Non-command 0 0 0 0 0 0 0.00
AMALAPURAM Poor Quality 774 517 745 408 2444 245 2199.00
AMALAPURAM Total (without PQ) 0 0 0 0 0 0 0.00
ConTec District Irrigation Plan - East Godavari 83
Pradhan Mantri Krishi Sinchayee Yojana Water Resource Department,
Government of Andhra Pradesh
Sl. No Mandal Name of work Ayacit in acres Estimate Amount
(Rs in Lakhs)Remarks
1 Rajamundry Rural
Raising and Strengthing of banks on Torredu main canal
from Km 0.00 to 1.00 in torredu village limits of
Rajamundry rural mandal in E.G.District
203.00 35.00 NO REPRESENTAION
2 RajanagaramImprovements to Kothavari tank near kalavacherla village
limits in rajanagaram mandal in E.G.District67.00 40.00 NO REPRESENTAION
3 Gokavaram Improvements to Jagannaikulu tank of Tirumalayapalem
of Gokavaram mandal in E.G.District
170.78 75.00 NO REPRESENTAION
4 Gokavaram Improvements to Isukapallivari tank of Gadulapallem
village of Gokavaram mandal in E.G.District
256.17 82.00 NO REPRESENTAION
5 Korukonda Improvements to Ramaswami tank near narasapuram
village limits of korukonda mandal in E.G.District
43.00 48.00 NO REPRESENTAION
6 AtreyapuramImprovements to Peravaram pumping scheme
1295.00 65.00 NO REPRESENTAION
7 KotananduruSpecial repairs to Billakagedda channel system in
B.H.Kota (V) of Kotananduru (M)200.00 40.00 NO REPRESENTAION
8 GollaproluSpecial repairs to Pedda tank in Chendurthi village of
Gollaprolu Mandal318.00 65.00 NO REPRESENTAION
9 ThondangiConstruction of weir at avagedda in A.V.Nagaram village
in Thondangi mandal243.00 110.00 NO REPRESENTAION
10 RangampetaImprovements to Ura tank of Doddigunta (V) of
Rangampeta(M)80.00 70.00 NO REPRESENTAION
11 PrathipduImprovements to Supply Channel of pedda tank
Sarabavaram (V) limits of Prathipadu(M)163.00 65.00 NO REPRESENTAION
12 PrathipduImprovements to pedda tank in Chintaluru (V) limits of
Prathipadu(M)154.00 70.00 NO REPRESENTAION
13Kotananduru
Special repairs to Diguvala Groyne in Kotananduru (V) of
Kotananduru Mandal593.00 325.00 NO REPRESENTAION
3785.95 1090.00Total of East Godavari District
Annexure 6-5-2-1-1 : List of Works to be proposed under NABARD XXII (East Godavari Dist )
ConTec District Irrigation Plan - East Godavari 84
Pradhan Mantri Krishi Sinchayee Yojana Water Resource Department,
Government of Andhra Pradesh
Annexure 6-5-3-1-1 : Activities under Horticulture Department Name of the District : East Godavari
Drip Sprinkler Total Drip Sprinkler Total Drip Sprinkler Total Drip Sprinkler Total
1 Peddapuram 0 330 250 580 0.00 0.00 0.00 198.00 46.07 244.07 244.07
2 Rangampeta 0 500 300 800 0.00 0.00 0.00 300.00 55.28 355.28 355.28
3 Samalkota 0 40 24 64 0.00 0.00 0.00 24.00 4.42 28.42 28.42
4 Thallarevu 0 10 10 20 0.00 0.00 0.00 6.00 1.84 7.84 7.84
5 Kajuluru 0 15 20 35 0.00 0.00 0.00 9.00 3.69 12.69 12.69
6 Pedapudi 0 30 20 50 0.00 0.00 0.00 18.00 3.69 21.69 21.69
7Rajamahendravaram
(Rural) 0 30 25 55 0.00 0.00 0.00 18.00 4.61 22.61 22.61
8Rajamahendravaram
(Urban) 0 0 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00
9 Rajanagaram 0 350 30 380 0.00 0.00 0.00 210.00 5.53 215.53 215.53
10 Alamuru 0 9 8 17 0.00 0.00 0.00 5.40 1.47 6.87 6.87
11 Kadiam 0 100 25 125 0.00 0.00 0.00 60.00 4.61 64.61 64.61
12 Kapileswarapuram 0 7 10 17 0.00 0.00 0.00 4.20 1.84 6.04 6.04
13 Anaparthi 0 25 10 35 0.00 0.00 0.00 15.00 1.84 16.84 16.84
14 Biccavolu 0 135 10 145 0.00 0.00 0.00 81.00 1.84 82.84 82.84
15 Mandapeta 0 40 10 50 0.00 0.00 0.00 24.00 1.84 25.84 25.84
16 Korukonda 0 250 140 390 0.00 0.00 0.00 150.00 25.80 175.80 175.80
17 Gokavaram 0 110 30 140 0.00 0.00 0.00 66.00 5.53 71.53 71.53
18 Seethanagaram 0 25 50 75 0.00 0.00 0.00 15.00 9.21 24.21 24.21
19 Thondangi 0 200 10 210 0.00 0.00 0.00 120.00 1.84 121.84 121.84
20 Tuni 0 200 100 300 0.00 0.00 0.00 120.00 18.43 138.43 138.43
21 Kotananduru 0 150 50 200 0.00 0.00 0.00 90.00 9.21 99.21 99.21
22 Rowthulapudi 0 200 70 270 0.00 0.00 0.00 120.00 12.90 132.90 132.90
23 Sankhavaram 0 100 50 150 0.00 0.00 0.00 60.00 9.21 69.21 69.21
24 Pithapuram 0 50 25 75 0.00 0.00 0.00 30.00 4.61 34.61 34.61
25 Prathipadu 0 180 50 230 0.00 0.00 0.00 108.00 9.21 117.21 117.21
26 Gollaprolu 0 12 50 62 0.00 0.00 0.00 7.20 9.21 16.41 16.41
27 Ainavilli 0 18 7 25 0.00 0.00 0.00 10.80 1.29 12.09 12.09
28 Allavaram 0 15 25 40 0.00 0.00 0.00 9.00 4.61 13.61 13.61
29 Amalapuram 0 5 10 15 0.00 0.00 0.00 3.00 1.84 4.84 4.84
30 Ambajipeta 0 5 20 25 0.00 0.00 0.00 3.00 3.69 6.69 6.69
31 Atreyapuram 0 80 30 110 0.00 0.00 0.00 48.00 5.53 53.53 53.53
32 I Polavaram 0 10 5 15 0.00 0.00 0.00 6.00 0.92 6.92 6.92
33 Katrenikona 0 10 15 25 0.00 0.00 0.00 6.00 2.76 8.76 8.76
34 Kothapeta 0 55 10 65 0.00 0.00 0.00 33.00 1.84 34.84 34.84
35 Malikipuram 0 110 50 160 0.00 0.00 0.00 66.00 9.21 75.21 75.21
36 Mamidikuduru 0 15 10 25 0.00 0.00 0.00 9.00 1.84 10.84 10.84
37 Mummidivaram 0 10 5 15 0.00 0.00 0.00 6.00 0.92 6.92 6.92
38 Ravulapalem 0 130 15 145 0.00 0.00 0.00 78.00 2.76 80.76 80.76
39 Razole 0 5 10 15 0.00 0.00 0.00 3.00 1.84 4.84 4.84
40 Sakhinetipalle 0 55 10 65 0.00 0.00 0.00 33.00 1.84 34.84 34.84
41 Uppalaguptam 0 15 10 25 0.00 0.00 0.00 9.00 1.84 10.84 10.84
42 Gandepalle 0 500 600 1100 0.00 0.00 0.00 300.00 110.56 410.56 410.56
43 Jaggampeta 0 350 150 500 0.00 0.00 0.00 210.00 27.64 237.64 237.64
44 Kirlampudi 0 100 5 105 0.00 0.00 0.00 60.00 0.92 60.92 60.92
45 Yeleswaram 0 200 80 280 0.00 0.00 0.00 120.00 14.74 134.74 134.74
46 Addateegala 0 190 30 220 0.00 0.00 0.00 114.00 5.53 119.53 119.53
47 Chinturu 150 300 450 0 0 0 90.00 55.28 145.28 0.00 0.00 0.00 145.28
48 Devipatnam 0 10 50 60 0.00 0.00 0.00 6.00 9.21 15.21 15.21
49 Gangavaram 0 35 15 50 0.00 0.00 0.00 21.00 2.76 23.76 23.76
50 Kunavaram 125 100 225 0 0 0 75.00 18.43 93.43 0.00 0.00 0.00 93.43
51 Rajavommangi 0 10 180 190 0.00 0.00 0.00 6.00 33.17 39.17 39.17
52 Rampachodavaram 0 60 150 210 0.00 0.00 0.00 36.00 27.64 63.64 63.64
53 V.R.Puram 40 25 65 0 0 0 24.00 4.61 28.61 0.00 0.00 0.00 28.61
54 Y Ramavaram 0 25 40 65 0.00 0.00 0.00 15.00 7.37 22.37 22.37
55 K.Gangavaram 0 20 15 35 0.00 0.00 0.00 12.00 2.76 14.76 14.76
56 Kakinada (Urban) 0 0 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00
57 Kakinada (Rural) 0 0 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00
58 Karapa 0 15 10 25 0.00 0.00 0.00 9.00 1.84 10.84 10.84
59 Maredumilli 0 10 10 20 0.00 0.00 0.00 6.00 1.84 7.84 7.84
60 P.Gannavaram 0 0 5 5 0.00 0.00 0.00 0.00 0.92 0.92 0.92
61 Pamarru 0 0 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00
62 Ramachandrapuram 0 15 10 25 0.00 0.00 0.00 9.00 1.84 10.84 10.84
63 U.Kothapalli 0 0 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00
64 Yetapaka 0 0 25 25 0.00 0.00 0.00 0.00 4.61 4.61 4.61
65 Rayavaram 0 40 60 100 0.00 0.00 0.00 24.00 11.06 35.06 35.06
Total 315 425 740 5216 3044 8260 189 78 267 3129.60 560.92 3690.52 3958
S.No Name of the Mandal
Physical (Area in Ha.) Financial (Rs. in Lakhs)
2016-17
DPAP Mandals Non DPAP Mandals DPAP Mandals Non DPAP Mandals Estimated
Cost
ConTec District Irrigation Plan - East Godavari 85
Pradhan Mantri Krishi Sinchayee Yojana Water Resource Department,
Government of Andhra Pradesh
Drip Sprinkler Total Drip Sprinkler Total Drip Sprinkler Total Drip Sprinkler Total
1 Peddapuram 0 500 300 800 0.00 0.00 0.00 300.00 55.28 355.28 355.28
2 Rangampeta 0 450 350 800 0.00 0.00 0.00 270.00 64.49 334.49 334.49
3 Samalkota 0 45 35 80 0.00 0.00 0.00 27.00 6.45 33.45 33.45
4 Thallarevu 0 15 25 40 0.00 0.00 0.00 9.00 4.61 13.61 13.61
5 Kajuluru 0 16 32 48 0.00 0.00 0.00 9.60 5.90 15.50 15.50
6 Pedapudi 0 28 18 46 0.00 0.00 0.00 16.80 3.32 20.12 20.12
7Rajamahendravaram
(Rural) 0 45 35 80 0.00 0.00 0.00 27.00 6.45 33.45 33.45
8Rajamahendravaram
(Urban) 0 0 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00
9 Rajanagaram 0 500 60 560 0.00 0.00 0.00 300.00 11.06 311.06 311.06
10 Alamuru 0 15 10 25 0.00 0.00 0.00 9.00 1.84 10.84 10.84
11 Kadiam 0 150 45 195 0.00 0.00 0.00 90.00 8.29 98.29 98.29
12 Kapileswarapuram 0 18 20 38 0.00 0.00 0.00 10.80 3.69 14.49 14.49
13 Anaparthi 0 45 15 60 0.00 0.00 0.00 27.00 2.76 29.76 29.76
14 Biccavolu 0 300 100 400 0.00 0.00 0.00 180.00 18.43 198.43 198.43
15 Mandapeta 0 80 50 130 0.00 0.00 0.00 48.00 9.21 57.21 57.21
16 Korukonda 0 300 160 460 0.00 0.00 0.00 180.00 29.48 209.48 209.48
17 Gokavaram 0 165 50 215 0.00 0.00 0.00 99.00 9.21 108.21 108.21
18 Seethanagaram 0 45 60 105 0.00 0.00 0.00 27.00 11.06 38.06 38.06
19 Thondangi 0 210 60 270 0.00 0.00 0.00 126.00 11.06 137.06 137.06
20 Tuni 0 235 125 360 0.00 0.00 0.00 141.00 23.03 164.03 164.03
21 Kotananduru 0 170 70 240 0.00 0.00 0.00 102.00 12.90 114.90 114.90
22 Rowthulapudi 0 215 95 310 0.00 0.00 0.00 129.00 17.51 146.51 146.51
23 Sankhavaram 0 120 65 185 0.00 0.00 0.00 72.00 11.98 83.98 83.98
24 Pithapuram 0 125 50 175 0.00 0.00 0.00 75.00 9.21 84.21 84.21
25 Prathipadu 0 300 120 420 0.00 0.00 0.00 180.00 22.11 202.11 202.11
26 Gollaprolu 0 28 60 88 0.00 0.00 0.00 16.80 11.06 27.86 27.86
27 Ainavilli 0 50 20 70 0.00 0.00 0.00 30.00 3.69 33.69 33.69
28 Allavaram 0 25 30 55 0.00 0.00 0.00 15.00 5.53 20.53 20.53
29 Amalapuram 0 20 35 55 0.00 0.00 0.00 12.00 6.45 18.45 18.45
30 Ambajipeta 0 15 35 50 0.00 0.00 0.00 9.00 6.45 15.45 15.45
31 Atreyapuram 0 230 60 290 0.00 0.00 0.00 138.00 11.06 149.06 149.06
32 I Polavaram 0 20 15 35 0.00 0.00 0.00 12.00 2.76 14.76 14.76
33 Katrenikona 0 20 20 40 0.00 0.00 0.00 12.00 3.69 15.69 15.69
34 Kothapeta 0 83 37 120 0.00 0.00 0.00 49.80 6.82 56.62 56.62
35 Malikipuram 0 270 85 355 0.00 0.00 0.00 162.00 15.66 177.66 177.66
36 Mamidikuduru 0 60 25 85 0.00 0.00 0.00 36.00 4.61 40.61 40.61
37 Mummidivaram 0 30 25 55 0.00 0.00 0.00 18.00 4.61 22.61 22.61
38 Ravulapalem 0 150 45 195 0.00 0.00 0.00 90.00 8.29 98.29 98.29
39 Razole 0 25 20 45 0.00 0.00 0.00 15.00 3.69 18.69 18.69
40 Sakhinetipalle 0 205 45 250 0.00 0.00 0.00 123.00 8.29 131.29 131.29
41 Uppalaguptam 0 25 30 55 0.00 0.00 0.00 15.00 5.53 20.53 20.53
42 Gandepalle 0 650 610 1260 0.00 0.00 0.00 390.00 112.40 502.40 502.40
43 Jaggampeta 0 600 500 1100 0.00 0.00 0.00 360.00 92.14 452.14 452.14
44 Kirlampudi 0 130 30 160 0.00 0.00 0.00 78.00 5.53 83.53 83.53
45 Yeleswaram 0 390 250 640 0.00 0.00 0.00 234.00 46.07 280.07 280.07
46 Addateegala 0 195 45 240 0.00 0.00 0.00 117.00 8.29 125.29 125.29
47 Chinturu 270 370 640 0 0 0 162.00 68.18 230.18 0.00 0.00 0.00 230.18
48 Devipatnam 0 20 56 76 0.00 0.00 0.00 12.00 10.32 22.32 22.32
49 Gangavaram 0 50 35 85 0.00 0.00 0.00 30.00 6.45 36.45 36.45
50 Kunavaram 140 125 265 0 0 0 84.00 23.03 107.03 0.00 0.00 0.00 107.03
51 Rajavommangi 0 25 184 209 0.00 0.00 0.00 15.00 33.91 48.91 48.91
52 Rampachodavaram 0 75 170 245 0.00 0.00 0.00 45.00 31.33 76.33 76.33
53 V.R.Puram 45 35 80 0 0 0 27.00 6.45 33.45 0.00 0.00 0.00 33.45
54 Y Ramavaram 0 35 45 80 0.00 0.00 0.00 21.00 8.29 29.29 29.29
55 K.Gangavaram 0 30 25 55 0.00 0.00 0.00 18.00 4.61 22.61 22.61
56 Kakinada (Urban) 0 0 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00
57 Kakinada (Rural) 0 0 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00
58 Karapa 0 25 45 70 0.00 0.00 0.00 15.00 8.29 23.29 23.29
59 Maredumilli 0 40 35 75 0.00 0.00 0.00 24.00 6.45 30.45 30.45
60 P.Gannavaram 0 25 35 60 0.00 0.00 0.00 15.00 6.45 21.45 21.45
61 Pamarru 0 40 35 75 0.00 0.00 0.00 24.00 6.45 30.45 30.45
62 Ramachandrapuram 0 40 45 85 0.00 0.00 0.00 24.00 8.29 32.29 32.29
63 U.Kothapalli 0 20 25 45 0.00 0.00 0.00 12.00 4.61 16.61 16.61
64 Yetapaka 0 25 30 55 0.00 0.00 0.00 15.00 5.53 20.53 20.53
65 Rayavaram 0 10 5 15 0.00 0.00 0.00 6.00 0.92 6.92 6.92
Total 455 530 985 7773 4742 12515 273 98 371 4663.80 873.81 5537.61 5908
Physical (Area in Ha.) Financial (Rs. in Lakhs)
S.No Name of the Mandal
2017-18
DPAP Mandals Non DPAP Mandals DPAP Mandals Non DPAP Mandals Estimated
Cost
ConTec District Irrigation Plan - East Godavari 86
Pradhan Mantri Krishi Sinchayee Yojana Water Resource Department,
Government of Andhra Pradesh
Drip Sprinkler Total Drip Sprinkler Total Drip Sprinkler Total Drip Sprinkler Total
1 Peddapuram 0 450 300 750 0.00 0.00 0.00 270.00 55.28 325.28 325.28
2 Rangampeta 0 500 350 850 0.00 0.00 0.00 300.00 64.49 364.49 364.49
3 Samalkota 0 40 40 80 0.00 0.00 0.00 24.00 7.37 31.37 31.37
4 Thallarevu 0 15 25 40 0.00 0.00 0.00 9.00 4.61 13.61 13.61
5 Kajuluru 0 16 32 48 0.00 0.00 0.00 9.60 5.90 15.50 15.50
6 Pedapudi 0 28 18 46 0.00 0.00 0.00 16.80 3.32 20.12 20.12
7Rajamahendravaram
(Rural) 0 45 35 80 0.00 0.00 0.00 27.00 6.45 33.45 33.45
8Rajamahendravaram
(Urban) 0 0 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00
9 Rajanagaram 0 450 60 510 0.00 0.00 0.00 270.00 11.06 281.06 281.06
10 Alamuru 0 15 10 25 0.00 0.00 0.00 9.00 1.84 10.84 10.84
11 Kadiam 0 150 45 195 0.00 0.00 0.00 90.00 8.29 98.29 98.29
12 Kapileswarapuram 0 18 20 38 0.00 0.00 0.00 10.80 3.69 14.49 14.49
13 Anaparthi 0 45 15 60 0.00 0.00 0.00 27.00 2.76 29.76 29.76
14 Biccavolu 0 350 100 450 0.00 0.00 0.00 210.00 18.43 228.43 228.43
15 Mandapeta 0 80 50 130 0.00 0.00 0.00 48.00 9.21 57.21 57.21
16 Korukonda 0 300 160 460 0.00 0.00 0.00 180.00 29.48 209.48 209.48
17 Gokavaram 0 165 50 215 0.00 0.00 0.00 99.00 9.21 108.21 108.21
18 Seethanagaram 0 45 50 95 0.00 0.00 0.00 27.00 9.21 36.21 36.21
19 Thondangi 0 210 60 270 0.00 0.00 0.00 126.00 11.06 137.06 137.06
20 Tuni 0 230 125 355 0.00 0.00 0.00 138.00 23.03 161.03 161.03
21 Kotananduru 0 170 70 240 0.00 0.00 0.00 102.00 12.90 114.90 114.90
22 Rowthulapudi 0 215 100 315 0.00 0.00 0.00 129.00 18.43 147.43 147.43
23 Sankhavaram 0 120 65 185 0.00 0.00 0.00 72.00 11.98 83.98 83.98
24 Pithapuram 0 125 50 175 0.00 0.00 0.00 75.00 9.21 84.21 84.21
25 Prathipadu 0 325 120 445 0.00 0.00 0.00 195.00 22.11 217.11 217.11
26 Gollaprolu 0 28 60 88 0.00 0.00 0.00 16.80 11.06 27.86 27.86
27 Ainavilli 0 50 20 70 0.00 0.00 0.00 30.00 3.69 33.69 33.69
28 Allavaram 0 25 30 55 0.00 0.00 0.00 15.00 5.53 20.53 20.53
29 Amalapuram 0 20 35 55 0.00 0.00 0.00 12.00 6.45 18.45 18.45
30 Ambajipeta 0 15 35 50 0.00 0.00 0.00 9.00 6.45 15.45 15.45
31 Atreyapuram 0 200 60 260 0.00 0.00 0.00 120.00 11.06 131.06 131.06
32 I Polavaram 0 20 15 35 0.00 0.00 0.00 12.00 2.76 14.76 14.76
33 Katrenikona 0 20 20 40 0.00 0.00 0.00 12.00 3.69 15.69 15.69
34 Kothapeta 0 83 37 120 0.00 0.00 0.00 49.80 6.82 56.62 56.62
35 Malikipuram 0 300 85 385 0.00 0.00 0.00 180.00 15.66 195.66 195.66
36 Mamidikuduru 0 60 25 85 0.00 0.00 0.00 36.00 4.61 40.61 40.61
37 Mummidivaram 0 30 25 55 0.00 0.00 0.00 18.00 4.61 22.61 22.61
38 Ravulapalem 0 150 40 190 0.00 0.00 0.00 90.00 7.37 97.37 97.37
39 Razole 0 25 30 55 0.00 0.00 0.00 15.00 5.53 20.53 20.53
40 Sakhinetipalle 0 205 45 250 0.00 0.00 0.00 123.00 8.29 131.29 131.29
41 Uppalaguptam 0 25 30 55 0.00 0.00 0.00 15.00 5.53 20.53 20.53
42 Gandepalle 0 650 610 1260 0.00 0.00 0.00 390.00 112.40 502.40 502.40
43 Jaggampeta 0 600 500 1100 0.00 0.00 0.00 360.00 92.14 452.14 452.14
44 Kirlampudi 0 130 30 160 0.00 0.00 0.00 78.00 5.53 83.53 83.53
45 Yeleswaram 0 390 250 640 0.00 0.00 0.00 234.00 46.07 280.07 280.07
46 Addateegala 0 195 45 240 0.00 0.00 0.00 117.00 8.29 125.29 125.29
47 Chinturu 270 370 640 0 0 0 162.00 68.18 230.18 0.00 0.00 0.00 230.18
48 Devipatnam 0 20 56 76 0.00 0.00 0.00 12.00 10.32 22.32 22.32
49 Gangavaram 0 50 35 85 0.00 0.00 0.00 30.00 6.45 36.45 36.45
50 Kunavaram 140 125 265 0 0 0 84.00 23.03 107.03 0.00 0.00 0.00 107.03
51 Rajavommangi 0 25 184 209 0.00 0.00 0.00 15.00 33.91 48.91 48.91
52 Rampachodavaram 0 75 170 245 0.00 0.00 0.00 45.00 31.33 76.33 76.33
53 V.R.Puram 45 35 80 0 0 0 27.00 6.45 33.45 0.00 0.00 0.00 33.45
54 Y Ramavaram 0 35 45 80 0.00 0.00 0.00 21.00 8.29 29.29 29.29
55 K.Gangavaram 0 30 25 55 0.00 0.00 0.00 18.00 4.61 22.61 22.61
56 Kakinada (Urban) 0 0 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00
57 Kakinada (Rural) 0 0 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00
58 Karapa 0 25 45 70 0.00 0.00 0.00 15.00 8.29 23.29 23.29
59 Maredumilli 0 40 30 70 0.00 0.00 0.00 24.00 5.53 29.53 29.53
60 P.Gannavaram 0 25 30 55 0.00 0.00 0.00 15.00 5.53 20.53 20.53
61 Pamarru 0 40 30 70 0.00 0.00 0.00 24.00 5.53 29.53 29.53
62 Ramachandrapuram 0 40 45 85 0.00 0.00 0.00 24.00 8.29 32.29 32.29
63 U.Kothapalli 0 20 20 40 0.00 0.00 0.00 12.00 3.69 15.69 15.69
64 Yetapaka 0 25 30 55 0.00 0.00 0.00 15.00 5.53 20.53 20.53
65 Rayavaram 0 10 5 15 0.00 0.00 0.00 6.00 0.92 6.92 6.92
Total 455 530 985 7788 4727 12515 273 98 371 4672.80 871.04 5543.84 5915
2018-19
Estimated
Cost
DPAP Mandals Non DPAP Mandals DPAP Mandals Non DPAP Mandals S.No Name of the Mandal
Physical (Area in Ha.) Financial (Rs. in Lakhs)
ConTec District Irrigation Plan - East Godavari 87
Pradhan Mantri Krishi Sinchayee Yojana Water Resource Department,
Government of Andhra Pradesh
Drip Sprinkler Total Drip Sprinkler Total Drip Sprinkler Total Drip Sprinkler Total
1 Peddapuram 0 400 250 650 0.00 0.00 0.00 240.00 46.07 286.07 286.07
2 Rangampeta 0 425 250 675 0.00 0.00 0.00 255.00 46.07 301.07 301.07
3 Samalkota 0 30 20 50 0.00 0.00 0.00 18.00 3.69 21.69 21.69
4 Thallarevu 0 15 25 40 0.00 0.00 0.00 9.00 4.61 13.61 13.61
5 Kajuluru 0 10 10 20 0.00 0.00 0.00 6.00 1.84 7.84 7.84
6 Pedapudi 0 15 5 20 0.00 0.00 0.00 9.00 0.92 9.92 9.92
7Rajamahendravaram
(Rural) 0 10 15 25 0.00 0.00 0.00 6.00 2.76 8.76 8.76
8Rajamahendravaram
(Urban) 0 15 20 35 0.00 0.00 0.00 9.00 3.69 12.69 12.69
9 Rajanagaram 0 400 350 750 0.00 0.00 0.00 240.00 64.49 304.49 304.49
10 Alamuru 0 10 10 20 0.00 0.00 0.00 6.00 1.84 7.84 7.84
11 Kadiam 0 200 20 220 0.00 0.00 0.00 120.00 3.69 123.69 123.69
12 Kapileswarapuram 0 250 150 400 0.00 0.00 0.00 150.00 27.64 177.64 177.64
13 Anaparthi 0 65 35 100 0.00 0.00 0.00 39.00 6.45 45.45 45.45
14 Biccavolu 0 180 80 260 0.00 0.00 0.00 108.00 14.74 122.74 122.74
15 Mandapeta 0 250 125 375 0.00 0.00 0.00 150.00 23.03 173.03 173.03
16 Korukonda 0 165 40 205 0.00 0.00 0.00 99.00 7.37 106.37 106.37
17 Gokavaram 0 200 60 260 0.00 0.00 0.00 120.00 11.06 131.06 131.06
18 Seethanagaram 0 175 50 225 0.00 0.00 0.00 105.00 9.21 114.21 114.21
19 Thondangi 0 125 50 175 0.00 0.00 0.00 75.00 9.21 84.21 84.21
20 Tuni 0 200 100 300 0.00 0.00 0.00 120.00 18.43 138.43 138.43
21 Kotananduru 0 125 75 200 0.00 0.00 0.00 75.00 13.82 88.82 88.82
22 Rowthulapudi 0 125 50 175 0.00 0.00 0.00 75.00 9.21 84.21 84.21
23 Sankhavaram 0 75 50 125 0.00 0.00 0.00 45.00 9.21 54.21 54.21
24 Pithapuram 0 25 10 35 0.00 0.00 0.00 15.00 1.84 16.84 16.84
25 Prathipadu 0 130 70 200 0.00 0.00 0.00 78.00 12.90 90.90 90.90
26 Gollaprolu 0 35 20 55 0.00 0.00 0.00 21.00 3.69 24.69 24.69
27 Ainavilli 0 25 30 55 0.00 0.00 0.00 15.00 5.53 20.53 20.53
28 Allavaram 0 10 35 45 0.00 0.00 0.00 6.00 6.45 12.45 12.45
29 Amalapuram 0 10 35 45 0.00 0.00 0.00 6.00 6.45 12.45 12.45
30 Ambajipeta 0 15 45 60 0.00 0.00 0.00 9.00 8.29 17.29 17.29
31 Atreyapuram 0 200 75 275 0.00 0.00 0.00 120.00 13.82 133.82 133.82
32 I Polavaram 0 50 50 100 0.00 0.00 0.00 30.00 9.21 39.21 39.21
33 Katrenikona 0 15 40 55 0.00 0.00 0.00 9.00 7.37 16.37 16.37
34 Kothapeta 0 25 45 70 0.00 0.00 0.00 15.00 8.29 23.29 23.29
35 Malikipuram 0 250 150 400 0.00 0.00 0.00 150.00 27.64 177.64 177.64
36 Mamidikuduru 0 10 20 30 0.00 0.00 0.00 6.00 3.69 9.69 9.69
37 Mummidivaram 0 45 50 95 0.00 0.00 0.00 27.00 9.21 36.21 36.21
38 Ravulapalem 0 65 80 145 0.00 0.00 0.00 39.00 14.74 53.74 53.74
39 Razole 0 15 30 45 0.00 0.00 0.00 9.00 5.53 14.53 14.53
40 Sakhinetipalle 0 15 30 45 0.00 0.00 0.00 9.00 5.53 14.53 14.53
41 Uppalaguptam 0 20 30 50 0.00 0.00 0.00 12.00 5.53 17.53 17.53
42 Gandepalle 0 500 500 1000 0.00 0.00 0.00 300.00 92.14 392.14 392.14
43 Jaggampeta 0 300 250 550 0.00 0.00 0.00 180.00 46.07 226.07 226.07
44 Kirlampudi 0 100 95 195 0.00 0.00 0.00 60.00 17.51 77.51 77.51
45 Yeleswaram 0 200 150 350 0.00 0.00 0.00 120.00 27.64 147.64 147.64
46 Addateegala 0 100 80 180 0.00 0.00 0.00 60.00 14.74 74.74 74.74
47 Chinturu 50 100 150 0 0 0 30.00 18.43 48.43 0.00 0.00 0.00 48.43
48 Devipatnam 0 30 40 70 0.00 0.00 0.00 18.00 7.37 25.37 25.37
49 Gangavaram 0 25 30 55 0.00 0.00 0.00 15.00 5.53 20.53 20.53
50 Kunavaram 165 80 245 0 0 0 99.00 14.74 113.74 0.00 0.00 0.00 113.74
51 Rajavommangi 0 10 125 135 0.00 0.00 0.00 6.00 23.03 29.03 29.03
52 Rampachodavaram 0 55 200 255 0.00 0.00 0.00 33.00 36.85 69.85 69.85
53 V.R.Puram 15 40 55 0 0 0 9.00 7.37 16.37 0.00 0.00 0.00 16.37
54 Y Ramavaram 0 10 90 100 0.00 0.00 0.00 6.00 16.58 22.58 22.58
55 K.Gangavaram 0 10 15 25 0.00 0.00 0.00 6.00 2.76 8.76 8.76
56 Kakinada (Urban) 0 0 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00
57 Kakinada (Rural) 0 40 25 65 0.00 0.00 0.00 24.00 4.61 28.61 28.61
58 Karapa 0 70 75 145 0.00 0.00 0.00 42.00 13.82 55.82 55.82
59 Maredumilli 0 125 70 195 0.00 0.00 0.00 75.00 12.90 87.90 87.90
60 P.Gannavaram 0 30 60 90 0.00 0.00 0.00 18.00 11.06 29.06 29.06
61 Pamarru 0 50 25 75 0.00 0.00 0.00 30.00 4.61 34.61 34.61
62 Ramachandrapuram 0 55 25 80 0.00 0.00 0.00 33.00 4.61 37.61 37.61
63 U.Kothapalli 0 10 20 30 0.00 0.00 0.00 6.00 3.69 9.69 9.69
64 Yetapaka 0 25 35 60 0.00 0.00 0.00 15.00 6.45 21.45 21.45
65 Rayavaram 0 10 25 35 0.00 0.00 0.00 6.00 4.61 10.61 10.61
Total 230 220 450 6180 4620 10800 138 41 179 3708.00 851.33 4559.33 4738
S.No Name of the Mandal
2019-20
DPAP Mandals Non DPAP Mandals DPAP Mandals Non DPAP Mandals Estimated
Cost
Physical (Area in Ha.) Financial (Rs. in Lakhs)
ConTec District Irrigation Plan - East Godavari 88
Pradhan Mantri Krishi Sinchayee Yojana Water Resource Department,
Government of Andhra Pradesh
Drip Sprinkler Total Drip Sprinkler Total Drip Sprinkler Total Drip Sprinkler Total
1 Peddapuram 0 350 200 550 0.00 0.00 0.00 210.00 36.85 246.85 246.85
2 Rangampeta 0 400 200 600 0.00 0.00 0.00 240.00 36.85 276.85 276.85
3 Samalkota 0 30 20 50 0.00 0.00 0.00 18.00 3.69 21.69 21.69
4 Thallarevu 0 15 25 40 0.00 0.00 0.00 9.00 4.61 13.61 13.61
5 Kajuluru 0 10 10 20 0.00 0.00 0.00 6.00 1.84 7.84 7.84
6 Pedapudi 0 15 5 20 0.00 0.00 0.00 9.00 0.92 9.92 9.92
7Rajamahendravaram
(Rural) 0 10 15 25 0.00 0.00 0.00 6.00 2.76 8.76 8.76
8Rajamahendravaram
(Urban) 0 15 20 35 0.00 0.00 0.00 9.00 3.69 12.69 12.69
9 Rajanagaram 0 350 350 700 0.00 0.00 0.00 210.00 64.49 274.49 274.49
10 Alamuru 0 10 10 20 0.00 0.00 0.00 6.00 1.84 7.84 7.84
11 Kadiam 0 250 20 270 0.00 0.00 0.00 150.00 3.69 153.69 153.69
12 Kapileswarapuram 0 300 150 450 0.00 0.00 0.00 180.00 27.64 207.64 207.64
13 Anaparthi 0 65 35 100 0.00 0.00 0.00 39.00 6.45 45.45 45.45
14 Biccavolu 0 200 80 280 0.00 0.00 0.00 120.00 14.74 134.74 134.74
15 Mandapeta 0 250 125 375 0.00 0.00 0.00 150.00 23.03 173.03 173.03
16 Korukonda 0 200 40 240 0.00 0.00 0.00 120.00 7.37 127.37 127.37
17 Gokavaram 0 200 60 260 0.00 0.00 0.00 120.00 11.06 131.06 131.06
18 Seethanagaram 0 175 50 225 0.00 0.00 0.00 105.00 9.21 114.21 114.21
19 Thondangi 0 125 50 175 0.00 0.00 0.00 75.00 9.21 84.21 84.21
20 Tuni 0 250 95 345 0.00 0.00 0.00 150.00 17.51 167.51 167.51
21 Kotananduru 0 150 75 225 0.00 0.00 0.00 90.00 13.82 103.82 103.82
22 Rowthulapudi 0 125 50 175 0.00 0.00 0.00 75.00 9.21 84.21 84.21
23 Sankhavaram 0 75 50 125 0.00 0.00 0.00 45.00 9.21 54.21 54.21
24 Pithapuram 0 25 10 35 0.00 0.00 0.00 15.00 1.84 16.84 16.84
25 Prathipadu 0 120 70 190 0.00 0.00 0.00 72.00 12.90 84.90 84.90
26 Gollaprolu 0 35 20 55 0.00 0.00 0.00 21.00 3.69 24.69 24.69
27 Ainavilli 0 20 35 55 0.00 0.00 0.00 12.00 6.45 18.45 18.45
28 Allavaram 0 10 35 45 0.00 0.00 0.00 6.00 6.45 12.45 12.45
29 Amalapuram 0 10 35 45 0.00 0.00 0.00 6.00 6.45 12.45 12.45
30 Ambajipeta 0 15 45 60 0.00 0.00 0.00 9.00 8.29 17.29 17.29
31 Atreyapuram 0 225 75 300 0.00 0.00 0.00 135.00 13.82 148.82 148.82
32 I Polavaram 0 50 50 100 0.00 0.00 0.00 30.00 9.21 39.21 39.21
33 Katrenikona 0 15 40 55 0.00 0.00 0.00 9.00 7.37 16.37 16.37
34 Kothapeta 0 25 45 70 0.00 0.00 0.00 15.00 8.29 23.29 23.29
35 Malikipuram 0 225 150 375 0.00 0.00 0.00 135.00 27.64 162.64 162.64
36 Mamidikuduru 0 15 20 35 0.00 0.00 0.00 9.00 3.69 12.69 12.69
37 Mummidivaram 0 45 50 95 0.00 0.00 0.00 27.00 9.21 36.21 36.21
38 Ravulapalem 0 65 80 145 0.00 0.00 0.00 39.00 14.74 53.74 53.74
39 Razole 0 15 30 45 0.00 0.00 0.00 9.00 5.53 14.53 14.53
40 Sakhinetipalle 0 15 30 45 0.00 0.00 0.00 9.00 5.53 14.53 14.53
41 Uppalaguptam 0 20 30 50 0.00 0.00 0.00 12.00 5.53 17.53 17.53
42 Gandepalle 0 450 425 875 0.00 0.00 0.00 270.00 78.31 348.31 348.31
43 Jaggampeta 0 300 250 550 0.00 0.00 0.00 180.00 46.07 226.07 226.07
44 Kirlampudi 0 130 95 225 0.00 0.00 0.00 78.00 17.51 95.51 95.51
45 Yeleswaram 0 225 150 375 0.00 0.00 0.00 135.00 27.64 162.64 162.64
46 Addateegala 0 150 80 230 0.00 0.00 0.00 90.00 14.74 104.74 104.74
47 Chinturu 50 100 150 0 0 0 30.00 18.43 48.43 0.00 0.00 0.00 48.43
48 Devipatnam 0 30 40 70 0.00 0.00 0.00 18.00 7.37 25.37 25.37
49 Gangavaram 0 25 30 55 0.00 0.00 0.00 15.00 5.53 20.53 20.53
50 Kunavaram 185 80 265 0 0 0 111.00 14.74 125.74 0.00 0.00 0.00 125.74
51 Rajavommangi 0 10 125 135 0.00 0.00 0.00 6.00 23.03 29.03 29.03
52 Rampachodavaram 0 55 200 255 0.00 0.00 0.00 33.00 36.85 69.85 69.85
53 V.R.Puram 15 40 55 0 0 0 9.00 7.37 16.37 0.00 0.00 0.00 16.37
54 Y Ramavaram 0 10 90 100 0.00 0.00 0.00 6.00 16.58 22.58 22.58
55 K.Gangavaram 0 10 15 25 0.00 0.00 0.00 6.00 2.76 8.76 8.76
56 Kakinada (Urban) 0 0 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00
57 Kakinada (Rural) 0 40 25 65 0.00 0.00 0.00 24.00 4.61 28.61 28.61
58 Karapa 0 70 75 145 0.00 0.00 0.00 42.00 13.82 55.82 55.82
59 Maredumilli 0 125 65 190 0.00 0.00 0.00 75.00 11.98 86.98 86.98
60 P.Gannavaram 0 30 60 90 0.00 0.00 0.00 18.00 11.06 29.06 29.06
61 Pamarru 0 50 25 75 0.00 0.00 0.00 30.00 4.61 34.61 34.61
62 Ramachandrapuram 0 55 25 80 0.00 0.00 0.00 33.00 4.61 37.61 37.61
63 U.Kothapalli 0 20 20 40 0.00 0.00 0.00 12.00 3.69 15.69 15.69
64 Yetapaka 0 25 35 60 0.00 0.00 0.00 15.00 6.45 21.45 21.45
65 Rayavaram 0 10 25 35 0.00 0.00 0.00 6.00 4.61 10.61 10.61
Total 250 220 470 6340 4440 10780 150 41 191 3804.00 818.16 4622.16 4813
Physical (Area in Ha.) Financial (Rs. in Lakhs)
S.No Name of the Mandal
2020-21
DPAP Mandals Non DPAP Mandals DPAP Mandals Non DPAP Mandals Estimated
Cost
ConTec District Irrigation Plan - East Godavari 89
Pradhan Mantri Krishi Sinchayee Yojana Water Resource Department,
Government of Andhra Pradesh
Drip Sprinkler Total Drip Sprinkler Total Drip Sprinkler Total Drip Sprinkler Total
1 Peddapuram 0 0 0 2113.48 1372.38 3485.86 0.00 0.00 0.00 1268.09 252.89 1520.98 1520.98
2 Rangampeta 0 0 0 2435.37 1665.41 4100.78 0.00 0.00 0.00 1461.22 306.89 1768.11 1768.11
3 Samalkota 0 0 0 194.37 139.7 334.07 0.00 0.00 0.00 116.62 25.74 142.36 142.36
4 Thallarevu 0 0 0 70.4 110 180.4 0.00 0.00 0.00 42.24 20.27 62.51 62.51
5 Kajuluru 0 0 0 67 104.77 171.77 0.00 0.00 0.00 40.20 19.31 59.51 59.51
6 Pedapudi 0 0 0 116 66.99 182.99 0.00 0.00 0.00 69.60 12.34 81.94 81.94
7Rajamahendravaram
(Rural) 0 0 0 154.25 130.35 284.6 0.00 0.00 0.00 92.55 24.02 116.57 116.57
8Rajamahendravaram
(Urban) 0 0 0 30 40 70 0.00 0.00 0.00 18.00 7.37 25.37 25.37
9 Rajanagaram 0 0 0 2149.76 851.85 3001.61 0.00 0.00 0.00 1289.86 156.97 1446.83 1446.83
10 Alamuru 0 0 0 61.36 48 109.36 0.00 0.00 0.00 36.82 8.84 45.66 45.66
11 Kadiam 0 0 0 856.53 155 1011.53 0.00 0.00 0.00 513.92 28.56 542.48 542.48
12 Kapileswarapuram 0 0 0 594.12 350 944.12 0.00 0.00 0.00 356.47 64.49 420.97 420.97
13 Anaparthi 0 0 0 250.96 112.05 363.01 0.00 0.00 0.00 150.58 20.65 171.22 171.22
14 Biccavolu 0 0 0 1191.72 370 1561.72 0.00 0.00 0.00 715.03 68.18 783.21 783.21
15 Mandapeta 0 0 0 711.86 360 1071.86 0.00 0.00 0.00 427.12 66.34 493.45 493.45
16 Korukonda 0 0 0 1279.12 579.23 1858.35 0.00 0.00 0.00 767.47 106.73 874.21 874.21
17 Gokavaram 0 0 0 862.54 256.51 1119.05 0.00 0.00 0.00 517.52 47.27 564.79 564.79
18 Seethanagaram 0 0 0 473.54 288.94 762.48 0.00 0.00 0.00 284.12 53.24 337.37 337.37
19 Thondangi 0 0 0 890.45 230 1120.45 0.00 0.00 0.00 534.27 42.38 576.65 576.65
20 Tuni 0 0 0 1166.61 582.84 1749.45 0.00 0.00 0.00 699.97 107.40 807.37 807.37
21 Kotananduru 0 0 0 791.5 351.33 1142.83 0.00 0.00 0.00 474.90 64.74 539.64 539.64
22 Rowthulapudi 0 0 0 914.84 377.43 1292.27 0.00 0.00 0.00 548.90 69.55 618.45 618.45
23 Sankhavaram 0 0 0 505.84 286.43 792.27 0.00 0.00 0.00 303.50 52.78 356.28 356.28
24 Pithapuram 0 0 0 357.21 145.53 502.74 0.00 0.00 0.00 214.33 26.82 241.14 241.14
25 Prathipadu 0 0 0 1109.87 439.06 1548.93 0.00 0.00 0.00 665.92 80.91 746.83 746.83
26 Gollaprolu 0 0 0 142.13 240.33 382.46 0.00 0.00 0.00 85.28 44.29 129.56 129.56
27 Ainavilli 0 0 0 169.14 112.81 281.95 0.00 0.00 0.00 101.48 20.79 122.27 122.27
28 Allavaram 0 0 0 85 160.15 245.15 0.00 0.00 0.00 51.00 29.51 80.51 80.51
29 Amalapuram 0 0 0 66.17 150 216.17 0.00 0.00 0.00 39.70 27.64 67.34 67.34
30 Ambajipeta 0 0 0 65 182.79 247.79 0.00 0.00 0.00 39.00 33.68 72.68 72.68
31 Atreyapuram 0 0 0 943.77 304.52 1248.29 0.00 0.00 0.00 566.26 56.11 622.38 622.38
32 I Polavaram 0 0 0 150.44 137.95 288.39 0.00 0.00 0.00 90.26 25.42 115.68 115.68
33 Katrenikona 0 0 0 82.66 135 217.66 0.00 0.00 0.00 49.60 24.88 74.47 74.47
34 Kothapeta 0 0 0 276.31 175.06 451.37 0.00 0.00 0.00 165.79 32.26 198.04 198.04
35 Malikipuram 0 0 0 1204.15 520 1724.15 0.00 0.00 0.00 722.49 95.82 818.31 818.31
36 Mamidikuduru 0 0 0 162.42 100 262.42 0.00 0.00 0.00 97.45 18.43 115.88 115.88
37 Mummidivaram 0 0 0 160.59 158.45 319.04 0.00 0.00 0.00 96.35 29.20 125.55 125.55
38 Ravulapalem 0 0 0 563.57 260.79 824.36 0.00 0.00 0.00 338.14 48.06 386.20 386.20
39 Razole 0 0 0 85.8 120 205.8 0.00 0.00 0.00 51.48 22.11 73.59 73.59
40 Sakhinetipalle 0 0 0 509.08 160 669.08 0.00 0.00 0.00 305.45 29.48 334.93 334.93
41 Uppalaguptam 0 0 0 108.2 130 238.2 0.00 0.00 0.00 64.92 23.96 88.88 88.88
42 Gandepalle 0 0 0 2899.39 3007.74 5907.13 0.00 0.00 0.00 1739.63 554.24 2293.87 2293.87
43 Jaggampeta 0 0 0 2245.33 1678.86 3924.19 0.00 0.00 0.00 1347.20 309.36 1656.56 1656.56
44 Kirlampudi 0 0 0 593.56 256.85 850.41 0.00 0.00 0.00 356.14 47.33 403.47 403.47
45 Yeleswaram 0 0 0 1438.7 917.87 2356.57 0.00 0.00 0.00 863.22 169.14 1032.36 1032.36
46 Addateegala 0 0 0 852.9 286.61 1139.51 0.00 0.00 0.00 511.74 52.81 564.55 564.55
47 Chinturu 793 1323 2116 0 0 0 476.08 243.74 719.82 0.00 0.00 0.00 719.82
48 Devipatnam 0 0 0 113.05 268.82 381.87 0.00 0.00 0.00 67.83 49.54 117.37 117.37
49 Gangavaram 0 0 0 204.16 147.17 351.33 0.00 0.00 0.00 122.50 27.12 149.62 149.62
50 Kunavaram 761 510 1271 0 0 0 456.77 93.98 550.75 0.00 0.00 0.00 550.75
51 Rajavommangi 0 0 0 83.62 868.35 951.97 0.00 0.00 0.00 50.17 160.01 210.18 210.18
52 Rampachodavaram 0 0 0 325.78 915.33 1241.11 0.00 0.00 0.00 195.47 168.67 364.14 364.14
53 V.R.Puram 160 179 339 0 0 0 96.00 33.05 129.05 0.00 0.00 0.00 129.05
54 Y Ramavaram 0 0 0 120.06 319.99 440.05 0.00 0.00 0.00 72.04 58.96 131.00 131.00
55 K.Gangavaram 0 0 0 100 95 195 0.00 0.00 0.00 60.00 17.51 77.51 77.51
56 Kakinada (Urban) 0 0 0 0 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00
57 Kakinada (Rural) 0 0 0 80 50 130 0.00 0.00 0.00 48.00 9.21 57.21 57.21
58 Karapa 0 0 0 205 250 455 0.00 0.00 0.00 123.00 46.07 169.07 169.07
59 Maredumilli 0 0 0 340 210 550 0.00 0.00 0.00 204.00 38.70 242.70 242.70
60 P.Gannavaram 0 0 0 110 190 300 0.00 0.00 0.00 66.00 35.01 101.01 101.01
61 Pamarru 0 0 0 180 115 295 0.00 0.00 0.00 108.00 21.19 129.19 129.19
62 Ramachandrapuram 0 0 0 205 150 355 0.00 0.00 0.00 123.00 27.64 150.64 150.64
63 U.Kothapalli 0 0 0 70 85 155 0.00 0.00 0.00 42.00 15.66 57.66 57.66
64 Yetapaka 0 0 0 100 155 255 0.00 0.00 0.00 60.00 28.56 88.56 88.56
65 Rayavaram 0 0 0 80 120 200 0.00 0.00 0.00 48.00 22.11 70.11 70.11
Total 1715 2012 3727 34470 22549 57019 1029 371 1400 20682 4155 24837 26237
Physical (Area in Ha.) Financial (Rs. in Lakhs)
Total
S.No Name of the Mandal Estimated
Cost
DPAP Mandals Non DPAP Mandals DPAP Mandals Non DPAP Mandals
ConTec District Irrigation Plan - East Godavari 90
Pradhan Mantri Krishi Sinchayee Yojana Water Resource Department,
Government of Andhra Pradesh
Sl. No Interventions proposed Unit
Unit cost with
limitation to
(Rs) Assistance
Area Estimate Amount
(Rs in Crores)
1 Water conservation works
1.1 Lining to farm ponds One Pond 50% limited to
Rs 25000
1.2
Supply of water carrying pipes for reducing
conveyance loses & water lifting devices (Diesel
engibe with pumpsets)
One unit 50% limited to
10000
1.3
Construction of percolation tanks/ secondary
storage structures with protective cence,
connectivity from canal/ ;erinnial source,
distributory/outlet, inlet and silt detention
structures at feasible locations
Cum
50% of cost
limited to
350/Cum
1124.00 1.12
2 Drought proofing measures
3 Insitu moisture conservation
3.1
insitu moisture conservation retention -
cinservation furrows, trenching around the
boundary of the fields
Ha
3.2 Custom hiring of Pivot irrigation One No
3.3 To RD department under specific request LS 1.00
4Artificial groundwater recharge through GW
Department
4.1 Through injection wells One No
4.2 Through soakpits around borewells One No
0.00 1124.00 2.12
Sl. No Head Year NoAmount in
Lakhs
1 B2 trainings 120 6.00
2 B4 exposure visits
3 B5 capacity buildings
4 B9 - Information Dissemination
5 All other activities
1 B2 trainings 546 27.30
2 B4 exposure visits 12 8.64
3 B5 capacity buildings 180 9.00
4 B9 - Information Dissemination 5 2.50
5 All other activities 5 1.00
1 B2 trainings 275 13.75
2 B4 exposure visits 8 1.78
3 B5 capacity buildings 36 1.80
4 B9 - Information Dissemination 5 2.50
5 All other activities 5 1.00
1 B2 trainings 275 13.75
2 B4 exposure visits 8 1.78
3 B5 capacity buildings 36 1.80
4 B9 - Information Dissemination 5 2.50
5 All other activities 5 1.00
1 B2 trainings 275 13.75
2 B4 exposure visits 8 1.78
3 B5 capacity buildings 36 1.80
4 B9 - Information Dissemination 5 2.50
5 All other activities 5 1.00
2017-18
2018-19
2019-20
2020-21
Annexure 6-5-3-1-2 : Action plan - Other Intervaentions - Agriculture Department
Total of East Godavari District
2016-175 5.00
Annexure 6-5-3-1-3 : Budget plan for ATMA
ConTec District Irrigation Plan - East Godavari 91
Pradhan Mantri Krishi Sinchayee Yojana Water Resource Department,
Government of Andhra Pradesh
Estimated Cost of the Project : 58645.00 Lakhs
Area in Ha : 277744.00 Ha
Sl no.
A. GROSS RECEIPT
1 Gross Value of farm produce 111021.12
2 Dung Receipts @ 4.5% - 3.0% of the fodder expenditure) 3330.63
3 Total (A) : Gross Receipt (1+2) 114351.76
B. EXPENSES :
1 Expenditure on seeds 2715.38
2 Expenditure on manure etc. 12548.80
3 Expenditure on hired labour (human and bullock) 27509.14
Without Project With Project
4 Fodder expenses 15% of Item A.1 10% of Item A.1 11102.11
5 Depriciation on implements 2.7% of Item A.1 2.7% of Item A.1 2997.57
6 Share and Cash rent 5% of Item A.1 3% of Item A.1 3330.63
7 Land Revenue 2% of Item A.1 2% of Item A.1 2220.42
8 Total (B) : Expenses (1 to 7) 62424.06
C NET VALUE OF PRODUCE
1 Total Gross Receipts (A.3) 114351.76
2 Less : Total Expenses (B.8) 62424.06
3 Net Value of Produce (C) : (1-2) 51927.69
D ANNUAL AGRICULTURAL BENEFITS
151927.69
2 Net Annual Benefits (D) : (1-2) 51927.69
E ANNUAL COST :
12639.025
22345.8
3 Annual operation & maintenance charges @ 1175/Ha of CCA 4000 Ha) 3263.49
4
5
6 Power charges for lift irrigation @ ……% per Ha (applicable to lift irrigation)
7 Total (E) : Annual costs (1 to 7) 8248.32
BENEFIT COST RATION = D3 : Annual Benefits / Annual Cost = (…….. / ..…..) 6.30
Depriciation of the project @4% of the cost of the project for 25 years life of the project
Depriciation of the pumping sysytem @8.33% of the estimated cost of the pumping
system assuming life of the system as 12 years (Applicable to lift irrigation)
Depriciation of the raising mains @...... % of the estimated cost of the raising mains
assuming life of the system as … years (applicable to lift irrigation)
Item Description
Annexure 6-6-1 : Calaculation of Benefit Cost ratio (BCR)
Net Value with project
Interest on capital @ 4.5% (Estimated total cost of the project including cost of the
project including cost of land development)
ConTec District Irrigation Plan - East Godavari 92