225
Grandwood Subdivision – Elora Transportation Impact Study Paradigm Transportation Solutions Limited July 2017

Grandwood Subdivision – Elora Transportation Impact Study...To the extent that this report is based on information supplied by other parties, Paradigm Transportation Solutions Limited

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Grandwood Subdivision – Elora Transportation Impact Study...To the extent that this report is based on information supplied by other parties, Paradigm Transportation Solutions Limited

Grandwood Subdivision – Elora Transportation Impact Study

Paradigm Transportation Solutions Limited

July 2017

Page 2: Grandwood Subdivision – Elora Transportation Impact Study...To the extent that this report is based on information supplied by other parties, Paradigm Transportation Solutions Limited
Page 3: Grandwood Subdivision – Elora Transportation Impact Study...To the extent that this report is based on information supplied by other parties, Paradigm Transportation Solutions Limited

Project Summary

Paradigm Transportation Solutions Limited

Granwood Subdivsion – Elora Transportation Impact Study List of Revisions

Version Date Description

0.1 June 2017 Internal Review

0.2 July 2017 Final for Submission

Signatures and Seals

Signature Engineer’s Seal

Disclaimer

This document has been prepared for the titled project or named part thereof (the “project”) and except for approval and commenting municipalities and agencies in their review and approval of this project, should not be relied upon or used for any other project without an independent check being carried out as to its suitability and prior written authorization of Paradigm Transportation Solutions Limited being obtained. Paradigm Transportation Solutions Limited accepts no responsibility or liability for the consequence of this document being used for a purpose other than the project for which it was commissioned. Any person using or relying on the document for such other purpose agrees, and will by such use or reliance be taken to confirm their agreement to indemnify Paradigm Transportation Solutions Limited for all loss or damage resulting there from. Paradigm Transportation Solutions Limited accepts no responsibility or liability for this document to any party other than the person by whom it was commissioned and the approval and commenting municipalities and agencies for the project.

To the extent that this report is based on information supplied by other parties, Paradigm Transportation Solutions Limited accepts no liability for any loss or damage suffered by the client, whether through contract or tort, stemming from any conclusions based on data supplied by parties other than Paradigm Transportation Solutions Limited and used by Paradigm Transportation Solutions Limited in preparing this report.

Project Number 170127 July 2017

Client Edgehill Properties Limited c/o Black, Shoemaker, Robinson & Donaldson 351 Speedvale Avenue West, Guelph ON N1H 1C2

Client Contact Nancy Shoemaker

Consultant Project Team Phil Grubb, P. Eng Adam J. Makarewicz, C.E.T., MITE

Paradigm Transportation Solutions Limited 22 King Street South Suite 300 Waterloo ON N2J 1N8 p: 519.896.3163 www.ptsl.com

Page 4: Grandwood Subdivision – Elora Transportation Impact Study...To the extent that this report is based on information supplied by other parties, Paradigm Transportation Solutions Limited
Page 5: Grandwood Subdivision – Elora Transportation Impact Study...To the extent that this report is based on information supplied by other parties, Paradigm Transportation Solutions Limited

Granwood Subdivsion – Elora | Transportation Impact Study | 170127 | July 2017

Paradigm Transportation Solutions Limited | Page i

Executive Summary

Content

Paradigm Transportation Solutions Limited (Paradigm) was retained to conduct this Transportation Impact Study for a residential development located south of McNab Street and west of Bridge Street in Elora, Ontario.

This Transportation Impact Study (TIS) includes an analysis of existing traffic conditions, a description of the proposed development, traffic forecasts for Opening Year and five years after Opening Year and outlines recommendations to improve future traffic conditions.

Development Concept

The site is located south of McNab Street, west of Bridge Street and east of Waterloo Street in Elora, Ontario. The development parcel currently consists of approximately 8.77 ha of land which is currently vacant. The proposed development is proposing to redevelop the land to consist of 152 residential units (54 single family, 12 semi-detached and 86 townhouses) to be built between the existing Waterloo Street and Clarke Street. Opening year is expected to occur at or before 2020.

The proposed concept plan provides for an extension of York Street to the west to align with the intersection of Waterloo Street and York Street. The provision of this extension will improve connectivity and route selection within the study area. In addition to the extension of York Street, Halls Drive is proposed to be extended to the west towards Waterloo Street providing for an additional connection.

Conclusions

Based on the investigations carried out, it is concluded that:

The development is forecast to generate 101 and 138 new trips during the weekday peak hours, respectively at full build out;

Capacity analyses were conducted for each of the study area intersections under 2017 (Base Year), 2020 (Background + Total), and 2025 (Background + Total). The results of the capacity analysis conducted as part of this study indicates that site generated traffic volumes during the peak-hour periods have only a negligible impact on intersection capacity within the study area.

With the York Street extension completed, diverted traffic from Wellington Road 7 and McNab Street is not expected to exceed 50 percent. The results of the capacity analysis conducted as part of this study indicates that the traffic diversion during the peak-hour periods have only a negligible impact on intersection capacity within the study area.

Page 6: Grandwood Subdivision – Elora Transportation Impact Study...To the extent that this report is based on information supplied by other parties, Paradigm Transportation Solutions Limited

Granwood Subdivsion – Elora | Transportation Impact Study | 170127 | July 2017

Paradigm Transportation Solutions Limited | Page ii

Given the low volume of trips forecasted, the roundabout at Victoria Street and McNab Street will not be adversely affected in terms of capacity or safety as a result of this development;

A southbound left turn lane with 30 metres of storage is warranted at Wellington Road 7 and York Street;

The analysis undertaken within was prepared using the most recent site plan. Any minor changes to the plan will not materially affect the conclusions contained within.

Recommendations

Based on the findings of this study, it is recommended that:

The County of Wellington review and determine the feasibility of providing a southbound left turn lane with 30 metres of storage at Wellington Road 7 and York Street as warranted under the 2025 Horizon. The Applicant is recommended to contribute 10.1% towards such an improvement.

The implementation of the above-mentioned mitigation measures not only accommodates future site-generated traffic but also improves some existing operational deficiencies in the vicinity of the site.

No further improvements are required as traffic generated from the proposed development will not materially affect the operations of the study area roadway.

Page 7: Grandwood Subdivision – Elora Transportation Impact Study...To the extent that this report is based on information supplied by other parties, Paradigm Transportation Solutions Limited

Granwood Subdivsion – Elora | Transportation Impact Study | 170127 | July 2017

Paradigm Transportation Solutions Limited | Page iii

Contents

1 Introduction .............................................................. 1

1.1 Overview ........................................................................................... 1 1.2 Purpose and Scope ......................................................................... 1

2 Existing Conditions .................................................. 4

2.1 Road Network .................................................................................. 4 2.2 Traffic Volumes ................................................................................ 6 2.2.1 Traffic Data ........................................................................................ 6 2.2.2 Adjustments ....................................................................................... 6 2.3 Traffic Operations ............................................................................ 8

3 Development Concept ........................................... 10

3.1 Development Description .............................................................. 10

4 Future Conditions ................................................... 12

4.1 Traffic Growth ................................................................................ 12 4.1.1 General Background Growth ........................................................... 12 4.1.2 Background Development ............................................................... 13 4.1.3 Growth Summary ............................................................................. 13 4.2 Development Trip Generation ....................................................... 16 4.2.1 Institute of Transportation Engineers (ITE) ....................................... 16 4.2.2 Trip Generation Estimates ............................................................... 16 4.3 Development Trip Distribution and Assignment .......................... 18

5 Future Operations Analysis ................................... 22

5.1 Background Traffic Operations .................................................... 22 5.2 Total Traffic Operations ................................................................ 25 5.3 Traffic Diversion ............................................................................. 28 5.3.1 Sensitivity Analysis .......................................................................... 30

6 Remedial Measures ................................................ 32

6.1 Left Turn Lane Warrants ................................................................ 32 6.2 Assessment of Impacts ................................................................. 33 6.3 Fair Share Contribution ................................................................. 34

7 Conclusions and Recommendations .................... 36

7.1 Conclusions ................................................................................... 36 7.2 Recommendations ......................................................................... 36

Page 8: Grandwood Subdivision – Elora Transportation Impact Study...To the extent that this report is based on information supplied by other parties, Paradigm Transportation Solutions Limited

Granwood Subdivsion – Elora | Transportation Impact Study | 170127 | July 2017

Paradigm Transportation Solutions Limited | Page iv

Appendices Appendix A Terms of Reference Appendix B Traffic Data Appendix C Base Year Traffic Operations Reports Appendix D Trip Distribution Calculations Appendix E Background Traffic Operations Reports Appendix F Total Traffic Operations Reports Appendix G Traffic Diversion Forecasts Appendix H Traffic Diversion Operations Reports Appendix I Left Turn Lane Warrant Nomographs

Page 9: Grandwood Subdivision – Elora Transportation Impact Study...To the extent that this report is based on information supplied by other parties, Paradigm Transportation Solutions Limited

Granwood Subdivsion – Elora | Transportation Impact Study | 170127 | July 2017

Paradigm Transportation Solutions Limited | Page v

Figures Figure 1.1: Study Area and Subject Development Location ................ 3 Figure 2.1: Existing Lane Configuration and Traffic Control ................ 5 Figure 2.2: Base Year Traffic Volumes .................................................. 7 Figure 3.1: Proposed Site Plan ............................................................. 11 Figure 4.1: 2020 Background Traffic Forecasts .................................. 14 Figure 4.2: 2025 Background Traffic Forecasts .................................. 15 Figure 4.3: Site Traffic Forecasts ......................................................... 19 Figure 4.4: 2020 Total Traffic Forecasts .............................................. 20 Figure 4.5: 2025 Total Traffic Forecasts .............................................. 21 Figure 5.1: Affected Traffic Movements .............................................. 29

Tables Table 2.1: Traffic Data Summary .......................................................... 6 Table 2.2: Vehicle Level of Service Definitions .................................... 8 Table 2.3: Base Year Peak Hour Traffic Operations ............................ 9 Table 4.1: Elora & Salem Population + Employment Growth ............ 12 Table 4.2: Trip Generation Estimates ................................................. 17 Table 4.3: Trip Distribution estimates ................................................ 18 Table 5.1: 2020 Background Operations Summary ........................... 23 Table 5.2: 2025 Background Operations Summary ........................... 24 Table 5.3: 2020 Total Operations Summary ....................................... 26 Table 5.4: 2025 Total Operations Summary ....................................... 27 Table 5.5: 2025 Total Operations Summary ....................................... 31 Table 6.1: Fair Share Contribution ...................................................... 35

Page 10: Grandwood Subdivision – Elora Transportation Impact Study...To the extent that this report is based on information supplied by other parties, Paradigm Transportation Solutions Limited

Granwood Subdivsion – Elora | Transportation Impact Study | 170127 | July 2017

Paradigm Transportation Solutions Limited | Page 1

1 Introduction

1.1 Overview

Paradigm Transportation Solutions Limited (Paradigm) was retained to conduct this Transportation Impact Study for a residential development located to the south of McNab Street and west of Bridge Street in Elora, Ontario. Figure 1.1 details the location of the subject development.

1.2 Purpose and Scope

The purpose of the study is to assess current traffic and site conditions in the vicinity of the proposed development, forecast additional traffic that may be generated by the proposed development, analyse the impact that this traffic may have on the adjacent roadway network and provide the municipality and owner with recommendations regarding any necessary remedial measures required to mitigate the identified impacts of the site generated traffic.

More specifically, the scope of this study is to:

Forecast traffic from the proposed development;

Assign the projected volumes to the surrounding road network based on the existing traffic patterns at the driveway connections;

Assess future total traffic within the study area. The following horizons have been considered: Opening Year (2020) and five years from Opening Year (2025); and

Identify operational or safety concerns and any mitigation measures that may be required to improve operations.

Pre-study consultation with the County of Wellington and Township of Centre Wellington via e-mail in May 2017, produced terms of reference for this study. Appendix A contains correspondence regarding this process.

Page 11: Grandwood Subdivision – Elora Transportation Impact Study...To the extent that this report is based on information supplied by other parties, Paradigm Transportation Solutions Limited

Granwood Subdivsion – Elora | Transportation Impact Study | 170127 | July 2017

Paradigm Transportation Solutions Limited | Page 2

The intersections evaluated within this study that are most likely to be impacted by the development, as identified by the County and Township are:

York Street and Wellington Road 7;

York Street and Victoria Street;

High Street and York Street;

Bridge Street and York Street;

Bridge Street and McNab Street; and

Wellington Road 7 and Wellington Road 21/McNab Street.

The intersection of McNab Street and Victoria Street was originally proposed to be analyzed. Through a field visit conducted in May 2017, it was observed that Victoria Street is being reconstructed affecting operations and typical volumes expected at the intersections with McNab Street and York Street.

Through the pre-study consultation, the County and Township advised that the intersection of McNab Street and Victoria Street is an existing roundabout that is operating well and advised that analysis would not be required. Confirmation however should be provided that concludes that the trip distribution projected for the development would not significantly impact the volumes at the roundabout.

Regarding establishing volumes at York Street and Victoria Street, the County and Township advised that traffic along York Street be derived from the count being completed at Wellington Road 7 and York Street and volumes along Victoria Street be estimated.

Page 12: Grandwood Subdivision – Elora Transportation Impact Study...To the extent that this report is based on information supplied by other parties, Paradigm Transportation Solutions Limited

Granwood Subdivsion – Elora | Transportation Impact Study | 170127 | July 2017

Paradigm Transportation Solutions Limited | Page 3

Figure 1.1: Study Area and Subject Development Location

Study Area and Subject Development Location

Figure 1.1Granwood Subdivision– Elora, Transportation Impact Study170127

LegendSubject Site

Study Area

Existing Intersection

Proposed Extension

Page 13: Grandwood Subdivision – Elora Transportation Impact Study...To the extent that this report is based on information supplied by other parties, Paradigm Transportation Solutions Limited

Granwood Subdivsion – Elora | Transportation Impact Study | 170127 | July 2017

Paradigm Transportation Solutions Limited | Page 4

2 Existing Conditions This section documents current traffic conditions, operational deficiencies, and constraints experienced by the public travelling at the intersections within the study area. The operational deficiencies and constraints identified at this stage will be fundamental to the process of defining the required remedial measures.

2.1 Road Network

Figure 2.1 displays the existing lane configurations and traffic control provisions at the study area intersections. The roadways that form the study area include:

Wellington Road 7 is a County arterial roadway with a posted speed limit of 50 km per hour in the study area. The cross-section is rural south of Wellington Road 21 and transforms to an urban cross-section to the north. There are no pedestrian facilities provided on either side of the roadway within the study area. The roadway operates with a single travel lane in each direction.

Wellington Road 21 is a County arterial roadway with a posted speed limit of 50 km per hour. The cross-section is urban and a pedestrian sidewalk is provided on the south side of the roadway. Approximately 150 metres west of the intersection with Wellington Road 7, the roadway transitions to a rural cross-section with an increased speed limit of 80 km per hour. The roadway operates with a single travel lane in each direction.

McNab Street is a Township local roadway with a posted speed limit of 50 km per hour. The cross-section is urban which contains curbs and gutter as well as a pedestrian sidewalk located on the both sides of the roadway. The roadway operates with a single travel lane in each direction.

Bridge Street is a Township collector roadway with a posted speed limit of 50 km per hour. The cross-section is urban and a pedestrian sidewalk is provided on the east side of the roadway. The roadway operates with a single travel lane in each direction.

York Street is a Township collector roadway with a posted speed limit of 50 km per hour. The cross-section is urban without any pedestrian facilities provided. The roadway operates with a single travel lane in each direction.

Victoria Street is a Township collector roadway with a posted speed limit of 50 km per hour. The cross-section is urban at the intersection with McNab Street and transitions to rural south of Nichol Street. A pedestrian sidewalk is provided on the east side of the roadway. The roadway operates with a single travel lane in each direction.

Page 14: Grandwood Subdivision – Elora Transportation Impact Study...To the extent that this report is based on information supplied by other parties, Paradigm Transportation Solutions Limited

Granwood Subdivsion – Elora | Transportation Impact Study | 170127 | July 2017

Paradigm Transportation Solutions Limited | Page 5

Figure 2.1: Existing Lane Configuration and Traffic Control

Exist

ing

Lane

Con

figur

atio

nA

nd Tr

affic

Con

trol

Figu

re 2

.1G

ranw

ood

Sub

div

ision

–El

ora

, Tra

nsp

orta

tion

Imp

act

Stu

dy

1701

27

Lege

nd

Lane

Con

figur

atio

n

Sto

p C

ontr

ol

Sig

naliz

ed In

ters

ectio

n

Yo

rk

Str

ee

t

Mc

Na

b

Str

ee

t

Yo

rk

Str

ee

t

Bridge Street

Victoria Street

High Street

We

llin

gto

n

Ro

ad

21

Wellington Road 7

Page 15: Grandwood Subdivision – Elora Transportation Impact Study...To the extent that this report is based on information supplied by other parties, Paradigm Transportation Solutions Limited

Granwood Subdivsion – Elora | Transportation Impact Study | 170127 | July 2017

Paradigm Transportation Solutions Limited | Page 6

2.2 Traffic Volumes

To assess intersection operations, turning movement counts are used to quantify the movement of vehicles through the area. Existing traffic data at an intersection or on a road section forms the foundation for analysis. The counts are usually taken during peak periods at an intersection to complete level of service analysis. Appendix B contains the traffic data utilized in this report.

2.2.1 Traffic Data

Turning movement volumes for the study area intersections for the Weekday Peak Hour were conducted by Paradigm. Table 2.1 outlines the count date of each intersection:

TABLE 2.1: TRAFFIC DATA SUMMARY

To establish volumes at the intersection of York Street and Victoria Street, the volumes at Wellington Road 7 and York Street was utilized to establish east-west volumes. North-south volumes are expected to resemble similar volumes occurring at York Street and High Street given similar road characteristics and access provisions as Victoria Street.

2.2.2 Adjustments

The counts conducted prior to year 2017 were factored with by an increase of 2.4% per annum applied to establish the base year traffic volumes.

Additionally, as no major intersections or access points are provided between Wellington Road 7 and High Street along York Street and between McNab Street and York Street along Bridge Street, volume balancing has been applied to the traffic volumes to ensure reasonable upstream and downstream flow was maintained at these study area intersections.

Figure 2.2 illustrates the base year traffic volumes during the weekday peak hours.

Date Season Conducted By

York Street & Wellington Road 7 May 2017 Spring Paradigm

York Street & Victoria Street Estimated - -

York Street & High Street May 2017 Spring Paradigm

York Street & Bridge Street September 2014 Fall Paradigm

Bridge Street & McNab Street September 2014 Fall Paradigm

Wellington Road 7 & Wellington Road 21 September 2014 Fall Paradigm

Intersection

Page 16: Grandwood Subdivision – Elora Transportation Impact Study...To the extent that this report is based on information supplied by other parties, Paradigm Transportation Solutions Limited

Granwood Subdivsion – Elora | Transportation Impact Study | 170127 | July 2017

Paradigm Transportation Solutions Limited | Page 7

Figure 2.2: Base Year Traffic Volumes

35

17 1

5 4

402

We

llin

gto

n

Ro

ad

7

20 11

568 35

11 42

550

18

17

15 17 3 7

17

0 9

46

Bri

dg

e

Str

ee

t

27 27 5 32 32 2110 41 41 8 33 33

10 27 5

31 13 5 1012

11 7 3 4 1

14

21 10 19

392 9 York

Street 13 7 12

9

401

32 21

2

581 34 42 27 3

Hig

h S

tre

et

61 46

York Street 15 33 13

40 4 4154

315

61

439

Subject Site

45

Vic

tori

a S

tre

et

357 96 376 45 5Wellington

Road 21207

44 242

153

16 21104192 106 225 20

10

215

37

353 46

44 155

16

15 McNab Street

4 0

15 15

555

We

llin

gto

n

Ro

ad

7

27 27

316 10

7 29

298

18

33 6 4 0 6 6

3 12

29

Bri

dg

e

Str

ee

t

61 61 13 34 34 139 43 43 3 47 47

4 24 1

34 32 8 1112

33 9 1 1 1

12

33 21 6

546

43

York Street

5 9 1

10

589

15 43

1

332 29 18 11 1

Hig

h S

tre

et

27 55

York Street

6 17 4

9

21 3436

404

27

224

Subject Site

55

Vic

tori

a S

tre

et

133 22 132 28 19Wellington

Road 2175

47 126

51

18148256 122 282 32

313

29

160 53

61 246 6 12 McNab

Street 11

Base Year Traffic Volumes

Figure 2.2Granwood Subdivision– Elora, Transportation Impact Study170127

Weekday AM Peak Hour

Weekday PM Peak Hour

Page 17: Grandwood Subdivision – Elora Transportation Impact Study...To the extent that this report is based on information supplied by other parties, Paradigm Transportation Solutions Limited

Granwood Subdivsion – Elora | Transportation Impact Study | 170127 | July 2017

Paradigm Transportation Solutions Limited | Page 8

2.3 Traffic Operations

The operations of intersections in the study area were evaluated with the existing turning movement volumes using Synchro 9.1 with HCM 2000 procedures.

The product of the unsignalized intersection analysis is a level of service (LOS) designation, LOS is a recognized method of quantifying the average delay experienced by drivers at intersections. It is based on the delay experienced by individual vehicles executing the various movements. Where LOS A to E normally represents acceptable conditions in an urban context and where LOS F represents situations where more significant delays may be experienced. The LOS A (little delay) to LOS F (extended delay) range provides an understanding of the relative time a motorist may have to wait to complete a turn at an unsignalized intersection or driveway.

The product of the signalized intersection includes LOS to establish relative levels of driver acceptability for various delays, however as LOS is based on delay criteria, an intersection performance index (volume to capacity ratio or V/C), is most often utilized in planning and design decisions. A V/C index of 1.0 indicates ‘at or near capacity conditions and is more or less useful in established problematic movements at signalized intersection that the LOS. Table 2.2 contains the level of service criteria for signalized and stop-controlled intersections.

TABLE 2.2: VEHICLE LEVEL OF SERVICE DEFINITIONS

The existing intersection operations are summarized in Table 2.3 indicating the existing levels of service (LOS), volume to capacity ratios (V/C) and 95th percentile queues experienced within the study area, for the weekday AM and PM peak hours.

Detailed Synchro reports are provided in Appendix C. The following is noted:

All intersections analyzed are operating with acceptable levels of service during the weekday peak hours. Delays are noted to be level of service between A-C with a v/c no greater than 0.43.

Signalized Intersections Unsignalized IntersectionsAverage Total Delay Average Total Delay

(sec/veh) (sec/veh)A < = 10 < = 10 AcceptableB > 10 & < = 20 > 10 & < = 15 AcceptableC > 20 & < = 35 > 15 & < = 25 AcceptableD > 35 & < = 55 > 25 & < = 35 Somewhat UndesirableE > 55 & < = 80 > 35 & < = 50 UndesirableF > 80 > 50 Undesirable

LOSLOS

Recommendation

Page 18: Grandwood Subdivision – Elora Transportation Impact Study...To the extent that this report is based on information supplied by other parties, Paradigm Transportation Solutions Limited

Granwood Subdivsion – Elora | Transportation Impact Study | 170127 | July 2017

Paradigm Transportation Solutions Limited | Page 9

TABLE 2.3: BASE YEAR PEAK HOUR TRAFFIC OPERATIONS

L T R A L T R A L T R A L T R A

LOS B B B B C C C C B B B B A B B B B

Delay 18 19 19 19 21 20 20 20 11 11 11 11 10 13 13 13 16

V/C 0.07 0.16 0.16 0.27 0.24 0.24 0.10 0.20 0.20 0.01 0.34 0.34

Queue 8 21 21 29 34 34 10 24 24 3 46 46

LOS B B B A A A A A A

Delay 14 14 14 0 0 0 1 1 1 1

V/C 0.10 0.10 0.19 0.01 0.04 0.04

Queue 3 3 0 0 1 1

LOS A A A A A A A A A A A A A A A A

Delay 2 2 2 2 0 0 0 0 10 10 10 10 9 9 9 9 3

V/C 0.01 0.01 0.01 0.00 0.00 0.00 0.01 0.01 0.01 0.02 0.02 0.02

Queue 0 0 0 0 0 0 0 0 0 0 0 0

LOS A A A A A A A A A A A A A A A A

Delay 3 3 3 3 2 2 2 2 10 10 10 10 9 9 9 9 6

V/C 0.01 0.01 0.01 0.00 0.00 0.00 0.01 0.01 0.01 0.05 0.05 0.05

Queue 0 0 0 0 0 0 0 0 0 1 1 1

LOS A A A A A A A A A

Delay 9 9 9 3 3 3 0 0 0 4

V/C 0.03 0.03 0.01 0.01 0.02 0.02

Queue 1 1 0 0 0 0

LOS A A A A A A A A A A A A A A A A

Delay 9 9 9 9 9 9 9 9 1 1 1 1 1 1 1 1 5

V/C 0.04 0.04 0.04 0.01 0.01 0.01 0.00 0.00 0.00 0.00 0.00 0.00

Queue 1 1 1 0 0 0 0 0 0 0 0 0

LOS C C C C C B B C B B B B A B B B B

Delay 20 22 22 22 23 19 19 21 11 14 14 14 10 12 12 12 17

V/C 0.22 0.40 0.40 0.34 0.18 0.18 0.08 0.43 0.43 0.04 0.22 0.22

Queue 23 54 54 28 26 26 9 58 58 4 29 29

LOS C C C A A A A A A

Delay 15 15 15 0 0 0 0 0 0 1

V/C 0.11 0.11 0.35 0.01 0.01 0.01

Queue 3 3 0 0 0 0

LOS A A A A A A A A A A A A A A A A

Delay 1 1 1 1 2 2 2 2 9 9 9 9 9 9 9 9 6

V/C 0.00 0.00 0.00 0.01 0.01 0.01 0.00 0.00 0.00 0.04 0.04 0.04

Queue 0 0 0 0 0 0 1 1 1 1 1 1

LOS A A A A A A A A A A A A A A A A

Delay 5 5 5 5 0 0 0 0 9 9 9 9 9 9 9 9 7

V/C 0.01 0.01 0.01 0.00 0.00 0.00 0.04 0.04 0.04 0.03 0.03 0.03

Queue 0 0 0 0 0 0 1 1 1 1 1 1

LOS A A A A A A A A A

Delay 9 9 9 1 1 1 0 0 0 3

V/C 0.05 0.05 0.00 0.00 0.02 0.02

Queue 1 1 0 0 0 0

LOS A A A A A A A A A A A A A A A A

Delay 9 9 9 9 9 9 9 9 2 2 2 2 2 2 2 2 4

V/C 0.03 0.03 0.03 0.02 0.02 0.02 0.01 0.01 0.01 0.01 0.01 0.01

Queue 1 1 1 0 0 0 0 0 0 0 0 0

AWSC - All-Way Stop Control L - Left MOE - Measure of Effectiveness V/C - Volume to Capacity Ratio

TWSC - Two-Way Stop Control T - Through LOS - Level of Service Queue (m) - 95th Percentile Queue Length

TCS - Traffic Control TCS R - Right Delay - Average Delay per Vehicle in Seconds

RBT - Roundabout A - Approach

PM

Pea

k H

our

1Wellington Road 7

and Wellington Road 21/McNab Street

TCS

2Wellington Road 7

and York StreetTWSC

3Victoria Street and

York StreetTWSC

4High Street and York

StreetTWSC

5Bridge Street and

McNab StreetTWSC

AM

Pea

k H

our

6Bridge Street and

York StreetTWSC

1

2

3

4

5

6

Wellington Road 7 and Wellington Road

21/McNab StreetTCS

Wellington Road 7 and York Street

TWSC

Victoria Street and York Street

TWSC

Control Type

MOE

Direction/Movement/Approach

Eastbound Westbound Northbound SouthboundOverall

Intersection

High Street and York Street

TWSC

Bridge Street and McNab Street

TWSC

Bridge Street and York Street

TWSC

Page 19: Grandwood Subdivision – Elora Transportation Impact Study...To the extent that this report is based on information supplied by other parties, Paradigm Transportation Solutions Limited

Granwood Subdivsion – Elora | Transportation Impact Study | 170127 | July 2017

Paradigm Transportation Solutions Limited | Page 10

3 Development Concept

3.1 Development Description

The site is located south of McNab Street, west of Bridge Street and east of Waterloo Street in Elora, Ontario. The development parcel currently consists of approximately 8.77 ha of land which is currently vacant. The development is proposing to redevelop the land to consist of 152 residential units (54 single family, 12 semi-detached and 86 townhouses) to be built between the existing Waterloo Street and Clarke Street. Opening year is assumed to occur at or before 2020.

The proposed concept plan provides for an extension of York Street to the west to align with the intersection of Waterloo Street and York Street West. The provision of this extension will improve connectivity and route selection within the study area. In addition to the extension of York Street, Halls Drive is proposed to be extended to the west towards Waterloo Street providing for an additional connection.

Figure 3.1 illustrates the site plan.

Page 20: Grandwood Subdivision – Elora Transportation Impact Study...To the extent that this report is based on information supplied by other parties, Paradigm Transportation Solutions Limited

Granwood Subdivsion – Elora | Transportation Impact Study | 170127 | July 2017

Paradigm Transportation Solutions Limited | Page 11

Figure 3.1: Proposed Site Plan

Prop

osed

Site

Pla

nFi

gure

3.1

Gra

nwoo

dSu

bd

ivisi

on–

Elor

a, T

rans

por

tatio

n Im

pa

ct S

tud

y17

0127

Page 21: Grandwood Subdivision – Elora Transportation Impact Study...To the extent that this report is based on information supplied by other parties, Paradigm Transportation Solutions Limited

Granwood Subdivsion – Elora | Transportation Impact Study | 170127 | July 2017

Paradigm Transportation Solutions Limited | Page 12

4 Future Conditions To remain consistent with the terms of reference established, a horizon year of 2020 (Opening Year) and 2025 (five years after Opening Day) has been utilized for total traffic analysis.

4.1 Traffic Growth

Traffic growth on area roadways is a function of the expected land development, economic activity, and changes in demographics. A frequently used procedure is to estimate an annual percentage increase and apply that increase to study-area traffic volumes. An alternative procedure is to identify estimated traffic generated by specific planned major developments that would be expected to affect the project study area roadways. For the purpose of this assessment, both methods were utilized.

Paradigm conducted research to determine the historic growth rate for traffic in this area as well as other planned developments that may affect traffic within the study area for the proposed project.

4.1.1 General Background Growth

A general growth rate was applied to the area roadways to account for population and employment growth. The Wellington County Official Plan1 provides growth management policies and growth forecast for local municipalities within the County. Table 4.1 summarises the Township population, household and employment forecast for Elora and Salem.

TABLE 4.1: ELORA & SALEM POPULATION + EMPLOYMENT GROWTH

An average annual traffic growth rate of 2.34% per annum has been assumed to reflect typical annual increases in traffic growth.

1 Amendment No. 99 to the County of Wellington Official Plan May 12, 2016

Total Total Growth Per AnnumPopulation Household %

2016 7,565 2,750 -

2036 12,080 4,300 2.34%

2041 13,060 4,675 0.40%

Year

Page 22: Grandwood Subdivision – Elora Transportation Impact Study...To the extent that this report is based on information supplied by other parties, Paradigm Transportation Solutions Limited

Granwood Subdivsion – Elora | Transportation Impact Study | 170127 | July 2017

Paradigm Transportation Solutions Limited | Page 13

4.1.2 Background Development

In addition to the historic traffic growth, as outlined in the terms of reference established for this study, it was agreed that there is currently one development project proposed in this area that would affect traffic volumes in the vicinity of the site. Just to the east of the proposed project, Acorn Developments is planning to construct a residential subdivision with over 800 units.

Traffic volumes associated with the proposed redevelopment were taken from the January 2015 Traffic Impact Study2 prepared for the project by our firm. This project is expected to be completed by the 2025 horizon.

4.1.3 Growth Summary

The background traffic volumes within the study area are estimated to consist of:

Generalized background traffic growth of 2.34% per annum;

Traffic related to the nearby developments for the 2025 horizon.

The weekday peak hour 2020 and 2025 background traffic volumes are illustrated Figure 4.1 and Figure 4.2.

2 141100: South River Road Residential Development Traffic Impact Study, Prepared by Paradigm, January 2015.

Page 23: Grandwood Subdivision – Elora Transportation Impact Study...To the extent that this report is based on information supplied by other parties, Paradigm Transportation Solutions Limited

Granwood Subdivsion – Elora | Transportation Impact Study | 170127 | July 2017

Paradigm Transportation Solutions Limited | Page 14

Figure 4.1: 2020 Background Traffic Forecasts

2020 BackgroundTraffic Volumes

Figure 4.1Granwood Subdivision– Elora, Transportation Impact Study170127

Weekday AM Peak Hour

Weekday PM Peak Hour

57

65 264 6 13 McNab

Street 12 19159274 131 303 35

335

31

172

144 24 142 30 20Wellington

Road 2181

50 135

55

10

23 3739

434

29

240

Subject Site

60

Vic

tori

a S

tre

et

11

632

16 46

1

357 31 19 11 1

Hig

h S

tre

et

28 60

York Street

6 18 4

13

36 23 6

586

46

York Street

5 10 1

10 47 45 3 50 50

4 26 1

37 34 9 1213

35 10 1 1 1

3 13

31

Bri

dg

e

Str

ee

t

65 65 14 36 36 14 7 31

320

19

35 6 4 0 6 6

49

47 166

17

16 McNab Street

4 0

16 16

596

We

llin

gto

n

Ro

ad

7

29 29

339 10

17 23112206 114 242 21

10

230

40

379

383 103 403 48 5Wellington

Road 21222

47 260

164 43 4 4458

338

66

471

Subject Site

48

Vic

tori

a S

tre

et

10

431

35 23

2

624 36 45 29 3

Hig

h S

tre

et

65 50

York Street 16 35 14

15

23 11 20

421

10

York Street 14 8 13

11 44 44 9 36 35

11 29 5

33 14 5 1113

12 8 3 4 1

0 9

49

Bri

dg

e

Str

ee

t

29 28 5 34 35 23 12 45

591

19

18

16 18 3 8

1837

18 1

5 4

432

We

llin

gto

n

Ro

ad

7

22 12

610 37

Page 24: Grandwood Subdivision – Elora Transportation Impact Study...To the extent that this report is based on information supplied by other parties, Paradigm Transportation Solutions Limited

Granwood Subdivsion – Elora | Transportation Impact Study | 170127 | July 2017

Paradigm Transportation Solutions Limited | Page 15

Figure 4.2: 2025 Background Traffic Forecasts

2025 BackgroundTraffic Volumes

Figure 4.2Granwood Subdivision– Elora, Transportation Impact Study170127

Weekday AM Peak Hour

Weekday PM Peak Hour

43

21 1

6 5

494

We

llin

gto

n

Ro

ad

7

24 13

710 43

33 6 40 38 25 13 73

688

22

21

18 21 4 8

21

12 49 50 10 41 40

12 42 1937 16 6 1215

13 8 4 5 1

0 11

80

Bri

dg

e

Str

ee

t

33

73

25 12 125

482

11

York Street 16 8 15

388

177

554

Subject Site

113

Vic

tori

a S

tre

et

59

493

39 25

2

725 42 51 32 12

Hig

h S

tre

et

179

113

York Street 18 56 10

5

Wellington Road 21

361

53 303

198 139

55 5865

296 136 364 74

12

312

57

457

542 116 631 145 6

64

53 187

72

38 McNab Street

5 0

18 18

684

We

llin

gto

n

Ro

ad

7

33 33

402 12

19 38190

74 16 41 41 16 8 54

380

22

40 7 5 0 7 7

11 52 52 4 58 57

5 44 5

41 39 10 1315

40 11 1 1 1

4 15

53

Bri

dg

e

Str

ee

t

74

107

39 25 38

673

52

York Street

6 11 1

501

65

291

Subject Site

162

Vic

tori

a S

tre

et

92

725

18 52

1

421 36 22 13 14

Hig

h S

tre

et

65

161

York Street

7 26 32

Wellington Road 21

124

57 168

66

39

108

5444

414 160 492 121

394

39

244

195 27 213 62 23

77

74 297

23

49 McNab Street 13 26283

Page 25: Grandwood Subdivision – Elora Transportation Impact Study...To the extent that this report is based on information supplied by other parties, Paradigm Transportation Solutions Limited

Granwood Subdivsion – Elora | Transportation Impact Study | 170127 | July 2017

Paradigm Transportation Solutions Limited | Page 16

4.2 Development Trip Generation

Trip generation information is used to forecast the anticipated level of traffic activity forecast to occur as a result development of the site. The following sub-sections provides the methodology used.

4.2.1 Institute of Transportation Engineers (ITE)

Trips estimated to be generated by the proposed development for the weekday AM and PM peak hours were developed using data from Trip Generation3. The following land use codes (LUC) has been utilized for estimating the trip generation for the development:

LUC 210 (Single Family Detached): All single-family detached homes on individual lots. A typical site surveyed is a suburban subdivision.

LUC 230 (Condominium/Townhouse): Ownership units that have at least one other owned unit within the same building structure. Both condominiums and townhouses are included in this land use. The studies in this land uses did not identify whether the condos/towns were low-rise or high-rise.

Data for the peak hour of adjacent street traffic were used to estimated trip generation. Fitted curve equations with satisfactory R2 values were applied. If no equations were available, the average rates have been applied.

4.2.2 Trip Generation Estimates

In an effort to be conservative, no trip reductions to reflect increased pedestrian /cycling activity were included in the calculation.

Table 4.2 summarizes the trip generation estimates for the weekday peak hours. A total of 101 AM and 138 PM peak hour new vehicle trips are forecast to be added to the area roadways.

3 Trip Generation Ninth Edition, Institute of Transportation Engineers, Washington D.C., 2012

Page 26: Grandwood Subdivision – Elora Transportation Impact Study...To the extent that this report is based on information supplied by other parties, Paradigm Transportation Solutions Limited

Granwood Subdivsion – Elora | Transportation Impact Study | 170127 | July 2017

Paradigm Transportation Solutions Limited | Page 17

TABLE 4.2: TRIP GENERATION ESTIMATES

Enter Exit Total Enter Exit Total

210 - Single Family Detached (Units)b 66 Net Newa 14 42 56 46 27 73

230 - Condominium/Townhouse (Units)c 86 Net Newa 9 36 45 42 23 65

Total Trip Generation 152 Net New 23 78 101 88 50 138

a Trip Generation estimate based on ITE equation rates

b ITE LUC 210 utilized for single family and semi-detached

c ITE LUC 230 utilized for on-street and stacked townhouses

Land Use Code Units TripsAM Peak Hour PM Peak Hour

Page 27: Grandwood Subdivision – Elora Transportation Impact Study...To the extent that this report is based on information supplied by other parties, Paradigm Transportation Solutions Limited

Granwood Subdivsion – Elora | Transportation Impact Study | 170127 | July 2017

Paradigm Transportation Solutions Limited | Page 18

4.3 Development Trip Distribution and Assignment

The directional distribution of traffic approaching and departing the development is a function of several variables: population densities, existing travel patterns, and the efficiency of the roadways leading to the site.

The trip distribution for the site was developed based on the 2011 Transportation Tomorrow Survey (TTS) data for the Elora-Salem and Fergus community. Based on the distribution of population within the study area, arrival and departure patterns for site-related traffic were estimated and adjusted, if appropriate, based on known local factors such as efficiency of local roadways.

The assignment of site generated traffic to specific travel routes was based on observed traffic flow conditions on available routes, and the assumption that most motorists will seek the fastest and most direct routes to and from the site. The trip distribution calculations are included in Appendix D.

Table 4.3 outlines the breakdown of the trip distribution for this study.

TABLE 4.3: TRIP DISTRIBUTION ESTIMATES

The projected site-generated traffic volume was distributed to the study area roadways using the trip distribution. Figure 4.3 illustrates the weekday peak hour site generated traffic volumes.

To develop Total traffic projections, the site generated traffic was added to the Background traffic volumes. Figure 4.4 and Figure 4.5 illustrate the 2020 and 2020 Total traffic volumes.

Direction Percent Assigned(to/From) To RouteNorth Wellington Road 7 11%

North Bridge Street 19%

North Victoria Street 15%

North High Street 7%

South Wellington Road 7 24%

South Bridge Street 15%

West Wellington Road 21 9%

Total 100%

Travel Route

Page 28: Grandwood Subdivision – Elora Transportation Impact Study...To the extent that this report is based on information supplied by other parties, Paradigm Transportation Solutions Limited

Granwood Subdivsion – Elora | Transportation Impact Study | 170127 | July 2017

Paradigm Transportation Solutions Limited | Page 19

Figure 4.3: Site Traffic Forecasts

Site GeneratedTraffic Volumes

Figure 4.3Granwood Subdivision– Elora, Transportation Impact Study170127

Weekday AM Peak Hour

Weekday PM Peak Hour

15

0 3 0 0 McNab Street

0 4

57 0 5 0

3 49

2 0 1 0 0Wellington

Road 211 2 9 0 0 0 151

4 411

Subject Site

15

Vic

tori

a S

tre

et

0

3 5 2

0

11 16 5 7 0

Hig

h S

tre

et

4 15

York Street

4 0 0

0

27 15 0

0 3 York Street

0 0 5

19 30 30 0 46 46

3 0 0

11 30 46 1216 0 0 2 5 0

0 51

12

Bri

dg

e

Str

ee

t

9 9 0 14 14 0 16 3

0 6 9 0 0 0 14 0

10

0 10 0 0 McNab Street

0 0

0 0

19

We

llin

gto

n

Ro

ad

7

0 06 0

0 1735 0 3 0

0

10 176

8 0 5 0 0Wellington

Road 215 2 6 0 0 0 103

13 178

Subject Site

10

Vic

tori

a S

tre

et

0

12 18 6

0

7 11 4 30 0

Hig

h S

tre

et

17 10

York Street 17 0 0

0

18 10 0

0 12

York Street

0 0 18

12 19 19 0 30 30

13 0 0

7 19 30 811 0 0 6 4 0

0 34

8

Bri

dg

e

Str

ee

t

33 33 0 51 52 0 58 13

0 21

33 0 0 0 52 00

0 0

0 0

12

We

llin

gto

n

Ro

ad

7

0 021 0

Page 29: Grandwood Subdivision – Elora Transportation Impact Study...To the extent that this report is based on information supplied by other parties, Paradigm Transportation Solutions Limited

Granwood Subdivsion – Elora | Transportation Impact Study | 170127 | July 2017

Paradigm Transportation Solutions Limited | Page 20

Figure 4.4: 2020 Total Traffic Forecasts

2020 TotalTraffic Volumes

Figure 4.4Granwood Subdivision– Elora, Transportation Impact Study170127

Weekday AM Peak Hour

Weekday PM Peak Hour

72

65 267 6 13 McNab

Street 12 23164281 131 308 35

338

35

181

146 24 143 30 20Wellington

Road 2182

52 144

55

10

23 5240

438

33

251

Subject Site

75

Vic

tori

a S

tre

et

11

635

21 48

1

368 47 24 18 1

Hig

h S

tre

et

32 75

York Street 10 18 4

13

63 38 6

586

49

York Street

5 10 6

29 77 75 3 96 96

7 26 1

48 64 55 2429

35 10 3 6 1

3 64

43

Bri

dg

e

Str

ee

t

74 74 14 50 50 14 23 34

320

25

44 6 4 0 20 6

59

47 176

17

16 McNab Street

4 0

16 16

615

We

llin

gto

n

Ro

ad

7

29 29

345 10

17 40115211 114 245 21

10

240

57

385

391 103 408 48 5Wellington

Road 21227

49 266

164 43 4 5461

351

83

479

Subject Site

58

Vic

tori

a S

tre

et

10

443

53 29

2

631 47 49 59 3

Hig

h S

tre

et

82 60

York Street 33 35 14

15

41 21 20

421

22

York Street 14 8 31

23 63 63 9 66 65

24 29 5

40 33 35 1924

12 8 9 8 1

0 43

57

Bri

dg

e

Str

ee

t

62 61 5 85 87 23 70 58

591

40

51

16 18 3 60

1837

18 1

5 4

444

We

llin

gto

n

Ro

ad

7

22 12

631 37

Page 30: Grandwood Subdivision – Elora Transportation Impact Study...To the extent that this report is based on information supplied by other parties, Paradigm Transportation Solutions Limited

Granwood Subdivsion – Elora | Transportation Impact Study | 170127 | July 2017

Paradigm Transportation Solutions Limited | Page 21

Figure 4.5: 2025 Total Traffic Forecasts

2025 TotalTraffic Volumes

Figure 4.5Granwood Subdivision– Elora, Transportation Impact Study170127

Weekday AM Peak Hour

Weekday PM Peak Hour

92

74 300

23

49 McNab Street 13 30288

421 160 497 121

397

43

253

197 27 214 62 23Wellington

Road 21125

59 177

66

39

108

6945

505

69

302

Subject Site

177

Vic

tori

a S

tre

et

92

728

23 54

1

432 52 27 20 14

Hig

h S

tre

et

69

176

York Street 11 26 32

107

66 40 38

673

55

York Street

6 11 6

30 82 82 4 104 103

8 44 5

52 69 56 2531

40 11 3 6 1

4 66

65

Bri

dg

e

Str

ee

t

83 83 16 55 55 16 24 57

380

28

49 7 5 0 21 7

74

53 197

72

38 McNab Street

5 0

18 18

703

We

llin

gto

n

Ro

ad

7

33 33

408 12

19 55193301 136 367 74

12

322

74

463

550 116 636 145 6Wellington

Road 21366

55 309

198 139

55 6868

401

194

562

Subject Site

123

Vic

tori

a S

tre

et

59

505

57 31

2

732 53 55 62 12

Hig

h S

tre

et

196

123

York Street 35 56 10

5

73

43 22 125

482

23

York Street 16 8 33

24 68 69 10 71 70

25 42 1944 35 36 2026

13 8 10

9 1

0 45

88

Bri

dg

e

Str

ee

t

66 66 6 91 90 25 71 86

688

43

54

18 21 4 60

2143

21 1

6 5

506

We

llin

gto

n

Ro

ad

7

24 13

731 43

Page 31: Grandwood Subdivision – Elora Transportation Impact Study...To the extent that this report is based on information supplied by other parties, Paradigm Transportation Solutions Limited

Granwood Subdivsion – Elora | Transportation Impact Study | 170127 | July 2017

Paradigm Transportation Solutions Limited | Page 22

5 Future Operations Analysis Capacity analyses provide an indication of the adequacy of the roadway facilities to serve the anticipated traffic demands. The analysis summary tables provided in this chapter contain the results of the weekday peak hour analysis for Background and Total traffic conditions.

5.1 Background Traffic Operations

Level of service analyses have been conducted using Synchro 9.1 with HCM 2000 procedures for the weekday AM and PM peak hour conditions. The intersections were assessed with the same parameters as in the analysis of existing conditions. Appendix E contains the detailed Synchro reports.

Table 5.1 and Table 5.2 displays a summary of the Background operations; the following is noted:

Under the 2020 Background horizon, all intersections analyzed are expected to operate with acceptable levels of service during the weekday peak hours. Delays are noted to be level of service between A-C with a v/c no greater than 0.46.

Under the 2025 Background horizon, all intersections analyzed are expected to operate with acceptable levels of service during the weekday peak hours. Delays are noted to be level of service between A-C with a v/c no greater than 0.55.

No capacity constraints are noted to occur under the 2020 and 2025 Background traffic projections. The current geometrics and traffic control will provide sufficient capacity for this timeframe based on the forecasts provided herein.

Page 32: Grandwood Subdivision – Elora Transportation Impact Study...To the extent that this report is based on information supplied by other parties, Paradigm Transportation Solutions Limited

Granwood Subdivsion – Elora | Transportation Impact Study | 170127 | July 2017

Paradigm Transportation Solutions Limited | Page 23

TABLE 5.1: 2020 BACKGROUND OPERATIONS SUMMARY

L T R A L T R A L T R A L T R A

LOS B B B B C C C C B B B B A B B B B

Delay 18 19 19 19 21 20 20 20 11 12 12 12 10 13 13 13 16

V/C 0.08 0.18 0.18 0.30 0.26 0.26 0.12 0.21 0.21 0.01 0.37 0.37

Queue 8 23 23 31 36 36 10 26 26 3 51 51

LOS B B B A A A A A A

Delay 14 14 14 0 0 0 1 1 1 1

V/C 0.12 0.12 0.20 0.01 0.04 0.04

Queue 3 3 0 0 1 1

LOS A A A A A A A A A A A A A A A A

Delay 2 2 2 2 0 0 0 0 10 10 10 10 10 10 10 10 3

V/C 0.01 0.01 0.01 0.00 0.00 0.00 0.01 0.01 0.01 0.02 0.02 0.02

Queue 0 0 0 0 0 0 0 0 0 1 1 1

LOS A A A A A A A A A A A A A A A A

Delay 3 3 3 3 2 2 2 2 10 10 10 10 9 9 9 9 6

V/C 0.01 0.01 0.01 0.00 0.00 0.00 0.01 0.01 0.01 0.05 0.05 0.05

Queue 0 0 0 0 0 0 0 0 0 1 1 1

LOS A A A A A A A A A

Delay 9 9 9 3 3 3 0 0 0 4

V/C 0.04 0.04 0.02 0.02 0.02 0.02

Queue 1 1 0 0 0 0

LOS A A A A A A A A A A A A A A A A

Delay 9 9 9 9 9 9 9 9 1 1 1 1 1 1 1 1 5

V/C 0.04 0.04 0.04 0.01 0.01 0.01 0.00 0.00 0.00 0.00 0.00 0.00

Queue 1 1 1 0 0 0 0 0 0 0 0 0

LOS C C C C C B B C B B B B A B B B B

Delay 20 23 23 22 24 19 19 22 11 15 15 14 10 12 12 12 17

V/C 0.24 0.43 0.43 0.39 0.19 0.19 0.08 0.46 0.46 0.05 0.24 0.24

Queue 25 58 58 31 27 27 10 65 65 5 31 31

LOS C C C A A A A A A

Delay 16 16 16 0 0 0 0 0 0 1

V/C 0.13 0.13 0.38 0.01 0.01 0.01

Queue 3 3 0 0 0 0

LOS A A A A A A A A A A A A A A A A

Delay 1 1 1 1 2 2 2 2 10 10 10 10 9 9 9 9 6

V/C 0.00 0.00 0.00 0.01 0.01 0.01 0.05 0.05 0.05 0.04 0.04 0.04

Queue 0 0 0 0 0 0 1 1 1 1 1 1

LOS A A A A A A A A A A A A A A A A

Delay 5 5 5 5 0 0 0 0 10 10 10 10 9 9 9 9 7

V/C 0.02 0.02 0.02 0.00 0.00 0.00 0.05 0.05 0.05 0.03 0.03 0.03

Queue 0 0 0 0 0 0 1 1 1 1 1 1

LOS A A A A A A A A A

Delay 9 9 9 1 1 1 0 0 0 3

V/C 0.05 0.05 0.00 0.00 0.03 0.03

Queue 1 1 0 0 0 0

LOS A A A A A A A A A A A A A A A A

Delay 9 9 9 9 9 9 9 9 2 2 2 2 2 2 2 2 4

V/C 0.03 0.03 0.03 0.02 0.02 0.02 0.01 0.01 0.01 0.01 0.01 0.01

Queue 1 1 1 0 0 0 0 0 0 0 0 0

AWSC - All-Way Stop Control L - Left MOE - Measure of Effectiveness V/C - Volume to Capacity Ratio

TWSC - Two-Way Stop Control T - Through LOS - Level of Service Queue (m) - 95th Percentile Queue Length

TCS - Traffic Control TCS R - Right Delay - Average Delay per Vehicle in Seconds

RBT - Roundabout A - Approach

5Bridge Street and

McNab StreetTWSC

6Bridge Street and

York StreetTWSC

3Victoria Street and

York StreetTWSC

4High Street and York

StreetTWSC

6Bridge Street and

York StreetTWSC

PM

Pea

k H

our

1Wellington Road 7

and Wellington Road 21/McNab Street

TCS

2Wellington Road 7

and York StreetTWSC

4High Street and York

StreetTWSC

5Bridge Street and

McNab StreetTWSC

AM

Pea

k H

our

1Wellington Road 7

and Wellington Road 21/McNab Street

TCS

2Wellington Road 7

and York StreetTWSC

3Victoria Street and

York StreetTWSC

IntersectionControl

TypeMOE

Direction/Movement/Approach

Eastbound Westbound Northbound SouthboundOverall

Page 33: Grandwood Subdivision – Elora Transportation Impact Study...To the extent that this report is based on information supplied by other parties, Paradigm Transportation Solutions Limited

Granwood Subdivsion – Elora | Transportation Impact Study | 170127 | July 2017

Paradigm Transportation Solutions Limited | Page 24

TABLE 5.2: 2025 BACKGROUND OPERATIONS SUMMARY

L T R A L T R A L T R A L T R A

LOS C C C C C C C C B B B B A B B B B

Delay 20 20 20 20 23 24 24 24 11 12 12 12 10 14 14 14 18

V/C 0.13 0.26 0.26 0.41 0.51 0.51 0.14 0.27 0.27 0.04 0.42 0.42

Queue 9 34 34 39 71 71 12 33 33 6 58 58

LOS C C C A A A A A A

Delay 17 17 17 0 0 0 1 1 1 2

V/C 0.16 0.16 0.24 0.01 0.05 0.05

Queue 4 4 0 0 1 1

LOS A A A A A A A A A A A A A A A A

Delay 2 2 2 2 0 0 0 0 10 10 10 10 10 10 10 10 3

V/C 0.01 0.01 0.01 0.00 0.00 0.00 0.02 0.02 0.02 0.02 0.02 0.02

Queue 0 0 0 0 0 0 0 0 0 1 1 1

LOS A A A A A A A A A A A A A A A A

Delay 3 3 3 3 2 2 2 2 10 10 10 10 9 9 9 9 6

V/C 0.01 0.01 0.01 0.00 0.00 0.00 0.02 0.02 0.02 0.06 0.06 0.06

Queue 0 0 0 0 0 0 0 0 0 1 1 1

LOS A A A A A A A A A

Delay 10 10 10 5 5 5 0 0 0 6

V/C 0.08 0.08 0.07 0.07 0.02 0.02

Queue 2 2 2 2 0 0

LOS A A A A A A A A A A A A A A A A

Delay 10 10 10 10 9 9 9 9 1 1 1 1 4 4 4 4 6

V/C 0.06 0.06 0.06 0.12 0.12 0.12 0.00 0.00 0.00 0.02 0.02 0.02

Queue 1 1 1 3 3 3 0 0 0 1 1 1

LOS C C C C C B B C B B B B A B B B B

Delay 23 28 28 27 49 21 21 32 11 16 16 16 13 12 12 12 22

V/C 0.34 0.66 0.66 0.77 0.35 0.35 0.10 0.55 0.55 0.23 0.27 0.27

Queue 30 96 96 55 47 47 11 81 81 15 35 35

LOS C C C A A A A A A

Delay 20 20 20 0 0 0 0 0 0 1

V/C 0.18 0.18 0.44 0.01 0.01 0.01

Queue 5 5 0 0 0 0

LOS A A A A A A A A A A A A A A A A

Delay 1 1 1 1 2 2 2 2 10 10 10 10 9 9 9 9 6

V/C 0.00 0.00 0.00 0.01 0.01 0.01 0.06 0.06 0.06 0.05 0.05 0.05

Queue 0 0 0 0 0 0 1 1 1 1 1 1

LOS A A A A A A A A A A A A A A A A

Delay 5 5 5 5 0 0 0 0 10 10 10 10 9 9 9 9 7

V/C 0.02 0.02 0.02 0.00 0.00 0.00 0.06 0.06 0.06 0.03 0.03 0.03

Queue 0 0 0 0 0 0 1 1 1 1 1 1

LOS A A A A A A A A A

Delay 9 9 9 4 4 4 0 0 0 6

V/C 0.16 0.16 0.04 0.04 0.04 0.04

Queue 4 4 1 1 0 0

LOS A A A A A A A A A A A A A A A A

Delay 11 11 11 11 10 10 10 10 1 1 1 1 5 5 5 5 6

V/C 0.04 0.04 0.04 0.10 0.10 0.10 0.01 0.01 0.01 0.07 0.07 0.07

Queue 1 1 1 3 3 3 0 0 0 2 2 2

AWSC - All-Way Stop Control L - Left MOE - Measure of Effectiveness V/C - Volume to Capacity Ratio

TWSC - Two-Way Stop Control T - Through LOS - Level of Service Queue (m) - 95th Percentile Queue Length

TCS - Traffic Control TCS R - Right Delay - Average Delay per Vehicle in Seconds

RBT - Roundabout A - Approach

5Bridge Street and

McNab StreetTWSC

6Bridge Street and

York StreetTWSC

3Victoria Street and

York StreetTWSC

4High Street and York

StreetTWSC

6Bridge Street and

York StreetTWSC

PM

Pea

k H

our

1Wellington Road 7

and Wellington Road 21/McNab Street

TCS

2Wellington Road 7

and York StreetTWSC

4High Street and York

StreetTWSC

5Bridge Street and

McNab StreetTWSC

AM

Pea

k H

our

1Wellington Road 7

and Wellington Road 21/McNab Street

TCS

2Wellington Road 7

and York StreetTWSC

3Victoria Street and

York StreetTWSC

IntersectionControl

TypeMOE

Direction/Movement/Approach

Eastbound Westbound Northbound SouthboundOverall

Page 34: Grandwood Subdivision – Elora Transportation Impact Study...To the extent that this report is based on information supplied by other parties, Paradigm Transportation Solutions Limited

Granwood Subdivsion – Elora | Transportation Impact Study | 170127 | July 2017

Paradigm Transportation Solutions Limited | Page 25

5.2 Total Traffic Operations

Total traffic conditions include traffic generated from the development added to the background traffic. Level of service analyses have been conducted using Synchro 9.1 with HCM 2000 procedures for the weekday AM and PM peak hour conditions. The intersections were assessed with the same parameters as in the analysis of existing conditions. Appendix F contains the detailed Synchro reports.

Table 5.3 and Table 5.4 displays a summary of the Total operations; the following is noted:

Under the 2020 Total horizon, all intersections analyzed are expected to operate with acceptable levels of service during the weekday peak hours. Delays are noted to be level of service between A-C with a v/c no greater than 0.47.

Under the 2025 Total horizon, all intersections analyzed are expected to operate acceptable levels of service during the weekday peak hours. Delays are noted to be level of service between A-C with a v/c no greater than 0.55.

No capacity constraints are noted to occur under the 2020 and 2025 Total traffic projections. The current geometrics and traffic control will provide sufficient capacity for this timeframe based on the forecasts provided herein.

Page 35: Grandwood Subdivision – Elora Transportation Impact Study...To the extent that this report is based on information supplied by other parties, Paradigm Transportation Solutions Limited

Granwood Subdivsion – Elora | Transportation Impact Study | 170127 | July 2017

Paradigm Transportation Solutions Limited | Page 26

TABLE 5.3: 2020 TOTAL OPERATIONS SUMMARY

L T R A L T R A L T R A L T R A

LOS B B B B C C C C B B B B A B B B B

Delay 18 19 19 19 21 20 20 21 11 12 12 12 10 13 13 13 16

V/C 0.08 0.18 0.18 0.30 0.27 0.27 0.12 0.22 0.22 0.01 0.37 0.37

Queue 8 24 24 31 37 37 11 28 28 3 51 51

LOS C C C A A A A A A

Delay 19 19 19 0 0 0 1 1 1 2

V/C 0.24 0.24 0.20 0.02 0.05 0.05

Queue 7 7 0 0 1 1

LOS A A A A A A A A A A A A A A A A

Delay 2 2 2 2 0 0 0 0 10 10 10 10 10 10 10 10 2

V/C 0.01 0.01 0.01 0.00 0.00 0.00 0.02 0.02 0.02 0.03 0.03 0.03

Queue 0 0 0 0 0 0 0 0 0 1 1 1

LOS A A A A A A A A B B B B A A A A

Delay 2 2 2 2 0 0 0 0 11 11 11 11 9 9 9 9 4

V/C 0.01 0.01 0.01 0.00 0.00 0.00 0.02 0.02 0.02 0.06 0.06 0.06

Queue 0 0 0 0 0 0 0 0 0 1 1 1

LOS A A A A A A A A A

Delay 9 9 9 2 2 2 0 0 0 3

V/C 0.04 0.04 0.02 0.02 0.02 0.02

Queue 1 1 0 0 0 0

LOS A A A A A A A A A A A A A A A A

Delay 9 9 9 9 9 9 9 9 2 2 2 2 1 1 1 1 5

V/C 0.07 0.07 0.07 0.01 0.01 0.01 0.01 0.01 0.01 0.00 0.00 0.00

Queue 2 2 2 0 0 0 0 0 0 0 0 0

LOS C C C C C B B C B B B B A B B B B

Delay 20 23 23 22 24 20 20 22 11 15 15 14 10 12 12 12 18

V/C 0.24 0.44 0.44 0.40 0.20 0.20 0.09 0.47 0.47 0.05 0.25 0.25

Queue 25 60 60 31 28 28 10 66 66 5 32 32

LOS C C C A A A A A A

Delay 19 19 19 0 0 0 1 1 1 1

V/C 0.21 0.21 0.38 0.03 0.03 0.03

Queue 6 6 0 0 1 1

LOS A A A A A A A A A A A A A A A A

Delay 1 1 1 1 1 1 1 1 10 10 10 10 10 10 10 10 5

V/C 0.00 0.00 0.00 0.01 0.01 0.01 0.05 0.05 0.05 0.07 0.07 0.07

Queue 0 0 0 0 0 0 1 1 1 2 2 2

LOS A A A A A A A A A A A A A A A A

Delay 2 2 2 2 0 0 0 0 10 10 10 10 10 10 10 10 4

V/C 0.02 0.02 0.02 0.00 0.00 0.00 0.06 0.06 0.06 0.04 0.04 0.04

Queue 0 0 0 0 0 0 1 1 1 1 1 1

LOS A A A A A A A A A

Delay 9 9 9 1 1 1 0 0 0 3

V/C 0.05 0.05 0.00 0.00 0.04 0.04

Queue 1 1 0 0 0 0

LOS A A A A A A A A A A A A A A A A

Delay 10 10 10 10 9 9 9 9 3 3 3 3 1 1 1 1 4

V/C 0.05 0.05 0.05 0.02 0.02 0.02 0.02 0.02 0.02 0.01 0.01 0.01

Queue 1 1 1 0 0 0 0 0 0 0 0 0

AWSC - All-Way Stop Control L - Left MOE - Measure of Effectiveness V/C - Volume to Capacity Ratio

TWSC - Two-Way Stop Control T - Through LOS - Level of Service Queue (m) - 95th Percentile Queue Length

TCS - Traffic Control TCS R - Right Delay - Average Delay per Vehicle in Seconds

RBT - Roundabout A - Approach

5Bridge Street and

McNab StreetTWSC

6Bridge Street and

York StreetTWSC

3Victoria Street and

York StreetTWSC

4High Street and York

StreetTWSC

6Bridge Street and

York StreetTWSC

PM

Pea

k H

our

1Wellington Road 7

and Wellington Road 21/McNab Street

TCS

2Wellington Road 7

and York StreetTWSC

4High Street and York

StreetTWSC

5Bridge Street and

McNab StreetTWSC

AM

Pea

k H

our

1Wellington Road 7

and Wellington Road 21/McNab Street

TCS

2Wellington Road 7

and York StreetTWSC

3Victoria Street and

York StreetTWSC

IntersectionControl

TypeMOE

Direction/Movement/Approach

Eastbound Westbound Northbound SouthboundOverall

Page 36: Grandwood Subdivision – Elora Transportation Impact Study...To the extent that this report is based on information supplied by other parties, Paradigm Transportation Solutions Limited

Granwood Subdivsion – Elora | Transportation Impact Study | 170127 | July 2017

Paradigm Transportation Solutions Limited | Page 27

TABLE 5.4: 2025 TOTAL OPERATIONS SUMMARY

L T R A L T R A L T R A L T R A

LOS B C C C C C C C B B B B A B B B B

Delay 20 20 20 20 24 24 24 24 11 12 12 12 10 14 14 14 18

V/C 0.13 0.27 0.27 0.41 0.52 0.52 0.15 0.28 0.28 0.04 0.42 0.42

Queue 9 34 34 39 73 73 12 35 35 6 59 59

LOS C C C A A A A A A

Delay 24 24 24 0 0 0 1 1 1 3

V/C 0.33 0.33 0.24 0.02 0.05 0.05

Queue 10 10 0 0 1 1

LOS A A A A A A A A A A A A A A A A

Delay 2 2 2 2 0 0 0 0 10 10 10 10 10 10 10 10 2

V/C 0.01 0.01 0.01 0.00 0.00 0.00 0.02 0.02 0.02 0.03 0.03 0.03

Queue 0 0 0 0 0 0 0 0 0 1 1 1

LOS A A A A A A A A B B B B A A A A

Delay 2 2 2 2 0 0 0 0 11 11 11 11 9 9 9 9 4

V/C 0.01 0.01 0.01 0.00 0.00 0.00 0.02 0.02 0.02 0.06 0.06 0.06

Queue 0 0 0 0 0 0 0 0 0 2 2 2

LOS A A A A A A A A A

Delay 10 10 10 5 5 5 0 0 0 5

V/C 0.08 0.08 0.07 0.07 0.03 0.03

Queue 1 1 2 2 0 0

LOS B B B B A A A A A A A A A A A A

Delay 11 11 11 11 9 9 9 9 1 1 1 1 4 4 4 4 7

V/C 0.10 0.10 0.10 0.12 0.12 0.12 0.01 0.01 0.01 0.02 0.02 0.02

Queue 3 3 3 0 0 0 0 0 0 1 1 1

LOS C C C C C B B C B B B B A B B B B

Delay 23 28 28 27 54 22 22 33 11 16 16 16 13 12 12 12 22

V/C 0.34 0.67 0.67 0.80 0.35 0.35 0.11 0.55 0.55 0.24 0.28 0.28

Queue 30 99 99 56 48 48 11 83 83 16 37 37

LOS C C C A A A A A A

Delay 24 24 24 0 0 0 1 1 1 2

V/C 0.28 0.28 0.44 0.03 0.03 0.03

Queue 9 9 0 0 1 1

LOS A A A A A A A A A A A A A A A A

Delay 1 1 1 1 1 1 1 1 10 10 10 10 10 10 10 10 5

V/C 0.00 0.00 0.00 0.01 0.01 0.01 0.06 0.06 0.06 0.08 0.08 0.08

Queue 0 0 0 0 0 0 2 2 2 2 2 2

LOS A A A A A A A A A A A A A A A A

Delay 2 2 2 2 0 0 0 0 10 10 10 10 10 10 10 10 5

V/C 0.02 0.02 0.02 0.00 0.00 0.00 0.06 0.06 0.06 0.04 0.04 0.04

Queue 0 0 0 0 0 0 2 2 2 1 1 1

LOS A A A A A A A A A

Delay 9 9 9 4 4 4 0 0 0 5

V/C 0.16 0.16 0.04 0.04 0.05 0.05

Queue 4 4 1 1 0 0

LOS A A A A A A A A A A A A A A A A

Delay 12 12 12 12 10 10 10 10 2 2 2 2 4 4 4 4 6

V/C 0.08 0.08 0.08 0.10 0.10 0.10 0.02 0.02 0.02 0.07 0.07 0.07

Queue 2 2 2 3 3 3 0 0 0 2 2 2

AWSC - All-Way Stop Control L - Left MOE - Measure of Effectiveness V/C - Volume to Capacity Ratio

TWSC - Two-Way Stop Control T - Through LOS - Level of Service Queue (m) - 95th Percentile Queue Length

TCS - Traffic Control TCS R - Right Delay - Average Delay per Vehicle in Seconds

RBT - Roundabout A - Approach

5Bridge Street and

McNab StreetTWSC

6Bridge Street and

York StreetTWSC

3Victoria Street and

York StreetTWSC

4High Street and York

StreetTWSC

6Bridge Street and

York StreetTWSC

PM

Pea

k H

our

1Wellington Road 7

and Wellington Road 21/McNab Street

TCS

2Wellington Road 7

and York StreetTWSC

4High Street and York

StreetTWSC

5Bridge Street and

McNab StreetTWSC

AM

Pea

k H

our

1Wellington Road 7

and Wellington Road 21/McNab Street

TCS

2Wellington Road 7

and York StreetTWSC

3Victoria Street and

York StreetTWSC

IntersectionControl

TypeMOE

Direction/Movement/Approach

Eastbound Westbound Northbound SouthboundOverall

Page 37: Grandwood Subdivision – Elora Transportation Impact Study...To the extent that this report is based on information supplied by other parties, Paradigm Transportation Solutions Limited

Granwood Subdivsion – Elora | Transportation Impact Study | 170127 | July 2017

Paradigm Transportation Solutions Limited | Page 28

5.3 Traffic Diversion

With construction of the development, York Street will provide for a continuous point of access from Bridge Street to Waterloo Street. The extension of York Street would provide for a direct access to Wellington Road 7, and an alternative route to residential lots that currently utilize McNab Street and Water Street.

The York Street extension would be particularly useful for traffic traveling to and from the south on Wellington Road 7. The extension of York Street would also provide a second alternative route for the industrial and commercial developments located along Park Road and Hamilton Street.

As a result of constructing the York Street extension, the change in traffic patterns will affect turn movements at several locations. Figure 5.1 depicts the affected turning traffic movements.

Three diversion scenarios for the affected movements were analyzed with the following splits; 10/90, 50/50, and 90/10. The use of these scenarios provides for a comprehensive evaluation of the diversion. Appendix G illustrates the proposed traffic estimates for the 2025 horizon for the diversion scenarios.

Page 38: Grandwood Subdivision – Elora Transportation Impact Study...To the extent that this report is based on information supplied by other parties, Paradigm Transportation Solutions Limited

Granwood Subdivsion – Elora | Transportation Impact Study | 170127 | July 2017

Paradigm Transportation Solutions Limited | Page 29

Figure 5.1: Affected Traffic Movements

Affe

cted

Tr

affic

Mov

emen

tsFi

gure

5.1

Gra

nwoo

dSu

bd

ivisi

on–

Elor

a, T

rans

por

tatio

n Im

pa

ct S

tud

y17

0127

Wellington Road 7

Bridge Street

Yo

rk

Str

ee

t

Sub

ject

Site

Victoria Street

High Street

Yo

rk

Str

ee

t

We

llin

gto

n

Ro

ad

21

Mc

Na

b

Str

ee

t

Lege

nd

Pro

ject

ed D

ecre

ase

Pro

ject

ed In

crea

se

Page 39: Grandwood Subdivision – Elora Transportation Impact Study...To the extent that this report is based on information supplied by other parties, Paradigm Transportation Solutions Limited

Granwood Subdivsion – Elora | Transportation Impact Study | 170127 | July 2017

Paradigm Transportation Solutions Limited | Page 30

5.3.1 Sensitivity Analysis

A diversion sensitivity analysis was performed for the 2025 horizon based on the projections provided in Appendix G. The evaluation criteria used to analyze area intersections was completed using Synchro 9.1 with HCM 2000 procedures for the weekday AM and PM peak hour conditions. Appendix H contains the detailed Synchro reports.

From the Synchro analysis, the only intersection expected to see a decrease in overall operation is Wellington Road 7 and York Street. From the results, this intersection could experience up to 52 seconds of delay during the weekday peak hours.

Table 5.5 displays a summary of the capacity comparison at this intersection under the 2025 Total 10/90 Split, 2025 Total 50/50 Split, and 2025 Total 90/10 Split.

The Wellington Road 7 and York Street intersection currently operates at LOS C. With the addition of diverted traffic to this location, this intersection may experience a decline from LOS C to LOS D-F; dependent on the percentage of diverted traffic. Realistically a diversion of no more than 50 percent is expected given the York Street extension does not provide for a shorter route/travel time for a clear majority of vehicles travelling to the north and west. For these reasons, traffic diversion is not expected to significantly impact the traffic operations at the Wellington Road 7 and York Street intersection.

Page 40: Grandwood Subdivision – Elora Transportation Impact Study...To the extent that this report is based on information supplied by other parties, Paradigm Transportation Solutions Limited

Granwood Subdivsion – Elora | Transportation Impact Study | 170127 | July 2017

Paradigm Transportation Solutions Limited | Page 31

TABLE 5.5: 2025 TOTAL OPERATIONS SUMMARY

Dem v/c Del LOS Dem v/c Del LOS Dem v/c Del LOS

WB LR AM Peak 94 0.37 25 D 143 0.56 33 D 192 0.76 51 F

WB LR PM Peak 76 0.32 26 D 106 0.49 34 D 135 0.68 52 F

Dem - Critical street approach vehicle demand Delay - Average Delay per Vehicle in Seconds

V/C - Volume to Capacity Ratio LOS - Level of Service

2Wellington Road 7

and York Street

IntersectionSide Street Movement

Critical Movement Capacity Comparison

2025 10% Diversion 2025 50% Diversion 2025 90% DiversionPeak

Period

Page 41: Grandwood Subdivision – Elora Transportation Impact Study...To the extent that this report is based on information supplied by other parties, Paradigm Transportation Solutions Limited

Granwood Subdivsion – Elora | Transportation Impact Study | 170127 | July 2017

Paradigm Transportation Solutions Limited | Page 32

6 Remedial Measures As outlined in the capacity analysis impacts to the weekday peak hour operations at study area intersections between future Background and Total conditions are expected to be relatively minor as a result of the proposed development. Most study area intersections are projected to operate well within the acceptable range.

6.1 Left Turn Lane Warrants

The need for auxiliary turn lanes was reviewed at the developments access connections.

The warrants for left-turn lanes follow the requirements in the Ministry of Transportation’s (MTO) Geometric Design Standards Manual4. Appendix I contains the left turn lane warrant nomographs.

The percentage of left-turning vehicles in the approaching volume were rounded to the nearest 5 percent, as nomographs are only provided for 5 percent increments.

The following is noted:

Under the 2025 background and total horizon, a southbound left turn lane with 25 metres of storage is warranted at Wellington Road 7 and York Street. An additional 5 metres of storage is warranted under the 50% and 90% traffic diversion scenarios; 30 metres total storage.

Left turn lane warrants were not conducted for the intersections of York Street with Victoria Street, High Street, Bridge Street and at the intersection of Bridge Street and McNab Street as the current and projected volumes do not meet the minimum approaching and opposing volumes to trigger the warrants.

4 MTO Geometric Design Standards for Ontario Highways, Chapter E, 1976

Page 42: Grandwood Subdivision – Elora Transportation Impact Study...To the extent that this report is based on information supplied by other parties, Paradigm Transportation Solutions Limited

Granwood Subdivsion – Elora | Transportation Impact Study | 170127 | July 2017

Paradigm Transportation Solutions Limited | Page 33

6.2 Assessment of Impacts

As outlined in the capacity analysis in the previous chapter, impacts to peak hour operations at study area intersections between future Background and Total conditions are expected to be relatively minor as a result of the proposed development. Most study area intersection are projected to operate well within the acceptable range.

The intersection of Victoria Street and McNab Street has not been assessed with an operational analysis as traffic volumes could not be established given the current ongoing reconstruction of Victoria Street. As this intersection is controlled by a single roundabout that is currently operating with acceptable levels of service, the development is proposed to contribute an additional 30 trips during the weekday peak hours. Given the low volume of additional traffic projected, the proposed development will not have a significant impact on the current traffic operations.

The area where a noticeable change in operations could occur is the intersection of Wellington Road 7 and York Street. The analysis presented in this report has indicated with the York Street extension completed, deficiencies in LOS for the site street approach could occur dependent on the amount of traffic that is diverted from Wellington Road 7 and McNab Street.

To assesse the diversion possibility, three scenarios were analyzed with the following splits; 10/90, 50/50, and 90/10. With additional traffic diverted to the Wellington Road 7 and York Street intersection, the 10/90 and 50/50 splits are expected to operate with adequate levels of service.

Utilizing the higher spilt of 90/10, increased delays are projected. It should be noted that the usage of a 90/10 diversion is highly conservative and serves as a worst-case scenario. Even under this assumption, the side street approach would still have spare capacity available given a volume to capacity ratio of 0.76 is projected.

Realistically a diversion of no more than 50 percent is expected given the York Street extension does not provide for a shorter route/travel time for a clear majority of vehicles travelling to the north and west. For these reasons, traffic diversion is not expected to significantly impact the traffic operations at the Wellington Road 7 and York Street intersection.

Page 43: Grandwood Subdivision – Elora Transportation Impact Study...To the extent that this report is based on information supplied by other parties, Paradigm Transportation Solutions Limited

Granwood Subdivsion – Elora | Transportation Impact Study | 170127 | July 2017

Paradigm Transportation Solutions Limited | Page 34

6.3 Fair Share Contribution

The analysis provided within determined that improvements are required at Wellington Road 7 and York Street in the form of a southbound left turn lane as a result of existing traffic, background traffic growth and cumulative development traffic.

Intersection improvements at Wellington Road 7 and York Street are estimated to cost approximately $62,400 for a 30-metre southbound left turn lane. The fair share is calculated by comparing the relative amount of traffic increase at this movement. This represents the project’s fair share towards funding of improvements to meet future traffic demands.

It should also be noted that the fair share contribution values contained in Table 6.1 were prepared according to the MTO Parametric Estimating Guide.

Under the 2025 horizon, a southbound left turn lane with 30 metres of storage is warranted at Wellington Road 7 and York Street. Based on the fair share calculation, the Applicant is recommended to contribute no more than 10.1% towards such an improvement.

Page 44: Grandwood Subdivision – Elora Transportation Impact Study...To the extent that this report is based on information supplied by other parties, Paradigm Transportation Solutions Limited

Granwood Subdivsion – Elora | Transportation Impact Study | 170127 | July 2017

Paradigm Transportation Solutions Limited | Page 35

TABLE 6.1: FAIR SHARE CONTRIBUTION

Improvement Base Year 2025 Totalb Development Percent Cost Estimatec Fair Share

Wellington Road 7 & York Street SB Left Turn Lane 52 149 15 10.1% 62,400$ 6,282$

a Peak Hour Volume based on AM and PM Peaks of SB Left Turn

b 2025 Total based on 50% diversion scenario

c 2011 Parametric Estimating Guide, Prepared by the Ministry of Transportation Ontario

Peak Hour Volumea

Intersection

Page 45: Grandwood Subdivision – Elora Transportation Impact Study...To the extent that this report is based on information supplied by other parties, Paradigm Transportation Solutions Limited

Granwood Subdivsion – Elora | Transportation Impact Study | 170127 | July 2017

Paradigm Transportation Solutions Limited | Page 36

7 Conclusions and Recommendations

7.1 Conclusions

Based on the investigations carried out, it is concluded that:

The development is forecast to generate 101 and 138 new trips during the weekday peak hours, respectively at full build out;

Capacity analyses were conducted for each of the study area intersections under 2017 (Base Year), 2020 (Background + Total), and 2025 (Background + Total). The results of the capacity analysis conducted as part of this study indicates that site generated traffic volumes during the peak-hour periods have only a negligible impact on intersection capacity within the study area.

With the York Street extension completed, diverted traffic from Wellington Road 7 and McNab Street is not expected to exceed 50 percent. The results of the capacity analysis conducted as part of this study indicates that the traffic diversion during the peak-hour periods have only a negligible impact on intersection capacity within the study area.

Given the low volume of trips forecasted, the roundabout at Victoria Street and McNab Street will not be adversely affected in terms of capacity or safety as a result of this development;

A southbound left turn lane with 30 metres of storage is warranted at Wellington Road 7 and York Street;

The analysis undertaken within was prepared using the most recent site plan. Any minor changes to the plan will not materially affect the conclusions contained within.

7.2 Recommendations

Based on the findings of this study, it is recommended that:

The County of Wellington review and determine the feasibility of providing a southbound left turn lane with 30 metres of storage at Wellington Road 7 and York Street as warranted under the 2025 Horizon. The Applicant is recommended to contribute no more 10.1% towards such an improvement if implemented.

The implementation of the above-mentioned mitigation measures not only accommodates future site-generated traffic but also improves some existing operational deficiencies in the vicinity of the site.

No further improvements are required as traffic generated from the proposed development will not materially affect the operations of the study area roadway.

Page 46: Grandwood Subdivision – Elora Transportation Impact Study...To the extent that this report is based on information supplied by other parties, Paradigm Transportation Solutions Limited
Page 47: Grandwood Subdivision – Elora Transportation Impact Study...To the extent that this report is based on information supplied by other parties, Paradigm Transportation Solutions Limited

Granwood Subdivsion – Elora | Transportation Impact Study | 170127 | July 2017

Paradigm Transportation Solutions Limited | Appendices

Appendix A

Terms of Reference

Page 48: Grandwood Subdivision – Elora Transportation Impact Study...To the extent that this report is based on information supplied by other parties, Paradigm Transportation Solutions Limited
Page 49: Grandwood Subdivision – Elora Transportation Impact Study...To the extent that this report is based on information supplied by other parties, Paradigm Transportation Solutions Limited

1

Adam Makarewicz

From: Brett Salmon <[email protected]>Sent: Wednesday, June 7, 2017 8:45 AMTo: Adam MakarewiczSubject: FW: 170136: Granwood Subdivision (Elora) TIS - Terms of Reference

Hi Adam  Comments from Howard Wray below.  Brett Salmon | Managing Director of Planning & Development  Township of Centre Wellington | 1 MacDonald Square, Elora, ON  N0B 1S0 519.846.9691  x297  centrewellington.ca  

From: Howard Wray [mailto:[email protected]]  Sent: Tuesday, June 6, 2017 5:37 PM To: Brett Salmon <[email protected]> Cc: 'Pasquale Costanzo ([email protected])' <[email protected]>; Ray Kirtz <[email protected]> Subject: RE: 170136: Granwood Subdivision (Elora) TIS ‐ Terms of Reference  Hi Brett,   I don’t expect that the Township has count data.  I’m not too concerned with McNab / Victoria.  This is the existing roundabout, and is operating well.  The York Street connection should, if anything, reduce traffic through the roundabout.  If their distribution analysis confirms this, they can conclude that there will be no negative effects on the roundabout.  The traffic on York Street at Victoria can be derived from the count they will do at York/WR7.  Victoria may have to be estimated for now.  That should be sufficient, but if there is a significant question or concern at this intersection when the report is reviewed, it could be counted later and addressed in an addendum, if necessary.   I agree with the analysis of the additional intersections.    Howard Wray, P. Eng.

Triton Engineering Services Limited 18 Robb Blvd., Unit 8 Orangeville, ON L9W 3L2 Tel (519) 941-0330 • Fax (519) 941-1830 • www.tritoneng.on.ca  

 This email message and any files transmitted with it are proprietary and confidential information of the sender and are intended only for the person(s) to

whom this email is addressed. If you have received this email message in error, please notify the sender immediately by telephone or email and destroy the original message without making a copy.

 

From: Brett Salmon [mailto:[email protected]] Sent: Tuesday, June 06, 2017 8:38 AM To: Howard Wray Cc: 'Pasquale Costanzo ([email protected])' Subject: FW: 170136: Granwood Subdivision (Elora) TIS - Terms of Reference

Page 50: Grandwood Subdivision – Elora Transportation Impact Study...To the extent that this report is based on information supplied by other parties, Paradigm Transportation Solutions Limited

2

 Howard what are your thoughts on this?  Brett Salmon | Managing Director of Planning & Development  Township of Centre Wellington | 1 MacDonald Square, Elora, ON  N0B 1S0 519.846.9691  x297  centrewellington.ca  

From: Adam Makarewicz [mailto:[email protected]]  Sent: Monday, June 5, 2017 4:49 PM To: Pasquale Costanzo <[email protected]>; Brett Salmon <[email protected]> Cc: Phil Grubb <[email protected]> Subject: RE: 170136: Granwood Subdivision (Elora) TIS ‐ Terms of Reference  Hi Pasquale and Brett, Further to the email noted below regarding the Terms of Reference, we have completed a preliminary field visit and note that due to the reconstruction of Victoria Street, we are unable to complete updated counts at Victoria Street with York Road and McNab Street. Can you please advise at your earliest opportunity if the Township has recent count data at these two intersections? If not, we have on file count data from the original TIS for the Grandwood Subdivision that was completed in 2000 as well as a 2014 count data at the neighbouring intersections of Wellington Road 7 and McNab Street, Water Street and Metcalfe Street and Bridge Street and McNab Street. If recent count data is not available, would the Township and County accept the use of utilizing 2000 count data with factors applied based on the upstream and downstream link volumes from the neighbouring intersections. Given the limited development activity that has occurred; based on a review of 2000 to 2016 aerial images, I don’t suspect the volumes to have changed significantly given the local nature of these connections. Furthermore, we are also proposing additional public roadway intersections to be evaluated as part of the TIS. Please see the additional intersections noted below in RED. Please advise on the availability of count data and if the Terms of Reference and methodology is acceptable. Adam J. Makarewicz, Dipl.T., C.E.T. MITE Transportation Engineering Technologist

Paradigm Transportation Solutions Limited 22 King Street South, Suite 300, Waterloo ON N2J 1N8 p: 905.381.2229 x303 m: 519.497.7179 e: [email protected] w: www.ptsl.com

From: Adam Makarewicz  Sent: Monday, May 29, 2017 3:34 PM To: 'Pasquale Costanzo' <[email protected]>; '[email protected]' <[email protected]>Subject: 170136: Granwood Subdivision (Elora) TIS ‐ Terms of Reference  Hi Pasquale and Brett,

Page 51: Grandwood Subdivision – Elora Transportation Impact Study...To the extent that this report is based on information supplied by other parties, Paradigm Transportation Solutions Limited

3

Paradigm is providing engineering assistance for a Site Plan Application for the proposed Granwood Subdivision in Elora, Ontario. The property is located west of Bridge Street and south of McNab Street East. A Traffic Impact Study is required to support said applications for this 124-residential unit development. A concept plan is enclosed for your reference. We are not aware if Wellington County and/or Township of Centre Wellington has any Traffic Impact Study Guidelines, further clarification is requested on this subject matter. The terms of reference for the study are suggested:

1. The public roadway intersections to be analyzed will be: York Street and Wellington Road 7; McNab Street and Victoria Street; York Street and Victoria Street;

High Street and York Street; Bridge Street and York Street; Bridge Street and McNab Street; and Wellington Road 7 and McNab Street.

2. To reflect the peak use of the site being concurrent with commuter hours, the weekday AM and PM

peak hours will be analyzed.

3. Base Year (2017) and five years after Opening year (2025) will be included in the analysis.

4. Trip generation will be based on ITE rates.

5. General background growth will be accounted for at 2.1% per annum, consistent with Population and Employment Growth Forecasts derived from the Wellington County’s 2013 Official Plan.

6. Traffic growth from nearby developments will be based on projections developed in the South River Road Residential Development Transportation Impact Study, 2015, prepared by our firm.

7. Traffic diversion will be accounted for as the result of York Street and Halls Drive extensions being completed as part of the development proposal.

8. Trip distribution will be based on existing travel patterns and most logical routes to the arterial road network.

We respectfully request your review and approval of these proposed Terms of Reference. Should you have any question or require additional information, please do not hesitate to contact myself. Regards, Adam J. Makarewicz, Dipl.T., C.E.T. MITE Transportation Engineering Technologist

Paradigm Transportation Solutions Limited 22 King Street South, Suite 300, Waterloo ON N2J 1N8 p: 905.381.2229 x303

Page 52: Grandwood Subdivision – Elora Transportation Impact Study...To the extent that this report is based on information supplied by other parties, Paradigm Transportation Solutions Limited

4

m: 519.497.7179 e: [email protected] w: www.ptsl.com  

This e-mail and any files transmitted with it are confidential and intended solely for the use of the individual or entity to whom they are addressed. If you have received this e-mail in error please notify the sender immediately. Please note that any views or opinions presented in this e-mail are solely those of the author and do not necessarily represent those of Paradigm Transportation Solutions Limited. Finally, the recipient should check this e-mail and any attachments for the presence of viruses. Paradigm Transportation Solutions Limited accepts no liability for any damage caused by any virus transmitted by this e-mail.

Page 53: Grandwood Subdivision – Elora Transportation Impact Study...To the extent that this report is based on information supplied by other parties, Paradigm Transportation Solutions Limited

1

Adam Makarewicz

From: Howard Wray <[email protected]>Sent: Tuesday, May 30, 2017 11:23 AMTo: Brett Salmon; 'Pasquale Costanzo ([email protected])'Cc: Colin Baker; Ray KirtzSubject: RE: 170136: Granwood Subdivision (Elora) TIS - Terms of Reference

Agreed.  A quick review of the numbers indicates an annual growth rate of 2.4% County‐wide and for Elora‐Salem.  Fergus is 3.3%.  Howard  

From: Brett Salmon [mailto:[email protected]] Sent: Tuesday, May 30, 2017 10:54 AM To: Howard Wray; 'Pasquale Costanzo ([email protected])' Cc: Colin Baker; Ray Kirtz Subject: RE: 170136: Granwood Subdivision (Elora) TIS - Terms of Reference  With reference to the general background traffic, and the reference to the growth forecasts in the 2013 County Official Plan, these have been updated with newer forecasts through County of Wellington OPA 99. These are the forecasts that should be used in projecting background traffic, in my opinion.  Brett Salmon | Managing Director of Planning & Development  Township of Centre Wellington | 1 MacDonald Square, Elora, ON  N0B 1S0 519.846.9691  x297  centrewellington.ca  

From: Howard Wray [mailto:[email protected]]  Sent: Tuesday, May 30, 2017 8:21 AM To: Brett Salmon <[email protected]>; 'Pasquale Costanzo ([email protected])' <[email protected]> Cc: Colin Baker <[email protected]>; Ray Kirtz <[email protected]> Subject: RE: 170136: Granwood Subdivision (Elora) TIS ‐ Terms of Reference  Hi Brett and Pasquale  My comments are provided below (in red).  Howard Wray, P. Eng.

Triton Engineering Services Limited 18 Robb Blvd., Unit 8 Orangeville, ON L9W 3L2 Tel (519) 941-0330 • Fax (519) 941-1830 • www.tritoneng.on.ca  

 This email message and any files transmitted with it are proprietary and confidential information of the sender and are intended only for the person(s) to

whom this email is addressed. If you have received this email message in error, please notify the sender immediately by telephone or email and destroy the original message without making a copy.

 

From: Brett Salmon [mailto:[email protected]] Sent: Monday, May 29, 2017 3:43 PM

Page 54: Grandwood Subdivision – Elora Transportation Impact Study...To the extent that this report is based on information supplied by other parties, Paradigm Transportation Solutions Limited

2

To: Colin Baker; Ray Kirtz; Howard Wray Subject: FW: 170136: Granwood Subdivision (Elora) TIS - Terms of Reference  FYI  Brett Salmon | Managing Director of Planning & Development  Township of Centre Wellington | 1 MacDonald Square, Elora, ON  N0B 1S0 519.846.9691  x297  centrewellington.ca  

From: Adam Makarewicz [mailto:[email protected]]  Sent: Monday, May 29, 2017 3:34 PM To: Pasquale Costanzo <[email protected]>; Brett Salmon <[email protected]> Subject: 170136: Granwood Subdivision (Elora) TIS ‐ Terms of Reference  Hi Pasquale and Brett, Paradigm is providing engineering assistance for a Site Plan Application for the proposed Granwood Subdivision in Elora, Ontario. The property is located west of Bridge Street and south of McNab Street East. A Traffic Impact Study is required to support said applications for this 124-residential unit development. A concept plan is enclosed for your reference. We are not aware if Wellington County and/or Township of Centre Wellington has any Traffic Impact Study Guidelines, further clarification is requested on this subject matter. The terms of reference for the study are suggested:

1. The public roadway intersections to be analyzed will be: York Street and Wellington Road 7; include sight distance analysis McNab Street and Victoria Street; York Street and Victoria Street; and High Street and York Street

                                York Street and Bridge Street 

2. To reflect the peak use of the site being concurrent with commuter hours, the weekday AM and PM

peak hours will be analyzed. Agreed

3. Base Year (2017) and five years after Opening year (2025) will be included in the analysis. Include 2020 (assumed year of full build out)

4. Trip generation will be based on ITE rates. Agreed

5. General background growth will be accounted for at 2.1% per annum, consistent with Population and Employment Growth Forecasts derived from the Wellington County’s 2013 Official Plan. Agreed

6. Traffic growth from nearby developments will be based on projections developed in the South River Road Residential Development Transportation Impact Study, 2015, prepared by our firm. Agreed

7. Traffic diversion will be accounted for as the result of York Street and Halls Drive extensions being completed as part of the development proposal. Yes.

8. Trip distribution will be based on existing travel patterns and most logical routes to the arterial road network. A review of logical routes and trip origin/destination should be given more emphasis than existing travel patterns, due to the completion of the York Street connection.

Page 55: Grandwood Subdivision – Elora Transportation Impact Study...To the extent that this report is based on information supplied by other parties, Paradigm Transportation Solutions Limited

3

We respectfully request your review and approval of these proposed Terms of Reference. Should you have any question or require additional information, please do not hesitate to contact myself. Regards, Adam J. Makarewicz, Dipl.T., C.E.T. MITE Transportation Engineering Technologist

Paradigm Transportation Solutions Limited 22 King Street South, Suite 300, Waterloo ON N2J 1N8 p: 905.381.2229 x303 m: 519.497.7179 e: [email protected] w: www.ptsl.com  

This e-mail and any files transmitted with it are confidential and intended solely for the use of the individual or entity to whom they are addressed. If you have received this e-mail in error please notify the sender immediately. Please note that any views or opinions presented in this e-mail are solely those of the author and do not necessarily represent those of Paradigm Transportation Solutions Limited. Finally, the recipient should check this e-mail and any attachments for the presence of viruses. Paradigm Transportation Solutions Limited accepts no liability for any damage caused by any virus transmitted by this e-mail.

Page 56: Grandwood Subdivision – Elora Transportation Impact Study...To the extent that this report is based on information supplied by other parties, Paradigm Transportation Solutions Limited
Page 57: Grandwood Subdivision – Elora Transportation Impact Study...To the extent that this report is based on information supplied by other parties, Paradigm Transportation Solutions Limited

Granwood Subdivsion – Elora | Transportation Impact Study | 170127 | July 2017

Paradigm Transportation Solutions Limited | Appendices

Appendix B

Traffic Data

Page 58: Grandwood Subdivision – Elora Transportation Impact Study...To the extent that this report is based on information supplied by other parties, Paradigm Transportation Solutions Limited
Page 59: Grandwood Subdivision – Elora Transportation Impact Study...To the extent that this report is based on information supplied by other parties, Paradigm Transportation Solutions Limited

Paradigm Transportation Solutions Limited43 Forest Road

Cambridge, Ontario, Canada N1S 3B4509-896-3163 [email protected]

Count Name: Bridge Street & York StreetSite Code:Start Date: 30/09/2014Page No: 1

Turning Movement Data

Start Time

Eastbound Approach Westbound Approach Northbound Approach Southbound Approach

Eastbound Westbound Northbound Southbound

Left Thru Right U-Turn Peds App.Total Left Thru Right U-Turn Peds App.

Total Left Thru Right U-Turn Peds App.Total Left Thru Right U-Turn Peds App.

Total Int. Total

7:00 1 0 0 0 0 1 2 0 1 0 0 3 0 3 0 0 0 3 0 5 0 0 0 5 12

7:15 7 0 1 0 0 8 1 1 2 0 3 4 2 3 1 0 0 6 1 4 1 0 1 6 24

7:30 5 0 4 0 0 9 1 0 3 0 1 4 2 2 0 0 1 4 0 2 0 0 1 2 19

7:45 3 0 6 1 0 10 0 0 1 0 1 1 0 6 0 0 2 6 0 4 1 0 1 5 22

Hourly Total 16 0 11 1 0 28 4 1 7 0 5 12 4 14 1 0 3 19 1 15 2 0 3 18 77

8:00 4 0 1 0 0 5 0 0 3 0 3 3 1 4 0 0 3 5 0 4 0 0 0 4 17

8:15 7 1 0 0 0 8 0 0 2 0 8 2 1 6 0 0 3 7 4 6 3 0 6 13 30

8:30 6 0 3 0 0 9 1 1 3 0 25 5 2 7 1 0 1 10 0 1 2 0 1 3 27

8:45 1 0 3 0 0 4 1 0 2 0 1 3 1 3 0 0 0 4 1 5 3 0 0 9 20

Hourly Total 18 1 7 0 0 26 2 1 10 0 37 13 5 20 1 0 7 26 5 16 8 0 7 29 94

9:00 2 0 1 0 1 3 0 0 0 0 3 0 0 7 0 0 0 7 1 1 4 0 1 6 16

9:15 2 0 1 0 0 3 0 0 1 0 2 1 0 6 0 0 0 6 0 4 2 1 0 7 17

9:30 8 0 1 0 0 9 0 0 1 0 0 1 0 6 0 0 0 6 0 2 0 0 1 2 18

9:45 3 0 1 0 0 4 1 0 0 0 1 1 1 7 2 0 0 10 1 5 3 0 1 9 24

Hourly Total 15 0 4 0 1 19 1 0 2 0 6 3 1 26 2 0 0 29 2 12 9 1 3 24 75

*** BREAK *** - - - - - - - - - - - - - - - - - - - - - - - - -

15:00 3 0 2 0 0 5 1 0 0 0 0 1 1 3 0 0 0 4 0 5 5 0 0 10 20

15:15 1 0 0 0 0 1 1 0 2 0 0 3 2 5 0 0 0 7 1 7 4 0 0 12 23

15:30 2 1 2 0 1 5 0 1 1 0 3 2 3 8 0 0 0 11 6 7 4 0 3 17 35

15:45 1 0 3 0 2 4 2 1 5 0 5 8 1 2 2 0 1 5 1 9 4 0 11 14 31

Hourly Total 7 1 7 0 3 15 4 2 8 0 8 14 7 18 2 0 1 27 8 28 17 0 14 53 109

16:00 3 0 1 0 0 4 0 0 2 0 2 2 2 8 1 0 0 11 1 12 4 0 0 17 34

16:15 3 0 3 0 0 6 1 0 0 0 0 1 3 7 2 0 0 12 4 3 2 0 0 9 28

16:30 1 0 0 0 0 1 1 0 0 0 0 1 1 4 3 0 1 8 0 7 3 0 0 10 20

16:45 1 0 1 0 0 2 0 0 2 0 1 2 4 9 0 0 0 13 2 4 2 0 0 8 25

Hourly Total 8 0 5 0 0 13 2 0 4 0 3 6 10 28 6 0 1 44 7 26 11 0 0 44 107

17:00 1 0 2 0 0 3 1 0 1 0 0 2 3 6 0 0 0 9 4 10 4 0 0 18 32

17:15 2 0 0 0 0 2 0 0 1 0 1 1 3 8 2 0 0 13 2 6 3 0 1 11 27

17:30 1 0 3 0 0 4 0 0 1 0 3 1 3 3 2 0 0 8 3 5 4 0 0 12 25

17:45 3 0 1 0 0 4 0 0 4 0 1 4 2 0 0 0 0 2 4 6 3 0 1 13 23

Hourly Total 7 0 6 0 0 13 1 0 7 0 5 8 11 17 4 0 0 32 13 27 14 0 2 54 107

Grand Total 71 2 40 1 4 114 14 4 38 0 64 56 38 123 16 0 12 177 36 124 61 1 29 222 569

Approach % 62.3 1.8 35.1 0.9 - - 25.0 7.1 67.9 0.0 - - 21.5 69.5 9.0 0.0 - - 16.2 55.9 27.5 0.5 - - -

Total % 12.5 0.4 7.0 0.2 - 20.0 2.5 0.7 6.7 0.0 - 9.8 6.7 21.6 2.8 0.0 - 31.1 6.3 21.8 10.7 0.2 - 39.0 -

Lights 69 2 37 1 - 109 12 3 35 0 - 50 38 119 15 0 - 172 35 118 57 1 - 211 542

% Lights 97.2 100.0 92.5 100.0 - 95.6 85.7 75.0 92.1 - - 89.3 100.0 96.7 93.8 - - 97.2 97.2 95.2 93.4 100.0 - 95.0 95.3

Mediums 2 0 3 0 - 5 2 1 3 0 - 6 0 3 1 0 - 4 1 6 3 0 - 10 25

Page 60: Grandwood Subdivision – Elora Transportation Impact Study...To the extent that this report is based on information supplied by other parties, Paradigm Transportation Solutions Limited

% Mediums 2.8 0.0 7.5 0.0 - 4.4 14.3 25.0 7.9 - - 10.7 0.0 2.4 6.3 - - 2.3 2.8 4.8 4.9 0.0 - 4.5 4.4

Articulated Trucks 0 0 0 0 - 0 0 0 0 0 - 0 0 1 0 0 - 1 0 0 1 0 - 1 2

% ArticulatedTrucks 0.0 0.0 0.0 0.0 - 0.0 0.0 0.0 0.0 - - 0.0 0.0 0.8 0.0 - - 0.6 0.0 0.0 1.6 0.0 - 0.5 0.4

Pedestrians - - - - 4 - - - - - 64 - - - - - 12 - - - - - 29 - -

% Pedestrians - - - - 100.0 - - - - - 100.0 - - - - - 100.0 - - - - - 100.0 - -

Page 61: Grandwood Subdivision – Elora Transportation Impact Study...To the extent that this report is based on information supplied by other parties, Paradigm Transportation Solutions Limited

Paradigm Transportation Solutions Limited43 Forest Road

Cambridge, Ontario, Canada N1S 3B4509-896-3163 [email protected]

Count Name: Bridge Street & York StreetSite Code:Start Date: 30/09/2014Page No: 3

30/09/2014 7:00Ending At30/09/2014 18:00

LightsMediumsArticulated TrucksPedestrians

Southbound Approach [N]

Out In Total

224 211 435

8 10 18

1 1 2

0 0 0

233 222 455

57 118 35 1 0

3 6 1 0 0

1 0 0 0 0

0 0 0 0 29

61 124 36 1 29R T L U P

54 0 0 2 52

Out

56 0 0 6 50 In

110 0 0 8 102

Total

Westbound A

pproach [E]

R 38 0 0 3 35

T 4 0 0 1 3

L 14 0 0 2 12

U 0 0 0 0 0

P 64 64 0 0 0

167 172 339

11 4 15

0 1 1

0 0 0

178 177 355Out In Total

Northbound Approach [S]

U L T R P

0 38 119 15 0

0 0 3 1 0

0 0 1 0 0

0 0 0 0 12

0 38 123 16 12

Eas

tbou

nd A

ppro

ach

[W]

Tota

l

208 9 1 0 218

In 109 5 0 0 114

Out 99 4 1 0 104

1 0 0 0 1 U

69 2 0 0 71 L

2 0 0 0 2 T

37 3 0 0 40 R

0 0 0 4 4 P

Turning Movement Data Plot

Page 62: Grandwood Subdivision – Elora Transportation Impact Study...To the extent that this report is based on information supplied by other parties, Paradigm Transportation Solutions Limited

Paradigm Transportation Solutions Limited43 Forest Road

Cambridge, Ontario, Canada N1S 3B4509-896-3163 [email protected]

Count Name: Bridge Street & York StreetSite Code:Start Date: 30/09/2014Page No: 4

Turning Movement Peak Hour Data (7:45)

Start Time

Eastbound Approach Westbound Approach Northbound Approach Southbound Approach

Eastbound Westbound Northbound Southbound

Left Thru Right U-Turn Peds App.Total Left Thru Right U-Turn Peds App.

Total Left Thru Right U-Turn Peds App.Total Left Thru Right U-Turn Peds App.

Total Int. Total

7:45 3 0 6 1 0 10 0 0 1 0 1 1 0 6 0 0 2 6 0 4 1 0 1 5 22

8:00 4 0 1 0 0 5 0 0 3 0 3 3 1 4 0 0 3 5 0 4 0 0 0 4 17

8:15 7 1 0 0 0 8 0 0 2 0 8 2 1 6 0 0 3 7 4 6 3 0 6 13 30

8:30 6 0 3 0 0 9 1 1 3 0 25 5 2 7 1 0 1 10 0 1 2 0 1 3 27

Total 20 1 10 1 0 32 1 1 9 0 37 11 4 23 1 0 9 28 4 15 6 0 8 25 96

Approach % 62.5 3.1 31.3 3.1 - - 9.1 9.1 81.8 0.0 - - 14.3 82.1 3.6 0.0 - - 16.0 60.0 24.0 0.0 - - -

Total % 20.8 1.0 10.4 1.0 - 33.3 1.0 1.0 9.4 0.0 - 11.5 4.2 24.0 1.0 0.0 - 29.2 4.2 15.6 6.3 0.0 - 26.0 -

PHF 0.714 0.250 0.417 0.250 - 0.800 0.250 0.250 0.750 0.000 - 0.550 0.500 0.821 0.250 0.000 - 0.700 0.250 0.625 0.500 0.000 - 0.481 0.800

Lights 20 1 9 1 - 31 1 1 8 0 - 10 4 22 0 0 - 26 3 13 5 0 - 21 88

% Lights 100.0 100.0 90.0 100.0 - 96.9 100.0 100.0 88.9 - - 90.9 100.0 95.7 0.0 - - 92.9 75.0 86.7 83.3 - - 84.0 91.7

Mediums 0 0 1 0 - 1 0 0 1 0 - 1 0 1 1 0 - 2 1 2 1 0 - 4 8

% Mediums 0.0 0.0 10.0 0.0 - 3.1 0.0 0.0 11.1 - - 9.1 0.0 4.3 100.0 - - 7.1 25.0 13.3 16.7 - - 16.0 8.3

Articulated Trucks 0 0 0 0 - 0 0 0 0 0 - 0 0 0 0 0 - 0 0 0 0 0 - 0 0

% ArticulatedTrucks 0.0 0.0 0.0 0.0 - 0.0 0.0 0.0 0.0 - - 0.0 0.0 0.0 0.0 - - 0.0 0.0 0.0 0.0 - - 0.0 0.0

Pedestrians - - - - 0 - - - - - 37 - - - - - 9 - - - - - 8 - -

% Pedestrians - - - - - - - - - - 100.0 - - - - - 100.0 - - - - - 100.0 - -

Page 63: Grandwood Subdivision – Elora Transportation Impact Study...To the extent that this report is based on information supplied by other parties, Paradigm Transportation Solutions Limited

Paradigm Transportation Solutions Limited43 Forest Road

Cambridge, Ontario, Canada N1S 3B4509-896-3163 [email protected]

Count Name: Bridge Street & York StreetSite Code:Start Date: 30/09/2014Page No: 5

Peak Hour Data

30/09/2014 7:45Ending At30/09/2014 8:45

LightsMediumsArticulated TrucksPedestrians

Southbound Approach [N]

Out In Total

50 21 71

2 4 6

0 0 0

0 0 0

52 25 77

5 13 3 0 0

1 2 1 0 0

0 0 0 0 0

0 0 0 0 8

6 15 4 0 8R T L U P

6 0 0 2 4 Out

11 0 0 1 10 In

17 0 0 3 14

Total

Westbound A

pproach [E]

R 9 0 0 1 8

T 1 0 0 0 1

L 1 0 0 0 1

U 0 0 0 0 0

P 37 37 0 0 0

23 26 49

3 2 5

0 0 0

0 0 0

26 28 54Out In Total

Northbound Approach [S]

U L T R P

0 4 22 0 0

0 0 1 1 0

0 0 0 0 0

0 0 0 0 9

0 4 23 1 9

Eas

tbou

nd A

ppro

ach

[W]

Tota

l

42 2 0 0 44

In 31 1 0 0 32

Out 11 1 0 0 12

1 0 0 0 1 U

20 0 0 0 20 L

1 0 0 0 1 T

9 1 0 0 10 R

0 0 0 0 0 P

Turning Movement Peak Hour Data Plot (7:45)

Page 64: Grandwood Subdivision – Elora Transportation Impact Study...To the extent that this report is based on information supplied by other parties, Paradigm Transportation Solutions Limited

Paradigm Transportation Solutions Limited43 Forest Road

Cambridge, Ontario, Canada N1S 3B4509-896-3163 [email protected]

Count Name: Bridge Street & York StreetSite Code:Start Date: 30/09/2014Page No: 6

Turning Movement Peak Hour Data (15:30)

Start Time

Eastbound Approach Westbound Approach Northbound Approach Southbound Approach

Eastbound Westbound Northbound Southbound

Left Thru Right U-Turn Peds App.Total Left Thru Right U-Turn Peds App.

Total Left Thru Right U-Turn Peds App.Total Left Thru Right U-Turn Peds App.

Total Int. Total

15:30 2 1 2 0 1 5 0 1 1 0 3 2 3 8 0 0 0 11 6 7 4 0 3 17 35

15:45 1 0 3 0 2 4 2 1 5 0 5 8 1 2 2 0 1 5 1 9 4 0 11 14 31

16:00 3 0 1 0 0 4 0 0 2 0 2 2 2 8 1 0 0 11 1 12 4 0 0 17 34

16:15 3 0 3 0 0 6 1 0 0 0 0 1 3 7 2 0 0 12 4 3 2 0 0 9 28

Total 9 1 9 0 3 19 3 2 8 0 10 13 9 25 5 0 1 39 12 31 14 0 14 57 128

Approach % 47.4 5.3 47.4 0.0 - - 23.1 15.4 61.5 0.0 - - 23.1 64.1 12.8 0.0 - - 21.1 54.4 24.6 0.0 - - -

Total % 7.0 0.8 7.0 0.0 - 14.8 2.3 1.6 6.3 0.0 - 10.2 7.0 19.5 3.9 0.0 - 30.5 9.4 24.2 10.9 0.0 - 44.5 -

PHF 0.750 0.250 0.750 0.000 - 0.792 0.375 0.500 0.400 0.000 - 0.406 0.750 0.781 0.625 0.000 - 0.813 0.500 0.646 0.875 0.000 - 0.838 0.914

Lights 8 1 8 0 - 17 2 2 6 0 - 10 9 24 5 0 - 38 12 29 13 0 - 54 119

% Lights 88.9 100.0 88.9 - - 89.5 66.7 100.0 75.0 - - 76.9 100.0 96.0 100.0 - - 97.4 100.0 93.5 92.9 - - 94.7 93.0

Mediums 1 0 1 0 - 2 1 0 2 0 - 3 0 1 0 0 - 1 0 2 1 0 - 3 9

% Mediums 11.1 0.0 11.1 - - 10.5 33.3 0.0 25.0 - - 23.1 0.0 4.0 0.0 - - 2.6 0.0 6.5 7.1 - - 5.3 7.0

Articulated Trucks 0 0 0 0 - 0 0 0 0 0 - 0 0 0 0 0 - 0 0 0 0 0 - 0 0

% ArticulatedTrucks 0.0 0.0 0.0 - - 0.0 0.0 0.0 0.0 - - 0.0 0.0 0.0 0.0 - - 0.0 0.0 0.0 0.0 - - 0.0 0.0

Pedestrians - - - - 3 - - - - - 10 - - - - - 1 - - - - - 14 - -

% Pedestrians - - - - 100.0 - - - - - 100.0 - - - - - 100.0 - - - - - 100.0 - -

Page 65: Grandwood Subdivision – Elora Transportation Impact Study...To the extent that this report is based on information supplied by other parties, Paradigm Transportation Solutions Limited

Paradigm Transportation Solutions Limited43 Forest Road

Cambridge, Ontario, Canada N1S 3B4509-896-3163 [email protected]

Count Name: Bridge Street & York StreetSite Code:Start Date: 30/09/2014Page No: 7

Peak Hour Data

30/09/2014 15:30Ending At30/09/2014 16:30

LightsMediumsArticulated TrucksPedestrians

Southbound Approach [N]

Out In Total

38 54 92

4 3 7

0 0 0

0 0 0

42 57 99

13 29 12 0 0

1 2 0 0 0

0 0 0 0 0

0 0 0 0 14

14 31 12 0 14R T L U P

18 0 0 0 18

Out

13 0 0 3 10 In

31 0 0 3 28

Total

Westbound A

pproach [E]

R 8 0 0 2 6

T 2 0 0 0 2

L 3 0 0 1 2

U 0 0 0 0 0

P 10 10 0 0 0

39 38 77

4 1 5

0 0 0

0 0 0

43 39 82Out In Total

Northbound Approach [S]

U L T R P

0 9 24 5 0

0 0 1 0 0

0 0 0 0 0

0 0 0 0 1

0 9 25 5 1

Eas

tbou

nd A

ppro

ach

[W]

Tota

l

41 3 0 0 44

In 17 2 0 0 19

Out 24 1 0 0 25

0 0 0 0 0 U

8 1 0 0 9 L

1 0 0 0 1 T

8 1 0 0 9 R

0 0 0 3 3 P

Turning Movement Peak Hour Data Plot (15:30)

Page 66: Grandwood Subdivision – Elora Transportation Impact Study...To the extent that this report is based on information supplied by other parties, Paradigm Transportation Solutions Limited

Paradigm Transportation Solutions Limited43 Forest Road

Cambridge, Ontario, Canada N1S 3B4509-896-3163 [email protected]

Count Name: Bridge Street & York StreetSite Code:Start Date: 30/09/2014Page No: 8

Page 67: Grandwood Subdivision – Elora Transportation Impact Study...To the extent that this report is based on information supplied by other parties, Paradigm Transportation Solutions Limited

Paradigm Transportation Solutions Limited43 Forest Road

Cambridge, Ontario, Canada N1S 3B4509-896-3163 [email protected]

Count Name: Wellington County Road 7 & 1LineSite Code:Start Date: 30/09/2014Page No: 1

Turning Movement Data

Start Time

Westbound Approach Northbound Approach Southbound Approach

Westbound Northbound Southbound

Left Right U-Turn Peds App. Total Thru Right U-Turn Peds App. Total Left Thru U-Turn Peds App. Total Int. Total

7:00 30 9 0 0 39 34 6 0 0 40 11 95 0 0 106 185

7:15 19 7 0 0 26 36 10 0 0 46 7 96 0 0 103 175

7:30 16 10 0 0 26 38 25 0 0 63 13 101 0 0 114 203

7:45 18 5 0 0 23 51 4 0 0 55 11 79 0 0 90 168

Hourly Total 83 31 0 0 114 159 45 0 0 204 42 371 0 0 413 731

8:00 15 8 0 0 23 42 6 0 0 48 8 67 0 0 75 146

8:15 11 8 0 0 19 41 7 0 0 48 2 85 0 0 87 154

8:30 10 6 0 0 16 18 1 0 0 19 10 56 0 0 66 101

8:45 7 12 0 0 19 55 7 0 0 62 8 79 0 0 87 168

Hourly Total 43 34 0 0 77 156 21 0 0 177 28 287 0 0 315 569

9:00 5 3 0 0 8 53 3 0 0 56 8 50 1 0 59 123

9:15 5 4 0 0 9 37 6 0 0 43 1 50 0 0 51 103

9:30 5 3 0 0 8 37 7 0 0 44 8 38 0 0 46 98

9:45 7 9 0 0 16 41 5 0 0 46 8 44 0 0 52 114

Hourly Total 22 19 0 0 41 168 21 0 0 189 25 182 1 0 208 438

*** BREAK *** - - - - - - - - - - - - - - - -

15:00 17 16 0 0 33 53 10 0 0 63 8 42 0 0 50 146

15:15 7 10 0 0 17 51 6 0 0 57 10 60 0 0 70 144

15:30 11 5 0 0 16 70 8 0 0 78 7 59 0 0 66 160

15:45 9 15 0 0 24 80 27 0 0 107 16 45 0 0 61 192

Hourly Total 44 46 0 0 90 254 51 0 0 305 41 206 0 0 247 642

16:00 9 14 0 0 23 68 19 0 0 87 12 65 1 0 78 188

16:15 16 14 0 0 30 76 10 0 0 86 7 73 0 0 80 196

16:30 17 12 0 0 29 82 12 0 0 94 10 62 0 0 72 195

16:45 8 8 0 0 16 100 11 0 0 111 14 65 0 0 79 206

Hourly Total 50 48 0 0 98 326 52 0 0 378 43 265 1 0 309 785

17:00 7 16 0 0 23 94 15 0 0 109 7 60 0 0 67 199

17:15 9 8 0 0 17 97 20 0 0 117 13 57 0 0 70 204

17:30 2 10 0 0 12 86 13 0 0 99 9 43 0 0 52 163

17:45 5 7 0 0 12 54 7 0 0 61 10 40 0 0 50 123

Hourly Total 23 41 0 0 64 331 55 0 0 386 39 200 0 0 239 689

Grand Total 265 219 0 0 484 1394 245 0 0 1639 218 1511 2 0 1731 3854

Approach % 54.8 45.2 0.0 - - 85.1 14.9 0.0 - - 12.6 87.3 0.1 - - -

Total % 6.9 5.7 0.0 - 12.6 36.2 6.4 0.0 - 42.5 5.7 39.2 0.1 - 44.9 -

Lights 228 207 0 - 435 1305 202 0 - 1507 209 1419 2 - 1630 3572

% Lights 86.0 94.5 - - 89.9 93.6 82.4 - - 91.9 95.9 93.9 100.0 - 94.2 92.7

Mediums 13 11 0 - 24 56 16 0 - 72 7 53 0 - 60 156

% Mediums 4.9 5.0 - - 5.0 4.0 6.5 - - 4.4 3.2 3.5 0.0 - 3.5 4.0

Page 68: Grandwood Subdivision – Elora Transportation Impact Study...To the extent that this report is based on information supplied by other parties, Paradigm Transportation Solutions Limited

Articulated Trucks 24 1 0 - 25 33 27 0 - 60 2 39 0 - 41 126

% Articulated Trucks 9.1 0.5 - - 5.2 2.4 11.0 - - 3.7 0.9 2.6 0.0 - 2.4 3.3

Pedestrians - - - 0 - - - - 0 - - - - 0 - -

% Pedestrians - - - - - - - - - - - - - - - -

Page 69: Grandwood Subdivision – Elora Transportation Impact Study...To the extent that this report is based on information supplied by other parties, Paradigm Transportation Solutions Limited

Paradigm Transportation Solutions Limited43 Forest Road

Cambridge, Ontario, Canada N1S 3B4509-896-3163 [email protected]

Count Name: Wellington County Road 7 & 1LineSite Code:Start Date: 30/09/2014Page No: 3

30/09/2014 7:00Ending At30/09/2014 18:00

LightsMediumsArticulated TrucksPedestrians

Southbound Approach [N]

Out In Total

1514 1630 3144

67 60 127

34 41 75

0 0 0

1615 1731 3346

1419 209 2 0

53 7 0 0

39 2 0 0

0 0 0 0

1511 218 2 0T L U P

463 0 29 23

411

Out

484 0 25 24

435

In

947 0 54 47

846

Total

Westbound A

pproach [E]

R 219 0 1 11207

L 265 0 24 13228

U 0 0 0 0 0

P 0 0 0 0 0

1647 1507 3154

66 72 138

63 60 123

0 0 0

1776 1639 3415Out In Total

Northbound Approach [S]

U T R P

0 1305 202 0

0 56 16 0

0 33 27 0

0 0 0 0

0 1394 245 0

Turning Movement Data Plot

Page 70: Grandwood Subdivision – Elora Transportation Impact Study...To the extent that this report is based on information supplied by other parties, Paradigm Transportation Solutions Limited

Paradigm Transportation Solutions Limited43 Forest Road

Cambridge, Ontario, Canada N1S 3B4509-896-3163 [email protected]

Count Name: Wellington County Road 7 & 1LineSite Code:Start Date: 30/09/2014Page No: 4

Turning Movement Peak Hour Data (7:00)

Start Time

Westbound Approach Northbound Approach Southbound Approach

Westbound Northbound Southbound

Left Right U-Turn Peds App. Total Thru Right U-Turn Peds App. Total Left Thru U-Turn Peds App. Total Int. Total

7:00 30 9 0 0 39 34 6 0 0 40 11 95 0 0 106 185

7:15 19 7 0 0 26 36 10 0 0 46 7 96 0 0 103 175

7:30 16 10 0 0 26 38 25 0 0 63 13 101 0 0 114 203

7:45 18 5 0 0 23 51 4 0 0 55 11 79 0 0 90 168

Total 83 31 0 0 114 159 45 0 0 204 42 371 0 0 413 731

Approach % 72.8 27.2 0.0 - - 77.9 22.1 0.0 - - 10.2 89.8 0.0 - - -

Total % 11.4 4.2 0.0 - 15.6 21.8 6.2 0.0 - 27.9 5.7 50.8 0.0 - 56.5 -

PHF 0.692 0.775 0.000 - 0.731 0.779 0.450 0.000 - 0.810 0.808 0.918 0.000 - 0.906 0.900

Lights 78 30 0 - 108 148 37 0 - 185 41 357 0 - 398 691

% Lights 94.0 96.8 - - 94.7 93.1 82.2 - - 90.7 97.6 96.2 - - 96.4 94.5

Mediums 2 1 0 - 3 6 1 0 - 7 1 10 0 - 11 21

% Mediums 2.4 3.2 - - 2.6 3.8 2.2 - - 3.4 2.4 2.7 - - 2.7 2.9

Articulated Trucks 3 0 0 - 3 5 7 0 - 12 0 4 0 - 4 19

% Articulated Trucks 3.6 0.0 - - 2.6 3.1 15.6 - - 5.9 0.0 1.1 - - 1.0 2.6

Pedestrians - - - 0 - - - - 0 - - - - 0 - -

% Pedestrians - - - - - - - - - - - - - - - -

Page 71: Grandwood Subdivision – Elora Transportation Impact Study...To the extent that this report is based on information supplied by other parties, Paradigm Transportation Solutions Limited

Paradigm Transportation Solutions Limited43 Forest Road

Cambridge, Ontario, Canada N1S 3B4509-896-3163 [email protected]

Count Name: Wellington County Road 7 & 1LineSite Code:Start Date: 30/09/2014Page No: 5

Peak Hour Data

30/09/2014 7:00Ending At30/09/2014 8:00

LightsMediumsArticulated TrucksPedestrians

Southbound Approach [N]

Out In Total

178 398 576

7 11 18

5 4 9

0 0 0

190 413 603

357 41 0 0

10 1 0 0

4 0 0 0

0 0 0 0

371 42 0 0T L U P

87 0 7 2 78

Out

114 0 3 3 108

In

201 0 10 5 186

Total

Westbound A

pproach [E]

R 31 0 0 1 30

L 83 0 3 2 78

U 0 0 0 0 0

P 0 0 0 0 0

435 185 620

12 7 19

7 12 19

0 0 0

454 204 658Out In Total

Northbound Approach [S]

U T R P

0 148 37 0

0 6 1 0

0 5 7 0

0 0 0 0

0 159 45 0

Turning Movement Peak Hour Data Plot (7:00)

Page 72: Grandwood Subdivision – Elora Transportation Impact Study...To the extent that this report is based on information supplied by other parties, Paradigm Transportation Solutions Limited

Paradigm Transportation Solutions Limited43 Forest Road

Cambridge, Ontario, Canada N1S 3B4509-896-3163 [email protected]

Count Name: Wellington County Road 7 & 1LineSite Code:Start Date: 30/09/2014Page No: 6

Turning Movement Peak Hour Data (16:30)

Start Time

Westbound Approach Northbound Approach Southbound Approach

Westbound Northbound Southbound

Left Right U-Turn Peds App. Total Thru Right U-Turn Peds App. Total Left Thru U-Turn Peds App. Total Int. Total

16:30 17 12 0 0 29 82 12 0 0 94 10 62 0 0 72 195

16:45 8 8 0 0 16 100 11 0 0 111 14 65 0 0 79 206

17:00 7 16 0 0 23 94 15 0 0 109 7 60 0 0 67 199

17:15 9 8 0 0 17 97 20 0 0 117 13 57 0 0 70 204

Total 41 44 0 0 85 373 58 0 0 431 44 244 0 0 288 804

Approach % 48.2 51.8 0.0 - - 86.5 13.5 0.0 - - 15.3 84.7 0.0 - - -

Total % 5.1 5.5 0.0 - 10.6 46.4 7.2 0.0 - 53.6 5.5 30.3 0.0 - 35.8 -

PHF 0.603 0.688 0.000 - 0.733 0.933 0.725 0.000 - 0.921 0.786 0.938 0.000 - 0.911 0.976

Lights 37 42 0 - 79 365 54 0 - 419 44 233 0 - 277 775

% Lights 90.2 95.5 - - 92.9 97.9 93.1 - - 97.2 100.0 95.5 - - 96.2 96.4

Mediums 1 2 0 - 3 3 0 0 - 3 0 3 0 - 3 9

% Mediums 2.4 4.5 - - 3.5 0.8 0.0 - - 0.7 0.0 1.2 - - 1.0 1.1

Articulated Trucks 3 0 0 - 3 5 4 0 - 9 0 8 0 - 8 20

% Articulated Trucks 7.3 0.0 - - 3.5 1.3 6.9 - - 2.1 0.0 3.3 - - 2.8 2.5

Pedestrians - - - 0 - - - - 0 - - - - 0 - -

% Pedestrians - - - - - - - - - - - - - - - -

Page 73: Grandwood Subdivision – Elora Transportation Impact Study...To the extent that this report is based on information supplied by other parties, Paradigm Transportation Solutions Limited

Paradigm Transportation Solutions Limited43 Forest Road

Cambridge, Ontario, Canada N1S 3B4509-896-3163 [email protected]

Count Name: Wellington County Road 7 & 1LineSite Code:Start Date: 30/09/2014Page No: 7

Peak Hour Data

30/09/2014 16:30Ending At30/09/2014 17:30

LightsMediumsArticulated TrucksPedestrians

Southbound Approach [N]

Out In Total

407 277 684

5 3 8

5 8 13

0 0 0

417 288 705

233 44 0 0

3 0 0 0

8 0 0 0

0 0 0 0

244 44 0 0T L U P

102 0 4 0 98

Out

85 0 3 3 79 In

187 0 7 3 177

Total

Westbound A

pproach [E]

R 44 0 0 2 42

L 41 0 3 1 37

U 0 0 0 0 0

P 0 0 0 0 0

270 419 689

4 3 7

11 9 20

0 0 0

285 431 716Out In Total

Northbound Approach [S]

U T R P

0 365 54 0

0 3 0 0

0 5 4 0

0 0 0 0

0 373 58 0

Turning Movement Peak Hour Data Plot (16:30)

Page 74: Grandwood Subdivision – Elora Transportation Impact Study...To the extent that this report is based on information supplied by other parties, Paradigm Transportation Solutions Limited

Paradigm Transportation Solutions Limited43 Forest Road

Cambridge, Ontario, Canada N1S 3B4509-896-3163 [email protected]

Count Name: Wellington County Road 7 & 1LineSite Code:Start Date: 30/09/2014Page No: 8

Page 75: Grandwood Subdivision – Elora Transportation Impact Study...To the extent that this report is based on information supplied by other parties, Paradigm Transportation Solutions Limited

Paradigm Transportation Solutions Limited22 King Street South, Suite 300

Waterloo, Ontario, Canada N2J 1N8519-896-3163 [email protected]

Count Name: York Street & High StreetSite Code:Start Date: 06/06/2017Page No: 1

Turning Movement Data

Start Time

York Street York Street High Street High Street

Eastbound Westbound Northbound Southbound

Left Thru Right U-Turn Peds App.Total Left Thru Right U-Turn Peds App.

Total Left Thru Right U-Turn Peds App.Total Left Thru Right U-Turn Peds App.

Total Int. Total

7:00 AM 1 2 2 0 0 5 1 3 0 0 0 4 3 3 0 0 0 6 1 2 7 0 0 10 25

7:15 AM 2 1 2 0 0 5 0 2 0 0 0 2 0 0 0 0 0 0 0 1 6 0 0 7 14

7:30 AM 3 0 4 0 0 7 0 1 1 0 0 2 4 1 0 0 0 5 0 1 11 0 0 12 26

7:45 AM 4 1 2 0 0 7 2 1 0 0 0 3 0 0 0 0 0 0 1 5 9 0 0 15 25

Hourly Total 10 4 10 0 0 24 3 7 1 0 0 11 7 4 0 0 0 11 2 9 33 0 0 44 90

8:00 AM 2 3 4 0 0 9 0 4 0 0 1 4 2 1 0 0 0 3 0 2 8 0 0 10 26

8:15 AM 4 2 5 0 0 11 1 2 0 0 0 3 0 2 0 0 0 2 0 1 5 0 0 6 22

8:30 AM 4 2 1 0 0 7 0 4 0 0 0 4 2 1 0 0 0 3 0 0 2 0 0 2 16

8:45 AM 4 3 3 0 0 10 0 4 0 0 0 4 3 1 0 0 0 4 0 3 5 0 0 8 26

Hourly Total 14 10 13 0 0 37 1 14 0 0 1 15 7 5 0 0 0 12 0 6 20 0 0 26 90

9:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

*** BREAK *** - - - - - - - - - - - - - - - - - - - - - - - - -

Hourly Total 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

4:00 PM 2 2 0 0 0 4 0 0 3 0 0 3 5 3 0 0 0 8 0 4 1 0 0 5 20

4:15 PM 8 2 0 0 0 10 0 2 0 0 0 2 3 4 1 0 0 8 1 1 3 0 0 5 25

4:30 PM 5 1 4 0 1 10 0 2 1 0 0 3 7 9 0 0 0 16 1 1 3 0 0 5 34

4:45 PM 6 2 0 0 0 8 0 1 0 0 0 1 2 1 0 0 0 3 1 1 4 0 0 6 18

Hourly Total 21 7 4 0 1 32 0 5 4 0 0 9 17 17 1 0 0 35 3 7 11 0 0 21 97

5:00 PM 7 1 1 0 0 9 0 2 1 0 0 3 1 1 0 0 0 2 0 1 5 0 0 6 20

5:15 PM 6 1 0 0 0 7 0 0 1 0 0 1 1 3 0 0 0 4 0 3 2 0 0 5 17

5:30 PM 8 2 0 0 2 10 0 0 0 0 0 0 0 1 0 0 0 1 1 1 6 0 0 8 19

5:45 PM 6 3 2 0 2 11 0 1 2 0 2 3 0 0 0 0 0 0 1 0 2 0 0 3 17

Hourly Total 27 7 3 0 4 37 0 3 4 0 2 7 2 5 0 0 0 7 2 5 15 0 0 22 73

6:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Grand Total 72 28 30 0 5 130 4 29 9 0 3 42 33 31 1 0 0 65 7 27 79 0 0 113 350

Approach % 55.4 21.5 23.1 0.0 - - 9.5 69.0 21.4 0.0 - - 50.8 47.7 1.5 0.0 - - 6.2 23.9 69.9 0.0 - - -

Total % 20.6 8.0 8.6 0.0 - 37.1 1.1 8.3 2.6 0.0 - 12.0 9.4 8.9 0.3 0.0 - 18.6 2.0 7.7 22.6 0.0 - 32.3 -

Lights 66 24 24 0 - 114 4 27 7 0 - 38 26 29 1 0 - 56 7 22 76 0 - 105 313

% Lights 91.7 85.7 80.0 - - 87.7 100.0 93.1 77.8 - - 90.5 78.8 93.5 100.0 - - 86.2 100.0 81.5 96.2 - - 92.9 89.4

Mediums 4 3 4 0 - 11 0 1 2 0 - 3 4 2 0 0 - 6 0 5 3 0 - 8 28

% Mediums 5.6 10.7 13.3 - - 8.5 0.0 3.4 22.2 - - 7.1 12.1 6.5 0.0 - - 9.2 0.0 18.5 3.8 - - 7.1 8.0

Articulated Trucks 2 1 2 0 - 5 0 1 0 0 - 1 3 0 0 0 - 3 0 0 0 0 - 0 9

% ArticulatedTrucks 2.8 3.6 6.7 - - 3.8 0.0 3.4 0.0 - - 2.4 9.1 0.0 0.0 - - 4.6 0.0 0.0 0.0 - - 0.0 2.6

Pedestrians - - - - 5 - - - - - 3 - - - - - 0 - - - - - 0 - -

% Pedestrians - - - - 100.0 - - - - - 100.0 - - - - - - - - - - - - - -

Page 76: Grandwood Subdivision – Elora Transportation Impact Study...To the extent that this report is based on information supplied by other parties, Paradigm Transportation Solutions Limited

Paradigm Transportation Solutions Limited22 King Street South, Suite 300

Waterloo, Ontario, Canada N2J 1N8519-896-3163 [email protected]

Count Name: York Street & High StreetSite Code:Start Date: 06/06/2017Page No: 2

06/06/2017 7:00 AMEnding At06/06/2017 6:15 PM

LightsMediumsArticulated TrucksPedestrians

High Street [N]

Out In Total

102 105 207

8 8 16

2 0 2

0 0 0

112 113 225

76 22 7 0 0

3 5 0 0 0

0 0 0 0 0

0 0 0 0 0

79 27 7 0 0R T L U P

36 0 1 3 32

Out

42 0 1 3 38 In

78 0 2 6 70

Total

York S

treet [E]

R 9 0 0 2 7

T 29 0 1 1 27

L 4 0 0 0 4

U 0 0 0 0 0

P 3 3 0 0 0

50 56 106

9 6 15

2 3 5

0 0 0

61 65 126Out In Total

High Street [S]

U L T R P

0 26 29 1 0

0 4 2 0 0

0 3 0 0 0

0 0 0 0 0

0 33 31 1 0

Yor

k S

treet

[W] To

tal

243

19 9 0 271

In 114

11 5 0 130

Out

129 8 4 0 141

0 0 0 0 0 U

66 4 2 0 72 L

24 3 1 0 28 T

24 4 2 0 30 R

0 0 0 5 5 P

Turning Movement Data Plot

Page 77: Grandwood Subdivision – Elora Transportation Impact Study...To the extent that this report is based on information supplied by other parties, Paradigm Transportation Solutions Limited

Paradigm Transportation Solutions Limited22 King Street South, Suite 300

Waterloo, Ontario, Canada N2J 1N8519-896-3163 [email protected]

Count Name: York Street & High StreetSite Code:Start Date: 06/06/2017Page No: 3

Turning Movement Peak Hour Data (7:30 AM)

Start Time

York Street York Street High Street High Street

Eastbound Westbound Northbound Southbound

Left Thru Right U-Turn Peds App.Total Left Thru Right U-Turn Peds App.

Total Left Thru Right U-Turn Peds App.Total Left Thru Right U-Turn Peds App.

Total Int. Total

7:30 AM 3 0 4 0 0 7 0 1 1 0 0 2 4 1 0 0 0 5 0 1 11 0 0 12 26

7:45 AM 4 1 2 0 0 7 2 1 0 0 0 3 0 0 0 0 0 0 1 5 9 0 0 15 25

8:00 AM 2 3 4 0 0 9 0 4 0 0 1 4 2 1 0 0 0 3 0 2 8 0 0 10 26

8:15 AM 4 2 5 0 0 11 1 2 0 0 0 3 0 2 0 0 0 2 0 1 5 0 0 6 22

Total 13 6 15 0 0 34 3 8 1 0 1 12 6 4 0 0 0 10 1 9 33 0 0 43 99

Approach % 38.2 17.6 44.1 0.0 - - 25.0 66.7 8.3 0.0 - - 60.0 40.0 0.0 0.0 - - 2.3 20.9 76.7 0.0 - - -

Total % 13.1 6.1 15.2 0.0 - 34.3 3.0 8.1 1.0 0.0 - 12.1 6.1 4.0 0.0 0.0 - 10.1 1.0 9.1 33.3 0.0 - 43.4 -

PHF 0.813 0.500 0.750 0.000 - 0.773 0.375 0.500 0.250 0.000 - 0.750 0.375 0.500 0.000 0.000 - 0.500 0.250 0.450 0.750 0.000 - 0.717 0.952

Lights 11 4 10 0 - 25 3 7 1 0 - 11 2 4 0 0 - 6 1 8 33 0 - 42 84

% Lights 84.6 66.7 66.7 - - 73.5 100.0 87.5 100.0 - - 91.7 33.3 100.0 - - - 60.0 100.0 88.9 100.0 - - 97.7 84.8

Mediums 2 1 4 0 - 7 0 1 0 0 - 1 3 0 0 0 - 3 0 1 0 0 - 1 12

% Mediums 15.4 16.7 26.7 - - 20.6 0.0 12.5 0.0 - - 8.3 50.0 0.0 - - - 30.0 0.0 11.1 0.0 - - 2.3 12.1

Articulated Trucks 0 1 1 0 - 2 0 0 0 0 - 0 1 0 0 0 - 1 0 0 0 0 - 0 3

% ArticulatedTrucks 0.0 16.7 6.7 - - 5.9 0.0 0.0 0.0 - - 0.0 16.7 0.0 - - - 10.0 0.0 0.0 0.0 - - 0.0 3.0

Pedestrians - - - - 0 - - - - - 1 - - - - - 0 - - - - - 0 - -

% Pedestrians - - - - - - - - - - 100.0 - - - - - - - - - - - - - -

Page 78: Grandwood Subdivision – Elora Transportation Impact Study...To the extent that this report is based on information supplied by other parties, Paradigm Transportation Solutions Limited

Paradigm Transportation Solutions Limited22 King Street South, Suite 300

Waterloo, Ontario, Canada N2J 1N8519-896-3163 [email protected]

Count Name: York Street & High StreetSite Code:Start Date: 06/06/2017Page No: 4

Peak Hour Data

06/06/2017 7:30 AMEnding At06/06/2017 8:30 AM

LightsMediumsArticulated TrucksPedestrians

High Street [N]

Out In Total

16 42 58

2 1 3

0 0 0

0 0 0

18 43 61

33 8 1 0 0

0 1 0 0 0

0 0 0 0 0

0 0 0 0 0

33 9 1 0 0R T L U P

7 0 1 1 5 Out

12 0 0 1 11 In

19 0 1 2 16

Total

York S

treet [E]

R 1 0 0 0 1

T 8 0 0 1 7

L 3 0 0 0 3

U 0 0 0 0 0

P 1 1 0 0 0

21 6 27

5 3 8

1 1 2

0 0 0

27 10 37Out In Total

High Street [S]

U L T R P

0 2 4 0 0

0 3 0 0 0

0 1 0 0 0

0 0 0 0 0

0 6 4 0 0

Yor

k S

treet

[W] To

tal

67 11 3 0 81

In 25 7 2 0 34

Out 42 4 1 0 47

0 0 0 0 0 U

11 2 0 0 13 L

4 1 1 0 6 T

10 4 1 0 15 R

0 0 0 0 0 P

Turning Movement Peak Hour Data Plot (7:30 AM)

Page 79: Grandwood Subdivision – Elora Transportation Impact Study...To the extent that this report is based on information supplied by other parties, Paradigm Transportation Solutions Limited

Paradigm Transportation Solutions Limited22 King Street South, Suite 300

Waterloo, Ontario, Canada N2J 1N8519-896-3163 [email protected]

Count Name: York Street & High StreetSite Code:Start Date: 06/06/2017Page No: 5

Turning Movement Peak Hour Data (4:00 PM)

Start Time

York Street York Street High Street High Street

Eastbound Westbound Northbound Southbound

Left Thru Right U-Turn Peds App.Total Left Thru Right U-Turn Peds App.

Total Left Thru Right U-Turn Peds App.Total Left Thru Right U-Turn Peds App.

Total Int. Total

4:00 PM 2 2 0 0 0 4 0 0 3 0 0 3 5 3 0 0 0 8 0 4 1 0 0 5 20

4:15 PM 8 2 0 0 0 10 0 2 0 0 0 2 3 4 1 0 0 8 1 1 3 0 0 5 25

4:30 PM 5 1 4 0 1 10 0 2 1 0 0 3 7 9 0 0 0 16 1 1 3 0 0 5 34

4:45 PM 6 2 0 0 0 8 0 1 0 0 0 1 2 1 0 0 0 3 1 1 4 0 0 6 18

Total 21 7 4 0 1 32 0 5 4 0 0 9 17 17 1 0 0 35 3 7 11 0 0 21 97

Approach % 65.6 21.9 12.5 0.0 - - 0.0 55.6 44.4 0.0 - - 48.6 48.6 2.9 0.0 - - 14.3 33.3 52.4 0.0 - - -

Total % 21.6 7.2 4.1 0.0 - 33.0 0.0 5.2 4.1 0.0 - 9.3 17.5 17.5 1.0 0.0 - 36.1 3.1 7.2 11.3 0.0 - 21.6 -

PHF 0.656 0.875 0.250 0.000 - 0.800 0.000 0.625 0.333 0.000 - 0.750 0.607 0.472 0.250 0.000 - 0.547 0.750 0.438 0.688 0.000 - 0.875 0.713

Lights 20 7 4 0 - 31 0 5 3 0 - 8 16 17 1 0 - 34 3 4 11 0 - 18 91

% Lights 95.2 100.0 100.0 - - 96.9 - 100.0 75.0 - - 88.9 94.1 100.0 100.0 - - 97.1 100.0 57.1 100.0 - - 85.7 93.8

Mediums 1 0 0 0 - 1 0 0 1 0 - 1 0 0 0 0 - 0 0 3 0 0 - 3 5

% Mediums 4.8 0.0 0.0 - - 3.1 - 0.0 25.0 - - 11.1 0.0 0.0 0.0 - - 0.0 0.0 42.9 0.0 - - 14.3 5.2

Articulated Trucks 0 0 0 0 - 0 0 0 0 0 - 0 1 0 0 0 - 1 0 0 0 0 - 0 1

% ArticulatedTrucks 0.0 0.0 0.0 - - 0.0 - 0.0 0.0 - - 0.0 5.9 0.0 0.0 - - 2.9 0.0 0.0 0.0 - - 0.0 1.0

Pedestrians - - - - 1 - - - - - 0 - - - - - 0 - - - - - 0 - -

% Pedestrians - - - - 100.0 - - - - - - - - - - - - - - - - - - - -

Page 80: Grandwood Subdivision – Elora Transportation Impact Study...To the extent that this report is based on information supplied by other parties, Paradigm Transportation Solutions Limited

Paradigm Transportation Solutions Limited22 King Street South, Suite 300

Waterloo, Ontario, Canada N2J 1N8519-896-3163 [email protected]

Count Name: York Street & High StreetSite Code:Start Date: 06/06/2017Page No: 6

Peak Hour Data

06/06/2017 4:00 PMEnding At06/06/2017 5:00 PM

LightsMediumsArticulated TrucksPedestrians

High Street [N]

Out In Total

40 18 58

2 3 5

0 0 0

0 0 0

42 21 63

11 4 3 0 0

0 3 0 0 0

0 0 0 0 0

0 0 0 0 0

11 7 3 0 0R T L U P

11 0 0 0 11

Out

9 0 0 1 8 In

20 0 0 1 19

Total

York S

treet [E]

R 4 0 0 1 3

T 5 0 0 0 5

L 0 0 0 0 0

U 0 0 0 0 0

P 0 0 0 0 0

8 34 42

3 0 3

0 1 1

0 0 0

11 35 46Out In Total

High Street [S]

U L T R P

0 16 17 1 0

0 0 0 0 0

0 1 0 0 0

0 0 0 0 0

0 17 17 1 0

Yor

k S

treet

[W] To

tal

63 1 1 0 65

In 31 1 0 0 32

Out 32 0 1 0 33

0 0 0 0 0 U

20 1 0 0 21 L

7 0 0 0 7 T

4 0 0 0 4 R

0 0 0 1 1 P

Turning Movement Peak Hour Data Plot (4:00 PM)

Page 81: Grandwood Subdivision – Elora Transportation Impact Study...To the extent that this report is based on information supplied by other parties, Paradigm Transportation Solutions Limited

Paradigm Transportation Solutions Limited22 King Street South, Suite 300

Waterloo, Ontario, Canada N2J 1N8519-896-3163 [email protected]

Count Name: York Street & High StreetSite Code:Start Date: 06/06/2017Page No: 7

Page 82: Grandwood Subdivision – Elora Transportation Impact Study...To the extent that this report is based on information supplied by other parties, Paradigm Transportation Solutions Limited

Paradigm Transportation Solutions Limited22 King Street South, Suite 300

Waterloo, Ontario, Canada N2J 1N8519-896-3163 [email protected]

Count Name: York Street & Wellington Road 7Site Code:Start Date: 06/06/2017Page No: 1

Turning Movement Data

Start Time

York Street Wellington Road 7 Wellington Road 7

Westbound Northbound Southbound

Left Right U-Turn Peds App. Total Thru Right U-Turn Peds App. Total Left Thru U-Turn Peds App. Total Int. Total

7:00 AM 1 5 0 0 6 50 3 0 0 53 7 92 0 0 99 158

7:15 AM 1 3 0 0 4 70 1 0 0 71 6 141 0 0 147 222

7:30 AM 0 6 0 0 6 74 1 0 0 75 7 142 0 0 149 230

7:45 AM 1 3 0 1 4 86 5 0 0 91 7 127 0 0 134 229

Hourly Total 3 17 0 1 20 280 10 0 0 290 27 502 0 0 529 839

8:00 AM 2 4 0 0 6 68 4 0 0 72 5 136 0 0 141 219

8:15 AM 1 3 0 0 4 87 4 0 0 91 6 91 0 0 97 192

8:30 AM 6 8 0 0 14 70 0 0 0 70 8 97 0 0 105 189

8:45 AM 2 5 0 0 7 67 1 0 0 68 6 115 0 0 121 196

Hourly Total 11 20 0 0 31 292 9 0 0 301 25 439 0 0 464 796

9:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

*** BREAK *** - - - - - - - - - - - - - - - -

Hourly Total 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

4:00 PM 2 8 0 0 10 110 5 0 0 115 3 112 0 0 115 240

4:15 PM 2 5 0 0 7 145 6 0 0 151 2 83 0 0 85 243

4:30 PM 4 11 0 1 15 143 3 0 0 146 3 94 0 0 97 258

4:45 PM 2 7 0 1 9 152 4 0 0 156 1 103 0 0 104 269

Hourly Total 10 31 0 2 41 550 18 0 0 568 9 392 0 0 401 1010

5:00 PM 3 7 0 1 10 126 5 0 0 131 1 94 0 0 95 236

5:15 PM 1 5 0 1 6 138 3 0 0 141 1 96 0 0 97 244

5:30 PM 1 3 0 0 4 155 5 0 0 160 1 95 0 0 96 260

5:45 PM 1 5 0 0 6 111 5 0 0 116 4 79 0 0 83 205

Hourly Total 6 20 0 2 26 530 18 0 0 548 7 364 0 0 371 945

Grand Total 30 88 0 5 118 1652 55 0 0 1707 68 1697 0 0 1765 3590

Approach % 25.4 74.6 0.0 - - 96.8 3.2 0.0 - - 3.9 96.1 0.0 - - -

Total % 0.8 2.5 0.0 - 3.3 46.0 1.5 0.0 - 47.5 1.9 47.3 0.0 - 49.2 -

Lights 26 74 0 - 100 1579 47 0 - 1626 63 1601 0 - 1664 3390

% Lights 86.7 84.1 - - 84.7 95.6 85.5 - - 95.3 92.6 94.3 - - 94.3 94.4

Mediums 2 11 0 - 13 43 6 0 - 49 4 67 0 - 71 133

% Mediums 6.7 12.5 - - 11.0 2.6 10.9 - - 2.9 5.9 3.9 - - 4.0 3.7

Articulated Trucks 2 3 0 - 5 30 2 0 - 32 1 29 0 - 30 67

% Articulated Trucks 6.7 3.4 - - 4.2 1.8 3.6 - - 1.9 1.5 1.7 - - 1.7 1.9

Pedestrians - - - 5 - - - - 0 - - - - 0 - -

% Pedestrians - - - 100.0 - - - - - - - - - - - -

Page 83: Grandwood Subdivision – Elora Transportation Impact Study...To the extent that this report is based on information supplied by other parties, Paradigm Transportation Solutions Limited

Paradigm Transportation Solutions Limited22 King Street South, Suite 300

Waterloo, Ontario, Canada N2J 1N8519-896-3163 [email protected]

Count Name: York Street & Wellington Road 7Site Code:Start Date: 06/06/2017Page No: 2

06/06/2017 7:00 AMEnding At06/06/2017 6:00 PM

LightsMediumsArticulated TrucksPedestrians

Wellington Road 7 [N]

Out In Total

1653 1664 3317

54 71 125

33 30 63

0 0 0

1740 1765 3505

1601 63 0 0

67 4 0 0

29 1 0 0

0 0 0 0

1697 68 0 0T L U P

123 0 3 10

110

Out

118 0 5 13

100

In

241 0 8 23

210

Total

York S

treet [E]

R 88 0 3 11 74

L 30 0 2 2 26

U 0 0 0 0 0

P 5 5 0 0 0

1627 1626 3253

69 49 118

31 32 63

0 0 0

1727 1707 3434Out In Total

Wellington Road 7 [S]

U T R P

0 1579 47 0

0 43 6 0

0 30 2 0

0 0 0 0

0 1652 55 0

Turning Movement Data Plot

Page 84: Grandwood Subdivision – Elora Transportation Impact Study...To the extent that this report is based on information supplied by other parties, Paradigm Transportation Solutions Limited

Paradigm Transportation Solutions Limited22 King Street South, Suite 300

Waterloo, Ontario, Canada N2J 1N8519-896-3163 [email protected]

Count Name: York Street & Wellington Road 7Site Code:Start Date: 06/06/2017Page No: 3

Turning Movement Peak Hour Data (7:15 AM)

Start Time

York Street Wellington Road 7 Wellington Road 7

Westbound Northbound Southbound

Left Right U-Turn Peds App. Total Thru Right U-Turn Peds App. Total Left Thru U-Turn Peds App. Total Int. Total

7:15 AM 1 3 0 0 4 70 1 0 0 71 6 141 0 0 147 222

7:30 AM 0 6 0 0 6 74 1 0 0 75 7 142 0 0 149 230

7:45 AM 1 3 0 1 4 86 5 0 0 91 7 127 0 0 134 229

8:00 AM 2 4 0 0 6 68 4 0 0 72 5 136 0 0 141 219

Total 4 16 0 1 20 298 11 0 0 309 25 546 0 0 571 900

Approach % 20.0 80.0 0.0 - - 96.4 3.6 0.0 - - 4.4 95.6 0.0 - - -

Total % 0.4 1.8 0.0 - 2.2 33.1 1.2 0.0 - 34.3 2.8 60.7 0.0 - 63.4 -

PHF 0.500 0.667 0.000 - 0.833 0.866 0.550 0.000 - 0.849 0.893 0.961 0.000 - 0.958 0.978

Lights 3 11 0 - 14 273 10 0 - 283 24 517 0 - 541 838

% Lights 75.0 68.8 - - 70.0 91.6 90.9 - - 91.6 96.0 94.7 - - 94.7 93.1

Mediums 1 4 0 - 5 18 0 0 - 18 0 19 0 - 19 42

% Mediums 25.0 25.0 - - 25.0 6.0 0.0 - - 5.8 0.0 3.5 - - 3.3 4.7

Articulated Trucks 0 1 0 - 1 7 1 0 - 8 1 10 0 - 11 20

% Articulated Trucks 0.0 6.3 - - 5.0 2.3 9.1 - - 2.6 4.0 1.8 - - 1.9 2.2

Pedestrians - - - 1 - - - - 0 - - - - 0 - -

% Pedestrians - - - 100.0 - - - - - - - - - - - -

Page 85: Grandwood Subdivision – Elora Transportation Impact Study...To the extent that this report is based on information supplied by other parties, Paradigm Transportation Solutions Limited

Paradigm Transportation Solutions Limited22 King Street South, Suite 300

Waterloo, Ontario, Canada N2J 1N8519-896-3163 [email protected]

Count Name: York Street & Wellington Road 7Site Code:Start Date: 06/06/2017Page No: 4

Peak Hour Data

06/06/2017 7:15 AMEnding At06/06/2017 8:15 AM

LightsMediumsArticulated TrucksPedestrians

Wellington Road 7 [N]

Out In Total

284 541 825

22 19 41

8 11 19

0 0 0

314 571 885

517 24 0 0

19 0 0 0

10 1 0 0

0 0 0 0

546 25 0 0T L U P

36 0 2 0 34

Out

20 0 1 5 14 In

56 0 3 5 48

Total

York S

treet [E]

R 16 0 1 4 11

L 4 0 0 1 3

U 0 0 0 0 0

P 1 1 0 0 0

520 283 803

20 18 38

10 8 18

0 0 0

550 309 859Out In Total

Wellington Road 7 [S]

U T R P

0 273 10 0

0 18 0 0

0 7 1 0

0 0 0 0

0 298 11 0

Turning Movement Peak Hour Data Plot (7:15 AM)

Page 86: Grandwood Subdivision – Elora Transportation Impact Study...To the extent that this report is based on information supplied by other parties, Paradigm Transportation Solutions Limited

Paradigm Transportation Solutions Limited22 King Street South, Suite 300

Waterloo, Ontario, Canada N2J 1N8519-896-3163 [email protected]

Count Name: York Street & Wellington Road 7Site Code:Start Date: 06/06/2017Page No: 5

Turning Movement Peak Hour Data (4:00 PM)

Start Time

York Street Wellington Road 7 Wellington Road 7

Westbound Northbound Southbound

Left Right U-Turn Peds App. Total Thru Right U-Turn Peds App. Total Left Thru U-Turn Peds App. Total Int. Total

4:00 PM 2 8 0 0 10 110 5 0 0 115 3 112 0 0 115 240

4:15 PM 2 5 0 0 7 145 6 0 0 151 2 83 0 0 85 243

4:30 PM 4 11 0 1 15 143 3 0 0 146 3 94 0 0 97 258

4:45 PM 2 7 0 1 9 152 4 0 0 156 1 103 0 0 104 269

Total 10 31 0 2 41 550 18 0 0 568 9 392 0 0 401 1010

Approach % 24.4 75.6 0.0 - - 96.8 3.2 0.0 - - 2.2 97.8 0.0 - - -

Total % 1.0 3.1 0.0 - 4.1 54.5 1.8 0.0 - 56.2 0.9 38.8 0.0 - 39.7 -

PHF 0.625 0.705 0.000 - 0.683 0.905 0.750 0.000 - 0.910 0.750 0.875 0.000 - 0.872 0.939

Lights 9 30 0 - 39 531 16 0 - 547 8 368 0 - 376 962

% Lights 90.0 96.8 - - 95.1 96.5 88.9 - - 96.3 88.9 93.9 - - 93.8 95.2

Mediums 0 0 0 - 0 9 1 0 - 10 1 19 0 - 20 30

% Mediums 0.0 0.0 - - 0.0 1.6 5.6 - - 1.8 11.1 4.8 - - 5.0 3.0

Articulated Trucks 1 1 0 - 2 10 1 0 - 11 0 5 0 - 5 18

% Articulated Trucks 10.0 3.2 - - 4.9 1.8 5.6 - - 1.9 0.0 1.3 - - 1.2 1.8

Pedestrians - - - 2 - - - - 0 - - - - 0 - -

% Pedestrians - - - 100.0 - - - - - - - - - - - -

Page 87: Grandwood Subdivision – Elora Transportation Impact Study...To the extent that this report is based on information supplied by other parties, Paradigm Transportation Solutions Limited

Paradigm Transportation Solutions Limited22 King Street South, Suite 300

Waterloo, Ontario, Canada N2J 1N8519-896-3163 [email protected]

Count Name: York Street & Wellington Road 7Site Code:Start Date: 06/06/2017Page No: 6

Peak Hour Data

06/06/2017 4:00 PMEnding At06/06/2017 5:00 PM

LightsMediumsArticulated TrucksPedestrians

Wellington Road 7 [N]

Out In Total

561 376 937

9 20 29

11 5 16

0 0 0

581 401 982

368 8 0 0

19 1 0 0

5 0 0 0

0 0 0 0

392 9 0 0T L U P

27 0 1 2 24

Out

41 0 2 0 39 In

68 0 3 2 63

Total

York S

treet [E]

R 31 0 1 0 30

L 10 0 1 0 9

U 0 0 0 0 0

P 2 2 0 0 0

377 547 924

19 10 29

6 11 17

0 0 0

402 568 970Out In Total

Wellington Road 7 [S]

U T R P

0 531 16 0

0 9 1 0

0 10 1 0

0 0 0 0

0 550 18 0

Turning Movement Peak Hour Data Plot (4:00 PM)

Page 88: Grandwood Subdivision – Elora Transportation Impact Study...To the extent that this report is based on information supplied by other parties, Paradigm Transportation Solutions Limited

Paradigm Transportation Solutions Limited22 King Street South, Suite 300

Waterloo, Ontario, Canada N2J 1N8519-896-3163 [email protected]

Count Name: York Street & Wellington Road 7Site Code:Start Date: 06/06/2017Page No: 7

Page 89: Grandwood Subdivision – Elora Transportation Impact Study...To the extent that this report is based on information supplied by other parties, Paradigm Transportation Solutions Limited

Granwood Subdivsion – Elora | Transportation Impact Study | 170127 | July 2017

Paradigm Transportation Solutions Limited | Appendices

Appendix C

Base Year Traffic Operations Reports

Page 90: Grandwood Subdivision – Elora Transportation Impact Study...To the extent that this report is based on information supplied by other parties, Paradigm Transportation Solutions Limited
Page 91: Grandwood Subdivision – Elora Transportation Impact Study...To the extent that this report is based on information supplied by other parties, Paradigm Transportation Solutions Limited

06/13/2017

170127 Granwood Subdivision 5:00 pm 06/13/2017 Baseline Synchro 9 ReportPage 1

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 22 75 36 122 148 12 47 126 51 6 246 61Future Volume (vph) 22 75 36 122 148 12 47 126 51 6 246 61Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900Storage Length (m) 70.0 0.0 30.0 0.0 90.0 0.0 40.0 0.0Storage Lanes 1 0 1 0 1 0 1 0Taper Length (m) 2.5 7.6 2.5 2.5Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Frt 0.952 0.989 0.957 0.970Flt Protected 0.950 0.950 0.950 0.950Satd. Flow (prot) 1472 1665 0 1807 1870 0 1755 1689 0 1825 1768 0Flt Permitted 0.609 0.679 0.495 0.623Satd. Flow (perm) 944 1665 0 1292 1870 0 914 1689 0 1197 1768 0Right Turn on Red Yes Yes Yes YesSatd. Flow (RTOR) 31 5 34 21Link Speed (k/h) 48 48 48 48Link Distance (m) 186.0 1088.5 201.4 99.7Travel Time (s) 14.0 81.6 15.1 7.5Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 24% 6% 18% 1% 1% 9% 4% 10% 6% 0% 6% 3%Adj. Flow (vph) 24 82 39 133 161 13 51 137 55 7 267 66Shared Lane Traffic (%)Lane Group Flow (vph) 24 121 0 133 174 0 51 192 0 7 333 0Enter Blocked Intersection No No No No No No No No No No No NoLane Alignment Left Left Right Left Left Right Left Left Right Left Left RightMedian Width(m) 3.7 3.7 3.7 3.7Link Offset(m) 0.0 0.0 0.0 0.0Crosswalk Width(m) 1.6 4.9 1.6 1.6Two way Left Turn LaneHeadway Factor 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99Turning Speed (k/h) 24 14 24 14 24 14 24 14Turn Type Perm NA Perm NA Perm NA Perm NAProtected Phases 4 8 2 6Permitted Phases 4 8 2 6Minimum Split (s) 24.0 24.0 24.0 24.0 24.0 24.0 24.0 24.0Total Split (s) 38.0 38.0 38.0 38.0 52.0 52.0 52.0 52.0Total Split (%) 42.2% 42.2% 42.2% 42.2% 57.8% 57.8% 57.8% 57.8%Maximum Green (s) 32.0 32.0 32.0 32.0 46.0 46.0 46.0 46.0Yellow Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0All-Red Time (s) 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0Lost Time Adjust (s) -2.0 -2.0 -2.0 -2.0 -2.0 -2.0 -2.0 -2.0Total Lost Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0Lead/LagLead-Lag Optimize?Walk Time (s) 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0Flash Dont Walk (s) 11.0 11.0 11.0 11.0 11.0 11.0 11.0 11.0Pedestrian Calls (#/hr) 0 0 0 0 0 0 0 0Act Effct Green (s) 34.0 34.0 34.0 34.0 48.0 48.0 48.0 48.0Actuated g/C Ratio 0.38 0.38 0.38 0.38 0.53 0.53 0.53 0.53

06/13/2017

170127 Granwood Subdivision 5:00 pm 06/13/2017 Baseline Synchro 9 ReportPage 2

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRv/c Ratio 0.07 0.19 0.27 0.25 0.10 0.21 0.01 0.35Control Delay 18.7 14.7 21.4 19.8 11.2 9.7 10.0 12.5Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 18.7 14.7 21.4 19.8 11.2 9.7 10.0 12.5LOS B B C B B A A BApproach Delay 15.4 20.5 10.0 12.5Approach LOS B C A BQueue Length 50th (m) 2.6 10.0 15.7 19.6 4.1 13.3 0.5 28.9Queue Length 95th (m) 7.7 21.4 29.2 34.1 9.8 24.3 2.5 46.3Internal Link Dist (m) 162.0 1064.5 177.4 75.7Turn Bay Length (m) 70.0 30.0 90.0 40.0Base Capacity (vph) 356 648 488 709 487 916 638 952Starvation Cap Reductn 0 0 0 0 0 0 0 0Spillback Cap Reductn 0 0 0 0 0 0 0 0Storage Cap Reductn 0 0 0 0 0 0 0 0Reduced v/c Ratio 0.07 0.19 0.27 0.25 0.10 0.21 0.01 0.35

Intersection SummaryArea Type: OtherCycle Length: 90Actuated Cycle Length: 90Offset: 0 (0%), Referenced to phase 2:NBTL and 6:SBTL, Start of GreenNatural Cycle: 50Control Type: PretimedMaximum v/c Ratio: 0.35Intersection Signal Delay: 14.7 Intersection LOS: BIntersection Capacity Utilization 47.1% ICU Level of Service AAnalysis Period (min) 15

Splits and Phases: 1: Wellington Road 7 & Wellington Road 21/McNab Street

Page 92: Grandwood Subdivision – Elora Transportation Impact Study...To the extent that this report is based on information supplied by other parties, Paradigm Transportation Solutions Limited

06/13/2017

170127 Granwood Subdivision 5:00 pm 06/13/2017 Baseline Synchro 9 ReportPage 3

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 22 75 36 122 148 12 47 126 51 6 246 61Future Volume (vph) 22 75 36 122 148 12 47 126 51 6 246 61Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900Total Lost time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Frt 1.00 0.95 1.00 0.99 1.00 0.96 1.00 0.97Flt Protected 0.95 1.00 0.95 1.00 0.95 1.00 0.95 1.00Satd. Flow (prot) 1472 1664 1807 1870 1755 1689 1825 1768Flt Permitted 0.61 1.00 0.68 1.00 0.50 1.00 0.62 1.00Satd. Flow (perm) 944 1664 1291 1870 915 1689 1198 1768Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 24 82 39 133 161 13 51 137 55 7 267 66RTOR Reduction (vph) 0 19 0 0 3 0 0 16 0 0 10 0Lane Group Flow (vph) 24 102 0 133 171 0 51 176 0 7 323 0Heavy Vehicles (%) 24% 6% 18% 1% 1% 9% 4% 10% 6% 0% 6% 3%Turn Type Perm NA Perm NA Perm NA Perm NAProtected Phases 4 8 2 6Permitted Phases 4 8 2 6Actuated Green, G (s) 32.0 32.0 32.0 32.0 46.0 46.0 46.0 46.0Effective Green, g (s) 34.0 34.0 34.0 34.0 48.0 48.0 48.0 48.0Actuated g/C Ratio 0.38 0.38 0.38 0.38 0.53 0.53 0.53 0.53Clearance Time (s) 6.0 6.0 6.0 6.0 6.0 6.0 6.0 6.0Lane Grp Cap (vph) 356 628 487 706 488 900 638 942v/s Ratio Prot 0.06 0.09 0.10 c0.18v/s Ratio Perm 0.03 c0.10 0.06 0.01v/c Ratio 0.07 0.16 0.27 0.24 0.10 0.20 0.01 0.34Uniform Delay, d1 17.9 18.6 19.4 19.2 10.4 10.9 9.9 12.0Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Incremental Delay, d2 0.4 0.6 1.4 0.8 0.4 0.5 0.0 1.0Delay (s) 18.2 19.1 20.8 20.0 10.8 11.4 9.9 13.0Level of Service B B C B B B A BApproach Delay (s) 19.0 20.3 11.3 12.9Approach LOS B C B B

Intersection SummaryHCM 2000 Control Delay 15.6 HCM 2000 Level of Service BHCM 2000 Volume to Capacity ratio 0.31Actuated Cycle Length (s) 90.0 Sum of lost time (s) 8.0Intersection Capacity Utilization 47.1% ICU Level of Service AAnalysis Period (min) 15c Critical Lane Group

06/13/2017

170127 Granwood Subdivision 5:00 pm 06/13/2017 Baseline Synchro 9 ReportPage 4

Lane Group WBL WBR NBT NBR SBL SBTLane ConfigurationsTraffic Volume (vph) 9 34 298 18 43 546Future Volume (vph) 9 34 298 18 43 546Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900Storage Length (m) 0.0 0.0 30.0 0.0Storage Lanes 1 0 1 0Taper Length (m) 2.5 2.5Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00Frt 0.894 0.850Flt Protected 0.989 0.996Satd. Flow (prot) 1309 0 1779 1498 0 1824Flt Permitted 0.989 0.996Satd. Flow (perm) 1309 0 1779 1498 0 1824Link Speed (k/h) 48 48 48Link Distance (m) 92.0 115.2 201.4Travel Time (s) 6.9 8.6 15.1Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 25% 31% 8% 9% 4% 5%Adj. Flow (vph) 10 37 324 20 47 593Shared Lane Traffic (%)Lane Group Flow (vph) 47 0 324 20 0 640Enter Blocked Intersection No No No No No NoLane Alignment Left Right Left Right Left LeftMedian Width(m) 3.7 3.7 3.7Link Offset(m) 0.0 0.0 0.0Crosswalk Width(m) 1.6 1.6 1.6Two way Left Turn LaneHeadway Factor 0.99 0.99 0.99 0.99 0.99 0.99Turning Speed (k/h) 24 14 14 24Sign Control Stop Free Free

Intersection SummaryArea Type: OtherControl Type: UnsignalizedIntersection Capacity Utilization 60.1% ICU Level of Service BAnalysis Period (min) 15

Page 93: Grandwood Subdivision – Elora Transportation Impact Study...To the extent that this report is based on information supplied by other parties, Paradigm Transportation Solutions Limited

06/13/2017

170127 Granwood Subdivision 5:00 pm 06/13/2017 Baseline Synchro 9 ReportPage 5

Movement WBL WBR NBT NBR SBL SBTLane ConfigurationsTraffic Volume (veh/h) 9 34 298 18 43 546Future Volume (Veh/h) 9 34 298 18 43 546Sign Control Stop Free FreeGrade 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 10 37 324 20 47 593PedestriansLane Width (m)Walking Speed (m/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (m) 201pX, platoon unblocked 0.93vC, conflicting volume 1011 324 344vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 974 324 344tC, single (s) 6.6 6.5 4.1tC, 2 stage (s)tF (s) 3.7 3.6 2.2p0 queue free % 96 94 96cM capacity (veh/h) 227 655 1204

Direction, Lane # WB 1 NB 1 NB 2 SB 1Volume Total 47 324 20 640Volume Left 10 0 0 47Volume Right 37 0 20 0cSH 467 1700 1700 1204Volume to Capacity 0.10 0.19 0.01 0.04Queue Length 95th (m) 2.5 0.0 0.0 0.9Control Delay (s) 13.6 0.0 0.0 1.0Lane LOS B AApproach Delay (s) 13.6 0.0 1.0Approach LOS B

Intersection SummaryAverage Delay 1.3Intersection Capacity Utilization 60.1% ICU Level of Service BAnalysis Period (min) 15

06/13/2017

170127 Granwood Subdivision 5:00 pm 06/13/2017 Baseline Synchro 9 ReportPage 6

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 13 33 15 3 32 12 6 4 0 1 9 5Future Volume (vph) 13 33 15 3 32 12 6 4 0 1 9 5Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Frt 0.967 0.966 0.958Flt Protected 0.990 0.997 0.969 0.997Satd. Flow (prot) 0 1803 0 0 1814 0 0 1825 0 0 1799 0Flt Permitted 0.990 0.997 0.969 0.997Satd. Flow (perm) 0 1803 0 0 1814 0 0 1825 0 0 1799 0Link Speed (k/h) 48 48 48 48Link Distance (m) 92.0 91.8 92.7 102.1Travel Time (s) 6.9 6.9 7.0 7.7Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 14 36 16 3 35 13 7 4 0 1 10 5Shared Lane Traffic (%)Lane Group Flow (vph) 0 66 0 0 51 0 0 11 0 0 16 0Enter Blocked Intersection No No No No No No No No No No No NoLane Alignment Left Left Right Left Left Right Left Left Right Left Left RightMedian Width(m) 0.0 0.0 0.0 0.0Link Offset(m) 0.0 0.0 0.0 0.0Crosswalk Width(m) 1.6 1.6 1.6 1.6Two way Left Turn LaneHeadway Factor 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99Turning Speed (k/h) 24 14 24 14 24 14 24 14Sign Control Free Free Stop Stop

Intersection SummaryArea Type: OtherControl Type: UnsignalizedIntersection Capacity Utilization 17.2% ICU Level of Service AAnalysis Period (min) 15

Page 94: Grandwood Subdivision – Elora Transportation Impact Study...To the extent that this report is based on information supplied by other parties, Paradigm Transportation Solutions Limited

06/13/2017

170127 Granwood Subdivision 5:00 pm 06/13/2017 Baseline Synchro 9 ReportPage 7

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (veh/h) 13 33 15 3 32 12 6 4 0 1 9 5Future Volume (Veh/h) 13 33 15 3 32 12 6 4 0 1 9 5Sign Control Free Free Stop StopGrade 0% 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 14 36 16 3 35 13 7 4 0 1 10 5PedestriansLane Width (m)Walking Speed (m/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (m)pX, platoon unblockedvC, conflicting volume 48 52 130 126 44 122 128 42vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 48 52 130 126 44 122 128 42tC, single (s) 4.1 4.1 7.1 6.5 6.2 7.1 6.5 6.2tC, 2 stage (s)tF (s) 2.2 2.2 3.5 4.0 3.3 3.5 4.0 3.3p0 queue free % 99 100 99 99 100 100 99 100cM capacity (veh/h) 1559 1554 824 756 1026 843 755 1029

Direction, Lane # EB 1 WB 1 NB 1 SB 1Volume Total 66 51 11 16Volume Left 14 3 7 1Volume Right 16 13 0 5cSH 1559 1554 798 829Volume to Capacity 0.01 0.00 0.01 0.02Queue Length 95th (m) 0.2 0.0 0.3 0.4Control Delay (s) 1.6 0.4 9.6 9.4Lane LOS A A A AApproach Delay (s) 1.6 0.4 9.6 9.4Approach LOS A A

Intersection SummaryAverage Delay 2.7Intersection Capacity Utilization 17.2% ICU Level of Service AAnalysis Period (min) 15

06/13/2017

170127 Granwood Subdivision 5:00 pm 06/13/2017 Baseline Synchro 9 ReportPage 8

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 13 6 15 3 8 1 6 4 0 1 9 33Future Volume (vph) 13 6 15 3 8 1 6 4 0 1 9 33Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Ped Bike FactorFrt 0.942 0.990 0.897Flt Protected 0.981 0.989 0.969 0.999Satd. Flow (prot) 0 1407 0 0 1737 0 0 1305 0 0 1682 0Flt Permitted 0.981 0.989 0.969 0.999Satd. Flow (perm) 0 1407 0 0 1737 0 0 1305 0 0 1682 0Link Speed (k/h) 48 48 48 48Link Distance (m) 91.8 278.1 75.3 102.9Travel Time (s) 6.9 20.9 5.6 7.7Confl. Peds. (#/hr) 1 1Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 15% 33% 33% 0% 12% 0% 67% 0% 0% 0% 11% 0%Adj. Flow (vph) 14 7 16 3 9 1 7 4 0 1 10 36Shared Lane Traffic (%)Lane Group Flow (vph) 0 37 0 0 13 0 0 11 0 0 47 0Enter Blocked Intersection No No No No No No No No No No No NoLane Alignment Left Left Right Left Left Right Left Left Right Left Left RightMedian Width(m) 0.0 0.0 0.0 0.0Link Offset(m) 0.0 0.0 0.0 0.0Crosswalk Width(m) 1.6 1.6 1.6 1.6Two way Left Turn LaneHeadway Factor 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99Turning Speed (k/h) 24 14 24 14 24 14 24 14Sign Control Free Free Stop Stop

Intersection SummaryArea Type: OtherControl Type: UnsignalizedIntersection Capacity Utilization 13.9% ICU Level of Service AAnalysis Period (min) 15

Page 95: Grandwood Subdivision – Elora Transportation Impact Study...To the extent that this report is based on information supplied by other parties, Paradigm Transportation Solutions Limited

06/13/2017

170127 Granwood Subdivision 5:00 pm 06/13/2017 Baseline Synchro 9 ReportPage 9

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (veh/h) 13 6 15 3 8 1 6 4 0 1 9 33Future Volume (Veh/h) 13 6 15 3 8 1 6 4 0 1 9 33Sign Control Free Free Stop StopGrade 0% 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 14 7 16 3 9 1 7 4 0 1 10 36Pedestrians 1Lane Width (m) 3.7Walking Speed (m/s) 1.0Percent Blockage 0Right turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (m)pX, platoon unblockedvC, conflicting volume 10 23 100 59 15 60 66 10vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 10 23 100 59 15 60 66 10tC, single (s) 4.2 4.1 7.8 6.5 6.2 7.1 6.6 6.2tC, 2 stage (s)tF (s) 2.3 2.2 4.1 4.0 3.3 3.5 4.1 3.3p0 queue free % 99 100 99 100 100 100 99 97cM capacity (veh/h) 1529 1605 709 827 1070 929 798 1075

Direction, Lane # EB 1 WB 1 NB 1 SB 1Volume Total 37 13 11 47Volume Left 14 3 7 1Volume Right 16 1 0 36cSH 1529 1605 748 998Volume to Capacity 0.01 0.00 0.01 0.05Queue Length 95th (m) 0.2 0.0 0.3 1.1Control Delay (s) 2.8 1.7 9.9 8.8Lane LOS A A A AApproach Delay (s) 2.8 1.7 9.9 8.8Approach LOS A A

Intersection SummaryAverage Delay 6.0Intersection Capacity Utilization 13.9% ICU Level of Service AAnalysis Period (min) 15

06/13/2017

170127 Granwood Subdivision 5:00 pm 06/13/2017 Baseline Synchro 9 ReportPage 10

Lane Group EBL EBR NBL NBT SBT SBRLane ConfigurationsTraffic Volume (vph) 19 9 21 34 18 11Future Volume (vph) 19 9 21 34 18 11Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00Frt 0.956 0.949Flt Protected 0.967 0.981Satd. Flow (prot) 1741 0 0 1848 1787 0Flt Permitted 0.967 0.981Satd. Flow (perm) 1741 0 0 1848 1787 0Link Speed (k/h) 48 48 48Link Distance (m) 1088.5 119.7 61.8Travel Time (s) 81.6 9.0 4.6Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 21 10 23 37 20 12Shared Lane Traffic (%)Lane Group Flow (vph) 31 0 0 60 32 0Enter Blocked Intersection No No No No No NoLane Alignment Left Right Left Left Left RightMedian Width(m) 7.4 0.0 0.0Link Offset(m) 0.0 0.0 0.0Crosswalk Width(m) 4.9 1.6 1.6Two way Left Turn LaneHeadway Factor 0.99 0.99 0.99 0.99 0.99 0.99Turning Speed (k/h) 24 14 24 14Sign Control Stop Free Free

Intersection SummaryArea Type: OtherControl Type: UnsignalizedIntersection Capacity Utilization 19.6% ICU Level of Service AAnalysis Period (min) 15

Page 96: Grandwood Subdivision – Elora Transportation Impact Study...To the extent that this report is based on information supplied by other parties, Paradigm Transportation Solutions Limited

06/13/2017

170127 Granwood Subdivision 5:00 pm 06/13/2017 Baseline Synchro 9 ReportPage 11

Movement EBL EBR NBL NBT SBT SBRLane ConfigurationsTraffic Volume (veh/h) 19 9 21 34 18 11Future Volume (Veh/h) 19 9 21 34 18 11Sign Control Stop Free FreeGrade 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 21 10 23 37 20 12PedestriansLane Width (m)Walking Speed (m/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (m)pX, platoon unblockedvC, conflicting volume 109 26 32vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 109 26 32tC, single (s) 6.4 6.2 4.1tC, 2 stage (s)tF (s) 3.5 3.3 2.2p0 queue free % 98 99 99cM capacity (veh/h) 875 1050 1580

Direction, Lane # EB 1 NB 1 SB 1Volume Total 31 60 32Volume Left 21 23 0Volume Right 10 0 12cSH 925 1580 1700Volume to Capacity 0.03 0.01 0.02Queue Length 95th (m) 0.8 0.3 0.0Control Delay (s) 9.0 2.9 0.0Lane LOS A AApproach Delay (s) 9.0 2.9 0.0Approach LOS A

Intersection SummaryAverage Delay 3.7Intersection Capacity Utilization 19.6% ICU Level of Service AAnalysis Period (min) 15

06/13/2017

170127 Granwood Subdivision 5:00 pm 06/13/2017 Baseline Synchro 9 ReportPage 12

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 21 1 11 1 1 10 4 24 1 4 17 6Future Volume (vph) 21 1 11 1 1 10 4 24 1 4 17 6Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Frt 0.955 0.886 0.996 0.967Flt Protected 0.969 0.996 0.994 0.993Satd. Flow (prot) 0 1720 0 0 1551 0 0 1785 0 0 1595 0Flt Permitted 0.969 0.996 0.994 0.993Satd. Flow (perm) 0 1720 0 0 1551 0 0 1785 0 0 1595 0Link Speed (k/h) 48 48 48 48Link Distance (m) 290.8 201.2 123.6 119.7Travel Time (s) 21.8 15.1 9.3 9.0Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 0% 0% 10% 0% 0% 11% 0% 4% 100% 25% 13% 17%Adj. Flow (vph) 23 1 12 1 1 11 4 26 1 4 18 7Shared Lane Traffic (%)Lane Group Flow (vph) 0 36 0 0 13 0 0 31 0 0 29 0Enter Blocked Intersection No No No No No No No No No No No NoLane Alignment Left Left Right Left Left Right Left Left Right Left Left RightMedian Width(m) 0.0 0.0 0.0 0.0Link Offset(m) 0.0 0.0 0.0 0.0Crosswalk Width(m) 1.6 1.6 1.6 1.6Two way Left Turn LaneHeadway Factor 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99Turning Speed (k/h) 24 14 24 14 24 14 24 14Sign Control Stop Stop Free Free

Intersection SummaryArea Type: OtherControl Type: UnsignalizedIntersection Capacity Utilization 18.4% ICU Level of Service AAnalysis Period (min) 15

Page 97: Grandwood Subdivision – Elora Transportation Impact Study...To the extent that this report is based on information supplied by other parties, Paradigm Transportation Solutions Limited

06/13/2017

170127 Granwood Subdivision 5:00 pm 06/13/2017 Baseline Synchro 9 ReportPage 13

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (veh/h) 21 1 11 1 1 10 4 24 1 4 17 6Future Volume (Veh/h) 21 1 11 1 1 10 4 24 1 4 17 6Sign Control Stop Stop Free FreeGrade 0% 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 23 1 12 1 1 11 4 26 1 4 18 7PedestriansLane Width (m)Walking Speed (m/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (m)pX, platoon unblockedvC, conflicting volume 76 64 22 76 68 26 25 27vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 76 64 22 76 68 26 25 27tC, single (s) 7.1 6.5 6.3 7.1 6.5 6.3 4.1 4.4tC, 2 stage (s)tF (s) 3.5 4.0 3.4 3.5 4.0 3.4 2.2 2.4p0 queue free % 97 100 99 100 100 99 100 100cM capacity (veh/h) 905 826 1033 903 823 1024 1603 1450

Direction, Lane # EB 1 WB 1 NB 1 SB 1Volume Total 36 13 31 29Volume Left 23 1 4 4Volume Right 12 11 1 7cSH 941 995 1603 1450Volume to Capacity 0.04 0.01 0.00 0.00Queue Length 95th (m) 0.9 0.3 0.1 0.1Control Delay (s) 9.0 8.7 1.0 1.1Lane LOS A A A AApproach Delay (s) 9.0 8.7 1.0 1.1Approach LOS A A

Intersection SummaryAverage Delay 4.5Intersection Capacity Utilization 18.4% ICU Level of Service AAnalysis Period (min) 15

Page 98: Grandwood Subdivision – Elora Transportation Impact Study...To the extent that this report is based on information supplied by other parties, Paradigm Transportation Solutions Limited

06/13/2017

170127 Granwood Subdivision 06/13/2017 Baseline Synchro 9 ReportPage 1

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 96 207 54 106 104 15 44 242 153 16 155 44Future Volume (vph) 96 207 54 106 104 15 44 242 153 16 155 44Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900Storage Length (m) 70.0 0.0 30.0 0.0 90.0 0.0 40.0 0.0Storage Lanes 1 0 1 0 1 0 1 0Taper Length (m) 2.5 7.6 2.5 2.5Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Frt 0.969 0.981 0.942 0.967Flt Protected 0.950 0.950 0.950 0.950Satd. Flow (prot) 1807 1825 0 1789 1836 0 1825 1777 0 1825 1743 0Flt Permitted 0.668 0.474 0.601 0.415Satd. Flow (perm) 1271 1825 0 893 1836 0 1155 1777 0 797 1743 0Right Turn on Red Yes Yes Yes YesSatd. Flow (RTOR) 17 9 54 24Link Speed (k/h) 48 48 48 48Link Distance (m) 186.0 1088.5 201.4 99.7Travel Time (s) 14.0 81.6 15.1 7.5Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 1% 2% 2% 2% 3% 0% 0% 3% 0% 0% 7% 5%Adj. Flow (vph) 104 225 59 115 113 16 48 263 166 17 168 48Shared Lane Traffic (%)Lane Group Flow (vph) 104 284 0 115 129 0 48 429 0 17 216 0Enter Blocked Intersection No No No No No No No No No No No NoLane Alignment Left Left Right Left Left Right Left Left Right Left Left RightMedian Width(m) 3.7 3.7 3.7 3.7Link Offset(m) 0.0 0.0 0.0 0.0Crosswalk Width(m) 1.6 4.9 1.6 1.6Two way Left Turn LaneHeadway Factor 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99Turning Speed (k/h) 24 14 24 14 24 14 24 14Turn Type Perm NA Perm NA Perm NA Perm NAProtected Phases 4 8 2 6Permitted Phases 4 8 2 6Minimum Split (s) 24.0 24.0 24.0 24.0 24.0 24.0 24.0 24.0Total Split (s) 38.0 38.0 38.0 38.0 52.0 52.0 52.0 52.0Total Split (%) 42.2% 42.2% 42.2% 42.2% 57.8% 57.8% 57.8% 57.8%Maximum Green (s) 32.0 32.0 32.0 32.0 46.0 46.0 46.0 46.0Yellow Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0All-Red Time (s) 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0Lost Time Adjust (s) -2.0 -2.0 -2.0 -2.0 -2.0 -2.0 -2.0 -2.0Total Lost Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0Lead/LagLead-Lag Optimize?Walk Time (s) 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0Flash Dont Walk (s) 11.0 11.0 11.0 11.0 11.0 11.0 11.0 11.0Pedestrian Calls (#/hr) 0 0 0 0 0 0 0 0Act Effct Green (s) 34.0 34.0 34.0 34.0 48.0 48.0 48.0 48.0Actuated g/C Ratio 0.38 0.38 0.38 0.38 0.53 0.53 0.53 0.53

06/13/2017

170127 Granwood Subdivision 06/13/2017 Baseline Synchro 9 ReportPage 2

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRv/c Ratio 0.22 0.41 0.34 0.18 0.08 0.44 0.04 0.23Control Delay 20.5 21.4 23.6 18.3 10.7 12.8 10.4 10.6Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 20.5 21.4 23.6 18.3 10.7 12.8 10.4 10.6LOS C C C B B B B BApproach Delay 21.2 20.8 12.6 10.6Approach LOS C C B BQueue Length 50th (m) 12.0 33.2 13.9 13.6 3.8 36.7 1.3 16.4Queue Length 95th (m) 23.4 53.7 27.9 25.5 9.1 58.3 4.4 28.5Internal Link Dist (m) 162.0 1064.5 177.4 75.7Turn Bay Length (m) 70.0 30.0 90.0 40.0Base Capacity (vph) 480 700 337 699 616 972 425 940Starvation Cap Reductn 0 0 0 0 0 0 0 0Spillback Cap Reductn 0 0 0 0 0 0 0 0Storage Cap Reductn 0 0 0 0 0 0 0 0Reduced v/c Ratio 0.22 0.41 0.34 0.18 0.08 0.44 0.04 0.23

Intersection SummaryArea Type: OtherCycle Length: 90Actuated Cycle Length: 90Offset: 0 (0%), Referenced to phase 2:NBTL and 6:SBTL, Start of GreenNatural Cycle: 50Control Type: PretimedMaximum v/c Ratio: 0.44Intersection Signal Delay: 16.2 Intersection LOS: BIntersection Capacity Utilization 59.6% ICU Level of Service BAnalysis Period (min) 15

Splits and Phases: 1: Wellington Road 7 & Wellington Road 21/McNab Street

Page 99: Grandwood Subdivision – Elora Transportation Impact Study...To the extent that this report is based on information supplied by other parties, Paradigm Transportation Solutions Limited

06/13/2017

170127 Granwood Subdivision 06/13/2017 Baseline Synchro 9 ReportPage 3

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 96 207 54 106 104 15 44 242 153 16 155 44Future Volume (vph) 96 207 54 106 104 15 44 242 153 16 155 44Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900Total Lost time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Frt 1.00 0.97 1.00 0.98 1.00 0.94 1.00 0.97Flt Protected 0.95 1.00 0.95 1.00 0.95 1.00 0.95 1.00Satd. Flow (prot) 1807 1825 1789 1837 1825 1777 1825 1743Flt Permitted 0.67 1.00 0.47 1.00 0.60 1.00 0.41 1.00Satd. Flow (perm) 1270 1825 892 1837 1154 1777 797 1743Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 104 225 59 115 113 16 48 263 166 17 168 48RTOR Reduction (vph) 0 11 0 0 6 0 0 25 0 0 11 0Lane Group Flow (vph) 104 273 0 115 123 0 48 404 0 17 205 0Heavy Vehicles (%) 1% 2% 2% 2% 3% 0% 0% 3% 0% 0% 7% 5%Turn Type Perm NA Perm NA Perm NA Perm NAProtected Phases 4 8 2 6Permitted Phases 4 8 2 6Actuated Green, G (s) 32.0 32.0 32.0 32.0 46.0 46.0 46.0 46.0Effective Green, g (s) 34.0 34.0 34.0 34.0 48.0 48.0 48.0 48.0Actuated g/C Ratio 0.38 0.38 0.38 0.38 0.53 0.53 0.53 0.53Clearance Time (s) 6.0 6.0 6.0 6.0 6.0 6.0 6.0 6.0Lane Grp Cap (vph) 479 689 336 693 615 947 425 929v/s Ratio Prot c0.15 0.07 c0.23 0.12v/s Ratio Perm 0.08 0.13 0.04 0.02v/c Ratio 0.22 0.40 0.34 0.18 0.08 0.43 0.04 0.22Uniform Delay, d1 19.0 20.5 20.0 18.7 10.2 12.7 10.0 11.1Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Incremental Delay, d2 1.0 1.7 2.8 0.6 0.2 1.4 0.2 0.5Delay (s) 20.0 22.2 22.8 19.2 10.5 14.1 10.2 11.7Level of Service C C C B B B B BApproach Delay (s) 21.6 20.9 13.7 11.5Approach LOS C C B B

Intersection SummaryHCM 2000 Control Delay 16.9 HCM 2000 Level of Service BHCM 2000 Volume to Capacity ratio 0.41Actuated Cycle Length (s) 90.0 Sum of lost time (s) 8.0Intersection Capacity Utilization 59.6% ICU Level of Service BAnalysis Period (min) 15c Critical Lane Group

06/13/2017

170127 Granwood Subdivision 06/13/2017 Baseline Synchro 9 ReportPage 4

Lane Group WBL WBR NBT NBR SBL SBTLane ConfigurationsTraffic Volume (vph) 10 31 550 18 9 392Future Volume (vph) 10 31 550 18 9 392Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900Storage Length (m) 0.0 0.0 30.0 0.0Storage Lanes 1 0 1 0Taper Length (m) 2.5 2.5Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00Frt 0.898 0.850Flt Protected 0.988 0.999Satd. Flow (prot) 1628 0 1865 1471 0 1809Flt Permitted 0.988 0.999Satd. Flow (perm) 1628 0 1865 1471 0 1809Link Speed (k/h) 48 48 48Link Distance (m) 92.0 115.2 201.4Travel Time (s) 6.9 8.6 15.1Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 10% 3% 3% 11% 11% 6%Adj. Flow (vph) 11 34 598 20 10 426Shared Lane Traffic (%)Lane Group Flow (vph) 45 0 598 20 0 436Enter Blocked Intersection No No No No No NoLane Alignment Left Right Left Right Left LeftMedian Width(m) 3.7 3.7 3.7Link Offset(m) 0.0 0.0 0.0Crosswalk Width(m) 1.6 1.6 1.6Two way Left Turn LaneHeadway Factor 0.99 0.99 0.99 0.99 0.99 0.99Turning Speed (k/h) 24 14 14 24Sign Control Stop Free Free

Intersection SummaryArea Type: OtherControl Type: UnsignalizedIntersection Capacity Utilization 38.9% ICU Level of Service AAnalysis Period (min) 15

Page 100: Grandwood Subdivision – Elora Transportation Impact Study...To the extent that this report is based on information supplied by other parties, Paradigm Transportation Solutions Limited

06/13/2017

170127 Granwood Subdivision 06/13/2017 Baseline Synchro 9 ReportPage 5

Movement WBL WBR NBT NBR SBL SBTLane ConfigurationsTraffic Volume (veh/h) 10 31 550 18 9 392Future Volume (Veh/h) 10 31 550 18 9 392Sign Control Stop Free FreeGrade 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 11 34 598 20 10 426PedestriansLane Width (m)Walking Speed (m/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (m) 201pX, platoon unblockedvC, conflicting volume 1044 598 618vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 1044 598 618tC, single (s) 6.5 6.2 4.2tC, 2 stage (s)tF (s) 3.6 3.3 2.3p0 queue free % 95 93 99cM capacity (veh/h) 242 500 920

Direction, Lane # WB 1 NB 1 NB 2 SB 1Volume Total 45 598 20 436Volume Left 11 0 0 10Volume Right 34 0 20 0cSH 397 1700 1700 920Volume to Capacity 0.11 0.35 0.01 0.01Queue Length 95th (m) 2.9 0.0 0.0 0.3Control Delay (s) 15.2 0.0 0.0 0.3Lane LOS C AApproach Delay (s) 15.2 0.0 0.3Approach LOS C

Intersection SummaryAverage Delay 0.8Intersection Capacity Utilization 38.9% ICU Level of Service AAnalysis Period (min) 15

06/13/2017

170127 Granwood Subdivision 06/13/2017 Baseline Synchro 9 ReportPage 6

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 5 17 5 8 13 12 15 17 3 12 7 13Future Volume (vph) 5 17 5 8 13 12 15 17 3 12 7 13Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Frt 0.976 0.951 0.989 0.946Flt Protected 0.991 0.988 0.979 0.982Satd. Flow (prot) 0 1822 0 0 1770 0 0 1824 0 0 1750 0Flt Permitted 0.991 0.988 0.979 0.982Satd. Flow (perm) 0 1822 0 0 1770 0 0 1824 0 0 1750 0Link Speed (k/h) 48 48 48 48Link Distance (m) 92.0 91.8 92.7 102.1Travel Time (s) 6.9 6.9 7.0 7.7Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 5 18 5 9 14 13 16 18 3 13 8 14Shared Lane Traffic (%)Lane Group Flow (vph) 0 28 0 0 36 0 0 37 0 0 35 0Enter Blocked Intersection No No No No No No No No No No No NoLane Alignment Left Left Right Left Left Right Left Left Right Left Left RightMedian Width(m) 0.0 0.0 0.0 0.0Link Offset(m) 0.0 0.0 0.0 0.0Crosswalk Width(m) 1.6 1.6 1.6 1.6Two way Left Turn LaneHeadway Factor 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99Turning Speed (k/h) 24 14 24 14 24 14 24 14Sign Control Free Free Stop Stop

Intersection SummaryArea Type: OtherControl Type: UnsignalizedIntersection Capacity Utilization 13.3% ICU Level of Service AAnalysis Period (min) 15

Page 101: Grandwood Subdivision – Elora Transportation Impact Study...To the extent that this report is based on information supplied by other parties, Paradigm Transportation Solutions Limited

06/13/2017

170127 Granwood Subdivision 06/13/2017 Baseline Synchro 9 ReportPage 7

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (veh/h) 5 17 5 8 13 12 15 17 3 12 7 13Future Volume (Veh/h) 5 17 5 8 13 12 15 17 3 12 7 13Sign Control Free Free Stop StopGrade 0% 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 5 18 5 9 14 13 16 18 3 13 8 14PedestriansLane Width (m)Walking Speed (m/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (m)pX, platoon unblockedvC, conflicting volume 27 23 87 76 20 81 72 20vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 27 23 87 76 20 81 72 20tC, single (s) 4.1 4.1 7.1 6.5 6.2 7.1 6.5 6.2tC, 2 stage (s)tF (s) 2.2 2.2 3.5 4.0 3.3 3.5 4.0 3.3p0 queue free % 100 99 98 98 100 99 99 99cM capacity (veh/h) 1587 1592 874 808 1057 883 812 1057

Direction, Lane # EB 1 WB 1 NB 1 SB 1Volume Total 28 36 37 35Volume Left 5 9 16 13Volume Right 5 13 3 14cSH 1587 1592 852 925Volume to Capacity 0.00 0.01 0.04 0.04Queue Length 95th (m) 0.1 0.1 1.0 0.9Control Delay (s) 1.3 1.8 9.4 9.0Lane LOS A A A AApproach Delay (s) 1.3 1.8 9.4 9.0Approach LOS A A

Intersection SummaryAverage Delay 5.7Intersection Capacity Utilization 13.3% ICU Level of Service AAnalysis Period (min) 15

06/13/2017

170127 Granwood Subdivision 06/13/2017 Baseline Synchro 9 ReportPage 8

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 21 7 4 0 5 4 17 17 1 3 7 11Future Volume (vph) 21 7 4 0 5 4 17 17 1 3 7 11Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Ped Bike FactorFrt 0.985 0.940 0.996 0.930Flt Protected 0.968 0.976 0.994Satd. Flow (prot) 0 1773 0 0 1625 0 0 1815 0 0 1545 0Flt Permitted 0.968 0.976 0.994Satd. Flow (perm) 0 1773 0 0 1625 0 0 1815 0 0 1545 0Link Speed (k/h) 48 48 48 48Link Distance (m) 91.8 278.1 75.3 102.9Travel Time (s) 6.9 20.9 5.6 7.7Confl. Peds. (#/hr) 1 1Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 5% 0% 0% 0% 0% 25% 6% 0% 0% 0% 43% 0%Adj. Flow (vph) 23 8 4 0 5 4 18 18 1 3 8 12Shared Lane Traffic (%)Lane Group Flow (vph) 0 35 0 0 9 0 0 37 0 0 23 0Enter Blocked Intersection No No No No No No No No No No No NoLane Alignment Left Left Right Left Left Right Left Left Right Left Left RightMedian Width(m) 0.0 0.0 0.0 0.0Link Offset(m) 0.0 0.0 0.0 0.0Crosswalk Width(m) 1.6 1.6 1.6 1.6Two way Left Turn LaneHeadway Factor 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99Turning Speed (k/h) 24 14 24 14 24 14 24 14Sign Control Free Free Stop Stop

Intersection SummaryArea Type: OtherControl Type: UnsignalizedIntersection Capacity Utilization 20.3% ICU Level of Service AAnalysis Period (min) 15

Page 102: Grandwood Subdivision – Elora Transportation Impact Study...To the extent that this report is based on information supplied by other parties, Paradigm Transportation Solutions Limited

06/13/2017

170127 Granwood Subdivision 06/13/2017 Baseline Synchro 9 ReportPage 9

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (veh/h) 21 7 4 0 5 4 17 17 1 3 7 11Future Volume (Veh/h) 21 7 4 0 5 4 17 17 1 3 7 11Sign Control Free Free Stop StopGrade 0% 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 23 8 4 0 5 4 18 18 1 3 8 12Pedestrians 1Lane Width (m) 3.7Walking Speed (m/s) 1.0Percent Blockage 0Right turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (m)pX, platoon unblockedvC, conflicting volume 9 12 79 65 11 74 65 7vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 9 12 79 65 11 74 65 7tC, single (s) 4.1 4.1 7.2 6.5 6.2 7.1 6.9 6.2tC, 2 stage (s)tF (s) 2.2 2.2 3.6 4.0 3.3 3.5 4.4 3.3p0 queue free % 99 100 98 98 100 100 99 99cM capacity (veh/h) 1591 1620 873 818 1075 894 742 1081

Direction, Lane # EB 1 WB 1 NB 1 SB 1Volume Total 35 9 37 23Volume Left 23 0 18 3Volume Right 4 4 1 12cSH 1591 1620 849 912Volume to Capacity 0.01 0.00 0.04 0.03Queue Length 95th (m) 0.3 0.0 1.0 0.6Control Delay (s) 4.8 0.0 9.4 9.1Lane LOS A A AApproach Delay (s) 4.8 0.0 9.4 9.1Approach LOS A A

Intersection SummaryAverage Delay 7.0Intersection Capacity Utilization 20.3% ICU Level of Service AAnalysis Period (min) 15

06/13/2017

170127 Granwood Subdivision 06/13/2017 Baseline Synchro 9 ReportPage 10

Lane Group EBL EBR NBL NBT SBT SBRLane ConfigurationsTraffic Volume (vph) 5 40 4 41 21 16Future Volume (vph) 5 40 4 41 21 16Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00Frt 0.879 0.943Flt Protected 0.995 0.996Satd. Flow (prot) 1647 0 0 1876 1776 0Flt Permitted 0.995 0.996Satd. Flow (perm) 1647 0 0 1876 1776 0Link Speed (k/h) 48 48 48Link Distance (m) 1088.5 119.7 61.8Travel Time (s) 81.6 9.0 4.6Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 5 43 4 45 23 17Shared Lane Traffic (%)Lane Group Flow (vph) 48 0 0 49 40 0Enter Blocked Intersection No No No No No NoLane Alignment Left Right Left Left Left RightMedian Width(m) 7.4 0.0 0.0Link Offset(m) 0.0 0.0 0.0Crosswalk Width(m) 4.9 1.6 1.6Two way Left Turn LaneHeadway Factor 0.99 0.99 0.99 0.99 0.99 0.99Turning Speed (k/h) 24 14 24 14Sign Control Stop Free Free

Intersection SummaryArea Type: OtherControl Type: UnsignalizedIntersection Capacity Utilization 15.5% ICU Level of Service AAnalysis Period (min) 15

Page 103: Grandwood Subdivision – Elora Transportation Impact Study...To the extent that this report is based on information supplied by other parties, Paradigm Transportation Solutions Limited

06/13/2017

170127 Granwood Subdivision 06/13/2017 Baseline Synchro 9 ReportPage 11

Movement EBL EBR NBL NBT SBT SBRLane ConfigurationsTraffic Volume (veh/h) 5 40 4 41 21 16Future Volume (Veh/h) 5 40 4 41 21 16Sign Control Stop Free FreeGrade 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 5 43 4 45 23 17PedestriansLane Width (m)Walking Speed (m/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (m)pX, platoon unblockedvC, conflicting volume 84 32 40vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 84 32 40tC, single (s) 6.4 6.2 4.1tC, 2 stage (s)tF (s) 3.5 3.3 2.2p0 queue free % 99 96 100cM capacity (veh/h) 915 1043 1570

Direction, Lane # EB 1 NB 1 SB 1Volume Total 48 49 40Volume Left 5 4 0Volume Right 43 0 17cSH 1028 1570 1700Volume to Capacity 0.05 0.00 0.02Queue Length 95th (m) 1.1 0.1 0.0Control Delay (s) 8.7 0.6 0.0Lane LOS A AApproach Delay (s) 8.7 0.6 0.0Approach LOS A

Intersection SummaryAverage Delay 3.3Intersection Capacity Utilization 15.5% ICU Level of Service AAnalysis Period (min) 15

06/13/2017

170127 Granwood Subdivision 06/13/2017 Baseline Synchro 9 ReportPage 12

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 10 1 10 3 2 9 10 27 5 13 33 15Future Volume (vph) 10 1 10 3 2 9 10 27 5 13 33 15Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Frt 0.935 0.910 0.985 0.967Flt Protected 0.977 0.990 0.988 0.990Satd. Flow (prot) 0 1595 0 0 1404 0 0 1823 0 0 1752 0Flt Permitted 0.977 0.990 0.988 0.990Satd. Flow (perm) 0 1595 0 0 1404 0 0 1823 0 0 1752 0Link Speed (k/h) 48 48 48 48Link Distance (m) 290.8 201.2 123.6 119.7Travel Time (s) 21.8 15.1 9.3 9.0Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 11% 0% 10% 33% 0% 25% 0% 4% 0% 0% 6% 7%Adj. Flow (vph) 11 1 11 3 2 10 11 29 5 14 36 16Shared Lane Traffic (%)Lane Group Flow (vph) 0 23 0 0 15 0 0 45 0 0 66 0Enter Blocked Intersection No No No No No No No No No No No NoLane Alignment Left Left Right Left Left Right Left Left Right Left Left RightMedian Width(m) 0.0 0.0 0.0 0.0Link Offset(m) 0.0 0.0 0.0 0.0Crosswalk Width(m) 1.6 1.6 1.6 1.6Two way Left Turn LaneHeadway Factor 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99Turning Speed (k/h) 24 14 24 14 24 14 24 14Sign Control Stop Stop Free Free

Intersection SummaryArea Type: OtherControl Type: UnsignalizedIntersection Capacity Utilization 14.3% ICU Level of Service AAnalysis Period (min) 15

Page 104: Grandwood Subdivision – Elora Transportation Impact Study...To the extent that this report is based on information supplied by other parties, Paradigm Transportation Solutions Limited

06/13/2017

170127 Granwood Subdivision 06/13/2017 Baseline Synchro 9 ReportPage 13

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (veh/h) 10 1 10 3 2 9 10 27 5 13 33 15Future Volume (Veh/h) 10 1 10 3 2 9 10 27 5 13 33 15Sign Control Stop Stop Free FreeGrade 0% 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 11 1 11 3 2 10 11 29 5 14 36 16PedestriansLane Width (m)Walking Speed (m/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (m)pX, platoon unblockedvC, conflicting volume 136 128 44 137 134 32 52 34vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 136 128 44 137 134 32 52 34tC, single (s) 7.2 6.5 6.3 7.4 6.5 6.4 4.1 4.1tC, 2 stage (s)tF (s) 3.6 4.0 3.4 3.8 4.0 3.5 2.2 2.2p0 queue free % 99 100 99 100 100 99 99 99cM capacity (veh/h) 795 754 1004 749 749 980 1567 1591

Direction, Lane # EB 1 WB 1 NB 1 SB 1Volume Total 23 15 45 66Volume Left 11 3 11 14Volume Right 11 10 5 16cSH 880 889 1567 1591Volume to Capacity 0.03 0.02 0.01 0.01Queue Length 95th (m) 0.6 0.4 0.2 0.2Control Delay (s) 9.2 9.1 1.8 1.6Lane LOS A A A AApproach Delay (s) 9.2 9.1 1.8 1.6Approach LOS A A

Intersection SummaryAverage Delay 3.6Intersection Capacity Utilization 14.3% ICU Level of Service AAnalysis Period (min) 15

Page 105: Grandwood Subdivision – Elora Transportation Impact Study...To the extent that this report is based on information supplied by other parties, Paradigm Transportation Solutions Limited

Granwood Subdivsion – Elora | Transportation Impact Study | 170127 | July 2017

Paradigm Transportation Solutions Limited | Appendices

Appendix D

Trip Distribution Calculations

Page 106: Grandwood Subdivision – Elora Transportation Impact Study...To the extent that this report is based on information supplied by other parties, Paradigm Transportation Solutions Limited
Page 107: Grandwood Subdivision – Elora Transportation Impact Study...To the extent that this report is based on information supplied by other parties, Paradigm Transportation Solutions Limited

South via Wellington Road 7 3%

North via Bridge Street 1%

Halton Region 1% South via Wellington Road 7 1%

West via Wellington Road 21 8%

North via Wellington Road 7 3%

South via Wellington Road 7 20%

North via Bridge Street 5%

South via Bridge Street 5%

Dufferin County 3% North via Bridge Street 3%

North via Wellington Road 7 8%

North via Victoria Street 15%

North via High Street 7%

North via Bridge Street 10%

South via Bridge Street 10%

West via Wellington Road 21 1%100%Total

Guelph

Greater Toronto Area 4%

Waterloo Region 11%

Travel Origin/Destination Route

Elora-Salem & Fergus 51%

30%

Page 108: Grandwood Subdivision – Elora Transportation Impact Study...To the extent that this report is based on information supplied by other parties, Paradigm Transportation Solutions Limited
Page 109: Grandwood Subdivision – Elora Transportation Impact Study...To the extent that this report is based on information supplied by other parties, Paradigm Transportation Solutions Limited

Granwood Subdivsion – Elora | Transportation Impact Study | 170127 | July 2017

Paradigm Transportation Solutions Limited | Appendices

Appendix E

Background Traffic Operations Reports

Page 110: Grandwood Subdivision – Elora Transportation Impact Study...To the extent that this report is based on information supplied by other parties, Paradigm Transportation Solutions Limited
Page 111: Grandwood Subdivision – Elora Transportation Impact Study...To the extent that this report is based on information supplied by other parties, Paradigm Transportation Solutions Limited

06/26/2017

170127 Granwood Subdivision 5:00 pm 06/13/2017 Baseline Synchro 9 ReportPage 1

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 24 81 39 131 159 13 50 135 55 6 264 65Future Volume (vph) 24 81 39 131 159 13 50 135 55 6 264 65Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900Storage Length (m) 70.0 0.0 30.0 0.0 90.0 0.0 40.0 0.0Storage Lanes 1 0 1 0 1 0 1 0Taper Length (m) 2.5 7.6 2.5 2.5Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Frt 0.952 0.989 0.957 0.970Flt Protected 0.950 0.950 0.950 0.950Satd. Flow (prot) 1472 1664 0 1807 1870 0 1755 1689 0 1825 1768 0Flt Permitted 0.593 0.667 0.474 0.609Satd. Flow (perm) 919 1664 0 1269 1870 0 876 1689 0 1170 1768 0Right Turn on Red Yes Yes Yes YesSatd. Flow (RTOR) 31 5 35 21Link Speed (k/h) 48 48 48 48Link Distance (m) 186.0 1088.5 201.4 99.7Travel Time (s) 14.0 81.6 15.1 7.5Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 24% 6% 18% 1% 1% 9% 4% 10% 6% 0% 6% 3%Adj. Flow (vph) 26 88 42 142 173 14 54 147 60 7 287 71Shared Lane Traffic (%)Lane Group Flow (vph) 26 130 0 142 187 0 54 207 0 7 358 0Enter Blocked Intersection No No No No No No No No No No No NoLane Alignment Left Left Right Left Left Right Left Left Right Left Left RightMedian Width(m) 3.7 3.7 3.7 3.7Link Offset(m) 0.0 0.0 0.0 0.0Crosswalk Width(m) 1.6 4.9 1.6 1.6Two way Left Turn LaneHeadway Factor 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99Turning Speed (k/h) 24 14 24 14 24 14 24 14Turn Type Perm NA Perm NA Perm NA Perm NAProtected Phases 4 8 2 6Permitted Phases 4 8 2 6Minimum Split (s) 24.0 24.0 24.0 24.0 24.0 24.0 24.0 24.0Total Split (s) 38.0 38.0 38.0 38.0 52.0 52.0 52.0 52.0Total Split (%) 42.2% 42.2% 42.2% 42.2% 57.8% 57.8% 57.8% 57.8%Maximum Green (s) 32.0 32.0 32.0 32.0 46.0 46.0 46.0 46.0Yellow Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0All-Red Time (s) 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0Lost Time Adjust (s) -2.0 -2.0 -2.0 -2.0 -2.0 -2.0 -2.0 -2.0Total Lost Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0Lead/LagLead-Lag Optimize?Walk Time (s) 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0Flash Dont Walk (s) 11.0 11.0 11.0 11.0 11.0 11.0 11.0 11.0Pedestrian Calls (#/hr) 0 0 0 0 0 0 0 0Act Effct Green (s) 34.0 34.0 34.0 34.0 48.0 48.0 48.0 48.0Actuated g/C Ratio 0.38 0.38 0.38 0.38 0.53 0.53 0.53 0.53

06/26/2017

170127 Granwood Subdivision 5:00 pm 06/13/2017 Baseline Synchro 9 ReportPage 2

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRv/c Ratio 0.07 0.20 0.30 0.26 0.12 0.23 0.01 0.38Control Delay 18.8 15.2 21.8 20.1 11.3 9.9 10.0 12.9Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 18.8 15.2 21.8 20.1 11.3 9.9 10.0 12.9LOS B B C C B A A BApproach Delay 15.8 20.8 10.2 12.8Approach LOS B C B BQueue Length 50th (m) 2.8 11.1 16.9 21.3 4.4 14.6 0.5 31.8Queue Length 95th (m) 8.1 23.1 31.1 36.4 10.3 26.3 2.5 50.5Internal Link Dist (m) 162.0 1064.5 177.4 75.7Turn Bay Length (m) 70.0 30.0 90.0 40.0Base Capacity (vph) 347 647 479 709 467 917 624 952Starvation Cap Reductn 0 0 0 0 0 0 0 0Spillback Cap Reductn 0 0 0 0 0 0 0 0Storage Cap Reductn 0 0 0 0 0 0 0 0Reduced v/c Ratio 0.07 0.20 0.30 0.26 0.12 0.23 0.01 0.38

Intersection SummaryArea Type: OtherCycle Length: 90Actuated Cycle Length: 90Offset: 0 (0%), Referenced to phase 2:NBTL and 6:SBTL, Start of GreenNatural Cycle: 50Control Type: PretimedMaximum v/c Ratio: 0.38Intersection Signal Delay: 15.0 Intersection LOS: BIntersection Capacity Utilization 49.2% ICU Level of Service AAnalysis Period (min) 15

Splits and Phases: 1: Wellington Road 7 & Wellington Road 21/McNab Street

Page 112: Grandwood Subdivision – Elora Transportation Impact Study...To the extent that this report is based on information supplied by other parties, Paradigm Transportation Solutions Limited

06/26/2017

170127 Granwood Subdivision 5:00 pm 06/13/2017 Baseline Synchro 9 ReportPage 3

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 24 81 39 131 159 13 50 135 55 6 264 65Future Volume (vph) 24 81 39 131 159 13 50 135 55 6 264 65Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900Total Lost time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Frt 1.00 0.95 1.00 0.99 1.00 0.96 1.00 0.97Flt Protected 0.95 1.00 0.95 1.00 0.95 1.00 0.95 1.00Satd. Flow (prot) 1472 1664 1807 1870 1755 1688 1825 1768Flt Permitted 0.59 1.00 0.67 1.00 0.47 1.00 0.61 1.00Satd. Flow (perm) 918 1664 1268 1870 875 1688 1170 1768Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 26 88 42 142 173 14 54 147 60 7 287 71RTOR Reduction (vph) 0 19 0 0 3 0 0 16 0 0 10 0Lane Group Flow (vph) 26 111 0 142 184 0 54 191 0 7 348 0Heavy Vehicles (%) 24% 6% 18% 1% 1% 9% 4% 10% 6% 0% 6% 3%Turn Type Perm NA Perm NA Perm NA Perm NAProtected Phases 4 8 2 6Permitted Phases 4 8 2 6Actuated Green, G (s) 32.0 32.0 32.0 32.0 46.0 46.0 46.0 46.0Effective Green, g (s) 34.0 34.0 34.0 34.0 48.0 48.0 48.0 48.0Actuated g/C Ratio 0.38 0.38 0.38 0.38 0.53 0.53 0.53 0.53Clearance Time (s) 6.0 6.0 6.0 6.0 6.0 6.0 6.0 6.0Lane Grp Cap (vph) 346 628 479 706 466 900 624 942v/s Ratio Prot 0.07 0.10 0.11 c0.20v/s Ratio Perm 0.03 c0.11 0.06 0.01v/c Ratio 0.08 0.18 0.30 0.26 0.12 0.21 0.01 0.37Uniform Delay, d1 17.9 18.7 19.6 19.3 10.4 11.0 9.9 12.2Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Incremental Delay, d2 0.4 0.6 1.6 0.9 0.5 0.5 0.0 1.1Delay (s) 18.4 19.3 21.2 20.2 11.0 11.6 9.9 13.3Level of Service B B C C B B A BApproach Delay (s) 19.1 20.6 11.5 13.3Approach LOS B C B B

Intersection SummaryHCM 2000 Control Delay 15.8 HCM 2000 Level of Service BHCM 2000 Volume to Capacity ratio 0.34Actuated Cycle Length (s) 90.0 Sum of lost time (s) 8.0Intersection Capacity Utilization 49.2% ICU Level of Service AAnalysis Period (min) 15c Critical Lane Group

06/26/2017

170127 Granwood Subdivision 5:00 pm 06/13/2017 Baseline Synchro 9 ReportPage 4

Lane Group WBL WBR NBT NBR SBL SBTLane ConfigurationsTraffic Volume (vph) 10 37 320 19 46 586Future Volume (vph) 10 37 320 19 46 586Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900Storage Length (m) 0.0 0.0 30.0 0.0Storage Lanes 1 0 1 0Taper Length (m) 2.5 2.5Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00Frt 0.894 0.850Flt Protected 0.989 0.996Satd. Flow (prot) 1310 0 1779 1498 0 1824Flt Permitted 0.989 0.996Satd. Flow (perm) 1310 0 1779 1498 0 1824Link Speed (k/h) 48 48 48Link Distance (m) 92.0 115.2 201.4Travel Time (s) 6.9 8.6 15.1Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 25% 31% 8% 9% 4% 5%Adj. Flow (vph) 11 40 348 21 50 637Shared Lane Traffic (%)Lane Group Flow (vph) 51 0 348 21 0 687Enter Blocked Intersection No No No No No NoLane Alignment Left Right Left Right Left LeftMedian Width(m) 3.7 3.7 3.7Link Offset(m) 0.0 0.0 0.0Crosswalk Width(m) 1.6 1.6 1.6Two way Left Turn LaneHeadway Factor 0.99 0.99 0.99 0.99 0.99 0.99Turning Speed (k/h) 24 14 14 24Sign Control Stop Free Free

Intersection SummaryArea Type: OtherControl Type: UnsignalizedIntersection Capacity Utilization 63.6% ICU Level of Service BAnalysis Period (min) 15

Page 113: Grandwood Subdivision – Elora Transportation Impact Study...To the extent that this report is based on information supplied by other parties, Paradigm Transportation Solutions Limited

06/26/2017

170127 Granwood Subdivision 5:00 pm 06/13/2017 Baseline Synchro 9 ReportPage 5

Movement WBL WBR NBT NBR SBL SBTLane ConfigurationsTraffic Volume (veh/h) 10 37 320 19 46 586Future Volume (Veh/h) 10 37 320 19 46 586Sign Control Stop Free FreeGrade 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 11 40 348 21 50 637PedestriansLane Width (m)Walking Speed (m/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (m) 201pX, platoon unblocked 0.91vC, conflicting volume 1085 348 369vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 1045 348 369tC, single (s) 6.6 6.5 4.1tC, 2 stage (s)tF (s) 3.7 3.6 2.2p0 queue free % 95 94 96cM capacity (veh/h) 200 634 1179

Direction, Lane # WB 1 NB 1 NB 2 SB 1Volume Total 51 348 21 687Volume Left 11 0 0 50Volume Right 40 0 21 0cSH 432 1700 1700 1179Volume to Capacity 0.12 0.20 0.01 0.04Queue Length 95th (m) 3.0 0.0 0.0 1.0Control Delay (s) 14.4 0.0 0.0 1.1Lane LOS B AApproach Delay (s) 14.4 0.0 1.1Approach LOS B

Intersection SummaryAverage Delay 1.4Intersection Capacity Utilization 63.6% ICU Level of Service BAnalysis Period (min) 15

06/26/2017

170127 Granwood Subdivision 5:00 pm 06/13/2017 Baseline Synchro 9 ReportPage 6

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 14 35 16 3 34 13 6 4 0 1 10 5Future Volume (vph) 14 35 16 3 34 13 6 4 0 1 10 5Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Frt 0.967 0.965 0.960Flt Protected 0.989 0.997 0.969 0.997Satd. Flow (prot) 0 1801 0 0 1812 0 0 1825 0 0 1803 0Flt Permitted 0.989 0.997 0.969 0.997Satd. Flow (perm) 0 1801 0 0 1812 0 0 1825 0 0 1803 0Link Speed (k/h) 48 48 48 48Link Distance (m) 92.0 91.8 92.7 102.1Travel Time (s) 6.9 6.9 7.0 7.7Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 15 38 17 3 37 14 7 4 0 1 11 5Shared Lane Traffic (%)Lane Group Flow (vph) 0 70 0 0 54 0 0 11 0 0 17 0Enter Blocked Intersection No No No No No No No No No No No NoLane Alignment Left Left Right Left Left Right Left Left Right Left Left RightMedian Width(m) 0.0 0.0 0.0 0.0Link Offset(m) 0.0 0.0 0.0 0.0Crosswalk Width(m) 1.6 1.6 1.6 1.6Two way Left Turn LaneHeadway Factor 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99Turning Speed (k/h) 24 14 24 14 24 14 24 14Sign Control Free Free Stop Stop

Intersection SummaryArea Type: OtherControl Type: UnsignalizedIntersection Capacity Utilization 17.9% ICU Level of Service AAnalysis Period (min) 15

Page 114: Grandwood Subdivision – Elora Transportation Impact Study...To the extent that this report is based on information supplied by other parties, Paradigm Transportation Solutions Limited

06/26/2017

170127 Granwood Subdivision 5:00 pm 06/13/2017 Baseline Synchro 9 ReportPage 7

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (veh/h) 14 35 16 3 34 13 6 4 0 1 10 5Future Volume (Veh/h) 14 35 16 3 34 13 6 4 0 1 10 5Sign Control Free Free Stop StopGrade 0% 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 15 38 17 3 37 14 7 4 0 1 11 5PedestriansLane Width (m)Walking Speed (m/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (m)pX, platoon unblockedvC, conflicting volume 51 55 137 134 46 128 135 44vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 51 55 137 134 46 128 135 44tC, single (s) 4.1 4.1 7.1 6.5 6.2 7.1 6.5 6.2tC, 2 stage (s)tF (s) 2.2 2.2 3.5 4.0 3.3 3.5 4.0 3.3p0 queue free % 99 100 99 99 100 100 99 100cM capacity (veh/h) 1555 1550 813 748 1023 834 747 1026

Direction, Lane # EB 1 WB 1 NB 1 SB 1Volume Total 70 54 11 17Volume Left 15 3 7 1Volume Right 17 14 0 5cSH 1555 1550 788 817Volume to Capacity 0.01 0.00 0.01 0.02Queue Length 95th (m) 0.2 0.0 0.3 0.5Control Delay (s) 1.6 0.4 9.6 9.5Lane LOS A A A AApproach Delay (s) 1.6 0.4 9.6 9.5Approach LOS A A

Intersection SummaryAverage Delay 2.7Intersection Capacity Utilization 17.9% ICU Level of Service AAnalysis Period (min) 15

06/26/2017

170127 Granwood Subdivision 5:00 pm 06/13/2017 Baseline Synchro 9 ReportPage 8

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 14 6 16 3 9 1 6 4 0 1 10 35Future Volume (vph) 14 6 16 3 9 1 6 4 0 1 10 35Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Ped Bike FactorFrt 0.941 0.990 0.897Flt Protected 0.981 0.989 0.969 0.999Satd. Flow (prot) 0 1407 0 0 1732 0 0 1305 0 0 1681 0Flt Permitted 0.981 0.989 0.969 0.999Satd. Flow (perm) 0 1407 0 0 1732 0 0 1305 0 0 1681 0Link Speed (k/h) 48 48 48 48Link Distance (m) 91.8 278.1 75.3 102.9Travel Time (s) 6.9 20.9 5.6 7.7Confl. Peds. (#/hr) 1 1Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 15% 33% 33% 0% 12% 0% 67% 0% 0% 0% 11% 0%Adj. Flow (vph) 15 7 17 3 10 1 7 4 0 1 11 38Shared Lane Traffic (%)Lane Group Flow (vph) 0 39 0 0 14 0 0 11 0 0 50 0Enter Blocked Intersection No No No No No No No No No No No NoLane Alignment Left Left Right Left Left Right Left Left Right Left Left RightMedian Width(m) 0.0 0.0 0.0 0.0Link Offset(m) 0.0 0.0 0.0 0.0Crosswalk Width(m) 1.6 1.6 1.6 1.6Two way Left Turn LaneHeadway Factor 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99Turning Speed (k/h) 24 14 24 14 24 14 24 14Sign Control Free Free Stop Stop

Intersection SummaryArea Type: OtherControl Type: UnsignalizedIntersection Capacity Utilization 14.2% ICU Level of Service AAnalysis Period (min) 15

Page 115: Grandwood Subdivision – Elora Transportation Impact Study...To the extent that this report is based on information supplied by other parties, Paradigm Transportation Solutions Limited

06/26/2017

170127 Granwood Subdivision 5:00 pm 06/13/2017 Baseline Synchro 9 ReportPage 9

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (veh/h) 14 6 16 3 9 1 6 4 0 1 10 35Future Volume (Veh/h) 14 6 16 3 9 1 6 4 0 1 10 35Sign Control Free Free Stop StopGrade 0% 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 15 7 17 3 10 1 7 4 0 1 11 38Pedestrians 1Lane Width (m) 3.7Walking Speed (m/s) 1.1Percent Blockage 0Right turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (m)pX, platoon unblockedvC, conflicting volume 11 24 106 62 16 64 70 12vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 11 24 106 62 16 64 70 12tC, single (s) 4.2 4.1 7.8 6.5 6.2 7.1 6.6 6.2tC, 2 stage (s)tF (s) 2.3 2.2 4.1 4.0 3.3 3.5 4.1 3.3p0 queue free % 99 100 99 100 100 100 99 96cM capacity (veh/h) 1527 1604 700 822 1070 923 794 1074

Direction, Lane # EB 1 WB 1 NB 1 SB 1Volume Total 39 14 11 50Volume Left 15 3 7 1Volume Right 17 1 0 38cSH 1527 1604 740 994Volume to Capacity 0.01 0.00 0.01 0.05Queue Length 95th (m) 0.2 0.0 0.3 1.2Control Delay (s) 2.9 1.6 9.9 8.8Lane LOS A A A AApproach Delay (s) 2.9 1.6 9.9 8.8Approach LOS A A

Intersection SummaryAverage Delay 6.0Intersection Capacity Utilization 14.2% ICU Level of Service AAnalysis Period (min) 15

06/26/2017

170127 Granwood Subdivision 5:00 pm 06/13/2017 Baseline Synchro 9 ReportPage 10

Lane Group EBL EBR NBL NBT SBT SBRLane ConfigurationsTraffic Volume (vph) 20 10 23 37 19 12Future Volume (vph) 20 10 23 37 19 12Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00Frt 0.955 0.948Flt Protected 0.968 0.981Satd. Flow (prot) 1741 0 0 1848 1786 0Flt Permitted 0.968 0.981Satd. Flow (perm) 1741 0 0 1848 1786 0Link Speed (k/h) 48 48 48Link Distance (m) 1088.5 119.7 61.8Travel Time (s) 81.6 9.0 4.6Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 22 11 25 40 21 13Shared Lane Traffic (%)Lane Group Flow (vph) 33 0 0 65 34 0Enter Blocked Intersection No No No No No NoLane Alignment Left Right Left Left Left RightMedian Width(m) 7.4 0.0 0.0Link Offset(m) 0.0 0.0 0.0Crosswalk Width(m) 4.9 1.6 1.6Two way Left Turn LaneHeadway Factor 0.99 0.99 0.99 0.99 0.99 0.99Turning Speed (k/h) 24 14 24 14Sign Control Stop Free Free

Intersection SummaryArea Type: OtherControl Type: UnsignalizedIntersection Capacity Utilization 19.9% ICU Level of Service AAnalysis Period (min) 15

Page 116: Grandwood Subdivision – Elora Transportation Impact Study...To the extent that this report is based on information supplied by other parties, Paradigm Transportation Solutions Limited

06/26/2017

170127 Granwood Subdivision 5:00 pm 06/13/2017 Baseline Synchro 9 ReportPage 11

Movement EBL EBR NBL NBT SBT SBRLane ConfigurationsTraffic Volume (veh/h) 20 10 23 37 19 12Future Volume (Veh/h) 20 10 23 37 19 12Sign Control Stop Free FreeGrade 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 22 11 25 40 21 13PedestriansLane Width (m)Walking Speed (m/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (m)pX, platoon unblockedvC, conflicting volume 118 28 34vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 118 28 34tC, single (s) 6.4 6.2 4.1tC, 2 stage (s)tF (s) 3.5 3.3 2.2p0 queue free % 97 99 98cM capacity (veh/h) 864 1048 1578

Direction, Lane # EB 1 NB 1 SB 1Volume Total 33 65 34Volume Left 22 25 0Volume Right 11 0 13cSH 918 1578 1700Volume to Capacity 0.04 0.02 0.02Queue Length 95th (m) 0.8 0.4 0.0Control Delay (s) 9.1 2.9 0.0Lane LOS A AApproach Delay (s) 9.1 2.9 0.0Approach LOS A

Intersection SummaryAverage Delay 3.7Intersection Capacity Utilization 19.9% ICU Level of Service AAnalysis Period (min) 15

06/26/2017

170127 Granwood Subdivision 5:00 pm 06/13/2017 Baseline Synchro 9 ReportPage 12

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 23 1 12 1 1 11 4 26 1 4 18 6Future Volume (vph) 23 1 12 1 1 11 4 26 1 4 18 6Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Frt 0.955 0.884 0.996 0.970Flt Protected 0.969 0.996 0.994 0.994Satd. Flow (prot) 0 1720 0 0 1546 0 0 1787 0 0 1604 0Flt Permitted 0.969 0.996 0.994 0.994Satd. Flow (perm) 0 1720 0 0 1546 0 0 1787 0 0 1604 0Link Speed (k/h) 48 48 48 48Link Distance (m) 290.8 201.2 123.6 119.7Travel Time (s) 21.8 15.1 9.3 9.0Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 0% 0% 10% 0% 0% 11% 0% 4% 100% 25% 13% 17%Adj. Flow (vph) 25 1 13 1 1 12 4 28 1 4 20 7Shared Lane Traffic (%)Lane Group Flow (vph) 0 39 0 0 14 0 0 33 0 0 31 0Enter Blocked Intersection No No No No No No No No No No No NoLane Alignment Left Left Right Left Left Right Left Left Right Left Left RightMedian Width(m) 0.0 0.0 0.0 0.0Link Offset(m) 0.0 0.0 0.0 0.0Crosswalk Width(m) 1.6 1.6 1.6 1.6Two way Left Turn LaneHeadway Factor 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99Turning Speed (k/h) 24 14 24 14 24 14 24 14Sign Control Stop Stop Free Free

Intersection SummaryArea Type: OtherControl Type: UnsignalizedIntersection Capacity Utilization 18.7% ICU Level of Service AAnalysis Period (min) 15

Page 117: Grandwood Subdivision – Elora Transportation Impact Study...To the extent that this report is based on information supplied by other parties, Paradigm Transportation Solutions Limited

06/26/2017

170127 Granwood Subdivision 5:00 pm 06/13/2017 Baseline Synchro 9 ReportPage 13

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (veh/h) 23 1 12 1 1 11 4 26 1 4 18 6Future Volume (Veh/h) 23 1 12 1 1 11 4 26 1 4 18 6Sign Control Stop Stop Free FreeGrade 0% 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 25 1 13 1 1 12 4 28 1 4 20 7PedestriansLane Width (m)Walking Speed (m/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (m)pX, platoon unblockedvC, conflicting volume 80 68 24 82 72 28 27 29vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 80 68 24 82 72 28 27 29tC, single (s) 7.1 6.5 6.3 7.1 6.5 6.3 4.1 4.3tC, 2 stage (s)tF (s) 3.5 4.0 3.4 3.5 4.0 3.4 2.2 2.4p0 queue free % 97 100 99 100 100 99 100 100cM capacity (veh/h) 897 822 1030 895 819 1021 1600 1447

Direction, Lane # EB 1 WB 1 NB 1 SB 1Volume Total 39 14 33 31Volume Left 25 1 4 4Volume Right 13 12 1 7cSH 935 994 1600 1447Volume to Capacity 0.04 0.01 0.00 0.00Queue Length 95th (m) 1.0 0.3 0.1 0.1Control Delay (s) 9.0 8.7 0.9 1.0Lane LOS A A A AApproach Delay (s) 9.0 8.7 0.9 1.0Approach LOS A A

Intersection SummaryAverage Delay 4.6Intersection Capacity Utilization 18.7% ICU Level of Service AAnalysis Period (min) 15

Page 118: Grandwood Subdivision – Elora Transportation Impact Study...To the extent that this report is based on information supplied by other parties, Paradigm Transportation Solutions Limited

06/26/2017

170127 Granwood Subdivision 06/13/2017 Baseline Synchro 9 ReportPage 1

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 103 222 58 114 112 16 47 260 164 17 166 47Future Volume (vph) 103 222 58 114 112 16 47 260 164 17 166 47Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900Storage Length (m) 70.0 0.0 30.0 0.0 90.0 0.0 40.0 0.0Storage Lanes 1 0 1 0 1 0 1 0Taper Length (m) 2.5 7.6 2.5 2.5Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Frt 0.969 0.982 0.942 0.967Flt Protected 0.950 0.950 0.950 0.950Satd. Flow (prot) 1807 1825 0 1789 1838 0 1825 1777 0 1825 1743 0Flt Permitted 0.655 0.450 0.587 0.389Satd. Flow (perm) 1246 1825 0 848 1838 0 1128 1777 0 747 1743 0Right Turn on Red Yes Yes Yes YesSatd. Flow (RTOR) 17 9 54 24Link Speed (k/h) 48 48 48 48Link Distance (m) 186.0 1088.5 201.4 99.7Travel Time (s) 14.0 81.6 15.1 7.5Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 1% 2% 2% 2% 3% 0% 0% 3% 0% 0% 7% 5%Adj. Flow (vph) 112 241 63 124 122 17 51 283 178 18 180 51Shared Lane Traffic (%)Lane Group Flow (vph) 112 304 0 124 139 0 51 461 0 18 231 0Enter Blocked Intersection No No No No No No No No No No No NoLane Alignment Left Left Right Left Left Right Left Left Right Left Left RightMedian Width(m) 3.7 3.7 3.7 3.7Link Offset(m) 0.0 0.0 0.0 0.0Crosswalk Width(m) 1.6 4.9 1.6 1.6Two way Left Turn LaneHeadway Factor 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99Turning Speed (k/h) 24 14 24 14 24 14 24 14Turn Type Perm NA Perm NA Perm NA Perm NAProtected Phases 4 8 2 6Permitted Phases 4 8 2 6Minimum Split (s) 24.0 24.0 24.0 24.0 24.0 24.0 24.0 24.0Total Split (s) 38.0 38.0 38.0 38.0 52.0 52.0 52.0 52.0Total Split (%) 42.2% 42.2% 42.2% 42.2% 57.8% 57.8% 57.8% 57.8%Maximum Green (s) 32.0 32.0 32.0 32.0 46.0 46.0 46.0 46.0Yellow Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0All-Red Time (s) 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0Lost Time Adjust (s) -2.0 -2.0 -2.0 -2.0 -2.0 -2.0 -2.0 -2.0Total Lost Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0Lead/LagLead-Lag Optimize?Walk Time (s) 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0Flash Dont Walk (s) 11.0 11.0 11.0 11.0 11.0 11.0 11.0 11.0Pedestrian Calls (#/hr) 0 0 0 0 0 0 0 0Act Effct Green (s) 34.0 34.0 34.0 34.0 48.0 48.0 48.0 48.0Actuated g/C Ratio 0.38 0.38 0.38 0.38 0.53 0.53 0.53 0.53

06/26/2017

170127 Granwood Subdivision 06/13/2017 Baseline Synchro 9 ReportPage 2

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRv/c Ratio 0.24 0.43 0.39 0.20 0.08 0.47 0.05 0.25Control Delay 20.9 22.0 24.9 18.5 10.8 13.4 10.5 10.8Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 20.9 22.0 24.9 18.5 10.8 13.4 10.5 10.8LOS C C C B B B B BApproach Delay 21.7 21.6 13.1 10.8Approach LOS C C B BQueue Length 50th (m) 13.0 36.1 15.3 14.8 4.1 40.8 1.4 17.9Queue Length 95th (m) 25.2 58.0 30.6 27.4 9.5 64.5 4.6 30.7Internal Link Dist (m) 162.0 1064.5 177.4 75.7Turn Bay Length (m) 70.0 30.0 90.0 40.0Base Capacity (vph) 470 700 320 699 601 972 398 940Starvation Cap Reductn 0 0 0 0 0 0 0 0Spillback Cap Reductn 0 0 0 0 0 0 0 0Storage Cap Reductn 0 0 0 0 0 0 0 0Reduced v/c Ratio 0.24 0.43 0.39 0.20 0.08 0.47 0.05 0.25

Intersection SummaryArea Type: OtherCycle Length: 90Actuated Cycle Length: 90Offset: 0 (0%), Referenced to phase 2:NBTL and 6:SBTL, Start of GreenNatural Cycle: 50Control Type: PretimedMaximum v/c Ratio: 0.47Intersection Signal Delay: 16.7 Intersection LOS: BIntersection Capacity Utilization 62.7% ICU Level of Service BAnalysis Period (min) 15

Splits and Phases: 1: Wellington Road 7 & Wellington Road 21/McNab Street

Page 119: Grandwood Subdivision – Elora Transportation Impact Study...To the extent that this report is based on information supplied by other parties, Paradigm Transportation Solutions Limited

06/26/2017

170127 Granwood Subdivision 06/13/2017 Baseline Synchro 9 ReportPage 3

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 103 222 58 114 112 16 47 260 164 17 166 47Future Volume (vph) 103 222 58 114 112 16 47 260 164 17 166 47Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900Total Lost time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Frt 1.00 0.97 1.00 0.98 1.00 0.94 1.00 0.97Flt Protected 0.95 1.00 0.95 1.00 0.95 1.00 0.95 1.00Satd. Flow (prot) 1807 1825 1789 1837 1825 1777 1825 1743Flt Permitted 0.65 1.00 0.45 1.00 0.59 1.00 0.39 1.00Satd. Flow (perm) 1245 1825 848 1837 1127 1777 748 1743Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 112 241 63 124 122 17 51 283 178 18 180 51RTOR Reduction (vph) 0 11 0 0 6 0 0 25 0 0 11 0Lane Group Flow (vph) 112 293 0 124 133 0 51 436 0 18 220 0Heavy Vehicles (%) 1% 2% 2% 2% 3% 0% 0% 3% 0% 0% 7% 5%Turn Type Perm NA Perm NA Perm NA Perm NAProtected Phases 4 8 2 6Permitted Phases 4 8 2 6Actuated Green, G (s) 32.0 32.0 32.0 32.0 46.0 46.0 46.0 46.0Effective Green, g (s) 34.0 34.0 34.0 34.0 48.0 48.0 48.0 48.0Actuated g/C Ratio 0.38 0.38 0.38 0.38 0.53 0.53 0.53 0.53Clearance Time (s) 6.0 6.0 6.0 6.0 6.0 6.0 6.0 6.0Lane Grp Cap (vph) 470 689 320 693 601 947 398 929v/s Ratio Prot c0.16 0.07 c0.25 0.13v/s Ratio Perm 0.09 0.15 0.05 0.02v/c Ratio 0.24 0.43 0.39 0.19 0.08 0.46 0.05 0.24Uniform Delay, d1 19.1 20.8 20.4 18.8 10.3 13.0 10.0 11.2Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Incremental Delay, d2 1.2 1.9 3.5 0.6 0.3 1.6 0.2 0.6Delay (s) 20.3 22.7 23.9 19.4 10.5 14.6 10.3 11.8Level of Service C C C B B B B BApproach Delay (s) 22.1 21.5 14.2 11.7Approach LOS C C B B

Intersection SummaryHCM 2000 Control Delay 17.4 HCM 2000 Level of Service BHCM 2000 Volume to Capacity ratio 0.45Actuated Cycle Length (s) 90.0 Sum of lost time (s) 8.0Intersection Capacity Utilization 62.7% ICU Level of Service BAnalysis Period (min) 15c Critical Lane Group

06/26/2017

170127 Granwood Subdivision 06/13/2017 Baseline Synchro 9 ReportPage 4

Lane Group WBL WBR NBT NBR SBL SBTLane ConfigurationsTraffic Volume (vph) 11 33 591 19 10 421Future Volume (vph) 11 33 591 19 10 421Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900Storage Length (m) 0.0 0.0 30.0 0.0Storage Lanes 1 0 1 0Taper Length (m) 2.5 2.5Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00Frt 0.899 0.850Flt Protected 0.988 0.999Satd. Flow (prot) 1629 0 1865 1471 0 1809Flt Permitted 0.988 0.999Satd. Flow (perm) 1629 0 1865 1471 0 1809Link Speed (k/h) 48 48 48Link Distance (m) 92.0 115.2 201.4Travel Time (s) 6.9 8.6 15.1Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 10% 3% 3% 11% 11% 6%Adj. Flow (vph) 12 36 642 21 11 458Shared Lane Traffic (%)Lane Group Flow (vph) 48 0 642 21 0 469Enter Blocked Intersection No No No No No NoLane Alignment Left Right Left Right Left LeftMedian Width(m) 3.7 3.7 3.7Link Offset(m) 0.0 0.0 0.0Crosswalk Width(m) 1.6 1.6 1.6Two way Left Turn LaneHeadway Factor 0.99 0.99 0.99 0.99 0.99 0.99Turning Speed (k/h) 24 14 14 24Sign Control Stop Free Free

Intersection SummaryArea Type: OtherControl Type: UnsignalizedIntersection Capacity Utilization 41.1% ICU Level of Service AAnalysis Period (min) 15

Page 120: Grandwood Subdivision – Elora Transportation Impact Study...To the extent that this report is based on information supplied by other parties, Paradigm Transportation Solutions Limited

06/26/2017

170127 Granwood Subdivision 06/13/2017 Baseline Synchro 9 ReportPage 5

Movement WBL WBR NBT NBR SBL SBTLane ConfigurationsTraffic Volume (veh/h) 11 33 591 19 10 421Future Volume (Veh/h) 11 33 591 19 10 421Sign Control Stop Free FreeGrade 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 12 36 642 21 11 458PedestriansLane Width (m)Walking Speed (m/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (m) 201pX, platoon unblocked 0.99vC, conflicting volume 1122 642 663vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 1120 642 663tC, single (s) 6.5 6.2 4.2tC, 2 stage (s)tF (s) 3.6 3.3 2.3p0 queue free % 94 92 99cM capacity (veh/h) 216 472 885

Direction, Lane # WB 1 NB 1 NB 2 SB 1Volume Total 48 642 21 469Volume Left 12 0 0 11Volume Right 36 0 21 0cSH 365 1700 1700 885Volume to Capacity 0.13 0.38 0.01 0.01Queue Length 95th (m) 3.4 0.0 0.0 0.3Control Delay (s) 16.4 0.0 0.0 0.4Lane LOS C AApproach Delay (s) 16.4 0.0 0.4Approach LOS C

Intersection SummaryAverage Delay 0.8Intersection Capacity Utilization 41.1% ICU Level of Service AAnalysis Period (min) 15

06/26/2017

170127 Granwood Subdivision 06/13/2017 Baseline Synchro 9 ReportPage 6

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 5 18 5 9 14 13 16 18 3 13 8 14Future Volume (vph) 5 18 5 9 14 13 16 18 3 13 8 14Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Frt 0.977 0.952 0.990 0.947Flt Protected 0.992 0.987 0.979 0.982Satd. Flow (prot) 0 1825 0 0 1770 0 0 1825 0 0 1752 0Flt Permitted 0.992 0.987 0.979 0.982Satd. Flow (perm) 0 1825 0 0 1770 0 0 1825 0 0 1752 0Link Speed (k/h) 48 48 48 48Link Distance (m) 92.0 91.8 92.7 102.1Travel Time (s) 6.9 6.9 7.0 7.7Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 5 20 5 10 15 14 17 20 3 14 9 15Shared Lane Traffic (%)Lane Group Flow (vph) 0 30 0 0 39 0 0 40 0 0 38 0Enter Blocked Intersection No No No No No No No No No No No NoLane Alignment Left Left Right Left Left Right Left Left Right Left Left RightMedian Width(m) 0.0 0.0 0.0 0.0Link Offset(m) 0.0 0.0 0.0 0.0Crosswalk Width(m) 1.6 1.6 1.6 1.6Two way Left Turn LaneHeadway Factor 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99Turning Speed (k/h) 24 14 24 14 24 14 24 14Sign Control Free Free Stop Stop

Intersection SummaryArea Type: OtherControl Type: UnsignalizedIntersection Capacity Utilization 13.3% ICU Level of Service AAnalysis Period (min) 15

Page 121: Grandwood Subdivision – Elora Transportation Impact Study...To the extent that this report is based on information supplied by other parties, Paradigm Transportation Solutions Limited

06/26/2017

170127 Granwood Subdivision 06/13/2017 Baseline Synchro 9 ReportPage 7

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (veh/h) 5 18 5 9 14 13 16 18 3 13 8 14Future Volume (Veh/h) 5 18 5 9 14 13 16 18 3 13 8 14Sign Control Free Free Stop StopGrade 0% 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 5 20 5 10 15 14 17 20 3 14 9 15PedestriansLane Width (m)Walking Speed (m/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (m)pX, platoon unblockedvC, conflicting volume 29 25 94 82 22 88 77 22vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 29 25 94 82 22 88 77 22tC, single (s) 4.1 4.1 7.1 6.5 6.2 7.1 6.5 6.2tC, 2 stage (s)tF (s) 2.2 2.2 3.5 4.0 3.3 3.5 4.0 3.3p0 queue free % 100 99 98 98 100 98 99 99cM capacity (veh/h) 1584 1589 863 801 1054 872 806 1055

Direction, Lane # EB 1 WB 1 NB 1 SB 1Volume Total 30 39 40 38Volume Left 5 10 17 14Volume Right 5 14 3 15cSH 1584 1589 842 917Volume to Capacity 0.00 0.01 0.05 0.04Queue Length 95th (m) 0.1 0.1 1.1 1.0Control Delay (s) 1.2 1.9 9.5 9.1Lane LOS A A A AApproach Delay (s) 1.2 1.9 9.5 9.1Approach LOS A A

Intersection SummaryAverage Delay 5.7Intersection Capacity Utilization 13.3% ICU Level of Service AAnalysis Period (min) 15

06/26/2017

170127 Granwood Subdivision 06/13/2017 Baseline Synchro 9 ReportPage 8

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 23 8 4 0 5 4 18 18 1 3 8 12Future Volume (vph) 23 8 4 0 5 4 18 18 1 3 8 12Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Ped Bike FactorFrt 0.986 0.940 0.997 0.930Flt Protected 0.968 0.976 0.994Satd. Flow (prot) 0 1775 0 0 1625 0 0 1816 0 0 1538 0Flt Permitted 0.968 0.976 0.994Satd. Flow (perm) 0 1775 0 0 1625 0 0 1816 0 0 1538 0Link Speed (k/h) 48 48 48 48Link Distance (m) 91.8 278.1 75.3 102.9Travel Time (s) 6.9 20.9 5.6 7.7Confl. Peds. (#/hr) 1 1Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 5% 0% 0% 0% 0% 25% 6% 0% 0% 0% 43% 0%Adj. Flow (vph) 25 9 4 0 5 4 20 20 1 3 9 13Shared Lane Traffic (%)Lane Group Flow (vph) 0 38 0 0 9 0 0 41 0 0 25 0Enter Blocked Intersection No No No No No No No No No No No NoLane Alignment Left Left Right Left Left Right Left Left Right Left Left RightMedian Width(m) 0.0 0.0 0.0 0.0Link Offset(m) 0.0 0.0 0.0 0.0Crosswalk Width(m) 1.6 1.6 1.6 1.6Two way Left Turn LaneHeadway Factor 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99Turning Speed (k/h) 24 14 24 14 24 14 24 14Sign Control Free Free Stop Stop

Intersection SummaryArea Type: OtherControl Type: UnsignalizedIntersection Capacity Utilization 21.0% ICU Level of Service AAnalysis Period (min) 15

Page 122: Grandwood Subdivision – Elora Transportation Impact Study...To the extent that this report is based on information supplied by other parties, Paradigm Transportation Solutions Limited

06/26/2017

170127 Granwood Subdivision 06/13/2017 Baseline Synchro 9 ReportPage 9

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (veh/h) 23 8 4 0 5 4 18 18 1 3 8 12Future Volume (Veh/h) 23 8 4 0 5 4 18 18 1 3 8 12Sign Control Free Free Stop StopGrade 0% 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 25 9 4 0 5 4 20 20 1 3 9 13Pedestrians 1Lane Width (m) 3.7Walking Speed (m/s) 1.1Percent Blockage 0Right turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (m)pX, platoon unblockedvC, conflicting volume 9 13 86 70 12 80 70 7vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 9 13 86 70 12 80 70 7tC, single (s) 4.1 4.1 7.2 6.5 6.2 7.1 6.9 6.2tC, 2 stage (s)tF (s) 2.2 2.2 3.6 4.0 3.3 3.5 4.4 3.3p0 queue free % 98 100 98 98 100 100 99 99cM capacity (veh/h) 1591 1619 862 811 1073 883 736 1081

Direction, Lane # EB 1 WB 1 NB 1 SB 1Volume Total 38 9 41 25Volume Left 25 0 20 3Volume Right 4 4 1 13cSH 1591 1619 840 905Volume to Capacity 0.02 0.00 0.05 0.03Queue Length 95th (m) 0.4 0.0 1.2 0.6Control Delay (s) 4.8 0.0 9.5 9.1Lane LOS A A AApproach Delay (s) 4.8 0.0 9.5 9.1Approach LOS A A

Intersection SummaryAverage Delay 7.1Intersection Capacity Utilization 21.0% ICU Level of Service AAnalysis Period (min) 15

06/26/2017

170127 Granwood Subdivision 06/13/2017 Baseline Synchro 9 ReportPage 10

Lane Group EBL EBR NBL NBT SBT SBRLane ConfigurationsTraffic Volume (vph) 5 43 4 44 23 17Future Volume (vph) 5 43 4 44 23 17Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00Frt 0.878 0.943Flt Protected 0.995 0.996Satd. Flow (prot) 1645 0 0 1876 1776 0Flt Permitted 0.995 0.996Satd. Flow (perm) 1645 0 0 1876 1776 0Link Speed (k/h) 48 48 48Link Distance (m) 1088.5 119.7 61.8Travel Time (s) 81.6 9.0 4.6Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 5 47 4 48 25 18Shared Lane Traffic (%)Lane Group Flow (vph) 52 0 0 52 43 0Enter Blocked Intersection No No No No No NoLane Alignment Left Right Left Left Left RightMedian Width(m) 7.4 0.0 0.0Link Offset(m) 0.0 0.0 0.0Crosswalk Width(m) 4.9 1.6 1.6Two way Left Turn LaneHeadway Factor 0.99 0.99 0.99 0.99 0.99 0.99Turning Speed (k/h) 24 14 24 14Sign Control Stop Free Free

Intersection SummaryArea Type: OtherControl Type: UnsignalizedIntersection Capacity Utilization 15.6% ICU Level of Service AAnalysis Period (min) 15

Page 123: Grandwood Subdivision – Elora Transportation Impact Study...To the extent that this report is based on information supplied by other parties, Paradigm Transportation Solutions Limited

06/26/2017

170127 Granwood Subdivision 06/13/2017 Baseline Synchro 9 ReportPage 11

Movement EBL EBR NBL NBT SBT SBRLane ConfigurationsTraffic Volume (veh/h) 5 43 4 44 23 17Future Volume (Veh/h) 5 43 4 44 23 17Sign Control Stop Free FreeGrade 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 5 47 4 48 25 18PedestriansLane Width (m)Walking Speed (m/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (m)pX, platoon unblockedvC, conflicting volume 90 34 43vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 90 34 43tC, single (s) 6.4 6.2 4.1tC, 2 stage (s)tF (s) 3.5 3.3 2.2p0 queue free % 99 95 100cM capacity (veh/h) 908 1039 1566

Direction, Lane # EB 1 NB 1 SB 1Volume Total 52 52 43Volume Left 5 4 0Volume Right 47 0 18cSH 1025 1566 1700Volume to Capacity 0.05 0.00 0.03Queue Length 95th (m) 1.2 0.1 0.0Control Delay (s) 8.7 0.6 0.0Lane LOS A AApproach Delay (s) 8.7 0.6 0.0Approach LOS A

Intersection SummaryAverage Delay 3.3Intersection Capacity Utilization 15.6% ICU Level of Service AAnalysis Period (min) 15

06/26/2017

170127 Granwood Subdivision 06/13/2017 Baseline Synchro 9 ReportPage 12

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 11 1 11 3 2 10 11 29 5 14 35 16Future Volume (vph) 11 1 11 3 2 10 11 29 5 14 35 16Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Frt 0.935 0.907 0.986 0.967Flt Protected 0.977 0.991 0.988 0.989Satd. Flow (prot) 0 1594 0 0 1400 0 0 1824 0 0 1751 0Flt Permitted 0.977 0.991 0.988 0.989Satd. Flow (perm) 0 1594 0 0 1400 0 0 1824 0 0 1751 0Link Speed (k/h) 48 48 48 48Link Distance (m) 290.8 201.2 123.6 119.7Travel Time (s) 21.8 15.1 9.3 9.0Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 11% 0% 10% 33% 0% 25% 0% 4% 0% 0% 6% 7%Adj. Flow (vph) 12 1 12 3 2 11 12 32 5 15 38 17Shared Lane Traffic (%)Lane Group Flow (vph) 0 25 0 0 16 0 0 49 0 0 70 0Enter Blocked Intersection No No No No No No No No No No No NoLane Alignment Left Left Right Left Left Right Left Left Right Left Left RightMedian Width(m) 0.0 0.0 0.0 0.0Link Offset(m) 0.0 0.0 0.0 0.0Crosswalk Width(m) 1.6 1.6 1.6 1.6Two way Left Turn LaneHeadway Factor 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99Turning Speed (k/h) 24 14 24 14 24 14 24 14Sign Control Stop Stop Free Free

Intersection SummaryArea Type: OtherControl Type: UnsignalizedIntersection Capacity Utilization 14.6% ICU Level of Service AAnalysis Period (min) 15

Page 124: Grandwood Subdivision – Elora Transportation Impact Study...To the extent that this report is based on information supplied by other parties, Paradigm Transportation Solutions Limited

06/26/2017

170127 Granwood Subdivision 06/13/2017 Baseline Synchro 9 ReportPage 13

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (veh/h) 11 1 11 3 2 10 11 29 5 14 35 16Future Volume (Veh/h) 11 1 11 3 2 10 11 29 5 14 35 16Sign Control Stop Stop Free FreeGrade 0% 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 12 1 12 3 2 11 12 32 5 15 38 17PedestriansLane Width (m)Walking Speed (m/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (m)pX, platoon unblockedvC, conflicting volume 147 138 46 148 144 34 55 37vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 147 138 46 148 144 34 55 37tC, single (s) 7.2 6.5 6.3 7.4 6.5 6.5 4.1 4.1tC, 2 stage (s)tF (s) 3.6 4.0 3.4 3.8 4.0 3.5 2.2 2.2p0 queue free % 98 100 99 100 100 99 99 99cM capacity (veh/h) 780 744 1001 736 739 976 1563 1587

Direction, Lane # EB 1 WB 1 NB 1 SB 1Volume Total 25 16 49 70Volume Left 12 3 12 15Volume Right 12 11 5 17cSH 871 886 1563 1587Volume to Capacity 0.03 0.02 0.01 0.01Queue Length 95th (m) 0.7 0.4 0.2 0.2Control Delay (s) 9.3 9.1 1.8 1.6Lane LOS A A A AApproach Delay (s) 9.3 9.1 1.8 1.6Approach LOS A A

Intersection SummaryAverage Delay 3.6Intersection Capacity Utilization 14.6% ICU Level of Service AAnalysis Period (min) 15

Page 125: Grandwood Subdivision – Elora Transportation Impact Study...To the extent that this report is based on information supplied by other parties, Paradigm Transportation Solutions Limited

06/26/2017

170127 Granwood Subdivision 5:00 pm 06/13/2017 Baseline Synchro 9 ReportPage 1

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 27 124 44 160 283 49 57 168 66 23 297 74Future Volume (vph) 27 124 44 160 283 49 57 168 66 23 297 74Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900Storage Length (m) 70.0 0.0 30.0 0.0 90.0 0.0 40.0 0.0Storage Lanes 1 0 1 0 1 0 1 0Taper Length (m) 2.5 7.6 2.5 2.5Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Frt 0.961 0.978 0.958 0.970Flt Protected 0.950 0.950 0.950 0.950Satd. Flow (prot) 1472 1691 0 1807 1839 0 1755 1690 0 1825 1768 0Flt Permitted 0.384 0.598 0.436 0.565Satd. Flow (perm) 595 1691 0 1137 1839 0 805 1690 0 1085 1768 0Right Turn on Red Yes Yes Yes YesSatd. Flow (RTOR) 23 11 34 21Link Speed (k/h) 48 48 48 48Link Distance (m) 186.0 1088.5 201.4 99.7Travel Time (s) 14.0 81.6 15.1 7.5Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 24% 6% 18% 1% 1% 9% 4% 10% 6% 0% 6% 3%Adj. Flow (vph) 29 135 48 174 308 53 62 183 72 25 323 80Shared Lane Traffic (%)Lane Group Flow (vph) 29 183 0 174 361 0 62 255 0 25 403 0Enter Blocked Intersection No No No No No No No No No No No NoLane Alignment Left Left Right Left Left Right Left Left Right Left Left RightMedian Width(m) 3.7 3.7 3.7 3.7Link Offset(m) 0.0 0.0 0.0 0.0Crosswalk Width(m) 1.6 4.9 1.6 1.6Two way Left Turn LaneHeadway Factor 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99Turning Speed (k/h) 24 14 24 14 24 14 24 14Turn Type Perm NA Perm NA Perm NA Perm NAProtected Phases 4 8 2 6Permitted Phases 4 8 2 6Minimum Split (s) 24.0 24.0 24.0 24.0 24.0 24.0 24.0 24.0Total Split (s) 38.0 38.0 38.0 38.0 52.0 52.0 52.0 52.0Total Split (%) 42.2% 42.2% 42.2% 42.2% 57.8% 57.8% 57.8% 57.8%Maximum Green (s) 32.0 32.0 32.0 32.0 46.0 46.0 46.0 46.0Yellow Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0All-Red Time (s) 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0Lost Time Adjust (s) -2.0 -2.0 -2.0 -2.0 -2.0 -2.0 -2.0 -2.0Total Lost Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0Lead/LagLead-Lag Optimize?Walk Time (s) 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0Flash Dont Walk (s) 11.0 11.0 11.0 11.0 11.0 11.0 11.0 11.0Pedestrian Calls (#/hr) 0 0 0 0 0 0 0 0Act Effct Green (s) 34.0 34.0 34.0 34.0 48.0 48.0 48.0 48.0Actuated g/C Ratio 0.38 0.38 0.38 0.38 0.53 0.53 0.53 0.53

06/26/2017

170127 Granwood Subdivision 5:00 pm 06/13/2017 Baseline Synchro 9 ReportPage 2

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRv/c Ratio 0.13 0.28 0.41 0.51 0.14 0.28 0.04 0.42Control Delay 20.3 18.3 24.2 24.1 11.8 10.8 10.4 13.6Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 20.3 18.3 24.2 24.1 11.8 10.8 10.4 13.6LOS C B C C B B B BApproach Delay 18.6 24.1 11.0 13.4Approach LOS B C B BQueue Length 50th (m) 3.2 18.7 21.7 45.8 5.1 19.3 1.9 37.3Queue Length 95th (m) 9.4 34.0 39.2 71.4 11.8 33.3 5.6 58.1Internal Link Dist (m) 162.0 1064.5 177.4 75.7Turn Bay Length (m) 70.0 30.0 90.0 40.0Base Capacity (vph) 224 653 429 701 429 917 578 952Starvation Cap Reductn 0 0 0 0 0 0 0 0Spillback Cap Reductn 0 0 0 0 0 0 0 0Storage Cap Reductn 0 0 0 0 0 0 0 0Reduced v/c Ratio 0.13 0.28 0.41 0.51 0.14 0.28 0.04 0.42

Intersection SummaryArea Type: OtherCycle Length: 90Actuated Cycle Length: 90Offset: 0 (0%), Referenced to phase 2:NBTL and 6:SBTL, Start of GreenNatural Cycle: 50Control Type: PretimedMaximum v/c Ratio: 0.51Intersection Signal Delay: 17.5 Intersection LOS: BIntersection Capacity Utilization 59.7% ICU Level of Service BAnalysis Period (min) 15

Splits and Phases: 1: Wellington Road 7 & Wellington Road 21/McNab Street

Page 126: Grandwood Subdivision – Elora Transportation Impact Study...To the extent that this report is based on information supplied by other parties, Paradigm Transportation Solutions Limited

06/26/2017

170127 Granwood Subdivision 5:00 pm 06/13/2017 Baseline Synchro 9 ReportPage 3

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 27 124 44 160 283 49 57 168 66 23 297 74Future Volume (vph) 27 124 44 160 283 49 57 168 66 23 297 74Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900Total Lost time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Frt 1.00 0.96 1.00 0.98 1.00 0.96 1.00 0.97Flt Protected 0.95 1.00 0.95 1.00 0.95 1.00 0.95 1.00Satd. Flow (prot) 1472 1691 1807 1839 1755 1690 1825 1768Flt Permitted 0.38 1.00 0.60 1.00 0.44 1.00 0.56 1.00Satd. Flow (perm) 596 1691 1137 1839 806 1690 1085 1768Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 29 135 48 174 308 53 62 183 72 25 323 80RTOR Reduction (vph) 0 14 0 0 7 0 0 16 0 0 10 0Lane Group Flow (vph) 29 169 0 174 354 0 62 239 0 25 393 0Heavy Vehicles (%) 24% 6% 18% 1% 1% 9% 4% 10% 6% 0% 6% 3%Turn Type Perm NA Perm NA Perm NA Perm NAProtected Phases 4 8 2 6Permitted Phases 4 8 2 6Actuated Green, G (s) 32.0 32.0 32.0 32.0 46.0 46.0 46.0 46.0Effective Green, g (s) 34.0 34.0 34.0 34.0 48.0 48.0 48.0 48.0Actuated g/C Ratio 0.38 0.38 0.38 0.38 0.53 0.53 0.53 0.53Clearance Time (s) 6.0 6.0 6.0 6.0 6.0 6.0 6.0 6.0Lane Grp Cap (vph) 225 638 429 694 429 901 578 942v/s Ratio Prot 0.10 c0.19 0.14 c0.22v/s Ratio Perm 0.05 0.15 0.08 0.02v/c Ratio 0.13 0.26 0.41 0.51 0.14 0.27 0.04 0.42Uniform Delay, d1 18.3 19.4 20.6 21.6 10.6 11.4 10.0 12.6Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Incremental Delay, d2 1.2 1.0 2.8 2.7 0.7 0.7 0.1 1.4Delay (s) 19.5 20.4 23.4 24.3 11.3 12.1 10.2 14.0Level of Service B C C C B B B BApproach Delay (s) 20.2 24.0 12.0 13.7Approach LOS C C B B

Intersection SummaryHCM 2000 Control Delay 18.0 HCM 2000 Level of Service BHCM 2000 Volume to Capacity ratio 0.46Actuated Cycle Length (s) 90.0 Sum of lost time (s) 8.0Intersection Capacity Utilization 59.7% ICU Level of Service BAnalysis Period (min) 15c Critical Lane Group

06/26/2017

170127 Granwood Subdivision 5:00 pm 06/13/2017 Baseline Synchro 9 ReportPage 4

Lane Group WBL WBR NBT NBR SBL SBTLane ConfigurationsTraffic Volume (vph) 11 41 380 22 52 673Future Volume (vph) 11 41 380 22 52 673Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900Storage Length (m) 0.0 0.0 30.0 0.0Storage Lanes 1 0 1 0Taper Length (m) 2.5 2.5Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00Frt 0.893 0.850Flt Protected 0.990 0.996Satd. Flow (prot) 1309 0 1779 1498 0 1824Flt Permitted 0.990 0.996Satd. Flow (perm) 1309 0 1779 1498 0 1824Link Speed (k/h) 48 48 48Link Distance (m) 92.0 115.2 201.4Travel Time (s) 6.9 8.6 15.1Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 25% 31% 8% 9% 4% 5%Adj. Flow (vph) 12 45 413 24 57 732Shared Lane Traffic (%)Lane Group Flow (vph) 57 0 413 24 0 789Enter Blocked Intersection No No No No No NoLane Alignment Left Right Left Right Left LeftMedian Width(m) 3.7 3.7 3.7Link Offset(m) 0.0 0.0 0.0Crosswalk Width(m) 1.6 1.6 1.6Two way Left Turn LaneHeadway Factor 0.99 0.99 0.99 0.99 0.99 0.99Turning Speed (k/h) 24 14 14 24Sign Control Stop Free Free

Intersection SummaryArea Type: OtherControl Type: UnsignalizedIntersection Capacity Utilization 71.6% ICU Level of Service CAnalysis Period (min) 15

Page 127: Grandwood Subdivision – Elora Transportation Impact Study...To the extent that this report is based on information supplied by other parties, Paradigm Transportation Solutions Limited

06/26/2017

170127 Granwood Subdivision 5:00 pm 06/13/2017 Baseline Synchro 9 ReportPage 5

Movement WBL WBR NBT NBR SBL SBTLane ConfigurationsTraffic Volume (veh/h) 11 41 380 22 52 673Future Volume (Veh/h) 11 41 380 22 52 673Sign Control Stop Free FreeGrade 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 12 45 413 24 57 732PedestriansLane Width (m)Walking Speed (m/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (m) 201pX, platoon unblocked 0.87vC, conflicting volume 1259 413 437vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 1222 413 437tC, single (s) 6.6 6.5 4.1tC, 2 stage (s)tF (s) 3.7 3.6 2.2p0 queue free % 92 92 95cM capacity (veh/h) 147 581 1112

Direction, Lane # WB 1 NB 1 NB 2 SB 1Volume Total 57 413 24 789Volume Left 12 0 0 57Volume Right 45 0 24 0cSH 358 1700 1700 1112Volume to Capacity 0.16 0.24 0.01 0.05Queue Length 95th (m) 4.3 0.0 0.0 1.2Control Delay (s) 17.0 0.0 0.0 1.3Lane LOS C AApproach Delay (s) 17.0 0.0 1.3Approach LOS C

Intersection SummaryAverage Delay 1.6Intersection Capacity Utilization 71.6% ICU Level of Service CAnalysis Period (min) 15

06/26/2017

170127 Granwood Subdivision 5:00 pm 06/13/2017 Baseline Synchro 9 ReportPage 6

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 16 40 18 4 39 15 7 5 0 1 11 6Future Volume (vph) 16 40 18 4 39 15 7 5 0 1 11 6Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Frt 0.966 0.965 0.953Flt Protected 0.989 0.997 0.970 0.998Satd. Flow (prot) 0 1799 0 0 1812 0 0 1827 0 0 1791 0Flt Permitted 0.989 0.997 0.970 0.998Satd. Flow (perm) 0 1799 0 0 1812 0 0 1827 0 0 1791 0Link Speed (k/h) 48 48 48 48Link Distance (m) 92.0 91.8 92.7 102.1Travel Time (s) 6.9 6.9 7.0 7.7Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 17 43 20 4 42 16 8 5 0 1 12 7Shared Lane Traffic (%)Lane Group Flow (vph) 0 80 0 0 62 0 0 13 0 0 20 0Enter Blocked Intersection No No No No No No No No No No No NoLane Alignment Left Left Right Left Left Right Left Left Right Left Left RightMedian Width(m) 0.0 0.0 0.0 0.0Link Offset(m) 0.0 0.0 0.0 0.0Crosswalk Width(m) 1.6 1.6 1.6 1.6Two way Left Turn LaneHeadway Factor 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99Turning Speed (k/h) 24 14 24 14 24 14 24 14Sign Control Free Free Stop Stop

Intersection SummaryArea Type: OtherControl Type: UnsignalizedIntersection Capacity Utilization 18.5% ICU Level of Service AAnalysis Period (min) 15

Page 128: Grandwood Subdivision – Elora Transportation Impact Study...To the extent that this report is based on information supplied by other parties, Paradigm Transportation Solutions Limited

06/26/2017

170127 Granwood Subdivision 5:00 pm 06/13/2017 Baseline Synchro 9 ReportPage 7

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (veh/h) 16 40 18 4 39 15 7 5 0 1 11 6Future Volume (Veh/h) 16 40 18 4 39 15 7 5 0 1 11 6Sign Control Free Free Stop StopGrade 0% 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 17 43 20 4 42 16 8 5 0 1 12 7PedestriansLane Width (m)Walking Speed (m/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (m)pX, platoon unblockedvC, conflicting volume 58 63 158 153 53 148 155 50vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 58 63 158 153 53 148 155 50tC, single (s) 4.1 4.1 7.1 6.5 6.2 7.1 6.5 6.2tC, 2 stage (s)tF (s) 2.2 2.2 3.5 4.0 3.3 3.5 4.0 3.3p0 queue free % 99 100 99 99 100 100 98 99cM capacity (veh/h) 1546 1540 784 729 1014 808 727 1018

Direction, Lane # EB 1 WB 1 NB 1 SB 1Volume Total 80 62 13 20Volume Left 17 4 8 1Volume Right 20 16 0 7cSH 1546 1540 762 812Volume to Capacity 0.01 0.00 0.02 0.02Queue Length 95th (m) 0.3 0.1 0.4 0.6Control Delay (s) 1.6 0.5 9.8 9.5Lane LOS A A A AApproach Delay (s) 1.6 0.5 9.8 9.5Approach LOS A A

Intersection SummaryAverage Delay 2.7Intersection Capacity Utilization 18.5% ICU Level of Service AAnalysis Period (min) 15

06/26/2017

170127 Granwood Subdivision 5:00 pm 06/13/2017 Baseline Synchro 9 ReportPage 8

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 16 7 18 4 10 1 7 5 0 1 11 40Future Volume (vph) 16 7 18 4 10 1 7 5 0 1 11 40Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Ped Bike FactorFrt 0.940 0.992 0.896Flt Protected 0.981 0.988 0.970 0.999Satd. Flow (prot) 0 1404 0 0 1739 0 0 1319 0 0 1680 0Flt Permitted 0.981 0.988 0.970 0.999Satd. Flow (perm) 0 1404 0 0 1739 0 0 1319 0 0 1680 0Link Speed (k/h) 48 48 48 48Link Distance (m) 91.8 278.1 75.3 102.9Travel Time (s) 6.9 20.9 5.6 7.7Confl. Peds. (#/hr) 1 1Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 15% 33% 33% 0% 12% 0% 67% 0% 0% 0% 11% 0%Adj. Flow (vph) 17 8 20 4 11 1 8 5 0 1 12 43Shared Lane Traffic (%)Lane Group Flow (vph) 0 45 0 0 16 0 0 13 0 0 56 0Enter Blocked Intersection No No No No No No No No No No No NoLane Alignment Left Left Right Left Left Right Left Left Right Left Left RightMedian Width(m) 0.0 0.0 0.0 0.0Link Offset(m) 0.0 0.0 0.0 0.0Crosswalk Width(m) 1.6 1.6 1.6 1.6Two way Left Turn LaneHeadway Factor 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99Turning Speed (k/h) 24 14 24 14 24 14 24 14Sign Control Free Free Stop Stop

Intersection SummaryArea Type: OtherControl Type: UnsignalizedIntersection Capacity Utilization 15.2% ICU Level of Service AAnalysis Period (min) 15

Page 129: Grandwood Subdivision – Elora Transportation Impact Study...To the extent that this report is based on information supplied by other parties, Paradigm Transportation Solutions Limited

06/26/2017

170127 Granwood Subdivision 5:00 pm 06/13/2017 Baseline Synchro 9 ReportPage 9

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (veh/h) 16 7 18 4 10 1 7 5 0 1 11 40Future Volume (Veh/h) 16 7 18 4 10 1 7 5 0 1 11 40Sign Control Free Free Stop StopGrade 0% 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 17 8 20 4 11 1 8 5 0 1 12 43Pedestrians 1Lane Width (m) 3.7Walking Speed (m/s) 1.1Percent Blockage 0Right turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (m)pX, platoon unblockedvC, conflicting volume 12 28 122 72 18 74 82 12vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 12 28 122 72 18 74 82 12tC, single (s) 4.2 4.1 7.8 6.5 6.2 7.1 6.6 6.2tC, 2 stage (s)tF (s) 2.3 2.2 4.1 4.0 3.3 3.5 4.1 3.3p0 queue free % 99 100 99 99 100 100 98 96cM capacity (veh/h) 1526 1599 678 811 1066 907 781 1073

Direction, Lane # EB 1 WB 1 NB 1 SB 1Volume Total 45 16 13 56Volume Left 17 4 8 1Volume Right 20 1 0 43cSH 1526 1599 724 990Volume to Capacity 0.01 0.00 0.02 0.06Queue Length 95th (m) 0.3 0.1 0.4 1.4Control Delay (s) 2.8 1.8 10.1 8.9Lane LOS A A B AApproach Delay (s) 2.8 1.8 10.1 8.9Approach LOS B A

Intersection SummaryAverage Delay 6.0Intersection Capacity Utilization 15.2% ICU Level of Service AAnalysis Period (min) 15

06/26/2017

170127 Granwood Subdivision 5:00 pm 06/13/2017 Baseline Synchro 9 ReportPage 10

Lane Group EBL EBR NBL NBT SBT SBRLane ConfigurationsTraffic Volume (vph) 23 39 108 54 26 13Future Volume (vph) 23 39 108 54 26 13Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00Frt 0.915 0.955Flt Protected 0.982 0.968Satd. Flow (prot) 1692 0 0 1823 1799 0Flt Permitted 0.982 0.968Satd. Flow (perm) 1692 0 0 1823 1799 0Link Speed (k/h) 48 48 48Link Distance (m) 1088.5 119.7 61.8Travel Time (s) 81.6 9.0 4.6Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 25 42 117 59 28 14Shared Lane Traffic (%)Lane Group Flow (vph) 67 0 0 176 42 0Enter Blocked Intersection No No No No No NoLane Alignment Left Right Left Left Left RightMedian Width(m) 7.4 0.0 0.0Link Offset(m) 0.0 0.0 0.0Crosswalk Width(m) 4.9 1.6 1.6Two way Left Turn LaneHeadway Factor 0.99 0.99 0.99 0.99 0.99 0.99Turning Speed (k/h) 24 14 24 14Sign Control Stop Free Free

Intersection SummaryArea Type: OtherControl Type: UnsignalizedIntersection Capacity Utilization 25.8% ICU Level of Service AAnalysis Period (min) 15

Page 130: Grandwood Subdivision – Elora Transportation Impact Study...To the extent that this report is based on information supplied by other parties, Paradigm Transportation Solutions Limited

06/26/2017

170127 Granwood Subdivision 5:00 pm 06/13/2017 Baseline Synchro 9 ReportPage 11

Movement EBL EBR NBL NBT SBT SBRLane ConfigurationsTraffic Volume (veh/h) 23 39 108 54 26 13Future Volume (Veh/h) 23 39 108 54 26 13Sign Control Stop Free FreeGrade 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 25 42 117 59 28 14PedestriansLane Width (m)Walking Speed (m/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (m)pX, platoon unblockedvC, conflicting volume 328 35 42vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 328 35 42tC, single (s) 6.4 6.2 4.1tC, 2 stage (s)tF (s) 3.5 3.3 2.2p0 queue free % 96 96 93cM capacity (veh/h) 617 1038 1567

Direction, Lane # EB 1 NB 1 SB 1Volume Total 67 176 42Volume Left 25 117 0Volume Right 42 0 14cSH 827 1567 1700Volume to Capacity 0.08 0.07 0.02Queue Length 95th (m) 2.0 1.8 0.0Control Delay (s) 9.7 5.2 0.0Lane LOS A AApproach Delay (s) 9.7 5.2 0.0Approach LOS A

Intersection SummaryAverage Delay 5.5Intersection Capacity Utilization 25.8% ICU Level of Service AAnalysis Period (min) 15

06/26/2017

170127 Granwood Subdivision 5:00 pm 06/13/2017 Baseline Synchro 9 ReportPage 12

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 25 1 13 14 1 92 5 44 5 32 26 7Future Volume (vph) 25 1 13 14 1 92 5 44 5 32 26 7Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Frt 0.955 0.884 0.988 0.985Flt Protected 0.969 0.994 0.996 0.976Satd. Flow (prot) 0 1720 0 0 1542 0 0 1689 0 0 1547 0Flt Permitted 0.969 0.994 0.996 0.976Satd. Flow (perm) 0 1720 0 0 1542 0 0 1689 0 0 1547 0Link Speed (k/h) 48 48 48 48Link Distance (m) 290.8 201.2 123.6 119.7Travel Time (s) 21.8 15.1 9.3 9.0Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 0% 0% 10% 0% 0% 11% 0% 4% 100% 25% 13% 17%Adj. Flow (vph) 27 1 14 15 1 100 5 48 5 35 28 8Shared Lane Traffic (%)Lane Group Flow (vph) 0 42 0 0 116 0 0 58 0 0 71 0Enter Blocked Intersection No No No No No No No No No No No NoLane Alignment Left Left Right Left Left Right Left Left Right Left Left RightMedian Width(m) 0.0 0.0 0.0 0.0Link Offset(m) 0.0 0.0 0.0 0.0Crosswalk Width(m) 1.6 1.6 1.6 1.6Two way Left Turn LaneHeadway Factor 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99Turning Speed (k/h) 24 14 24 14 24 14 24 14Sign Control Stop Stop Free Free

Intersection SummaryArea Type: OtherControl Type: UnsignalizedIntersection Capacity Utilization 24.6% ICU Level of Service AAnalysis Period (min) 15

Page 131: Grandwood Subdivision – Elora Transportation Impact Study...To the extent that this report is based on information supplied by other parties, Paradigm Transportation Solutions Limited

06/26/2017

170127 Granwood Subdivision 5:00 pm 06/13/2017 Baseline Synchro 9 ReportPage 13

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (veh/h) 25 1 13 14 1 92 5 44 5 32 26 7Future Volume (Veh/h) 25 1 13 14 1 92 5 44 5 32 26 7Sign Control Stop Stop Free FreeGrade 0% 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 27 1 14 15 1 100 5 48 5 35 28 8PedestriansLane Width (m)Walking Speed (m/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (m)pX, platoon unblockedvC, conflicting volume 263 165 32 177 166 50 36 53vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 263 165 32 177 166 50 36 53tC, single (s) 7.1 6.5 6.3 7.1 6.5 6.3 4.1 4.3tC, 2 stage (s)tF (s) 3.5 4.0 3.4 3.5 4.0 3.4 2.2 2.4p0 queue free % 96 100 99 98 100 90 100 98cM capacity (veh/h) 610 711 1019 762 710 993 1588 1417

Direction, Lane # EB 1 WB 1 NB 1 SB 1Volume Total 42 116 58 71Volume Left 27 15 5 35Volume Right 14 100 5 8cSH 707 952 1588 1417Volume to Capacity 0.06 0.12 0.00 0.02Queue Length 95th (m) 1.4 3.2 0.1 0.6Control Delay (s) 10.4 9.3 0.6 3.8Lane LOS B A A AApproach Delay (s) 10.4 9.3 0.6 3.8Approach LOS B A

Intersection SummaryAverage Delay 6.4Intersection Capacity Utilization 24.6% ICU Level of Service AAnalysis Period (min) 15

Page 132: Grandwood Subdivision – Elora Transportation Impact Study...To the extent that this report is based on information supplied by other parties, Paradigm Transportation Solutions Limited

06/26/2017

170127 Granwood Subdivision 06/13/2017 Baseline Synchro 9 ReportPage 1

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 116 361 65 136 190 38 53 303 198 72 187 53Future Volume (vph) 116 361 65 136 190 38 53 303 198 72 187 53Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900Storage Length (m) 70.0 0.0 30.0 0.0 90.0 0.0 40.0 0.0Storage Lanes 1 0 1 0 1 0 1 0Taper Length (m) 2.5 7.6 2.5 2.5Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Frt 0.977 0.975 0.941 0.967Flt Protected 0.950 0.950 0.950 0.950Satd. Flow (prot) 1807 1840 0 1789 1827 0 1825 1776 0 1825 1743 0Flt Permitted 0.517 0.272 0.559 0.325Satd. Flow (perm) 983 1840 0 512 1827 0 1074 1776 0 624 1743 0Right Turn on Red Yes Yes Yes YesSatd. Flow (RTOR) 12 13 56 24Link Speed (k/h) 48 48 48 48Link Distance (m) 186.0 1088.5 201.4 99.7Travel Time (s) 14.0 81.6 15.1 7.5Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 1% 2% 2% 2% 3% 0% 0% 3% 0% 0% 7% 5%Adj. Flow (vph) 126 392 71 148 207 41 58 329 215 78 203 58Shared Lane Traffic (%)Lane Group Flow (vph) 126 463 0 148 248 0 58 544 0 78 261 0Enter Blocked Intersection No No No No No No No No No No No NoLane Alignment Left Left Right Left Left Right Left Left Right Left Left RightMedian Width(m) 3.7 3.7 3.7 3.7Link Offset(m) 0.0 0.0 0.0 0.0Crosswalk Width(m) 1.6 4.9 1.6 1.6Two way Left Turn LaneHeadway Factor 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99Turning Speed (k/h) 24 14 24 14 24 14 24 14Turn Type Perm NA Perm NA Perm NA Perm NAProtected Phases 4 8 2 6Permitted Phases 4 8 2 6Minimum Split (s) 24.0 24.0 24.0 24.0 24.0 24.0 24.0 24.0Total Split (s) 38.0 38.0 38.0 38.0 52.0 52.0 52.0 52.0Total Split (%) 42.2% 42.2% 42.2% 42.2% 57.8% 57.8% 57.8% 57.8%Maximum Green (s) 32.0 32.0 32.0 32.0 46.0 46.0 46.0 46.0Yellow Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0All-Red Time (s) 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0Lost Time Adjust (s) -2.0 -2.0 -2.0 -2.0 -2.0 -2.0 -2.0 -2.0Total Lost Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0Lead/LagLead-Lag Optimize?Walk Time (s) 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0Flash Dont Walk (s) 11.0 11.0 11.0 11.0 11.0 11.0 11.0 11.0Pedestrian Calls (#/hr) 0 0 0 0 0 0 0 0Act Effct Green (s) 34.0 34.0 34.0 34.0 48.0 48.0 48.0 48.0Actuated g/C Ratio 0.38 0.38 0.38 0.38 0.53 0.53 0.53 0.53

06/26/2017

170127 Granwood Subdivision 06/13/2017 Baseline Synchro 9 ReportPage 2

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRv/c Ratio 0.34 0.66 0.77 0.36 0.10 0.56 0.23 0.28Control Delay 23.3 28.0 52.9 20.8 11.0 15.1 13.6 11.3Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 23.3 28.0 52.9 20.8 11.0 15.1 13.6 11.3LOS C C D C B B B BApproach Delay 27.0 32.8 14.7 11.8Approach LOS C C B BQueue Length 50th (m) 15.3 63.4 22.0 28.6 4.7 52.5 6.8 20.9Queue Length 95th (m) 29.8 96.1 #55.0 47.2 10.6 81.4 15.4 35.0Internal Link Dist (m) 162.0 1064.5 177.4 75.7Turn Bay Length (m) 70.0 30.0 90.0 40.0Base Capacity (vph) 371 702 193 698 572 973 332 940Starvation Cap Reductn 0 0 0 0 0 0 0 0Spillback Cap Reductn 0 0 0 0 0 0 0 0Storage Cap Reductn 0 0 0 0 0 0 0 0Reduced v/c Ratio 0.34 0.66 0.77 0.36 0.10 0.56 0.23 0.28

Intersection SummaryArea Type: OtherCycle Length: 90Actuated Cycle Length: 90Offset: 0 (0%), Referenced to phase 2:NBTL and 6:SBTL, Start of GreenNatural Cycle: 50Control Type: PretimedMaximum v/c Ratio: 0.77Intersection Signal Delay: 21.7 Intersection LOS: CIntersection Capacity Utilization 76.0% ICU Level of Service DAnalysis Period (min) 15# 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles.

Splits and Phases: 1: Wellington Road 7 & Wellington Road 21/McNab Street

Page 133: Grandwood Subdivision – Elora Transportation Impact Study...To the extent that this report is based on information supplied by other parties, Paradigm Transportation Solutions Limited

06/26/2017

170127 Granwood Subdivision 06/13/2017 Baseline Synchro 9 ReportPage 3

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 116 361 65 136 190 38 53 303 198 72 187 53Future Volume (vph) 116 361 65 136 190 38 53 303 198 72 187 53Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900Total Lost time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Frt 1.00 0.98 1.00 0.98 1.00 0.94 1.00 0.97Flt Protected 0.95 1.00 0.95 1.00 0.95 1.00 0.95 1.00Satd. Flow (prot) 1807 1840 1789 1828 1825 1775 1825 1743Flt Permitted 0.52 1.00 0.27 1.00 0.56 1.00 0.32 1.00Satd. Flow (perm) 983 1840 512 1828 1074 1775 624 1743Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 126 392 71 148 207 41 58 329 215 78 203 58RTOR Reduction (vph) 0 7 0 0 8 0 0 26 0 0 11 0Lane Group Flow (vph) 126 456 0 148 240 0 58 518 0 78 250 0Heavy Vehicles (%) 1% 2% 2% 2% 3% 0% 0% 3% 0% 0% 7% 5%Turn Type Perm NA Perm NA Perm NA Perm NAProtected Phases 4 8 2 6Permitted Phases 4 8 2 6Actuated Green, G (s) 32.0 32.0 32.0 32.0 46.0 46.0 46.0 46.0Effective Green, g (s) 34.0 34.0 34.0 34.0 48.0 48.0 48.0 48.0Actuated g/C Ratio 0.38 0.38 0.38 0.38 0.53 0.53 0.53 0.53Clearance Time (s) 6.0 6.0 6.0 6.0 6.0 6.0 6.0 6.0Lane Grp Cap (vph) 371 695 193 690 572 946 332 929v/s Ratio Prot 0.25 0.13 c0.29 0.14v/s Ratio Perm 0.13 c0.29 0.05 0.13v/c Ratio 0.34 0.66 0.77 0.35 0.10 0.55 0.23 0.27Uniform Delay, d1 20.0 23.2 24.5 20.1 10.4 13.8 11.2 11.4Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Incremental Delay, d2 2.5 4.8 24.8 1.4 0.4 2.3 1.7 0.7Delay (s) 22.5 27.9 49.3 21.4 10.7 16.1 12.9 12.2Level of Service C C D C B B B BApproach Delay (s) 26.8 31.9 15.6 12.3Approach LOS C C B B

Intersection SummaryHCM 2000 Control Delay 21.8 HCM 2000 Level of Service CHCM 2000 Volume to Capacity ratio 0.64Actuated Cycle Length (s) 90.0 Sum of lost time (s) 8.0Intersection Capacity Utilization 76.0% ICU Level of Service DAnalysis Period (min) 15c Critical Lane Group

06/26/2017

170127 Granwood Subdivision 06/13/2017 Baseline Synchro 9 ReportPage 4

Lane Group WBL WBR NBT NBR SBL SBTLane ConfigurationsTraffic Volume (vph) 12 37 688 22 11 482Future Volume (vph) 12 37 688 22 11 482Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900Storage Length (m) 0.0 0.0 30.0 0.0Storage Lanes 1 0 1 0Taper Length (m) 2.5 2.5Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00Frt 0.898 0.850Flt Protected 0.988 0.999Satd. Flow (prot) 1628 0 1865 1471 0 1809Flt Permitted 0.988 0.999Satd. Flow (perm) 1628 0 1865 1471 0 1809Link Speed (k/h) 48 48 48Link Distance (m) 92.0 115.2 201.4Travel Time (s) 6.9 8.6 15.1Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 10% 3% 3% 11% 11% 6%Adj. Flow (vph) 13 40 748 24 12 524Shared Lane Traffic (%)Lane Group Flow (vph) 53 0 748 24 0 536Enter Blocked Intersection No No No No No NoLane Alignment Left Right Left Right Left LeftMedian Width(m) 3.7 3.7 3.7Link Offset(m) 0.0 0.0 0.0Crosswalk Width(m) 1.6 1.6 1.6Two way Left Turn LaneHeadway Factor 0.99 0.99 0.99 0.99 0.99 0.99Turning Speed (k/h) 24 14 14 24Sign Control Stop Free Free

Intersection SummaryArea Type: OtherControl Type: UnsignalizedIntersection Capacity Utilization 46.2% ICU Level of Service AAnalysis Period (min) 15

Page 134: Grandwood Subdivision – Elora Transportation Impact Study...To the extent that this report is based on information supplied by other parties, Paradigm Transportation Solutions Limited

06/26/2017

170127 Granwood Subdivision 06/13/2017 Baseline Synchro 9 ReportPage 5

Movement WBL WBR NBT NBR SBL SBTLane ConfigurationsTraffic Volume (veh/h) 12 37 688 22 11 482Future Volume (Veh/h) 12 37 688 22 11 482Sign Control Stop Free FreeGrade 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 13 40 748 24 12 524PedestriansLane Width (m)Walking Speed (m/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (m) 201pX, platoon unblocked 0.96vC, conflicting volume 1296 748 772vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 1288 748 772tC, single (s) 6.5 6.2 4.2tC, 2 stage (s)tF (s) 3.6 3.3 2.3p0 queue free % 92 90 99cM capacity (veh/h) 165 411 804

Direction, Lane # WB 1 NB 1 NB 2 SB 1Volume Total 53 748 24 536Volume Left 13 0 0 12Volume Right 40 0 24 0cSH 301 1700 1700 804Volume to Capacity 0.18 0.44 0.01 0.01Queue Length 95th (m) 4.8 0.0 0.0 0.3Control Delay (s) 19.5 0.0 0.0 0.4Lane LOS C AApproach Delay (s) 19.5 0.0 0.4Approach LOS C

Intersection SummaryAverage Delay 0.9Intersection Capacity Utilization 46.2% ICU Level of Service AAnalysis Period (min) 15

06/26/2017

170127 Granwood Subdivision 06/13/2017 Baseline Synchro 9 ReportPage 6

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 6 21 6 10 16 15 18 21 4 15 8 16Future Volume (vph) 6 21 6 10 16 15 18 21 4 15 8 16Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Frt 0.974 0.951 0.989 0.945Flt Protected 0.991 0.988 0.979 0.981Satd. Flow (prot) 0 1818 0 0 1770 0 0 1824 0 0 1746 0Flt Permitted 0.991 0.988 0.979 0.981Satd. Flow (perm) 0 1818 0 0 1770 0 0 1824 0 0 1746 0Link Speed (k/h) 48 48 48 48Link Distance (m) 92.0 91.8 92.7 102.1Travel Time (s) 6.9 6.9 7.0 7.7Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 7 23 7 11 17 16 20 23 4 16 9 17Shared Lane Traffic (%)Lane Group Flow (vph) 0 37 0 0 44 0 0 47 0 0 42 0Enter Blocked Intersection No No No No No No No No No No No NoLane Alignment Left Left Right Left Left Right Left Left Right Left Left RightMedian Width(m) 0.0 0.0 0.0 0.0Link Offset(m) 0.0 0.0 0.0 0.0Crosswalk Width(m) 1.6 1.6 1.6 1.6Two way Left Turn LaneHeadway Factor 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99Turning Speed (k/h) 24 14 24 14 24 14 24 14Sign Control Free Free Stop Stop

Intersection SummaryArea Type: OtherControl Type: UnsignalizedIntersection Capacity Utilization 13.5% ICU Level of Service AAnalysis Period (min) 15

Page 135: Grandwood Subdivision – Elora Transportation Impact Study...To the extent that this report is based on information supplied by other parties, Paradigm Transportation Solutions Limited

06/26/2017

170127 Granwood Subdivision 06/13/2017 Baseline Synchro 9 ReportPage 7

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (veh/h) 6 21 6 10 16 15 18 21 4 15 8 16Future Volume (Veh/h) 6 21 6 10 16 15 18 21 4 15 8 16Sign Control Free Free Stop StopGrade 0% 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 7 23 7 11 17 16 20 23 4 16 9 17PedestriansLane Width (m)Walking Speed (m/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (m)pX, platoon unblockedvC, conflicting volume 33 30 109 96 26 103 91 25vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 33 30 109 96 26 103 91 25tC, single (s) 4.1 4.1 7.1 6.5 6.2 7.1 6.5 6.2tC, 2 stage (s)tF (s) 2.2 2.2 3.5 4.0 3.3 3.5 4.0 3.3p0 queue free % 100 99 98 97 100 98 99 98cM capacity (veh/h) 1579 1583 841 786 1049 847 790 1051

Direction, Lane # EB 1 WB 1 NB 1 SB 1Volume Total 37 44 47 42Volume Left 7 11 20 16Volume Right 7 16 4 17cSH 1579 1583 826 904Volume to Capacity 0.00 0.01 0.06 0.05Queue Length 95th (m) 0.1 0.2 1.4 1.1Control Delay (s) 1.4 1.9 9.6 9.2Lane LOS A A A AApproach Delay (s) 1.4 1.9 9.6 9.2Approach LOS A A

Intersection SummaryAverage Delay 5.7Intersection Capacity Utilization 13.5% ICU Level of Service AAnalysis Period (min) 15

06/26/2017

170127 Granwood Subdivision 06/13/2017 Baseline Synchro 9 ReportPage 8

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 25 8 5 0 6 5 21 21 1 4 8 13Future Volume (vph) 25 8 5 0 6 5 21 21 1 4 8 13Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Ped Bike FactorFrt 0.984 0.944 0.997 0.930Flt Protected 0.968 0.976 0.993Satd. Flow (prot) 0 1772 0 0 1642 0 0 1816 0 0 1552 0Flt Permitted 0.968 0.976 0.993Satd. Flow (perm) 0 1772 0 0 1642 0 0 1816 0 0 1552 0Link Speed (k/h) 48 48 48 48Link Distance (m) 91.8 278.1 75.3 102.9Travel Time (s) 6.9 20.9 5.6 7.7Confl. Peds. (#/hr) 1 1Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 5% 0% 0% 0% 0% 25% 6% 0% 0% 0% 43% 0%Adj. Flow (vph) 27 9 5 0 7 5 23 23 1 4 9 14Shared Lane Traffic (%)Lane Group Flow (vph) 0 41 0 0 12 0 0 47 0 0 27 0Enter Blocked Intersection No No No No No No No No No No No NoLane Alignment Left Left Right Left Left Right Left Left Right Left Left RightMedian Width(m) 0.0 0.0 0.0 0.0Link Offset(m) 0.0 0.0 0.0 0.0Crosswalk Width(m) 1.6 1.6 1.6 1.6Two way Left Turn LaneHeadway Factor 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99Turning Speed (k/h) 24 14 24 14 24 14 24 14Sign Control Free Free Stop Stop

Intersection SummaryArea Type: OtherControl Type: UnsignalizedIntersection Capacity Utilization 21.3% ICU Level of Service AAnalysis Period (min) 15

Page 136: Grandwood Subdivision – Elora Transportation Impact Study...To the extent that this report is based on information supplied by other parties, Paradigm Transportation Solutions Limited

06/26/2017

170127 Granwood Subdivision 06/13/2017 Baseline Synchro 9 ReportPage 9

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (veh/h) 25 8 5 0 6 5 21 21 1 4 8 13Future Volume (Veh/h) 25 8 5 0 6 5 21 21 1 4 8 13Sign Control Free Free Stop StopGrade 0% 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 27 9 5 0 7 5 23 23 1 4 9 14Pedestrians 1Lane Width (m) 3.7Walking Speed (m/s) 1.1Percent Blockage 0Right turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (m)pX, platoon unblockedvC, conflicting volume 12 14 94 78 12 88 78 10vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 12 14 94 78 12 88 78 10tC, single (s) 4.1 4.1 7.2 6.5 6.2 7.1 6.9 6.2tC, 2 stage (s)tF (s) 2.2 2.2 3.6 4.0 3.3 3.5 4.4 3.3p0 queue free % 98 100 97 97 100 100 99 99cM capacity (veh/h) 1587 1617 850 803 1073 869 728 1078

Direction, Lane # EB 1 WB 1 NB 1 SB 1Volume Total 41 12 47 27Volume Left 27 0 23 4Volume Right 5 5 1 14cSH 1587 1617 830 901Volume to Capacity 0.02 0.00 0.06 0.03Queue Length 95th (m) 0.4 0.0 1.4 0.7Control Delay (s) 4.9 0.0 9.6 9.1Lane LOS A A AApproach Delay (s) 4.9 0.0 9.6 9.1Approach LOS A A

Intersection SummaryAverage Delay 7.1Intersection Capacity Utilization 21.3% ICU Level of Service AAnalysis Period (min) 15

06/26/2017

170127 Granwood Subdivision 06/13/2017 Baseline Synchro 9 ReportPage 10

Lane Group EBL EBR NBL NBT SBT SBRLane ConfigurationsTraffic Volume (vph) 6 139 55 58 38 19Future Volume (vph) 6 139 55 58 38 19Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00Frt 0.871 0.954Flt Protected 0.998 0.976Satd. Flow (prot) 1637 0 0 1838 1797 0Flt Permitted 0.998 0.976Satd. Flow (perm) 1637 0 0 1838 1797 0Link Speed (k/h) 48 48 48Link Distance (m) 1088.5 119.7 61.8Travel Time (s) 81.6 9.0 4.6Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 7 151 60 63 41 21Shared Lane Traffic (%)Lane Group Flow (vph) 158 0 0 123 62 0Enter Blocked Intersection No No No No No NoLane Alignment Left Right Left Left Left RightMedian Width(m) 7.4 0.0 0.0Link Offset(m) 0.0 0.0 0.0Crosswalk Width(m) 4.9 1.6 1.6Two way Left Turn LaneHeadway Factor 0.99 0.99 0.99 0.99 0.99 0.99Turning Speed (k/h) 24 14 24 14Sign Control Stop Free Free

Intersection SummaryArea Type: OtherControl Type: UnsignalizedIntersection Capacity Utilization 28.4% ICU Level of Service AAnalysis Period (min) 15

Page 137: Grandwood Subdivision – Elora Transportation Impact Study...To the extent that this report is based on information supplied by other parties, Paradigm Transportation Solutions Limited

06/26/2017

170127 Granwood Subdivision 06/13/2017 Baseline Synchro 9 ReportPage 11

Movement EBL EBR NBL NBT SBT SBRLane ConfigurationsTraffic Volume (veh/h) 6 139 55 58 38 19Future Volume (Veh/h) 6 139 55 58 38 19Sign Control Stop Free FreeGrade 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 7 151 60 63 41 21PedestriansLane Width (m)Walking Speed (m/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (m)pX, platoon unblockedvC, conflicting volume 234 52 62vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 234 52 62tC, single (s) 6.4 6.2 4.1tC, 2 stage (s)tF (s) 3.5 3.3 2.2p0 queue free % 99 85 96cM capacity (veh/h) 724 1016 1541

Direction, Lane # EB 1 NB 1 SB 1Volume Total 158 123 62Volume Left 7 60 0Volume Right 151 0 21cSH 999 1541 1700Volume to Capacity 0.16 0.04 0.04Queue Length 95th (m) 4.3 0.9 0.0Control Delay (s) 9.3 3.8 0.0Lane LOS A AApproach Delay (s) 9.3 3.8 0.0Approach LOS A

Intersection SummaryAverage Delay 5.6Intersection Capacity Utilization 28.4% ICU Level of Service AAnalysis Period (min) 15

06/26/2017

170127 Granwood Subdivision 06/13/2017 Baseline Synchro 9 ReportPage 12

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 12 1 12 12 2 59 12 42 19 105 56 18Future Volume (vph) 12 1 12 12 2 59 12 42 19 105 56 18Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Frt 0.935 0.891 0.965 0.986Flt Protected 0.976 0.992 0.992 0.972Satd. Flow (prot) 0 1592 0 0 1351 0 0 1798 0 0 1795 0Flt Permitted 0.976 0.992 0.992 0.972Satd. Flow (perm) 0 1592 0 0 1351 0 0 1798 0 0 1795 0Link Speed (k/h) 48 48 48 48Link Distance (m) 290.8 201.2 123.6 119.7Travel Time (s) 21.8 15.1 9.3 9.0Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 11% 0% 10% 33% 0% 25% 0% 4% 0% 0% 6% 7%Adj. Flow (vph) 13 1 13 13 2 64 13 46 21 114 61 20Shared Lane Traffic (%)Lane Group Flow (vph) 0 27 0 0 79 0 0 80 0 0 195 0Enter Blocked Intersection No No No No No No No No No No No NoLane Alignment Left Left Right Left Left Right Left Left Right Left Left RightMedian Width(m) 0.0 0.0 0.0 0.0Link Offset(m) 0.0 0.0 0.0 0.0Crosswalk Width(m) 1.6 1.6 1.6 1.6Two way Left Turn LaneHeadway Factor 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99Turning Speed (k/h) 24 14 24 14 24 14 24 14Sign Control Stop Stop Free Free

Intersection SummaryArea Type: OtherControl Type: UnsignalizedIntersection Capacity Utilization 27.7% ICU Level of Service AAnalysis Period (min) 15

Page 138: Grandwood Subdivision – Elora Transportation Impact Study...To the extent that this report is based on information supplied by other parties, Paradigm Transportation Solutions Limited

06/26/2017

170127 Granwood Subdivision 06/13/2017 Baseline Synchro 9 ReportPage 13

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (veh/h) 12 1 12 12 2 59 12 42 19 105 56 18Future Volume (Veh/h) 12 1 12 12 2 59 12 42 19 105 56 18Sign Control Stop Stop Free FreeGrade 0% 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 13 1 13 13 2 64 13 46 21 114 61 20PedestriansLane Width (m)Walking Speed (m/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (m)pX, platoon unblockedvC, conflicting volume 446 392 71 395 392 56 81 67vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 446 392 71 395 392 56 81 67tC, single (s) 7.2 6.5 6.3 7.4 6.5 6.5 4.1 4.1tC, 2 stage (s)tF (s) 3.6 4.0 3.4 3.8 4.0 3.5 2.2 2.2p0 queue free % 97 100 99 97 100 93 99 93cM capacity (veh/h) 442 502 970 474 503 949 1529 1547

Direction, Lane # EB 1 WB 1 NB 1 SB 1Volume Total 27 79 80 195Volume Left 13 13 13 114Volume Right 13 64 21 20cSH 603 799 1529 1547Volume to Capacity 0.04 0.10 0.01 0.07Queue Length 95th (m) 1.1 2.5 0.2 1.8Control Delay (s) 11.3 10.0 1.3 4.6Lane LOS B A A AApproach Delay (s) 11.3 10.0 1.3 4.6Approach LOS B A

Intersection SummaryAverage Delay 5.5Intersection Capacity Utilization 27.7% ICU Level of Service AAnalysis Period (min) 15

Page 139: Grandwood Subdivision – Elora Transportation Impact Study...To the extent that this report is based on information supplied by other parties, Paradigm Transportation Solutions Limited

Granwood Subdivsion – Elora | Transportation Impact Study | 170127 | July 2017

Paradigm Transportation Solutions Limited | Appendices

Appendix F

Total Traffic Operations Reports

Page 140: Grandwood Subdivision – Elora Transportation Impact Study...To the extent that this report is based on information supplied by other parties, Paradigm Transportation Solutions Limited
Page 141: Grandwood Subdivision – Elora Transportation Impact Study...To the extent that this report is based on information supplied by other parties, Paradigm Transportation Solutions Limited

06/26/2017

170127 Granwood Subdivision 5:00 pm 06/13/2017 Baseline Synchro 9 ReportPage 1

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 24 82 40 131 164 13 52 144 55 6 267 65Future Volume (vph) 24 82 40 131 164 13 52 144 55 6 267 65Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900Storage Length (m) 70.0 0.0 30.0 0.0 90.0 0.0 40.0 0.0Storage Lanes 1 0 1 0 1 0 1 0Taper Length (m) 2.5 7.6 2.5 2.5Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Frt 0.951 0.989 0.959 0.970Flt Protected 0.950 0.950 0.950 0.950Satd. Flow (prot) 1472 1662 0 1807 1870 0 1755 1692 0 1825 1768 0Flt Permitted 0.586 0.664 0.471 0.600Satd. Flow (perm) 908 1662 0 1263 1870 0 870 1692 0 1153 1768 0Right Turn on Red Yes Yes Yes YesSatd. Flow (RTOR) 31 5 33 21Link Speed (k/h) 48 48 48 48Link Distance (m) 186.0 1088.5 201.4 99.7Travel Time (s) 14.0 81.6 15.1 7.5Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 24% 6% 18% 1% 1% 9% 4% 10% 6% 0% 6% 3%Adj. Flow (vph) 26 89 43 142 178 14 57 157 60 7 290 71Shared Lane Traffic (%)Lane Group Flow (vph) 26 132 0 142 192 0 57 217 0 7 361 0Enter Blocked Intersection No No No No No No No No No No No NoLane Alignment Left Left Right Left Left Right Left Left Right Left Left RightMedian Width(m) 3.7 3.7 3.7 3.7Link Offset(m) 0.0 0.0 0.0 0.0Crosswalk Width(m) 1.6 4.9 1.6 1.6Two way Left Turn LaneHeadway Factor 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99Turning Speed (k/h) 24 14 24 14 24 14 24 14Turn Type Perm NA Perm NA Perm NA Perm NAProtected Phases 4 8 2 6Permitted Phases 4 8 2 6Minimum Split (s) 24.0 24.0 24.0 24.0 24.0 24.0 24.0 24.0Total Split (s) 38.0 38.0 38.0 38.0 52.0 52.0 52.0 52.0Total Split (%) 42.2% 42.2% 42.2% 42.2% 57.8% 57.8% 57.8% 57.8%Maximum Green (s) 32.0 32.0 32.0 32.0 46.0 46.0 46.0 46.0Yellow Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0All-Red Time (s) 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0Lost Time Adjust (s) -2.0 -2.0 -2.0 -2.0 -2.0 -2.0 -2.0 -2.0Total Lost Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0Lead/LagLead-Lag Optimize?Walk Time (s) 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0Flash Dont Walk (s) 11.0 11.0 11.0 11.0 11.0 11.0 11.0 11.0Pedestrian Calls (#/hr) 0 0 0 0 0 0 0 0Act Effct Green (s) 34.0 34.0 34.0 34.0 48.0 48.0 48.0 48.0Actuated g/C Ratio 0.38 0.38 0.38 0.38 0.53 0.53 0.53 0.53

06/26/2017

170127 Granwood Subdivision 5:00 pm 06/13/2017 Baseline Synchro 9 ReportPage 2

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRv/c Ratio 0.08 0.20 0.30 0.27 0.12 0.24 0.01 0.38Control Delay 18.8 15.3 21.8 20.2 11.4 10.2 10.0 12.9Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 18.8 15.3 21.8 20.2 11.4 10.2 10.0 12.9LOS B B C C B B A BApproach Delay 15.9 20.9 10.5 12.9Approach LOS B C B BQueue Length 50th (m) 2.8 11.4 16.9 21.9 4.6 15.7 0.5 32.2Queue Length 95th (m) 8.1 23.5 31.1 37.4 10.8 27.9 2.5 50.9Internal Link Dist (m) 162.0 1064.5 177.4 75.7Turn Bay Length (m) 70.0 30.0 90.0 40.0Base Capacity (vph) 343 647 477 709 464 917 614 952Starvation Cap Reductn 0 0 0 0 0 0 0 0Spillback Cap Reductn 0 0 0 0 0 0 0 0Storage Cap Reductn 0 0 0 0 0 0 0 0Reduced v/c Ratio 0.08 0.20 0.30 0.27 0.12 0.24 0.01 0.38

Intersection SummaryArea Type: OtherCycle Length: 90Actuated Cycle Length: 90Offset: 0 (0%), Referenced to phase 2:NBTL and 6:SBTL, Start of GreenNatural Cycle: 50Control Type: PretimedMaximum v/c Ratio: 0.38Intersection Signal Delay: 15.1 Intersection LOS: BIntersection Capacity Utilization 49.5% ICU Level of Service AAnalysis Period (min) 15

Splits and Phases: 1: Wellington Road 7 & Wellington Road 21/McNab Street

Page 142: Grandwood Subdivision – Elora Transportation Impact Study...To the extent that this report is based on information supplied by other parties, Paradigm Transportation Solutions Limited

06/26/2017

170127 Granwood Subdivision 5:00 pm 06/13/2017 Baseline Synchro 9 ReportPage 3

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 24 82 40 131 164 13 52 144 55 6 267 65Future Volume (vph) 24 82 40 131 164 13 52 144 55 6 267 65Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900Total Lost time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Frt 1.00 0.95 1.00 0.99 1.00 0.96 1.00 0.97Flt Protected 0.95 1.00 0.95 1.00 0.95 1.00 0.95 1.00Satd. Flow (prot) 1472 1663 1807 1870 1755 1691 1825 1769Flt Permitted 0.59 1.00 0.66 1.00 0.47 1.00 0.60 1.00Satd. Flow (perm) 909 1663 1263 1870 871 1691 1152 1769Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 26 89 43 142 178 14 57 157 60 7 290 71RTOR Reduction (vph) 0 19 0 0 3 0 0 15 0 0 10 0Lane Group Flow (vph) 26 113 0 142 189 0 57 202 0 7 351 0Heavy Vehicles (%) 24% 6% 18% 1% 1% 9% 4% 10% 6% 0% 6% 3%Turn Type Perm NA Perm NA Perm NA Perm NAProtected Phases 4 8 2 6Permitted Phases 4 8 2 6Actuated Green, G (s) 32.0 32.0 32.0 32.0 46.0 46.0 46.0 46.0Effective Green, g (s) 34.0 34.0 34.0 34.0 48.0 48.0 48.0 48.0Actuated g/C Ratio 0.38 0.38 0.38 0.38 0.53 0.53 0.53 0.53Clearance Time (s) 6.0 6.0 6.0 6.0 6.0 6.0 6.0 6.0Lane Grp Cap (vph) 343 628 477 706 464 901 614 943v/s Ratio Prot 0.07 0.10 0.12 c0.20v/s Ratio Perm 0.03 c0.11 0.07 0.01v/c Ratio 0.08 0.18 0.30 0.27 0.12 0.22 0.01 0.37Uniform Delay, d1 17.9 18.7 19.6 19.4 10.5 11.1 9.9 12.2Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Incremental Delay, d2 0.4 0.6 1.6 0.9 0.5 0.6 0.0 1.1Delay (s) 18.4 19.3 21.2 20.3 11.0 11.7 9.9 13.4Level of Service B B C C B B A BApproach Delay (s) 19.2 20.7 11.6 13.3Approach LOS B C B B

Intersection SummaryHCM 2000 Control Delay 15.9 HCM 2000 Level of Service BHCM 2000 Volume to Capacity ratio 0.34Actuated Cycle Length (s) 90.0 Sum of lost time (s) 8.0Intersection Capacity Utilization 49.5% ICU Level of Service AAnalysis Period (min) 15c Critical Lane Group

06/26/2017

170127 Granwood Subdivision 5:00 pm 06/13/2017 Baseline Synchro 9 ReportPage 4

Lane Group WBL WBR NBT NBR SBL SBTLane ConfigurationsTraffic Volume (vph) 29 48 320 25 49 586Future Volume (vph) 29 48 320 25 49 586Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900Storage Length (m) 0.0 0.0 30.0 0.0Storage Lanes 1 0 1 0Taper Length (m) 2.5 2.5Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00Frt 0.916 0.850Flt Protected 0.981 0.996Satd. Flow (prot) 1341 0 1779 1498 0 1824Flt Permitted 0.981 0.996Satd. Flow (perm) 1341 0 1779 1498 0 1824Link Speed (k/h) 48 48 48Link Distance (m) 92.0 115.2 201.4Travel Time (s) 6.9 8.6 15.1Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 25% 31% 8% 9% 4% 5%Adj. Flow (vph) 32 52 348 27 53 637Shared Lane Traffic (%)Lane Group Flow (vph) 84 0 348 27 0 690Enter Blocked Intersection No No No No No NoLane Alignment Left Right Left Right Left LeftMedian Width(m) 3.7 3.7 3.7Link Offset(m) 0.0 0.0 0.0Crosswalk Width(m) 1.6 1.6 1.6Two way Left Turn LaneHeadway Factor 0.99 0.99 0.99 0.99 0.99 0.99Turning Speed (k/h) 24 14 14 24Sign Control Stop Free Free

Intersection SummaryArea Type: OtherControl Type: UnsignalizedIntersection Capacity Utilization 64.9% ICU Level of Service CAnalysis Period (min) 15

Page 143: Grandwood Subdivision – Elora Transportation Impact Study...To the extent that this report is based on information supplied by other parties, Paradigm Transportation Solutions Limited

06/26/2017

170127 Granwood Subdivision 5:00 pm 06/13/2017 Baseline Synchro 9 ReportPage 5

Movement WBL WBR NBT NBR SBL SBTLane ConfigurationsTraffic Volume (veh/h) 29 48 320 25 49 586Future Volume (Veh/h) 29 48 320 25 49 586Sign Control Stop Free FreeGrade 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 32 52 348 27 53 637PedestriansLane Width (m)Walking Speed (m/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (m) 201pX, platoon unblocked 0.91vC, conflicting volume 1091 348 375vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 1050 348 375tC, single (s) 6.6 6.5 4.1tC, 2 stage (s)tF (s) 3.7 3.6 2.2p0 queue free % 84 92 95cM capacity (veh/h) 198 634 1173

Direction, Lane # WB 1 NB 1 NB 2 SB 1Volume Total 84 348 27 690Volume Left 32 0 0 53Volume Right 52 0 27 0cSH 345 1700 1700 1173Volume to Capacity 0.24 0.20 0.02 0.05Queue Length 95th (m) 7.1 0.0 0.0 1.1Control Delay (s) 18.8 0.0 0.0 1.2Lane LOS C AApproach Delay (s) 18.8 0.0 1.2Approach LOS C

Intersection SummaryAverage Delay 2.1Intersection Capacity Utilization 64.9% ICU Level of Service CAnalysis Period (min) 15

06/26/2017

170127 Granwood Subdivision 5:00 pm 06/13/2017 Baseline Synchro 9 ReportPage 6

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 14 44 16 3 64 29 6 4 0 6 10 5Future Volume (vph) 14 44 16 3 64 29 6 4 0 6 10 5Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Frt 0.971 0.959 0.971Flt Protected 0.991 0.999 0.969 0.985Satd. Flow (prot) 0 1812 0 0 1804 0 0 1825 0 0 1801 0Flt Permitted 0.991 0.999 0.969 0.985Satd. Flow (perm) 0 1812 0 0 1804 0 0 1825 0 0 1801 0Link Speed (k/h) 48 48 48 48Link Distance (m) 92.0 91.8 92.7 102.1Travel Time (s) 6.9 6.9 7.0 7.7Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 15 48 17 3 70 32 7 4 0 7 11 5Shared Lane Traffic (%)Lane Group Flow (vph) 0 80 0 0 105 0 0 11 0 0 23 0Enter Blocked Intersection No No No No No No No No No No No NoLane Alignment Left Left Right Left Left Right Left Left Right Left Left RightMedian Width(m) 0.0 0.0 0.0 0.0Link Offset(m) 0.0 0.0 0.0 0.0Crosswalk Width(m) 1.6 1.6 1.6 1.6Two way Left Turn LaneHeadway Factor 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99Turning Speed (k/h) 24 14 24 14 24 14 24 14Sign Control Free Free Stop Stop

Intersection SummaryArea Type: OtherControl Type: UnsignalizedIntersection Capacity Utilization 20.2% ICU Level of Service AAnalysis Period (min) 15

Page 144: Grandwood Subdivision – Elora Transportation Impact Study...To the extent that this report is based on information supplied by other parties, Paradigm Transportation Solutions Limited

06/26/2017

170127 Granwood Subdivision 5:00 pm 06/13/2017 Baseline Synchro 9 ReportPage 7

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (veh/h) 14 44 16 3 64 29 6 4 0 6 10 5Future Volume (Veh/h) 14 44 16 3 64 29 6 4 0 6 10 5Sign Control Free Free Stop StopGrade 0% 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 15 48 17 3 70 32 7 4 0 7 11 5PedestriansLane Width (m)Walking Speed (m/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (m)pX, platoon unblockedvC, conflicting volume 102 65 189 194 56 180 187 86vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 102 65 189 194 56 180 187 86tC, single (s) 4.1 4.1 7.1 6.5 6.2 7.1 6.5 6.2tC, 2 stage (s)tF (s) 2.2 2.2 3.5 4.0 3.3 3.5 4.0 3.3p0 queue free % 99 100 99 99 100 99 98 99cM capacity (veh/h) 1490 1537 751 692 1010 771 699 973

Direction, Lane # EB 1 WB 1 NB 1 SB 1Volume Total 80 105 11 23Volume Left 15 3 7 7Volume Right 17 32 0 5cSH 1490 1537 729 768Volume to Capacity 0.01 0.00 0.02 0.03Queue Length 95th (m) 0.2 0.0 0.3 0.7Control Delay (s) 1.5 0.2 10.0 9.8Lane LOS A A B AApproach Delay (s) 1.5 0.2 10.0 9.8Approach LOS B A

Intersection SummaryAverage Delay 2.2Intersection Capacity Utilization 20.2% ICU Level of Service AAnalysis Period (min) 15

06/26/2017

170127 Granwood Subdivision 5:00 pm 06/13/2017 Baseline Synchro 9 ReportPage 8

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 14 20 16 3 55 6 6 4 0 3 10 35Future Volume (vph) 14 20 16 3 55 6 6 4 0 3 10 35Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Ped Bike FactorFrt 0.957 0.986 0.901Flt Protected 0.986 0.998 0.969 0.997Satd. Flow (prot) 0 1416 0 0 1714 0 0 1305 0 0 1686 0Flt Permitted 0.986 0.998 0.969 0.997Satd. Flow (perm) 0 1416 0 0 1714 0 0 1305 0 0 1686 0Link Speed (k/h) 48 48 48 48Link Distance (m) 91.8 278.1 75.3 102.9Travel Time (s) 6.9 20.9 5.6 7.7Confl. Peds. (#/hr) 1 1Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 15% 33% 33% 0% 12% 0% 67% 0% 0% 0% 11% 0%Adj. Flow (vph) 15 22 17 3 60 7 7 4 0 3 11 38Shared Lane Traffic (%)Lane Group Flow (vph) 0 54 0 0 70 0 0 11 0 0 52 0Enter Blocked Intersection No No No No No No No No No No No NoLane Alignment Left Left Right Left Left Right Left Left Right Left Left RightMedian Width(m) 0.0 0.0 0.0 0.0Link Offset(m) 0.0 0.0 0.0 0.0Crosswalk Width(m) 1.6 1.6 1.6 1.6Two way Left Turn LaneHeadway Factor 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99Turning Speed (k/h) 24 14 24 14 24 14 24 14Sign Control Free Free Stop Stop

Intersection SummaryArea Type: OtherControl Type: UnsignalizedIntersection Capacity Utilization 18.5% ICU Level of Service AAnalysis Period (min) 15

Page 145: Grandwood Subdivision – Elora Transportation Impact Study...To the extent that this report is based on information supplied by other parties, Paradigm Transportation Solutions Limited

06/26/2017

170127 Granwood Subdivision 5:00 pm 06/13/2017 Baseline Synchro 9 ReportPage 9

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (veh/h) 14 20 16 3 55 6 6 4 0 3 10 35Future Volume (Veh/h) 14 20 16 3 55 6 6 4 0 3 10 35Sign Control Free Free Stop StopGrade 0% 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 15 22 17 3 60 7 7 4 0 3 11 38Pedestrians 1Lane Width (m) 3.7Walking Speed (m/s) 1.1Percent Blockage 0Right turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (m)pX, platoon unblockedvC, conflicting volume 67 39 174 134 30 132 138 64vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 67 39 174 134 30 132 138 64tC, single (s) 4.2 4.1 7.8 6.5 6.2 7.1 6.6 6.2tC, 2 stage (s)tF (s) 2.3 2.2 4.1 4.0 3.3 3.5 4.1 3.3p0 queue free % 99 100 99 99 100 100 98 96cM capacity (veh/h) 1456 1584 625 752 1050 834 727 1004

Direction, Lane # EB 1 WB 1 NB 1 SB 1Volume Total 54 70 11 52Volume Left 15 3 7 3Volume Right 17 7 0 38cSH 1456 1584 666 919Volume to Capacity 0.01 0.00 0.02 0.06Queue Length 95th (m) 0.2 0.0 0.4 1.4Control Delay (s) 2.1 0.3 10.5 9.2Lane LOS A A B AApproach Delay (s) 2.1 0.3 10.5 9.2Approach LOS B A

Intersection SummaryAverage Delay 3.9Intersection Capacity Utilization 18.5% ICU Level of Service AAnalysis Period (min) 15

06/26/2017

170127 Granwood Subdivision 5:00 pm 06/13/2017 Baseline Synchro 9 ReportPage 10

Lane Group EBL EBR NBL NBT SBT SBRLane ConfigurationsTraffic Volume (vph) 20 10 23 52 23 12Future Volume (vph) 20 10 23 52 23 12Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00Frt 0.955 0.954Flt Protected 0.968 0.985Satd. Flow (prot) 1741 0 0 1855 1797 0Flt Permitted 0.968 0.985Satd. Flow (perm) 1741 0 0 1855 1797 0Link Speed (k/h) 48 48 48Link Distance (m) 1088.5 119.7 61.8Travel Time (s) 81.6 9.0 4.6Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 22 11 25 57 25 13Shared Lane Traffic (%)Lane Group Flow (vph) 33 0 0 82 38 0Enter Blocked Intersection No No No No No NoLane Alignment Left Right Left Left Left RightMedian Width(m) 7.4 0.0 0.0Link Offset(m) 0.0 0.0 0.0Crosswalk Width(m) 4.9 1.6 1.6Two way Left Turn LaneHeadway Factor 0.99 0.99 0.99 0.99 0.99 0.99Turning Speed (k/h) 24 14 24 14Sign Control Stop Free Free

Intersection SummaryArea Type: OtherControl Type: UnsignalizedIntersection Capacity Utilization 20.7% ICU Level of Service AAnalysis Period (min) 15

Page 146: Grandwood Subdivision – Elora Transportation Impact Study...To the extent that this report is based on information supplied by other parties, Paradigm Transportation Solutions Limited

06/26/2017

170127 Granwood Subdivision 5:00 pm 06/13/2017 Baseline Synchro 9 ReportPage 11

Movement EBL EBR NBL NBT SBT SBRLane ConfigurationsTraffic Volume (veh/h) 20 10 23 52 23 12Future Volume (Veh/h) 20 10 23 52 23 12Sign Control Stop Free FreeGrade 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 22 11 25 57 25 13PedestriansLane Width (m)Walking Speed (m/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (m)pX, platoon unblockedvC, conflicting volume 138 32 38vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 138 32 38tC, single (s) 6.4 6.2 4.1tC, 2 stage (s)tF (s) 3.5 3.3 2.2p0 queue free % 97 99 98cM capacity (veh/h) 841 1043 1572

Direction, Lane # EB 1 NB 1 SB 1Volume Total 33 82 38Volume Left 22 25 0Volume Right 11 0 13cSH 899 1572 1700Volume to Capacity 0.04 0.02 0.02Queue Length 95th (m) 0.9 0.4 0.0Control Delay (s) 9.2 2.3 0.0Lane LOS A AApproach Delay (s) 9.2 2.3 0.0Approach LOS A

Intersection SummaryAverage Delay 3.2Intersection Capacity Utilization 20.7% ICU Level of Service AAnalysis Period (min) 15

06/26/2017

170127 Granwood Subdivision 5:00 pm 06/13/2017 Baseline Synchro 9 ReportPage 12

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 38 1 24 1 1 11 7 26 1 4 18 10Future Volume (vph) 38 1 24 1 1 11 7 26 1 4 18 10Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Frt 0.948 0.884 0.996 0.958Flt Protected 0.971 0.996 0.989 0.994Satd. Flow (prot) 0 1703 0 0 1546 0 0 1790 0 0 1582 0Flt Permitted 0.971 0.996 0.989 0.994Satd. Flow (perm) 0 1703 0 0 1546 0 0 1790 0 0 1582 0Link Speed (k/h) 48 48 48 48Link Distance (m) 290.8 201.2 123.6 119.7Travel Time (s) 21.8 15.1 9.3 9.0Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 0% 0% 10% 0% 0% 11% 0% 4% 100% 25% 13% 17%Adj. Flow (vph) 41 1 26 1 1 12 8 28 1 4 20 11Shared Lane Traffic (%)Lane Group Flow (vph) 0 68 0 0 14 0 0 37 0 0 35 0Enter Blocked Intersection No No No No No No No No No No No NoLane Alignment Left Left Right Left Left Right Left Left Right Left Left RightMedian Width(m) 0.0 0.0 0.0 0.0Link Offset(m) 0.0 0.0 0.0 0.0Crosswalk Width(m) 1.6 1.6 1.6 1.6Two way Left Turn LaneHeadway Factor 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99Turning Speed (k/h) 24 14 24 14 24 14 24 14Sign Control Stop Stop Free Free

Intersection SummaryArea Type: OtherControl Type: UnsignalizedIntersection Capacity Utilization 20.3% ICU Level of Service AAnalysis Period (min) 15

Page 147: Grandwood Subdivision – Elora Transportation Impact Study...To the extent that this report is based on information supplied by other parties, Paradigm Transportation Solutions Limited

06/26/2017

170127 Granwood Subdivision 5:00 pm 06/13/2017 Baseline Synchro 9 ReportPage 13

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (veh/h) 38 1 24 1 1 11 7 26 1 4 18 10Future Volume (Veh/h) 38 1 24 1 1 11 7 26 1 4 18 10Sign Control Stop Stop Free FreeGrade 0% 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 41 1 26 1 1 12 8 28 1 4 20 11PedestriansLane Width (m)Walking Speed (m/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (m)pX, platoon unblockedvC, conflicting volume 90 78 26 104 84 28 31 29vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 90 78 26 104 84 28 31 29tC, single (s) 7.1 6.5 6.3 7.1 6.5 6.3 4.1 4.3tC, 2 stage (s)tF (s) 3.5 4.0 3.4 3.5 4.0 3.4 2.2 2.4p0 queue free % 95 100 97 100 100 99 99 100cM capacity (veh/h) 882 809 1028 852 804 1021 1595 1447

Direction, Lane # EB 1 WB 1 NB 1 SB 1Volume Total 68 14 37 35Volume Left 41 1 8 4Volume Right 26 12 1 11cSH 931 988 1595 1447Volume to Capacity 0.07 0.01 0.01 0.00Queue Length 95th (m) 1.8 0.3 0.1 0.1Control Delay (s) 9.2 8.7 1.6 0.9Lane LOS A A A AApproach Delay (s) 9.2 8.7 1.6 0.9Approach LOS A A

Intersection SummaryAverage Delay 5.4Intersection Capacity Utilization 20.3% ICU Level of Service AAnalysis Period (min) 15

Page 148: Grandwood Subdivision – Elora Transportation Impact Study...To the extent that this report is based on information supplied by other parties, Paradigm Transportation Solutions Limited

06/26/2017

170127 Granwood Subdivision 06/13/2017 Baseline Synchro 9 ReportPage 1

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 103 227 61 114 115 16 49 266 164 17 176 47Future Volume (vph) 103 227 61 114 115 16 49 266 164 17 176 47Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900Storage Length (m) 70.0 0.0 30.0 0.0 90.0 0.0 40.0 0.0Storage Lanes 1 0 1 0 1 0 1 0Taper Length (m) 2.5 7.6 2.5 2.5Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Frt 0.968 0.982 0.943 0.968Flt Protected 0.950 0.950 0.950 0.950Satd. Flow (prot) 1807 1823 0 1789 1838 0 1825 1779 0 1825 1745 0Flt Permitted 0.651 0.440 0.576 0.385Satd. Flow (perm) 1238 1823 0 829 1838 0 1107 1779 0 740 1745 0Right Turn on Red Yes Yes Yes YesSatd. Flow (RTOR) 17 9 53 23Link Speed (k/h) 48 48 48 48Link Distance (m) 186.0 1088.5 201.4 99.7Travel Time (s) 14.0 81.6 15.1 7.5Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 1% 2% 2% 2% 3% 0% 0% 3% 0% 0% 7% 5%Adj. Flow (vph) 112 247 66 124 125 17 53 289 178 18 191 51Shared Lane Traffic (%)Lane Group Flow (vph) 112 313 0 124 142 0 53 467 0 18 242 0Enter Blocked Intersection No No No No No No No No No No No NoLane Alignment Left Left Right Left Left Right Left Left Right Left Left RightMedian Width(m) 3.7 3.7 3.7 3.7Link Offset(m) 0.0 0.0 0.0 0.0Crosswalk Width(m) 1.6 4.9 1.6 1.6Two way Left Turn LaneHeadway Factor 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99Turning Speed (k/h) 24 14 24 14 24 14 24 14Turn Type Perm NA Perm NA Perm NA Perm NAProtected Phases 4 8 2 6Permitted Phases 4 8 2 6Minimum Split (s) 24.0 24.0 24.0 24.0 24.0 24.0 24.0 24.0Total Split (s) 38.0 38.0 38.0 38.0 52.0 52.0 52.0 52.0Total Split (%) 42.2% 42.2% 42.2% 42.2% 57.8% 57.8% 57.8% 57.8%Maximum Green (s) 32.0 32.0 32.0 32.0 46.0 46.0 46.0 46.0Yellow Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0All-Red Time (s) 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0Lost Time Adjust (s) -2.0 -2.0 -2.0 -2.0 -2.0 -2.0 -2.0 -2.0Total Lost Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0Lead/LagLead-Lag Optimize?Walk Time (s) 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0Flash Dont Walk (s) 11.0 11.0 11.0 11.0 11.0 11.0 11.0 11.0Pedestrian Calls (#/hr) 0 0 0 0 0 0 0 0Act Effct Green (s) 34.0 34.0 34.0 34.0 48.0 48.0 48.0 48.0Actuated g/C Ratio 0.38 0.38 0.38 0.38 0.53 0.53 0.53 0.53

06/26/2017

170127 Granwood Subdivision 06/13/2017 Baseline Synchro 9 ReportPage 2

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRv/c Ratio 0.24 0.45 0.40 0.20 0.09 0.48 0.05 0.26Control Delay 20.9 22.3 25.2 18.6 10.9 13.5 10.5 11.1Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 20.9 22.3 25.2 18.6 10.9 13.5 10.5 11.1LOS C C C B B B B BApproach Delay 21.9 21.7 13.2 11.0Approach LOS C C B BQueue Length 50th (m) 13.0 37.5 15.4 15.1 4.2 41.8 1.4 19.1Queue Length 95th (m) 25.2 60.0 30.9 27.8 9.9 65.7 4.6 32.4Internal Link Dist (m) 162.0 1064.5 177.4 75.7Turn Bay Length (m) 70.0 30.0 90.0 40.0Base Capacity (vph) 467 699 313 699 590 973 394 941Starvation Cap Reductn 0 0 0 0 0 0 0 0Spillback Cap Reductn 0 0 0 0 0 0 0 0Storage Cap Reductn 0 0 0 0 0 0 0 0Reduced v/c Ratio 0.24 0.45 0.40 0.20 0.09 0.48 0.05 0.26

Intersection SummaryArea Type: OtherCycle Length: 90Actuated Cycle Length: 90Offset: 0 (0%), Referenced to phase 2:NBTL and 6:SBTL, Start of GreenNatural Cycle: 50Control Type: PretimedMaximum v/c Ratio: 0.48Intersection Signal Delay: 16.9 Intersection LOS: BIntersection Capacity Utilization 63.5% ICU Level of Service BAnalysis Period (min) 15

Splits and Phases: 1: Wellington Road 7 & Wellington Road 21/McNab Street

Page 149: Grandwood Subdivision – Elora Transportation Impact Study...To the extent that this report is based on information supplied by other parties, Paradigm Transportation Solutions Limited

06/26/2017

170127 Granwood Subdivision 06/13/2017 Baseline Synchro 9 ReportPage 3

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 103 227 61 114 115 16 49 266 164 17 176 47Future Volume (vph) 103 227 61 114 115 16 49 266 164 17 176 47Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900Total Lost time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Frt 1.00 0.97 1.00 0.98 1.00 0.94 1.00 0.97Flt Protected 0.95 1.00 0.95 1.00 0.95 1.00 0.95 1.00Satd. Flow (prot) 1807 1824 1789 1838 1825 1778 1825 1746Flt Permitted 0.65 1.00 0.44 1.00 0.58 1.00 0.38 1.00Satd. Flow (perm) 1238 1824 828 1838 1107 1778 739 1746Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 112 247 66 124 125 17 53 289 178 18 191 51RTOR Reduction (vph) 0 11 0 0 6 0 0 25 0 0 11 0Lane Group Flow (vph) 112 302 0 124 136 0 53 442 0 18 231 0Heavy Vehicles (%) 1% 2% 2% 2% 3% 0% 0% 3% 0% 0% 7% 5%Turn Type Perm NA Perm NA Perm NA Perm NAProtected Phases 4 8 2 6Permitted Phases 4 8 2 6Actuated Green, G (s) 32.0 32.0 32.0 32.0 46.0 46.0 46.0 46.0Effective Green, g (s) 34.0 34.0 34.0 34.0 48.0 48.0 48.0 48.0Actuated g/C Ratio 0.38 0.38 0.38 0.38 0.53 0.53 0.53 0.53Clearance Time (s) 6.0 6.0 6.0 6.0 6.0 6.0 6.0 6.0Lane Grp Cap (vph) 467 689 312 694 590 948 394 931v/s Ratio Prot c0.17 0.07 c0.25 0.13v/s Ratio Perm 0.09 0.15 0.05 0.02v/c Ratio 0.24 0.44 0.40 0.20 0.09 0.47 0.05 0.25Uniform Delay, d1 19.2 20.9 20.5 18.8 10.3 13.0 10.0 11.3Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Incremental Delay, d2 1.2 2.0 3.8 0.6 0.3 1.6 0.2 0.6Delay (s) 20.4 22.9 24.3 19.5 10.6 14.7 10.3 11.9Level of Service C C C B B B B BApproach Delay (s) 22.2 21.7 14.3 11.8Approach LOS C C B B

Intersection SummaryHCM 2000 Control Delay 17.5 HCM 2000 Level of Service BHCM 2000 Volume to Capacity ratio 0.45Actuated Cycle Length (s) 90.0 Sum of lost time (s) 8.0Intersection Capacity Utilization 63.5% ICU Level of Service BAnalysis Period (min) 15c Critical Lane Group

06/26/2017

170127 Granwood Subdivision 06/13/2017 Baseline Synchro 9 ReportPage 4

Lane Group WBL WBR NBT NBR SBL SBTLane ConfigurationsTraffic Volume (vph) 23 40 591 40 22 421Future Volume (vph) 23 40 591 40 22 421Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900Storage Length (m) 0.0 0.0 30.0 0.0Storage Lanes 1 0 1 0Taper Length (m) 2.5 2.5Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00Frt 0.915 0.850Flt Protected 0.982 0.998Satd. Flow (prot) 1635 0 1865 1471 0 1805Flt Permitted 0.982 0.998Satd. Flow (perm) 1635 0 1865 1471 0 1805Link Speed (k/h) 48 48 48Link Distance (m) 92.0 115.2 201.4Travel Time (s) 6.9 8.6 15.1Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 10% 3% 3% 11% 11% 6%Adj. Flow (vph) 25 43 642 43 24 458Shared Lane Traffic (%)Lane Group Flow (vph) 68 0 642 43 0 482Enter Blocked Intersection No No No No No NoLane Alignment Left Right Left Right Left LeftMedian Width(m) 3.7 3.7 3.7Link Offset(m) 0.0 0.0 0.0Crosswalk Width(m) 1.6 1.6 1.6Two way Left Turn LaneHeadway Factor 0.99 0.99 0.99 0.99 0.99 0.99Turning Speed (k/h) 24 14 14 24Sign Control Stop Free Free

Intersection SummaryArea Type: OtherControl Type: UnsignalizedIntersection Capacity Utilization 50.5% ICU Level of Service AAnalysis Period (min) 15

Page 150: Grandwood Subdivision – Elora Transportation Impact Study...To the extent that this report is based on information supplied by other parties, Paradigm Transportation Solutions Limited

06/26/2017

170127 Granwood Subdivision 06/13/2017 Baseline Synchro 9 ReportPage 5

Movement WBL WBR NBT NBR SBL SBTLane ConfigurationsTraffic Volume (veh/h) 23 40 591 40 22 421Future Volume (Veh/h) 23 40 591 40 22 421Sign Control Stop Free FreeGrade 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 25 43 642 43 24 458PedestriansLane Width (m)Walking Speed (m/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (m) 201pX, platoon unblocked 0.99vC, conflicting volume 1148 642 685vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 1143 642 685tC, single (s) 6.5 6.2 4.2tC, 2 stage (s)tF (s) 3.6 3.3 2.3p0 queue free % 88 91 97cM capacity (veh/h) 205 472 868

Direction, Lane # WB 1 NB 1 NB 2 SB 1Volume Total 68 642 43 482Volume Left 25 0 0 24Volume Right 43 0 43 0cSH 319 1700 1700 868Volume to Capacity 0.21 0.38 0.03 0.03Queue Length 95th (m) 6.0 0.0 0.0 0.6Control Delay (s) 19.3 0.0 0.0 0.8Lane LOS C AApproach Delay (s) 19.3 0.0 0.8Approach LOS C

Intersection SummaryAverage Delay 1.4Intersection Capacity Utilization 50.5% ICU Level of Service AAnalysis Period (min) 15

06/26/2017

170127 Granwood Subdivision 06/13/2017 Baseline Synchro 9 ReportPage 6

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 5 51 5 9 33 24 16 18 3 31 8 14Future Volume (vph) 5 51 5 9 33 24 16 18 3 31 8 14Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Frt 0.990 0.951 0.990 0.965Flt Protected 0.996 0.993 0.979 0.972Satd. Flow (prot) 0 1857 0 0 1779 0 0 1825 0 0 1767 0Flt Permitted 0.996 0.993 0.979 0.972Satd. Flow (perm) 0 1857 0 0 1779 0 0 1825 0 0 1767 0Link Speed (k/h) 48 48 48 48Link Distance (m) 92.0 91.8 92.7 102.1Travel Time (s) 6.9 6.9 7.0 7.7Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 5 55 5 10 36 26 17 20 3 34 9 15Shared Lane Traffic (%)Lane Group Flow (vph) 0 65 0 0 72 0 0 40 0 0 58 0Enter Blocked Intersection No No No No No No No No No No No NoLane Alignment Left Left Right Left Left Right Left Left Right Left Left RightMedian Width(m) 0.0 0.0 0.0 0.0Link Offset(m) 0.0 0.0 0.0 0.0Crosswalk Width(m) 1.6 1.6 1.6 1.6Two way Left Turn LaneHeadway Factor 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99Turning Speed (k/h) 24 14 24 14 24 14 24 14Sign Control Free Free Stop Stop

Intersection SummaryArea Type: OtherControl Type: UnsignalizedIntersection Capacity Utilization 16.8% ICU Level of Service AAnalysis Period (min) 15

Page 151: Grandwood Subdivision – Elora Transportation Impact Study...To the extent that this report is based on information supplied by other parties, Paradigm Transportation Solutions Limited

06/26/2017

170127 Granwood Subdivision 06/13/2017 Baseline Synchro 9 ReportPage 7

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (veh/h) 5 51 5 9 33 24 16 18 3 31 8 14Future Volume (Veh/h) 5 51 5 9 33 24 16 18 3 31 8 14Sign Control Free Free Stop StopGrade 0% 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 5 55 5 10 36 26 17 20 3 34 9 15PedestriansLane Width (m)Walking Speed (m/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (m)pX, platoon unblockedvC, conflicting volume 62 60 156 150 58 150 139 49vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 62 60 156 150 58 150 139 49tC, single (s) 4.1 4.1 7.1 6.5 6.2 7.1 6.5 6.2tC, 2 stage (s)tF (s) 2.2 2.2 3.5 4.0 3.3 3.5 4.0 3.3p0 queue free % 100 99 98 97 100 96 99 99cM capacity (veh/h) 1541 1544 785 735 1009 793 745 1020

Direction, Lane # EB 1 WB 1 NB 1 SB 1Volume Total 65 72 40 58Volume Left 5 10 17 34Volume Right 5 26 3 15cSH 1541 1544 772 833Volume to Capacity 0.00 0.01 0.05 0.07Queue Length 95th (m) 0.1 0.1 1.2 1.7Control Delay (s) 0.6 1.1 9.9 9.6Lane LOS A A A AApproach Delay (s) 0.6 1.1 9.9 9.6Approach LOS A A

Intersection SummaryAverage Delay 4.6Intersection Capacity Utilization 16.8% ICU Level of Service AAnalysis Period (min) 15

06/26/2017

170127 Granwood Subdivision 06/13/2017 Baseline Synchro 9 ReportPage 8

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 23 60 4 0 35 8 18 18 1 9 8 12Future Volume (vph) 23 60 4 0 35 8 18 18 1 9 8 12Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Ped Bike FactorFrt 0.994 0.974 0.997 0.945Flt Protected 0.987 0.976 0.985Satd. Flow (prot) 0 1860 0 0 1786 0 0 1816 0 0 1595 0Flt Permitted 0.987 0.976 0.985Satd. Flow (perm) 0 1860 0 0 1786 0 0 1816 0 0 1595 0Link Speed (k/h) 48 48 48 48Link Distance (m) 91.8 278.1 75.3 102.9Travel Time (s) 6.9 20.9 5.6 7.7Confl. Peds. (#/hr) 1 1Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 5% 0% 0% 0% 0% 25% 6% 0% 0% 0% 43% 0%Adj. Flow (vph) 25 65 4 0 38 9 20 20 1 10 9 13Shared Lane Traffic (%)Lane Group Flow (vph) 0 94 0 0 47 0 0 41 0 0 32 0Enter Blocked Intersection No No No No No No No No No No No NoLane Alignment Left Left Right Left Left Right Left Left Right Left Left RightMedian Width(m) 0.0 0.0 0.0 0.0Link Offset(m) 0.0 0.0 0.0 0.0Crosswalk Width(m) 1.6 1.6 1.6 1.6Two way Left Turn LaneHeadway Factor 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99Turning Speed (k/h) 24 14 24 14 24 14 24 14Sign Control Free Free Stop Stop

Intersection SummaryArea Type: OtherControl Type: UnsignalizedIntersection Capacity Utilization 21.7% ICU Level of Service AAnalysis Period (min) 15

Page 152: Grandwood Subdivision – Elora Transportation Impact Study...To the extent that this report is based on information supplied by other parties, Paradigm Transportation Solutions Limited

06/26/2017

170127 Granwood Subdivision 06/13/2017 Baseline Synchro 9 ReportPage 9

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (veh/h) 23 60 4 0 35 8 18 18 1 9 8 12Future Volume (Veh/h) 23 60 4 0 35 8 18 18 1 9 8 12Sign Control Free Free Stop StopGrade 0% 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 25 65 4 0 38 9 20 20 1 10 9 13Pedestrians 1Lane Width (m) 3.7Walking Speed (m/s) 1.1Percent Blockage 0Right turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (m)pX, platoon unblockedvC, conflicting volume 47 69 177 164 68 172 162 42vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 47 69 177 164 68 172 162 42tC, single (s) 4.1 4.1 7.2 6.5 6.2 7.1 6.9 6.2tC, 2 stage (s)tF (s) 2.2 2.2 3.6 4.0 3.3 3.5 4.4 3.3p0 queue free % 98 100 97 97 100 99 99 99cM capacity (veh/h) 1541 1545 749 720 1000 768 652 1034

Direction, Lane # EB 1 WB 1 NB 1 SB 1Volume Total 94 47 41 32Volume Left 25 0 20 10Volume Right 4 9 1 13cSH 1541 1545 739 812Volume to Capacity 0.02 0.00 0.06 0.04Queue Length 95th (m) 0.4 0.0 1.3 0.9Control Delay (s) 2.1 0.0 10.2 9.6Lane LOS A B AApproach Delay (s) 2.1 0.0 10.2 9.6Approach LOS B A

Intersection SummaryAverage Delay 4.3Intersection Capacity Utilization 21.7% ICU Level of Service AAnalysis Period (min) 15

06/26/2017

170127 Granwood Subdivision 06/13/2017 Baseline Synchro 9 ReportPage 10

Lane Group EBL EBR NBL NBT SBT SBRLane ConfigurationsTraffic Volume (vph) 5 43 4 54 40 17Future Volume (vph) 5 43 4 54 40 17Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00Frt 0.878 0.960Flt Protected 0.995 0.997Satd. Flow (prot) 1645 0 0 1878 1808 0Flt Permitted 0.995 0.997Satd. Flow (perm) 1645 0 0 1878 1808 0Link Speed (k/h) 48 48 48Link Distance (m) 1088.5 119.7 61.8Travel Time (s) 81.6 9.0 4.6Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 5 47 4 59 43 18Shared Lane Traffic (%)Lane Group Flow (vph) 52 0 0 63 61 0Enter Blocked Intersection No No No No No NoLane Alignment Left Right Left Left Left RightMedian Width(m) 7.4 0.0 0.0Link Offset(m) 0.0 0.0 0.0Crosswalk Width(m) 4.9 1.6 1.6Two way Left Turn LaneHeadway Factor 0.99 0.99 0.99 0.99 0.99 0.99Turning Speed (k/h) 24 14 24 14Sign Control Stop Free Free

Intersection SummaryArea Type: OtherControl Type: UnsignalizedIntersection Capacity Utilization 16.1% ICU Level of Service AAnalysis Period (min) 15

Page 153: Grandwood Subdivision – Elora Transportation Impact Study...To the extent that this report is based on information supplied by other parties, Paradigm Transportation Solutions Limited

06/26/2017

170127 Granwood Subdivision 06/13/2017 Baseline Synchro 9 ReportPage 11

Movement EBL EBR NBL NBT SBT SBRLane ConfigurationsTraffic Volume (veh/h) 5 43 4 54 40 17Future Volume (Veh/h) 5 43 4 54 40 17Sign Control Stop Free FreeGrade 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 5 47 4 59 43 18PedestriansLane Width (m)Walking Speed (m/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (m)pX, platoon unblockedvC, conflicting volume 119 52 61vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 119 52 61tC, single (s) 6.4 6.2 4.1tC, 2 stage (s)tF (s) 3.5 3.3 2.2p0 queue free % 99 95 100cM capacity (veh/h) 874 1016 1542

Direction, Lane # EB 1 NB 1 SB 1Volume Total 52 63 61Volume Left 5 4 0Volume Right 47 0 18cSH 1000 1542 1700Volume to Capacity 0.05 0.00 0.04Queue Length 95th (m) 1.2 0.1 0.0Control Delay (s) 8.8 0.5 0.0Lane LOS A AApproach Delay (s) 8.8 0.5 0.0Approach LOS A

Intersection SummaryAverage Delay 2.8Intersection Capacity Utilization 16.1% ICU Level of Service AAnalysis Period (min) 15

06/26/2017

170127 Granwood Subdivision 06/13/2017 Baseline Synchro 9 ReportPage 12

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 21 1 19 3 2 10 24 29 5 14 35 33Future Volume (vph) 21 1 19 3 2 10 24 29 5 14 35 33Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Frt 0.937 0.907 0.989 0.945Flt Protected 0.975 0.991 0.980 0.992Satd. Flow (prot) 0 1591 0 0 1400 0 0 1825 0 0 1709 0Flt Permitted 0.975 0.991 0.980 0.992Satd. Flow (perm) 0 1591 0 0 1400 0 0 1825 0 0 1709 0Link Speed (k/h) 48 48 48 48Link Distance (m) 290.8 201.2 123.6 119.7Travel Time (s) 21.8 15.1 9.3 9.0Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 11% 0% 10% 33% 0% 25% 0% 4% 0% 0% 6% 7%Adj. Flow (vph) 23 1 21 3 2 11 26 32 5 15 38 36Shared Lane Traffic (%)Lane Group Flow (vph) 0 45 0 0 16 0 0 63 0 0 89 0Enter Blocked Intersection No No No No No No No No No No No NoLane Alignment Left Left Right Left Left Right Left Left Right Left Left RightMedian Width(m) 0.0 0.0 0.0 0.0Link Offset(m) 0.0 0.0 0.0 0.0Crosswalk Width(m) 1.6 1.6 1.6 1.6Two way Left Turn LaneHeadway Factor 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99Turning Speed (k/h) 24 14 24 14 24 14 24 14Sign Control Stop Stop Free Free

Intersection SummaryArea Type: OtherControl Type: UnsignalizedIntersection Capacity Utilization 18.4% ICU Level of Service AAnalysis Period (min) 15

Page 154: Grandwood Subdivision – Elora Transportation Impact Study...To the extent that this report is based on information supplied by other parties, Paradigm Transportation Solutions Limited

06/26/2017

170127 Granwood Subdivision 06/13/2017 Baseline Synchro 9 ReportPage 13

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (veh/h) 21 1 19 3 2 10 24 29 5 14 35 33Future Volume (Veh/h) 21 1 19 3 2 10 24 29 5 14 35 33Sign Control Stop Stop Free FreeGrade 0% 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 23 1 21 3 2 11 26 32 5 15 38 36PedestriansLane Width (m)Walking Speed (m/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (m)pX, platoon unblockedvC, conflicting volume 184 175 56 194 190 34 74 37vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 184 175 56 194 190 34 74 37tC, single (s) 7.2 6.5 6.3 7.4 6.5 6.5 4.1 4.1tC, 2 stage (s)tF (s) 3.6 4.0 3.4 3.8 4.0 3.5 2.2 2.2p0 queue free % 97 100 98 100 100 99 98 99cM capacity (veh/h) 732 703 988 673 689 976 1538 1587

Direction, Lane # EB 1 WB 1 NB 1 SB 1Volume Total 45 16 63 89Volume Left 23 3 26 15Volume Right 21 11 5 36cSH 832 859 1538 1587Volume to Capacity 0.05 0.02 0.02 0.01Queue Length 95th (m) 1.3 0.4 0.4 0.2Control Delay (s) 9.6 9.3 3.1 1.3Lane LOS A A A AApproach Delay (s) 9.6 9.3 3.1 1.3Approach LOS A A

Intersection SummaryAverage Delay 4.2Intersection Capacity Utilization 18.4% ICU Level of Service AAnalysis Period (min) 15

Page 155: Grandwood Subdivision – Elora Transportation Impact Study...To the extent that this report is based on information supplied by other parties, Paradigm Transportation Solutions Limited

06/26/2017

170127 Granwood Subdivision 5:00 pm 06/13/2017 Baseline Synchro 9 ReportPage 1

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 27 125 45 160 288 49 59 177 66 23 300 74Future Volume (vph) 27 125 45 160 288 49 59 177 66 23 300 74Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900Storage Length (m) 70.0 0.0 30.0 0.0 90.0 0.0 40.0 0.0Storage Lanes 1 0 1 0 1 0 1 0Taper Length (m) 2.5 7.6 2.5 2.5Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Frt 0.960 0.978 0.959 0.970Flt Protected 0.950 0.950 0.950 0.950Satd. Flow (prot) 1472 1689 0 1807 1839 0 1755 1692 0 1825 1768 0Flt Permitted 0.379 0.595 0.434 0.556Satd. Flow (perm) 587 1689 0 1132 1839 0 802 1692 0 1068 1768 0Right Turn on Red Yes Yes Yes YesSatd. Flow (RTOR) 23 11 32 21Link Speed (k/h) 48 48 48 48Link Distance (m) 186.0 1088.5 201.4 99.7Travel Time (s) 14.0 81.6 15.1 7.5Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 24% 6% 18% 1% 1% 9% 4% 10% 6% 0% 6% 3%Adj. Flow (vph) 29 136 49 174 313 53 64 192 72 25 326 80Shared Lane Traffic (%)Lane Group Flow (vph) 29 185 0 174 366 0 64 264 0 25 406 0Enter Blocked Intersection No No No No No No No No No No No NoLane Alignment Left Left Right Left Left Right Left Left Right Left Left RightMedian Width(m) 3.7 3.7 3.7 3.7Link Offset(m) 0.0 0.0 0.0 0.0Crosswalk Width(m) 1.6 4.9 1.6 1.6Two way Left Turn LaneHeadway Factor 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99Turning Speed (k/h) 24 14 24 14 24 14 24 14Turn Type Perm NA Perm NA Perm NA Perm NAProtected Phases 4 8 2 6Permitted Phases 4 8 2 6Minimum Split (s) 24.0 24.0 24.0 24.0 24.0 24.0 24.0 24.0Total Split (s) 38.0 38.0 38.0 38.0 52.0 52.0 52.0 52.0Total Split (%) 42.2% 42.2% 42.2% 42.2% 57.8% 57.8% 57.8% 57.8%Maximum Green (s) 32.0 32.0 32.0 32.0 46.0 46.0 46.0 46.0Yellow Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0All-Red Time (s) 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0Lost Time Adjust (s) -2.0 -2.0 -2.0 -2.0 -2.0 -2.0 -2.0 -2.0Total Lost Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0Lead/LagLead-Lag Optimize?Walk Time (s) 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0Flash Dont Walk (s) 11.0 11.0 11.0 11.0 11.0 11.0 11.0 11.0Pedestrian Calls (#/hr) 0 0 0 0 0 0 0 0Act Effct Green (s) 34.0 34.0 34.0 34.0 48.0 48.0 48.0 48.0Actuated g/C Ratio 0.38 0.38 0.38 0.38 0.53 0.53 0.53 0.53

06/26/2017

170127 Granwood Subdivision 5:00 pm 06/13/2017 Baseline Synchro 9 ReportPage 2

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRv/c Ratio 0.13 0.28 0.41 0.52 0.15 0.29 0.04 0.43Control Delay 20.4 18.4 24.2 24.3 11.9 11.1 10.4 13.7Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 20.4 18.4 24.2 24.3 11.9 11.1 10.4 13.7LOS C B C C B B B BApproach Delay 18.7 24.3 11.2 13.5Approach LOS B C B BQueue Length 50th (m) 3.2 18.9 21.7 46.6 5.3 20.5 2.0 37.6Queue Length 95th (m) 9.4 34.3 39.4 72.5 12.0 34.8 5.6 58.7Internal Link Dist (m) 162.0 1064.5 177.4 75.7Turn Bay Length (m) 70.0 30.0 90.0 40.0Base Capacity (vph) 221 652 427 701 427 917 569 952Starvation Cap Reductn 0 0 0 0 0 0 0 0Spillback Cap Reductn 0 0 0 0 0 0 0 0Storage Cap Reductn 0 0 0 0 0 0 0 0Reduced v/c Ratio 0.13 0.28 0.41 0.52 0.15 0.29 0.04 0.43

Intersection SummaryArea Type: OtherCycle Length: 90Actuated Cycle Length: 90Offset: 0 (0%), Referenced to phase 2:NBTL and 6:SBTL, Start of GreenNatural Cycle: 50Control Type: PretimedMaximum v/c Ratio: 0.52Intersection Signal Delay: 17.6 Intersection LOS: BIntersection Capacity Utilization 60.1% ICU Level of Service BAnalysis Period (min) 15

Splits and Phases: 1: Wellington Road 7 & Wellington Road 21/McNab Street

Page 156: Grandwood Subdivision – Elora Transportation Impact Study...To the extent that this report is based on information supplied by other parties, Paradigm Transportation Solutions Limited

06/26/2017

170127 Granwood Subdivision 5:00 pm 06/13/2017 Baseline Synchro 9 ReportPage 3

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 27 125 45 160 288 49 59 177 66 23 300 74Future Volume (vph) 27 125 45 160 288 49 59 177 66 23 300 74Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900Total Lost time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Frt 1.00 0.96 1.00 0.98 1.00 0.96 1.00 0.97Flt Protected 0.95 1.00 0.95 1.00 0.95 1.00 0.95 1.00Satd. Flow (prot) 1472 1690 1807 1840 1755 1692 1825 1769Flt Permitted 0.38 1.00 0.60 1.00 0.43 1.00 0.56 1.00Satd. Flow (perm) 587 1690 1132 1840 801 1692 1069 1769Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 29 136 49 174 313 53 64 192 72 25 326 80RTOR Reduction (vph) 0 14 0 0 7 0 0 15 0 0 10 0Lane Group Flow (vph) 29 171 0 174 359 0 64 249 0 25 396 0Heavy Vehicles (%) 24% 6% 18% 1% 1% 9% 4% 10% 6% 0% 6% 3%Turn Type Perm NA Perm NA Perm NA Perm NAProtected Phases 4 8 2 6Permitted Phases 4 8 2 6Actuated Green, G (s) 32.0 32.0 32.0 32.0 46.0 46.0 46.0 46.0Effective Green, g (s) 34.0 34.0 34.0 34.0 48.0 48.0 48.0 48.0Actuated g/C Ratio 0.38 0.38 0.38 0.38 0.53 0.53 0.53 0.53Clearance Time (s) 6.0 6.0 6.0 6.0 6.0 6.0 6.0 6.0Lane Grp Cap (vph) 221 638 427 695 427 902 570 943v/s Ratio Prot 0.10 c0.20 0.15 c0.22v/s Ratio Perm 0.05 0.15 0.08 0.02v/c Ratio 0.13 0.27 0.41 0.52 0.15 0.28 0.04 0.42Uniform Delay, d1 18.3 19.4 20.6 21.6 10.7 11.5 10.0 12.6Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Incremental Delay, d2 1.2 1.0 2.9 2.7 0.7 0.8 0.1 1.4Delay (s) 19.6 20.4 23.5 24.4 11.4 12.3 10.2 14.0Level of Service B C C C B B B BApproach Delay (s) 20.3 24.1 12.1 13.8Approach LOS C C B B

Intersection SummaryHCM 2000 Control Delay 18.0 HCM 2000 Level of Service BHCM 2000 Volume to Capacity ratio 0.46Actuated Cycle Length (s) 90.0 Sum of lost time (s) 8.0Intersection Capacity Utilization 60.1% ICU Level of Service BAnalysis Period (min) 15c Critical Lane Group

06/26/2017

170127 Granwood Subdivision 5:00 pm 06/13/2017 Baseline Synchro 9 ReportPage 4

Lane Group WBL WBR NBT NBR SBL SBTLane ConfigurationsTraffic Volume (vph) 30 52 380 28 55 673Future Volume (vph) 30 52 380 28 55 673Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900Storage Length (m) 0.0 0.0 30.0 0.0Storage Lanes 1 0 1 0Taper Length (m) 2.5 2.5Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00Frt 0.914 0.850Flt Protected 0.982 0.996Satd. Flow (prot) 1339 0 1779 1498 0 1824Flt Permitted 0.982 0.996Satd. Flow (perm) 1339 0 1779 1498 0 1824Link Speed (k/h) 48 48 48Link Distance (m) 92.0 115.2 201.4Travel Time (s) 6.9 8.6 15.1Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 25% 31% 8% 9% 4% 5%Adj. Flow (vph) 33 57 413 30 60 732Shared Lane Traffic (%)Lane Group Flow (vph) 90 0 413 30 0 792Enter Blocked Intersection No No No No No NoLane Alignment Left Right Left Right Left LeftMedian Width(m) 3.7 3.7 3.7Link Offset(m) 0.0 0.0 0.0Crosswalk Width(m) 1.6 1.6 1.6Two way Left Turn LaneHeadway Factor 0.99 0.99 0.99 0.99 0.99 0.99Turning Speed (k/h) 24 14 14 24Sign Control Stop Free Free

Intersection SummaryArea Type: OtherControl Type: UnsignalizedIntersection Capacity Utilization 73.3% ICU Level of Service DAnalysis Period (min) 15

Page 157: Grandwood Subdivision – Elora Transportation Impact Study...To the extent that this report is based on information supplied by other parties, Paradigm Transportation Solutions Limited

06/26/2017

170127 Granwood Subdivision 5:00 pm 06/13/2017 Baseline Synchro 9 ReportPage 5

Movement WBL WBR NBT NBR SBL SBTLane ConfigurationsTraffic Volume (veh/h) 30 52 380 28 55 673Future Volume (Veh/h) 30 52 380 28 55 673Sign Control Stop Free FreeGrade 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 33 57 413 30 60 732PedestriansLane Width (m)Walking Speed (m/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (m) 201pX, platoon unblocked 0.87vC, conflicting volume 1265 413 443vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 1229 413 443tC, single (s) 6.6 6.5 4.1tC, 2 stage (s)tF (s) 3.7 3.6 2.2p0 queue free % 77 90 95cM capacity (veh/h) 145 581 1107

Direction, Lane # WB 1 NB 1 NB 2 SB 1Volume Total 90 413 30 792Volume Left 33 0 0 60Volume Right 57 0 30 0cSH 276 1700 1700 1107Volume to Capacity 0.33 0.24 0.02 0.05Queue Length 95th (m) 10.4 0.0 0.0 1.3Control Delay (s) 24.3 0.0 0.0 1.4Lane LOS C AApproach Delay (s) 24.3 0.0 1.4Approach LOS C

Intersection SummaryAverage Delay 2.5Intersection Capacity Utilization 73.3% ICU Level of Service DAnalysis Period (min) 15

06/26/2017

170127 Granwood Subdivision 5:00 pm 06/13/2017 Baseline Synchro 9 ReportPage 6

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 16 49 18 4 69 31 7 5 0 6 11 6Future Volume (vph) 16 49 18 4 69 31 7 5 0 6 11 6Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Frt 0.970 0.959 0.964Flt Protected 0.991 0.998 0.970 0.987Satd. Flow (prot) 0 1810 0 0 1803 0 0 1827 0 0 1792 0Flt Permitted 0.991 0.998 0.970 0.987Satd. Flow (perm) 0 1810 0 0 1803 0 0 1827 0 0 1792 0Link Speed (k/h) 48 48 48 48Link Distance (m) 92.0 91.8 92.7 102.1Travel Time (s) 6.9 6.9 7.0 7.7Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 17 53 20 4 75 34 8 5 0 7 12 7Shared Lane Traffic (%)Lane Group Flow (vph) 0 90 0 0 113 0 0 13 0 0 26 0Enter Blocked Intersection No No No No No No No No No No No NoLane Alignment Left Left Right Left Left Right Left Left Right Left Left RightMedian Width(m) 0.0 0.0 0.0 0.0Link Offset(m) 0.0 0.0 0.0 0.0Crosswalk Width(m) 1.6 1.6 1.6 1.6Two way Left Turn LaneHeadway Factor 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99Turning Speed (k/h) 24 14 24 14 24 14 24 14Sign Control Free Free Stop Stop

Intersection SummaryArea Type: OtherControl Type: UnsignalizedIntersection Capacity Utilization 20.9% ICU Level of Service AAnalysis Period (min) 15

Page 158: Grandwood Subdivision – Elora Transportation Impact Study...To the extent that this report is based on information supplied by other parties, Paradigm Transportation Solutions Limited

06/26/2017

170127 Granwood Subdivision 5:00 pm 06/13/2017 Baseline Synchro 9 ReportPage 7

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (veh/h) 16 49 18 4 69 31 7 5 0 6 11 6Future Volume (Veh/h) 16 49 18 4 69 31 7 5 0 6 11 6Sign Control Free Free Stop StopGrade 0% 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 17 53 20 4 75 34 8 5 0 7 12 7PedestriansLane Width (m)Walking Speed (m/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (m)pX, platoon unblockedvC, conflicting volume 109 73 210 214 63 200 207 92vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 109 73 210 214 63 200 207 92tC, single (s) 4.1 4.1 7.1 6.5 6.2 7.1 6.5 6.2tC, 2 stage (s)tF (s) 2.2 2.2 3.5 4.0 3.3 3.5 4.0 3.3p0 queue free % 99 100 99 99 100 99 98 99cM capacity (veh/h) 1481 1527 724 674 1002 747 680 965

Direction, Lane # EB 1 WB 1 NB 1 SB 1Volume Total 90 113 13 26Volume Left 17 4 8 7Volume Right 20 34 0 7cSH 1481 1527 704 759Volume to Capacity 0.01 0.00 0.02 0.03Queue Length 95th (m) 0.3 0.1 0.4 0.8Control Delay (s) 1.5 0.3 10.2 9.9Lane LOS A A B AApproach Delay (s) 1.5 0.3 10.2 9.9Approach LOS B A

Intersection SummaryAverage Delay 2.3Intersection Capacity Utilization 20.9% ICU Level of Service AAnalysis Period (min) 15

06/26/2017

170127 Granwood Subdivision 5:00 pm 06/13/2017 Baseline Synchro 9 ReportPage 8

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 16 21 18 4 56 6 7 5 0 3 11 40Future Volume (vph) 16 21 18 4 56 6 7 5 0 3 11 40Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Ped Bike FactorFrt 0.955 0.987 0.900Flt Protected 0.986 0.997 0.970 0.997Satd. Flow (prot) 0 1414 0 0 1716 0 0 1319 0 0 1685 0Flt Permitted 0.986 0.997 0.970 0.997Satd. Flow (perm) 0 1414 0 0 1716 0 0 1319 0 0 1685 0Link Speed (k/h) 48 48 48 48Link Distance (m) 91.8 278.1 75.3 102.9Travel Time (s) 6.9 20.9 5.6 7.7Confl. Peds. (#/hr) 1 1Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 15% 33% 33% 0% 12% 0% 67% 0% 0% 0% 11% 0%Adj. Flow (vph) 17 23 20 4 61 7 8 5 0 3 12 43Shared Lane Traffic (%)Lane Group Flow (vph) 0 60 0 0 72 0 0 13 0 0 58 0Enter Blocked Intersection No No No No No No No No No No No NoLane Alignment Left Left Right Left Left Right Left Left Right Left Left RightMedian Width(m) 0.0 0.0 0.0 0.0Link Offset(m) 0.0 0.0 0.0 0.0Crosswalk Width(m) 1.6 1.6 1.6 1.6Two way Left Turn LaneHeadway Factor 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99Turning Speed (k/h) 24 14 24 14 24 14 24 14Sign Control Free Free Stop Stop

Intersection SummaryArea Type: OtherControl Type: UnsignalizedIntersection Capacity Utilization 18.7% ICU Level of Service AAnalysis Period (min) 15

Page 159: Grandwood Subdivision – Elora Transportation Impact Study...To the extent that this report is based on information supplied by other parties, Paradigm Transportation Solutions Limited

06/26/2017

170127 Granwood Subdivision 5:00 pm 06/13/2017 Baseline Synchro 9 ReportPage 9

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (veh/h) 16 21 18 4 56 6 7 5 0 3 11 40Future Volume (Veh/h) 16 21 18 4 56 6 7 5 0 3 11 40Sign Control Free Free Stop StopGrade 0% 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 17 23 20 4 61 7 8 5 0 3 12 43Pedestrians 1Lane Width (m) 3.7Walking Speed (m/s) 1.1Percent Blockage 0Right turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (m)pX, platoon unblockedvC, conflicting volume 68 43 190 143 33 142 150 66vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 68 43 190 143 33 142 150 66tC, single (s) 4.2 4.1 7.8 6.5 6.2 7.1 6.6 6.2tC, 2 stage (s)tF (s) 2.3 2.2 4.1 4.0 3.3 3.5 4.1 3.3p0 queue free % 99 100 99 99 100 100 98 96cM capacity (veh/h) 1454 1579 605 741 1046 819 716 1003

Direction, Lane # EB 1 WB 1 NB 1 SB 1Volume Total 60 72 13 58Volume Left 17 4 8 3Volume Right 20 7 0 43cSH 1454 1579 651 916Volume to Capacity 0.01 0.00 0.02 0.06Queue Length 95th (m) 0.3 0.1 0.5 1.5Control Delay (s) 2.2 0.4 10.6 9.2Lane LOS A A B AApproach Delay (s) 2.2 0.4 10.6 9.2Approach LOS B A

Intersection SummaryAverage Delay 4.1Intersection Capacity Utilization 18.7% ICU Level of Service AAnalysis Period (min) 15

06/26/2017

170127 Granwood Subdivision 5:00 pm 06/13/2017 Baseline Synchro 9 ReportPage 10

Lane Group EBL EBR NBL NBT SBT SBRLane ConfigurationsTraffic Volume (vph) 23 39 108 69 30 13Future Volume (vph) 23 39 108 69 30 13Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00Frt 0.915 0.960Flt Protected 0.982 0.970Satd. Flow (prot) 1692 0 0 1827 1808 0Flt Permitted 0.982 0.970Satd. Flow (perm) 1692 0 0 1827 1808 0Link Speed (k/h) 48 48 48Link Distance (m) 1088.5 119.7 61.8Travel Time (s) 81.6 9.0 4.6Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 25 42 117 75 33 14Shared Lane Traffic (%)Lane Group Flow (vph) 67 0 0 192 47 0Enter Blocked Intersection No No No No No NoLane Alignment Left Right Left Left Left RightMedian Width(m) 7.4 0.0 0.0Link Offset(m) 0.0 0.0 0.0Crosswalk Width(m) 4.9 1.6 1.6Two way Left Turn LaneHeadway Factor 0.99 0.99 0.99 0.99 0.99 0.99Turning Speed (k/h) 24 14 24 14Sign Control Stop Free Free

Intersection SummaryArea Type: OtherControl Type: UnsignalizedIntersection Capacity Utilization 26.6% ICU Level of Service AAnalysis Period (min) 15

Page 160: Grandwood Subdivision – Elora Transportation Impact Study...To the extent that this report is based on information supplied by other parties, Paradigm Transportation Solutions Limited

06/26/2017

170127 Granwood Subdivision 5:00 pm 06/13/2017 Baseline Synchro 9 ReportPage 11

Movement EBL EBR NBL NBT SBT SBRLane ConfigurationsTraffic Volume (veh/h) 23 39 108 69 30 13Future Volume (Veh/h) 23 39 108 69 30 13Sign Control Stop Free FreeGrade 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 25 42 117 75 33 14PedestriansLane Width (m)Walking Speed (m/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (m)pX, platoon unblockedvC, conflicting volume 349 40 47vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 349 40 47tC, single (s) 6.4 6.2 4.1tC, 2 stage (s)tF (s) 3.5 3.3 2.2p0 queue free % 96 96 93cM capacity (veh/h) 600 1031 1560

Direction, Lane # EB 1 NB 1 SB 1Volume Total 67 192 47Volume Left 25 117 0Volume Right 42 0 14cSH 813 1560 1700Volume to Capacity 0.08 0.07 0.03Queue Length 95th (m) 2.0 1.8 0.0Control Delay (s) 9.8 4.8 0.0Lane LOS A AApproach Delay (s) 9.8 4.8 0.0Approach LOS A

Intersection SummaryAverage Delay 5.2Intersection Capacity Utilization 26.6% ICU Level of Service AAnalysis Period (min) 15

06/26/2017

170127 Granwood Subdivision 5:00 pm 06/13/2017 Baseline Synchro 9 ReportPage 12

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 40 1 25 14 1 92 8 44 5 32 26 11Future Volume (vph) 40 1 25 14 1 92 8 44 5 32 26 11Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Frt 0.949 0.884 0.989 0.978Flt Protected 0.971 0.994 0.993 0.977Satd. Flow (prot) 0 1705 0 0 1542 0 0 1697 0 0 1539 0Flt Permitted 0.971 0.994 0.993 0.977Satd. Flow (perm) 0 1705 0 0 1542 0 0 1697 0 0 1539 0Link Speed (k/h) 48 48 48 48Link Distance (m) 290.8 201.2 123.6 119.7Travel Time (s) 21.8 15.1 9.3 9.0Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 0% 0% 10% 0% 0% 11% 0% 4% 100% 25% 13% 17%Adj. Flow (vph) 43 1 27 15 1 100 9 48 5 35 28 12Shared Lane Traffic (%)Lane Group Flow (vph) 0 71 0 0 116 0 0 62 0 0 75 0Enter Blocked Intersection No No No No No No No No No No No NoLane Alignment Left Left Right Left Left Right Left Left Right Left Left RightMedian Width(m) 0.0 0.0 0.0 0.0Link Offset(m) 0.0 0.0 0.0 0.0Crosswalk Width(m) 1.6 1.6 1.6 1.6Two way Left Turn LaneHeadway Factor 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99Turning Speed (k/h) 24 14 24 14 24 14 24 14Sign Control Stop Stop Free Free

Intersection SummaryArea Type: OtherControl Type: UnsignalizedIntersection Capacity Utilization 26.7% ICU Level of Service AAnalysis Period (min) 15

Page 161: Grandwood Subdivision – Elora Transportation Impact Study...To the extent that this report is based on information supplied by other parties, Paradigm Transportation Solutions Limited

06/26/2017

170127 Granwood Subdivision 5:00 pm 06/13/2017 Baseline Synchro 9 ReportPage 13

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (veh/h) 40 1 25 14 1 92 8 44 5 32 26 11Future Volume (Veh/h) 40 1 25 14 1 92 8 44 5 32 26 11Sign Control Stop Stop Free FreeGrade 0% 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 43 1 27 15 1 100 9 48 5 35 28 12PedestriansLane Width (m)Walking Speed (m/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (m)pX, platoon unblockedvC, conflicting volume 273 175 34 200 178 50 40 53vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 273 175 34 200 178 50 40 53tC, single (s) 7.1 6.5 6.3 7.1 6.5 6.3 4.1 4.3tC, 2 stage (s)tF (s) 3.5 4.0 3.4 3.5 4.0 3.4 2.2 2.4p0 queue free % 93 100 97 98 100 90 99 98cM capacity (veh/h) 600 700 1017 725 697 993 1583 1417

Direction, Lane # EB 1 WB 1 NB 1 SB 1Volume Total 71 116 62 75Volume Left 43 15 9 35Volume Right 27 100 5 12cSH 712 944 1583 1417Volume to Capacity 0.10 0.12 0.01 0.02Queue Length 95th (m) 2.5 3.2 0.1 0.6Control Delay (s) 10.6 9.3 1.1 3.7Lane LOS B A A AApproach Delay (s) 10.6 9.3 1.1 3.7Approach LOS B A

Intersection SummaryAverage Delay 6.7Intersection Capacity Utilization 26.7% ICU Level of Service AAnalysis Period (min) 15

Page 162: Grandwood Subdivision – Elora Transportation Impact Study...To the extent that this report is based on information supplied by other parties, Paradigm Transportation Solutions Limited

06/26/2017

170127 Granwood Subdivision 06/13/2017 Baseline Synchro 9 ReportPage 1

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 116 366 68 136 193 38 55 309 198 72 197 53Future Volume (vph) 116 366 68 136 193 38 55 309 198 72 197 53Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900Storage Length (m) 70.0 0.0 30.0 0.0 90.0 0.0 40.0 0.0Storage Lanes 1 0 1 0 1 0 1 0Taper Length (m) 2.5 7.6 2.5 2.5Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Frt 0.976 0.975 0.941 0.968Flt Protected 0.950 0.950 0.950 0.950Satd. Flow (prot) 1807 1838 0 1789 1827 0 1825 1775 0 1825 1745 0Flt Permitted 0.513 0.262 0.549 0.319Satd. Flow (perm) 976 1838 0 493 1827 0 1055 1775 0 613 1745 0Right Turn on Red Yes Yes Yes YesSatd. Flow (RTOR) 12 13 55 23Link Speed (k/h) 48 48 48 48Link Distance (m) 186.0 1088.5 201.4 99.7Travel Time (s) 14.0 81.6 15.1 7.5Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 1% 2% 2% 2% 3% 0% 0% 3% 0% 0% 7% 5%Adj. Flow (vph) 126 398 74 148 210 41 60 336 215 78 214 58Shared Lane Traffic (%)Lane Group Flow (vph) 126 472 0 148 251 0 60 551 0 78 272 0Enter Blocked Intersection No No No No No No No No No No No NoLane Alignment Left Left Right Left Left Right Left Left Right Left Left RightMedian Width(m) 3.7 3.7 3.7 3.7Link Offset(m) 0.0 0.0 0.0 0.0Crosswalk Width(m) 1.6 4.9 1.6 1.6Two way Left Turn LaneHeadway Factor 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99Turning Speed (k/h) 24 14 24 14 24 14 24 14Turn Type Perm NA Perm NA Perm NA Perm NAProtected Phases 4 8 2 6Permitted Phases 4 8 2 6Minimum Split (s) 24.0 24.0 24.0 24.0 24.0 24.0 24.0 24.0Total Split (s) 38.0 38.0 38.0 38.0 52.0 52.0 52.0 52.0Total Split (%) 42.2% 42.2% 42.2% 42.2% 57.8% 57.8% 57.8% 57.8%Maximum Green (s) 32.0 32.0 32.0 32.0 46.0 46.0 46.0 46.0Yellow Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0All-Red Time (s) 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0Lost Time Adjust (s) -2.0 -2.0 -2.0 -2.0 -2.0 -2.0 -2.0 -2.0Total Lost Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0Lead/LagLead-Lag Optimize?Walk Time (s) 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0Flash Dont Walk (s) 11.0 11.0 11.0 11.0 11.0 11.0 11.0 11.0Pedestrian Calls (#/hr) 0 0 0 0 0 0 0 0Act Effct Green (s) 34.0 34.0 34.0 34.0 48.0 48.0 48.0 48.0Actuated g/C Ratio 0.38 0.38 0.38 0.38 0.53 0.53 0.53 0.53

06/26/2017

170127 Granwood Subdivision 06/13/2017 Baseline Synchro 9 ReportPage 2

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRv/c Ratio 0.34 0.67 0.80 0.36 0.11 0.57 0.24 0.29Control Delay 23.4 28.5 57.4 20.9 11.1 15.3 13.7 11.5Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 23.4 28.5 57.4 20.9 11.1 15.3 13.7 11.5LOS C C E C B B B BApproach Delay 27.4 34.4 14.9 12.0Approach LOS C C B BQueue Length 50th (m) 15.3 65.2 22.3 29.0 4.8 53.7 6.8 22.1Queue Length 95th (m) 29.9 98.6 #56.3 47.8 11.0 83.2 15.5 36.8Internal Link Dist (m) 162.0 1064.5 177.4 75.7Turn Bay Length (m) 70.0 30.0 90.0 40.0Base Capacity (vph) 368 701 186 698 562 972 326 941Starvation Cap Reductn 0 0 0 0 0 0 0 0Spillback Cap Reductn 0 0 0 0 0 0 0 0Storage Cap Reductn 0 0 0 0 0 0 0 0Reduced v/c Ratio 0.34 0.67 0.80 0.36 0.11 0.57 0.24 0.29

Intersection SummaryArea Type: OtherCycle Length: 90Actuated Cycle Length: 90Offset: 0 (0%), Referenced to phase 2:NBTL and 6:SBTL, Start of GreenNatural Cycle: 50Control Type: PretimedMaximum v/c Ratio: 0.80Intersection Signal Delay: 22.2 Intersection LOS: CIntersection Capacity Utilization 76.8% ICU Level of Service DAnalysis Period (min) 15# 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles.

Splits and Phases: 1: Wellington Road 7 & Wellington Road 21/McNab Street

Page 163: Grandwood Subdivision – Elora Transportation Impact Study...To the extent that this report is based on information supplied by other parties, Paradigm Transportation Solutions Limited

06/26/2017

170127 Granwood Subdivision 06/13/2017 Baseline Synchro 9 ReportPage 3

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 116 366 68 136 193 38 55 309 198 72 197 53Future Volume (vph) 116 366 68 136 193 38 55 309 198 72 197 53Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900Total Lost time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Frt 1.00 0.98 1.00 0.98 1.00 0.94 1.00 0.97Flt Protected 0.95 1.00 0.95 1.00 0.95 1.00 0.95 1.00Satd. Flow (prot) 1807 1839 1789 1828 1825 1776 1825 1745Flt Permitted 0.51 1.00 0.26 1.00 0.55 1.00 0.32 1.00Satd. Flow (perm) 977 1839 494 1828 1055 1776 614 1745Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 126 398 74 148 210 41 60 336 215 78 214 58RTOR Reduction (vph) 0 7 0 0 8 0 0 26 0 0 11 0Lane Group Flow (vph) 126 465 0 148 243 0 60 525 0 78 261 0Heavy Vehicles (%) 1% 2% 2% 2% 3% 0% 0% 3% 0% 0% 7% 5%Turn Type Perm NA Perm NA Perm NA Perm NAProtected Phases 4 8 2 6Permitted Phases 4 8 2 6Actuated Green, G (s) 32.0 32.0 32.0 32.0 46.0 46.0 46.0 46.0Effective Green, g (s) 34.0 34.0 34.0 34.0 48.0 48.0 48.0 48.0Actuated g/C Ratio 0.38 0.38 0.38 0.38 0.53 0.53 0.53 0.53Clearance Time (s) 6.0 6.0 6.0 6.0 6.0 6.0 6.0 6.0Lane Grp Cap (vph) 369 694 186 690 562 947 327 930v/s Ratio Prot 0.25 0.13 c0.30 0.15v/s Ratio Perm 0.13 c0.30 0.06 0.13v/c Ratio 0.34 0.67 0.80 0.35 0.11 0.55 0.24 0.28Uniform Delay, d1 20.0 23.3 24.9 20.1 10.4 13.9 11.2 11.5Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Incremental Delay, d2 2.5 5.1 28.7 1.4 0.4 2.3 1.7 0.8Delay (s) 22.5 28.4 53.6 21.5 10.8 16.3 12.9 12.3Level of Service C C D C B B B BApproach Delay (s) 27.2 33.4 15.7 12.4Approach LOS C C B B

Intersection SummaryHCM 2000 Control Delay 22.2 HCM 2000 Level of Service CHCM 2000 Volume to Capacity ratio 0.65Actuated Cycle Length (s) 90.0 Sum of lost time (s) 8.0Intersection Capacity Utilization 76.8% ICU Level of Service DAnalysis Period (min) 15c Critical Lane Group

06/26/2017

170127 Granwood Subdivision 06/13/2017 Baseline Synchro 9 ReportPage 4

Lane Group WBL WBR NBT NBR SBL SBTLane ConfigurationsTraffic Volume (vph) 24 44 688 43 23 482Future Volume (vph) 24 44 688 43 23 482Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900Storage Length (m) 0.0 0.0 30.0 0.0Storage Lanes 1 0 1 0Taper Length (m) 2.5 2.5Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00Frt 0.912 0.850Flt Protected 0.983 0.998Satd. Flow (prot) 1633 0 1865 1471 0 1805Flt Permitted 0.983 0.998Satd. Flow (perm) 1633 0 1865 1471 0 1805Link Speed (k/h) 48 48 48Link Distance (m) 92.0 115.2 201.4Travel Time (s) 6.9 8.6 15.1Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 10% 3% 3% 11% 11% 6%Adj. Flow (vph) 26 48 748 47 25 524Shared Lane Traffic (%)Lane Group Flow (vph) 74 0 748 47 0 549Enter Blocked Intersection No No No No No NoLane Alignment Left Right Left Right Left LeftMedian Width(m) 3.7 3.7 3.7Link Offset(m) 0.0 0.0 0.0Crosswalk Width(m) 1.6 1.6 1.6Two way Left Turn LaneHeadway Factor 0.99 0.99 0.99 0.99 0.99 0.99Turning Speed (k/h) 24 14 14 24Sign Control Stop Free Free

Intersection SummaryArea Type: OtherControl Type: UnsignalizedIntersection Capacity Utilization 54.8% ICU Level of Service AAnalysis Period (min) 15

Page 164: Grandwood Subdivision – Elora Transportation Impact Study...To the extent that this report is based on information supplied by other parties, Paradigm Transportation Solutions Limited

06/26/2017

170127 Granwood Subdivision 06/13/2017 Baseline Synchro 9 ReportPage 5

Movement WBL WBR NBT NBR SBL SBTLane ConfigurationsTraffic Volume (veh/h) 24 44 688 43 23 482Future Volume (Veh/h) 24 44 688 43 23 482Sign Control Stop Free FreeGrade 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 26 48 748 47 25 524PedestriansLane Width (m)Walking Speed (m/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (m) 201pX, platoon unblocked 0.95vC, conflicting volume 1322 748 795vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 1314 748 795tC, single (s) 6.5 6.2 4.2tC, 2 stage (s)tF (s) 3.6 3.3 2.3p0 queue free % 83 88 97cM capacity (veh/h) 155 411 788

Direction, Lane # WB 1 NB 1 NB 2 SB 1Volume Total 74 748 47 549Volume Left 26 0 0 25Volume Right 48 0 47 0cSH 260 1700 1700 788Volume to Capacity 0.28 0.44 0.03 0.03Queue Length 95th (m) 8.6 0.0 0.0 0.7Control Delay (s) 24.2 0.0 0.0 0.9Lane LOS C AApproach Delay (s) 24.2 0.0 0.9Approach LOS C

Intersection SummaryAverage Delay 1.6Intersection Capacity Utilization 54.8% ICU Level of Service AAnalysis Period (min) 15

06/26/2017

170127 Granwood Subdivision 06/13/2017 Baseline Synchro 9 ReportPage 6

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 6 54 6 10 35 26 18 21 4 33 8 16Future Volume (vph) 6 54 6 10 35 26 18 21 4 33 8 16Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Frt 0.987 0.951 0.989 0.963Flt Protected 0.995 0.993 0.979 0.972Satd. Flow (prot) 0 1850 0 0 1779 0 0 1824 0 0 1763 0Flt Permitted 0.995 0.993 0.979 0.972Satd. Flow (perm) 0 1850 0 0 1779 0 0 1824 0 0 1763 0Link Speed (k/h) 48 48 48 48Link Distance (m) 92.0 91.8 92.7 102.1Travel Time (s) 6.9 6.9 7.0 7.7Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 7 59 7 11 38 28 20 23 4 36 9 17Shared Lane Traffic (%)Lane Group Flow (vph) 0 73 0 0 77 0 0 47 0 0 62 0Enter Blocked Intersection No No No No No No No No No No No NoLane Alignment Left Left Right Left Left Right Left Left Right Left Left RightMedian Width(m) 0.0 0.0 0.0 0.0Link Offset(m) 0.0 0.0 0.0 0.0Crosswalk Width(m) 1.6 1.6 1.6 1.6Two way Left Turn LaneHeadway Factor 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99Turning Speed (k/h) 24 14 24 14 24 14 24 14Sign Control Free Free Stop Stop

Intersection SummaryArea Type: OtherControl Type: UnsignalizedIntersection Capacity Utilization 17.5% ICU Level of Service AAnalysis Period (min) 15

Page 165: Grandwood Subdivision – Elora Transportation Impact Study...To the extent that this report is based on information supplied by other parties, Paradigm Transportation Solutions Limited

06/26/2017

170127 Granwood Subdivision 06/13/2017 Baseline Synchro 9 ReportPage 7

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (veh/h) 6 54 6 10 35 26 18 21 4 33 8 16Future Volume (Veh/h) 6 54 6 10 35 26 18 21 4 33 8 16Sign Control Free Free Stop StopGrade 0% 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 7 59 7 11 38 28 20 23 4 36 9 17PedestriansLane Width (m)Walking Speed (m/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (m)pX, platoon unblockedvC, conflicting volume 66 66 172 164 62 166 154 52vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 66 66 172 164 62 166 154 52tC, single (s) 4.1 4.1 7.1 6.5 6.2 7.1 6.5 6.2tC, 2 stage (s)tF (s) 2.2 2.2 3.5 4.0 3.3 3.5 4.0 3.3p0 queue free % 100 99 97 97 100 95 99 98cM capacity (veh/h) 1536 1536 764 720 1002 769 729 1016

Direction, Lane # EB 1 WB 1 NB 1 SB 1Volume Total 73 77 47 62Volume Left 7 11 20 36Volume Right 7 28 4 17cSH 1536 1536 756 817Volume to Capacity 0.00 0.01 0.06 0.08Queue Length 95th (m) 0.1 0.2 1.5 1.9Control Delay (s) 0.7 1.1 10.1 9.8Lane LOS A A B AApproach Delay (s) 0.7 1.1 10.1 9.8Approach LOS B A

Intersection SummaryAverage Delay 4.7Intersection Capacity Utilization 17.5% ICU Level of Service AAnalysis Period (min) 15

06/26/2017

170127 Granwood Subdivision 06/13/2017 Baseline Synchro 9 ReportPage 8

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 25 60 5 0 36 9 21 21 1 10 8 13Future Volume (vph) 25 60 5 0 36 9 21 21 1 10 8 13Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Ped Bike FactorFrt 0.993 0.972 0.997 0.944Flt Protected 0.986 0.976 0.984Satd. Flow (prot) 0 1855 0 0 1777 0 0 1816 0 0 1602 0Flt Permitted 0.986 0.976 0.984Satd. Flow (perm) 0 1855 0 0 1777 0 0 1816 0 0 1602 0Link Speed (k/h) 48 48 48 48Link Distance (m) 91.8 278.1 75.3 102.9Travel Time (s) 6.9 20.9 5.6 7.7Confl. Peds. (#/hr) 1 1Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 5% 0% 0% 0% 0% 25% 6% 0% 0% 0% 43% 0%Adj. Flow (vph) 27 65 5 0 39 10 23 23 1 11 9 14Shared Lane Traffic (%)Lane Group Flow (vph) 0 97 0 0 49 0 0 47 0 0 34 0Enter Blocked Intersection No No No No No No No No No No No NoLane Alignment Left Left Right Left Left Right Left Left Right Left Left RightMedian Width(m) 0.0 0.0 0.0 0.0Link Offset(m) 0.0 0.0 0.0 0.0Crosswalk Width(m) 1.6 1.6 1.6 1.6Two way Left Turn LaneHeadway Factor 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99Turning Speed (k/h) 24 14 24 14 24 14 24 14Sign Control Free Free Stop Stop

Intersection SummaryArea Type: OtherControl Type: UnsignalizedIntersection Capacity Utilization 22.2% ICU Level of Service AAnalysis Period (min) 15

Page 166: Grandwood Subdivision – Elora Transportation Impact Study...To the extent that this report is based on information supplied by other parties, Paradigm Transportation Solutions Limited

06/26/2017

170127 Granwood Subdivision 06/13/2017 Baseline Synchro 9 ReportPage 9

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (veh/h) 25 60 5 0 36 9 21 21 1 10 8 13Future Volume (Veh/h) 25 60 5 0 36 9 21 21 1 10 8 13Sign Control Free Free Stop StopGrade 0% 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 27 65 5 0 39 10 23 23 1 11 9 14Pedestrians 1Lane Width (m) 3.7Walking Speed (m/s) 1.1Percent Blockage 0Right turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (m)pX, platoon unblockedvC, conflicting volume 49 70 184 170 68 179 168 44vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 49 70 184 170 68 179 168 44tC, single (s) 4.1 4.1 7.2 6.5 6.2 7.1 6.9 6.2tC, 2 stage (s)tF (s) 2.2 2.2 3.6 4.0 3.3 3.5 4.4 3.3p0 queue free % 98 100 97 97 100 99 99 99cM capacity (veh/h) 1539 1544 740 713 999 756 645 1032

Direction, Lane # EB 1 WB 1 NB 1 SB 1Volume Total 97 49 47 34Volume Left 27 0 23 11Volume Right 5 10 1 14cSH 1539 1544 731 808Volume to Capacity 0.02 0.00 0.06 0.04Queue Length 95th (m) 0.4 0.0 1.6 1.0Control Delay (s) 2.2 0.0 10.3 9.6Lane LOS A B AApproach Delay (s) 2.2 0.0 10.3 9.6Approach LOS B A

Intersection SummaryAverage Delay 4.5Intersection Capacity Utilization 22.2% ICU Level of Service AAnalysis Period (min) 15

06/26/2017

170127 Granwood Subdivision 06/13/2017 Baseline Synchro 9 ReportPage 10

Lane Group EBL EBR NBL NBT SBT SBRLane ConfigurationsTraffic Volume (vph) 6 139 55 68 55 19Future Volume (vph) 6 139 55 68 55 19Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00Frt 0.871 0.965Flt Protected 0.998 0.978Satd. Flow (prot) 1637 0 0 1842 1818 0Flt Permitted 0.998 0.978Satd. Flow (perm) 1637 0 0 1842 1818 0Link Speed (k/h) 48 48 48Link Distance (m) 1088.5 119.7 61.8Travel Time (s) 81.6 9.0 4.6Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 7 151 60 74 60 21Shared Lane Traffic (%)Lane Group Flow (vph) 158 0 0 134 81 0Enter Blocked Intersection No No No No No NoLane Alignment Left Right Left Left Left RightMedian Width(m) 7.4 0.0 0.0Link Offset(m) 0.0 0.0 0.0Crosswalk Width(m) 4.9 1.6 1.6Two way Left Turn LaneHeadway Factor 0.99 0.99 0.99 0.99 0.99 0.99Turning Speed (k/h) 24 14 24 14Sign Control Stop Free Free

Intersection SummaryArea Type: OtherControl Type: UnsignalizedIntersection Capacity Utilization 28.9% ICU Level of Service AAnalysis Period (min) 15

Page 167: Grandwood Subdivision – Elora Transportation Impact Study...To the extent that this report is based on information supplied by other parties, Paradigm Transportation Solutions Limited

06/26/2017

170127 Granwood Subdivision 06/13/2017 Baseline Synchro 9 ReportPage 11

Movement EBL EBR NBL NBT SBT SBRLane ConfigurationsTraffic Volume (veh/h) 6 139 55 68 55 19Future Volume (Veh/h) 6 139 55 68 55 19Sign Control Stop Free FreeGrade 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 7 151 60 74 60 21PedestriansLane Width (m)Walking Speed (m/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (m)pX, platoon unblockedvC, conflicting volume 264 70 81vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 264 70 81tC, single (s) 6.4 6.2 4.1tC, 2 stage (s)tF (s) 3.5 3.3 2.2p0 queue free % 99 85 96cM capacity (veh/h) 696 992 1517

Direction, Lane # EB 1 NB 1 SB 1Volume Total 158 134 81Volume Left 7 60 0Volume Right 151 0 21cSH 974 1517 1700Volume to Capacity 0.16 0.04 0.05Queue Length 95th (m) 4.4 0.9 0.0Control Delay (s) 9.4 3.5 0.0Lane LOS A AApproach Delay (s) 9.4 3.5 0.0Approach LOS A

Intersection SummaryAverage Delay 5.2Intersection Capacity Utilization 28.9% ICU Level of Service AAnalysis Period (min) 15

06/26/2017

170127 Granwood Subdivision 06/13/2017 Baseline Synchro 9 ReportPage 12

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 22 1 20 12 2 59 25 42 19 105 56 35Future Volume (vph) 22 1 20 12 2 59 25 42 19 105 56 35Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Frt 0.937 0.891 0.970 0.976Flt Protected 0.975 0.992 0.986 0.974Satd. Flow (prot) 0 1591 0 0 1351 0 0 1802 0 0 1774 0Flt Permitted 0.975 0.992 0.986 0.974Satd. Flow (perm) 0 1591 0 0 1351 0 0 1802 0 0 1774 0Link Speed (k/h) 48 48 48 48Link Distance (m) 290.8 201.2 123.6 119.7Travel Time (s) 21.8 15.1 9.3 9.0Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 11% 0% 10% 33% 0% 25% 0% 4% 0% 0% 6% 7%Adj. Flow (vph) 24 1 22 13 2 64 27 46 21 114 61 38Shared Lane Traffic (%)Lane Group Flow (vph) 0 47 0 0 79 0 0 94 0 0 213 0Enter Blocked Intersection No No No No No No No No No No No NoLane Alignment Left Left Right Left Left Right Left Left Right Left Left RightMedian Width(m) 0.0 0.0 0.0 0.0Link Offset(m) 0.0 0.0 0.0 0.0Crosswalk Width(m) 1.6 1.6 1.6 1.6Two way Left Turn LaneHeadway Factor 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99Turning Speed (k/h) 24 14 24 14 24 14 24 14Sign Control Stop Stop Free Free

Intersection SummaryArea Type: OtherControl Type: UnsignalizedIntersection Capacity Utilization 30.4% ICU Level of Service AAnalysis Period (min) 15

Page 168: Grandwood Subdivision – Elora Transportation Impact Study...To the extent that this report is based on information supplied by other parties, Paradigm Transportation Solutions Limited

06/26/2017

170127 Granwood Subdivision 06/13/2017 Baseline Synchro 9 ReportPage 13

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (veh/h) 22 1 20 12 2 59 25 42 19 105 56 35Future Volume (Veh/h) 22 1 20 12 2 59 25 42 19 105 56 35Sign Control Stop Stop Free FreeGrade 0% 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 24 1 22 13 2 64 27 46 21 114 61 38PedestriansLane Width (m)Walking Speed (m/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (m)pX, platoon unblockedvC, conflicting volume 484 429 80 441 438 56 99 67vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 484 429 80 441 438 56 99 67tC, single (s) 7.2 6.5 6.3 7.4 6.5 6.5 4.1 4.1tC, 2 stage (s)tF (s) 3.6 4.0 3.4 3.8 4.0 3.5 2.2 2.2p0 queue free % 94 100 98 97 100 93 98 93cM capacity (veh/h) 414 474 958 433 469 949 1507 1547

Direction, Lane # EB 1 WB 1 NB 1 SB 1Volume Total 47 79 94 213Volume Left 24 13 27 114Volume Right 22 64 21 38cSH 566 777 1507 1547Volume to Capacity 0.08 0.10 0.02 0.07Queue Length 95th (m) 2.1 2.6 0.4 1.8Control Delay (s) 11.9 10.2 2.2 4.3Lane LOS B B A AApproach Delay (s) 11.9 10.2 2.2 4.3Approach LOS B B

Intersection SummaryAverage Delay 5.7Intersection Capacity Utilization 30.4% ICU Level of Service AAnalysis Period (min) 15

Page 169: Grandwood Subdivision – Elora Transportation Impact Study...To the extent that this report is based on information supplied by other parties, Paradigm Transportation Solutions Limited

Granwood Subdivsion – Elora | Transportation Impact Study | 170127 | July 2017

Paradigm Transportation Solutions Limited | Appendices

Appendix G

Traffic Diversion Forecasts

Page 170: Grandwood Subdivision – Elora Transportation Impact Study...To the extent that this report is based on information supplied by other parties, Paradigm Transportation Solutions Limited
Page 171: Grandwood Subdivision – Elora Transportation Impact Study...To the extent that this report is based on information supplied by other parties, Paradigm Transportation Solutions Limited

2025 Total

10% Diversion Traffic Volumes

Figure G.1Granwood Subdivision– Elora, Transportation Impact Study

170127

Weekday AM Peak Hour

Weekday PM Peak Hour

93

74

301

23 47 McNab

Street

12

33

281

421 157 485 110

398

45

253

196 27 208 56 21

Wellington

Road 21

121

66

179

64 35

98

72

48

506

68

309

Subject Site

170

Vic

tori

a S

tre

et

85

728

22

53

8

438

51

26 34 14

Hig

h S

tre

et

69

169

York

Street

15

24

30

107

73 43 38

669

59 York

Street

6 10 6

34 94 94 5 117 116

11

41 5

60 81 69 27

31

40

10 3

6 3

5 80

65

Bri

dg

e

Str

ee

t

89 89 16 61 62 16 31 57

378

30 55

7 4 0

28

7

77

53

199

71 37 McNab

Street

4 0

18 18

703

We

llin

gto

n

Ro

ad

7

33

33

408

11

17

59

189

301 133 359 66

11

323

76

463

551 116 622 130 5

Wellington

Road 21

358

59

310

193 125

49

72

77

409

184

562

Subject Site

121

Vic

tori

a S

tre

et

56

512

57

31

6

732

50

52 71 12

Hig

h S

tre

et

186

122

York

Street

39

51

96

74

60 25 125

479

33 York

Street

16 8 33

27 76 77 11 80 79

26

41

19

49 43 45 25

26

13 8 10 9 10

1 55

88

Bri

dg

e

Str

ee

t

80 81 6 108 108 25 91 86

683

47 69

18

18 6

78

21

42

18 3

6 5

506

We

llin

gto

n

Ro

ad

7

25

14

730

42

Page 172: Grandwood Subdivision – Elora Transportation Impact Study...To the extent that this report is based on information supplied by other parties, Paradigm Transportation Solutions Limited

2025 Total

50% Diversion Traffic Volumes

Figure G.2Granwood Subdivision– Elora, Transportation Impact Study

170127

Weekday AM Peak Hour

Weekday PM Peak Hour

96

74

304

20 42 McNab

Street

7 47

253

421 140 435 61

398

54

252

196 27 184 30 11

Wellington

Road 21

107

94

183

57 19

54

85

62

506

66

334

Subject Site

139

Vic

tori

a S

tre

et

61

729

17

48

32

464

49

24 82 14

Hig

h S

tre

et

67

139

York

Street

27

18

22

107

93 49 38

653

76 York

Street

6 5 6

50 143 143 9 170 169

23

29 5

93 130 122 33

31

40 5 3

6 11

9 137

65

Bri

dg

e

Str

ee

t

113 113 16 87 88 16 59 57

371

37 79

7 2 2

54

7

94

53

206

64 34 McNab

Street

2 2

18 18

703

We

llin

gto

n

Ro

ad

7

32

32

408

11

10

74

173

301 122 329 37

11

323

84

463

551 116 564 73 3

Wellington

Road 21

325

75

313

175 70

27

91

110

438

144

563

Subject Site

118

Vic

tori

a S

tre

et

44

541

53

27

17

733

42

44 95 12

Hig

h S

tre

et

145

118

York

Street

48

34

63

73

122 37 125

468

73 York

Street

16 4 33

38 106 107 14 113 112

30

37

19

68 73 78 42

26

13 4 10 9 43

4 91

88

Bri

dg

e

Str

ee

t

138 139 6 174 174 25 165 86

665

65 127

18

10

14 144

21

42

10

11

6 5

506

We

llin

gto

n

Ro

ad

7

24

13

730

42

Page 173: Grandwood Subdivision – Elora Transportation Impact Study...To the extent that this report is based on information supplied by other parties, Paradigm Transportation Solutions Limited

2025 Total

90% Diversion Traffic Volumes

Figure G.3Granwood Subdivision– Elora, Transportation Impact Study

170127

Weekday AM Peak Hour

Weekday PM Peak Hour

100

74

307

17 38 McNab

Street

1 61

225

421 124 387 12

398

62

253

196 27 158 6 2

Wellington

Road 21

92

122

188

49 4

11

98

77

508

65

359

Subject Site

109

Vic

tori

a S

tre

et

36

731

13

44

57

489

47

22 131 14

Hig

h S

tre

et

66

108

York

Street

40

12

14

107

112 54 38

637

94 York

Street

6 1 6

66 192 192 13 223 222

34

18 5

126 179 175 39

31

40 1 3

6 19

13 194

65

Bri

dg

e

Str

ee

t

139 139 16 115 116 16 89 57

363

45 105

7 0 4

82

7

111

53

213

57 31 McNab

Street

0 4

18 18

703

We

llin

gto

n

Ro

ad

7

32

32

408

11

2 88

158

301 111 300 7

11

323

90

463

550 116 507 15 1

Wellington

Road 21

292

90

316

158 14

5

110

142

466

102

564

Subject Site

115

Vic

tori

a S

tre

et

33

570

50

24

28

734

34

36 117 12

Hig

h S

tre

et

103

115

York

Street

55

17

31

73

183 49 125

457

113 York

Street

16 1 33

49 135 136 17 145 144

34

33

19

86 102 110 59

26

13 1 10 9 75

8 127

88

Bri

dg

e

Str

ee

t

196 196 6 239 239 25 239 86

648

83 184

18 2 22 209

21

43

2 20

6 5

506

We

llin

gto

n

Ro

ad

7

24

14

731

42

Page 174: Grandwood Subdivision – Elora Transportation Impact Study...To the extent that this report is based on information supplied by other parties, Paradigm Transportation Solutions Limited
Page 175: Grandwood Subdivision – Elora Transportation Impact Study...To the extent that this report is based on information supplied by other parties, Paradigm Transportation Solutions Limited

Granwood Subdivsion – Elora | Transportation Impact Study | 170127 | July 2017

Paradigm Transportation Solutions Limited | Appendices

Appendix H

Traffic Diversion Operations Reports

Page 176: Grandwood Subdivision – Elora Transportation Impact Study...To the extent that this report is based on information supplied by other parties, Paradigm Transportation Solutions Limited
Page 177: Grandwood Subdivision – Elora Transportation Impact Study...To the extent that this report is based on information supplied by other parties, Paradigm Transportation Solutions Limited

06/26/2017

170127 Granwood Subdivision 5:00 pm 06/13/2017 Baseline Synchro 9 ReportPage 1

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 27 121 48 157 281 47 66 179 64 23 301 74Future Volume (vph) 27 121 48 157 281 47 66 179 64 23 301 74Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900Storage Length (m) 70.0 0.0 30.0 0.0 90.0 0.0 40.0 0.0Storage Lanes 1 0 1 0 1 0 1 0Taper Length (m) 2.5 7.6 2.5 2.5Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Frt 0.958 0.979 0.960 0.971Flt Protected 0.950 0.950 0.950 0.950Satd. Flow (prot) 1472 1682 0 1807 1841 0 1755 1693 0 1825 1770 0Flt Permitted 0.390 0.597 0.433 0.555Satd. Flow (perm) 604 1682 0 1136 1841 0 800 1693 0 1066 1770 0Right Turn on Red Yes Yes Yes YesSatd. Flow (RTOR) 25 11 31 21Link Speed (k/h) 48 48 48 48Link Distance (m) 186.0 1088.5 201.4 99.7Travel Time (s) 14.0 81.6 15.1 7.5Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 24% 6% 18% 1% 1% 9% 4% 10% 6% 0% 6% 3%Adj. Flow (vph) 29 132 52 171 305 51 72 195 70 25 327 80Shared Lane Traffic (%)Lane Group Flow (vph) 29 184 0 171 356 0 72 265 0 25 407 0Enter Blocked Intersection No No No No No No No No No No No NoLane Alignment Left Left Right Left Left Right Left Left Right Left Left RightMedian Width(m) 3.7 3.7 3.7 3.7Link Offset(m) 0.0 0.0 0.0 0.0Crosswalk Width(m) 1.6 4.9 1.6 1.6Two way Left Turn LaneHeadway Factor 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99Turning Speed (k/h) 24 14 24 14 24 14 24 14Turn Type Perm NA Perm NA Perm NA Perm NAProtected Phases 4 8 2 6Permitted Phases 4 8 2 6Minimum Split (s) 24.0 24.0 24.0 24.0 24.0 24.0 24.0 24.0Total Split (s) 38.0 38.0 38.0 38.0 52.0 52.0 52.0 52.0Total Split (%) 42.2% 42.2% 42.2% 42.2% 57.8% 57.8% 57.8% 57.8%Maximum Green (s) 32.0 32.0 32.0 32.0 46.0 46.0 46.0 46.0Yellow Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0All-Red Time (s) 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0Lost Time Adjust (s) -2.0 -2.0 -2.0 -2.0 -2.0 -2.0 -2.0 -2.0Total Lost Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0Lead/LagLead-Lag Optimize?Walk Time (s) 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0Flash Dont Walk (s) 11.0 11.0 11.0 11.0 11.0 11.0 11.0 11.0Pedestrian Calls (#/hr) 0 0 0 0 0 0 0 0Act Effct Green (s) 34.0 34.0 34.0 34.0 48.0 48.0 48.0 48.0Actuated g/C Ratio 0.38 0.38 0.38 0.38 0.53 0.53 0.53 0.53

06/26/2017

170127 Granwood Subdivision 5:00 pm 06/13/2017 Baseline Synchro 9 ReportPage 2

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRv/c Ratio 0.13 0.28 0.40 0.51 0.17 0.29 0.04 0.43Control Delay 20.3 18.2 24.0 24.0 12.1 11.1 10.4 13.7Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 20.3 18.2 24.0 24.0 12.1 11.1 10.4 13.7LOS C B C C B B B BApproach Delay 18.5 24.0 11.4 13.5Approach LOS B C B BQueue Length 50th (m) 3.2 18.6 21.3 45.0 6.0 20.6 2.0 37.7Queue Length 95th (m) 9.3 34.0 38.5 70.1 13.4 35.1 5.6 58.8Internal Link Dist (m) 162.0 1064.5 177.4 75.7Turn Bay Length (m) 70.0 30.0 90.0 40.0Base Capacity (vph) 228 650 429 702 426 917 568 953Starvation Cap Reductn 0 0 0 0 0 0 0 0Spillback Cap Reductn 0 0 0 0 0 0 0 0Storage Cap Reductn 0 0 0 0 0 0 0 0Reduced v/c Ratio 0.13 0.28 0.40 0.51 0.17 0.29 0.04 0.43

Intersection SummaryArea Type: OtherCycle Length: 90Actuated Cycle Length: 90Offset: 0 (0%), Referenced to phase 2:NBTL and 6:SBTL, Start of GreenNatural Cycle: 50Control Type: PretimedMaximum v/c Ratio: 0.51Intersection Signal Delay: 17.4 Intersection LOS: BIntersection Capacity Utilization 59.6% ICU Level of Service BAnalysis Period (min) 15

Splits and Phases: 1: Wellington Road 7 & Wellington Road 21/McNab Street

Page 178: Grandwood Subdivision – Elora Transportation Impact Study...To the extent that this report is based on information supplied by other parties, Paradigm Transportation Solutions Limited

06/26/2017

170127 Granwood Subdivision 5:00 pm 06/13/2017 Baseline Synchro 9 ReportPage 3

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 27 121 48 157 281 47 66 179 64 23 301 74Future Volume (vph) 27 121 48 157 281 47 66 179 64 23 301 74Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900Total Lost time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Frt 1.00 0.96 1.00 0.98 1.00 0.96 1.00 0.97Flt Protected 0.95 1.00 0.95 1.00 0.95 1.00 0.95 1.00Satd. Flow (prot) 1472 1682 1807 1840 1755 1694 1825 1769Flt Permitted 0.39 1.00 0.60 1.00 0.43 1.00 0.56 1.00Satd. Flow (perm) 604 1682 1135 1840 800 1694 1067 1769Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 29 132 52 171 305 51 72 195 70 25 327 80RTOR Reduction (vph) 0 16 0 0 7 0 0 14 0 0 10 0Lane Group Flow (vph) 29 168 0 171 349 0 72 251 0 25 397 0Heavy Vehicles (%) 24% 6% 18% 1% 1% 9% 4% 10% 6% 0% 6% 3%Turn Type Perm NA Perm NA Perm NA Perm NAProtected Phases 4 8 2 6Permitted Phases 4 8 2 6Actuated Green, G (s) 32.0 32.0 32.0 32.0 46.0 46.0 46.0 46.0Effective Green, g (s) 34.0 34.0 34.0 34.0 48.0 48.0 48.0 48.0Actuated g/C Ratio 0.38 0.38 0.38 0.38 0.53 0.53 0.53 0.53Clearance Time (s) 6.0 6.0 6.0 6.0 6.0 6.0 6.0 6.0Lane Grp Cap (vph) 228 635 428 695 426 903 569 943v/s Ratio Prot 0.10 c0.19 0.15 c0.22v/s Ratio Perm 0.05 0.15 0.09 0.02v/c Ratio 0.13 0.27 0.40 0.50 0.17 0.28 0.04 0.42Uniform Delay, d1 18.3 19.4 20.5 21.5 10.8 11.5 10.0 12.6Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Incremental Delay, d2 1.1 1.0 2.8 2.6 0.9 0.8 0.1 1.4Delay (s) 19.4 20.4 23.3 24.1 11.6 12.3 10.2 14.0Level of Service B C C C B B B BApproach Delay (s) 20.3 23.8 12.1 13.8Approach LOS C C B B

Intersection SummaryHCM 2000 Control Delay 17.8 HCM 2000 Level of Service BHCM 2000 Volume to Capacity ratio 0.45Actuated Cycle Length (s) 90.0 Sum of lost time (s) 8.0Intersection Capacity Utilization 59.6% ICU Level of Service BAnalysis Period (min) 15c Critical Lane Group

06/26/2017

170127 Granwood Subdivision 5:00 pm 06/13/2017 Baseline Synchro 9 ReportPage 4

Lane Group WBL WBR NBT NBR SBL SBTLane ConfigurationsTraffic Volume (vph) 34 60 378 30 59 669Future Volume (vph) 34 60 378 30 59 669Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900Storage Length (m) 0.0 0.0 30.0 0.0Storage Lanes 1 0 1 0Taper Length (m) 2.5 2.5Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00Frt 0.914 0.850Flt Protected 0.982 0.996Satd. Flow (prot) 1338 0 1779 1498 0 1824Flt Permitted 0.982 0.996Satd. Flow (perm) 1338 0 1779 1498 0 1824Link Speed (k/h) 48 48 48Link Distance (m) 92.0 115.2 201.4Travel Time (s) 6.9 8.6 15.1Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 25% 31% 8% 9% 4% 5%Adj. Flow (vph) 37 65 411 33 64 727Shared Lane Traffic (%)Lane Group Flow (vph) 102 0 411 33 0 791Enter Blocked Intersection No No No No No NoLane Alignment Left Right Left Right Left LeftMedian Width(m) 3.7 3.7 3.7Link Offset(m) 0.0 0.0 0.0Crosswalk Width(m) 1.6 1.6 1.6Two way Left Turn LaneHeadway Factor 0.99 0.99 0.99 0.99 0.99 0.99Turning Speed (k/h) 24 14 14 24Sign Control Stop Free Free

Intersection SummaryArea Type: OtherControl Type: UnsignalizedIntersection Capacity Utilization 73.9% ICU Level of Service DAnalysis Period (min) 15

Page 179: Grandwood Subdivision – Elora Transportation Impact Study...To the extent that this report is based on information supplied by other parties, Paradigm Transportation Solutions Limited

06/26/2017

170127 Granwood Subdivision 5:00 pm 06/13/2017 Baseline Synchro 9 ReportPage 5

Movement WBL WBR NBT NBR SBL SBTLane ConfigurationsTraffic Volume (veh/h) 34 60 378 30 59 669Future Volume (Veh/h) 34 60 378 30 59 669Sign Control Stop Free FreeGrade 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 37 65 411 33 64 727PedestriansLane Width (m)Walking Speed (m/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (m) 201pX, platoon unblocked 0.87vC, conflicting volume 1266 411 444vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 1230 411 444tC, single (s) 6.6 6.5 4.1tC, 2 stage (s)tF (s) 3.7 3.6 2.2p0 queue free % 74 89 94cM capacity (veh/h) 144 583 1106

Direction, Lane # WB 1 NB 1 NB 2 SB 1Volume Total 102 411 33 791Volume Left 37 0 0 64Volume Right 65 0 33 0cSH 277 1700 1700 1106Volume to Capacity 0.37 0.24 0.02 0.06Queue Length 95th (m) 12.4 0.0 0.0 1.4Control Delay (s) 25.4 0.0 0.0 1.5Lane LOS D AApproach Delay (s) 25.4 0.0 1.5Approach LOS D

Intersection SummaryAverage Delay 2.8Intersection Capacity Utilization 73.9% ICU Level of Service DAnalysis Period (min) 15

06/26/2017

170127 Granwood Subdivision 5:00 pm 06/13/2017 Baseline Synchro 9 ReportPage 6

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 16 55 18 5 81 31 7 4 0 6 10 6Future Volume (vph) 16 55 18 5 81 31 7 4 0 6 10 6Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Frt 0.972 0.964 0.962Flt Protected 0.991 0.998 0.968 0.986Satd. Flow (prot) 0 1814 0 0 1812 0 0 1823 0 0 1787 0Flt Permitted 0.991 0.998 0.968 0.986Satd. Flow (perm) 0 1814 0 0 1812 0 0 1823 0 0 1787 0Link Speed (k/h) 48 48 48 48Link Distance (m) 92.0 91.8 92.7 102.1Travel Time (s) 6.9 6.9 7.0 7.7Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 17 60 20 5 88 34 8 4 0 7 11 7Shared Lane Traffic (%)Lane Group Flow (vph) 0 97 0 0 127 0 0 12 0 0 25 0Enter Blocked Intersection No No No No No No No No No No No NoLane Alignment Left Left Right Left Left Right Left Left Right Left Left RightMedian Width(m) 0.0 0.0 0.0 0.0Link Offset(m) 0.0 0.0 0.0 0.0Crosswalk Width(m) 1.6 1.6 1.6 1.6Two way Left Turn LaneHeadway Factor 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99Turning Speed (k/h) 24 14 24 14 24 14 24 14Sign Control Free Free Stop Stop

Intersection SummaryArea Type: OtherControl Type: UnsignalizedIntersection Capacity Utilization 20.8% ICU Level of Service AAnalysis Period (min) 15

Page 180: Grandwood Subdivision – Elora Transportation Impact Study...To the extent that this report is based on information supplied by other parties, Paradigm Transportation Solutions Limited

06/26/2017

170127 Granwood Subdivision 5:00 pm 06/13/2017 Baseline Synchro 9 ReportPage 7

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (veh/h) 16 55 18 5 81 31 7 4 0 6 10 6Future Volume (Veh/h) 16 55 18 5 81 31 7 4 0 6 10 6Sign Control Free Free Stop StopGrade 0% 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 17 60 20 5 88 34 8 4 0 7 11 7PedestriansLane Width (m)Walking Speed (m/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (m)pX, platoon unblockedvC, conflicting volume 122 80 232 236 70 221 229 105vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 122 80 232 236 70 221 229 105tC, single (s) 4.1 4.1 7.1 6.5 6.2 7.1 6.5 6.2tC, 2 stage (s)tF (s) 2.2 2.2 3.5 4.0 3.3 3.5 4.0 3.3p0 queue free % 99 100 99 99 100 99 98 99cM capacity (veh/h) 1465 1518 701 655 993 723 661 949

Direction, Lane # EB 1 WB 1 NB 1 SB 1Volume Total 97 127 12 25Volume Left 17 5 8 7Volume Right 20 34 0 7cSH 1465 1518 685 742Volume to Capacity 0.01 0.00 0.02 0.03Queue Length 95th (m) 0.3 0.1 0.4 0.8Control Delay (s) 1.4 0.3 10.4 10.0Lane LOS A A B BApproach Delay (s) 1.4 0.3 10.4 10.0Approach LOS B B

Intersection SummaryAverage Delay 2.1Intersection Capacity Utilization 20.8% ICU Level of Service AAnalysis Period (min) 15

06/26/2017

170127 Granwood Subdivision 5:00 pm 06/13/2017 Baseline Synchro 9 ReportPage 8

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 16 28 18 5 69 6 7 4 0 3 10 40Future Volume (vph) 16 28 18 5 69 6 7 4 0 3 10 40Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Ped Bike FactorFrt 0.960 0.989 0.898Flt Protected 0.987 0.997 0.968 0.997Satd. Flow (prot) 0 1417 0 0 1717 0 0 1285 0 0 1684 0Flt Permitted 0.987 0.997 0.968 0.997Satd. Flow (perm) 0 1417 0 0 1717 0 0 1285 0 0 1684 0Link Speed (k/h) 48 48 48 48Link Distance (m) 91.8 278.1 75.3 102.9Travel Time (s) 6.9 20.9 5.6 7.7Confl. Peds. (#/hr) 1 1Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 15% 33% 33% 0% 12% 0% 67% 0% 0% 0% 11% 0%Adj. Flow (vph) 17 30 20 5 75 7 8 4 0 3 11 43Shared Lane Traffic (%)Lane Group Flow (vph) 0 67 0 0 87 0 0 12 0 0 57 0Enter Blocked Intersection No No No No No No No No No No No NoLane Alignment Left Left Right Left Left Right Left Left Right Left Left RightMedian Width(m) 0.0 0.0 0.0 0.0Link Offset(m) 0.0 0.0 0.0 0.0Crosswalk Width(m) 1.6 1.6 1.6 1.6Two way Left Turn LaneHeadway Factor 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99Turning Speed (k/h) 24 14 24 14 24 14 24 14Sign Control Free Free Stop Stop

Intersection SummaryArea Type: OtherControl Type: UnsignalizedIntersection Capacity Utilization 18.8% ICU Level of Service AAnalysis Period (min) 15

Page 181: Grandwood Subdivision – Elora Transportation Impact Study...To the extent that this report is based on information supplied by other parties, Paradigm Transportation Solutions Limited

06/26/2017

170127 Granwood Subdivision 5:00 pm 06/13/2017 Baseline Synchro 9 ReportPage 9

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (veh/h) 16 28 18 5 69 6 7 4 0 3 10 40Future Volume (Veh/h) 16 28 18 5 69 6 7 4 0 3 10 40Sign Control Free Free Stop StopGrade 0% 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 17 30 20 5 75 7 8 4 0 3 11 43Pedestrians 1Lane Width (m) 3.7Walking Speed (m/s) 1.1Percent Blockage 0Right turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (m)pX, platoon unblockedvC, conflicting volume 82 50 212 166 40 164 172 80vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 82 50 212 166 40 164 172 80tC, single (s) 4.2 4.1 7.8 6.5 6.2 7.1 6.6 6.2tC, 2 stage (s)tF (s) 2.3 2.2 4.1 4.0 3.3 3.5 4.1 3.3p0 queue free % 99 100 99 99 100 100 98 96cM capacity (veh/h) 1437 1570 583 719 1037 792 694 985

Direction, Lane # EB 1 WB 1 NB 1 SB 1Volume Total 67 87 12 57Volume Left 17 5 8 3Volume Right 20 7 0 43cSH 1437 1570 622 901Volume to Capacity 0.01 0.00 0.02 0.06Queue Length 95th (m) 0.3 0.1 0.4 1.5Control Delay (s) 2.0 0.4 10.9 9.3Lane LOS A A B AApproach Delay (s) 2.0 0.4 10.9 9.3Approach LOS B A

Intersection SummaryAverage Delay 3.7Intersection Capacity Utilization 18.8% ICU Level of Service AAnalysis Period (min) 15

06/26/2017

170127 Granwood Subdivision 5:00 pm 06/13/2017 Baseline Synchro 9 ReportPage 10

Lane Group EBL EBR NBL NBT SBT SBRLane ConfigurationsTraffic Volume (vph) 21 35 98 72 33 12Future Volume (vph) 21 35 98 72 33 12Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00Frt 0.916 0.964Flt Protected 0.981 0.972Satd. Flow (prot) 1692 0 0 1831 1816 0Flt Permitted 0.981 0.972Satd. Flow (perm) 1692 0 0 1831 1816 0Link Speed (k/h) 48 48 48Link Distance (m) 1088.5 119.7 61.8Travel Time (s) 81.6 9.0 4.6Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 23 38 107 78 36 13Shared Lane Traffic (%)Lane Group Flow (vph) 61 0 0 185 49 0Enter Blocked Intersection No No No No No NoLane Alignment Left Right Left Left Left RightMedian Width(m) 7.4 0.0 0.0Link Offset(m) 0.0 0.0 0.0Crosswalk Width(m) 4.9 1.6 1.6Two way Left Turn LaneHeadway Factor 0.99 0.99 0.99 0.99 0.99 0.99Turning Speed (k/h) 24 14 24 14Sign Control Stop Free Free

Intersection SummaryArea Type: OtherControl Type: UnsignalizedIntersection Capacity Utilization 25.9% ICU Level of Service AAnalysis Period (min) 15

Page 182: Grandwood Subdivision – Elora Transportation Impact Study...To the extent that this report is based on information supplied by other parties, Paradigm Transportation Solutions Limited

06/26/2017

170127 Granwood Subdivision 5:00 pm 06/13/2017 Baseline Synchro 9 ReportPage 11

Movement EBL EBR NBL NBT SBT SBRLane ConfigurationsTraffic Volume (veh/h) 21 35 98 72 33 12Future Volume (Veh/h) 21 35 98 72 33 12Sign Control Stop Free FreeGrade 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 23 38 107 78 36 13PedestriansLane Width (m)Walking Speed (m/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (m)pX, platoon unblockedvC, conflicting volume 334 42 49vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 334 42 49tC, single (s) 6.4 6.2 4.1tC, 2 stage (s)tF (s) 3.5 3.3 2.2p0 queue free % 96 96 93cM capacity (veh/h) 615 1028 1558

Direction, Lane # EB 1 NB 1 SB 1Volume Total 61 185 49Volume Left 23 107 0Volume Right 38 0 13cSH 821 1558 1700Volume to Capacity 0.07 0.07 0.03Queue Length 95th (m) 1.8 1.7 0.0Control Delay (s) 9.7 4.6 0.0Lane LOS A AApproach Delay (s) 9.7 4.6 0.0Approach LOS A

Intersection SummaryAverage Delay 4.9Intersection Capacity Utilization 25.9% ICU Level of Service AAnalysis Period (min) 15

06/26/2017

170127 Granwood Subdivision 5:00 pm 06/13/2017 Baseline Synchro 9 ReportPage 12

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 43 3 27 14 8 85 11 41 5 30 24 15Future Volume (vph) 43 3 27 14 8 85 11 41 5 30 24 15Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Frt 0.950 0.893 0.989 0.971Flt Protected 0.971 0.994 0.990 0.978Satd. Flow (prot) 0 1709 0 0 1568 0 0 1695 0 0 1531 0Flt Permitted 0.971 0.994 0.990 0.978Satd. Flow (perm) 0 1709 0 0 1568 0 0 1695 0 0 1531 0Link Speed (k/h) 48 48 48 48Link Distance (m) 290.8 201.2 123.6 119.7Travel Time (s) 21.8 15.1 9.3 9.0Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 0% 0% 10% 0% 0% 11% 0% 4% 100% 25% 13% 17%Adj. Flow (vph) 47 3 29 15 9 92 12 45 5 33 26 16Shared Lane Traffic (%)Lane Group Flow (vph) 0 79 0 0 116 0 0 62 0 0 75 0Enter Blocked Intersection No No No No No No No No No No No NoLane Alignment Left Left Right Left Left Right Left Left Right Left Left RightMedian Width(m) 0.0 0.0 0.0 0.0Link Offset(m) 0.0 0.0 0.0 0.0Crosswalk Width(m) 1.6 1.6 1.6 1.6Two way Left Turn LaneHeadway Factor 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99Turning Speed (k/h) 24 14 24 14 24 14 24 14Sign Control Stop Stop Free Free

Intersection SummaryArea Type: OtherControl Type: UnsignalizedIntersection Capacity Utilization 25.2% ICU Level of Service AAnalysis Period (min) 15

Page 183: Grandwood Subdivision – Elora Transportation Impact Study...To the extent that this report is based on information supplied by other parties, Paradigm Transportation Solutions Limited

06/26/2017

170127 Granwood Subdivision 5:00 pm 06/13/2017 Baseline Synchro 9 ReportPage 13

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (veh/h) 43 3 27 14 8 85 11 41 5 30 24 15Future Volume (Veh/h) 43 3 27 14 8 85 11 41 5 30 24 15Sign Control Stop Stop Free FreeGrade 0% 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 47 3 29 15 9 92 12 45 5 33 26 16PedestriansLane Width (m)Walking Speed (m/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (m)pX, platoon unblockedvC, conflicting volume 268 174 34 202 180 48 42 50vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 268 174 34 202 180 48 42 50tC, single (s) 7.1 6.5 6.3 7.1 6.5 6.3 4.1 4.3tC, 2 stage (s)tF (s) 3.5 4.0 3.4 3.5 4.0 3.4 2.2 2.4p0 queue free % 92 100 97 98 99 91 99 98cM capacity (veh/h) 605 701 1017 719 696 997 1580 1421

Direction, Lane # EB 1 WB 1 NB 1 SB 1Volume Total 79 116 62 75Volume Left 47 15 12 33Volume Right 29 92 5 16cSH 715 920 1580 1421Volume to Capacity 0.11 0.13 0.01 0.02Queue Length 95th (m) 2.8 3.3 0.2 0.5Control Delay (s) 10.7 9.5 1.5 3.4Lane LOS B A A AApproach Delay (s) 10.7 9.5 1.5 3.4Approach LOS B A

Intersection SummaryAverage Delay 6.9Intersection Capacity Utilization 25.2% ICU Level of Service AAnalysis Period (min) 15

06/26/2017

170127 Granwood Subdivision 06/13/2017 Baseline Synchro 9 ReportPage 1

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 116 358 77 133 189 37 59 310 193 71 199 53Future Volume (vph) 116 358 77 133 189 37 59 310 193 71 199 53Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900Storage Length (m) 70.0 0.0 30.0 0.0 90.0 0.0 40.0 0.0Storage Lanes 1 0 1 0 1 0 1 0Taper Length (m) 2.5 7.6 2.5 2.5Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Frt 0.973 0.976 0.942 0.968Flt Protected 0.950 0.950 0.950 0.950Satd. Flow (prot) 1807 1833 0 1789 1829 0 1825 1777 0 1825 1745 0Flt Permitted 0.521 0.261 0.547 0.322Satd. Flow (perm) 991 1833 0 492 1829 0 1051 1777 0 619 1745 0Right Turn on Red Yes Yes Yes YesSatd. Flow (RTOR) 14 13 53 23Link Speed (k/h) 48 48 48 48Link Distance (m) 186.0 1088.5 201.4 99.7Travel Time (s) 14.0 81.6 15.1 7.5Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 1% 2% 2% 2% 3% 0% 0% 3% 0% 0% 7% 5%Adj. Flow (vph) 126 389 84 145 205 40 64 337 210 77 216 58Shared Lane Traffic (%)Lane Group Flow (vph) 126 473 0 145 245 0 64 547 0 77 274 0Enter Blocked Intersection No No No No No No No No No No No NoLane Alignment Left Left Right Left Left Right Left Left Right Left Left RightMedian Width(m) 3.7 3.7 3.7 3.7Link Offset(m) 0.0 0.0 0.0 0.0Crosswalk Width(m) 1.6 4.9 1.6 1.6Two way Left Turn LaneHeadway Factor 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99Turning Speed (k/h) 24 14 24 14 24 14 24 14Turn Type Perm NA Perm NA Perm NA Perm NAProtected Phases 4 8 2 6Permitted Phases 4 8 2 6Minimum Split (s) 24.0 24.0 24.0 24.0 24.0 24.0 24.0 24.0Total Split (s) 38.0 38.0 38.0 38.0 52.0 52.0 52.0 52.0Total Split (%) 42.2% 42.2% 42.2% 42.2% 57.8% 57.8% 57.8% 57.8%Maximum Green (s) 32.0 32.0 32.0 32.0 46.0 46.0 46.0 46.0Yellow Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0All-Red Time (s) 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0Lost Time Adjust (s) -2.0 -2.0 -2.0 -2.0 -2.0 -2.0 -2.0 -2.0Total Lost Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0Lead/LagLead-Lag Optimize?Walk Time (s) 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0Flash Dont Walk (s) 11.0 11.0 11.0 11.0 11.0 11.0 11.0 11.0Pedestrian Calls (#/hr) 0 0 0 0 0 0 0 0Act Effct Green (s) 34.0 34.0 34.0 34.0 48.0 48.0 48.0 48.0Actuated g/C Ratio 0.38 0.38 0.38 0.38 0.53 0.53 0.53 0.53

Page 184: Grandwood Subdivision – Elora Transportation Impact Study...To the extent that this report is based on information supplied by other parties, Paradigm Transportation Solutions Limited

06/26/2017

170127 Granwood Subdivision 06/13/2017 Baseline Synchro 9 ReportPage 2

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRv/c Ratio 0.34 0.67 0.78 0.35 0.11 0.56 0.23 0.29Control Delay 23.2 28.5 55.9 20.7 11.2 15.2 13.6 11.6Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 23.2 28.5 55.9 20.7 11.2 15.2 13.6 11.6LOS C C E C B B B BApproach Delay 27.4 33.8 14.8 12.0Approach LOS C C B BQueue Length 50th (m) 15.2 65.1 21.7 28.1 5.2 53.3 6.7 22.3Queue Length 95th (m) 29.7 98.7 #54.5 46.5 11.5 82.3 15.2 37.0Internal Link Dist (m) 162.0 1064.5 177.4 75.7Turn Bay Length (m) 70.0 30.0 90.0 40.0Base Capacity (vph) 374 701 185 699 560 972 330 941Starvation Cap Reductn 0 0 0 0 0 0 0 0Spillback Cap Reductn 0 0 0 0 0 0 0 0Storage Cap Reductn 0 0 0 0 0 0 0 0Reduced v/c Ratio 0.34 0.67 0.78 0.35 0.11 0.56 0.23 0.29

Intersection SummaryArea Type: OtherCycle Length: 90Actuated Cycle Length: 90Offset: 0 (0%), Referenced to phase 2:NBTL and 6:SBTL, Start of GreenNatural Cycle: 50Control Type: PretimedMaximum v/c Ratio: 0.78Intersection Signal Delay: 22.0 Intersection LOS: CIntersection Capacity Utilization 76.5% ICU Level of Service DAnalysis Period (min) 15# 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles.

Splits and Phases: 1: Wellington Road 7 & Wellington Road 21/McNab Street

06/26/2017

170127 Granwood Subdivision 06/13/2017 Baseline Synchro 9 ReportPage 3

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 116 358 77 133 189 37 59 310 193 71 199 53Future Volume (vph) 116 358 77 133 189 37 59 310 193 71 199 53Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900Total Lost time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Frt 1.00 0.97 1.00 0.98 1.00 0.94 1.00 0.97Flt Protected 0.95 1.00 0.95 1.00 0.95 1.00 0.95 1.00Satd. Flow (prot) 1807 1833 1789 1828 1825 1778 1825 1745Flt Permitted 0.52 1.00 0.26 1.00 0.55 1.00 0.32 1.00Satd. Flow (perm) 990 1833 492 1828 1051 1778 619 1745Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 126 389 84 145 205 40 64 337 210 77 216 58RTOR Reduction (vph) 0 9 0 0 8 0 0 25 0 0 11 0Lane Group Flow (vph) 126 464 0 145 237 0 64 522 0 77 263 0Heavy Vehicles (%) 1% 2% 2% 2% 3% 0% 0% 3% 0% 0% 7% 5%Turn Type Perm NA Perm NA Perm NA Perm NAProtected Phases 4 8 2 6Permitted Phases 4 8 2 6Actuated Green, G (s) 32.0 32.0 32.0 32.0 46.0 46.0 46.0 46.0Effective Green, g (s) 34.0 34.0 34.0 34.0 48.0 48.0 48.0 48.0Actuated g/C Ratio 0.38 0.38 0.38 0.38 0.53 0.53 0.53 0.53Clearance Time (s) 6.0 6.0 6.0 6.0 6.0 6.0 6.0 6.0Lane Grp Cap (vph) 374 692 185 690 560 948 330 930v/s Ratio Prot 0.25 0.13 c0.29 0.15v/s Ratio Perm 0.13 c0.29 0.06 0.12v/c Ratio 0.34 0.67 0.78 0.34 0.11 0.55 0.23 0.28Uniform Delay, d1 20.0 23.3 24.8 20.0 10.4 13.9 11.2 11.5Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Incremental Delay, d2 2.4 5.1 27.5 1.4 0.4 2.3 1.7 0.8Delay (s) 22.4 28.5 52.2 21.4 10.9 16.2 12.8 12.3Level of Service C C D C B B B BApproach Delay (s) 27.2 32.9 15.6 12.4Approach LOS C C B B

Intersection SummaryHCM 2000 Control Delay 22.0 HCM 2000 Level of Service CHCM 2000 Volume to Capacity ratio 0.65Actuated Cycle Length (s) 90.0 Sum of lost time (s) 8.0Intersection Capacity Utilization 76.5% ICU Level of Service DAnalysis Period (min) 15c Critical Lane Group

Page 185: Grandwood Subdivision – Elora Transportation Impact Study...To the extent that this report is based on information supplied by other parties, Paradigm Transportation Solutions Limited

06/26/2017

170127 Granwood Subdivision 06/13/2017 Baseline Synchro 9 ReportPage 4

Lane Group WBL WBR NBT NBR SBL SBTLane ConfigurationsTraffic Volume (vph) 27 49 683 47 33 479Future Volume (vph) 27 49 683 47 33 479Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900Storage Length (m) 0.0 0.0 30.0 0.0Storage Lanes 1 0 1 0Taper Length (m) 2.5 2.5Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00Frt 0.913 0.850Flt Protected 0.983 0.997Satd. Flow (prot) 1635 0 1865 1471 0 1801Flt Permitted 0.983 0.997Satd. Flow (perm) 1635 0 1865 1471 0 1801Link Speed (k/h) 48 48 48Link Distance (m) 92.0 115.2 201.4Travel Time (s) 6.9 8.6 15.1Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 10% 3% 3% 11% 11% 6%Adj. Flow (vph) 29 53 742 51 36 521Shared Lane Traffic (%)Lane Group Flow (vph) 82 0 742 51 0 557Enter Blocked Intersection No No No No No NoLane Alignment Left Right Left Right Left LeftMedian Width(m) 3.7 3.7 3.7Link Offset(m) 0.0 0.0 0.0Crosswalk Width(m) 1.6 1.6 1.6Two way Left Turn LaneHeadway Factor 0.99 0.99 0.99 0.99 0.99 0.99Turning Speed (k/h) 24 14 14 24Sign Control Stop Free Free

Intersection SummaryArea Type: OtherControl Type: UnsignalizedIntersection Capacity Utilization 63.5% ICU Level of Service BAnalysis Period (min) 15

06/26/2017

170127 Granwood Subdivision 06/13/2017 Baseline Synchro 9 ReportPage 5

Movement WBL WBR NBT NBR SBL SBTLane ConfigurationsTraffic Volume (veh/h) 27 49 683 47 33 479Future Volume (Veh/h) 27 49 683 47 33 479Sign Control Stop Free FreeGrade 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 29 53 742 51 36 521PedestriansLane Width (m)Walking Speed (m/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (m) 201pX, platoon unblocked 0.96vC, conflicting volume 1335 742 793vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 1327 742 793tC, single (s) 6.5 6.2 4.2tC, 2 stage (s)tF (s) 3.6 3.3 2.3p0 queue free % 81 87 95cM capacity (veh/h) 150 414 789

Direction, Lane # WB 1 NB 1 NB 2 SB 1Volume Total 82 742 51 557Volume Left 29 0 0 36Volume Right 53 0 51 0cSH 255 1700 1700 789Volume to Capacity 0.32 0.44 0.03 0.05Queue Length 95th (m) 10.2 0.0 0.0 1.1Control Delay (s) 25.6 0.0 0.0 1.2Lane LOS D AApproach Delay (s) 25.6 0.0 1.2Approach LOS D

Intersection SummaryAverage Delay 1.9Intersection Capacity Utilization 63.5% ICU Level of Service BAnalysis Period (min) 15

Page 186: Grandwood Subdivision – Elora Transportation Impact Study...To the extent that this report is based on information supplied by other parties, Paradigm Transportation Solutions Limited

06/26/2017

170127 Granwood Subdivision 06/13/2017 Baseline Synchro 9 ReportPage 6

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 6 69 6 11 43 26 18 18 6 33 8 16Future Volume (vph) 6 69 6 11 43 26 18 18 6 33 8 16Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Frt 0.989 0.957 0.980 0.963Flt Protected 0.996 0.993 0.979 0.972Satd. Flow (prot) 0 1855 0 0 1790 0 0 1807 0 0 1763 0Flt Permitted 0.996 0.993 0.979 0.972Satd. Flow (perm) 0 1855 0 0 1790 0 0 1807 0 0 1763 0Link Speed (k/h) 48 48 48 48Link Distance (m) 92.0 91.8 92.7 102.1Travel Time (s) 6.9 6.9 7.0 7.7Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 7 75 7 12 47 28 20 20 7 36 9 17Shared Lane Traffic (%)Lane Group Flow (vph) 0 89 0 0 87 0 0 47 0 0 62 0Enter Blocked Intersection No No No No No No No No No No No NoLane Alignment Left Left Right Left Left Right Left Left Right Left Left RightMedian Width(m) 0.0 0.0 0.0 0.0Link Offset(m) 0.0 0.0 0.0 0.0Crosswalk Width(m) 1.6 1.6 1.6 1.6Two way Left Turn LaneHeadway Factor 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99Turning Speed (k/h) 24 14 24 14 24 14 24 14Sign Control Free Free Stop Stop

Intersection SummaryArea Type: OtherControl Type: UnsignalizedIntersection Capacity Utilization 18.5% ICU Level of Service AAnalysis Period (min) 15

06/26/2017

170127 Granwood Subdivision 06/13/2017 Baseline Synchro 9 ReportPage 7

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (veh/h) 6 69 6 11 43 26 18 18 6 33 8 16Future Volume (Veh/h) 6 69 6 11 43 26 18 18 6 33 8 16Sign Control Free Free Stop StopGrade 0% 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 7 75 7 12 47 28 20 20 7 36 9 17PedestriansLane Width (m)Walking Speed (m/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (m)pX, platoon unblockedvC, conflicting volume 75 82 199 192 78 194 181 61vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 75 82 199 192 78 194 181 61tC, single (s) 4.1 4.1 7.1 6.5 6.2 7.1 6.5 6.2tC, 2 stage (s)tF (s) 2.2 2.2 3.5 4.0 3.3 3.5 4.0 3.3p0 queue free % 100 99 97 97 99 95 99 98cM capacity (veh/h) 1524 1515 732 695 982 736 704 1004

Direction, Lane # EB 1 WB 1 NB 1 SB 1Volume Total 89 87 47 62Volume Left 7 12 20 36Volume Right 7 28 7 17cSH 1524 1515 743 788Volume to Capacity 0.00 0.01 0.06 0.08Queue Length 95th (m) 0.1 0.2 1.5 1.9Control Delay (s) 0.6 1.1 10.2 10.0Lane LOS A A B AApproach Delay (s) 0.6 1.1 10.2 10.0Approach LOS B A

Intersection SummaryAverage Delay 4.4Intersection Capacity Utilization 18.5% ICU Level of Service AAnalysis Period (min) 15

Page 187: Grandwood Subdivision – Elora Transportation Impact Study...To the extent that this report is based on information supplied by other parties, Paradigm Transportation Solutions Limited

06/26/2017

170127 Granwood Subdivision 06/13/2017 Baseline Synchro 9 ReportPage 8

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 25 78 5 1 45 9 21 18 3 10 8 13Future Volume (vph) 25 78 5 1 45 9 21 18 3 10 8 13Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Ped Bike FactorFrt 0.994 0.977 0.991 0.944Flt Protected 0.989 0.999 0.976 0.984Satd. Flow (prot) 0 1867 0 0 1800 0 0 1804 0 0 1602 0Flt Permitted 0.989 0.999 0.976 0.984Satd. Flow (perm) 0 1867 0 0 1800 0 0 1804 0 0 1602 0Link Speed (k/h) 48 48 48 48Link Distance (m) 91.8 278.1 75.3 102.9Travel Time (s) 6.9 20.9 5.6 7.7Confl. Peds. (#/hr) 1 1Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 5% 0% 0% 0% 0% 25% 6% 0% 0% 0% 43% 0%Adj. Flow (vph) 27 85 5 1 49 10 23 20 3 11 9 14Shared Lane Traffic (%)Lane Group Flow (vph) 0 117 0 0 60 0 0 46 0 0 34 0Enter Blocked Intersection No No No No No No No No No No No NoLane Alignment Left Left Right Left Left Right Left Left Right Left Left RightMedian Width(m) 0.0 0.0 0.0 0.0Link Offset(m) 0.0 0.0 0.0 0.0Crosswalk Width(m) 1.6 1.6 1.6 1.6Two way Left Turn LaneHeadway Factor 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99Turning Speed (k/h) 24 14 24 14 24 14 24 14Sign Control Free Free Stop Stop

Intersection SummaryArea Type: OtherControl Type: UnsignalizedIntersection Capacity Utilization 23.1% ICU Level of Service AAnalysis Period (min) 15

06/26/2017

170127 Granwood Subdivision 06/13/2017 Baseline Synchro 9 ReportPage 9

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (veh/h) 25 78 5 1 45 9 21 18 3 10 8 13Future Volume (Veh/h) 25 78 5 1 45 9 21 18 3 10 8 13Sign Control Free Free Stop StopGrade 0% 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 27 85 5 1 49 10 23 20 3 11 9 14Pedestrians 1Lane Width (m) 3.7Walking Speed (m/s) 1.1Percent Blockage 0Right turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (m)pX, platoon unblockedvC, conflicting volume 59 90 216 202 88 212 200 54vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 59 90 216 202 88 212 200 54tC, single (s) 4.1 4.1 7.2 6.5 6.2 7.1 6.9 6.2tC, 2 stage (s)tF (s) 2.2 2.2 3.6 4.0 3.3 3.5 4.4 3.3p0 queue free % 98 100 97 97 100 98 99 99cM capacity (veh/h) 1526 1518 704 684 974 720 618 1019

Direction, Lane # EB 1 WB 1 NB 1 SB 1Volume Total 117 60 46 34Volume Left 27 1 23 11Volume Right 5 10 3 14cSH 1526 1518 708 780Volume to Capacity 0.02 0.00 0.06 0.04Queue Length 95th (m) 0.4 0.0 1.6 1.0Control Delay (s) 1.8 0.1 10.4 9.8Lane LOS A A B AApproach Delay (s) 1.8 0.1 10.4 9.8Approach LOS B A

Intersection SummaryAverage Delay 4.0Intersection Capacity Utilization 23.1% ICU Level of Service AAnalysis Period (min) 15

Page 188: Grandwood Subdivision – Elora Transportation Impact Study...To the extent that this report is based on information supplied by other parties, Paradigm Transportation Solutions Limited

06/26/2017

170127 Granwood Subdivision 06/13/2017 Baseline Synchro 9 ReportPage 10

Lane Group EBL EBR NBL NBT SBT SBRLane ConfigurationsTraffic Volume (vph) 5 125 49 72 59 17Future Volume (vph) 5 125 49 72 59 17Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00Frt 0.870 0.970Flt Protected 0.998 0.980Satd. Flow (prot) 1635 0 0 1846 1827 0Flt Permitted 0.998 0.980Satd. Flow (perm) 1635 0 0 1846 1827 0Link Speed (k/h) 48 48 48Link Distance (m) 1088.5 119.7 61.8Travel Time (s) 81.6 9.0 4.6Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 5 136 53 78 64 18Shared Lane Traffic (%)Lane Group Flow (vph) 141 0 0 131 82 0Enter Blocked Intersection No No No No No NoLane Alignment Left Right Left Left Left RightMedian Width(m) 7.4 0.0 0.0Link Offset(m) 0.0 0.0 0.0Crosswalk Width(m) 4.9 1.6 1.6Two way Left Turn LaneHeadway Factor 0.99 0.99 0.99 0.99 0.99 0.99Turning Speed (k/h) 24 14 24 14Sign Control Stop Free Free

Intersection SummaryArea Type: OtherControl Type: UnsignalizedIntersection Capacity Utilization 27.8% ICU Level of Service AAnalysis Period (min) 15

06/26/2017

170127 Granwood Subdivision 06/13/2017 Baseline Synchro 9 ReportPage 11

Movement EBL EBR NBL NBT SBT SBRLane ConfigurationsTraffic Volume (veh/h) 5 125 49 72 59 17Future Volume (Veh/h) 5 125 49 72 59 17Sign Control Stop Free FreeGrade 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 5 136 53 78 64 18PedestriansLane Width (m)Walking Speed (m/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (m)pX, platoon unblockedvC, conflicting volume 257 73 82vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 257 73 82tC, single (s) 6.4 6.2 4.1tC, 2 stage (s)tF (s) 3.5 3.3 2.2p0 queue free % 99 86 97cM capacity (veh/h) 706 989 1515

Direction, Lane # EB 1 NB 1 SB 1Volume Total 141 131 82Volume Left 5 53 0Volume Right 136 0 18cSH 975 1515 1700Volume to Capacity 0.14 0.03 0.05Queue Length 95th (m) 3.8 0.8 0.0Control Delay (s) 9.3 3.2 0.0Lane LOS A AApproach Delay (s) 9.3 3.2 0.0Approach LOS A

Intersection SummaryAverage Delay 4.9Intersection Capacity Utilization 27.8% ICU Level of Service AAnalysis Period (min) 15

Page 189: Grandwood Subdivision – Elora Transportation Impact Study...To the extent that this report is based on information supplied by other parties, Paradigm Transportation Solutions Limited

06/26/2017

170127 Granwood Subdivision 06/13/2017 Baseline Synchro 9 ReportPage 12

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 25 10 25 12 6 56 26 41 19 96 51 39Future Volume (vph) 25 10 25 12 6 56 26 41 19 96 51 39Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Frt 0.944 0.898 0.970 0.972Flt Protected 0.980 0.992 0.985 0.975Satd. Flow (prot) 0 1635 0 0 1379 0 0 1801 0 0 1766 0Flt Permitted 0.980 0.992 0.985 0.975Satd. Flow (perm) 0 1635 0 0 1379 0 0 1801 0 0 1766 0Link Speed (k/h) 48 48 48 48Link Distance (m) 290.8 201.2 123.6 119.7Travel Time (s) 21.8 15.1 9.3 9.0Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 11% 0% 10% 33% 0% 25% 0% 4% 0% 0% 6% 7%Adj. Flow (vph) 27 11 27 13 7 61 28 45 21 104 55 42Shared Lane Traffic (%)Lane Group Flow (vph) 0 65 0 0 81 0 0 94 0 0 201 0Enter Blocked Intersection No No No No No No No No No No No NoLane Alignment Left Left Right Left Left Right Left Left Right Left Left RightMedian Width(m) 0.0 0.0 0.0 0.0Link Offset(m) 0.0 0.0 0.0 0.0Crosswalk Width(m) 1.6 1.6 1.6 1.6Two way Left Turn LaneHeadway Factor 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99Turning Speed (k/h) 24 14 24 14 24 14 24 14Sign Control Stop Stop Free Free

Intersection SummaryArea Type: OtherControl Type: UnsignalizedIntersection Capacity Utilization 31.1% ICU Level of Service AAnalysis Period (min) 15

06/26/2017

170127 Granwood Subdivision 06/13/2017 Baseline Synchro 9 ReportPage 13

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (veh/h) 25 10 25 12 6 56 26 41 19 96 51 39Future Volume (Veh/h) 25 10 25 12 6 56 26 41 19 96 51 39Sign Control Stop Stop Free FreeGrade 0% 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 27 11 27 13 7 61 28 45 21 104 55 42PedestriansLane Width (m)Walking Speed (m/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (m)pX, platoon unblockedvC, conflicting volume 460 406 76 428 416 56 97 66vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 460 406 76 428 416 56 97 66tC, single (s) 7.2 6.5 6.3 7.4 6.5 6.5 4.1 4.1tC, 2 stage (s)tF (s) 3.6 4.0 3.4 3.8 4.0 3.5 2.2 2.2p0 queue free % 94 98 97 97 99 94 98 93cM capacity (veh/h) 430 492 963 435 485 950 1509 1549

Direction, Lane # EB 1 WB 1 NB 1 SB 1Volume Total 65 81 94 201Volume Left 27 13 28 104Volume Right 27 61 21 42cSH 574 747 1509 1549Volume to Capacity 0.11 0.11 0.02 0.07Queue Length 95th (m) 2.9 2.8 0.4 1.6Control Delay (s) 12.1 10.4 2.3 4.1Lane LOS B B A AApproach Delay (s) 12.1 10.4 2.3 4.1Approach LOS B B

Intersection SummaryAverage Delay 6.1Intersection Capacity Utilization 31.1% ICU Level of Service AAnalysis Period (min) 15

Page 190: Grandwood Subdivision – Elora Transportation Impact Study...To the extent that this report is based on information supplied by other parties, Paradigm Transportation Solutions Limited

06/26/2017

170127 Granwood Subdivision 5:00 pm 06/13/2017 Baseline Synchro 9 ReportPage 1

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 27 107 62 140 253 42 94 183 57 20 304 74Future Volume (vph) 27 107 62 140 253 42 94 183 57 20 304 74Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900Storage Length (m) 70.0 0.0 30.0 0.0 90.0 0.0 40.0 0.0Storage Lanes 1 0 1 0 1 0 1 0Taper Length (m) 2.5 7.6 2.5 2.5Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Frt 0.945 0.979 0.964 0.971Flt Protected 0.950 0.950 0.950 0.950Satd. Flow (prot) 1472 1645 0 1807 1841 0 1755 1698 0 1825 1770 0Flt Permitted 0.430 0.598 0.431 0.559Satd. Flow (perm) 666 1645 0 1137 1841 0 796 1698 0 1074 1770 0Right Turn on Red Yes Yes Yes YesSatd. Flow (RTOR) 37 11 27 21Link Speed (k/h) 48 48 48 48Link Distance (m) 186.0 1088.5 201.4 99.7Travel Time (s) 14.0 81.6 15.1 7.5Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 24% 6% 18% 1% 1% 9% 4% 10% 6% 0% 6% 3%Adj. Flow (vph) 29 116 67 152 275 46 102 199 62 22 330 80Shared Lane Traffic (%)Lane Group Flow (vph) 29 183 0 152 321 0 102 261 0 22 410 0Enter Blocked Intersection No No No No No No No No No No No NoLane Alignment Left Left Right Left Left Right Left Left Right Left Left RightMedian Width(m) 3.7 3.7 3.7 3.7Link Offset(m) 0.0 0.0 0.0 0.0Crosswalk Width(m) 1.6 4.9 1.6 1.6Two way Left Turn LaneHeadway Factor 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99Turning Speed (k/h) 24 14 24 14 24 14 24 14Turn Type Perm NA Perm NA Perm NA Perm NAProtected Phases 4 8 2 6Permitted Phases 4 8 2 6Minimum Split (s) 24.0 24.0 24.0 24.0 24.0 24.0 24.0 24.0Total Split (s) 38.0 38.0 38.0 38.0 52.0 52.0 52.0 52.0Total Split (%) 42.2% 42.2% 42.2% 42.2% 57.8% 57.8% 57.8% 57.8%Maximum Green (s) 32.0 32.0 32.0 32.0 46.0 46.0 46.0 46.0Yellow Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0All-Red Time (s) 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0Lost Time Adjust (s) -2.0 -2.0 -2.0 -2.0 -2.0 -2.0 -2.0 -2.0Total Lost Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0Lead/LagLead-Lag Optimize?Walk Time (s) 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0Flash Dont Walk (s) 11.0 11.0 11.0 11.0 11.0 11.0 11.0 11.0Pedestrian Calls (#/hr) 0 0 0 0 0 0 0 0Act Effct Green (s) 34.0 34.0 34.0 34.0 48.0 48.0 48.0 48.0Actuated g/C Ratio 0.38 0.38 0.38 0.38 0.53 0.53 0.53 0.53

06/26/2017

170127 Granwood Subdivision 5:00 pm 06/13/2017 Baseline Synchro 9 ReportPage 2

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRv/c Ratio 0.12 0.28 0.35 0.46 0.24 0.28 0.04 0.43Control Delay 19.9 16.8 23.1 22.9 13.1 11.3 10.3 13.7Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 19.9 16.8 23.1 22.9 13.1 11.3 10.3 13.7LOS B B C C B B B BApproach Delay 17.2 23.0 11.8 13.6Approach LOS B C B BQueue Length 50th (m) 3.2 16.9 18.5 39.5 8.9 20.6 1.7 38.2Queue Length 95th (m) 9.2 32.2 34.2 62.3 18.5 34.9 5.2 59.5Internal Link Dist (m) 162.0 1064.5 177.4 75.7Turn Bay Length (m) 70.0 30.0 90.0 40.0Base Capacity (vph) 251 644 429 702 424 918 572 953Starvation Cap Reductn 0 0 0 0 0 0 0 0Spillback Cap Reductn 0 0 0 0 0 0 0 0Storage Cap Reductn 0 0 0 0 0 0 0 0Reduced v/c Ratio 0.12 0.28 0.35 0.46 0.24 0.28 0.04 0.43

Intersection SummaryArea Type: OtherCycle Length: 90Actuated Cycle Length: 90Offset: 0 (0%), Referenced to phase 2:NBTL and 6:SBTL, Start of GreenNatural Cycle: 50Control Type: PretimedMaximum v/c Ratio: 0.46Intersection Signal Delay: 16.7 Intersection LOS: BIntersection Capacity Utilization 59.1% ICU Level of Service BAnalysis Period (min) 15

Splits and Phases: 1: Wellington Road 7 & Wellington Road 21/McNab Street

Page 191: Grandwood Subdivision – Elora Transportation Impact Study...To the extent that this report is based on information supplied by other parties, Paradigm Transportation Solutions Limited

06/26/2017

170127 Granwood Subdivision 5:00 pm 06/13/2017 Baseline Synchro 9 ReportPage 3

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 27 107 62 140 253 42 94 183 57 20 304 74Future Volume (vph) 27 107 62 140 253 42 94 183 57 20 304 74Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900Total Lost time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Frt 1.00 0.95 1.00 0.98 1.00 0.96 1.00 0.97Flt Protected 0.95 1.00 0.95 1.00 0.95 1.00 0.95 1.00Satd. Flow (prot) 1472 1645 1807 1840 1755 1699 1825 1769Flt Permitted 0.43 1.00 0.60 1.00 0.43 1.00 0.56 1.00Satd. Flow (perm) 667 1645 1137 1840 795 1699 1074 1769Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 29 116 67 152 275 46 102 199 62 22 330 80RTOR Reduction (vph) 0 23 0 0 7 0 0 13 0 0 10 0Lane Group Flow (vph) 29 160 0 152 314 0 102 248 0 22 400 0Heavy Vehicles (%) 24% 6% 18% 1% 1% 9% 4% 10% 6% 0% 6% 3%Turn Type Perm NA Perm NA Perm NA Perm NAProtected Phases 4 8 2 6Permitted Phases 4 8 2 6Actuated Green, G (s) 32.0 32.0 32.0 32.0 46.0 46.0 46.0 46.0Effective Green, g (s) 34.0 34.0 34.0 34.0 48.0 48.0 48.0 48.0Actuated g/C Ratio 0.38 0.38 0.38 0.38 0.53 0.53 0.53 0.53Clearance Time (s) 6.0 6.0 6.0 6.0 6.0 6.0 6.0 6.0Lane Grp Cap (vph) 251 621 429 695 424 906 572 943v/s Ratio Prot 0.10 c0.17 0.15 c0.23v/s Ratio Perm 0.04 0.13 0.13 0.02v/c Ratio 0.12 0.26 0.35 0.45 0.24 0.27 0.04 0.42Uniform Delay, d1 18.2 19.3 20.1 21.0 11.2 11.5 10.0 12.7Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Incremental Delay, d2 0.9 1.0 2.3 2.1 1.3 0.7 0.1 1.4Delay (s) 19.2 20.3 22.4 23.1 12.6 12.2 10.1 14.1Level of Service B C C C B B B BApproach Delay (s) 20.1 22.9 12.3 13.9Approach LOS C C B B

Intersection SummaryHCM 2000 Control Delay 17.3 HCM 2000 Level of Service BHCM 2000 Volume to Capacity ratio 0.44Actuated Cycle Length (s) 90.0 Sum of lost time (s) 8.0Intersection Capacity Utilization 59.1% ICU Level of Service BAnalysis Period (min) 15c Critical Lane Group

06/26/2017

170127 Granwood Subdivision 5:00 pm 06/13/2017 Baseline Synchro 9 ReportPage 4

Lane Group WBL WBR NBT NBR SBL SBTLane ConfigurationsTraffic Volume (vph) 50 93 371 37 76 653Future Volume (vph) 50 93 371 37 76 653Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900Storage Length (m) 0.0 0.0 30.0 0.0Storage Lanes 1 0 1 0Taper Length (m) 2.5 2.5Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00Frt 0.912 0.850Flt Protected 0.983 0.995Satd. Flow (prot) 1336 0 1779 1498 0 1822Flt Permitted 0.983 0.995Satd. Flow (perm) 1336 0 1779 1498 0 1822Link Speed (k/h) 48 48 48Link Distance (m) 92.0 115.2 201.4Travel Time (s) 6.9 8.6 15.1Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 25% 31% 8% 9% 4% 5%Adj. Flow (vph) 54 101 403 40 83 710Shared Lane Traffic (%)Lane Group Flow (vph) 155 0 403 40 0 793Enter Blocked Intersection No No No No No NoLane Alignment Left Right Left Right Left LeftMedian Width(m) 3.7 3.7 3.7Link Offset(m) 0.0 0.0 0.0Crosswalk Width(m) 1.6 1.6 1.6Two way Left Turn LaneHeadway Factor 0.99 0.99 0.99 0.99 0.99 0.99Turning Speed (k/h) 24 14 14 24Sign Control Stop Free Free

Intersection SummaryArea Type: OtherControl Type: UnsignalizedIntersection Capacity Utilization 76.6% ICU Level of Service DAnalysis Period (min) 15

Page 192: Grandwood Subdivision – Elora Transportation Impact Study...To the extent that this report is based on information supplied by other parties, Paradigm Transportation Solutions Limited

06/26/2017

170127 Granwood Subdivision 5:00 pm 06/13/2017 Baseline Synchro 9 ReportPage 5

Movement WBL WBR NBT NBR SBL SBTLane ConfigurationsTraffic Volume (veh/h) 50 93 371 37 76 653Future Volume (Veh/h) 50 93 371 37 76 653Sign Control Stop Free FreeGrade 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 54 101 403 40 83 710PedestriansLane Width (m)Walking Speed (m/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (m) 201pX, platoon unblocked 0.88vC, conflicting volume 1279 403 443vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 1248 403 443tC, single (s) 6.6 6.5 4.1tC, 2 stage (s)tF (s) 3.7 3.6 2.2p0 queue free % 61 83 92cM capacity (veh/h) 139 589 1107

Direction, Lane # WB 1 NB 1 NB 2 SB 1Volume Total 155 403 40 793Volume Left 54 0 0 83Volume Right 101 0 40 0cSH 277 1700 1700 1107Volume to Capacity 0.56 0.24 0.02 0.08Queue Length 95th (m) 24.0 0.0 0.0 1.8Control Delay (s) 33.3 0.0 0.0 1.9Lane LOS D AApproach Delay (s) 33.3 0.0 1.9Approach LOS D

Intersection SummaryAverage Delay 4.8Intersection Capacity Utilization 76.6% ICU Level of Service DAnalysis Period (min) 15

06/26/2017

170127 Granwood Subdivision 5:00 pm 06/13/2017 Baseline Synchro 9 ReportPage 6

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 16 79 18 9 130 31 7 2 2 6 5 6Future Volume (vph) 16 79 18 9 130 31 7 2 2 6 5 6Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Frt 0.978 0.975 0.977 0.950Flt Protected 0.993 0.997 0.968 0.982Satd. Flow (prot) 0 1829 0 0 1831 0 0 1781 0 0 1757 0Flt Permitted 0.993 0.997 0.968 0.982Satd. Flow (perm) 0 1829 0 0 1831 0 0 1781 0 0 1757 0Link Speed (k/h) 48 48 48 48Link Distance (m) 92.0 91.8 92.7 102.1Travel Time (s) 6.9 6.9 7.0 7.7Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 17 86 20 10 141 34 8 2 2 7 5 7Shared Lane Traffic (%)Lane Group Flow (vph) 0 123 0 0 185 0 0 12 0 0 19 0Enter Blocked Intersection No No No No No No No No No No No NoLane Alignment Left Left Right Left Left Right Left Left Right Left Left RightMedian Width(m) 0.0 0.0 0.0 0.0Link Offset(m) 0.0 0.0 0.0 0.0Crosswalk Width(m) 1.6 1.6 1.6 1.6Two way Left Turn LaneHeadway Factor 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99Turning Speed (k/h) 24 14 24 14 24 14 24 14Sign Control Free Free Stop Stop

Intersection SummaryArea Type: OtherControl Type: UnsignalizedIntersection Capacity Utilization 21.1% ICU Level of Service AAnalysis Period (min) 15

Page 193: Grandwood Subdivision – Elora Transportation Impact Study...To the extent that this report is based on information supplied by other parties, Paradigm Transportation Solutions Limited

06/26/2017

170127 Granwood Subdivision 5:00 pm 06/13/2017 Baseline Synchro 9 ReportPage 7

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (veh/h) 16 79 18 9 130 31 7 2 2 6 5 6Future Volume (Veh/h) 16 79 18 9 130 31 7 2 2 6 5 6Sign Control Free Free Stop StopGrade 0% 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 17 86 20 10 141 34 8 2 2 7 5 7PedestriansLane Width (m)Walking Speed (m/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (m)pX, platoon unblockedvC, conflicting volume 175 106 318 325 96 311 318 158vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 175 106 318 325 96 311 318 158tC, single (s) 4.1 4.1 7.1 6.5 6.2 7.1 6.5 6.2tC, 2 stage (s)tF (s) 2.2 2.2 3.5 4.0 3.3 3.5 4.0 3.3p0 queue free % 99 99 99 100 100 99 99 99cM capacity (veh/h) 1401 1485 617 582 960 629 587 887

Direction, Lane # EB 1 WB 1 NB 1 SB 1Volume Total 123 185 12 19Volume Left 17 10 8 7Volume Right 20 34 2 7cSH 1401 1485 649 690Volume to Capacity 0.01 0.01 0.02 0.03Queue Length 95th (m) 0.3 0.2 0.4 0.6Control Delay (s) 1.1 0.5 10.6 10.4Lane LOS A A B BApproach Delay (s) 1.1 0.5 10.6 10.4Approach LOS B B

Intersection SummaryAverage Delay 1.6Intersection Capacity Utilization 21.1% ICU Level of Service AAnalysis Period (min) 15

06/26/2017

170127 Granwood Subdivision 5:00 pm 06/13/2017 Baseline Synchro 9 ReportPage 8

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 16 54 18 9 122 6 7 2 2 3 5 40Future Volume (vph) 16 54 18 9 122 6 7 2 2 3 5 40Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Ped Bike FactorFrt 0.972 0.994 0.977 0.886Flt Protected 0.991 0.997 0.968 0.997Satd. Flow (prot) 0 1426 0 0 1721 0 0 1256 0 0 1679 0Flt Permitted 0.991 0.997 0.968 0.997Satd. Flow (perm) 0 1426 0 0 1721 0 0 1256 0 0 1679 0Link Speed (k/h) 48 48 48 48Link Distance (m) 91.8 278.1 75.3 102.9Travel Time (s) 6.9 20.9 5.6 7.7Confl. Peds. (#/hr) 1 1Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 15% 33% 33% 0% 12% 0% 67% 0% 0% 0% 11% 0%Adj. Flow (vph) 17 59 20 10 133 7 8 2 2 3 5 43Shared Lane Traffic (%)Lane Group Flow (vph) 0 96 0 0 150 0 0 12 0 0 51 0Enter Blocked Intersection No No No No No No No No No No No NoLane Alignment Left Left Right Left Left Right Left Left Right Left Left RightMedian Width(m) 0.0 0.0 0.0 0.0Link Offset(m) 0.0 0.0 0.0 0.0Crosswalk Width(m) 1.6 1.6 1.6 1.6Two way Left Turn LaneHeadway Factor 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99Turning Speed (k/h) 24 14 24 14 24 14 24 14Sign Control Free Free Stop Stop

Intersection SummaryArea Type: OtherControl Type: UnsignalizedIntersection Capacity Utilization 19.6% ICU Level of Service AAnalysis Period (min) 15

Page 194: Grandwood Subdivision – Elora Transportation Impact Study...To the extent that this report is based on information supplied by other parties, Paradigm Transportation Solutions Limited

06/26/2017

170127 Granwood Subdivision 5:00 pm 06/13/2017 Baseline Synchro 9 ReportPage 9

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (veh/h) 16 54 18 9 122 6 7 2 2 3 5 40Future Volume (Veh/h) 16 54 18 9 122 6 7 2 2 3 5 40Sign Control Free Free Stop StopGrade 0% 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 17 59 20 10 133 7 8 2 2 3 5 43Pedestrians 1Lane Width (m) 3.7Walking Speed (m/s) 1.1Percent Blockage 0Right turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (m)pX, platoon unblockedvC, conflicting volume 140 79 306 263 69 262 270 138vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 140 79 306 263 69 262 270 138tC, single (s) 4.2 4.1 7.8 6.5 6.2 7.1 6.6 6.2tC, 2 stage (s)tF (s) 2.3 2.2 4.1 4.0 3.3 3.5 4.1 3.3p0 queue free % 99 99 98 100 100 100 99 95cM capacity (veh/h) 1367 1532 501 633 1000 681 610 915

Direction, Lane # EB 1 WB 1 NB 1 SB 1Volume Total 96 150 12 51Volume Left 17 10 8 3Volume Right 20 7 2 43cSH 1367 1532 568 856Volume to Capacity 0.01 0.01 0.02 0.06Queue Length 95th (m) 0.3 0.1 0.5 1.4Control Delay (s) 1.4 0.5 11.5 9.5Lane LOS A A B AApproach Delay (s) 1.4 0.5 11.5 9.5Approach LOS B A

Intersection SummaryAverage Delay 2.7Intersection Capacity Utilization 19.6% ICU Level of Service AAnalysis Period (min) 15

06/26/2017

170127 Granwood Subdivision 5:00 pm 06/13/2017 Baseline Synchro 9 ReportPage 10

Lane Group EBL EBR NBL NBT SBT SBRLane ConfigurationsTraffic Volume (vph) 11 19 54 85 47 7Future Volume (vph) 11 19 54 85 47 7Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00Frt 0.914 0.982Flt Protected 0.982 0.981Satd. Flow (prot) 1690 0 0 1848 1850 0Flt Permitted 0.982 0.981Satd. Flow (perm) 1690 0 0 1848 1850 0Link Speed (k/h) 48 48 48Link Distance (m) 1088.5 119.7 61.8Travel Time (s) 81.6 9.0 4.6Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 12 21 59 92 51 8Shared Lane Traffic (%)Lane Group Flow (vph) 33 0 0 151 59 0Enter Blocked Intersection No No No No No NoLane Alignment Left Right Left Left Left RightMedian Width(m) 7.4 0.0 0.0Link Offset(m) 0.0 0.0 0.0Crosswalk Width(m) 4.9 1.6 1.6Two way Left Turn LaneHeadway Factor 0.99 0.99 0.99 0.99 0.99 0.99Turning Speed (k/h) 24 14 24 14Sign Control Stop Free Free

Intersection SummaryArea Type: OtherControl Type: UnsignalizedIntersection Capacity Utilization 24.1% ICU Level of Service AAnalysis Period (min) 15

Page 195: Grandwood Subdivision – Elora Transportation Impact Study...To the extent that this report is based on information supplied by other parties, Paradigm Transportation Solutions Limited

06/26/2017

170127 Granwood Subdivision 5:00 pm 06/13/2017 Baseline Synchro 9 ReportPage 11

Movement EBL EBR NBL NBT SBT SBRLane ConfigurationsTraffic Volume (veh/h) 11 19 54 85 47 7Future Volume (Veh/h) 11 19 54 85 47 7Sign Control Stop Free FreeGrade 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 12 21 59 92 51 8PedestriansLane Width (m)Walking Speed (m/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (m)pX, platoon unblockedvC, conflicting volume 265 55 59vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 265 55 59tC, single (s) 6.4 6.2 4.1tC, 2 stage (s)tF (s) 3.5 3.3 2.2p0 queue free % 98 98 96cM capacity (veh/h) 696 1012 1545

Direction, Lane # EB 1 NB 1 SB 1Volume Total 33 151 59Volume Left 12 59 0Volume Right 21 0 8cSH 869 1545 1700Volume to Capacity 0.04 0.04 0.03Queue Length 95th (m) 0.9 0.9 0.0Control Delay (s) 9.3 3.1 0.0Lane LOS A AApproach Delay (s) 9.3 3.1 0.0Approach LOS A

Intersection SummaryAverage Delay 3.2Intersection Capacity Utilization 24.1% ICU Level of Service AAnalysis Period (min) 15

06/26/2017

170127 Granwood Subdivision 5:00 pm 06/13/2017 Baseline Synchro 9 ReportPage 12

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 49 11 33 14 32 61 23 29 5 22 18 27Future Volume (vph) 49 11 33 14 32 61 23 29 5 22 18 27Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Frt 0.952 0.923 0.989 0.946Flt Protected 0.974 0.994 0.980 0.984Satd. Flow (prot) 0 1720 0 0 1659 0 0 1691 0 0 1509 0Flt Permitted 0.974 0.994 0.980 0.984Satd. Flow (perm) 0 1720 0 0 1659 0 0 1691 0 0 1509 0Link Speed (k/h) 48 48 48 48Link Distance (m) 290.8 201.2 123.6 119.7Travel Time (s) 21.8 15.1 9.3 9.0Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 0% 0% 10% 0% 0% 11% 0% 4% 100% 25% 13% 17%Adj. Flow (vph) 53 12 36 15 35 66 25 32 5 24 20 29Shared Lane Traffic (%)Lane Group Flow (vph) 0 101 0 0 116 0 0 62 0 0 73 0Enter Blocked Intersection No No No No No No No No No No No NoLane Alignment Left Left Right Left Left Right Left Left Right Left Left RightMedian Width(m) 0.0 0.0 0.0 0.0Link Offset(m) 0.0 0.0 0.0 0.0Crosswalk Width(m) 1.6 1.6 1.6 1.6Two way Left Turn LaneHeadway Factor 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99Turning Speed (k/h) 24 14 24 14 24 14 24 14Sign Control Stop Stop Free Free

Intersection SummaryArea Type: OtherControl Type: UnsignalizedIntersection Capacity Utilization 23.2% ICU Level of Service AAnalysis Period (min) 15

Page 196: Grandwood Subdivision – Elora Transportation Impact Study...To the extent that this report is based on information supplied by other parties, Paradigm Transportation Solutions Limited

06/26/2017

170127 Granwood Subdivision 5:00 pm 06/13/2017 Baseline Synchro 9 ReportPage 13

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (veh/h) 49 11 33 14 32 61 23 29 5 22 18 27Future Volume (Veh/h) 49 11 33 14 32 61 23 29 5 22 18 27Sign Control Stop Stop Free FreeGrade 0% 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 53 12 36 15 35 66 25 32 5 24 20 29PedestriansLane Width (m)Walking Speed (m/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (m)pX, platoon unblockedvC, conflicting volume 250 170 34 209 182 34 49 37vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 250 170 34 209 182 34 49 37tC, single (s) 7.1 6.5 6.3 7.1 6.5 6.3 4.1 4.3tC, 2 stage (s)tF (s) 3.5 4.0 3.4 3.5 4.0 3.4 2.2 2.4p0 queue free % 91 98 96 98 95 93 98 98cM capacity (veh/h) 620 704 1016 699 693 1013 1571 1437

Direction, Lane # EB 1 WB 1 NB 1 SB 1Volume Total 101 116 62 73Volume Left 53 15 25 24Volume Right 36 66 5 29cSH 732 846 1571 1437Volume to Capacity 0.14 0.14 0.02 0.02Queue Length 95th (m) 3.6 3.6 0.4 0.4Control Delay (s) 10.7 9.9 3.0 2.6Lane LOS B A A AApproach Delay (s) 10.7 9.9 3.0 2.6Approach LOS B A

Intersection SummaryAverage Delay 7.4Intersection Capacity Utilization 23.2% ICU Level of Service AAnalysis Period (min) 15

06/26/2017

170127 Granwood Subdivision 06/13/2017 Baseline Synchro 9 ReportPage 1

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 116 325 110 122 173 34 75 313 175 64 206 53Future Volume (vph) 116 325 110 122 173 34 75 313 175 64 206 53Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900Storage Length (m) 70.0 0.0 30.0 0.0 90.0 0.0 40.0 0.0Storage Lanes 1 0 1 0 1 0 1 0Taper Length (m) 2.5 7.6 2.5 2.5Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Frt 0.962 0.975 0.946 0.969Flt Protected 0.950 0.950 0.950 0.950Satd. Flow (prot) 1807 1812 0 1789 1827 0 1825 1783 0 1825 1746 0Flt Permitted 0.545 0.261 0.540 0.335Satd. Flow (perm) 1037 1812 0 492 1827 0 1037 1783 0 644 1746 0Right Turn on Red Yes Yes Yes YesSatd. Flow (RTOR) 22 13 48 22Link Speed (k/h) 48 48 48 48Link Distance (m) 186.0 1088.5 201.4 99.7Travel Time (s) 14.0 81.6 15.1 7.5Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 1% 2% 2% 2% 3% 0% 0% 3% 0% 0% 7% 5%Adj. Flow (vph) 126 353 120 133 188 37 82 340 190 70 224 58Shared Lane Traffic (%)Lane Group Flow (vph) 126 473 0 133 225 0 82 530 0 70 282 0Enter Blocked Intersection No No No No No No No No No No No NoLane Alignment Left Left Right Left Left Right Left Left Right Left Left RightMedian Width(m) 3.7 3.7 3.7 3.7Link Offset(m) 0.0 0.0 0.0 0.0Crosswalk Width(m) 1.6 4.9 1.6 1.6Two way Left Turn LaneHeadway Factor 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99Turning Speed (k/h) 24 14 24 14 24 14 24 14Turn Type Perm NA Perm NA Perm NA Perm NAProtected Phases 4 8 2 6Permitted Phases 4 8 2 6Minimum Split (s) 24.0 24.0 24.0 24.0 24.0 24.0 24.0 24.0Total Split (s) 38.0 38.0 38.0 38.0 52.0 52.0 52.0 52.0Total Split (%) 42.2% 42.2% 42.2% 42.2% 57.8% 57.8% 57.8% 57.8%Maximum Green (s) 32.0 32.0 32.0 32.0 46.0 46.0 46.0 46.0Yellow Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0All-Red Time (s) 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0Lost Time Adjust (s) -2.0 -2.0 -2.0 -2.0 -2.0 -2.0 -2.0 -2.0Total Lost Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0Lead/LagLead-Lag Optimize?Walk Time (s) 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0Flash Dont Walk (s) 11.0 11.0 11.0 11.0 11.0 11.0 11.0 11.0Pedestrian Calls (#/hr) 0 0 0 0 0 0 0 0Act Effct Green (s) 34.0 34.0 34.0 34.0 48.0 48.0 48.0 48.0Actuated g/C Ratio 0.38 0.38 0.38 0.38 0.53 0.53 0.53 0.53

Page 197: Grandwood Subdivision – Elora Transportation Impact Study...To the extent that this report is based on information supplied by other parties, Paradigm Transportation Solutions Limited

06/26/2017

170127 Granwood Subdivision 06/13/2017 Baseline Synchro 9 ReportPage 2

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRv/c Ratio 0.32 0.68 0.72 0.32 0.15 0.54 0.20 0.30Control Delay 22.8 28.1 48.7 20.2 11.6 15.0 13.0 11.7Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 22.8 28.1 48.7 20.2 11.6 15.0 13.0 11.7LOS C C D C B B B BApproach Delay 27.0 30.8 14.5 12.0Approach LOS C C B BQueue Length 50th (m) 15.1 64.1 19.3 25.4 6.8 51.3 6.0 23.3Queue Length 95th (m) 29.3 97.9 #49.1 42.7 14.2 79.2 13.7 38.4Internal Link Dist (m) 162.0 1064.5 177.4 75.7Turn Bay Length (m) 70.0 30.0 90.0 40.0Base Capacity (vph) 391 698 185 698 553 973 343 941Starvation Cap Reductn 0 0 0 0 0 0 0 0Spillback Cap Reductn 0 0 0 0 0 0 0 0Storage Cap Reductn 0 0 0 0 0 0 0 0Reduced v/c Ratio 0.32 0.68 0.72 0.32 0.15 0.54 0.20 0.30

Intersection SummaryArea Type: OtherCycle Length: 90Actuated Cycle Length: 90Offset: 0 (0%), Referenced to phase 2:NBTL and 6:SBTL, Start of GreenNatural Cycle: 50Control Type: PretimedMaximum v/c Ratio: 0.72Intersection Signal Delay: 21.0 Intersection LOS: CIntersection Capacity Utilization 75.2% ICU Level of Service DAnalysis Period (min) 15# 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles.

Splits and Phases: 1: Wellington Road 7 & Wellington Road 21/McNab Street

06/26/2017

170127 Granwood Subdivision 06/13/2017 Baseline Synchro 9 ReportPage 3

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 116 325 110 122 173 34 75 313 175 64 206 53Future Volume (vph) 116 325 110 122 173 34 75 313 175 64 206 53Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900Total Lost time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Frt 1.00 0.96 1.00 0.98 1.00 0.95 1.00 0.97Flt Protected 0.95 1.00 0.95 1.00 0.95 1.00 0.95 1.00Satd. Flow (prot) 1807 1812 1789 1828 1825 1783 1825 1747Flt Permitted 0.55 1.00 0.26 1.00 0.54 1.00 0.34 1.00Satd. Flow (perm) 1037 1812 492 1828 1038 1783 644 1747Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 126 353 120 133 188 37 82 340 190 70 224 58RTOR Reduction (vph) 0 14 0 0 8 0 0 22 0 0 10 0Lane Group Flow (vph) 126 459 0 133 217 0 82 508 0 70 272 0Heavy Vehicles (%) 1% 2% 2% 2% 3% 0% 0% 3% 0% 0% 7% 5%Turn Type Perm NA Perm NA Perm NA Perm NAProtected Phases 4 8 2 6Permitted Phases 4 8 2 6Actuated Green, G (s) 32.0 32.0 32.0 32.0 46.0 46.0 46.0 46.0Effective Green, g (s) 34.0 34.0 34.0 34.0 48.0 48.0 48.0 48.0Actuated g/C Ratio 0.38 0.38 0.38 0.38 0.53 0.53 0.53 0.53Clearance Time (s) 6.0 6.0 6.0 6.0 6.0 6.0 6.0 6.0Lane Grp Cap (vph) 391 684 185 690 553 950 343 931v/s Ratio Prot 0.25 0.12 c0.28 0.16v/s Ratio Perm 0.12 c0.27 0.08 0.11v/c Ratio 0.32 0.67 0.72 0.31 0.15 0.53 0.20 0.29Uniform Delay, d1 19.8 23.3 23.9 19.8 10.6 13.7 11.0 11.6Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Incremental Delay, d2 2.2 5.2 21.3 1.2 0.6 2.2 1.3 0.8Delay (s) 22.0 28.5 45.2 21.0 11.2 15.9 12.3 12.4Level of Service C C D C B B B BApproach Delay (s) 27.2 30.0 15.2 12.4Approach LOS C C B B

Intersection SummaryHCM 2000 Control Delay 21.2 HCM 2000 Level of Service CHCM 2000 Volume to Capacity ratio 0.61Actuated Cycle Length (s) 90.0 Sum of lost time (s) 8.0Intersection Capacity Utilization 75.2% ICU Level of Service DAnalysis Period (min) 15c Critical Lane Group

Page 198: Grandwood Subdivision – Elora Transportation Impact Study...To the extent that this report is based on information supplied by other parties, Paradigm Transportation Solutions Limited

06/26/2017

170127 Granwood Subdivision 06/13/2017 Baseline Synchro 9 ReportPage 4

Lane Group WBL WBR NBT NBR SBL SBTLane ConfigurationsTraffic Volume (vph) 38 68 665 65 73 468Future Volume (vph) 38 68 665 65 73 468Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900Storage Length (m) 0.0 0.0 30.0 0.0Storage Lanes 1 0 1 0Taper Length (m) 2.5 2.5Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00Frt 0.913 0.850Flt Protected 0.982 0.993Satd. Flow (prot) 1633 0 1865 1471 0 1788Flt Permitted 0.982 0.993Satd. Flow (perm) 1633 0 1865 1471 0 1788Link Speed (k/h) 48 48 48Link Distance (m) 92.0 115.2 201.4Travel Time (s) 6.9 8.6 15.1Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 10% 3% 3% 11% 11% 6%Adj. Flow (vph) 41 74 723 71 79 509Shared Lane Traffic (%)Lane Group Flow (vph) 115 0 723 71 0 588Enter Blocked Intersection No No No No No NoLane Alignment Left Right Left Right Left LeftMedian Width(m) 3.7 3.7 3.7Link Offset(m) 0.0 0.0 0.0Crosswalk Width(m) 1.6 1.6 1.6Two way Left Turn LaneHeadway Factor 0.99 0.99 0.99 0.99 0.99 0.99Turning Speed (k/h) 24 14 14 24Sign Control Stop Free Free

Intersection SummaryArea Type: OtherControl Type: UnsignalizedIntersection Capacity Utilization 80.0% ICU Level of Service DAnalysis Period (min) 15

06/26/2017

170127 Granwood Subdivision 06/13/2017 Baseline Synchro 9 ReportPage 5

Movement WBL WBR NBT NBR SBL SBTLane ConfigurationsTraffic Volume (veh/h) 38 68 665 65 73 468Future Volume (Veh/h) 38 68 665 65 73 468Sign Control Stop Free FreeGrade 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 41 74 723 71 79 509PedestriansLane Width (m)Walking Speed (m/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (m) 201pX, platoon unblocked 0.96vC, conflicting volume 1390 723 794vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 1385 723 794tC, single (s) 6.5 6.2 4.2tC, 2 stage (s)tF (s) 3.6 3.3 2.3p0 queue free % 69 83 90cM capacity (veh/h) 131 425 789

Direction, Lane # WB 1 NB 1 NB 2 SB 1Volume Total 115 723 71 588Volume Left 41 0 0 79Volume Right 74 0 71 0cSH 236 1700 1700 789Volume to Capacity 0.49 0.43 0.04 0.10Queue Length 95th (m) 18.7 0.0 0.0 2.5Control Delay (s) 34.0 0.0 0.0 2.6Lane LOS D AApproach Delay (s) 34.0 0.0 2.6Approach LOS D

Intersection SummaryAverage Delay 3.6Intersection Capacity Utilization 80.0% ICU Level of Service DAnalysis Period (min) 15

Page 199: Grandwood Subdivision – Elora Transportation Impact Study...To the extent that this report is based on information supplied by other parties, Paradigm Transportation Solutions Limited

06/26/2017

170127 Granwood Subdivision 06/13/2017 Baseline Synchro 9 ReportPage 6

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 6 127 6 14 73 26 18 10 14 33 4 16Future Volume (vph) 6 127 6 14 73 26 18 10 14 33 4 16Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Frt 0.994 0.969 0.956 0.960Flt Protected 0.998 0.994 0.979 0.969Satd. Flow (prot) 0 1868 0 0 1814 0 0 1763 0 0 1752 0Flt Permitted 0.998 0.994 0.979 0.969Satd. Flow (perm) 0 1868 0 0 1814 0 0 1763 0 0 1752 0Link Speed (k/h) 48 48 48 48Link Distance (m) 92.0 91.8 92.7 102.1Travel Time (s) 6.9 6.9 7.0 7.7Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 7 138 7 15 79 28 20 11 15 36 4 17Shared Lane Traffic (%)Lane Group Flow (vph) 0 152 0 0 122 0 0 46 0 0 57 0Enter Blocked Intersection No No No No No No No No No No No NoLane Alignment Left Left Right Left Left Right Left Left Right Left Left RightMedian Width(m) 0.0 0.0 0.0 0.0Link Offset(m) 0.0 0.0 0.0 0.0Crosswalk Width(m) 1.6 1.6 1.6 1.6Two way Left Turn LaneHeadway Factor 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99Turning Speed (k/h) 24 14 24 14 24 14 24 14Sign Control Free Free Stop Stop

Intersection SummaryArea Type: OtherControl Type: UnsignalizedIntersection Capacity Utilization 22.3% ICU Level of Service AAnalysis Period (min) 15

06/26/2017

170127 Granwood Subdivision 06/13/2017 Baseline Synchro 9 ReportPage 7

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (veh/h) 6 127 6 14 73 26 18 10 14 33 4 16Future Volume (Veh/h) 6 127 6 14 73 26 18 10 14 33 4 16Sign Control Free Free Stop StopGrade 0% 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 7 138 7 15 79 28 20 11 15 36 4 17PedestriansLane Width (m)Walking Speed (m/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (m)pX, platoon unblockedvC, conflicting volume 107 145 298 292 142 299 282 93vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 107 145 298 292 142 299 282 93tC, single (s) 4.1 4.1 7.1 6.5 6.2 7.1 6.5 6.2tC, 2 stage (s)tF (s) 2.2 2.2 3.5 4.0 3.3 3.5 4.0 3.3p0 queue free % 100 99 97 98 98 94 99 98cM capacity (veh/h) 1484 1437 633 609 906 626 617 964

Direction, Lane # EB 1 WB 1 NB 1 SB 1Volume Total 152 122 46 57Volume Left 7 15 20 36Volume Right 7 28 15 17cSH 1484 1437 695 699Volume to Capacity 0.00 0.01 0.07 0.08Queue Length 95th (m) 0.1 0.2 1.6 2.0Control Delay (s) 0.4 1.0 10.6 10.6Lane LOS A A B BApproach Delay (s) 0.4 1.0 10.6 10.6Approach LOS B B

Intersection SummaryAverage Delay 3.4Intersection Capacity Utilization 22.3% ICU Level of Service AAnalysis Period (min) 15

Page 200: Grandwood Subdivision – Elora Transportation Impact Study...To the extent that this report is based on information supplied by other parties, Paradigm Transportation Solutions Limited

06/26/2017

170127 Granwood Subdivision 06/13/2017 Baseline Synchro 9 ReportPage 8

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 25 144 5 4 78 9 21 10 11 10 4 13Future Volume (vph) 25 144 5 4 78 9 21 10 11 10 4 13Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Ped Bike FactorFrt 0.996 0.986 0.965 0.935Flt Protected 0.993 0.998 0.976 0.981Satd. Flow (prot) 0 1887 0 0 1844 0 0 1757 0 0 1663 0Flt Permitted 0.993 0.998 0.976 0.981Satd. Flow (perm) 0 1887 0 0 1844 0 0 1757 0 0 1663 0Link Speed (k/h) 48 48 48 48Link Distance (m) 91.8 278.1 75.3 102.9Travel Time (s) 6.9 20.9 5.6 7.7Confl. Peds. (#/hr) 1 1Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 5% 0% 0% 0% 0% 25% 6% 0% 0% 0% 43% 0%Adj. Flow (vph) 27 157 5 4 85 10 23 11 12 11 4 14Shared Lane Traffic (%)Lane Group Flow (vph) 0 189 0 0 99 0 0 46 0 0 29 0Enter Blocked Intersection No No No No No No No No No No No NoLane Alignment Left Left Right Left Left Right Left Left Right Left Left RightMedian Width(m) 0.0 0.0 0.0 0.0Link Offset(m) 0.0 0.0 0.0 0.0Crosswalk Width(m) 1.6 1.6 1.6 1.6Two way Left Turn LaneHeadway Factor 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99Turning Speed (k/h) 24 14 24 14 24 14 24 14Sign Control Free Free Stop Stop

Intersection SummaryArea Type: OtherControl Type: UnsignalizedIntersection Capacity Utilization 26.4% ICU Level of Service AAnalysis Period (min) 15

06/26/2017

170127 Granwood Subdivision 06/13/2017 Baseline Synchro 9 ReportPage 9

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (veh/h) 25 144 5 4 78 9 21 10 11 10 4 13Future Volume (Veh/h) 25 144 5 4 78 9 21 10 11 10 4 13Sign Control Free Free Stop StopGrade 0% 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 27 157 5 4 85 10 23 11 12 11 4 14Pedestrians 1Lane Width (m) 3.7Walking Speed (m/s) 1.1Percent Blockage 0Right turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (m)pX, platoon unblockedvC, conflicting volume 95 162 328 316 160 330 314 90vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 95 162 328 316 160 330 314 90tC, single (s) 4.1 4.1 7.2 6.5 6.2 7.1 6.9 6.2tC, 2 stage (s)tF (s) 2.2 2.2 3.6 4.0 3.3 3.5 4.4 3.3p0 queue free % 98 100 96 98 99 98 99 99cM capacity (veh/h) 1480 1429 596 590 889 600 528 973

Direction, Lane # EB 1 WB 1 NB 1 SB 1Volume Total 189 99 46 29Volume Left 27 4 23 11Volume Right 5 10 12 14cSH 1480 1429 650 720Volume to Capacity 0.02 0.00 0.07 0.04Queue Length 95th (m) 0.4 0.1 1.7 1.0Control Delay (s) 1.2 0.3 11.0 10.2Lane LOS A A B BApproach Delay (s) 1.2 0.3 11.0 10.2Approach LOS B B

Intersection SummaryAverage Delay 2.9Intersection Capacity Utilization 26.4% ICU Level of Service AAnalysis Period (min) 15

Page 201: Grandwood Subdivision – Elora Transportation Impact Study...To the extent that this report is based on information supplied by other parties, Paradigm Transportation Solutions Limited

06/26/2017

170127 Granwood Subdivision 06/13/2017 Baseline Synchro 9 ReportPage 10

Lane Group EBL EBR NBL NBT SBT SBRLane ConfigurationsTraffic Volume (vph) 3 70 27 91 74 10Future Volume (vph) 3 70 27 91 74 10Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00Frt 0.870 0.984Flt Protected 0.998 0.989Satd. Flow (prot) 1635 0 0 1863 1853 0Flt Permitted 0.998 0.989Satd. Flow (perm) 1635 0 0 1863 1853 0Link Speed (k/h) 48 48 48Link Distance (m) 1088.5 119.7 61.8Travel Time (s) 81.6 9.0 4.6Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 3 76 29 99 80 11Shared Lane Traffic (%)Lane Group Flow (vph) 79 0 0 128 91 0Enter Blocked Intersection No No No No No NoLane Alignment Left Right Left Left Left RightMedian Width(m) 7.4 0.0 0.0Link Offset(m) 0.0 0.0 0.0Crosswalk Width(m) 4.9 1.6 1.6Two way Left Turn LaneHeadway Factor 0.99 0.99 0.99 0.99 0.99 0.99Turning Speed (k/h) 24 14 24 14Sign Control Stop Free Free

Intersection SummaryArea Type: OtherControl Type: UnsignalizedIntersection Capacity Utilization 24.1% ICU Level of Service AAnalysis Period (min) 15

06/26/2017

170127 Granwood Subdivision 06/13/2017 Baseline Synchro 9 ReportPage 11

Movement EBL EBR NBL NBT SBT SBRLane ConfigurationsTraffic Volume (veh/h) 3 70 27 91 74 10Future Volume (Veh/h) 3 70 27 91 74 10Sign Control Stop Free FreeGrade 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 3 76 29 99 80 11PedestriansLane Width (m)Walking Speed (m/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (m)pX, platoon unblockedvC, conflicting volume 242 86 91vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 242 86 91tC, single (s) 6.4 6.2 4.1tC, 2 stage (s)tF (s) 3.5 3.3 2.2p0 queue free % 100 92 98cM capacity (veh/h) 731 973 1504

Direction, Lane # EB 1 NB 1 SB 1Volume Total 79 128 91Volume Left 3 29 0Volume Right 76 0 11cSH 961 1504 1700Volume to Capacity 0.08 0.02 0.05Queue Length 95th (m) 2.0 0.4 0.0Control Delay (s) 9.1 1.8 0.0Lane LOS A AApproach Delay (s) 9.1 1.8 0.0Approach LOS A

Intersection SummaryAverage Delay 3.2Intersection Capacity Utilization 24.1% ICU Level of Service AAnalysis Period (min) 15

Page 202: Grandwood Subdivision – Elora Transportation Impact Study...To the extent that this report is based on information supplied by other parties, Paradigm Transportation Solutions Limited

06/26/2017

170127 Granwood Subdivision 06/13/2017 Baseline Synchro 9 ReportPage 12

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 37 43 42 12 17 44 30 37 19 63 34 48Future Volume (vph) 37 43 42 12 17 44 30 37 19 63 34 48Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Frt 0.953 0.918 0.970 0.955Flt Protected 0.985 0.992 0.983 0.979Satd. Flow (prot) 0 1689 0 0 1450 0 0 1801 0 0 1732 0Flt Permitted 0.985 0.992 0.983 0.979Satd. Flow (perm) 0 1689 0 0 1450 0 0 1801 0 0 1732 0Link Speed (k/h) 48 48 48 48Link Distance (m) 290.8 201.2 123.6 119.7Travel Time (s) 21.8 15.1 9.3 9.0Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 11% 0% 10% 33% 0% 25% 0% 4% 0% 0% 6% 7%Adj. Flow (vph) 40 47 46 13 18 48 33 40 21 68 37 52Shared Lane Traffic (%)Lane Group Flow (vph) 0 133 0 0 79 0 0 94 0 0 157 0Enter Blocked Intersection No No No No No No No No No No No NoLane Alignment Left Left Right Left Left Right Left Left Right Left Left RightMedian Width(m) 0.0 0.0 0.0 0.0Link Offset(m) 0.0 0.0 0.0 0.0Crosswalk Width(m) 1.6 1.6 1.6 1.6Two way Left Turn LaneHeadway Factor 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99Turning Speed (k/h) 24 14 24 14 24 14 24 14Sign Control Stop Stop Free Free

Intersection SummaryArea Type: OtherControl Type: UnsignalizedIntersection Capacity Utilization 30.4% ICU Level of Service AAnalysis Period (min) 15

06/26/2017

170127 Granwood Subdivision 06/13/2017 Baseline Synchro 9 ReportPage 13

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (veh/h) 37 43 42 12 17 44 30 37 19 63 34 48Future Volume (Veh/h) 37 43 42 12 17 44 30 37 19 63 34 48Sign Control Stop Stop Free FreeGrade 0% 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 40 47 46 13 18 48 33 40 21 68 37 52PedestriansLane Width (m)Walking Speed (m/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (m)pX, platoon unblockedvC, conflicting volume 372 326 63 385 342 50 89 61vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 372 326 63 385 342 50 89 61tC, single (s) 7.2 6.5 6.3 7.4 6.5 6.5 4.1 4.1tC, 2 stage (s)tF (s) 3.6 4.0 3.4 3.8 4.0 3.5 2.2 2.2p0 queue free % 92 92 95 97 97 95 98 96cM capacity (veh/h) 500 557 980 442 546 956 1519 1555

Direction, Lane # EB 1 WB 1 NB 1 SB 1Volume Total 133 79 94 157Volume Left 40 13 33 68Volume Right 46 48 21 52cSH 629 702 1519 1555Volume to Capacity 0.21 0.11 0.02 0.04Queue Length 95th (m) 6.0 2.9 0.5 1.0Control Delay (s) 12.2 10.8 2.7 3.4Lane LOS B B A AApproach Delay (s) 12.2 10.8 2.7 3.4Approach LOS B B

Intersection SummaryAverage Delay 7.1Intersection Capacity Utilization 30.4% ICU Level of Service AAnalysis Period (min) 15

Page 203: Grandwood Subdivision – Elora Transportation Impact Study...To the extent that this report is based on information supplied by other parties, Paradigm Transportation Solutions Limited

06/26/2017

170127 Granwood Subdivision 5:00 pm 06/13/2017 Baseline Synchro 9 ReportPage 1

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 27 92 77 124 225 38 122 188 49 17 307 74Future Volume (vph) 27 92 77 124 225 38 122 188 49 17 307 74Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900Storage Length (m) 70.0 0.0 30.0 0.0 90.0 0.0 40.0 0.0Storage Lanes 1 0 1 0 1 0 1 0Taper Length (m) 2.5 7.6 2.5 2.5Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Frt 0.932 0.978 0.969 0.971Flt Protected 0.950 0.950 0.950 0.950Satd. Flow (prot) 1472 1606 0 1807 1839 0 1755 1705 0 1825 1769 0Flt Permitted 0.471 0.597 0.427 0.563Satd. Flow (perm) 730 1606 0 1136 1839 0 789 1705 0 1082 1769 0Right Turn on Red Yes Yes Yes YesSatd. Flow (RTOR) 54 11 22 21Link Speed (k/h) 48 48 48 48Link Distance (m) 186.0 1088.5 201.4 99.7Travel Time (s) 14.0 81.6 15.1 7.5Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 24% 6% 18% 1% 1% 9% 4% 10% 6% 0% 6% 3%Adj. Flow (vph) 29 100 84 135 245 41 133 204 53 18 334 80Shared Lane Traffic (%)Lane Group Flow (vph) 29 184 0 135 286 0 133 257 0 18 414 0Enter Blocked Intersection No No No No No No No No No No No NoLane Alignment Left Left Right Left Left Right Left Left Right Left Left RightMedian Width(m) 3.7 3.7 3.7 3.7Link Offset(m) 0.0 0.0 0.0 0.0Crosswalk Width(m) 1.6 4.9 1.6 1.6Two way Left Turn LaneHeadway Factor 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99Turning Speed (k/h) 24 14 24 14 24 14 24 14Turn Type Perm NA Perm NA Perm NA Perm NAProtected Phases 4 8 2 6Permitted Phases 4 8 2 6Minimum Split (s) 24.0 24.0 24.0 24.0 24.0 24.0 24.0 24.0Total Split (s) 38.0 38.0 38.0 38.0 52.0 52.0 52.0 52.0Total Split (%) 42.2% 42.2% 42.2% 42.2% 57.8% 57.8% 57.8% 57.8%Maximum Green (s) 32.0 32.0 32.0 32.0 46.0 46.0 46.0 46.0Yellow Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0All-Red Time (s) 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0Lost Time Adjust (s) -2.0 -2.0 -2.0 -2.0 -2.0 -2.0 -2.0 -2.0Total Lost Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0Lead/LagLead-Lag Optimize?Walk Time (s) 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0Flash Dont Walk (s) 11.0 11.0 11.0 11.0 11.0 11.0 11.0 11.0Pedestrian Calls (#/hr) 0 0 0 0 0 0 0 0Act Effct Green (s) 34.0 34.0 34.0 34.0 48.0 48.0 48.0 48.0Actuated g/C Ratio 0.38 0.38 0.38 0.38 0.53 0.53 0.53 0.53

06/26/2017

170127 Granwood Subdivision 5:00 pm 06/13/2017 Baseline Synchro 9 ReportPage 2

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRv/c Ratio 0.11 0.29 0.31 0.41 0.32 0.28 0.03 0.43Control Delay 19.6 15.0 22.4 21.9 14.4 11.4 10.2 13.8Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 19.6 15.0 22.4 21.9 14.4 11.4 10.2 13.8LOS B B C C B B B BApproach Delay 15.6 22.1 12.5 13.7Approach LOS B C B BQueue Length 50th (m) 3.2 15.0 16.2 34.2 12.2 20.7 1.4 38.7Queue Length 95th (m) 9.1 30.0 30.5 55.1 24.4 34.9 4.5 60.0Internal Link Dist (m) 162.0 1064.5 177.4 75.7Turn Bay Length (m) 70.0 30.0 90.0 40.0Base Capacity (vph) 275 640 429 701 420 919 577 953Starvation Cap Reductn 0 0 0 0 0 0 0 0Spillback Cap Reductn 0 0 0 0 0 0 0 0Storage Cap Reductn 0 0 0 0 0 0 0 0Reduced v/c Ratio 0.11 0.29 0.31 0.41 0.32 0.28 0.03 0.43

Intersection SummaryArea Type: OtherCycle Length: 90Actuated Cycle Length: 90Offset: 0 (0%), Referenced to phase 2:NBTL and 6:SBTL, Start of GreenNatural Cycle: 50Control Type: PretimedMaximum v/c Ratio: 0.43Intersection Signal Delay: 16.1 Intersection LOS: BIntersection Capacity Utilization 59.1% ICU Level of Service BAnalysis Period (min) 15

Splits and Phases: 1: Wellington Road 7 & Wellington Road 21/McNab Street

Page 204: Grandwood Subdivision – Elora Transportation Impact Study...To the extent that this report is based on information supplied by other parties, Paradigm Transportation Solutions Limited

06/26/2017

170127 Granwood Subdivision 5:00 pm 06/13/2017 Baseline Synchro 9 ReportPage 3

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 27 92 77 124 225 38 122 188 49 17 307 74Future Volume (vph) 27 92 77 124 225 38 122 188 49 17 307 74Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900Total Lost time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Frt 1.00 0.93 1.00 0.98 1.00 0.97 1.00 0.97Flt Protected 0.95 1.00 0.95 1.00 0.95 1.00 0.95 1.00Satd. Flow (prot) 1472 1605 1807 1840 1755 1705 1825 1770Flt Permitted 0.47 1.00 0.60 1.00 0.43 1.00 0.56 1.00Satd. Flow (perm) 730 1605 1135 1840 789 1705 1081 1770Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 29 100 84 135 245 41 133 204 53 18 334 80RTOR Reduction (vph) 0 34 0 0 7 0 0 10 0 0 10 0Lane Group Flow (vph) 29 150 0 135 279 0 133 247 0 18 404 0Heavy Vehicles (%) 24% 6% 18% 1% 1% 9% 4% 10% 6% 0% 6% 3%Turn Type Perm NA Perm NA Perm NA Perm NAProtected Phases 4 8 2 6Permitted Phases 4 8 2 6Actuated Green, G (s) 32.0 32.0 32.0 32.0 46.0 46.0 46.0 46.0Effective Green, g (s) 34.0 34.0 34.0 34.0 48.0 48.0 48.0 48.0Actuated g/C Ratio 0.38 0.38 0.38 0.38 0.53 0.53 0.53 0.53Clearance Time (s) 6.0 6.0 6.0 6.0 6.0 6.0 6.0 6.0Lane Grp Cap (vph) 275 606 428 695 420 909 576 944v/s Ratio Prot 0.09 c0.15 0.14 c0.23v/s Ratio Perm 0.04 0.12 0.17 0.02v/c Ratio 0.11 0.25 0.32 0.40 0.32 0.27 0.03 0.43Uniform Delay, d1 18.1 19.2 19.8 20.5 11.8 11.5 10.0 12.7Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Incremental Delay, d2 0.8 1.0 1.9 1.7 2.0 0.7 0.1 1.4Delay (s) 18.9 20.2 21.7 22.3 13.8 12.2 10.1 14.1Level of Service B C C C B B B BApproach Delay (s) 20.0 22.1 12.7 14.0Approach LOS C C B B

Intersection SummaryHCM 2000 Control Delay 16.9 HCM 2000 Level of Service BHCM 2000 Volume to Capacity ratio 0.42Actuated Cycle Length (s) 90.0 Sum of lost time (s) 8.0Intersection Capacity Utilization 59.1% ICU Level of Service BAnalysis Period (min) 15c Critical Lane Group

06/26/2017

170127 Granwood Subdivision 5:00 pm 06/13/2017 Baseline Synchro 9 ReportPage 4

Lane Group WBL WBR NBT NBR SBL SBTLane ConfigurationsTraffic Volume (vph) 66 126 363 45 94 637Future Volume (vph) 66 126 363 45 94 637Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900Storage Length (m) 0.0 0.0 30.0 0.0Storage Lanes 1 0 1 0Taper Length (m) 2.5 2.5Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00Frt 0.912 0.850Flt Protected 0.983 0.994Satd. Flow (prot) 1336 0 1779 1498 0 1821Flt Permitted 0.983 0.994Satd. Flow (perm) 1336 0 1779 1498 0 1821Link Speed (k/h) 48 48 48Link Distance (m) 92.0 115.2 201.4Travel Time (s) 6.9 8.6 15.1Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 25% 31% 8% 9% 4% 5%Adj. Flow (vph) 72 137 395 49 102 692Shared Lane Traffic (%)Lane Group Flow (vph) 209 0 395 49 0 794Enter Blocked Intersection No No No No No NoLane Alignment Left Right Left Right Left LeftMedian Width(m) 3.7 3.7 3.7Link Offset(m) 0.0 0.0 0.0Crosswalk Width(m) 1.6 1.6 1.6Two way Left Turn LaneHeadway Factor 0.99 0.99 0.99 0.99 0.99 0.99Turning Speed (k/h) 24 14 14 24Sign Control Stop Free Free

Intersection SummaryArea Type: OtherControl Type: UnsignalizedIntersection Capacity Utilization 79.2% ICU Level of Service DAnalysis Period (min) 15

Page 205: Grandwood Subdivision – Elora Transportation Impact Study...To the extent that this report is based on information supplied by other parties, Paradigm Transportation Solutions Limited

06/26/2017

170127 Granwood Subdivision 5:00 pm 06/13/2017 Baseline Synchro 9 ReportPage 5

Movement WBL WBR NBT NBR SBL SBTLane ConfigurationsTraffic Volume (veh/h) 66 126 363 45 94 637Future Volume (Veh/h) 66 126 363 45 94 637Sign Control Stop Free FreeGrade 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 72 137 395 49 102 692PedestriansLane Width (m)Walking Speed (m/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (m) 201pX, platoon unblocked 0.89vC, conflicting volume 1291 395 444vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 1264 395 444tC, single (s) 6.6 6.5 4.1tC, 2 stage (s)tF (s) 3.7 3.6 2.2p0 queue free % 47 77 91cM capacity (veh/h) 135 595 1106

Direction, Lane # WB 1 NB 1 NB 2 SB 1Volume Total 209 395 49 794Volume Left 72 0 0 102Volume Right 137 0 49 0cSH 274 1700 1700 1106Volume to Capacity 0.76 0.23 0.03 0.09Queue Length 95th (m) 43.2 0.0 0.0 2.3Control Delay (s) 50.7 0.0 0.0 2.3Lane LOS F AApproach Delay (s) 50.7 0.0 2.3Approach LOS F

Intersection SummaryAverage Delay 8.6Intersection Capacity Utilization 79.2% ICU Level of Service DAnalysis Period (min) 15

06/26/2017

170127 Granwood Subdivision 5:00 pm 06/13/2017 Baseline Synchro 9 ReportPage 6

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 16 105 18 13 179 31 7 0 4 6 1 6Future Volume (vph) 16 105 18 13 179 31 7 0 4 6 1 6Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Frt 0.982 0.981 0.955 0.937Flt Protected 0.994 0.997 0.968 0.977Satd. Flow (prot) 0 1838 0 0 1842 0 0 1741 0 0 1724 0Flt Permitted 0.994 0.997 0.968 0.977Satd. Flow (perm) 0 1838 0 0 1842 0 0 1741 0 0 1724 0Link Speed (k/h) 48 48 48 48Link Distance (m) 92.0 91.8 92.7 102.1Travel Time (s) 6.9 6.9 7.0 7.7Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 17 114 20 14 195 34 8 0 4 7 1 7Shared Lane Traffic (%)Lane Group Flow (vph) 0 151 0 0 243 0 0 12 0 0 15 0Enter Blocked Intersection No No No No No No No No No No No NoLane Alignment Left Left Right Left Left Right Left Left Right Left Left RightMedian Width(m) 0.0 0.0 0.0 0.0Link Offset(m) 0.0 0.0 0.0 0.0Crosswalk Width(m) 1.6 1.6 1.6 1.6Two way Left Turn LaneHeadway Factor 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99Turning Speed (k/h) 24 14 24 14 24 14 24 14Sign Control Free Free Stop Stop

Intersection SummaryArea Type: OtherControl Type: UnsignalizedIntersection Capacity Utilization 23.9% ICU Level of Service AAnalysis Period (min) 15

Page 206: Grandwood Subdivision – Elora Transportation Impact Study...To the extent that this report is based on information supplied by other parties, Paradigm Transportation Solutions Limited

06/26/2017

170127 Granwood Subdivision 5:00 pm 06/13/2017 Baseline Synchro 9 ReportPage 7

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (veh/h) 16 105 18 13 179 31 7 0 4 6 1 6Future Volume (Veh/h) 16 105 18 13 179 31 7 0 4 6 1 6Sign Control Free Free Stop StopGrade 0% 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 17 114 20 14 195 34 8 0 4 7 1 7PedestriansLane Width (m)Walking Speed (m/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (m)pX, platoon unblockedvC, conflicting volume 229 134 406 415 124 402 408 212vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 229 134 406 415 124 402 408 212tC, single (s) 4.1 4.1 7.1 6.5 6.2 7.1 6.5 6.2tC, 2 stage (s)tF (s) 2.2 2.2 3.5 4.0 3.3 3.5 4.0 3.3p0 queue free % 99 99 99 100 100 99 100 99cM capacity (veh/h) 1339 1451 541 516 927 547 521 828

Direction, Lane # EB 1 WB 1 NB 1 SB 1Volume Total 151 243 12 15Volume Left 17 14 8 7Volume Right 20 34 4 7cSH 1339 1451 628 647Volume to Capacity 0.01 0.01 0.02 0.02Queue Length 95th (m) 0.3 0.2 0.4 0.5Control Delay (s) 1.0 0.5 10.8 10.7Lane LOS A A B BApproach Delay (s) 1.0 0.5 10.8 10.7Approach LOS B B

Intersection SummaryAverage Delay 1.3Intersection Capacity Utilization 23.9% ICU Level of Service AAnalysis Period (min) 15

06/26/2017

170127 Granwood Subdivision 5:00 pm 06/13/2017 Baseline Synchro 9 ReportPage 8

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 16 82 18 13 175 6 7 0 4 3 1 40Future Volume (vph) 16 82 18 13 175 6 7 0 4 3 1 40Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Ped Bike FactorFrt 0.979 0.996 0.955 0.876Flt Protected 0.993 0.997 0.968 0.997Satd. Flow (prot) 0 1430 0 0 1722 0 0 1228 0 0 1674 0Flt Permitted 0.993 0.997 0.968 0.997Satd. Flow (perm) 0 1430 0 0 1722 0 0 1228 0 0 1674 0Link Speed (k/h) 48 48 48 48Link Distance (m) 91.8 278.1 75.3 102.9Travel Time (s) 6.9 20.9 5.6 7.7Confl. Peds. (#/hr) 1 1Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 15% 33% 33% 0% 12% 0% 67% 0% 0% 0% 11% 0%Adj. Flow (vph) 17 89 20 14 190 7 8 0 4 3 1 43Shared Lane Traffic (%)Lane Group Flow (vph) 0 126 0 0 211 0 0 12 0 0 47 0Enter Blocked Intersection No No No No No No No No No No No NoLane Alignment Left Left Right Left Left Right Left Left Right Left Left RightMedian Width(m) 0.0 0.0 0.0 0.0Link Offset(m) 0.0 0.0 0.0 0.0Crosswalk Width(m) 1.6 1.6 1.6 1.6Two way Left Turn LaneHeadway Factor 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99Turning Speed (k/h) 24 14 24 14 24 14 24 14Sign Control Free Free Stop Stop

Intersection SummaryArea Type: OtherControl Type: UnsignalizedIntersection Capacity Utilization 22.1% ICU Level of Service AAnalysis Period (min) 15

Page 207: Grandwood Subdivision – Elora Transportation Impact Study...To the extent that this report is based on information supplied by other parties, Paradigm Transportation Solutions Limited

06/26/2017

170127 Granwood Subdivision 5:00 pm 06/13/2017 Baseline Synchro 9 ReportPage 9

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (veh/h) 16 82 18 13 175 6 7 0 4 3 1 40Future Volume (Veh/h) 16 82 18 13 175 6 7 0 4 3 1 40Sign Control Free Free Stop StopGrade 0% 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 17 89 20 14 190 7 8 0 4 3 1 43Pedestrians 1Lane Width (m) 3.7Walking Speed (m/s) 1.1Percent Blockage 0Right turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (m)pX, platoon unblockedvC, conflicting volume 197 109 399 358 99 358 364 194vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 197 109 399 358 99 358 364 194tC, single (s) 4.2 4.1 7.8 6.5 6.2 7.1 6.6 6.2tC, 2 stage (s)tF (s) 2.3 2.2 4.1 4.0 3.3 3.5 4.1 3.3p0 queue free % 99 99 98 100 100 99 100 95cM capacity (veh/h) 1302 1494 430 559 962 588 537 851

Direction, Lane # EB 1 WB 1 NB 1 SB 1Volume Total 126 211 12 47Volume Left 17 14 8 3Volume Right 20 7 4 43cSH 1302 1494 527 818Volume to Capacity 0.01 0.01 0.02 0.06Queue Length 95th (m) 0.3 0.2 0.5 1.4Control Delay (s) 1.1 0.6 12.0 9.7Lane LOS A A B AApproach Delay (s) 1.1 0.6 12.0 9.7Approach LOS B A

Intersection SummaryAverage Delay 2.2Intersection Capacity Utilization 22.1% ICU Level of Service AAnalysis Period (min) 15

06/26/2017

170127 Granwood Subdivision 5:00 pm 06/13/2017 Baseline Synchro 9 ReportPage 10

Lane Group EBL EBR NBL NBT SBT SBRLane ConfigurationsTraffic Volume (vph) 2 4 11 98 61 1Future Volume (vph) 2 4 11 98 61 1Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00Frt 0.910 0.998Flt Protected 0.984 0.995Satd. Flow (prot) 1687 0 0 1874 1880 0Flt Permitted 0.984 0.995Satd. Flow (perm) 1687 0 0 1874 1880 0Link Speed (k/h) 48 48 48Link Distance (m) 1088.5 119.7 61.8Travel Time (s) 81.6 9.0 4.6Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 2 4 12 107 66 1Shared Lane Traffic (%)Lane Group Flow (vph) 6 0 0 119 67 0Enter Blocked Intersection No No No No No NoLane Alignment Left Right Left Left Left RightMedian Width(m) 7.4 0.0 0.0Link Offset(m) 0.0 0.0 0.0Crosswalk Width(m) 4.9 1.6 1.6Two way Left Turn LaneHeadway Factor 0.99 0.99 0.99 0.99 0.99 0.99Turning Speed (k/h) 24 14 24 14Sign Control Stop Free Free

Intersection SummaryArea Type: OtherControl Type: UnsignalizedIntersection Capacity Utilization 22.4% ICU Level of Service AAnalysis Period (min) 15

Page 208: Grandwood Subdivision – Elora Transportation Impact Study...To the extent that this report is based on information supplied by other parties, Paradigm Transportation Solutions Limited

06/26/2017

170127 Granwood Subdivision 5:00 pm 06/13/2017 Baseline Synchro 9 ReportPage 11

Movement EBL EBR NBL NBT SBT SBRLane ConfigurationsTraffic Volume (veh/h) 2 4 11 98 61 1Future Volume (Veh/h) 2 4 11 98 61 1Sign Control Stop Free FreeGrade 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 2 4 12 107 66 1PedestriansLane Width (m)Walking Speed (m/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (m)pX, platoon unblockedvC, conflicting volume 198 66 67vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 198 66 67tC, single (s) 6.4 6.2 4.1tC, 2 stage (s)tF (s) 3.5 3.3 2.2p0 queue free % 100 100 99cM capacity (veh/h) 785 997 1535

Direction, Lane # EB 1 NB 1 SB 1Volume Total 6 119 67Volume Left 2 12 0Volume Right 4 0 1cSH 915 1535 1700Volume to Capacity 0.01 0.01 0.04Queue Length 95th (m) 0.2 0.2 0.0Control Delay (s) 9.0 0.8 0.0Lane LOS A AApproach Delay (s) 9.0 0.8 0.0Approach LOS A

Intersection SummaryAverage Delay 0.8Intersection Capacity Utilization 22.4% ICU Level of Service AAnalysis Period (min) 15

06/26/2017

170127 Granwood Subdivision 5:00 pm 06/13/2017 Baseline Synchro 9 ReportPage 12

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 54 19 39 14 57 36 34 18 5 14 12 40Future Volume (vph) 54 19 39 14 57 36 34 18 5 14 12 40Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Frt 0.954 0.955 0.989 0.918Flt Protected 0.976 0.994 0.971 0.990Satd. Flow (prot) 0 1729 0 0 1759 0 0 1687 0 0 1480 0Flt Permitted 0.976 0.994 0.971 0.990Satd. Flow (perm) 0 1729 0 0 1759 0 0 1687 0 0 1480 0Link Speed (k/h) 48 48 48 48Link Distance (m) 290.8 201.2 123.6 119.7Travel Time (s) 21.8 15.1 9.3 9.0Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 0% 0% 10% 0% 0% 11% 0% 4% 100% 25% 13% 17%Adj. Flow (vph) 59 21 42 15 62 39 37 20 5 15 13 43Shared Lane Traffic (%)Lane Group Flow (vph) 0 122 0 0 116 0 0 62 0 0 71 0Enter Blocked Intersection No No No No No No No No No No No NoLane Alignment Left Left Right Left Left Right Left Left Right Left Left RightMedian Width(m) 0.0 0.0 0.0 0.0Link Offset(m) 0.0 0.0 0.0 0.0Crosswalk Width(m) 1.6 1.6 1.6 1.6Two way Left Turn LaneHeadway Factor 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99Turning Speed (k/h) 24 14 24 14 24 14 24 14Sign Control Stop Stop Free Free

Intersection SummaryArea Type: OtherControl Type: UnsignalizedIntersection Capacity Utilization 27.1% ICU Level of Service AAnalysis Period (min) 15

Page 209: Grandwood Subdivision – Elora Transportation Impact Study...To the extent that this report is based on information supplied by other parties, Paradigm Transportation Solutions Limited

06/26/2017

170127 Granwood Subdivision 5:00 pm 06/13/2017 Baseline Synchro 9 ReportPage 13

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (veh/h) 54 19 39 14 57 36 34 18 5 14 12 40Future Volume (Veh/h) 54 19 39 14 57 36 34 18 5 14 12 40Sign Control Stop Stop Free FreeGrade 0% 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 59 21 42 15 62 39 37 20 5 15 13 43PedestriansLane Width (m)Walking Speed (m/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (m)pX, platoon unblockedvC, conflicting volume 231 164 34 214 182 22 56 25vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 231 164 34 214 182 22 56 25tC, single (s) 7.1 6.5 6.3 7.1 6.5 6.3 4.1 4.3tC, 2 stage (s)tF (s) 3.5 4.0 3.4 3.5 4.0 3.4 2.2 2.4p0 queue free % 91 97 96 98 91 96 98 99cM capacity (veh/h) 636 708 1016 682 691 1029 1562 1453

Direction, Lane # EB 1 WB 1 NB 1 SB 1Volume Total 122 116 62 71Volume Left 59 15 37 15Volume Right 42 39 5 43cSH 745 775 1562 1453Volume to Capacity 0.16 0.15 0.02 0.01Queue Length 95th (m) 4.4 4.0 0.6 0.2Control Delay (s) 10.8 10.5 4.5 1.6Lane LOS B B A AApproach Delay (s) 10.8 10.5 4.5 1.6Approach LOS B B

Intersection SummaryAverage Delay 7.9Intersection Capacity Utilization 27.1% ICU Level of Service AAnalysis Period (min) 15

06/26/2017

170127 Granwood Subdivision 06/13/2017 Baseline Synchro 9 ReportPage 1

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 116 292 142 111 158 31 90 316 158 57 213 53Future Volume (vph) 116 292 142 111 158 31 90 316 158 57 213 53Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900Storage Length (m) 70.0 0.0 30.0 0.0 90.0 0.0 40.0 0.0Storage Lanes 1 0 1 0 1 0 1 0Taper Length (m) 2.5 7.6 2.5 2.5Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Frt 0.951 0.975 0.950 0.970Flt Protected 0.950 0.950 0.950 0.950Satd. Flow (prot) 1807 1791 0 1789 1827 0 1825 1789 0 1825 1748 0Flt Permitted 0.569 0.263 0.533 0.347Satd. Flow (perm) 1082 1791 0 495 1827 0 1024 1789 0 667 1748 0Right Turn on Red Yes Yes Yes YesSatd. Flow (RTOR) 31 13 43 21Link Speed (k/h) 48 48 48 48Link Distance (m) 186.0 1088.5 201.4 99.7Travel Time (s) 14.0 81.6 15.1 7.5Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 1% 2% 2% 2% 3% 0% 0% 3% 0% 0% 7% 5%Adj. Flow (vph) 126 317 154 121 172 34 98 343 172 62 232 58Shared Lane Traffic (%)Lane Group Flow (vph) 126 471 0 121 206 0 98 515 0 62 290 0Enter Blocked Intersection No No No No No No No No No No No NoLane Alignment Left Left Right Left Left Right Left Left Right Left Left RightMedian Width(m) 3.7 3.7 3.7 3.7Link Offset(m) 0.0 0.0 0.0 0.0Crosswalk Width(m) 1.6 4.9 1.6 1.6Two way Left Turn LaneHeadway Factor 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99Turning Speed (k/h) 24 14 24 14 24 14 24 14Turn Type Perm NA Perm NA Perm NA Perm NAProtected Phases 4 8 2 6Permitted Phases 4 8 2 6Minimum Split (s) 24.0 24.0 24.0 24.0 24.0 24.0 24.0 24.0Total Split (s) 38.0 38.0 38.0 38.0 52.0 52.0 52.0 52.0Total Split (%) 42.2% 42.2% 42.2% 42.2% 57.8% 57.8% 57.8% 57.8%Maximum Green (s) 32.0 32.0 32.0 32.0 46.0 46.0 46.0 46.0Yellow Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0All-Red Time (s) 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0Lost Time Adjust (s) -2.0 -2.0 -2.0 -2.0 -2.0 -2.0 -2.0 -2.0Total Lost Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0Lead/LagLead-Lag Optimize?Walk Time (s) 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0Flash Dont Walk (s) 11.0 11.0 11.0 11.0 11.0 11.0 11.0 11.0Pedestrian Calls (#/hr) 0 0 0 0 0 0 0 0Act Effct Green (s) 34.0 34.0 34.0 34.0 48.0 48.0 48.0 48.0Actuated g/C Ratio 0.38 0.38 0.38 0.38 0.53 0.53 0.53 0.53

Page 210: Grandwood Subdivision – Elora Transportation Impact Study...To the extent that this report is based on information supplied by other parties, Paradigm Transportation Solutions Limited

06/26/2017

170127 Granwood Subdivision 06/13/2017 Baseline Synchro 9 ReportPage 2

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRv/c Ratio 0.31 0.68 0.65 0.30 0.18 0.53 0.17 0.31Control Delay 22.4 27.7 42.1 19.7 11.9 14.8 12.5 11.9Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 22.4 27.7 42.1 19.7 11.9 14.8 12.5 11.9LOS C C D B B B B BApproach Delay 26.6 28.0 14.3 12.0Approach LOS C C B BQueue Length 50th (m) 15.0 62.5 16.9 22.8 8.2 49.6 5.2 24.2Queue Length 95th (m) 29.0 96.2 #43.1 39.1 16.7 76.5 12.3 39.6Internal Link Dist (m) 162.0 1064.5 177.4 75.7Turn Bay Length (m) 70.0 30.0 90.0 40.0Base Capacity (vph) 408 695 187 698 546 974 355 942Starvation Cap Reductn 0 0 0 0 0 0 0 0Spillback Cap Reductn 0 0 0 0 0 0 0 0Storage Cap Reductn 0 0 0 0 0 0 0 0Reduced v/c Ratio 0.31 0.68 0.65 0.30 0.18 0.53 0.17 0.31

Intersection SummaryArea Type: OtherCycle Length: 90Actuated Cycle Length: 90Offset: 0 (0%), Referenced to phase 2:NBTL and 6:SBTL, Start of GreenNatural Cycle: 50Control Type: PretimedMaximum v/c Ratio: 0.68Intersection Signal Delay: 20.1 Intersection LOS: CIntersection Capacity Utilization 73.9% ICU Level of Service DAnalysis Period (min) 15# 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles.

Splits and Phases: 1: Wellington Road 7 & Wellington Road 21/McNab Street

06/26/2017

170127 Granwood Subdivision 06/13/2017 Baseline Synchro 9 ReportPage 3

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 116 292 142 111 158 31 90 316 158 57 213 53Future Volume (vph) 116 292 142 111 158 31 90 316 158 57 213 53Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900Total Lost time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Frt 1.00 0.95 1.00 0.98 1.00 0.95 1.00 0.97Flt Protected 0.95 1.00 0.95 1.00 0.95 1.00 0.95 1.00Satd. Flow (prot) 1807 1791 1789 1828 1825 1789 1825 1748Flt Permitted 0.57 1.00 0.26 1.00 0.53 1.00 0.35 1.00Satd. Flow (perm) 1082 1791 496 1828 1024 1789 667 1748Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 126 317 154 121 172 34 98 343 172 62 232 58RTOR Reduction (vph) 0 19 0 0 8 0 0 20 0 0 10 0Lane Group Flow (vph) 126 452 0 121 198 0 98 495 0 62 280 0Heavy Vehicles (%) 1% 2% 2% 2% 3% 0% 0% 3% 0% 0% 7% 5%Turn Type Perm NA Perm NA Perm NA Perm NAProtected Phases 4 8 2 6Permitted Phases 4 8 2 6Actuated Green, G (s) 32.0 32.0 32.0 32.0 46.0 46.0 46.0 46.0Effective Green, g (s) 34.0 34.0 34.0 34.0 48.0 48.0 48.0 48.0Actuated g/C Ratio 0.38 0.38 0.38 0.38 0.53 0.53 0.53 0.53Clearance Time (s) 6.0 6.0 6.0 6.0 6.0 6.0 6.0 6.0Lane Grp Cap (vph) 408 676 187 690 546 954 355 932v/s Ratio Prot c0.25 0.11 c0.28 0.16v/s Ratio Perm 0.12 0.24 0.10 0.09v/c Ratio 0.31 0.67 0.65 0.29 0.18 0.52 0.17 0.30Uniform Delay, d1 19.7 23.3 23.1 19.5 10.8 13.5 10.8 11.7Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Incremental Delay, d2 2.0 5.2 16.0 1.0 0.7 2.0 1.1 0.8Delay (s) 21.7 28.5 39.1 20.6 11.6 15.6 11.9 12.5Level of Service C C D C B B B BApproach Delay (s) 27.1 27.4 14.9 12.4Approach LOS C C B B

Intersection SummaryHCM 2000 Control Delay 20.4 HCM 2000 Level of Service CHCM 2000 Volume to Capacity ratio 0.58Actuated Cycle Length (s) 90.0 Sum of lost time (s) 8.0Intersection Capacity Utilization 73.9% ICU Level of Service DAnalysis Period (min) 15c Critical Lane Group

Page 211: Grandwood Subdivision – Elora Transportation Impact Study...To the extent that this report is based on information supplied by other parties, Paradigm Transportation Solutions Limited

06/26/2017

170127 Granwood Subdivision 06/13/2017 Baseline Synchro 9 ReportPage 4

Lane Group WBL WBR NBT NBR SBL SBTLane ConfigurationsTraffic Volume (vph) 49 86 648 83 113 457Future Volume (vph) 49 86 648 83 113 457Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900Storage Length (m) 0.0 0.0 30.0 0.0Storage Lanes 1 0 1 0Taper Length (m) 2.5 2.5Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00Frt 0.914 0.850Flt Protected 0.982 0.990Satd. Flow (prot) 1634 0 1865 1471 0 1778Flt Permitted 0.982 0.990Satd. Flow (perm) 1634 0 1865 1471 0 1778Link Speed (k/h) 48 48 48Link Distance (m) 92.0 115.2 201.4Travel Time (s) 6.9 8.6 15.1Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 10% 3% 3% 11% 11% 6%Adj. Flow (vph) 53 93 704 90 123 497Shared Lane Traffic (%)Lane Group Flow (vph) 146 0 704 90 0 620Enter Blocked Intersection No No No No No NoLane Alignment Left Right Left Right Left LeftMedian Width(m) 3.7 3.7 3.7Link Offset(m) 0.0 0.0 0.0Crosswalk Width(m) 1.6 1.6 1.6Two way Left Turn LaneHeadway Factor 0.99 0.99 0.99 0.99 0.99 0.99Turning Speed (k/h) 24 14 14 24Sign Control Stop Free Free

Intersection SummaryArea Type: OtherControl Type: UnsignalizedIntersection Capacity Utilization 82.4% ICU Level of Service EAnalysis Period (min) 15

06/26/2017

170127 Granwood Subdivision 06/13/2017 Baseline Synchro 9 ReportPage 5

Movement WBL WBR NBT NBR SBL SBTLane ConfigurationsTraffic Volume (veh/h) 49 86 648 83 113 457Future Volume (Veh/h) 49 86 648 83 113 457Sign Control Stop Free FreeGrade 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 53 93 704 90 123 497PedestriansLane Width (m)Walking Speed (m/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (m) 201pX, platoon unblocked 0.96vC, conflicting volume 1447 704 794vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 1445 704 794tC, single (s) 6.5 6.2 4.2tC, 2 stage (s)tF (s) 3.6 3.3 2.3p0 queue free % 53 79 84cM capacity (veh/h) 113 435 789

Direction, Lane # WB 1 NB 1 NB 2 SB 1Volume Total 146 704 90 620Volume Left 53 0 0 123Volume Right 93 0 90 0cSH 214 1700 1700 789Volume to Capacity 0.68 0.41 0.05 0.16Queue Length 95th (m) 32.5 0.0 0.0 4.2Control Delay (s) 51.7 0.0 0.0 3.9Lane LOS F AApproach Delay (s) 51.7 0.0 3.9Approach LOS F

Intersection SummaryAverage Delay 6.4Intersection Capacity Utilization 82.4% ICU Level of Service EAnalysis Period (min) 15

Page 212: Grandwood Subdivision – Elora Transportation Impact Study...To the extent that this report is based on information supplied by other parties, Paradigm Transportation Solutions Limited

06/26/2017

170127 Granwood Subdivision 06/13/2017 Baseline Synchro 9 ReportPage 6

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 6 184 6 17 102 26 18 2 22 33 1 16Future Volume (vph) 6 184 6 17 102 26 18 2 22 33 1 16Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Frt 0.996 0.976 0.930 0.957Flt Protected 0.998 0.994 0.979 0.968Satd. Flow (prot) 0 1872 0 0 1827 0 0 1715 0 0 1745 0Flt Permitted 0.998 0.994 0.979 0.968Satd. Flow (perm) 0 1872 0 0 1827 0 0 1715 0 0 1745 0Link Speed (k/h) 48 48 48 48Link Distance (m) 92.0 91.8 92.7 102.1Travel Time (s) 6.9 6.9 7.0 7.7Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 7 200 7 18 111 28 20 2 24 36 1 17Shared Lane Traffic (%)Lane Group Flow (vph) 0 214 0 0 157 0 0 46 0 0 54 0Enter Blocked Intersection No No No No No No No No No No No NoLane Alignment Left Left Right Left Left Right Left Left Right Left Left RightMedian Width(m) 0.0 0.0 0.0 0.0Link Offset(m) 0.0 0.0 0.0 0.0Crosswalk Width(m) 1.6 1.6 1.6 1.6Two way Left Turn LaneHeadway Factor 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99Turning Speed (k/h) 24 14 24 14 24 14 24 14Sign Control Free Free Stop Stop

Intersection SummaryArea Type: OtherControl Type: UnsignalizedIntersection Capacity Utilization 26.1% ICU Level of Service AAnalysis Period (min) 15

06/26/2017

170127 Granwood Subdivision 06/13/2017 Baseline Synchro 9 ReportPage 7

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (veh/h) 6 184 6 17 102 26 18 2 22 33 1 16Future Volume (Veh/h) 6 184 6 17 102 26 18 2 22 33 1 16Sign Control Free Free Stop StopGrade 0% 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 7 200 7 18 111 28 20 2 24 36 1 17PedestriansLane Width (m)Walking Speed (m/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (m)pX, platoon unblockedvC, conflicting volume 139 207 396 392 204 404 382 125vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 139 207 396 392 204 404 382 125tC, single (s) 4.1 4.1 7.1 6.5 6.2 7.1 6.5 6.2tC, 2 stage (s)tF (s) 2.2 2.2 3.5 4.0 3.3 3.5 4.0 3.3p0 queue free % 100 99 96 100 97 93 100 98cM capacity (veh/h) 1445 1364 545 534 837 533 541 926

Direction, Lane # EB 1 WB 1 NB 1 SB 1Volume Total 214 157 46 54Volume Left 7 18 20 36Volume Right 7 28 24 17cSH 1445 1364 666 615Volume to Capacity 0.00 0.01 0.07 0.09Queue Length 95th (m) 0.1 0.3 1.7 2.2Control Delay (s) 0.3 1.0 10.8 11.4Lane LOS A A B BApproach Delay (s) 0.3 1.0 10.8 11.4Approach LOS B B

Intersection SummaryAverage Delay 2.8Intersection Capacity Utilization 26.1% ICU Level of Service AAnalysis Period (min) 15

Page 213: Grandwood Subdivision – Elora Transportation Impact Study...To the extent that this report is based on information supplied by other parties, Paradigm Transportation Solutions Limited

06/26/2017

170127 Granwood Subdivision 06/13/2017 Baseline Synchro 9 ReportPage 8

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 25 209 5 8 110 9 21 2 20 10 1 13Future Volume (vph) 25 209 5 8 110 9 21 2 20 10 1 13Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Ped Bike FactorFrt 0.997 0.990 0.937 0.927Flt Protected 0.995 0.997 0.976 0.979Satd. Flow (prot) 0 1896 0 0 1863 0 0 1707 0 0 1715 0Flt Permitted 0.995 0.997 0.976 0.979Satd. Flow (perm) 0 1896 0 0 1863 0 0 1707 0 0 1715 0Link Speed (k/h) 48 48 48 48Link Distance (m) 91.8 278.1 75.3 102.9Travel Time (s) 6.9 20.9 5.6 7.7Confl. Peds. (#/hr) 1 1Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 5% 0% 0% 0% 0% 25% 6% 0% 0% 0% 43% 0%Adj. Flow (vph) 27 227 5 9 120 10 23 2 22 11 1 14Shared Lane Traffic (%)Lane Group Flow (vph) 0 259 0 0 139 0 0 47 0 0 26 0Enter Blocked Intersection No No No No No No No No No No No NoLane Alignment Left Left Right Left Left Right Left Left Right Left Left RightMedian Width(m) 0.0 0.0 0.0 0.0Link Offset(m) 0.0 0.0 0.0 0.0Crosswalk Width(m) 1.6 1.6 1.6 1.6Two way Left Turn LaneHeadway Factor 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99Turning Speed (k/h) 24 14 24 14 24 14 24 14Sign Control Free Free Stop Stop

Intersection SummaryArea Type: OtherControl Type: UnsignalizedIntersection Capacity Utilization 29.5% ICU Level of Service AAnalysis Period (min) 15

06/26/2017

170127 Granwood Subdivision 06/13/2017 Baseline Synchro 9 ReportPage 9

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (veh/h) 25 209 5 8 110 9 21 2 20 10 1 13Future Volume (Veh/h) 25 209 5 8 110 9 21 2 20 10 1 13Sign Control Free Free Stop StopGrade 0% 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 27 227 5 9 120 10 23 2 22 11 1 14Pedestrians 1Lane Width (m) 3.7Walking Speed (m/s) 1.1Percent Blockage 0Right turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (m)pX, platoon unblockedvC, conflicting volume 130 232 441 432 230 450 429 125vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 130 232 441 432 230 450 429 125tC, single (s) 4.1 4.1 7.2 6.5 6.2 7.1 6.9 6.2tC, 2 stage (s)tF (s) 2.2 2.2 3.6 4.0 3.3 3.5 4.4 3.3p0 queue free % 98 99 95 100 97 98 100 98cM capacity (veh/h) 1437 1348 501 507 813 496 450 931

Direction, Lane # EB 1 WB 1 NB 1 SB 1Volume Total 259 139 47 26Volume Left 27 9 23 11Volume Right 5 10 22 14cSH 1437 1348 611 660Volume to Capacity 0.02 0.01 0.08 0.04Queue Length 95th (m) 0.4 0.2 1.9 0.9Control Delay (s) 0.9 0.5 11.4 10.7Lane LOS A A B BApproach Delay (s) 0.9 0.5 11.4 10.7Approach LOS B B

Intersection SummaryAverage Delay 2.4Intersection Capacity Utilization 29.5% ICU Level of Service AAnalysis Period (min) 15

Page 214: Grandwood Subdivision – Elora Transportation Impact Study...To the extent that this report is based on information supplied by other parties, Paradigm Transportation Solutions Limited

06/26/2017

170127 Granwood Subdivision 06/13/2017 Baseline Synchro 9 ReportPage 10

Lane Group EBL EBR NBL NBT SBT SBRLane ConfigurationsTraffic Volume (vph) 1 14 5 110 88 2Future Volume (vph) 1 14 5 110 88 2Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00Frt 0.873 0.997Flt Protected 0.997 0.998Satd. Flow (prot) 1639 0 0 1880 1878 0Flt Permitted 0.997 0.998Satd. Flow (perm) 1639 0 0 1880 1878 0Link Speed (k/h) 48 48 48Link Distance (m) 1088.5 119.7 61.8Travel Time (s) 81.6 9.0 4.6Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 1 15 5 120 96 2Shared Lane Traffic (%)Lane Group Flow (vph) 16 0 0 125 98 0Enter Blocked Intersection No No No No No NoLane Alignment Left Right Left Left Left RightMedian Width(m) 7.4 0.0 0.0Link Offset(m) 0.0 0.0 0.0Crosswalk Width(m) 4.9 1.6 1.6Two way Left Turn LaneHeadway Factor 0.99 0.99 0.99 0.99 0.99 0.99Turning Speed (k/h) 24 14 24 14Sign Control Stop Free Free

Intersection SummaryArea Type: OtherControl Type: UnsignalizedIntersection Capacity Utilization 19.9% ICU Level of Service AAnalysis Period (min) 15

06/26/2017

170127 Granwood Subdivision 06/13/2017 Baseline Synchro 9 ReportPage 11

Movement EBL EBR NBL NBT SBT SBRLane ConfigurationsTraffic Volume (veh/h) 1 14 5 110 88 2Future Volume (Veh/h) 1 14 5 110 88 2Sign Control Stop Free FreeGrade 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 1 15 5 120 96 2PedestriansLane Width (m)Walking Speed (m/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (m)pX, platoon unblockedvC, conflicting volume 227 97 98vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 227 97 98tC, single (s) 6.4 6.2 4.1tC, 2 stage (s)tF (s) 3.5 3.3 2.2p0 queue free % 100 98 100cM capacity (veh/h) 759 959 1495

Direction, Lane # EB 1 NB 1 SB 1Volume Total 16 125 98Volume Left 1 5 0Volume Right 15 0 2cSH 944 1495 1700Volume to Capacity 0.02 0.00 0.06Queue Length 95th (m) 0.4 0.1 0.0Control Delay (s) 8.9 0.3 0.0Lane LOS A AApproach Delay (s) 8.9 0.3 0.0Approach LOS A

Intersection SummaryAverage Delay 0.8Intersection Capacity Utilization 19.9% ICU Level of Service AAnalysis Period (min) 15

Page 215: Grandwood Subdivision – Elora Transportation Impact Study...To the extent that this report is based on information supplied by other parties, Paradigm Transportation Solutions Limited

06/26/2017

170127 Granwood Subdivision 06/13/2017 Baseline Synchro 9 ReportPage 12

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 49 75 59 12 28 33 34 33 19 31 17 55Future Volume (vph) 49 75 59 12 28 33 34 33 19 31 17 55Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Frt 0.957 0.938 0.970 0.928Flt Protected 0.987 0.992 0.981 0.985Satd. Flow (prot) 0 1710 0 0 1530 0 0 1800 0 0 1677 0Flt Permitted 0.987 0.992 0.981 0.985Satd. Flow (perm) 0 1710 0 0 1530 0 0 1800 0 0 1677 0Link Speed (k/h) 48 48 48 48Link Distance (m) 290.8 201.2 123.6 119.7Travel Time (s) 21.8 15.1 9.3 9.0Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 11% 0% 10% 33% 0% 25% 0% 4% 0% 0% 6% 7%Adj. Flow (vph) 53 82 64 13 30 36 37 36 21 34 18 60Shared Lane Traffic (%)Lane Group Flow (vph) 0 199 0 0 79 0 0 94 0 0 112 0Enter Blocked Intersection No No No No No No No No No No No NoLane Alignment Left Left Right Left Left Right Left Left Right Left Left RightMedian Width(m) 0.0 0.0 0.0 0.0Link Offset(m) 0.0 0.0 0.0 0.0Crosswalk Width(m) 1.6 1.6 1.6 1.6Two way Left Turn LaneHeadway Factor 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99Turning Speed (k/h) 24 14 24 14 24 14 24 14Sign Control Stop Stop Free Free

Intersection SummaryArea Type: OtherControl Type: UnsignalizedIntersection Capacity Utilization 30.5% ICU Level of Service AAnalysis Period (min) 15

06/26/2017

170127 Granwood Subdivision 06/13/2017 Baseline Synchro 9 ReportPage 13

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (veh/h) 49 75 59 12 28 33 34 33 19 31 17 55Future Volume (Veh/h) 49 75 59 12 28 33 34 33 19 31 17 55Sign Control Stop Stop Free FreeGrade 0% 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 53 82 64 13 30 36 37 36 21 34 18 60PedestriansLane Width (m)Walking Speed (m/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (m)pX, platoon unblockedvC, conflicting volume 288 247 48 342 266 46 78 57vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 288 247 48 342 266 46 78 57tC, single (s) 7.2 6.5 6.3 7.4 6.5 6.5 4.1 4.1tC, 2 stage (s)tF (s) 3.6 4.0 3.4 3.8 4.0 3.5 2.2 2.2p0 queue free % 91 87 94 97 95 96 98 98cM capacity (veh/h) 579 629 999 454 613 961 1533 1560

Direction, Lane # EB 1 WB 1 NB 1 SB 1Volume Total 199 79 94 112Volume Left 53 13 37 34Volume Right 64 36 21 60cSH 696 687 1533 1560Volume to Capacity 0.29 0.11 0.02 0.02Queue Length 95th (m) 9.0 2.9 0.6 0.5Control Delay (s) 12.2 10.9 3.0 2.4Lane LOS B B A AApproach Delay (s) 12.2 10.9 3.0 2.4Approach LOS B B

Intersection SummaryAverage Delay 7.9Intersection Capacity Utilization 30.5% ICU Level of Service AAnalysis Period (min) 15

Page 216: Grandwood Subdivision – Elora Transportation Impact Study...To the extent that this report is based on information supplied by other parties, Paradigm Transportation Solutions Limited
Page 217: Grandwood Subdivision – Elora Transportation Impact Study...To the extent that this report is based on information supplied by other parties, Paradigm Transportation Solutions Limited

Granwood Subdivsion – Elora | Transportation Impact Study | 170127 | July 2017

Paradigm Transportation Solutions Limited | Appendices

Appendix I

Left Turn Lane Warrant Nomographs

Page 218: Grandwood Subdivision – Elora Transportation Impact Study...To the extent that this report is based on information supplied by other parties, Paradigm Transportation Solutions Limited
Page 219: Grandwood Subdivision – Elora Transportation Impact Study...To the extent that this report is based on information supplied by other parties, Paradigm Transportation Solutions Limited

Wellington Road 7 & York RoadSouthbound Left Turn Lane Warrant

2025 Background

Figure I.1AGranwood Subdivision– Elora, Transportation Impact Study

170127

Legend

AM Peak Hour

PM Peak Hour

Page 220: Grandwood Subdivision – Elora Transportation Impact Study...To the extent that this report is based on information supplied by other parties, Paradigm Transportation Solutions Limited

Wellington Road 7 & York RoadSouthbound Left Turn Lane Warrant

2025 Total

Figure I.1BGranwood Subdivision– Elora, Transportation Impact Study

170127

Legend

AM Peak Hour

PM Peak Hour

Page 221: Grandwood Subdivision – Elora Transportation Impact Study...To the extent that this report is based on information supplied by other parties, Paradigm Transportation Solutions Limited

Wellington Road 7 & York RoadSouthbound Left Turn Lane Warrant

2025 Total (10% Diversion)

Figure I.1CGranwood Subdivision– Elora, Transportation Impact Study

170127

Legend

AM Peak Hour

PM Peak Hour

Page 222: Grandwood Subdivision – Elora Transportation Impact Study...To the extent that this report is based on information supplied by other parties, Paradigm Transportation Solutions Limited

Wellington Road 7 & York RoadSouthbound Left Turn Lane Warrant

2025 Total (50% Diversion)

Figure I.1DGranwood Subdivision– Elora, Transportation Impact Study

170127

Legend

AM Peak Hour

PM Peak Hour

Page 223: Grandwood Subdivision – Elora Transportation Impact Study...To the extent that this report is based on information supplied by other parties, Paradigm Transportation Solutions Limited

Wellington Road 7 & York RoadSouthbound Left Turn Lane Warrant

2025 Total (90% Diversion)

Figure I.1EGranwood Subdivision– Elora, Transportation Impact Study

170127

Legend

AM Peak Hour

PM Peak Hour

Page 224: Grandwood Subdivision – Elora Transportation Impact Study...To the extent that this report is based on information supplied by other parties, Paradigm Transportation Solutions Limited

Bridge Street & McNab StreetNorthbound Left Turn Lane Warrant

2025 Total

Figure I.2AGranwood Subdivision– Elora, Transportation Impact Study

170127

Legend

AM Peak Hour

PM Peak Hour

Page 225: Grandwood Subdivision – Elora Transportation Impact Study...To the extent that this report is based on information supplied by other parties, Paradigm Transportation Solutions Limited

Bridge Street & York StreetNorthbound Left Turn Lane Warrant

2025 Total (90% Diversion)

Figure I.2BGranwood Subdivision– Elora, Transportation Impact Study

170127

Legend

AM Peak Hour

PM Peak Hour