GPS Orbits Jim Rohde, Bob Dulaney, Bill Kass, Steve Hilla National Geodetic Survey 2005 Convocation October 24-28, 2005 Silver Spring, Maryland Holiday Inn 8777 Georgia Avenue

GPS Orbits

Embed Size (px)

DESCRIPTION

GPS Orbits. Jim Rohde, Bob Dulaney, Bill Kass, Steve Hilla National Geodetic Survey 2005 Convocation October 24-28, 2005 Silver Spring, Maryland Holiday Inn 8777 Georgia Avenue. Improvements to Orbit Processing in 2004/2005. - PowerPoint PPT Presentation

Citation preview

Page 1: GPS Orbits

GPS Orbits

Jim Rohde, Bob Dulaney, Bill Kass, Steve Hilla

National Geodetic Survey 2005 ConvocationOctober 24-28, 2005Silver Spring, MarylandHoliday Inn8777 Georgia Avenue

Page 2: GPS Orbits

Improvements to Orbit Processing in 2004/2005

• Stars Procedure – Added redundant baselines by processing sub-networks and combining their normal equations

• Integer phase ambiguity fixing

• Moved production from HP to SUN x86 platform

• Orbit adjustment done more rigorously (ADJEPH)

• Fixed pole tide sign error

• Improved sub-daily EOP model

• Absolute Antenna Phase Center Offsets and PCVs

• Monuments as Reference Points (future)

• Updated Ocean Tide Loading Model (future)

Page 3: GPS Orbits
Page 4: GPS Orbits
Page 5: GPS Orbits

Multiyear CORS

• Motivation– To provide long-term consistent solution of all data– Results used for CORS coordinates and velocities –

realization of NSRS– Implement recent improvements in GPS Data

Processing

• Time Span – 1994 through 2005

• Reference Frame IGb00 – IGS realization of ITRF00

Page 6: GPS Orbits

Multiyear CORS (cont.)

• Procedure

– Streamline processing to fit with routine operations and avoid repeated reprocessing

– Step 1: Daily Global Solution – orbits, EOPs, IGS and some CORS site positions; solutions stacked weekly for the IGS

– Step 2: Daily CORS Solution – CORS and some North American IGS site positions; solutions stacked weekly for NAREF

– Step 3: Daily Multiyear Solution – combination of all normal equations for orbits, EOPs, and all IGS and CORS site positions

Page 7: GPS Orbits

Multiyear CORS (cont.)

– Step 4: Weekly Multiyear Solution – Stack 7 daily multiyear solutions and archive results

– Step 5: Full Multiyear solution – Stack all weeks together to solve for site velocities

• Schedule – Begin processing January 2006, complete in 3-6 months