32
1 Graham, Cory (SD) From: Mario Poveda <[email protected]> Sent: Friday, October 18, 2019 12:12 PM To: Graham, Cory (SD) Cc: Jason Mann; Raichura, Ash; Irvin Subject: BRRMF - Cell 32 - Notification to MSD for use authorization Attachments: L90011_BRADY LANDFILL QA-QC PACKAGE.pdf; 15-0107-014-_DensityTesting2019.pdf; BRRMF - Cell 32 - Atterberg Limits and HC test for two samples.pdf; Proctor_123314413_KGS Group Inc _Client_14413_1_20190807.pdf Importance: High Good afternoon Ms. Graham. Construction of the new Cell 32 at Brady Road Resource Management Facility is almost complete. The last critical component is the installation of the filter geotextile on top of the drainage gravel layer and it is expected to be completed by Tuesday October 22. I am attaching the complete QA/QC report from Titan Environmental for the HDPE geomembrane and geotechnical laboratory results for the Engineered Clay Liner for your reference. As shown in the design drawings, the complete seepage barrier at the cell includes (from topdown): 8 oz. nonwoven geotextile (filter) 300 mm of drainage gravel (comprised of two different 150 mm layers) 16 oz. nonwoven geotextile (cushion) 60 mil HDPE geomembrane 150 mm of recompacted clay liner The perforated HDPE pipe has also been installed, as well as the vertical manhole for extracting the leachate via a compressed air driven pump. The City is requesting authorization to commence the use of the new cell for landfilling purposes. Please review this information and let us know your decision at your earliest convenience. Thank you for your time. Regards, Mario Poveda M.Sc., P.Eng. ENVIRONMENTAL ENGINEER P 204 896 1209 ext 286 [email protected] | kgsgroup.com 3rd Floor 865 Waverley St Winnipeg, MB R3T 5P4 This email (including any attachments) is only for the use of the intended recipient(s). It may contain information or material that is confidential, proprietary or privileged. Any unauthorized use, distribution, disclosure or copying of this email is strictly prohibited. If you believe that you received this email in error, please notify us immediately by reply email or telephone and permanently delete this email without making or retaining a hard copy.

Graham, Cory (SD) · 2020. 8. 11. · 1 Graham, Cory (SD) From: Mario Poveda Sent: Friday, October 18, 2019 12:12 PM To: Graham, Cory (SD) Cc: Jason Mann;

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

  • 1

    Graham, Cory (SD)

    From: Mario Poveda Sent: Friday, October 18, 2019 12:12 PMTo: Graham, Cory (SD)Cc: Jason Mann; Raichura, Ash; IrvinSubject: BRRMF - Cell 32 - Notification to MSD for use authorizationAttachments: L90011_BRADY LANDFILL QA-QC PACKAGE.pdf;

    15-0107-014-_DensityTesting2019.pdf; BRRMF - Cell 32 - Atterberg Limits and HC test for two samples.pdf; Proctor_123314413_KGS Group Inc _Client_14413_1_20190807.pdf

    Importance: High

    Good afternoon Ms. Graham.  Construction of the new Cell 32 at Brady Road Resource Management Facility is almost complete. The last critical component is the installation of the filter geotextile on top of the drainage gravel layer and it is expected to be completed by Tuesday October 22.   I am attaching the complete QA/QC report from Titan Environmental for the HDPE geomembrane and geotechnical laboratory results for the Engineered Clay Liner for your reference.  As shown in the design drawings, the complete seepage barrier at the cell includes (from top‐down):  

      8 oz. non‐woven geotextile (filter)  300 mm of drainage gravel (comprised of two different 150 mm layers)  16 oz. non‐woven geotextile (cushion)  60 mil HDPE geomembrane  150 mm of re‐compacted clay liner 

     The perforated HDPE pipe has also been installed, as well as the vertical manhole for extracting the leachate via a compressed air driven pump.  The City is requesting authorization to commence the use of the new cell for landfilling purposes. Please review this information and let us know your decision at your earliest convenience.   Thank you for your time.  Regards,  Mario  Poveda   M.Sc., P.Eng.  E N V I R O N M E N T A L E N G I N E E R

     

    P 204‐896‐1209 ext 286 [email protected]  |  kgsgroup.com3rd Floor ‐ 865 Waverley St Winnipeg, MB  R3T 5P4 

    This email (including any attachments) is only for the use of the intended recipient(s). It may contain information or material that is confidential, proprietary or privileged. Any unauthorized use, distribution, disclosure or copying of this email is strictly prohibited. If you believe that you received this email in error, please notify us immediately by reply email or telephone and permanently delete this email without making or retaining a hard copy.   

  •   

     

      

        

    L9011  

    BRADY ROAD LANDFILL CELL 32 HDPE & GEOTEXTILE AS‐BUILT 

     WINNIPEG, MB 

     COMPLETED 15‐OCT‐19 

      

     

  • P1

    P2

    P3

    P4

    P5

    P6

    P7

    P8

    P9

    P10

    P11

    P12

    P13

    P14

    P15

    P16

    P17

    P18

    P64

    P63

    P62

    P61

    P60

    P59

    P58

    P57

    P56

    P55

    P54

    P53

    P52

    P51

    P50

    P49

    P48

    P47

    P19

    P21

    P23

    P24

    P26

    P28

    P30

    P20

    P22

    P25

    P27

    P29

    P31

    P32

    P34

    P33

    P35

    P36

    P38

    P41

    P43

    P44

    P45

    P46

    P37

    P40

    P42

    P39

    R

    1

    R

    2

    R

    3

    R

    4

    R

    5

    R

    6

    R

    7

    R

    8

    R

    9

    R

    1

    0

    R

    1

    1

    R

    1

    2

    R

    1

    3

    R

    1

    4

    R

    1

    5

    R

    1

    6

    R

    1

    7

    R

    1

    8

    R

    1

    9

    R

    2

    0

    R

    2

    1

    R

    2

    2

    R

    2

    3

    R

    2

    4

    R

    2

    5

    R

    2

    6

    R

    2

    7

    R

    2

    8

    R

    2

    9

    R

    3

    0

    R

    3

    1

    R

    3

    2R

    3

    3

    R

    3

    4

    R

    3

    5

    R

    3

    6

    R

    3

    7

    R

    3

    8

    R

    3

    8

    R

    3

    9

    R

    3

    9

    R

    4

    0

    NO EXISTING MATERIAL

    FOR TIE-IN, AREA TO BE

    CLAY CAPPED BY OTHERS.

    D

    T

    1

    D

    T

    2

    D

    T

    3

    D

    T

    4

    D

    T

    5

    D

    T

    6

    D

    T

    7

    D

    T

    8

    D

    T

    9

    D

    T

    1

    0

    D

    T

    1

    1

    D

    T

    1

    2

    D

    T

    1

    3

    D

    T

    1

    4

    D

    T

    1

    5

    D

    T

    1

    6

    D

    T

    1

    7

    x

    4

    X

    1

    X

    2

    X

    3

    DWG TITLE:

    CLIENT:

    TITAN ENVIRONMENTAL CONTAINMENT LTD.

    DWG NO.:

    REV. NO.:

    001

    PROJ. NO.:

    DATE:

    DRAWN BY:

    REV. BY:

    SCALE:

    NTS

    EA

    NOT APPROVED FOR CONSTRUCTION

    DWG TITLE:

    CLIENT:

    N

    LEGEND:

    ANCHOR TRENCH/ TIE-IN

    DWG TITLE: HDPE LINER AS-BUILT

    CLIENT:

    TITAN ENVIRONMENTAL CONTAINMENT LTD.

    DWG NO.:

    REV. NO.:

    001

    000

    PROJ. NO.:

    DATE:

    DRAWN BY:

    REV. BY:

    SCALE:

    NTS

    EA

    NOT APPROVED FOR CONSTRUCTION

    DWG TITLE:

    CLIENT:

    EA

    LEGEND:

    ANCHOR TRENCH/ TIE-IN

    Report any discrepancies to Titan Environmental Containment Ltd.Do not

    scale dimensions from drawing. Do not modify drawing, re-use it, or use it

    for purposes other than those intended at the time of its preparation

    without prior written permission from Titan Environmental Containment Ltd.

    Final Panel Locations to be installed at the descretion of the TITAN field

    Superintendant as see fit to existing site conditions..

    BRADY ROAD LANDFILL CELL 32

    15-OCT-19

    L9011

    CITY OF WINNIPEG

  • G29

    G30 G31

    G33G32

    G34

    G35 G36

    G38G37

    G39

    G40 G41

    G43G42

    G44

    G45 G46

    G48G47

    G49

    G50 G51

    G53G52

    G54

    G55 G56

    G58G57

    G59

    G60 G61

    G63G62

    G64

    G65 G66

    G68G67

    G69

    G70 G71

    G73G72

    G74

    G1

    G2

    G3

    G4

    G5

    G6

    G7

    G8

    G9

    G10

    G11

    G12

    G13

    G14

    G15

    G16

    G17

    G18

    G19

    G20

    G21

    G22

    G23

    G24

    G25

    G26

    G27

    G28

    DWG TITLE:

    CLIENT:

    TITAN ENVIRONMENTAL CONTAINMENT LTD.

    DWG NO.:

    REV. NO.:

    PROJ. NO.:

    DATE:

    DRAWN BY:

    REV. BY:

    SCALE:

    NTS

    EA

    NOT APPROVED FOR CONSTRUCTION

    DWG TITLE:

    CLIENT:

    N

    LEGEND:

    ANCHOR TRENCH/ TIE-IN

    DWG TITLE:GEOTEXTILE LINER AS-BUILT

    CLIENT:

    TITAN ENVIRONMENTAL CONTAINMENT LTD.

    DWG NO.:

    REV. NO.:

    002

    000

    PROJ. NO.:

    DATE:

    DRAWN BY:

    REV. BY:

    SCALE:

    NTS

    EA

    NOT APPROVED FOR CONSTRUCTION

    DWG TITLE:

    CLIENT:

    EA

    LEGEND:

    ANCHOR TRENCH/ TIE-IN

    Report any discrepancies to Titan Environmental Containment Ltd.Do not

    scale dimensions from drawing. Do not modify drawing, re-use it, or use it

    for purposes other than those intended at the time of its preparation

    without prior written permission from Titan Environmental Containment Ltd.

    Final Panel Locations to be installed at the descretion of the TITAN field

    Superintendant as see fit to existing site conditions..

    BRADY ROAD LANDFILL CELL 32

    15-OCT-19

    L9011

    CITY OF WINNIPEG

  • PANEL PLACEMENT LOG

    DATE

    LEN

    GTH

    WID

    TH

    DD/MMM/YY

    08/09/2019 G1 TE-E116 300 15

    08/09/2019 G2 TE-E116 300 15

    08/09/2019 G3 TE-E116 300 15

    08/09/2019 G4 TE-E116 300 15

    08/09/2019 G5 TE-E116 300 15

    08/09/2019 G6 TE-E116 300 15

    08/09/2019 G7 TE-E116 300 15

    08/09/2019 G8 TE-E116 300 15

    08/09/2019 G9 TE-E116 300 15

    08/09/2019 G10 TE-E116 300 15

    08/09/2019 G11 TE-E116 300 15

    08/09/2019 G12 TE-E116 300 15

    08/09/2019 G13 TE-E116 300 15

    08/09/2019 G14 TE-E116 300 15

    08/09/2019 G15 TE-E116 300 15

    08/09/2019 G16 TE-E116 300 15

    08/09/2019 G17 TE-E116 300 15

    08/09/2019 G18 TE-E116 300 15

    08/09/2019 G19 TE-E116 300 15

    08/09/2019 G20 TE-E116 300 15

    08/09/2019 G21 TE-E116 300 15

    08/09/2019 G22 TE-E116 300 15

    08/09/2019 G23 TE-E116 300 15

    08/09/2019 G24 TE-E116 300 15

    08/09/2019 G25 TE-E116 300 15

    08/09/2019 G26 TE-E116 300 15

    08/09/2019 G27 TE-E116 300 15

    08/09/2019 G28 TE-E116 300 15

    08/09/2019 G29 TE-E116 240 15

    08/09/2019 G30 TE-E116 180 15

    08/09/2019 G31 TE-E116 60 15

    08/09/2019 G32 TE-E116 120 15

    08/09/2019 G33 TE-E116 120 15

    08/09/2019 G34 TE-E116 240 15

    08/09/2019 G35 TE-E116 180 15

    08/09/2019 G36 TE-E116 60 15

    08/09/2019 G37 TE-E116 120 15

    08/09/2019 G38 TE-E116 120 15

    08/09/2019 G39 TE-E116 240 15

    Project Name: Brady Landfill Product Type: Geotextile 16oz

    PAN

    EL N

    UMBE

    R

    ROLL

    NUM

    BER

    CO

    MM

    ENTS

    FEET

  • PANEL PLACEMENT LOG

    DATE

    LEN

    GTH

    WID

    TH

    DD/MMM/YY

    Project Name: Brady Landfill Product Type: Geotextile 16oz

    PAN

    EL N

    UMBE

    R

    ROLL

    NUM

    BER

    CO

    MM

    ENTS

    FEET

    08/09/2019 G40 TE-E116 180 15

    08/09/2019 G41 TE-E116 60 15

    08/09/2019 G42 TE-E116 120 15

    08/09/2019 G43 TE-E116 120 15

    08/09/2019 G44 TE-E116 240 15

    08/09/2019 G45 TE-E116 180 15

    08/09/2019 G46 TE-E116 60 15

    08/09/2019 G47 TE-E116 120 15

    08/09/2019 G48 TE-E116 120 15

    08/09/2019 G49 TE-E116 240 15

    08/09/2019 G50 TE-E116 180 15

    08/09/2019 G51 TE-E116 60 15

    08/09/2019 G52 TE-E116 120 15

    08/09/2019 G53 TE-E116 120 15

    08/09/2019 G54 TE-E116 240 15

    08/09/2019 G55 TE-E116 180 15

    08/09/2019 G56 TE-E116 60 15

    08/09/2019 G57 TE-E116 120 15

    08/09/2019 G58 TE-E116 120 15

    08/09/2019 G59 TE-E116 240 15

    08/09/2019 G60 TE-E116 180 15

    08/09/2019 G61 TE-E116 60 15

    08/09/2019 G62 TE-E116 120 15

    08/09/2019 G63 TE-E116 120 15

    08/09/2019 G64 TE-E116 240 15

    08/09/2019 G65 TE-E116 180 15

    08/09/2019 G66 TE-E116 60 15

    08/09/2019 G67 TE-E116 120 15

    08/09/2019 G68 TE-E116 120 15

    08/09/2019 G69 TE-E116 240 15

    08/09/2019 G70 TE-E116 180 15

    08/09/2019 G71 TE-E116 60 15

    08/09/2019 G72 TE-E116 120 15

    08/09/2019 G73 TE-E116 120 15

    08/09/2019 G74 TE-E116 240 15

  • PANEL PLACEMENT LOG

    DATE

    LEN

    GTH

    WID

    TH

    DD/MMM/YY

    05/09/2019 P1 44345 68 23 Double Sided Textured

    05/09/2019 P2 44345 68 23 Double Sided Textured

    05/09/2019 P3 44345 69 23 Double Sided Textured

    05/09/2019 P4 44345 69 23 Double Sided Textured

    05/09/2019 P5 44345 70 23 Double Sided Textured

    05/09/2019 P6 44345 71 23 Double Sided Textured

    05/09/2019 P7 44345 72 23 Double Sided Textured

    05/09/2019 P8 44347 74 23 Double Sided Textured

    05/09/2019 P9 44347 74 23 Double Sided Textured

    05/09/2019 P10 44347 73 23 Double Sided Textured

    05/09/2019 P11 44347 72 23 Double Sided Textured

    05/09/2019 P12 44347 72 23 Double Sided Textured

    05/09/2019 P13 44347 72 23 Double Sided Textured

    05/09/2019 P14 44347 72 23 Double Sided Textured

    05/09/2019 P15 44343 72 23 Double Sided Textured

    05/09/2019 P16 44343 72 23 Double Sided Textured

    05/09/2019 P17 44343 72 23 Double Sided Textured

    05/09/2019 P18 44343 72 23 Double Sided Textured

    06/09/2019 P19 103480 384 23 Smooth

    06/09/2019 P20 103480 20 23 Smooth

    06/09/2019 P21 103484 364 23 Smooth

    06/09/2019 P22 103484 106 23 Smooth

    06/09/2019 P23 103481 278 23 Smooth

    06/09/2019 P24 103481 240 23 Smooth

    06/09/2019 P25 144391 147 23 Smooth

    06/09/2019 P26 144391 336 23 Smooth

    06/09/2019 P27 144392 50 23 Smooth

    06/09/2019 P28 144392 385 23 Smooth

    06/09/2019 P29 144392 60 23 Smooth

    06/09/2019 P30 144396 225 23 Smooth

    06/09/2019 P31 144396 160 23 Smooth

    06/09/2019 P32 144393 225 23 Smooth

    06/09/2019 P33 144393 285 23 Smooth

    06/09/2019 P34 144390 100 23 Smooth

    07/09/2019 P35 144390 385 23 Smooth

    07/09/2019 P36 144397 385 23 Smooth

    07/09/2019 P37 144397 120 23 Smooth

    07/09/2019 P38 103485 265 23 Smooth

    07/09/2019 P39 103485 235 23 Smooth

    Product Type: 60mil HDPEProject Name: Brady Landfill

    ROLL

    NUM

    BER

    CO

    MM

    ENTS

    FEETPAN

    EL N

    UMBE

    R

  • PANEL PLACEMENT LOG

    DATE

    LEN

    GTH

    WID

    TH

    DD/MMM/YY

    Product Type: 60mil HDPEProject Name: Brady Landfill

    ROLL

    NUM

    BER

    CO

    MM

    ENTS

    FEETPAN

    EL N

    UMBE

    R

    07/09/2019 P40 103482 150 23 Smooth

    07/09/2019 P41 103482 335 23 Smooth

    07/09/2019 P42 103486 50 23 Smooth

    07/09/2019 P43 103486 385 23 Smooth

    07/09/2019 P44 144394 385 23 Smooth

    07/09/2019 P45 144395 385 23 Smooth

    07/09/2019 P46 144298 385 23 Smooth

    07/09/2019 P47 44343 66 23 Double Sided Textured

    07/09/2019 P48 44343 66 23 Double Sided Textured

    07/09/2019 P49 44343 67 23 Double Sided Textured

    07/09/2019 P50 44348 67 23 Double Sided Textured

    07/09/2019 P51 44348 67 23 Double Sided Textured

    07/09/2019 P52 44348 68 23 Double Sided Textured

    07/09/2019 P53 44348 68 23 Double Sided Textured

    07/09/2019 P54 44348 68 23 Double Sided Textured

    07/09/2019 P55 44348 68 23 Double Sided Textured

    07/09/2019 P56 44348 69 23 Double Sided Textured

    07/09/2019 P57 44346 69 23 Double Sided Textured

    07/09/2019 P58 44346 69 23 Double Sided Textured

    07/09/2019 P59 44346 69 23 Double Sided Textured

    07/09/2019 P60 44346 70 23 Double Sided Textured

    07/09/2019 P61 44346 70 23 Double Sided Textured

    07/09/2019 P62 44346 70 23 Double Sided Textured

    07/09/2019 P63 44344 70 23 Double Sided Textured

    07/09/2019 P64 44344 70 23 Double Sided Textured

  • WEDGE SEAM LOG

    WEL

    D DA

    TE

    SEA

    M L

    ENG

    TH

    TEST

    DA

    TE

    DD/MMM/YY AM PM FEET DD/MMM/YY

    P1/P2 05/09/2019 1250 KD 11 68 06/09/2019 43 42 PASS KH

    P2/P3 05/09/2019 1250 OL 32 68 06/09/2019 46 46 PASS KH

    P3/P4 05/09/2019 105 KD 11 69 06/09/2019 42 42 PASS KH

    P4/P5 05/09/2019 104 OL 32 69 06/09/2019 39 39 PASS KH

    P5/P6 05/09/2019 120 KD 11 70 06/09/2019 42 41 PASS KH

    P6/P7 05/09/2019 116 OL 32 71 06/09/2019 41 41 PASS KH

    P7/P8 05/09/2019 133 KD 11 72 06/09/2019 47 47 PASS KH

    P8/P9 05/09/2019 129 OL 32 74 06/09/2019 49 47 PASS KH

    P9/P10 05/09/2019 149 KD 11 73 06/09/2019 51 51 PASS KH

    P10/P11 05/09/2019 145 OL 32 73 06/09/2019 36 36 PASS KH

    P11/P12 05/09/2019 200 KD 11 72 06/09/2019 46 46 PASS KH

    P12/P13 05/09/2019 200 OL 32 72 06/09/2019 45 45 PASS KH

    P13/P14 05/09/2019 218 KD 11 72 06/09/2019 45 44 PASS KH

    P14/P15 05/09/2019 220 OL 32 72 06/09/2019 42 42 PASS KH

    P15/P16 05/09/2019 230 KD 11 72 06/09/2019 40 39 PASS KH

    P16/P17 05/09/2019 235 OL 32 72 06/09/2019 46 46 PASS KH

    P17/P18 05/09/2019 244 KD 11 72 06/09/2019 43 43 PASS KH

    PASS KH

    P20/P21 06/09/2019 950 OL 32 23 06/09/2019 42 42 PASS KH

    P19/P20,21 06/09/2019 1000 KD 11 285 06/09/2019 40 40 PASS KH

    P22/P23 06/09/2019 955 KD 11 23 06/09/2019 46 44 PASS KH

    P20,21/P22,23 06/09/2019 1030 OL 32 285 06/09/2019 39 39 PASS KH

    P24/P25 06/09/2019 1110 OL 32 23 06/09/2019 45 45 PASS KH

    P22,23/P24,25 06/09/2019 1115 KD 11 285 06/09/2019 46 45 PASS KH

    P26/P27 06/09/2019 1138 OL 11 23 06/09/2019 42 40 PASS KH

    P24,25/P26,27 06/09/2019 1142 OL 32 285 06/09/2019 41 41 PASS KH

    P26,27/P28 06/09/2019 210 KD 11 285 06/09/2019 39 38 PASS KH

    P29/P30 06/09/2019 215 OL 32 23 07/09/2019 42 41 PASS KH

    P28/P29,30 06/09/2019 220 OL 32 285 07/09/2019 41 41 PASS KH

    P31/P32 06/09/2019 404 KD 11 23 07/09/2019 47 46 PASS KH

    P29,30/P31,32 06/09/2019 410 KD 11 285 07/09/2019 40 39 PASS KH

    P33/P34 06/09/2019 422 OL 32 23 07/09/2019 40 40 PASS KH

    P31,32/P33,34 06/09/2019 430 OL 32 285 07/09/2019 45 45 PASS KH

    PASS KH

    P33,34/P35 07/09/2019 1015 OL 32 285 07/09/2019 46 46 PASS KH

    P35/P36 07/09/2019 1022 CS 43 285 07/09/2019 40 40 PASS KH

    P37/P38 07/09/2019 1042 KD 11 23 07/09/2019 39 38 PASS KH

    P36/P37,38 07/09/2019 1047 KD 11 285 07/09/2019 41 41 PASS KH

    Product Type: 60mil HDPEProject Name: Brady Landfill

    STA

    RT P

    SI

    FIN

    ISH

    PSI

    AIR TEST INFORMATIONSEAM LOGBE

    TWEE

    N P

    AN

    ELS

    TEST

    RES

    ULTS

    QC

    TEC

    HNIC

    IAN

    TIME

    OF

    DAY

    TEC

    HNIC

    IAN

    WED

    GE

    #

  • WEDGE SEAM LOG

    WEL

    D DA

    TE

    SEA

    M L

    ENG

    TH

    TEST

    DA

    TE

    DD/MMM/YY AM PM FEET DD/MMM/YY

    Product Type: 60mil HDPEProject Name: Brady Landfill

    STA

    RT P

    SI

    FIN

    ISH

    PSI

    AIR TEST INFORMATIONSEAM LOGBE

    TWEE

    N P

    AN

    ELS

    TEST

    RES

    ULTS

    QC

    TEC

    HNIC

    IAN

    TIME

    OF

    DAY

    TEC

    HNIC

    IAN

    WED

    GE

    #

    P39/P40 07/09/2019 1110 CS 43 23 07/09/2019 41 40 PASS KH

    P37,38/P39,40 07/09/2019 1050 OL 32 285 07/09/2019 40 40 PASS KH

    P41/P42 07/09/2019 1143 KD 11 23 07/09/2019 43 42 PASS KH

    P39,40/P41,42 07/09/2019 1151 CS 43 285 07/09/2019 46 46 PASS KH

    P41,42/P43 07/09/2019 1155 KD 11 285 07/09/2019 42 42 PASS KH

    P43/P44 07/09/2019 220 OL 32 285 07/09/2019 43 42 PASS KH

    P44/P45 07/09/2019 220 CS 43 285 07/09/2019 38 37 PASS KH

    P45/P46 07/09/2019 230 KD 11 285 07/09/2019 40 40 PASS KH

    P47/P48 07/09/2019 335 CS 43 64 08/09/2019 45 44 PASS KH

    P48/P49 07/09/2019 345 KD 11 65 08/09/2019 42 41 PASS KH

    P49/P50 07/09/2019 405 OL 32 65 08/09/2019 45 45 PASS KH

    P50/P51 07/09/2019 405 CS 43 65 08/09/2019 38 38 PASS KH

    P51/P52 07/09/2019 403 KD 11 65 08/09/2019 40 39 PASS KH

    P52/P53 07/09/2019 420 CS 43 66 08/09/2019 52 51 PASS KH

    P53/P54 07/09/2019 420 KD 11 67 08/09/2019 47 46 PASS KH

    P54/P55 07/09/2019 420 OL 32 67 08/09/2019 45 45 PASS KH

    P55/P56 07/09/2019 437 CS 43 67 08/09/2019 47 47 PASS KH

    P56/P57 07/09/2019 435 KD 11 68 08/09/2019 44 44 PASS KH

    P57/P58 07/09/2019 430 OL 32 68 08/09/2019 42 42 PASS KH

    P58/P59 07/09/2019 448 CS 43 68 08/09/2019 40 40 PASS KH

    P59/P60 07/09/2019 435 KD 11 69 08/09/2019 37 36 PASS KH

    P60/P61 07/09/2019 445 OL 32 69 08/09/2019 46 45 PASS KH

    P61/P62 07/09/2019 510 KD 11 70 08/09/2019 49 49 PASS KH

    P62/P63 07/09/2019 455 OL 32 70 08/09/2019 50 50 PASS KH

    P63/P64 07/09/2019 505 OL 32 70 08/09/2019 45 44 PASS KH

  • BUTT SEAM LOG

    WEL

    D DA

    TE

    SEA

    M L

    ENG

    TH

    TEST

    DA

    TE

    Seam Starts Between Panels

    Finishes Between Panels DD/MMM/YY A

    M PM FEET DD/MMM/YY

    P18/P19 P1/P19 06/09/2019 1005 CS 43 390

    P19 P1 06/07/2019 41 40 PASS KH

    P19 P2 06/07/2019 40 40 PASS KH

    P19 P3 06/07/2019 37 36 PASS KH

    P19 P4 06/07/2019 48 47 PASS KH

    P19 P5 06/07/2019 40 39 PASS KH

    P19 P6 06/07/2019 41 40 PASS KH

    P19 P7 06/07/2019 46 44 PASS KH

    P19 P8 06/07/2019 37 37 PASS KH

    P19 P9 06/07/2019 50 50 PASS KH

    P19 P10 06/07/2019 38 37 PASS KH

    P19 P11 06/07/2019 43 43 PASS KH

    P19 P12 06/07/2019 46 45 PASS KH

    P19 P13 06/07/2019 40 40 PASS KH

    P19 P14 06/07/2019 39 39 PASS KH

    P19 P15 06/07/2019 42 41 PASS KH

    P19 P16 06/07/2019 47 45 PASS KH

    P19 P17 06/07/2019 50 49 PASS KH

    P19 P18 06/07/2019 42 42 PASS KH

    P64/P46 P47/P46 07/09/2019 530 OL 32 387

    P46 P47 07/09/2019 42 40 PASS KH

    P46 P48 07/09/2019 46 46 PASS KH

    P46 P49 07/09/2019 40 40 PASS KH

    P46 P50 07/09/2019 38 37 PASS KH

    P46 P51 07/09/2019 36 35 PASS KH

    P46 P52 07/09/2019 46 45 PASS KH

    P46 P53 07/09/2019 43 43 PASS KH

    P46 P54 07/09/2019 48 48 PASS KH

    P46 P55 07/09/2019 49 48 PASS KH

    P46 P56 07/09/2019 39 38 PASS KH

    P46 P57 07/09/2019 46 45 PASS KH

    P46 P58 07/09/2019 44 44 PASS KH

    BUTT SEAM LOG

    TEC

    HNIC

    IAN

    WED

    GE

    #

    Project Name: Brady Landfill Product Type: 60mil HDPE

    STA

    RT P

    SI

    FIN

    ISH

    PSI

    TEST

    RES

    ULTS

    BUTT

    SEA

    M

    BUTT

    SEA

    M L

    ETTE

    R

    QC

    TEC

    HNIC

    IAN

    TIME

    OF

    DAY

    AIR TEST INFORMATION

  • BUTT SEAM LOG

    WEL

    D DA

    TE

    SEA

    M L

    ENG

    TH

    TEST

    DA

    TE

    Seam Starts Between Panels

    Finishes Between Panels DD/MMM/YY A

    M PM FEET DD/MMM/YY

    BUTT SEAM LOG

    TEC

    HNIC

    IAN

    WED

    GE

    #

    Project Name: Brady Landfill Product Type: 60mil HDPE

    STA

    RT P

    SI

    FIN

    ISH

    PSI

    TEST

    RES

    ULTS

    BUTT

    SEA

    M

    BUTT

    SEA

    M L

    ETTE

    R

    QC

    TEC

    HNIC

    IAN

    TIME

    OF

    DAY

    AIR TEST INFORMATION

    P46 P59 07/09/2019 42 41 PASS KH

    P46 P60 07/09/2019 39 38 PASS KH

    P46 P61 07/09/2019 41 41 PASS KH

    P46 P62 07/09/2019 45 45 PASS KH

    P46 P63 07/09/2019 46 45 PASS KH

    P46 P64 07/09/2019 45 45 PASS KH

  • WEDGE TRIAL LOG

    Project Name:

    Wedge #: 32Date:

    Sheet Type:AM TEST PM TEST

    Time: 1116 AM Time: PM Technician: OL Technician: NOTES:

    Ambient Temp: 21 °C Ambient Temp: °CWedge Speed: 550 ft/hr Wedge Speed: ft/hrWedge Temp: 860F °C / °F Wedge Temp: °C / °F

    200%+ F.T.B. 200%+ F.T.B.

    200%+ F.T.B. 200%+ F.T.B.

    200%+ F.T.B. 200%+ F.T.B.

    200%+ F.T.B. 200%+ F.T.B.

    200%+ F.T.B. 200%+ F.T.B.

    200%+ F.T.B. 200%+ F.T.B.

    200%+ F.T.B. 200%+ F.T.B.

    200%+ F.T.B. 200%+ F.T.B.

    200%+ F.T.B. 200%+ F.T.B.

    200%+ F.T.B. 200%+ F.T.B.

    200%+ F.T.B. 200%+ F.T.B.

    200%+ F.T.B. 200%+ F.T.B.

    200%+ F.T.B. 200%+ F.T.B.

    200%+ F.T.B. 200%+ F.T.B.

    200%+ F.T.B. 200%+ F.T.B.

    Wedge #: 11Date:

    Sheet Type:AM TEST PM TEST

    Time: 1115 AM Time: PM Technician: KD Technician: NOTES:

    Ambient Temp: 21 °C Ambient Temp: °CWedge Speed: 480 ft/hr Wedge Speed: ft/hrWedge Temp: 860F °C / °F Wedge Temp: °C / °F

    200%+ F.T.B. 200%+ F.T.B.

    200%+ F.T.B. 200%+ F.T.B.

    200%+ F.T.B. 200%+ F.T.B.

    200%+ F.T.B. 200%+ F.T.B.

    200%+ F.T.B. 200%+ F.T.B.

    200%+ F.T.B. 200%+ F.T.B.

    200%+ F.T.B. 200%+ F.T.B.

    200%+ F.T.B. 200%+ F.T.B.

    200%+ F.T.B. 200%+ F.T.B.

    200%+ F.T.B. 200%+ F.T.B.

    200%+ F.T.B. 200%+ F.T.B.

    200%+ F.T.B. 200%+ F.T.B.

    200%+ F.T.B. 200%+ F.T.B.

    200%+ F.T.B. 200%+ F.T.B.

    200%+ F.T.B. 200%+ F.T.B.

    60 mil HDPE

    ELO

    NG

    ATIO

    N

    128

    132

    126

    156

    INSIDE PEEL

    OUTSIDE PEEL

    121

    119

    139

    152

    115

    111

    INSIDE PEEL

    112

    120INSIDE PEEL INSIDE PEEL

    SHEAR

    60mil HDPEBRADY LANDFILL Product Type:

    SHEAR

    BREA

    K TY

    PE

    60 mil HDPE

    ELO

    NG

    ATIO

    N

    ELO

    NG

    ATIO

    NEL

    ON

    GA

    TION

    05/09/2019

    125

    BREA

    K TY

    PE

    BREA

    K TY

    PE

    05/09/2019

    OUTSIDE PEEL

    BREA

    K TY

    PE

    126

    120

    SHEAR

    135

    SHEAR142

    OUTSIDE PEEL OUTSIDE PEEL

    118

    110

    116

    120

    141

  • WEDGE TRIAL LOG

    Project Name: 60mil HDPEBRADY LANDFILL Product Type:

    Wedge #: 32Date:

    Sheet Type:AM TEST PM TEST

    Time: 820 AM Time: 200 PM Technician: OL Technician: OL NOTES:

    Ambient Temp: 22 °C Ambient Temp: 26 °CWedge Speed: 530 ft/hr Wedge Speed: 530 ft/hrWedge Temp: 860F °C / °F Wedge Temp: 860F °C / °F

    200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.

    Wedge #: 11Date:

    Sheet Type:AM TEST PM TEST

    Time: 800 AM Time: 200 PM Technician: KD Technician: KD NOTES:

    Ambient Temp: 20 °C Ambient Temp: 25 °CWedge Speed: 480 ft/hr Wedge Speed: 480 ft/hrWedge Temp: 860F °C / °F Wedge Temp: 860F °C / °F

    200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.

    06/09/2019

    OUTSIDE PEEL

    122

    OUTSIDE PEEL

    128128 124117 125

    INSIDE PEEL

    120

    INSIDE PEEL

    125117 126112 120117 119

    60 mil HDPE

    ELO

    NG

    ATIO

    N

    BREA

    K TY

    PE

    06/09/201960 mil HDPE

    ELO

    NG

    ATIO

    N

    BREA

    K TY

    PE

    ELO

    NG

    ATIO

    N

    BREA

    K TY

    PE

    147 145

    119 120

    ELO

    NG

    ATIO

    N

    BREA

    K TY

    PE

    SHEAR

    142

    SHEAR

    157156 162

    OUTSIDE PEEL

    122

    OUTSIDE PEEL

    119124 116117 123

    INSIDE PEEL

    120

    INSIDE PEEL

    122109 126118 120119 121

    148 146

    114 116

    SHEAR

    156

    SHEAR

    154143 150

  • WEDGE TRIAL LOG

    Project Name: 60mil HDPEBRADY LANDFILL Product Type:

    Wedge #: 32Date:

    Sheet Type:AM TEST PM TEST

    Time: AM Time: 525 PM Technician: Technician: OL NOTES:

    Ambient Temp: °C Ambient Temp: 22 °CWedge Speed: ft/hr Wedge Speed: 500 ft/hrWedge Temp: °C / °F Wedge Temp: 860 °F

    200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.

    Wedge #:Date:

    Sheet Type:AM TEST PM TEST

    Time: AM Time: PM Technician: Technician: NOTES:

    Ambient Temp: °C Ambient Temp: °CWedge Speed: ft/hr Wedge Speed: ft/hrWedge Temp: °C / °F Wedge Temp: °C / °F

    200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.

    07/09/201960 mil HDPE

    ELO

    NG

    ATIO

    N

    BREA

    K TY

    PEINSIDE PEEL INSIDE PEEL

    106109117110

    ELO

    NG

    ATIO

    N

    BREA

    K TY

    PE

    137

    ELO

    NG

    ATIO

    N

    BREA

    K TY

    PE

    OUTSIDE PEEL

    99104103109

    SHEAR SHEAR

    145139

    ELO

    NG

    ATIO

    N

    BREA

    K TY

    PE

    OUTSIDE PEEL

    INSIDE PEEL INSIDE PEEL

    OUTSIDE PEEL OUTSIDE PEEL

    SHEAR SHEAR

  • EXTRUDER TRIAL LOGProject Name:

    Extruder#: 5Date:

    Sheet Type:AM TEST PM TEST

    Time: 900 AM Time: 200 PM Technician: RN Technician: RN NOTES:

    Ambient Temp: 22 °C Ambient Temp: 24 °CBarrel/Air Temp: 460 / 450 °C Barrel/Air Temp: 460 / 450 °C

    200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.

    Extruder#: 5Date: NOTES:

    Sheet Type:AM TEST PM TEST

    Time: 900 AM Time: 155 PM Technician: RN Technician: RN

    Ambient Temp: 21 °C Ambient Temp: 24 °CBarrel/Air Temp: 460 / 450 °C Barrel/Air Temp: 460 / 450 °C

    200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.

    BREA

    K TY

    PE

    SHEAR SHEAR

    110PEEL

    109

    ELO

    NG

    ATIO

    N

    Product Type: 60mil HDPE

    ELO

    NG

    ATIO

    N

    BREA

    K TY

    PE

    ELO

    NG

    ATIO

    N

    Brady Landfill

    109

    148

    105102

    104

    155

    99

    BREA

    K TY

    PE

    06/09/2019

    139145135

    143

    60mil HDPE

    145152

    PEEL

    103

    60mil HDPE07/09/2019

    167160

    ELO

    NG

    ATIO

    N

    BREA

    K TY

    PE

    121

    119116

    PEEL

    SHEAR

    1091179799

    139

    PEEL

    SHEAR

    140

  • EXTRUDER TRIAL LOGProject Name: Product Type: 60mil HDPEBrady Landfill

    Extruder#: 5Date:

    Sheet Type:AM TEST PM TEST

    Time: 920 AM Time: 210 PM Technician: DP Technician: DP NOTES:

    Ambient Temp: 19 °C Ambient Temp: 24 °CBarrel/Air Temp: 460 / 450 °C Barrel/Air Temp: 460 / 450 °C

    200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.

    SHEAR

    156

    SHEAR

    148150 135154 138

    ELO

    NG

    ATIO

    N

    BREA

    K TY

    PE

    PEEL

    112

    PEEL

    118114 123110 109116 107

    08/09/2019 60mil HDPE

    ELO

    NG

    ATIO

    N

    BREA

    K TY

    PE

  • EXTRUSION DETAIL LOG

    Project Name

    Product Type:

    CO

    DE

    TEST

    DA

    TE

    SEE LEGEND DD/MMM/YY

    06/09/2019 RN BO P16/P17 bottom 08/09/2019 PASS KH Vac Box

    06/09/2019 RN BO P18 @ butt 08/09/2019 PASS KH Vac Box

    06/09/2019 RN E P15 going up 30' 08/09/2019 PASS KH Vac Box

    06/09/2019 RN E P15 @ butt 08/09/2019 PASS KH Vac Box

    06/09/2019 RN BO P14 @ butt 08/09/2019 PASS KH Vac Box

    06/09/2019 RN E P13 @ butt 08/09/2019 PASS KH Vac Box

    06/09/2019 RN E P12 @ butt 08/09/2019 PASS KH Vac Box

    06/09/2019 RN E P11/P12 1/3 up slope 08/09/2019 PASS KH Vac Box

    06/09/2019 RN E P9 @ butt 08/09/2019 PASS KH Vac Box

    06/09/2019 RN E P7 @ butt 08/09/2019 PASS KH Vac Box

    06/09/2019 RN E p6 @ butt 08/09/2019 PASS KH Vac Box

    06/09/2019 RN E p5 @ butt 08/09/2019 PASS KH Vac Box

    06/09/2019 RN E p3 @ butt 08/09/2019 PASS KH Vac Box

    07/09/2019 RN BO P22/P24 @ N toe 08/09/2019 PASS KH Vac Box

    07/09/2019 RN P P23/P25 @ S Trench 08/09/2019 PASS KH Vac Box

    07/09/2019 RN BO P28/P30 08/09/2019 PASS KH Vac Box

    07/09/2019 RN E P30 near cross 08/09/2019 PASS KH Vac Box

    07/09/2019 RN BO P32/P34 08/09/2019 PASS KH Vac Box

    07/09/2019 RN BO P34/P35 08/09/2019 PASS KH Vac Box

    07/09/2019 RN P P35/P36 08/09/2019 PASS KH Vac Box

    07/09/2019 RN E P35/P36 08/09/2019 PASS KH Vac Box

    07/09/2019 RN E P40 near cross 08/09/2019 PASS KH Vac Box

    07/09/2019 RN P P39/P40/P41 08/09/2019 PASS KH Vac Box

    07/09/2019 RN E P42 08/09/2019 PASS KH Vac Box

    07/09/2019 RN P P43/P44 08/09/2019 PASS KH Vac Box

    07/09/2019 RN BO P44/P45 08/09/2019 PASS KH Vac Box

    07/09/2019 RN P P44/P45 08/09/2019 PASS KH Vac Box

    08/09/2019 DP E P63 08/09/2019 PASS KH Vac Box

    08/09/2019 DP PT P56 08/09/2019 PASS KH Vac Box

    08/09/2019 DP P P52/P53 08/09/2019 PASS KH Vac Box

    08/09/2019 DP E P52 08/09/2019 PASS KH Vac Box

    08/09/2019 DP E P51/P50 08/09/2019 PASS KH Vac Box

    08/09/2019 DP E P50 08/09/2019 PASS KH Vac Box

    R10

    R11

    R12

    R13

    R14

    R24

    R25

    R26

    2 X 6"

    3x2

    6"

    3 X 6"

    4'

    1X1

    3X2

    8'

    CODE LEGENDBO-BLOCK OFF

    P-PATCHPT-PENETRATION

    E-EXTRUSION BEADT-THREE PANEL INTERSECTION

    Brady Landfill

    TEST

    RES

    ULTS

    DT-DESTRUCTIVE TEST

    DETA

    IL L

    ETTE

    R

    DETA

    IL D

    ATE

    DIM

    ENSI

    ON

    S

    60mil HDPE

    LOC

    ATIO

    N

    C-CAP

    R6

    R7

    R8

    18'

    6"

    10 X 6"

    6"R5

    * UNLESS OTHERWISE NOTED, ALL 3 PANEL INTERSECTIONS COME WITH VACUUM TESTED EXTRUDED T-WELDS.

    6"

    1'

    1'

    6"

    TEST

    TYPE

    TEC

    HNIC

    IAN

    QC

    TEC

    H

    1'

    6"

    R1

    R2

    R3

    R4

    R9

    R22

    R23

    R15

    R16

    R17

    R18

    R19

    R206"

    3x3

    1'

    6"

    3X2

    1'

    1'

    2 X 1'

    6'

    1X1

    13 X 6"

    7X5

    R31

    R32

    R33

    R27

    R28

    R29

    R30

    2 X 6"

    1'

    6"

    R21

  • EXTRUSION DETAIL LOG

    Project Name

    Product Type:

    CO

    DE

    TEST

    DA

    TE

    SEE LEGEND DD/MMM/YY

    CODE LEGENDBO-BLOCK OFF

    P-PATCHPT-PENETRATION

    E-EXTRUSION BEADT-THREE PANEL INTERSECTION

    Brady Landfill

    TEST

    RES

    ULTS

    DT-DESTRUCTIVE TEST

    DETA

    IL L

    ETTE

    R

    DETA

    IL D

    ATE

    DIM

    ENSI

    ON

    S

    60mil HDPE

    LOC

    ATIO

    N

    C-CAP

    * UNLESS OTHERWISE NOTED, ALL 3 PANEL INTERSECTIONS COME WITH VACUUM TESTED EXTRUDED T-WELDS.

    TEST

    TYPE

    TEC

    HNIC

    IAN

    QC

    TEC

    H

    08/09/2019 DP E P47/P48 08/09/2019 PASS KH Vac Box

    08/09/2019 DP E P47/P48 08/09/2019 PASS KH Vac Box08/09/2019 DP E P63 @ BUTT 08/09/2019 PASS KH Vac Box

    08/09/2019 DP E P62 @ BUTT 08/09/2019 PASS KH Vac Box

    06/09/2019 RN C Existing cell Tie in 08/09/2019 PASS KH Vac Box

    07/09/2019 RN C Existing cell Tie in 08/09/2019 PASS KH Vac Box

    08/09/2019 DP C Existing cell Tie in 08/09/2019 PASS KH Vac Box

    06/09/2019 RN DT P15/P16 1/3 up slope 08/09/2019 PASS KH Vac Box

    06/09/2019 RN DT P16/P17 1/2 up slope 08/09/2019 PASS KH Vac Box

    06/09/2019 RN DT P23/P25 15' N 08/09/2019 PASS KH Vac Box

    06/09/2019 RN DT P25/P26 50' N 08/09/2019 PASS KH Vac Box06/09/2019 RN DT P26/P28 125' N 08/09/2019 PASS KH Vac Box

    06/09/2019 RN DT P28/P30 215'N 08/09/2019 PASS KH Vac Box

    06/09/2019 RN DT P30/P31 240' N 08/09/2019 PASS KH Vac Box

    06/09/2019 RN DT P31/P33 330' N 08/09/2019 PASS KH Vac Box

    07/09/2019 RN DT P35/P36 115'N 08/09/2019 PASS KH Vac Box

    07/09/2019 RN DT P36/P37 350' N 08/09/2019 PASS KH Vac Box

    07/09/2019 RN DT P38/P40 75' N 08/09/2019 PASS KH Vac Box

    07/09/2019 RN DT P39/P41 230' N 08/09/2019 PASS KH Vac Box

    07/09/2019 RN DT P43/P44 190' N 08/09/2019 PASS KH Vac Box

    07/09/2019 RN DT P44/P45 345'N 08/09/2019 PASS KH Vac Box

    07/09/2019 RN DT P45/P46 80' N 08/09/2019 PASS KH Vac Box

    08/09/2019 DP DT P53/P54 7' from but 08/09/2019 PASS KH Vac Box

    08/09/2019 DP DT P62/P63 7' from butt 08/09/2019 PASS KH Vac Box

    4X2

    4X2

    6"

    205'

    154'

    52'

    4X2

    4X2

    4X2

    4X2

    4X2

    4X2

    4X2

    4X2

    4X2

    4X2

    4 X 6"

    R34

    R35

    R361'

    1'

    R37

    R38

    R39

    R40

    DT1

    DT2

    DT3

    DT5

    DT4

    DT6

    DT7

    DT8

    DT9

    DT10

    DT11

    DT12

    DT13

    DT14

    DT15

    DT16

    DT17

    4X2

    4X2

    4X2

    4X2

    4X2

  • DESTRUCTIVE TEST LOG

    Project Name: Sheet Type:

    DT#: 1 DT#: 2Between Panels: Between Panels:

    QA Monitor: QA Monitor:

    Date: Date:

    Time: 245 Time: 305

    200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.

    DT#: 3 DT#: 4Between Panels: Between Panels:

    QA Monitor: QA Monitor:

    Date: Date:

    Time: 320 Time: 340

    200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.

    200%+ F.T.B. 200%+ F.T.B.

    200%+ F.T.B. 200%+ F.T.B.

    200%+ F.T.B. 200%+ F.T.B.

    200%+ F.T.B. 200%+ F.T.B.

    200%+ F.T.B. 200%+ F.T.B.

    BRADY LANDFILL

    115110

    119

    120120

    119

    115

    INSIDE PEEL

    OUTSIDE PEEL

    SHEAR

    129120

    118

    139129

    130

    115122130

    60mil HDPE

    128125128

    P25/P26

    06/09/2019

    126126

    SHEAR

    144

    06/09/2019

    122

    140140

    120

    06/09/2019 06/09/2019

    INSIDE PEEL

    137128

    KH

    OUTSIDE PEEL OUTSIDE PEEL

    119 130

    129114110 134

    OUTSIDE PEEL

    118122

    INSIDE PEEL INSIDE PEEL

    136142

    140165

    126

    150144

    128

    130

    122114

    SHEAR

    143

    SHEAR

    150

    139 134

    146 145

    144 147

    159 146

    ELO

    NG

    ATIO

    N

    KH

    BREA

    K TY

    PE

    ELO

    NG

    ATIO

    N

    BREA

    K TY

    PE

    P23/P25

    ELO

    NG

    ATIO

    N

    BREA

    K TY

    PEKH

    124124

    137

    ELO

    NG

    ATIO

    N

    BREA

    K TY

    PE

    P16/P17P15/P16

    KH

  • DESTRUCTIVE TEST LOG

    Project Name: Sheet Type:BRADY LANDFILL 60mil HDPE

    DT# 5 DT#: 6Between Panels: Between Panels:

    QA Monitor: QA Monitor:Date: Date:Time: 1020 Time: 1035

    200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.

    DT#: 7 DT#: 8Between Panels: Between Panels:

    QA Monitor: QA Monitor:Date: Date:Time: 1052 Time: 1110

    200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.

    SHEAR

    144

    SHEAR

    148149 145142 142146 140150 138

    OUTSIDE PEEL

    119

    OUTSIDE PEEL

    114110 130122 136112 141132 135

    INSIDE PEEL

    117

    INSIDE PEEL

    133129 120136 126131 137132 129

    P30/P31

    ELO

    NG

    ATIO

    N

    BREA

    K TY

    PE

    P31/P33

    ELO

    NG

    ATIO

    N

    BREA

    K TY

    PEKH KH07/09/2019 07/09/2019

    SHEAR

    155

    SHEAR

    160146 147148 156144 155142 152

    OUTSIDE PEEL

    118

    OUTSIDE PEEL

    115136 120110 123141 127142 127

    INSIDE PEEL

    127

    INSIDE PEEL

    129133 124118 123125 129145 108

    P26/P28

    ELO

    NG

    ATIO

    N

    BREA

    K TY

    PE

    P28/P30

    ELO

    NG

    ATIO

    N

    BREA

    K TY

    PEKH KH07/09/2019 07/09/2019

  • DESTRUCTIVE TEST LOG

    Project Name: Sheet Type:BRADY LANDFILL 60mil HDPE

    DT#: 9 DT#: 10Between Panels: Between Panels:

    QA Monitor: QA Monitor:Date: Date:Time: 430 Time: 440

    200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.

    DT#: 11 DT#: 12Between Panels: Between Panels:

    QA Monitor: QA Monitor:Date: Date:Time: 455 Time: 509

    200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.

    SHEAR

    146

    SHEAR

    147143 144144 136148 145149 149

    OUTSIDE PEEL

    129

    OUTSIDE PEEL

    113122 124116 118115 104112 104

    INSIDE PEEL

    104

    INSIDE PEEL

    116135 129120 120135 111128 132

    P38/P40

    ELO

    NG

    ATIO

    N

    BREA

    K TY

    PE

    P39/P41

    ELO

    NG

    ATIO

    N

    BREA

    K TY

    PEKH KH07/09/2019 07/09/2019

    SHEAR

    146

    SHEAR

    150143 145134 157140 143141 140

    OUTSIDE PEEL

    128

    OUTSIDE PEEL

    110137 117116 118130 118120 120

    INSIDE PEEL

    139

    INSIDE PEEL

    115111 119136 117124 117123 128

    P35/P36

    ELO

    NG

    ATIO

    N

    BREA

    K TY

    PE

    P36/P37

    ELO

    NG

    ATIO

    N

    BREA

    K TY

    PEKH KH07/09/2019 07/09/2019

  • DESTRUCTIVE TEST LOG

    Project Name: Sheet Type:BRADY LANDFILL 60mil HDPE

    DT#: 13 DT#: 14Between Panels: Between Panels:

    QA Monitor: QA Monitor:Date: Date:Time: 520 Time: 533

    200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.

    DT#: 15 DT#: 16Between Panels: Between Panels:

    QA Monitor: QA Monitor:Date: Date:Time: 545 Time: 100

    200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.

    SHEAR

    145

    SHEAR

    139150 147143 145140 148146 144

    OUTSIDE PEEL

    133

    OUTSIDE PEEL

    112146 95135 98140 121133 107

    INSIDE PEEL

    132

    INSIDE PEEL

    123128 123132 112134 121128 126

    P45/P46

    ELO

    NG

    ATIO

    N

    BREA

    K TY

    PE

    P53/P54

    ELO

    NG

    ATIO

    N

    BREA

    K TY

    PEKH KH07/09/2019 08/09/2019

    SHEAR

    137

    SHEAR

    137139 148135 146142 142141 144

    OUTSIDE PEEL

    115

    OUTSIDE PEEL

    112119 112127 105120 118106 116

    INSIDE PEEL

    117

    INSIDE PEEL

    125120 119128 128118 132125 125

    P43/P44

    ELO

    NG

    ATIO

    N

    BREA

    K TY

    PE

    P44/P45

    ELO

    NG

    ATIO

    N

    BREA

    K TY

    PEKH KH07/09/2019 07/-9/2019

  • DESTRUCTIVE TEST LOG

    Project Name: Sheet Type:BRADY LANDFILL 60mil HDPE

    DT#: 17 DT#:Between Panels: Between Panels:

    QA Monitor: QA Monitor:Date: Date:Time: 120 Time:

    200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.

    SHEAR

    137

    SHEAR142153145150

    OUTSIDE PEEL

    113

    OUTSIDE PEEL106115120116

    INSIDE PEEL

    112

    INSIDE PEEL111123109111

    P62/P63

    ELO

    NG

    ATIO

    N

    BREA

    K TY

    PE

    ELO

    NG

    ATIO

    N

    BREA

    K TY

    PEKH08/09/2019

  • SEPTEMBER 2019SEPTEMBER 2019

    BRADY ROAD RESOURCE MANAGEMENTBRADY ROAD RESOURCE MANAGEMENT

    REVISIONS / ISSUEYY/MM/DDNO. CHECKBY

    FACILITY - CELL 32 CONSTRUCTIONFACILITY - CELL 32 CONSTRUCTION

    FIGURE 01FIGURE 01 XX

    !(

    !(

    !(

    !(!(

    !(

    !(

    !(

    !(

    !(

    !(

    !(

    !(

    !(

    !(

    !(

    !(

    !(

    !(

    !(

    !(

    !(

    !(

    !(

    !(

    !(

    !(

    !(

    !(

    !(

    ACCESS

    ROAD T1

    T2T3

    T4T5

    T6T7

    T8

    T9

    T10T11

    T13

    T14T15

    T16

    S1

    S2S3

    S4S5

    T23

    T24

    S6

    T12

    T17

    T20

    T21

    T22

    T18T19

    629400

    629400

    629500

    629500

    629600

    629600

    551370

    0

    551370

    0

    551380

    0

    551380

    0

    AREA OFINTERESTSouth Perimeter Highway St.

    Mary's

    Road

    Pembina Highway

    Waverle

    y Stree

    t

    10 0 10 20 30 40

    Meters

    ©

    ---19/09/05X FOR INTERNAL USE ONLY

    FileNa

    me: P

    :\Proj

    ects\2015\1

    5-0107-0

    14\D

    wg\G

    IS\MX

    Ds\W

    orking

    \Surv

    ey_20190816\1

    5-0107-0

    14-F

    ig01.m

    xd11"x1

    7' P

    LOT SC

    ALE 1

    :1

    LEGEND:!( Densometer Test Location

    !( Shelby Tube LocationExcavation Dimensions

    REV:

    Portio

    ns of d

    ata P

    roduced b

    y KG

    S Gro

    up, u

    nder

    Licence

    with

    the P

    rovinc

    e of

    Manit

    oba

    2019 H

    er Ma

    jesty

    the Q

    ueen in

    Righ

    t of M

    anitoba.

    All ri

    ghts

    reserv

    ed.

    SCALE: METRIC 11"x17"1:1,000

    DESCRIPTION

    1km

    ISSUEDBY

    ---

    ¯

    NOTES:1. Imgaery shown from City of Winnipeg Open Data Portal and dated as 2018.2. All units are metric and in metres unless otherwise specified. Transverse Mercator Projection, NAD 1983, Zone 14. Elevations are in metres above sea level (MSL).

    PRELIMINARYNOT TO BE USED FOR CONSTRUCTION

    !

    GEOTECHNICAL QUALITY ASSURANCEGEOTECHNICAL QUALITY ASSURANCE

    DRAFT

    Proctor ResultsMax Dry Density (kg/m3) 1456Optimum Moisture Content (%) 27.0Test # DD % PR Moisture % CommentTest 1 1406 96.5 24.5 -Test 2 1365 93.4 27.6 -Test 3 1339 92 27.1 -Test 4 1397 95.9 26 -Test 5 1438 98.7 23.2 -Test 6 1456 100 26.7 -Test 7 1412 97 27.3 -Test 8 1322 90.8 29.7 -Test 9 1364 93.7 24.8 -Test 10 1366 93.8 27.1 -Test 11 1411 96.9 24.5 -Test 12 1403 96.4 22.9 -Test 13 1393 95.7 21.6 -Test 14 1332 91.5 29.7 -Test 15 1292 88.7 32.9 -Test 16 1332 91.9 29.9 -Test 17 1341 92.1 31.1 Retry @ T16Test 18 1338 92.5 30.2 Retry @ T15Test 19 1366 93.8 29.9 Retry @T14Test 20 1371 94.3 21.8Test 21 1371 99.2 25.7 Retry @ T8Test 22 1436 98.6 18.2Test 23 1440 98.9 19.9Test 24 1518 104.3 14.3

    1923.7 494.4 Total (without initial retry location)96.185 24.72 Average (without initial retry location)

  • Stantec Consulting Ltd. 199 Henlow Bay, Winnipeg MB R3Y 1G4

    September 20, 2019 File: 123314413

    Attention: Mr. Andrew Sinclair KGS Group Inc. 3rd Floor – 865 Waverley St. Winnipeg, Manitoba R3T 5P4

    Good day Andrew,

    Reference: Brady Landfill Cell 32 (15-0107-014)

    On September 4, 2019, two (2) soil samples were submitted to our laboratory for analysis. The following tests were conducted on select soil samples:

    • ASTM D4318 - Liquid Limit, Plastic Limit, and Plasticity Index of Soils• ASTM D5084 - Measurement of Hydraulic Conductivity of Saturated Porous Materials Using a

    Flexible Wall Permeameter

    The resulting test data is attached.

    We appreciate the opportunity to assist you on this project. Please contact the undersigned if you have any questions regarding this report.

    Regards,

    Stantec Consulting Ltd.

    Larry Presado, C.Tech. Jason Thompson, C.E.T Senior Geotechnical Technologist Principal – Manager, Materials Testing Services

    Phone: (204) 488-6999 Phone: (204) 928-4004 [email protected] [email protected]

    Attachment: Table 1 – Atterberg Limits Test Data 2 x Atterberg Limits Reports 2 x Hydraulic Conductivity Reports

  • September 20, 2019 Mr. Andrew Sinclair Page 2 of 2

    Reference: Brady Landfill Cell 32 (15-0107-014)

    TABLE 3 – ATTERBERG LIMITS TEST DATA

    Field Sample ID Liquid Limit Plastic Limit Plasticity Index As Rec’d Water Content (%)

    Shelby #1 98 28 70 56.5

    Shelby #5 97 29 68 47.4

  • Atterberg Limits Client: KGS Group Inc. LABORATORY

    Project Name: Brady Landfill Cell 32 199 Henlow Bay

    Method A- Multi-Point (15-0107-014)

    Project No: Winnipeg, Manitoba

    Date Received:

    Date Tested:

    Tested By:

    Sample :

    1 2 3

    33 28 24

    160 265 153 264 238

    48 49 49 27.19 27.58

    33 35 34 25.44 25.95

    18 20 19 19.31 20.19

    15.0 15.0 15.2 6.1 5.8

    14.5 14.6 14.9 1.8 1.6

    96.4% 97.3% 98.4% 28.5% 28.3%

    Reviewed By: Jason Thompson, C.E.T.

    Reporting of these test results constitutes a testing service only. Engineering interpretation or evaluation of the test results is provided only on written request. The data presented above is for the sole use of the client stipulated above. STANTEC is not responsible, nor can be held liable, for the use of this report by any other party, with or without the knowledge of STANTEC.

    Wt. Dry Soil (g) Wt. Dry Soil (g) Natural MC (%)Wt. Water (g) Wt. Water (g)

    56.5%Water Content (%) Water Content (%)

    Wt. Sa. (dry+tare)(g) Wt. Sa. (dry+tare)(g)PI 70

    Wt. Tare (g) Wt. Tare (g)

    Tare No. Tare No.PL 28

    Wt. Sa. (wet+tare)(g) Wt. Sa. (wet+tare)(g)

    98No. of Blows

    Shelby #1

    TrialTrial 1 2 LL

    LIQUID LIMIT PLASTIC LIMIT RESULTS

    ASTM D4318

    Donald Eliazar

    123314413

    September 4, 2019 Canada R3Y 1G4

    September 11, 2019 Tel: (204) 488-6999

    CH

    ML

    MH

    CL-ML

    CL

    0

    10

    20

    30

    40

    50

    60

    0 10 20 30 40 50 60 70 80 90 100

    PL

    AS

    TIC

    ITY

    IN

    DE

    X

    LIQUID LIMIT

    1

    2

    3

    96.0%

    96.5%

    97.0%

    97.5%

    98.0%

    98.5%

    99.0%

    15 20 25 30 35

    WA

    TER

    CO

    NTE

    NT

    (%)

    BLOWS

  • Atterberg Limits Client: KGS Group Inc. LABORATORY

    Project Name: Brady Landfill Cell 32 199 Henlow Bay

    Method A- Multi-Point (15-0107-014)

    Project No: Winnipeg, Manitoba

    Date Received:

    Date Tested:

    Tested By:

    Sample :

    1 2 3

    31 27 23

    258 275 166 186 217

    49 50 54 28.58 28.15

    34 36 37 26.47 25.96

    19 21 19 19.14 18.23

    15.4 15.1 17.6 7.3 7.7

    14.7 14.6 17.1 2.1 2.2

    95.5% 96.7% 97.5% 28.8% 28.3%

    Reviewed By: Jason Thompson, C.E.T.

    Reporting of these test results constitutes a testing service only. Engineering interpretation or evaluation of the test results is provided only on written request. The data presented above is for the sole use of the client stipulated above. STANTEC is not responsible, nor can be held liable, for the use of this report by any other party, with or without the knowledge of STANTEC.

    Wt. Dry Soil (g) Wt. Dry Soil (g) Natural MC (%)Wt. Water (g) Wt. Water (g)

    47.4%Water Content (%) Water Content (%)

    Wt. Sa. (dry+tare)(g) Wt. Sa. (dry+tare)(g)PI 68

    Wt. Tare (g) Wt. Tare (g)

    Tare No. Tare No.PL 29

    Wt. Sa. (wet+tare)(g) Wt. Sa. (wet+tare)(g)

    97No. of Blows

    Shelby #5

    TrialTrial 1 2 LL

    LIQUID LIMIT PLASTIC LIMIT RESULTS

    ASTM D4318

    Donald Eliazar

    123314413

    September 4, 2019 Canada R3Y 1G4

    September 11, 2019 Tel: (204) 488-6999

    CH

    ML

    MH

    CL-ML

    CL

    0

    10

    20

    30

    40

    50

    60

    0 10 20 30 40 50 60 70 80 90 100

    PL

    AS

    TIC

    ITY

    IN

    DE

    X

    LIQUID LIMIT

    1

    2

    3

    95.0%

    95.5%

    96.0%

    96.5%

    97.0%

    97.5%

    98.0%

    15 20 25 30 35

    WA

    TER

    CO

    NTE

    NT

    (%)

    BLOWS

  • TO PROJECT

    ATTN: 1

    SOIL DESCRIPTION:

    DATE TESTED:CONFINING PRESSURE (kPa):EFFECTIVE SATURATION STRESS (kPa):ASSUMED SPECIFIC GRAVITY:HYDRAULIC GRADIENT:TYPE OF PERMEANT LIQUID:HYDRAULIC CONDUCTIVITY, "k" (cm/s):HYDRAULIC CONDUCTIVITY, "k20" (cm/s):

    Initial ReadingFinal Reading

    COMMENTS:

    REPORT DATE:REPORT DATE: REVIEWED BY

    KGS Group Inc. Brady Landfill Cell 32 (15-0107-014)

    3rd Floor - 865 Waverley St.

    Winnipeg, Manitoba

    R3T 5P4 PROJECT NO. 123314413

    565.8

    SAMPLE ID: Shelby #1 - Clay Liner

    Andrew Sinclair REPORT NO.

    De-aired Water8.0E-097.7E-09

    50.660.955.71.094

    Design with community in mind

    Jason Thompson, C.E.T.2019.Sep.20

    Saturation

    (%)

    94.1102.1

    Height

    (mm)

    Diameter

    (mm)

    Wet Mass

    (g)

    Dry Density

    (g/cm3)

    Water Content by

    Mass (%)

    Water Content by

    Volume (%)

    77.6 70.9 538.3

    Stantec Consulting Ltd.

    199 Henlow Bay, Winnipeg, MB R3Y 1G4Tel: (204) 488-6999

    ASTM D5084 - MEASUREMENT OF HYDRAULIC CONDUCTIVITY OF

    SATURATED POROUS MATERIALS USING A FLEXIBLE WALL

    PERMEAMETER

    Reporting of these test results constitutes a testing service only. Engineering interpretation or evaluation of the test results is provided only on written request. The data presented above is for the sole use of the client stipulated above. Stantec is not responsible, nor can be held liable, for the use of this report by any other party, with or without the knowledge of Stantec.

    1.252 40.472.380.9

    Clay, brown, stiff, moist, high plasticity, trace silt

    September 9 to September 18, 2019137.934.52.7118.4

    1.00E-11

    1.00E-10

    1.00E-09

    1.00E-08

    1.00E-07

    1.5 2.5 3.5 4.5 5.5 6.5 7.5 8.5 9.5

    Hyd

    rau

    lic

    Co

    nd

    uc

    tivit

    y (

    cm

    /se

    c)

    Time (days)

  • TO PROJECT

    ATTN: 2

    SOIL DESCRIPTION:

    DATE TESTED:CONFINING PRESSURE (kPa):EFFECTIVE SATURATION STRESS (kPa):ASSUMED SPECIFIC GRAVITY:HYDRAULIC GRADIENT:TYPE OF PERMEANT LIQUID:HYDRAULIC CONDUCTIVITY, "k" (cm/s):HYDRAULIC CONDUCTIVITY, "k20" (cm/s):

    Initial ReadingFinal Reading

    COMMENTS:

    REPORT DATE:REPORT DATE: REVIEWED BY

    Stantec Consulting Ltd.

    199 Henlow Bay, Winnipeg, MB R3Y 1G4Tel: (204) 488-6999

    ASTM D5084 - MEASUREMENT OF HYDRAULIC CONDUCTIVITY OF

    SATURATED POROUS MATERIALS USING A FLEXIBLE WALL

    PERMEAMETER

    Reporting of these test results constitutes a testing service only. Engineering interpretation or evaluation of the test results is provided only on written request. The data presented above is for the sole use of the client stipulated above. Stantec is not responsible, nor can be held liable, for the use of this report by any other party, with or without the knowledge of Stantec.

    1.369 36.572.579.0

    Clay, brown, stiff, moist, high plasticity

    September 9 to September 18, 2019137.934.52.7118.8

    Design with community in mind

    Jason Thompson, C.E.T.2019.Sep.20

    Saturation

    (%)

    100.9100.5

    Height

    (mm)

    Diameter

    (mm)

    Wet Mass

    (g)

    Dry Density

    (g/cm3)

    Water Content by

    Mass (%)

    Water Content by

    Volume (%)

    77.1 70.7 566.2587.9

    SAMPLE ID: Shelby #5 - Clay Liner

    Andrew Sinclair REPORT NO.

    De-aired Water9.7E-099.4E-09

    49.953.742.51.263

    KGS Group Inc. Brady Landfill Cell 32 (15-0107-014)

    3rd Floor - 865 Waverley St.

    Winnipeg, Manitoba

    R3T 5P4 PROJECT NO. 123314413

    1.00E-11

    1.00E-10

    1.00E-09

    1.00E-08

    1.00E-07

    0.5 1.5 2.5 3.5 4.5 5.5 6.5 7.5 8.5 9.5

    Hyd

    rau

    lic

    Co

    nd

    uc

    tivit

    y (

    cm

    /se

    c)

    Time (days)

  • 199 Henlow BayWinnipeg, ManitobaR3Y 1G4Tel: (204) 488-6999

    Silty ClayMATERIAL TYPE

    PROJECT NO.

    CLIENT

    C.C.

    123314413

    KGS Group Inc.KGS Group Inc.3rd Floor - 865 Waverley StWinnipeg, MBR3T 5P4

    ATTN: Andrew SinclairCell 32 Project

    1

    Manual

    44.2

    TO

    PROJECT

    PROCTOR NO.

    PREPARATION

    INSITU MOISTURE

    COMMENTS

    1 1650

    1748

    1857

    1685

    2

    3

    4

    Page 1 of 1 2019.Aug.07

    TRIALNUMBER

    WETDENSITY(kg/m3)

    DRYDENSITY(kg/m3)

    MOISTURECONTENT

    (%)

    1381

    1413

    1454

    1278

    19.5

    23.7

    27.7

    31.8

    TESTED BY Matthew Moniz

    SUPPLIERSOURCE Existing Material

    MATERIAL IDENTIFICATIONMATERIAL USE Clay LinerMAX. NOMINAL SIZE

    COMPACTION STANDARD

    COMPACTION PROCEDURE

    OVERSIZE CORRECTION METHOD

    Standard Proctor,ASTM D698A: 101.6mm Mold,Passing 4.75mm

    None

    MAXIMUMDRY

    DENSITY(kg/m3)

    OPTIMUMMOISTURECONTENT

    (%)

    1456 27.0CALCULATEDOVERSIZE CORRECTED

    RETAINED 4.75mm SCREEN

    REVIEWED BY

    Reporting of these test results constitutes a testing service only. Engineering interpretation or evaluation of the test results is provided on written request. The data presented is for sole use ofclient stipulated above. Stantec is not responsible, nor can be held liable, for the use of this report by any other party, with or without the knowledge of Stantec.

    Jason Thompson, C.E.T.

    RAMMER TYPE

    Moist

    PROCTOR TEST REPORT

    DATE SAMPLED 2019.Jul.30 DATE RECEIVED 2019.Jul.31 DATE TESTED 2019.Aug.06

    %

    request for use.pdfL90011_BRADY LANDFILL QA-QC PACKAGE.pdf001002Sheets and Views001

    003Sheets and Views002

    004005

    15-0107-014-_DensityTesting2019.pdfBRRMF - Cell 32 - Atterberg Limits and HC test for two samples.pdfTable 3 – Atterberg Limits Test Data

    Proctor_123314413_KGS Group Inc _Client_14413_1_20190807.pdf