Grace Church Property Commi1ee Report to the Vestry
14 October, 2013
1 Property Commi1ee Report to the Vestry v3
A subcommi*ee of the Vestry, with responsibili7es to:
1. Look beyond the current budget year to assess needs, review alterna7ves, conduct analysis associated with repair or capital investment projects iden7fied in the near-‐, mid-‐ and long-‐term (,e.g., out to ten years). In effect this helps to focus the Junior Warden on execu7ng the current budget and responding to unplanned events during his/her term.
2. Assist the Vestry in establishing priori7es, 7ming, and costs associated with improvements to parish property. In effect, the Property Commi*ee performs long range planning for the Vestry’s considera7on.
3. Involve the parish in thinking about growth paths to support our ministries. In effect, the Property Commi*ee is postured to help parish members understand and take interest in financially suppor7ng investments in our parish infrastructure.
4. Present an annual recommenda7on with priori7es to the Vestry in September/ October 7meframe regarding capital improvements that should be considered for funding in the budget for the following year.
5. Establish a set of useable files that provide the status and history of service contracts, major expenditures, and infrastructure. (Added Mar 2013)
Purpose
2 Property Commi1ee Report to the Vestry
v3
Membership
• 9 members — rotaAng 3 off/3 on each year; includes present and former Junior Wardens and Grace Episcopal School reps.
2013 2014 2015 2016
Frank Waskowicz O1o Wolf Phil Smith
Amy Barron Mike Barron Rick Eudy (GES)
Deborah Crabtree KrisAne Hesse Rob Cheron (GES)
Jr Warden New Member New Member
The commi5ee is chaired by a former Junior Warden who assumes that posiAon in his/her second year off the Vestry. E.g., Frank Waskowicz leaves the commi5ee at year’s end. Amy Barron is Chair in 2014. Deborah Crabtree is Chair in 2015.
3 Property Commi1ee Report to the Vestry
v3
Our Property
In mid-‐year there had been discussions about selling this parcel of land. Did not occur. Thanks to Cathy Puskar and KrisAne Hesse for professional advice and assistance.
Le1ers are “in the works’ to neighbors along Russell Road cauAoning them not to trespass.
4 Property Commi1ee Report to the Vestry
v3
1. Look beyond the current budget year to assess needs, review alterna7ves, conduct analysis associated with repair or capital investment projects iden7fied in the near-‐, mid-‐ and long-‐term (,e.g., out to ten years). In effect this helps to focus the Junior Warden on execu7ng the current budget and responding to unplanned events during his/her term.
Phil Smith worked with a highly detailed Excel spreadsheet suggested by Jean Reed 4-‐6 years ago, to produce a working document focused on major systems. While sAll incomplete, and built on best “guesAmates” of costs and replacement dates, the display nonetheless makes clear the absolute necessity of husbanding a significant reserve within the vestry’s Capital Improvement Fund.
Area Served Guideline Year Last Recommended ITEM Useful Life Replaced Cost Exterior Slate Roof (6,000 sf) Sanctuary 75-80 1954 $26,000.00 Repairs to broken tiles 2012 $1,000 Annual Fake Slate Roof (1,000 sf) Link 20-25 1991 $3,182.00 Repairs to broken tiles 2012 $1,000 Annual Flat Roof (15,000 sf) School Wing 20-30 2010 $37,500.00 Warranty repair of coping 2012 Façade Waterproofing Complex 07-10 $50,000 Windows (67 double hung) Complex 25-30 2011 $137,000.00 Stained Glass Sanctuary 50-75 1954 $74,000 Water Management & Control General Property $25,000.00 Parking Lot - Repair, Seal, Restripe 3-4 yrs 2003 $5-12,000 - Mill entire parking lot 7-12 yrs 1994 $35,900.00 New Handicapped Parking $100,000.00 Columbarium 1994 - 48 in-ground niches 2013 $3,500 - 149 interior niches $75,000 Fence with Neighbors on Russell $10,000
The orange entries are very near term expenses based on year of installaAon and expected useful life
Property Commi1ee Report to the Vestry v3 5
Landscape Landscaping - Play Fields General Property
Landscaping - Fencing General Property Stockade Chiller enclosure 13-18 1994 $3,000.00 Perimeter - chain link Playground 20-30 Perimeter - wooden 13-18 Perimeter - iron/decrative 13-18 2001 Landscaping - Retaining Walls 20-30 Stone Back Fields 20-30 2001-2007 Wood Ties 13-18 2001 Landscaping - Sidewalks General Property 40-50 1954 Landscaping - Exterior Signage 20-25 $5,000.00
Landscaping - Exterior Lighting 15-20 $750.00
HVAC Energy Management Control System Complex 20 1994 $25,000.00 Water - Boiler Heating system boiler Complex 25-30 2008 $30,000.00 Domestic water heater Complex 15-20 1995 $3,000.00 hot water pump Complex 15-20 1994 $3,000.00 Domestic HW Storage Tank Boiler Room 20 2001 $5,000.00 Domestic HW Recirculating Pump Boiler Room 15 2001 $1,000.00 Split System 20 Ton Sanctuary 20-25 1998 $50,000.00 Choir Loft Heat Pump Chior loft 10-15 2012 $6,600.00 Fan Coil Units (7 units) Merrow Hall 30 1994 $20,000.00 Chiller - 60 Ton Merrow Hall 20-25 1994 $75,000.00 AHU #1/CU-1 7.5 Ton Link Building 20-25 1994 $25,000.00 AHU #2/CU-2 10 Ton Link Building 20-25 1994 $30,000.00 AHU #3/CU-3 4 Ton Link Building 20-25 1994 $12,000.00 AHU #4/CU-4 10 Ton Link Building 20-25 1994 $20,000.00 AHU #5 15 Ton Classrooms 30 2013 $10,000.00 AHU #6 6 Ton Kitchen 30 1994 $10,000.00 AHU #7 7.5 Ton 3rd Floor Link 15-20 1994 $16,000.00 Split System HP Choir Loft 15-20 2012 $10,000.00
There is strong probability that we could require $21,000 in HVAC capital expenses in 2014.
Also, our energy management control system is old and inefficient. InstallaAon of a modern system should be a high priority.
There is virtual certainty that an addiAonal $160,000 will be required to replace aging components of our HVAC system between now and 2019.
Some of these costs will be shared with the school.
6 Property Commi1ee Report to the Vestry
v3
The orange entries are very near term expenses based on year of installaAon and expected useful life
Life Support Fire Control System Complex 20-30 1991 $70,000.00 Elevator - Link Link 20-30 1980 $75,000.00 Electronic Door Detectors $4,983.00 Emergency Telephone $1,712.00 Power Unit Replacement $24,349.00 Door Open/close mechanisms $24,600.00 Elevator - Sanctuary Sanctuary 20-30 1994 $75,000.00
Kitchen - Merrow Hall 3rd Floor 1959 3 compartment Sink 3rd Floor 1959 $1,500.00 Exhaust Hood 3rd Floor 1994 $8,000.00 Refrigerator/Freezer 3rd Floor 10-15 $8,500.00 Ice machine 3rd Floor 10-15 2009 $5,000.00 Dishwasher 3rd Floor 20-25 2011 $5,000.00 Coffee Maker 3rd Floor 07-10 2009 $2,500.00 Ovens - stacked 3rd Floor 30-40 1959 $5,000 Oven/Stove 3rd Floor 30-40 1959 $5,000 Ktchen - St. Marks 2nd Floor 1994 Refridgerator/Freezer 2nd Floor 10-15 $500.00 Countertop and cabinets 2nd Floor 1994 Kitchenette - 1st Floor 1st Floor 1994 Countertop and cabinets 1st Floor 1994
We have a proposal to accommodate a number of safety features on Merrow Hall elevator.
The commi1ee is considering whether money might be be1er spent replacing the current elevator.
7 Property Commi1ee Report to the Vestry
v3
The orange entries are very near term expenses based on year of installaAon and expected useful life
Bathrooms 1st Floor M&W @ school Toilets & Stalls 1st Floor 1994 $4,000.00 Countertops/Sinks 1st Floor 1994 $800.00 Tile work 1st Floor 1994 Walls, Ceilings 1st Floor 1994 1st Floor M&W @ Undercroft Toilets & Stalls 1st Floor 1994 $2,000.00 Countertops/Sinks 1st Floor 1994 Tile work 1st Floor 1994 Walls, Ceilings 1st Floor 1994 2nd Floor M&W@ Sacristy Toilets & Stalls 2nd Floor 1994 $4,000.00 Countertops/Sinks 2nd Floor 1994 $1,000.00 Tile work 2nd Floor 1994 Walls, Ceilings 2nd Floor 1994 3rd Floor Unisex Toilets & Stalls 3rd Floor 1994 $500.00 Countertops/Sinks 3rd Floor 1994 $500.00 Tile work 3rd Floor 1994 Walls and Ceilings 3rd Floor 1994
General Building
Interior Signage
Lighting Sanctuary/Sacristy New LED 2013 Merrow Hall Auditorium 1994 Classrooms 1994 Offices and Library 1994 Corridors/Common Spaces 1994
Our bathroom faciliAes are perfectly serviceable.
From Ame to Ame concerns about internal signage have arisen with the suggesAon that we hire a signage expert to design a system for us.
For a Ame the school was pursuing a new lighAng system for the auditorium.
New LED lighAng has been installed in the sanctuary.
The commi1ee had considered the wider issue of upgrading lighAng throughout our property. The issue has been tabled for the present. The school – with whom costs would be shared – believes we can stay with old technologies for the near term. We are working on a building standard for replacement fixtures so we are prepared when the ballasts fail.
8 Property Commi1ee Report to the Vestry
v3
The orange entries are very near term expenses based on year of installaAon and expected useful life
Merrow Hall Auditorium Paint 3rd Floor 2011 $3,000 Ceiling 3rd Floor 1994 Floors 3rd Floor 1994 Classrooms
Paint 2d/3rd floor 2010 Ceiling 2d/3rd floor 1994 Floors 2d/3rd floor 1994 St John Room 3rd Floor Paint 3rd Floor 2012 Ceiling 3rd Floor 1994 Floors 3rd Floor 2012 Offices/Library Paint 1st/2nd Floor 2010 Ceiling 1st/2nd Floor 1994 Floors 1st/2nd Floor 1994 Corridors/Common Spaces Paint complex 2010/12 Ceiling complex 1994 Floors complex 1994 Sanctuary/Sacristy Paint Sanctuary 1958/94 Ceiling Sanctuary 1958/94 Flagstone Sanctuary.Nave Resealed 1958/94 Hardwood Nave Refinished 2010 $3,900
Sound System Sanctuary/Nave 2011 $30,000.00 Audio Recording $3,000 Video Recording $17,000
Maintenance budget responds to immediate needs for Paint, ceilings and floors.
Several parish organizaAons have considered installing audio and video recording capabiliAes in the Nave.
9 Property Commi1ee Report to the Vestry
v3
2. Assist the Vestry in establishing priori7es, 7ming, and costs associated with improvements to parish property. In effect, the Property Commi*ee performs long range planning for the Vestry’s considera7on.
The commi1ee has worked as a useful sounding board for the Junior Warden throughout the year. It’s clear to all that she has borne a heavy load and accomplished a great deal – revisiAng service contracts, taking a fresh look at HVAC maintenance and rediscovering our control system, genng involvement of the parish in clearing out our jungle, assessing and correcAng structural issues, etc.
The commi1ee has also coordinated with Lee Meeks in iniAaAng his long range planning venture.
10 Property Commi1ee Report to the Vestry
v3
3. Involve the parish in thinking about growth paths to support our ministries. In effect, the Property Commi*ee is postured to help parish members understand and take interest in financially suppor7ng investments in our parish infrastructure.
In April, the Commi1ee sponsored a Forum event, with the announced objecAve of discussing near and long-‐term challenges regarding the maintenance and growth of our parish physical plant. Mike Barron chaired the meeAng. Lee Meeks was invited to a1end to respond to quesAons about strategic planning.
Topics that were discussed included lighAng, HVAC, and the need for a long term facility maintenance plan
11 Property Commi1ee Report to the Vestry
v3
4. Present an annual recommenda7on with priori7es to the Vestry in September/ October 7meframe regarding capital improvements that should be considered for funding in the budget for the following year.
1. Plan on likely capital expenditures for failing HVAC components in 2013 ($21,000)
2. Install a new energy management control system to achieve effecAve and trustworthy means of controlling our HVAC systems with an esAmated payback of 10-‐12% annual energy savings. Cost shared with the school. ($25,000)
3. Plan to repair/refurbish the Merrow Hall elevator, or replace it enArely over the next two years.
4. Replace the ovens and stove in the kitchen ($10,000)
Lastly, the commi1ee believes that we need to take a fresh look at the possibility of hiring a building manager who would work with the Junior Warden in meeAng the vestry’s objecAves. Such a posiAon would provide funcAonal conAnuity over Ame, ensuring more efficiency. Cost could be shared with the school. It might also be possible to hire a person that shares his Ame with several parishes. That might make it affordable.
Property Commi1ee Report to the Vestry v3
Parking Lot - Repair, Seal, Restripe 3-4 yrs 2003 $5-12,000 HVAC Energy Management Control System Complex 20 1994 $25,000.00 Domestic water heater Complex 15-20 1995 $3,000.00 Hot water pump Complex 15-20 1994 $3,000.00 AHU#7 7.5 Ton 3rd Floor Link 15-20 1994 $16,000 Elevator Link 20-30 1991 $75,000 Oven and Stove Kitchen 30-40 1959 $10,000 Interior Signage Complex Extended Audio Recording Loft/Nave $3,000
12
5. Establish a set of useable files that provide the status and history of service contracts, major expenditures, and infrastructure. (Added Mar 2013)
Amy Barron, O1o Wolf and Deborah Crabtree consolidated Junior Warden materials in a searchable file in the parish office.
All blueprints and plans were collected and hung on hanging files donated by KrisAne Hesse in the New Narthex undercrop.
13 Property Commi1ee Report to the Vestry
v3