Graham, Cory (SD)
From: Mario Poveda Sent: Friday, October 18, 2019 12:12 PMTo: Graham, Cory (SD)Cc: Jason Mann; Raichura, Ash; IrvinSubject: BRRMF - Cell 32 - Notification to MSD for use authorizationAttachments: L90011_BRADY LANDFILL QA-QC PACKAGE.pdf;
15-0107-014-_DensityTesting2019.pdf; BRRMF - Cell 32 - Atterberg Limits and HC test for two samples.pdf; Proctor_123314413_KGS Group Inc _Client_14413_1_20190807.pdf
Importance: High
Good afternoon Ms. Graham. Construction of the new Cell 32 at Brady Road Resource Management Facility is almost complete. The last critical component is the installation of the filter geotextile on top of the drainage gravel layer and it is expected to be completed by Tuesday October 22. I am attaching the complete QA/QC report from Titan Environmental for the HDPE geomembrane and geotechnical laboratory results for the Engineered Clay Liner for your reference. As shown in the design drawings, the complete seepage barrier at the cell includes (from top‐down):
8 oz. non‐woven geotextile (filter) 300 mm of drainage gravel (comprised of two different 150 mm layers) 16 oz. non‐woven geotextile (cushion) 60 mil HDPE geomembrane 150 mm of re‐compacted clay liner
The perforated HDPE pipe has also been installed, as well as the vertical manhole for extracting the leachate via a compressed air driven pump. The City is requesting authorization to commence the use of the new cell for landfilling purposes. Please review this information and let us know your decision at your earliest convenience. Thank you for your time. Regards, Mario Poveda M.Sc., P.Eng. E N V I R O N M E N T A L E N G I N E E R
P 204‐896‐1209 ext 286 [email protected] | kgsgroup.com3rd Floor ‐ 865 Waverley St Winnipeg, MB R3T 5P4
This email (including any attachments) is only for the use of the intended recipient(s). It may contain information or material that is confidential, proprietary or privileged. Any unauthorized use, distribution, disclosure or copying of this email is strictly prohibited. If you believe that you received this email in error, please notify us immediately by reply email or telephone and permanently delete this email without making or retaining a hard copy.
L9011
BRADY ROAD LANDFILL CELL 32 HDPE & GEOTEXTILE AS‐BUILT
WINNIPEG, MB
COMPLETED 15‐OCT‐19
P1
P2
P3
P4
P5
P6
P7
P8
P9
P10
P11
P12
P13
P14
P15
P16
P17
P18
P64
P63
P62
P61
P60
P59
P58
P57
P56
P55
P54
P53
P52
P51
P50
P49
P48
P47
P19
P21
P23
P24
P26
P28
P30
P20
P22
P25
P27
P29
P31
P32
P34
P33
P35
P36
P38
P41
P43
P44
P45
P46
P37
P40
P42
P39
R
1
R
2
R
3
R
4
R
5
R
6
R
7
R
8
R
9
R
1
0
R
1
1
R
1
2
R
1
3
R
1
4
R
1
5
R
1
6
R
1
7
R
1
8
R
1
9
R
2
0
R
2
1
R
2
2
R
2
3
R
2
4
R
2
5
R
2
6
R
2
7
R
2
8
R
2
9
R
3
0
R
3
1
R
3
2R
3
3
R
3
4
R
3
5
R
3
6
R
3
7
R
3
8
R
3
8
R
3
9
R
3
9
R
4
0
NO EXISTING MATERIAL
FOR TIE-IN, AREA TO BE
CLAY CAPPED BY OTHERS.
D
T
1
D
T
2
D
T
3
D
T
4
D
T
5
D
T
6
D
T
7
D
T
8
D
T
9
D
T
1
0
D
T
1
1
D
T
1
2
D
T
1
3
D
T
1
4
D
T
1
5
D
T
1
6
D
T
1
7
x
4
X
1
X
2
X
3
DWG TITLE:
CLIENT:
TITAN ENVIRONMENTAL CONTAINMENT LTD.
DWG NO.:
REV. NO.:
001
PROJ. NO.:
DATE:
DRAWN BY:
REV. BY:
SCALE:
NTS
EA
NOT APPROVED FOR CONSTRUCTION
DWG TITLE:
CLIENT:
N
LEGEND:
ANCHOR TRENCH/ TIE-IN
DWG TITLE: HDPE LINER AS-BUILT
CLIENT:
TITAN ENVIRONMENTAL CONTAINMENT LTD.
DWG NO.:
REV. NO.:
001
000
PROJ. NO.:
DATE:
DRAWN BY:
REV. BY:
SCALE:
NTS
EA
NOT APPROVED FOR CONSTRUCTION
DWG TITLE:
CLIENT:
EA
LEGEND:
ANCHOR TRENCH/ TIE-IN
Report any discrepancies to Titan Environmental Containment Ltd.Do not
scale dimensions from drawing. Do not modify drawing, re-use it, or use it
for purposes other than those intended at the time of its preparation
without prior written permission from Titan Environmental Containment Ltd.
Final Panel Locations to be installed at the descretion of the TITAN field
Superintendant as see fit to existing site conditions..
BRADY ROAD LANDFILL CELL 32
15-OCT-19
L9011
CITY OF WINNIPEG
G29
G30 G31
G33G32
G34
G35 G36
G38G37
G39
G40 G41
G43G42
G44
G45 G46
G48G47
G49
G50 G51
G53G52
G54
G55 G56
G58G57
G59
G60 G61
G63G62
G64
G65 G66
G68G67
G69
G70 G71
G73G72
G74
G1
G2
G3
G4
G5
G6
G7
G8
G9
G10
G11
G12
G13
G14
G15
G16
G17
G18
G19
G20
G21
G22
G23
G24
G25
G26
G27
G28
DWG TITLE:
CLIENT:
TITAN ENVIRONMENTAL CONTAINMENT LTD.
DWG NO.:
REV. NO.:
PROJ. NO.:
DATE:
DRAWN BY:
REV. BY:
SCALE:
NTS
EA
NOT APPROVED FOR CONSTRUCTION
DWG TITLE:
CLIENT:
N
LEGEND:
ANCHOR TRENCH/ TIE-IN
DWG TITLE:GEOTEXTILE LINER AS-BUILT
CLIENT:
TITAN ENVIRONMENTAL CONTAINMENT LTD.
DWG NO.:
REV. NO.:
002
000
PROJ. NO.:
DATE:
DRAWN BY:
REV. BY:
SCALE:
NTS
EA
NOT APPROVED FOR CONSTRUCTION
DWG TITLE:
CLIENT:
EA
LEGEND:
ANCHOR TRENCH/ TIE-IN
Report any discrepancies to Titan Environmental Containment Ltd.Do not
scale dimensions from drawing. Do not modify drawing, re-use it, or use it
for purposes other than those intended at the time of its preparation
without prior written permission from Titan Environmental Containment Ltd.
Final Panel Locations to be installed at the descretion of the TITAN field
Superintendant as see fit to existing site conditions..
BRADY ROAD LANDFILL CELL 32
15-OCT-19
L9011
CITY OF WINNIPEG
PANEL PLACEMENT LOG
DATE
LEN
GTH
WID
TH
DD/MMM/YY
08/09/2019 G1 TE-E116 300 15
08/09/2019 G2 TE-E116 300 15
08/09/2019 G3 TE-E116 300 15
08/09/2019 G4 TE-E116 300 15
08/09/2019 G5 TE-E116 300 15
08/09/2019 G6 TE-E116 300 15
08/09/2019 G7 TE-E116 300 15
08/09/2019 G8 TE-E116 300 15
08/09/2019 G9 TE-E116 300 15
08/09/2019 G10 TE-E116 300 15
08/09/2019 G11 TE-E116 300 15
08/09/2019 G12 TE-E116 300 15
08/09/2019 G13 TE-E116 300 15
08/09/2019 G14 TE-E116 300 15
08/09/2019 G15 TE-E116 300 15
08/09/2019 G16 TE-E116 300 15
08/09/2019 G17 TE-E116 300 15
08/09/2019 G18 TE-E116 300 15
08/09/2019 G19 TE-E116 300 15
08/09/2019 G20 TE-E116 300 15
08/09/2019 G21 TE-E116 300 15
08/09/2019 G22 TE-E116 300 15
08/09/2019 G23 TE-E116 300 15
08/09/2019 G24 TE-E116 300 15
08/09/2019 G25 TE-E116 300 15
08/09/2019 G26 TE-E116 300 15
08/09/2019 G27 TE-E116 300 15
08/09/2019 G28 TE-E116 300 15
08/09/2019 G29 TE-E116 240 15
08/09/2019 G30 TE-E116 180 15
08/09/2019 G31 TE-E116 60 15
08/09/2019 G32 TE-E116 120 15
08/09/2019 G33 TE-E116 120 15
08/09/2019 G34 TE-E116 240 15
08/09/2019 G35 TE-E116 180 15
08/09/2019 G36 TE-E116 60 15
08/09/2019 G37 TE-E116 120 15
08/09/2019 G38 TE-E116 120 15
08/09/2019 G39 TE-E116 240 15
Project Name: Brady Landfill Product Type: Geotextile 16oz
PAN
EL N
UMBE
R
ROLL
NUM
BER
CO
MM
ENTS
FEET
PANEL PLACEMENT LOG
DATE
LEN
GTH
WID
TH
DD/MMM/YY
Project Name: Brady Landfill Product Type: Geotextile 16oz
PAN
EL N
UMBE
R
ROLL
NUM
BER
CO
MM
ENTS
FEET
08/09/2019 G40 TE-E116 180 15
08/09/2019 G41 TE-E116 60 15
08/09/2019 G42 TE-E116 120 15
08/09/2019 G43 TE-E116 120 15
08/09/2019 G44 TE-E116 240 15
08/09/2019 G45 TE-E116 180 15
08/09/2019 G46 TE-E116 60 15
08/09/2019 G47 TE-E116 120 15
08/09/2019 G48 TE-E116 120 15
08/09/2019 G49 TE-E116 240 15
08/09/2019 G50 TE-E116 180 15
08/09/2019 G51 TE-E116 60 15
08/09/2019 G52 TE-E116 120 15
08/09/2019 G53 TE-E116 120 15
08/09/2019 G54 TE-E116 240 15
08/09/2019 G55 TE-E116 180 15
08/09/2019 G56 TE-E116 60 15
08/09/2019 G57 TE-E116 120 15
08/09/2019 G58 TE-E116 120 15
08/09/2019 G59 TE-E116 240 15
08/09/2019 G60 TE-E116 180 15
08/09/2019 G61 TE-E116 60 15
08/09/2019 G62 TE-E116 120 15
08/09/2019 G63 TE-E116 120 15
08/09/2019 G64 TE-E116 240 15
08/09/2019 G65 TE-E116 180 15
08/09/2019 G66 TE-E116 60 15
08/09/2019 G67 TE-E116 120 15
08/09/2019 G68 TE-E116 120 15
08/09/2019 G69 TE-E116 240 15
08/09/2019 G70 TE-E116 180 15
08/09/2019 G71 TE-E116 60 15
08/09/2019 G72 TE-E116 120 15
08/09/2019 G73 TE-E116 120 15
08/09/2019 G74 TE-E116 240 15
PANEL PLACEMENT LOG
DATE
LEN
GTH
WID
TH
DD/MMM/YY
05/09/2019 P1 44345 68 23 Double Sided Textured
05/09/2019 P2 44345 68 23 Double Sided Textured
05/09/2019 P3 44345 69 23 Double Sided Textured
05/09/2019 P4 44345 69 23 Double Sided Textured
05/09/2019 P5 44345 70 23 Double Sided Textured
05/09/2019 P6 44345 71 23 Double Sided Textured
05/09/2019 P7 44345 72 23 Double Sided Textured
05/09/2019 P8 44347 74 23 Double Sided Textured
05/09/2019 P9 44347 74 23 Double Sided Textured
05/09/2019 P10 44347 73 23 Double Sided Textured
05/09/2019 P11 44347 72 23 Double Sided Textured
05/09/2019 P12 44347 72 23 Double Sided Textured
05/09/2019 P13 44347 72 23 Double Sided Textured
05/09/2019 P14 44347 72 23 Double Sided Textured
05/09/2019 P15 44343 72 23 Double Sided Textured
05/09/2019 P16 44343 72 23 Double Sided Textured
05/09/2019 P17 44343 72 23 Double Sided Textured
05/09/2019 P18 44343 72 23 Double Sided Textured
06/09/2019 P19 103480 384 23 Smooth
06/09/2019 P20 103480 20 23 Smooth
06/09/2019 P21 103484 364 23 Smooth
06/09/2019 P22 103484 106 23 Smooth
06/09/2019 P23 103481 278 23 Smooth
06/09/2019 P24 103481 240 23 Smooth
06/09/2019 P25 144391 147 23 Smooth
06/09/2019 P26 144391 336 23 Smooth
06/09/2019 P27 144392 50 23 Smooth
06/09/2019 P28 144392 385 23 Smooth
06/09/2019 P29 144392 60 23 Smooth
06/09/2019 P30 144396 225 23 Smooth
06/09/2019 P31 144396 160 23 Smooth
06/09/2019 P32 144393 225 23 Smooth
06/09/2019 P33 144393 285 23 Smooth
06/09/2019 P34 144390 100 23 Smooth
07/09/2019 P35 144390 385 23 Smooth
07/09/2019 P36 144397 385 23 Smooth
07/09/2019 P37 144397 120 23 Smooth
07/09/2019 P38 103485 265 23 Smooth
07/09/2019 P39 103485 235 23 Smooth
Product Type: 60mil HDPEProject Name: Brady Landfill
ROLL
NUM
BER
CO
MM
ENTS
FEETPAN
EL N
UMBE
R
PANEL PLACEMENT LOG
DATE
LEN
GTH
WID
TH
DD/MMM/YY
Product Type: 60mil HDPEProject Name: Brady Landfill
ROLL
NUM
BER
CO
MM
ENTS
FEETPAN
EL N
UMBE
R
07/09/2019 P40 103482 150 23 Smooth
07/09/2019 P41 103482 335 23 Smooth
07/09/2019 P42 103486 50 23 Smooth
07/09/2019 P43 103486 385 23 Smooth
07/09/2019 P44 144394 385 23 Smooth
07/09/2019 P45 144395 385 23 Smooth
07/09/2019 P46 144298 385 23 Smooth
07/09/2019 P47 44343 66 23 Double Sided Textured
07/09/2019 P48 44343 66 23 Double Sided Textured
07/09/2019 P49 44343 67 23 Double Sided Textured
07/09/2019 P50 44348 67 23 Double Sided Textured
07/09/2019 P51 44348 67 23 Double Sided Textured
07/09/2019 P52 44348 68 23 Double Sided Textured
07/09/2019 P53 44348 68 23 Double Sided Textured
07/09/2019 P54 44348 68 23 Double Sided Textured
07/09/2019 P55 44348 68 23 Double Sided Textured
07/09/2019 P56 44348 69 23 Double Sided Textured
07/09/2019 P57 44346 69 23 Double Sided Textured
07/09/2019 P58 44346 69 23 Double Sided Textured
07/09/2019 P59 44346 69 23 Double Sided Textured
07/09/2019 P60 44346 70 23 Double Sided Textured
07/09/2019 P61 44346 70 23 Double Sided Textured
07/09/2019 P62 44346 70 23 Double Sided Textured
07/09/2019 P63 44344 70 23 Double Sided Textured
07/09/2019 P64 44344 70 23 Double Sided Textured
WEDGE SEAM LOG
WEL
D DA
TE
SEA
M L
ENG
TH
TEST
DA
TE
DD/MMM/YY AM PM FEET DD/MMM/YY
P1/P2 05/09/2019 1250 KD 11 68 06/09/2019 43 42 PASS KH
P2/P3 05/09/2019 1250 OL 32 68 06/09/2019 46 46 PASS KH
P3/P4 05/09/2019 105 KD 11 69 06/09/2019 42 42 PASS KH
P4/P5 05/09/2019 104 OL 32 69 06/09/2019 39 39 PASS KH
P5/P6 05/09/2019 120 KD 11 70 06/09/2019 42 41 PASS KH
P6/P7 05/09/2019 116 OL 32 71 06/09/2019 41 41 PASS KH
P7/P8 05/09/2019 133 KD 11 72 06/09/2019 47 47 PASS KH
P8/P9 05/09/2019 129 OL 32 74 06/09/2019 49 47 PASS KH
P9/P10 05/09/2019 149 KD 11 73 06/09/2019 51 51 PASS KH
P10/P11 05/09/2019 145 OL 32 73 06/09/2019 36 36 PASS KH
P11/P12 05/09/2019 200 KD 11 72 06/09/2019 46 46 PASS KH
P12/P13 05/09/2019 200 OL 32 72 06/09/2019 45 45 PASS KH
P13/P14 05/09/2019 218 KD 11 72 06/09/2019 45 44 PASS KH
P14/P15 05/09/2019 220 OL 32 72 06/09/2019 42 42 PASS KH
P15/P16 05/09/2019 230 KD 11 72 06/09/2019 40 39 PASS KH
P16/P17 05/09/2019 235 OL 32 72 06/09/2019 46 46 PASS KH
P17/P18 05/09/2019 244 KD 11 72 06/09/2019 43 43 PASS KH
PASS KH
P20/P21 06/09/2019 950 OL 32 23 06/09/2019 42 42 PASS KH
P19/P20,21 06/09/2019 1000 KD 11 285 06/09/2019 40 40 PASS KH
P22/P23 06/09/2019 955 KD 11 23 06/09/2019 46 44 PASS KH
P20,21/P22,23 06/09/2019 1030 OL 32 285 06/09/2019 39 39 PASS KH
P24/P25 06/09/2019 1110 OL 32 23 06/09/2019 45 45 PASS KH
P22,23/P24,25 06/09/2019 1115 KD 11 285 06/09/2019 46 45 PASS KH
P26/P27 06/09/2019 1138 OL 11 23 06/09/2019 42 40 PASS KH
P24,25/P26,27 06/09/2019 1142 OL 32 285 06/09/2019 41 41 PASS KH
P26,27/P28 06/09/2019 210 KD 11 285 06/09/2019 39 38 PASS KH
P29/P30 06/09/2019 215 OL 32 23 07/09/2019 42 41 PASS KH
P28/P29,30 06/09/2019 220 OL 32 285 07/09/2019 41 41 PASS KH
P31/P32 06/09/2019 404 KD 11 23 07/09/2019 47 46 PASS KH
P29,30/P31,32 06/09/2019 410 KD 11 285 07/09/2019 40 39 PASS KH
P33/P34 06/09/2019 422 OL 32 23 07/09/2019 40 40 PASS KH
P31,32/P33,34 06/09/2019 430 OL 32 285 07/09/2019 45 45 PASS KH
PASS KH
P33,34/P35 07/09/2019 1015 OL 32 285 07/09/2019 46 46 PASS KH
P35/P36 07/09/2019 1022 CS 43 285 07/09/2019 40 40 PASS KH
P37/P38 07/09/2019 1042 KD 11 23 07/09/2019 39 38 PASS KH
P36/P37,38 07/09/2019 1047 KD 11 285 07/09/2019 41 41 PASS KH
Product Type: 60mil HDPEProject Name: Brady Landfill
STA
RT P
SI
FIN
ISH
PSI
AIR TEST INFORMATIONSEAM LOGBE
TWEE
N P
AN
ELS
TEST
RES
ULTS
QC
TEC
HNIC
IAN
TIME
OF
DAY
TEC
HNIC
IAN
WED
GE
#
WEDGE SEAM LOG
WEL
D DA
TE
SEA
M L
ENG
TH
TEST
DA
TE
DD/MMM/YY AM PM FEET DD/MMM/YY
Product Type: 60mil HDPEProject Name: Brady Landfill
STA
RT P
SI
FIN
ISH
PSI
AIR TEST INFORMATIONSEAM LOGBE
TWEE
N P
AN
ELS
TEST
RES
ULTS
QC
TEC
HNIC
IAN
TIME
OF
DAY
TEC
HNIC
IAN
WED
GE
#
P39/P40 07/09/2019 1110 CS 43 23 07/09/2019 41 40 PASS KH
P37,38/P39,40 07/09/2019 1050 OL 32 285 07/09/2019 40 40 PASS KH
P41/P42 07/09/2019 1143 KD 11 23 07/09/2019 43 42 PASS KH
P39,40/P41,42 07/09/2019 1151 CS 43 285 07/09/2019 46 46 PASS KH
P41,42/P43 07/09/2019 1155 KD 11 285 07/09/2019 42 42 PASS KH
P43/P44 07/09/2019 220 OL 32 285 07/09/2019 43 42 PASS KH
P44/P45 07/09/2019 220 CS 43 285 07/09/2019 38 37 PASS KH
P45/P46 07/09/2019 230 KD 11 285 07/09/2019 40 40 PASS KH
P47/P48 07/09/2019 335 CS 43 64 08/09/2019 45 44 PASS KH
P48/P49 07/09/2019 345 KD 11 65 08/09/2019 42 41 PASS KH
P49/P50 07/09/2019 405 OL 32 65 08/09/2019 45 45 PASS KH
P50/P51 07/09/2019 405 CS 43 65 08/09/2019 38 38 PASS KH
P51/P52 07/09/2019 403 KD 11 65 08/09/2019 40 39 PASS KH
P52/P53 07/09/2019 420 CS 43 66 08/09/2019 52 51 PASS KH
P53/P54 07/09/2019 420 KD 11 67 08/09/2019 47 46 PASS KH
P54/P55 07/09/2019 420 OL 32 67 08/09/2019 45 45 PASS KH
P55/P56 07/09/2019 437 CS 43 67 08/09/2019 47 47 PASS KH
P56/P57 07/09/2019 435 KD 11 68 08/09/2019 44 44 PASS KH
P57/P58 07/09/2019 430 OL 32 68 08/09/2019 42 42 PASS KH
P58/P59 07/09/2019 448 CS 43 68 08/09/2019 40 40 PASS KH
P59/P60 07/09/2019 435 KD 11 69 08/09/2019 37 36 PASS KH
P60/P61 07/09/2019 445 OL 32 69 08/09/2019 46 45 PASS KH
P61/P62 07/09/2019 510 KD 11 70 08/09/2019 49 49 PASS KH
P62/P63 07/09/2019 455 OL 32 70 08/09/2019 50 50 PASS KH
P63/P64 07/09/2019 505 OL 32 70 08/09/2019 45 44 PASS KH
BUTT SEAM LOG
WEL
D DA
TE
SEA
M L
ENG
TH
TEST
DA
TE
Seam Starts Between Panels
Finishes Between Panels DD/MMM/YY A
M PM FEET DD/MMM/YY
P18/P19 P1/P19 06/09/2019 1005 CS 43 390
P19 P1 06/07/2019 41 40 PASS KH
P19 P2 06/07/2019 40 40 PASS KH
P19 P3 06/07/2019 37 36 PASS KH
P19 P4 06/07/2019 48 47 PASS KH
P19 P5 06/07/2019 40 39 PASS KH
P19 P6 06/07/2019 41 40 PASS KH
P19 P7 06/07/2019 46 44 PASS KH
P19 P8 06/07/2019 37 37 PASS KH
P19 P9 06/07/2019 50 50 PASS KH
P19 P10 06/07/2019 38 37 PASS KH
P19 P11 06/07/2019 43 43 PASS KH
P19 P12 06/07/2019 46 45 PASS KH
P19 P13 06/07/2019 40 40 PASS KH
P19 P14 06/07/2019 39 39 PASS KH
P19 P15 06/07/2019 42 41 PASS KH
P19 P16 06/07/2019 47 45 PASS KH
P19 P17 06/07/2019 50 49 PASS KH
P19 P18 06/07/2019 42 42 PASS KH
P64/P46 P47/P46 07/09/2019 530 OL 32 387
P46 P47 07/09/2019 42 40 PASS KH
P46 P48 07/09/2019 46 46 PASS KH
P46 P49 07/09/2019 40 40 PASS KH
P46 P50 07/09/2019 38 37 PASS KH
P46 P51 07/09/2019 36 35 PASS KH
P46 P52 07/09/2019 46 45 PASS KH
P46 P53 07/09/2019 43 43 PASS KH
P46 P54 07/09/2019 48 48 PASS KH
P46 P55 07/09/2019 49 48 PASS KH
P46 P56 07/09/2019 39 38 PASS KH
P46 P57 07/09/2019 46 45 PASS KH
P46 P58 07/09/2019 44 44 PASS KH
BUTT SEAM LOG
TEC
HNIC
IAN
WED
GE
#
Project Name: Brady Landfill Product Type: 60mil HDPE
STA
RT P
SI
FIN
ISH
PSI
TEST
RES
ULTS
BUTT
SEA
M
BUTT
SEA
M L
ETTE
R
QC
TEC
HNIC
IAN
TIME
OF
DAY
AIR TEST INFORMATION
BUTT SEAM LOG
WEL
D DA
TE
SEA
M L
ENG
TH
TEST
DA
TE
Seam Starts Between Panels
Finishes Between Panels DD/MMM/YY A
M PM FEET DD/MMM/YY
BUTT SEAM LOG
TEC
HNIC
IAN
WED
GE
#
Project Name: Brady Landfill Product Type: 60mil HDPE
STA
RT P
SI
FIN
ISH
PSI
TEST
RES
ULTS
BUTT
SEA
M
BUTT
SEA
M L
ETTE
R
QC
TEC
HNIC
IAN
TIME
OF
DAY
AIR TEST INFORMATION
P46 P59 07/09/2019 42 41 PASS KH
P46 P60 07/09/2019 39 38 PASS KH
P46 P61 07/09/2019 41 41 PASS KH
P46 P62 07/09/2019 45 45 PASS KH
P46 P63 07/09/2019 46 45 PASS KH
P46 P64 07/09/2019 45 45 PASS KH
WEDGE TRIAL LOG
Project Name:
Wedge #: 32Date:
Sheet Type:AM TEST PM TEST
Time: 1116 AM Time: PM Technician: OL Technician: NOTES:
Ambient Temp: 21 °C Ambient Temp: °CWedge Speed: 550 ft/hr Wedge Speed: ft/hrWedge Temp: 860F °C / °F Wedge Temp: °C / °F
200%+ F.T.B. 200%+ F.T.B.
200%+ F.T.B. 200%+ F.T.B.
200%+ F.T.B. 200%+ F.T.B.
200%+ F.T.B. 200%+ F.T.B.
200%+ F.T.B. 200%+ F.T.B.
200%+ F.T.B. 200%+ F.T.B.
200%+ F.T.B. 200%+ F.T.B.
200%+ F.T.B. 200%+ F.T.B.
200%+ F.T.B. 200%+ F.T.B.
200%+ F.T.B. 200%+ F.T.B.
200%+ F.T.B. 200%+ F.T.B.
200%+ F.T.B. 200%+ F.T.B.
200%+ F.T.B. 200%+ F.T.B.
200%+ F.T.B. 200%+ F.T.B.
200%+ F.T.B. 200%+ F.T.B.
Wedge #: 11Date:
Sheet Type:AM TEST PM TEST
Time: 1115 AM Time: PM Technician: KD Technician: NOTES:
Ambient Temp: 21 °C Ambient Temp: °CWedge Speed: 480 ft/hr Wedge Speed: ft/hrWedge Temp: 860F °C / °F Wedge Temp: °C / °F
200%+ F.T.B. 200%+ F.T.B.
200%+ F.T.B. 200%+ F.T.B.
200%+ F.T.B. 200%+ F.T.B.
200%+ F.T.B. 200%+ F.T.B.
200%+ F.T.B. 200%+ F.T.B.
200%+ F.T.B. 200%+ F.T.B.
200%+ F.T.B. 200%+ F.T.B.
200%+ F.T.B. 200%+ F.T.B.
200%+ F.T.B. 200%+ F.T.B.
200%+ F.T.B. 200%+ F.T.B.
200%+ F.T.B. 200%+ F.T.B.
200%+ F.T.B. 200%+ F.T.B.
200%+ F.T.B. 200%+ F.T.B.
200%+ F.T.B. 200%+ F.T.B.
200%+ F.T.B. 200%+ F.T.B.
60 mil HDPE
ELO
NG
ATIO
N
128
132
126
156
INSIDE PEEL
OUTSIDE PEEL
121
119
139
152
115
111
INSIDE PEEL
112
120INSIDE PEEL INSIDE PEEL
SHEAR
60mil HDPEBRADY LANDFILL Product Type:
SHEAR
BREA
K TY
PE
60 mil HDPE
ELO
NG
ATIO
N
ELO
NG
ATIO
NEL
ON
GA
TION
05/09/2019
125
BREA
K TY
PE
BREA
K TY
PE
05/09/2019
OUTSIDE PEEL
BREA
K TY
PE
126
120
SHEAR
135
SHEAR142
OUTSIDE PEEL OUTSIDE PEEL
118
110
116
120
141
WEDGE TRIAL LOG
Project Name: 60mil HDPEBRADY LANDFILL Product Type:
Wedge #: 32Date:
Sheet Type:AM TEST PM TEST
Time: 820 AM Time: 200 PM Technician: OL Technician: OL NOTES:
Ambient Temp: 22 °C Ambient Temp: 26 °CWedge Speed: 530 ft/hr Wedge Speed: 530 ft/hrWedge Temp: 860F °C / °F Wedge Temp: 860F °C / °F
200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.
Wedge #: 11Date:
Sheet Type:AM TEST PM TEST
Time: 800 AM Time: 200 PM Technician: KD Technician: KD NOTES:
Ambient Temp: 20 °C Ambient Temp: 25 °CWedge Speed: 480 ft/hr Wedge Speed: 480 ft/hrWedge Temp: 860F °C / °F Wedge Temp: 860F °C / °F
200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.
06/09/2019
OUTSIDE PEEL
122
OUTSIDE PEEL
128128 124117 125
INSIDE PEEL
120
INSIDE PEEL
125117 126112 120117 119
60 mil HDPE
ELO
NG
ATIO
N
BREA
K TY
PE
06/09/201960 mil HDPE
ELO
NG
ATIO
N
BREA
K TY
PE
ELO
NG
ATIO
N
BREA
K TY
PE
147 145
119 120
ELO
NG
ATIO
N
BREA
K TY
PE
SHEAR
142
SHEAR
157156 162
OUTSIDE PEEL
122
OUTSIDE PEEL
119124 116117 123
INSIDE PEEL
120
INSIDE PEEL
122109 126118 120119 121
148 146
114 116
SHEAR
156
SHEAR
154143 150
WEDGE TRIAL LOG
Project Name: 60mil HDPEBRADY LANDFILL Product Type:
Wedge #: 32Date:
Sheet Type:AM TEST PM TEST
Time: AM Time: 525 PM Technician: Technician: OL NOTES:
Ambient Temp: °C Ambient Temp: 22 °CWedge Speed: ft/hr Wedge Speed: 500 ft/hrWedge Temp: °C / °F Wedge Temp: 860 °F
200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.
Wedge #:Date:
Sheet Type:AM TEST PM TEST
Time: AM Time: PM Technician: Technician: NOTES:
Ambient Temp: °C Ambient Temp: °CWedge Speed: ft/hr Wedge Speed: ft/hrWedge Temp: °C / °F Wedge Temp: °C / °F
200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.
07/09/201960 mil HDPE
ELO
NG
ATIO
N
BREA
K TY
PEINSIDE PEEL INSIDE PEEL
106109117110
ELO
NG
ATIO
N
BREA
K TY
PE
137
ELO
NG
ATIO
N
BREA
K TY
PE
OUTSIDE PEEL
99104103109
SHEAR SHEAR
145139
ELO
NG
ATIO
N
BREA
K TY
PE
OUTSIDE PEEL
INSIDE PEEL INSIDE PEEL
OUTSIDE PEEL OUTSIDE PEEL
SHEAR SHEAR
EXTRUDER TRIAL LOGProject Name:
Extruder#: 5Date:
Sheet Type:AM TEST PM TEST
Time: 900 AM Time: 200 PM Technician: RN Technician: RN NOTES:
Ambient Temp: 22 °C Ambient Temp: 24 °CBarrel/Air Temp: 460 / 450 °C Barrel/Air Temp: 460 / 450 °C
200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.
Extruder#: 5Date: NOTES:
Sheet Type:AM TEST PM TEST
Time: 900 AM Time: 155 PM Technician: RN Technician: RN
Ambient Temp: 21 °C Ambient Temp: 24 °CBarrel/Air Temp: 460 / 450 °C Barrel/Air Temp: 460 / 450 °C
200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.
BREA
K TY
PE
SHEAR SHEAR
110PEEL
109
ELO
NG
ATIO
N
Product Type: 60mil HDPE
ELO
NG
ATIO
N
BREA
K TY
PE
ELO
NG
ATIO
N
Brady Landfill
109
148
105102
104
155
99
BREA
K TY
PE
06/09/2019
139145135
143
60mil HDPE
145152
PEEL
103
60mil HDPE07/09/2019
167160
ELO
NG
ATIO
N
BREA
K TY
PE
121
119116
PEEL
SHEAR
1091179799
139
PEEL
SHEAR
140
EXTRUDER TRIAL LOGProject Name: Product Type: 60mil HDPEBrady Landfill
Extruder#: 5Date:
Sheet Type:AM TEST PM TEST
Time: 920 AM Time: 210 PM Technician: DP Technician: DP NOTES:
Ambient Temp: 19 °C Ambient Temp: 24 °CBarrel/Air Temp: 460 / 450 °C Barrel/Air Temp: 460 / 450 °C
200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.
SHEAR
156
SHEAR
148150 135154 138
ELO
NG
ATIO
N
BREA
K TY
PE
PEEL
112
PEEL
118114 123110 109116 107
08/09/2019 60mil HDPE
ELO
NG
ATIO
N
BREA
K TY
PE
EXTRUSION DETAIL LOG
Project Name
Product Type:
CO
DE
TEST
DA
TE
SEE LEGEND DD/MMM/YY
06/09/2019 RN BO P16/P17 bottom 08/09/2019 PASS KH Vac Box
06/09/2019 RN BO P18 @ butt 08/09/2019 PASS KH Vac Box
06/09/2019 RN E P15 going up 30' 08/09/2019 PASS KH Vac Box
06/09/2019 RN E P15 @ butt 08/09/2019 PASS KH Vac Box
06/09/2019 RN BO P14 @ butt 08/09/2019 PASS KH Vac Box
06/09/2019 RN E P13 @ butt 08/09/2019 PASS KH Vac Box
06/09/2019 RN E P12 @ butt 08/09/2019 PASS KH Vac Box
06/09/2019 RN E P11/P12 1/3 up slope 08/09/2019 PASS KH Vac Box
06/09/2019 RN E P9 @ butt 08/09/2019 PASS KH Vac Box
06/09/2019 RN E P7 @ butt 08/09/2019 PASS KH Vac Box
06/09/2019 RN E p6 @ butt 08/09/2019 PASS KH Vac Box
06/09/2019 RN E p5 @ butt 08/09/2019 PASS KH Vac Box
06/09/2019 RN E p3 @ butt 08/09/2019 PASS KH Vac Box
07/09/2019 RN BO P22/P24 @ N toe 08/09/2019 PASS KH Vac Box
07/09/2019 RN P P23/P25 @ S Trench 08/09/2019 PASS KH Vac Box
07/09/2019 RN BO P28/P30 08/09/2019 PASS KH Vac Box
07/09/2019 RN E P30 near cross 08/09/2019 PASS KH Vac Box
07/09/2019 RN BO P32/P34 08/09/2019 PASS KH Vac Box
07/09/2019 RN BO P34/P35 08/09/2019 PASS KH Vac Box
07/09/2019 RN P P35/P36 08/09/2019 PASS KH Vac Box
07/09/2019 RN E P35/P36 08/09/2019 PASS KH Vac Box
07/09/2019 RN E P40 near cross 08/09/2019 PASS KH Vac Box
07/09/2019 RN P P39/P40/P41 08/09/2019 PASS KH Vac Box
07/09/2019 RN E P42 08/09/2019 PASS KH Vac Box
07/09/2019 RN P P43/P44 08/09/2019 PASS KH Vac Box
07/09/2019 RN BO P44/P45 08/09/2019 PASS KH Vac Box
07/09/2019 RN P P44/P45 08/09/2019 PASS KH Vac Box
08/09/2019 DP E P63 08/09/2019 PASS KH Vac Box
08/09/2019 DP PT P56 08/09/2019 PASS KH Vac Box
08/09/2019 DP P P52/P53 08/09/2019 PASS KH Vac Box
08/09/2019 DP E P52 08/09/2019 PASS KH Vac Box
08/09/2019 DP E P51/P50 08/09/2019 PASS KH Vac Box
08/09/2019 DP E P50 08/09/2019 PASS KH Vac Box
R10
R11
R12
R13
R14
R24
R25
R26
2 X 6"
3x2
6"
3 X 6"
4'
1X1
3X2
8'
CODE LEGENDBO-BLOCK OFF
P-PATCHPT-PENETRATION
E-EXTRUSION BEADT-THREE PANEL INTERSECTION
Brady Landfill
TEST
RES
ULTS
DT-DESTRUCTIVE TEST
DETA
IL L
ETTE
R
DETA
IL D
ATE
DIM
ENSI
ON
S
60mil HDPE
LOC
ATIO
N
C-CAP
R6
R7
R8
18'
6"
10 X 6"
6"R5
* UNLESS OTHERWISE NOTED, ALL 3 PANEL INTERSECTIONS COME WITH VACUUM TESTED EXTRUDED T-WELDS.
6"
1'
1'
6"
TEST
TYPE
TEC
HNIC
IAN
QC
TEC
H
1'
6"
R1
R2
R3
R4
R9
R22
R23
R15
R16
R17
R18
R19
R206"
3x3
1'
6"
3X2
1'
1'
2 X 1'
6'
1X1
13 X 6"
7X5
R31
R32
R33
R27
R28
R29
R30
2 X 6"
1'
6"
R21
EXTRUSION DETAIL LOG
Project Name
Product Type:
CO
DE
TEST
DA
TE
SEE LEGEND DD/MMM/YY
CODE LEGENDBO-BLOCK OFF
P-PATCHPT-PENETRATION
E-EXTRUSION BEADT-THREE PANEL INTERSECTION
Brady Landfill
TEST
RES
ULTS
DT-DESTRUCTIVE TEST
DETA
IL L
ETTE
R
DETA
IL D
ATE
DIM
ENSI
ON
S
60mil HDPE
LOC
ATIO
N
C-CAP
* UNLESS OTHERWISE NOTED, ALL 3 PANEL INTERSECTIONS COME WITH VACUUM TESTED EXTRUDED T-WELDS.
TEST
TYPE
TEC
HNIC
IAN
QC
TEC
H
08/09/2019 DP E P47/P48 08/09/2019 PASS KH Vac Box
08/09/2019 DP E P47/P48 08/09/2019 PASS KH Vac Box08/09/2019 DP E P63 @ BUTT 08/09/2019 PASS KH Vac Box
08/09/2019 DP E P62 @ BUTT 08/09/2019 PASS KH Vac Box
06/09/2019 RN C Existing cell Tie in 08/09/2019 PASS KH Vac Box
07/09/2019 RN C Existing cell Tie in 08/09/2019 PASS KH Vac Box
08/09/2019 DP C Existing cell Tie in 08/09/2019 PASS KH Vac Box
06/09/2019 RN DT P15/P16 1/3 up slope 08/09/2019 PASS KH Vac Box
06/09/2019 RN DT P16/P17 1/2 up slope 08/09/2019 PASS KH Vac Box
06/09/2019 RN DT P23/P25 15' N 08/09/2019 PASS KH Vac Box
06/09/2019 RN DT P25/P26 50' N 08/09/2019 PASS KH Vac Box06/09/2019 RN DT P26/P28 125' N 08/09/2019 PASS KH Vac Box
06/09/2019 RN DT P28/P30 215'N 08/09/2019 PASS KH Vac Box
06/09/2019 RN DT P30/P31 240' N 08/09/2019 PASS KH Vac Box
06/09/2019 RN DT P31/P33 330' N 08/09/2019 PASS KH Vac Box
07/09/2019 RN DT P35/P36 115'N 08/09/2019 PASS KH Vac Box
07/09/2019 RN DT P36/P37 350' N 08/09/2019 PASS KH Vac Box
07/09/2019 RN DT P38/P40 75' N 08/09/2019 PASS KH Vac Box
07/09/2019 RN DT P39/P41 230' N 08/09/2019 PASS KH Vac Box
07/09/2019 RN DT P43/P44 190' N 08/09/2019 PASS KH Vac Box
07/09/2019 RN DT P44/P45 345'N 08/09/2019 PASS KH Vac Box
07/09/2019 RN DT P45/P46 80' N 08/09/2019 PASS KH Vac Box
08/09/2019 DP DT P53/P54 7' from but 08/09/2019 PASS KH Vac Box
08/09/2019 DP DT P62/P63 7' from butt 08/09/2019 PASS KH Vac Box
4X2
4X2
6"
205'
154'
52'
4X2
4X2
4X2
4X2
4X2
4X2
4X2
4X2
4X2
4X2
4 X 6"
R34
R35
R361'
1'
R37
R38
R39
R40
DT1
DT2
DT3
DT5
DT4
DT6
DT7
DT8
DT9
DT10
DT11
DT12
DT13
DT14
DT15
DT16
DT17
4X2
4X2
4X2
4X2
4X2
DESTRUCTIVE TEST LOG
Project Name: Sheet Type:
DT#: 1 DT#: 2Between Panels: Between Panels:
QA Monitor: QA Monitor:
Date: Date:
Time: 245 Time: 305
200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.
DT#: 3 DT#: 4Between Panels: Between Panels:
QA Monitor: QA Monitor:
Date: Date:
Time: 320 Time: 340
200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.
200%+ F.T.B. 200%+ F.T.B.
200%+ F.T.B. 200%+ F.T.B.
200%+ F.T.B. 200%+ F.T.B.
200%+ F.T.B. 200%+ F.T.B.
200%+ F.T.B. 200%+ F.T.B.
BRADY LANDFILL
115110
119
120120
119
115
INSIDE PEEL
OUTSIDE PEEL
SHEAR
129120
118
139129
130
115122130
60mil HDPE
128125128
P25/P26
06/09/2019
126126
SHEAR
144
06/09/2019
122
140140
120
06/09/2019 06/09/2019
INSIDE PEEL
137128
KH
OUTSIDE PEEL OUTSIDE PEEL
119 130
129114110 134
OUTSIDE PEEL
118122
INSIDE PEEL INSIDE PEEL
136142
140165
126
150144
128
130
122114
SHEAR
143
SHEAR
150
139 134
146 145
144 147
159 146
ELO
NG
ATIO
N
KH
BREA
K TY
PE
ELO
NG
ATIO
N
BREA
K TY
PE
P23/P25
ELO
NG
ATIO
N
BREA
K TY
PEKH
124124
137
ELO
NG
ATIO
N
BREA
K TY
PE
P16/P17P15/P16
KH
DESTRUCTIVE TEST LOG
Project Name: Sheet Type:BRADY LANDFILL 60mil HDPE
DT# 5 DT#: 6Between Panels: Between Panels:
QA Monitor: QA Monitor:Date: Date:Time: 1020 Time: 1035
200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.
DT#: 7 DT#: 8Between Panels: Between Panels:
QA Monitor: QA Monitor:Date: Date:Time: 1052 Time: 1110
200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.
SHEAR
144
SHEAR
148149 145142 142146 140150 138
OUTSIDE PEEL
119
OUTSIDE PEEL
114110 130122 136112 141132 135
INSIDE PEEL
117
INSIDE PEEL
133129 120136 126131 137132 129
P30/P31
ELO
NG
ATIO
N
BREA
K TY
PE
P31/P33
ELO
NG
ATIO
N
BREA
K TY
PEKH KH07/09/2019 07/09/2019
SHEAR
155
SHEAR
160146 147148 156144 155142 152
OUTSIDE PEEL
118
OUTSIDE PEEL
115136 120110 123141 127142 127
INSIDE PEEL
127
INSIDE PEEL
129133 124118 123125 129145 108
P26/P28
ELO
NG
ATIO
N
BREA
K TY
PE
P28/P30
ELO
NG
ATIO
N
BREA
K TY
PEKH KH07/09/2019 07/09/2019
DESTRUCTIVE TEST LOG
Project Name: Sheet Type:BRADY LANDFILL 60mil HDPE
DT#: 9 DT#: 10Between Panels: Between Panels:
QA Monitor: QA Monitor:Date: Date:Time: 430 Time: 440
200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.
DT#: 11 DT#: 12Between Panels: Between Panels:
QA Monitor: QA Monitor:Date: Date:Time: 455 Time: 509
200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.
SHEAR
146
SHEAR
147143 144144 136148 145149 149
OUTSIDE PEEL
129
OUTSIDE PEEL
113122 124116 118115 104112 104
INSIDE PEEL
104
INSIDE PEEL
116135 129120 120135 111128 132
P38/P40
ELO
NG
ATIO
N
BREA
K TY
PE
P39/P41
ELO
NG
ATIO
N
BREA
K TY
PEKH KH07/09/2019 07/09/2019
SHEAR
146
SHEAR
150143 145134 157140 143141 140
OUTSIDE PEEL
128
OUTSIDE PEEL
110137 117116 118130 118120 120
INSIDE PEEL
139
INSIDE PEEL
115111 119136 117124 117123 128
P35/P36
ELO
NG
ATIO
N
BREA
K TY
PE
P36/P37
ELO
NG
ATIO
N
BREA
K TY
PEKH KH07/09/2019 07/09/2019
DESTRUCTIVE TEST LOG
Project Name: Sheet Type:BRADY LANDFILL 60mil HDPE
DT#: 13 DT#: 14Between Panels: Between Panels:
QA Monitor: QA Monitor:Date: Date:Time: 520 Time: 533
200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.
DT#: 15 DT#: 16Between Panels: Between Panels:
QA Monitor: QA Monitor:Date: Date:Time: 545 Time: 100
200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.
SHEAR
145
SHEAR
139150 147143 145140 148146 144
OUTSIDE PEEL
133
OUTSIDE PEEL
112146 95135 98140 121133 107
INSIDE PEEL
132
INSIDE PEEL
123128 123132 112134 121128 126
P45/P46
ELO
NG
ATIO
N
BREA
K TY
PE
P53/P54
ELO
NG
ATIO
N
BREA
K TY
PEKH KH07/09/2019 08/09/2019
SHEAR
137
SHEAR
137139 148135 146142 142141 144
OUTSIDE PEEL
115
OUTSIDE PEEL
112119 112127 105120 118106 116
INSIDE PEEL
117
INSIDE PEEL
125120 119128 128118 132125 125
P43/P44
ELO
NG
ATIO
N
BREA
K TY
PE
P44/P45
ELO
NG
ATIO
N
BREA
K TY
PEKH KH07/09/2019 07/-9/2019
DESTRUCTIVE TEST LOG
Project Name: Sheet Type:BRADY LANDFILL 60mil HDPE
DT#: 17 DT#:Between Panels: Between Panels:
QA Monitor: QA Monitor:Date: Date:Time: 120 Time:
200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.
SHEAR
137
SHEAR142153145150
OUTSIDE PEEL
113
OUTSIDE PEEL106115120116
INSIDE PEEL
112
INSIDE PEEL111123109111
P62/P63
ELO
NG
ATIO
N
BREA
K TY
PE
ELO
NG
ATIO
N
BREA
K TY
PEKH08/09/2019
SEPTEMBER 2019SEPTEMBER 2019
BRADY ROAD RESOURCE MANAGEMENTBRADY ROAD RESOURCE MANAGEMENT
REVISIONS / ISSUEYY/MM/DDNO. CHECKBY
FACILITY - CELL 32 CONSTRUCTIONFACILITY - CELL 32 CONSTRUCTION
FIGURE 01FIGURE 01 XX
!(
!(
!(
!(!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
ACCESS
ROAD T1
T2T3
T4T5
T6T7
T8
T9
T10T11
T13
T14T15
T16
S1
S2S3
S4S5
T23
T24
S6
T12
T17
T20
T21
T22
T18T19
629400
629400
629500
629500
629600
629600
551370
0
551370
0
551380
0
551380
0
AREA OFINTERESTSouth Perimeter Highway St.
Mary's
Road
Pembina Highway
Waverle
y Stree
t
10 0 10 20 30 40
Meters
©
---19/09/05X FOR INTERNAL USE ONLY
FileNa
me: P
:\Proj
ects\2015\1
5-0107-0
14\D
wg\G
IS\MX
Ds\W
orking
\Surv
ey_20190816\1
5-0107-0
14-F
ig01.m
xd11"x1
7' P
LOT SC
ALE 1
:1
LEGEND:!( Densometer Test Location
!( Shelby Tube LocationExcavation Dimensions
REV:
Portio
ns of d
ata P
roduced b
y KG
S Gro
up, u
nder
Licence
with
the P
rovinc
e of
Manit
oba
2019 H
er Ma
jesty
the Q
ueen in
Righ
t of M
anitoba.
All ri
ghts
reserv
ed.
SCALE: METRIC 11"x17"1:1,000
DESCRIPTION
1km
ISSUEDBY
---
¯
NOTES:1. Imgaery shown from City of Winnipeg Open Data Portal and dated as 2018.2. All units are metric and in metres unless otherwise specified. Transverse Mercator Projection, NAD 1983, Zone 14. Elevations are in metres above sea level (MSL).
PRELIMINARYNOT TO BE USED FOR CONSTRUCTION
!
GEOTECHNICAL QUALITY ASSURANCEGEOTECHNICAL QUALITY ASSURANCE
DRAFT
Proctor ResultsMax Dry Density (kg/m3) 1456Optimum Moisture Content (%) 27.0Test # DD % PR Moisture % CommentTest 1 1406 96.5 24.5 -Test 2 1365 93.4 27.6 -Test 3 1339 92 27.1 -Test 4 1397 95.9 26 -Test 5 1438 98.7 23.2 -Test 6 1456 100 26.7 -Test 7 1412 97 27.3 -Test 8 1322 90.8 29.7 -Test 9 1364 93.7 24.8 -Test 10 1366 93.8 27.1 -Test 11 1411 96.9 24.5 -Test 12 1403 96.4 22.9 -Test 13 1393 95.7 21.6 -Test 14 1332 91.5 29.7 -Test 15 1292 88.7 32.9 -Test 16 1332 91.9 29.9 -Test 17 1341 92.1 31.1 Retry @ T16Test 18 1338 92.5 30.2 Retry @ T15Test 19 1366 93.8 29.9 Retry @T14Test 20 1371 94.3 21.8Test 21 1371 99.2 25.7 Retry @ T8Test 22 1436 98.6 18.2Test 23 1440 98.9 19.9Test 24 1518 104.3 14.3
1923.7 494.4 Total (without initial retry location)96.185 24.72 Average (without initial retry location)
Stantec Consulting Ltd. 199 Henlow Bay, Winnipeg MB R3Y 1G4
September 20, 2019 File: 123314413
Attention: Mr. Andrew Sinclair KGS Group Inc. 3rd Floor – 865 Waverley St. Winnipeg, Manitoba R3T 5P4
Good day Andrew,
Reference: Brady Landfill Cell 32 (15-0107-014)
On September 4, 2019, two (2) soil samples were submitted to our laboratory for analysis. The following tests were conducted on select soil samples:
• ASTM D4318 - Liquid Limit, Plastic Limit, and Plasticity Index of Soils• ASTM D5084 - Measurement of Hydraulic Conductivity of Saturated Porous Materials Using a
Flexible Wall Permeameter
The resulting test data is attached.
We appreciate the opportunity to assist you on this project. Please contact the undersigned if you have any questions regarding this report.
Regards,
Stantec Consulting Ltd.
Larry Presado, C.Tech. Jason Thompson, C.E.T Senior Geotechnical Technologist Principal – Manager, Materials Testing Services
Phone: (204) 488-6999 Phone: (204) 928-4004 [email protected] [email protected]
Attachment: Table 1 – Atterberg Limits Test Data 2 x Atterberg Limits Reports 2 x Hydraulic Conductivity Reports
September 20, 2019 Mr. Andrew Sinclair Page 2 of 2
Reference: Brady Landfill Cell 32 (15-0107-014)
TABLE 3 – ATTERBERG LIMITS TEST DATA
Field Sample ID Liquid Limit Plastic Limit Plasticity Index As Rec’d Water Content (%)
Shelby #1 98 28 70 56.5
Shelby #5 97 29 68 47.4
Atterberg Limits Client: KGS Group Inc. LABORATORY
Project Name: Brady Landfill Cell 32 199 Henlow Bay
Method A- Multi-Point (15-0107-014)
Project No: Winnipeg, Manitoba
Date Received:
Date Tested:
Tested By:
Sample :
1 2 3
33 28 24
160 265 153 264 238
48 49 49 27.19 27.58
33 35 34 25.44 25.95
18 20 19 19.31 20.19
15.0 15.0 15.2 6.1 5.8
14.5 14.6 14.9 1.8 1.6
96.4% 97.3% 98.4% 28.5% 28.3%
Reviewed By: Jason Thompson, C.E.T.
Reporting of these test results constitutes a testing service only. Engineering interpretation or evaluation of the test results is provided only on written request. The data presented above is for the sole use of the client stipulated above. STANTEC is not responsible, nor can be held liable, for the use of this report by any other party, with or without the knowledge of STANTEC.
Wt. Dry Soil (g) Wt. Dry Soil (g) Natural MC (%)Wt. Water (g) Wt. Water (g)
56.5%Water Content (%) Water Content (%)
Wt. Sa. (dry+tare)(g) Wt. Sa. (dry+tare)(g)PI 70
Wt. Tare (g) Wt. Tare (g)
Tare No. Tare No.PL 28
Wt. Sa. (wet+tare)(g) Wt. Sa. (wet+tare)(g)
98No. of Blows
Shelby #1
TrialTrial 1 2 LL
LIQUID LIMIT PLASTIC LIMIT RESULTS
ASTM D4318
Donald Eliazar
123314413
September 4, 2019 Canada R3Y 1G4
September 11, 2019 Tel: (204) 488-6999
CH
ML
MH
CL-ML
CL
0
10
20
30
40
50
60
0 10 20 30 40 50 60 70 80 90 100
PL
AS
TIC
ITY
IN
DE
X
LIQUID LIMIT
1
2
3
96.0%
96.5%
97.0%
97.5%
98.0%
98.5%
99.0%
15 20 25 30 35
WA
TER
CO
NTE
NT
(%)
BLOWS
Atterberg Limits Client: KGS Group Inc. LABORATORY
Project Name: Brady Landfill Cell 32 199 Henlow Bay
Method A- Multi-Point (15-0107-014)
Project No: Winnipeg, Manitoba
Date Received:
Date Tested:
Tested By:
Sample :
1 2 3
31 27 23
258 275 166 186 217
49 50 54 28.58 28.15
34 36 37 26.47 25.96
19 21 19 19.14 18.23
15.4 15.1 17.6 7.3 7.7
14.7 14.6 17.1 2.1 2.2
95.5% 96.7% 97.5% 28.8% 28.3%
Reviewed By: Jason Thompson, C.E.T.
Reporting of these test results constitutes a testing service only. Engineering interpretation or evaluation of the test results is provided only on written request. The data presented above is for the sole use of the client stipulated above. STANTEC is not responsible, nor can be held liable, for the use of this report by any other party, with or without the knowledge of STANTEC.
Wt. Dry Soil (g) Wt. Dry Soil (g) Natural MC (%)Wt. Water (g) Wt. Water (g)
47.4%Water Content (%) Water Content (%)
Wt. Sa. (dry+tare)(g) Wt. Sa. (dry+tare)(g)PI 68
Wt. Tare (g) Wt. Tare (g)
Tare No. Tare No.PL 29
Wt. Sa. (wet+tare)(g) Wt. Sa. (wet+tare)(g)
97No. of Blows
Shelby #5
TrialTrial 1 2 LL
LIQUID LIMIT PLASTIC LIMIT RESULTS
ASTM D4318
Donald Eliazar
123314413
September 4, 2019 Canada R3Y 1G4
September 11, 2019 Tel: (204) 488-6999
CH
ML
MH
CL-ML
CL
0
10
20
30
40
50
60
0 10 20 30 40 50 60 70 80 90 100
PL
AS
TIC
ITY
IN
DE
X
LIQUID LIMIT
1
2
3
95.0%
95.5%
96.0%
96.5%
97.0%
97.5%
98.0%
15 20 25 30 35
WA
TER
CO
NTE
NT
(%)
BLOWS
TO PROJECT
ATTN: 1
SOIL DESCRIPTION:
DATE TESTED:CONFINING PRESSURE (kPa):EFFECTIVE SATURATION STRESS (kPa):ASSUMED SPECIFIC GRAVITY:HYDRAULIC GRADIENT:TYPE OF PERMEANT LIQUID:HYDRAULIC CONDUCTIVITY, "k" (cm/s):HYDRAULIC CONDUCTIVITY, "k20" (cm/s):
Initial ReadingFinal Reading
COMMENTS:
REPORT DATE:REPORT DATE: REVIEWED BY
KGS Group Inc. Brady Landfill Cell 32 (15-0107-014)
3rd Floor - 865 Waverley St.
Winnipeg, Manitoba
R3T 5P4 PROJECT NO. 123314413
565.8
SAMPLE ID: Shelby #1 - Clay Liner
Andrew Sinclair REPORT NO.
De-aired Water8.0E-097.7E-09
50.660.955.71.094
Design with community in mind
Jason Thompson, C.E.T.2019.Sep.20
Saturation
(%)
94.1102.1
Height
(mm)
Diameter
(mm)
Wet Mass
(g)
Dry Density
(g/cm3)
Water Content by
Mass (%)
Water Content by
Volume (%)
77.6 70.9 538.3
Stantec Consulting Ltd.
199 Henlow Bay, Winnipeg, MB R3Y 1G4Tel: (204) 488-6999
ASTM D5084 - MEASUREMENT OF HYDRAULIC CONDUCTIVITY OF
SATURATED POROUS MATERIALS USING A FLEXIBLE WALL
PERMEAMETER
Reporting of these test results constitutes a testing service only. Engineering interpretation or evaluation of the test results is provided only on written request. The data presented above is for the sole use of the client stipulated above. Stantec is not responsible, nor can be held liable, for the use of this report by any other party, with or without the knowledge of Stantec.
1.252 40.472.380.9
Clay, brown, stiff, moist, high plasticity, trace silt
September 9 to September 18, 2019137.934.52.7118.4
1.00E-11
1.00E-10
1.00E-09
1.00E-08
1.00E-07
1.5 2.5 3.5 4.5 5.5 6.5 7.5 8.5 9.5
Hyd
rau
lic
Co
nd
uc
tivit
y (
cm
/se
c)
Time (days)
TO PROJECT
ATTN: 2
SOIL DESCRIPTION:
DATE TESTED:CONFINING PRESSURE (kPa):EFFECTIVE SATURATION STRESS (kPa):ASSUMED SPECIFIC GRAVITY:HYDRAULIC GRADIENT:TYPE OF PERMEANT LIQUID:HYDRAULIC CONDUCTIVITY, "k" (cm/s):HYDRAULIC CONDUCTIVITY, "k20" (cm/s):
Initial ReadingFinal Reading
COMMENTS:
REPORT DATE:REPORT DATE: REVIEWED BY
Stantec Consulting Ltd.
199 Henlow Bay, Winnipeg, MB R3Y 1G4Tel: (204) 488-6999
ASTM D5084 - MEASUREMENT OF HYDRAULIC CONDUCTIVITY OF
SATURATED POROUS MATERIALS USING A FLEXIBLE WALL
PERMEAMETER
Reporting of these test results constitutes a testing service only. Engineering interpretation or evaluation of the test results is provided only on written request. The data presented above is for the sole use of the client stipulated above. Stantec is not responsible, nor can be held liable, for the use of this report by any other party, with or without the knowledge of Stantec.
1.369 36.572.579.0
Clay, brown, stiff, moist, high plasticity
September 9 to September 18, 2019137.934.52.7118.8
Design with community in mind
Jason Thompson, C.E.T.2019.Sep.20
Saturation
(%)
100.9100.5
Height
(mm)
Diameter
(mm)
Wet Mass
(g)
Dry Density
(g/cm3)
Water Content by
Mass (%)
Water Content by
Volume (%)
77.1 70.7 566.2587.9
SAMPLE ID: Shelby #5 - Clay Liner
Andrew Sinclair REPORT NO.
De-aired Water9.7E-099.4E-09
49.953.742.51.263
KGS Group Inc. Brady Landfill Cell 32 (15-0107-014)
3rd Floor - 865 Waverley St.
Winnipeg, Manitoba
R3T 5P4 PROJECT NO. 123314413
1.00E-11
1.00E-10
1.00E-09
1.00E-08
1.00E-07
0.5 1.5 2.5 3.5 4.5 5.5 6.5 7.5 8.5 9.5
Hyd
rau
lic
Co
nd
uc
tivit
y (
cm
/se
c)
Time (days)
199 Henlow BayWinnipeg, ManitobaR3Y 1G4Tel: (204) 488-6999
Silty ClayMATERIAL TYPE
PROJECT NO.
CLIENT
C.C.
123314413
KGS Group Inc.KGS Group Inc.3rd Floor - 865 Waverley StWinnipeg, MBR3T 5P4
ATTN: Andrew SinclairCell 32 Project
1
Manual
44.2
TO
PROJECT
PROCTOR NO.
PREPARATION
INSITU MOISTURE
COMMENTS
1 1650
1748
1857
1685
2
3
4
Page 1 of 1 2019.Aug.07
TRIALNUMBER
WETDENSITY(kg/m3)
DRYDENSITY(kg/m3)
MOISTURECONTENT
(%)
1381
1413
1454
1278
19.5
23.7
27.7
31.8
TESTED BY Matthew Moniz
SUPPLIERSOURCE Existing Material
MATERIAL IDENTIFICATIONMATERIAL USE Clay LinerMAX. NOMINAL SIZE
COMPACTION STANDARD
COMPACTION PROCEDURE
OVERSIZE CORRECTION METHOD
Standard Proctor,ASTM D698A: 101.6mm Mold,Passing 4.75mm
None
MAXIMUMDRY
DENSITY(kg/m3)
OPTIMUMMOISTURECONTENT
(%)
1456 27.0CALCULATEDOVERSIZE CORRECTED
RETAINED 4.75mm SCREEN
REVIEWED BY
Reporting of these test results constitutes a testing service only. Engineering interpretation or evaluation of the test results is provided on written request. The data presented is for sole use ofclient stipulated above. Stantec is not responsible, nor can be held liable, for the use of this report by any other party, with or without the knowledge of Stantec.
Jason Thompson, C.E.T.
RAMMER TYPE
Moist
PROCTOR TEST REPORT
DATE SAMPLED 2019.Jul.30 DATE RECEIVED 2019.Jul.31 DATE TESTED 2019.Aug.06
%
request for use.pdfL90011_BRADY LANDFILL QA-QC PACKAGE.pdf001002Sheets and Views001
003Sheets and Views002
004005
15-0107-014-_DensityTesting2019.pdfBRRMF - Cell 32 - Atterberg Limits and HC test for two samples.pdfTable 3 – Atterberg Limits Test Data
Proctor_123314413_KGS Group Inc _Client_14413_1_20190807.pdf