Grace Bible Church Grace Bible Church Ministry Goals & Master Plan Presentation

Grace Bible Church Ministry Goals & Master Plan Presentation

Embed Size (px)

Citation preview

Grace Bible ChurchGrace Bible Church

Ministry Goals & Master Plan Presentation

Ministry Goals & Plan

3 Areas of Ministry

• Worship• Discipleship• Evangelism

Ministry Goals: 2007

• Discipleship Plan• Enhancements to Corporate Worship

• Music Ministry• Audio/Visual Enhancements• Seating• Visitors• Children

• Training for Biblical Counseling• Written Resources

Ministry Goals: 1-2 years

• Biblical Counseling Ministry• Cross-cultural Outreach• Hospital Ministry• Intern Program• Missionary Coordinator

Ministry Goals: 2-5 years

• Bookstore & Resource Center• Bible Institute• Special Events & Conferences• Missionary Trips• College Ministry

Facilities Impact of Ministry Plan

Discipleship Plan

• Time Horizon: 2007• Facilities Impact: None - Normal

facilities usage

Enhancements to Corporate Worship

• Time Horizon: 2007• Facilities Impact:

• Musician space at front of sanctuary• Sound system improvements & relocation• Improved seating• Improved space & ability to receive visitors• Improved fellowship space (foyer)• Cry room, parent room

Training for Biblical Counseling

• Time Horizon: 2007• Facilities Impact: None – Normal

facilities usage

Written Resources

• Time Horizon: 2007• Facilities Impact:

• Display space• Library expansion for shelves & tables• Possible initial start of a bookstore

Counseling Ministry

• Time Horizon: 1-2 years• Facilities Impact:

• Establishment of office space

Cross-cultural Ministry

• Time Horizon: 1-2 years• Facilities Impact:

• Classroom space• Potential storage space

Hospital Ministry

• Time Horizon: 1-2 years• Facilities impact: none

Intern Program

• Time Horizon: 1-2 years• Facilities impact:

• Office space with shelving

Missionary Coordinator

• Time Horizon: 1-2 years• Facilities impact:

• Office space (long term)

Bookstore & Resource Center

• Time Horizon: 2-5 years• Facilities impact:

• Dedicated room with storage

Bible Institute

• Time Horizon: 2-5 years• Facilities Impact:

• Classrooms• Study space• Enhanced library

Special Events & Conferences

• Time Horizon: 2-5 years• Facilities impact:

• Large group meeting space• Classroom/seminar space• Large kitchen capacity• Sufficient parking

College Ministry

• Time Horizon: 2-5 years• Facilities impact:

• Large meeting area

Preliminary Priority of Projects

THE FINAL DECISION ON THE ORDER OF PROJECTS SHOULD BE GUIDED BY THE MINISTRY PLAN WHICH IS FOUNDED ON

OUR CORE BELIEFS AS PASTOR TERRY TAUGHT DURING THE SUNDAYS OF APRIL.

Plat Approval ProcessSurvey $1500

Preliminary plat & zoning application

$2000

Seek waiver from requirement to extend water & sewer services along Hwy 4 property line

Could save $20,000

Plat Approval Process

• Related Issues:• Plat approval must be complete before we

can obtain a building permit to expand the facilities “footprint” (any new structure)

Sanctuary Building Projects

New seating $15,000

Lighting improvements $15,000

Update “look” of sanctuary $25,000

Fees & contingency $10,000

Move sound room to back wall of sanctuary

Unknown

Musician space Unknown

Improve library & begin bookstore Unknown

Sanctuary Building Projects

• Related issues:• No permit required• Consider a re-evaluation of sanctuary

building space in order to best achieve the goals of the Ministry Plan

Sidewalk Project Connecting the Buildings

Sidewalk $3.00 per square foot

Cover over sidewalks Approx. $5.00 per square foot

Re-locate A/C units Approx. $2500

Rework fellowship hall into foyer space

Unknown

Fees & contingency Approx. $5000

Sidewalk Project Connecting the Building

• Related issues:• Requires a “patio cover” permit – minimal

impact

Hwy 4 Entrance Project

Entrance, parking, sidewalk

$90,000

Landscaping $15,000

Sign $10,000

Fees & contingency $10,000

Hwy 4 Entrance Project

• Related issues:• Building permit not required• Hwy 4 entrance requires TXDOT approval• Requires city engineering approval• Requires certain amount of landscaping• May require paved fire lane to fire hydrant

Ministries Building Completion Project

Classrooms $40,000

Kitchen completion $65,000

Fire suppression sprinkler system $55,000

Gym floor $25,000

Masonry on 30% of exterior $25,000

Smoke alarm system $7500

Storage/pantry finish out $3000

Professional fees $5000

Contingency $20,000

Ministries Building Completion Projects

• Related issues:• Requires interior finish out permit• Plans must be reviewed by state

accessibility board• An elevator might be a requirement

($50,000-60,000)• Kitchen exhaust system could increase

estimate

Welcome Center Project

• Requires a building permit• Must be preceded by the plat approval• Will require 80% masonry over all

buildings• Could require some retro-fit of

sprinklers in sanctuary building• Cost estimate: Approx. $675,000

Long Term Sanctuary Project

• Cost estimate: Approx. $1,500,000

Architectural Presentation

Q&A

Where We Go From Here

Form a Building Committee

Formulate How the Building Committee Will:

• Work with Scott project by project to achieve best results

• Use the Ministry Plan/Core Values to guide their decisions/prioritize projects

• Consider city ordinance/codes and project cost estimates in prioritizing projects

• Use others in the body to make “working groups” for portions of each project

• Report to the elders

The Building Fund is Currently at: $73,684.47