28
C-201 1" = 60' GRAPHIC SCALE

GRAPHIC SCALE 1 = 60' C-201 - NCPC

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

C-401
M A
T C
M A
T C
H L
I N
E - S
E E
C-402
GRAPHIC SCALE 1" = 30'
M A
T C
M A
T C
H L
I N
E - S
E E
GRAPHIC SCALE 1" = 30'
F .
UP
1 2 3 4 5 7 8 9 12 13 14 14.4 15 15.4 16 16.6 17
A
B.6
C
D
D.6
E
F
G
B
P -6
77 A
C A
D E
M IC
IN S
TR U
C TI
O N
F A
C IL
IT Y
, T E
C O
M S
C H
O O
LS
M AR IN E C O R P S B AS E
Q U AN TI C O , VI R G IN IA
SHEET OF
N C
L A
S S
IF IE
D / /F
O R
O F
F IC
UNCLASSIFIED/ /FOR OFFICIAL USE ONLY54321 DRAWING REVISION 10 MAY 2014
N O
T F
O R
C O
IN A
R Y
D EP AR TM EN T O F TH E N AV Y
N AV AL FA C IL IT IE S EN G IN N ER IN G C O M M AN D
N A
V A
L F
A C
IL IT
IE S
E N
G IN
N E
R IN
G C
O M
M A
N D
W A
S H
IN G
T O
N W AS H IN G TO N N AV Y YA R D , W AS H IN G TO N
N C
P C
F IR
S T
F .
DNUP
UP
UPUP
1 2 3 4 5 7 8 9 12 13 14 14.4 15 15.4 16 16.6 17
A
B.6
C
D
D.6
E
F
G
B
11106
B.5
46' - 10 1/2"
LS
M AR IN E C O R P S B AS E
Q U AN TI C O , VI R G IN IA
SHEET OF
N C
L A
S S
IF IE
D / /F
O R
O F
F IC
UNCLASSIFIED/ /FOR OFFICIAL USE ONLY54321 DRAWING REVISION 10 MAY 2014
N O
T F
O R
C O
IN A
R Y
D EP AR TM EN T O F TH E N AV Y
N AV AL FA C IL IT IE S EN G IN N ER IN G C O M M AN D
N A
V A
L F
A C
IL IT
IE S
E N
G IN
N E
R IN
G C
O M
M A
N D
W A
S H
IN G
T O
N W AS H IN G TO N N AV Y YA R D , W AS H IN G TO N
N C
P C
S E
C O
N D
F .
UP
UP
UP
1 2 3 4 5 7 8 9 12 13 14 14.4 15 15.4 16 16.6 17
A
B.6
C
D
D.6
E
F
G
B
11106
B.5
7 2
56' - 0" 48' - 8"
7 2
LS
M AR IN E C O R P S B AS E
Q U AN TI C O , VI R G IN IA
SHEET OF
N C
L A
S S
IF IE
D / /F
O R
O F
F IC
UNCLASSIFIED/ /FOR OFFICIAL USE ONLY54321 DRAWING REVISION 10 MAY 2014
N O
T F
O R
C O
IN A
R Y
D EP AR TM EN T O F TH E N AV Y
N AV AL FA C IL IT IE S EN G IN N ER IN G C O M M AN D
N A
V A
L F
A C
IL IT
IE S
E N
G IN
N E
R IN
G C
O M
M A
N D
W A
S H
IN G
T O
N W AS H IN G TO N N AV Y YA R D , W AS H IN G TO N
N C
P C
T H
IR D
NCPC THIRD FLOOR PLAN
1 2 3 4 5 7 8 9 12 13 14 14.4 15 15.4 16 16.6 17
A
B.6
C
D
D.6
E
F
G
B
LS
M AR IN E C O R P S B AS E
Q U AN TI C O , VI R G IN IA
SHEET OF
N C
L A
S S
IF IE
D / /F
O R
O F
F IC
UNCLASSIFIED/ /FOR OFFICIAL USE ONLY54321 DRAWING REVISION 10 MAY 2014
N O
T F
O R
C O
IN A
R Y
D EP AR TM EN T O F TH E N AV Y
N AV AL FA C IL IT IE S EN G IN N ER IN G C O M M AN D
N A
V A
L F
A C
IL IT
IE S
E N
G IN
N E
R IN
G C
O M
M A
N D
W A
S H
IN G
T O
N W AS H IN G TO N N AV Y YA R D , W AS H IN G TO N
N C
P C
R O
O F
AE-310 3
P -6
77 A
C A
D E
M IC
IN S
TR U
C TI
O N
F A
C IL
IT Y
, T E
C O
M S
C H
O O
LS
M AR IN E C O R P S B AS E
Q U AN TI C O , VI R G IN IA
SHEET OF
N C
L A
S S
IF IE
D / /F
O R
O F
F IC
UNCLASSIFIED/ /FOR OFFICIAL USE ONLY54321 DRAWING REVISION 10 MAY 2014
N O
T F
O R
C O
IN A
R Y
C O N C EP T D ES IG N S U B M IT TA L
0 6 / 1 6 / 2 0 1 6
D EP AR TM EN T O F TH E N AV Y
N AV AL FA C IL IT IE S EN G IN N ER IN G C O M M AN D
N A
V A
L F
A C
IL IT
IE S
E N
G IN
N E
R IN
G C
O M
M A
N D
W A
S H
IN G
T O
N W AS H IN G TO N N AV Y YA R D , W AS H IN G TO N
5 0 % D ES IG N S U B M IT TA L
0 8 / 0 5 / 2 0 1 6
B U
IL D
IN G
S E
C T
IO N
1/8" = 1'-0" C1
LONGITUDINAL BUILDING SECTION - CUT BETWEEN COLUMN LINES C.6 & D - LOOKING NORTH
1/8" = 1'-0" A1
LONGITUDINAL BUILDING SECTION - CUT BETWEEN COLUMN LINES C.6 & D - LOOKING NORTH (CONTINUED)
FIRST FLOOR 0' - 0"
SECOND FLOOR 14' - 10"
THIRD FLOOR 29' - 8"
AE-314 15
AE-314 16
AE-315 2
AE-315 1
P -6
77 A
C A
D E
M IC
IN S
TR U
C TI
O N
F A
C IL
IT Y
, T E
C O
M S
C H
O O
LS
M AR IN E C O R P S B AS E
Q U AN TI C O , VI R G IN IA
SHEET OF
U N
UNCLASSIFIED/ /FOR OFFICIAL USE ONLY54321 DRAWING REVISION 10 MAY 2014
N O
T F
O R
C O
IN A
R Y
C O N C EP T D ES IG N S U B M IT TA L
0 6 / 1 6 / 2 0 1 6
D EP AR TM EN T O F TH E N AV Y
N AV AL FA C IL IT IE S EN G IN N ER IN G C O M M AN D
N A
V A
L F
A C
IL IT
IE S
E N
G IN
N E
R IN
G C
O M
M A
N D
W A
S H
IN G
T O
N W AS H IN G TO N N AV Y YA R D , W AS H IN G TO N
5 0 % D ES IG N S U B M IT TA L
0 8 / 0 5 / 2 0 1 6
B U
IL D
IN G
S E
C T
IO N
1/8" = 1'-0" HH
TRANSVERSE BUILDING SECTION - CUT BETWEEN COLUMN LINES 7 & 8 - LOOKING EAST 1/8" = 1'-0"
II TRANSVERSE BUILDING SECTION - CUT BETWEEN COLUMN LINES 10 & 11 - LOOKING EAST
Virginia Runoff Reduction Method Worksheet
DEQ Virginia Runoff Reduction Method ReDevelopment Compliance Spreadsheet   Version 3.0 
BMP Design Specifications List: 2013 Draft Stds & Specs
Site Summary
43 9.87
Site Land Cover Summary
PreReDevelopment Land Cover  (acres) A soils B Soils C Soils D Soils Totals % of Total
Forest/Open (acres) 0.00 6.65 0.00 0.00 6.65 67
Managed Turf (acres) 0.00 1.77 0.00 0.00 1.77 18
Impervious Cover (acres) 0.00 1.45 0.00 0.00 1.45 15
9.87 100
PostReDevelopment Land Cover  (acres) A soils B Soils C Soils D Soils Totals % of Total
Forest/Open (acres) 0.00 0.41 0.00 0.00 0.41 4 * Managed Turf (acres) 0.00 4.76 0.00 0.00 4.76 48
Impervious Cover (acres) 0.00 4.70 0.00 0.00 4.70 48 * Forest/Open Space areas must be protected in accordance with the Virginia Runoff Reduction Method 9.87 100
Site Tv and Land Cover Nutrient Loads
Post ReDevelopment
Post Development 
(New Impervious)
(lb/acre/yr)
(lb/acre/yr)
Site Rv 0.35 0.95 0.28 0.63 1.25 0.81
Treatment Volume (ft3)  8,501 11,208 6,656
TP Load (lb/yr) 5.34 7.04 4.18
Total TP Load Reduction Required (lb/yr) 2.00 5.71
Pre ReDevelopment
88.58
7.70
0.55 19,708
Site Compliance Summary
Total TP Load Reduction Achieved (lb/yr) 8.53
Total TN Load Reduction Achieved (lb/yr) 62.37
Remaining Post Development TP Load  (lb/yr)
3.85
0.00 ** TARGET TP REDUCTION EXCEEDED BY 0.82 LB/YEAR **
Maximum % Reduction Required Below  PreReDevelopment Load
20%
Drainage Area Summary
D.A. A D.A. B D.A. C D.A. D D.A. E Total Forest/Open (acres) 0.00 0.00 0.00 0.00 0.00 0.00
Managed Turf (acres) 0.29 0.46 0.58 0.42 0.00 1.75
Impervious Cover (acres) 0.67 0.70 1.52 1.12 0.00 4.01 Total Area (acres) 0.96 1.16 2.10 1.54 0.00 5.76
Drainage Area Compliance Summary
D.A. A D.A. B D.A. C D.A. D D.A. E Total
TP Load Reduced (lb/yr) 1.42 1.55 3.20 2.35 0.00 8.53
TN Load Reduced (lb/yr) 10.41 11.35 23.39 17.21 0.00 62.37
Summary Print
Drainage Area A Summary
Land Cover Summary
A Soils B Soils C Soils D Soils Total % of Total
Forest/Open (acres) 0.00 0.00 0.00 0.00 0.00 0
Managed Turf (acres) 0.00 0.29 0.00 0.00 0.29 30
Impervious Cover (acres) 0.00 0.67 0.00 0.00 0.67 70
0.96
Impervious  Cover Credit  Area (acres)
BMP Treatment  Volume (ft3)
TP Load from  Upstream 
TP Removed  (lb/yr)
TP Remaining  (lb/yr)
6.b. Bioretention #2 or MicroBioretention  #2 (Spec #9)
0.29 0.67 2,521.04 0.00 1.58 1.42 0.16
Total Impervious Cover Treated (acres) 0.67
Total Turf Area Treated (acres)  0.29 Total TP Load Reduction Achieved in D.A.  (lb/yr)
1.42
10.41
Drainage Area B Summary
Land Cover Summary
A Soils B Soils C Soils D Soils Total % of Total
Forest/Open (acres) 0.00 0.00 0.00 0.00 0.00 0
Managed Turf (acres) 0.00 0.46 0.00 0.00 0.46 40
Impervious Cover (acres) 0.00 0.70 0.00 0.00 0.70 60
1.16
Impervious  Cover Credit  Area (acres)
BMP Treatment  Volume (ft3)
TP Load from  Upstream 
TP Removed  (lb/yr)
TP Remaining  (lb/yr)
6.b. Bioretention #2 or MicroBioretention  #2 (Spec #9)
0.46 0.7 2,747.91 0.00 1.72 1.55 0.17
Total Impervious Cover Treated (acres) 0.70
Total Turf Area Treated (acres)  0.46 Total TP Load Reduction Achieved in D.A.  (lb/yr) 1.55
Total TN Load Reduction Achieved in D.A.  (lb/yr) 11.35
Summary Print
Drainage Area C Summary
Land Cover Summary
A Soils B Soils C Soils D Soils Total % of Total
Forest/Open (acres) 0.00 0.00 0.00 0.00 0.00 0
Managed Turf (acres) 0.00 0.58 0.00 0.00 0.58 28
Impervious Cover (acres) 0.00 1.52 0.00 0.00 1.52 72
2.10
Impervious  Cover Credit  Area (acres)
BMP Treatment  Volume (ft3)
TP Load from  Upstream 
TP Removed  (lb/yr)
TP Remaining  (lb/yr)
6.b. Bioretention #2 or MicroBioretention  #2 (Spec #9)
0.58 1.52 5,662.80 0.00 3.55 3.20 0.36
Total Impervious Cover Treated (acres) 1.52
Total Turf Area Treated (acres)  0.58 Total TP Load Reduction Achieved in D.A.  (lb/yr) 3.20
Total TN Load Reduction Achieved in D.A.  (lb/yr) 23.39
Summary Print
Drainage Area D Summary
Land Cover Summary
A Soils B Soils C Soils D Soils Total % of Total
Forest/Open (acres) 0.00 0.00 0.00 0.00 0.00 0
Managed Turf (acres) 0.00 0.42 0.00 0.00 0.42 27
Impervious Cover (acres) 0.00 1.12 0.00 0.00 1.12 73
1.54
Impervious  Cover Credit  Area (acres)
BMP Treatment  Volume (ft3)
TP Load from  Upstream 
TP Removed  (lb/yr)
TP Remaining  (lb/yr)
6.b. Bioretention #2 or MicroBioretention  #2 (Spec #9)
0.42 1.12 4,167.24 0.00 2.62 2.35 0.26
Total Impervious Cover Treated (acres) 1.12
Total Turf Area Treated (acres)  0.42 Total TP Load Reduction Achieved in D.A.  (lb/yr)
2.35
17.21
Virginia Runoff Reduction Method Worksheet
Runoff Volume and CN Calculations
1year storm 2year storm  10year storm  Target Rainfall Event (in) 2.57 3.12 4.83
Drainage Areas RV & CN Drainage Area A Drainage Area B Drainage Area C Drainage Area D Drainage Area E
CN 87 83 88 88 0
RR (ft3) 2,017 2,198 4,530 3,334 0
RV wo RR (wsin) 1.37 1.11 1.44 1.44 0.00
RV w RR (wsin) 0.79 0.59 0.85 0.85 0.00
CN adjusted 77 72 78 78 0
RV wo RR (wsin) 1.84 1.54 1.93 1.93 0.00
RV w RR (wsin) 1.27 1.02 1.33 1.33 0.00
CN adjusted 79 75 80 80 0
RV wo RR (wsin) 3.41 3.02 3.51 3.51 0.00
RV w RR (wsin) 2.83 2.50 2.91 2.91 0.00
CN adjusted 81 77 82 82 0
1year return period
2year return period
10year return period