• Dominik• Dustin• Jonathon

12/19/2011

Page 2: Graduate Project A brief on K12 and Higher Education IT planning Dominik Dustin Jonathon 12/19/2011 Graduate Project1

Graduate Project

2

Agenda Graduate Objectives Research Objectives

K12 Bloomer ACT-Department UW-Stout

Question Conclusion

12/19/2011

Page 3: Graduate Project A brief on K12 and Higher Education IT planning Dominik Dustin Jonathon 12/19/2011 Graduate Project1

Graduate Project

3

Graduate Objectives Use the information system design

principles represented in the course to analyze information system design processes for at least two similar enterprises

Identify similarities and differences of the design processes

Synthesize the design principles of the two enterprises into a best practices information system design model

12/19/2011

Page 4: Graduate Project A brief on K12 and Higher Education IT planning Dominik Dustin Jonathon 12/19/2011 Graduate Project1

Graduate Project

4

The research objectivesUniversity of WI – Stout

ACT departmentBloomer School District

- K12

12/19/2011

Page 5: Graduate Project A brief on K12 and Higher Education IT planning Dominik Dustin Jonathon 12/19/2011 Graduate Project1

Graduate Project

5

Why those schools? Two similar enterprises that our group

had connections too Extensive experience working in both

areas

12/19/2011

Page 6: Graduate Project A brief on K12 and Higher Education IT planning Dominik Dustin Jonathon 12/19/2011 Graduate Project1

6

The ContactsJerry Addie Tim Fehr

Jerry is the Lab Manager for the Apparel Communication

Technology Department

Tim Fehr is a Senior IT director for CESA 10 and

Head IT technician of Bloomer School District

12/19/2011

Graduate Project

Page 7: Graduate Project A brief on K12 and Higher Education IT planning Dominik Dustin Jonathon 12/19/2011 Graduate Project1

Graduate Project

7

The methodology of the questions

12/19/2011

Page 8: Graduate Project A brief on K12 and Higher Education IT planning Dominik Dustin Jonathon 12/19/2011 Graduate Project1

Graduate Project

8

1. In the IT department, how many workers are full-time or part-time?

ACT Department Bloomer K12

In the ACT department are working:• two full-time employees,• three professors (full-

time)• four to five part-time

students

In Bloomer K12 are working:

• One full-time employee• Two part-time IT staff• One Tech Coordinator

12/19/2011

Page 9: Graduate Project A brief on K12 and Higher Education IT planning Dominik Dustin Jonathon 12/19/2011 Graduate Project1

Graduate Project

9

2. Before one is hired, what are the processes of hiring a new worker for a certain job? Testing or training required?

ACT Department Bloomer K12

• Teachers• Long process

(~6 months)• Tender the position• Wait for applications• Compare responses

with requirements• Phone interviews• Personal interviews• Make decisions

• Students are direct hired by Kevin

• Long process (~6 months)

• Tender the position• Wait for applications• Compare responses with

requirements• Personal interviews• Make decisions

12/19/2011

Page 10: Graduate Project A brief on K12 and Higher Education IT planning Dominik Dustin Jonathon 12/19/2011 Graduate Project1

Graduate Project

10

3. What training happens when the new employee is at work the first day? Anything that needs to happen?

ACT Department Bloomer K12

• The new faculty members will receive a lot of paperwork about their new position

• should know what he have to do from the interviews and the papers.

• Students employees are getting advised what they have to do by Kevin.

Time spend to familiarizing him with :• VLANS,• networking

infrastructures, servers• Where things happened

such as DNS, OD and AD masters, Web, Mail, Content Filtering, Spam Filtering, backups, etc.

12/19/2011

Page 11: Graduate Project A brief on K12 and Higher Education IT planning Dominik Dustin Jonathon 12/19/2011 Graduate Project1

Graduate Project

11

4. What kind of budget is the department held to for the fiscal year?

ACT Department Bloomer K12

A lot of budget cuttings and revivals for the resources in the whole IT-Department. • Overall IT-Department

have a budget around $400.000.

• The Budget for the ACT Department is about $150.000 or $160.000, depends on the semester and year.  

• The Tech Coordinator handles the district’s IP budget and doesn’t tell us what is budgeted. 

• We turn in requisitions and needs assessments and they are reviewed and approved, rejected or sent back for revision.

12/19/2011

Page 12: Graduate Project A brief on K12 and Higher Education IT planning Dominik Dustin Jonathon 12/19/2011 Graduate Project1

Graduate Project

12

5. What’s the process of upgrade when new technology is needed?

ACT Department Bloomer K12

• When it is economic cost effective to just replace broken parts to get it faster they do it,

• When it is ineffective they replace it with a whole new system.

• A lot of ‘band aids’ on equipment

• getting by with old hardware dedicated to one job which it can handle well

• things running far longer than a business would deem safe or sound

12/19/2011

Page 13: Graduate Project A brief on K12 and Higher Education IT planning Dominik Dustin Jonathon 12/19/2011 Graduate Project1

Graduate Project

13

6. What happens when the equipment you already have fails? Buy the same or something better?

ACT Department Bloomer K12

• If there is still warranty they use the warranty

• If not, depends on what is broke and what does it cost to fix it

• In complex cases they rather buy new equipment then try to fix it

• This totally depends on the degree of the failure and the perceived importance that the administrators put on that item’s function. 

• It also depends on how spectacularly something fails. 

12/19/2011

Page 14: Graduate Project A brief on K12 and Higher Education IT planning Dominik Dustin Jonathon 12/19/2011 Graduate Project1

Graduate Project

14

7. How many hours on average does the personnel work?

ACT Department Bloomer K12

• full time = 45-50hrs a week.

• Monday to Friday from 7.15am to 5.30pm. (weekday)

• Students work 10 to 12 hours  

• 45-50hrs -- 715-530 – • 10-15mins for lunch

Jeremy and Kevin the same too. 

• Students -- 10-12 hours

• Tim -- two 8 hour days and some overtime. 

• Could live at the district and not get caught up.

• New full time tech is putting in 45-50 hours a week

12/19/2011

Page 15: Graduate Project A brief on K12 and Higher Education IT planning Dominik Dustin Jonathon 12/19/2011 Graduate Project1

Graduate Project

15

8. When replacing equipment, where does this extra equipment go?

ACT Department Bloomer K12

• Try to reuse equipment as long as possible

• Either use it or parts for replacement

• Other Option• give it to the classes

to "explore" or "play" with it.

• Old equipment is repurposed until it can serve no useful function.  

• Recycling candy colored iMacs

• Repurposing G4 iBooks and eMacs into serviceable internet stations

• PCs recycled faster then MACS

12/19/2011

Page 16: Graduate Project A brief on K12 and Higher Education IT planning Dominik Dustin Jonathon 12/19/2011 Graduate Project1

Graduate Project

16

9. What kind of IT or networking equipment has been implemented into the network here?

ACT Department Bloomer K12

• Servers, Computers and Laptops either are HP or Apple (depends on Needs)

• Network infrastructure mainly Cisco components

• Software used is OS10/X, Windows XP-7, Unix and Linux Systems

• Older Systems running Linux 

• Greatest needs = aging infrastructure

• Switches are slower than 75% of our machines 

• covered with 10/100 Cisco switches

• New machines are relying on wireless connections

12/19/2011

Page 17: Graduate Project A brief on K12 and Higher Education IT planning Dominik Dustin Jonathon 12/19/2011 Graduate Project1

Graduate Project

17

10. What kind of computers and how many do you have to work with?

ACT Department Bloomer K12

• total around 350 Computers

• general supplier contracts• Hewlett Packard and

Apple computers.• Apple Computers are

35%• HP PCs are 40%

• process of switching from Macs to PCs• still have over 200 Macs in

use• 2 PC Labs at HS; 1 at MS

• updated with 28 PCs each. 

• 90 PC netbooks at High School in portable carts, • 70 netbooks at the Middle

School.   .

12/19/2011

Page 18: Graduate Project A brief on K12 and Higher Education IT planning Dominik Dustin Jonathon 12/19/2011 Graduate Project1

Graduate Project

18

11. What is the design of the network infrastructure at the location?

ACT Department Bloomer K12

• not responsible for the network design

• dependent from the IT-Department and ASK5000

• it is a star topography • large gigabit switch

and an older Cisco switch (but not everywhere)

• currently tries to get CAT-6 Ethernet cables everywhere

• three buildings connected by fiber optics through the local telco.  • All buildings are using

Cisco 10/100 switches (over 10 years old now).  • However, all buildings

also have up to a 50 meg connection to the Internet when needed.

12/19/2011

Page 19: Graduate Project A brief on K12 and Higher Education IT planning Dominik Dustin Jonathon 12/19/2011 Graduate Project1

Graduate Project

19

12. How many locations is your department in-charge of?

ACT Department Bloomer K12

• Apparel• GCM -- Graphic

Communications Management

• ITM -- Information Technology Management

• ICT -- Information and Communication Technologies 

• Photo

• 5 - three buildings,

• District Office

12/19/2011

Page 20: Graduate Project A brief on K12 and Higher Education IT planning Dominik Dustin Jonathon 12/19/2011 Graduate Project1

Graduate Project

20

The Design Process Differences & Similarities The biggest difference is the amount of funding that

each place of education receives.  both receive money from the state,

higher education is capable of higher returns budgets for k12 much lower

Both have mixed equipment PCs/Macs ~350 @ ATC ~500 @ Bloomer

Full and part time worker at both ACT: two full time technicians, 2 full time, 3 Professors

and 4-5 Students K12: Three technicians, only one in full time

12/19/2011

Page 21: Graduate Project A brief on K12 and Higher Education IT planning Dominik Dustin Jonathon 12/19/2011 Graduate Project1

Graduate Project

21

The Design Process Differences & Similarities Differences in the quality of equipment

ACT has a superior upgrade path Bloomer needs to use all of it’s equipment so long as it’s

functioning Qualifications of their technicians

Stout can hire the best and the brightest and pay them accordingly, full time. 

Bloomer has to go with what they can afford.  Stout has an extensive process whereas Bloomer is pretty much cut and dry job-hiring process.

When external help is necessary ACT can grab help from another it-departments in stout

instead of hiring external contractors Bloomer on the other hand has to hire people from other

companies like CESA 10 or Corporate Technologies.  

12/19/2011

Page 22: Graduate Project A brief on K12 and Higher Education IT planning Dominik Dustin Jonathon 12/19/2011 Graduate Project1

Graduate Project

22

Questions?