RECLAMATION PROJECT
LEWIS AND CLARK COUNTY, MONTANA
APRIL 05, 2013
PREPARED BYPIONEER TECHNICAL SERVICES, INC.
SOURCE: USGS 7.5 MINUTE QUADRANGLE
PROJECTLOCATION
PROJECT LOCATION
GREAT DIVIDE SAND TAILINGS
DEQ CONTRACT NO. 410017MONTANA DEPARTMENT OF ENVIRONMENTAL QUALITY
ABANDONED MINE LANDS BUREAU
DRAWN BY:
DESIGNED BY:
CHECKED BY:
APPROVED BY:
PROJECT NO:
DATE:
PROJECTION:
ZONE:
DATUM:
UNITS:
SOURCE:
DATE: BY: DESC:REVISION:
But
te, H
elen
a, A
naco
nda
SHE
ET
IN
DE
XB
LM
/DE
Q-A
ML
BG
RE
AT
DIV
IDE
SA
ND
TA
ILIN
GS
RE
CL
AM
AT
ION
PR
OJE
CT
-
-
NAD83
FEET
PIONEER
CA/CR
JJM
MCB
TR
10162
04-05-2013
---- ---- ----
---- ---- ----
---- ---- ----
---- ---- ----
---- ---- ----
AN
D L
EG
EN
D
2%
2+00
GRADE OR SURFACE SLOPE (PERCENT)
EXISTING - PLAN VIEW PROPOSED - PLAN VIEW
100 FT. STATIONING
INTERMEDIATE CONTOURS
INDEX CONTOURSINDEX CONTOURS
INTERMEDIATE CONTOURS
FENCE
EXISTING ROAD
STREAM CHANNEL/SURFACE WATER
CENTERLINE
CENTERLINE
SLOPE DESIGNATION(ARROWS POINT DOWN SLOPE)
SLOPE DESIGNATION
CULVERT
TELEPHONE LINE
ELECTRICAL LINE
WATER LINE
LIGHT POLE
SNOW-PRODUCTION HYDRANT
SNOW-PRODUCTION POWER PANEL
STRUCTURE
COLLAPSED ADIT
60
62
.360
61.0
0
1+00EXISTING GROUND ELEVATION(AS SPECIFIED ON PROFILE) FINISHED GROUND ELEVATION
(AS SPECIFIED ON PROFILE)
COMMUNITCATION LINE
SKI LIFT
WATER LINE
ELECTRICAL LINE
TELEPHONE LINE
COMMUNITCATION LINE
HEL
ENA,
MT
5960
120
1 E.
BR
OAD
WAY
, SUI
TE C
(406
) 457
-825
2
\\192.168.253.15\PROJECT$\HELENADATA\DEQ\BALD BUTTE - GREAT DIVIDE\CONSTRUCTION\DRAWINGS\AS-BUILT\SHEET SET - GREAT DIVIDE\GD-F-CO-ILN-001-11.DWG4/2/2013 4:33:43 PM
NOTE:SEE BALD BUTTE DRAWING SET FOR TAILINGSPLACEMENT PLAN AND REPOSITORY.
SECTIONSHEET NUMBER ON WHICHDETAIL APPEARS.
DETAIL NUMBER
DETAIL
SHEET NUMBER ONWHICH DETAIL APPEARS
DETAIL NUMBER
SHEET NUMBER ONWHICH SECTIONAPPEARS.
SECTION DESIGNATION
SHEET NUMBER ONWHICH SECTION APPEARS
SECTION DESIGNATION
ON PLANON PLAN
AT DETAIL AT SECTION DETAIL
SECTION INDICATORDETAIL INDICATOR PROFILE ELEVATIONS
LEGEND SHEET INDEX
SELECT BACKFILL/BEDDING MATERIAL
TAILINGS
STRUCTURAL FILL/CRUSHED TOP SURFACING
TYPE 1 OR TYPE II RIPRAPAS NOTED.
COVER SOIL
GENERAL FILL
EROSION CONTROL MAT
MARYSVILLE
OTTAWA GULCH ROAD
BELMONT DRIVE
DRAWN BY:
DESIGNED BY:
CHECKED BY:
APPROVED BY:
PROJECT NO:
DATE:
DISPLAYED AS:
COORD SYS/ZONE:
DATUM:
UNITS:
SOURCE:
DATE: BY: DESC:REVISION:
\\192.168.253.15\PROJECT$\HELENADATA\DEQ\BALD BUTTE - GREAT DIVIDE\CONSTRUCTION\DRAWINGS\AS-BUILT\SHEET SET - GREAT DIVIDE\GD-F-CO-PLN-009-11.DWG4/2/2013 4:33:58 PM
GR
EA
T D
IVID
EPR
OJE
CT
OV
ER
VIE
W
BL
M/D
EQ
-AM
LB
GR
EA
T D
IVID
E S
AN
D T
AIL
ING
SR
EC
LA
MA
TIO
N P
RO
JEC
T
04-05-2013
MSP
NAD83
FEET
NAIP AERIAL
CA/CR
JJM
MCB
TR
10162
HEL
ENA,
MT
5960
120
1 E.
BR
OAD
WAY
, SUI
TE C
(406
) 457
-825
2
GREAT DIVIDEPROJECT AREA
REPOSITORY LOCATION, SEE BALDBUTTE PLANSET, SHEET BB-4
CULVERT NO. 1 REMOVED AND REPLACED, SEE
SHEET GD-D6
CULVERT NO. 2 REMOVE AND REPLACE, SEE
SHEET GD-D6
CULVERT NO. 3 REMOVE AND REPLACE, SEE
SHEET GD-D6CULVERT NO. 4
REMOVED AND REPLACED, SEESHEET GD-D6
CATTLE GUARD NO. 2,USED BY-PASS GATE
CULVERT NO. 5 REMOVED AND REPLACED, SEE
SHEET GD-D6
IMPROVED AND MAINTAINEDOTTAWA GULCH ROAD,
SEE SPECIAL PROVISIONS
CATTLE GUARD NO. 1,USED BY-PASS GATE
NOTE:FINAL ROAD MAINTENANCE AND CULVERTSREPLACED DURING 2012 CONSTRUCTION SEASON
DRAWN BY:
DESIGNED BY:
CHECKED BY:
APPROVED BY:
PROJECT NO:
DATE:
DISPLAYED AS:
COORD SYS/ZONE:
DATUM:
UNITS:
SOURCE:
DATE: BY: DESC:REVISION:
\\192.168.253.15\PROJECT$\HELENADATA\DEQ\BALD BUTTE - GREAT DIVIDE\CONSTRUCTION\DRAWINGS\AS-BUILT\SHEET SET - GREAT DIVIDE\GD-F-CO-PLN-008-11.DWG4/2/2013 4:34:38 PM
HA
UL
RO
AD
IMPR
OV
EM
EN
TPL
AN
VIE
W 1
BL
M/D
EQ
-AM
LB
GR
EA
T D
IVID
E S
AN
D T
AIL
ING
SR
EC
LA
MA
TIO
N P
RO
JEC
T
04-05-2013
MSP
NAD83
FEET
NAIP AERIAL
CA/CR
JJM
MCB
TR
10162
HEL
ENA,
MT
5960
120
1 E.
BR
OAD
WAY
, SUI
TE C
(406
) 457
-825
2
CULVERT NO. 6 REMOVE AND REPLACE, SEESHEET GD-D6
CULVERT NO. 7REMOVE AND REPLACE, SEE
SHEET GD-D6
CULVERT NO. 8REMOVED AND REPLACED, SEE
SHEET GD-D6
CULVERT NO. 9REMOVED AND REPLACED, SEE
SHEET GD-D6
IMPROVED AND MAINTAINEDOTTAWA GULCH ROAD,
SEE SPECIAL PROVISIONS
TO REPOSITORY
CATTLE GUARD NO. 3,USED BY-PASS GATE
NOTE:FINAL ROAD MAINTENANCE AND CULVERTSREPLACED DURING 2012 CONSTRUCTION SEASON
DRAWN BY:
DESIGNED BY:
CHECKED BY:
APPROVED BY:
PROJECT NO:
DATE:
DISPLAYED AS:
COORD SYS/ZONE:
DATUM:
UNITS:
SOURCE:
DATE: BY: DESC:REVISION:
\\192.168.253.15\PROJECT$\HELENADATA\DEQ\BALD BUTTE - GREAT DIVIDE\CONSTRUCTION\DRAWINGS\AS-BUILT\SHEET SET - GREAT DIVIDE\GD-F-CO-PLN-008-11.DWG4/2/2013 4:34:43 PM
HA
UL
RO
AD
IMPR
OV
EM
EN
TPL
AN
VIE
W 2
BL
M/D
EQ
-AM
LB
GR
EA
T D
IVID
E S
AN
D T
AIL
ING
SR
EC
LA
MA
TIO
N P
RO
JEC
T
04-05-2013
MSP
NAD83
FEET
NAIP AERIAL
CA/CR
JJM
MCB
TR
10162
HEL
ENA,
MT
5960
120
1 E.
BR
OAD
WAY
, SUI
TE C
(406
) 457
-825
2
REPLACED CATTLE GUARD NO. 4,SEE SPECIAL PROVISIONS
IMPROVE AND MAINTAINOTTAWA GULCH ROAD,
SEE SPECIAL PROVISIONS
TO REPOSITORY
TO MARYSVILLE
MAINTAIN MAINTAINED BELMONT DRIVE,SEE SPECIAL PROVISIONS.PLACED 4"LIFT OF 3/4" SURFACING FROMENTRANCE TO GREAT DIVIDE PARKING LOTS TOOTTAWA GULCH PARKING AREA PER M.O.A. BETWEENDEQ AND LEWIS AND CLARK COUNTY(WORK DIRECTIVE CHANGE NO. 3/CHANGE ORDER NO. 5).
DRAWN BY:
DESIGNED BY:
CHECKED BY:
APPROVED BY:
PROJECT NO:
DATE:
DISPLAYED AS:
COORD SYS/ZONE:
DATUM:
UNITS:
SOURCE:
DATE: BY: DESC:REVISION:
\\192.168.253.15\PROJECT$\HELENADATA\DEQ\BALD BUTTE - GREAT DIVIDE\CONSTRUCTION\DRAWINGS\AS-BUILT\SHEET SET - GREAT DIVIDE\GD-F-CO-PLN-008-11.DWG4/2/2013 4:34:48 PM
HA
UL
RO
AD
IMPR
OV
EM
EN
TS
PLA
N V
IEW
3
BL
M/D
EQ
-AM
LB
GR
EA
T D
IVID
E S
AN
D T
AIL
ING
SR
EC
LA
MA
TIO
N P
RO
JEC
T
04-05-2013
MSP
NAD83
FEET
NAIP AERIAL
CA/CR
JJM
MCB
TR
10162
HEL
ENA,
MT
5960
120
1 E.
BR
OAD
WAY
, SUI
TE C
(406
) 457
-825
2
REPLACED CATTLE GUARD NO. 4,SEE SPECIAL PROVISIONS
MAINTAIN MAINTAINED BELMONT DRIVE,SEE SPECIAL PROVISIONS.
PLACED 4" LIFT OF 3/4" SURFACING FROM ENTRANCE TOGREAT DIVIDE PARKING LOTS TO OTTAWA GULCH PARKING AREA
PER M.O.A. BETWEEN DEQ AND LEWIS AND CLARK COUNTY(WORK DIRECTIVE CHANGE NO. 3/CHANGE ORDER NO. 5).
TO R
EPOSITO
RY
GREAT DIVIDEPROJECT AREA
DRAWN BY:
DESIGNED BY:
CHECKED BY:
APPROVED BY:
PROJECT NO:
DATE:
DISPLAYED AS:
COORD SYS/ZONE:
DATUM:
UNITS:
SOURCE:
DATE: BY: DESC:REVISION:
\\192.168.253.15\PROJECT$\HELENADATA\DEQ\BALD BUTTE - GREAT DIVIDE\CONSTRUCTION\DRAWINGS\AS-BUILT\SHEET SET - GREAT DIVIDE\GD-F-CO-PLN-008-11.DWG4/2/2013 4:34:53 PM
HA
UL
RO
AD
IMPR
OV
EM
EN
TPL
AN
VIE
W 4
BL
M/D
EQ
-AM
LB
GR
EA
T D
IVID
E S
AN
D T
AIL
ING
SR
EC
LA
MA
TIO
N P
RO
JEC
T
04-05-2013
MSP
NAD83
FEET
NAIP AERIAL
CA/CR
JJM
MCB
TR
10162
HEL
ENA,
MT
5960
120
1 E.
BR
OAD
WAY
, SUI
TE C
(406
) 457
-825
2
0+00
1+00
2+00
3+00
4+00
5+00
6+00
7+00
8+00
9+00
10+0
0
11+0
0
12+0
0
13+0
0
13+5
0
0+00
1+00
2+00
3+00
4+00
5+00
6+00
7+00
8+00
8+50
0+00
1+00
2+00
3+00
4+00
4+70
0+00
1+00
2+00
3+00
4+00
5+00
5+86
0+00
1+00
2+00
3+00
4+00
5+00
6+00
7+00
8+00
8+25
6220
6210
62006200
6190
61806180
6170
61606160
61506150
61406140
61306130
6120
61106110
6100
6090
60806080
6070
60606060
60506050
60406040
60306030
60206020
6010
6000
5990
5980
5980
5970
5960
5950
5940
5930
5920
5910
5910
6110
6100
6090
6080
60706070 6060
6060
60506050
60406030
6030
6020
6010
6000
6000
5990
5980 5970
5970 59605960
5950
5950
5940
5930
5920
59
20
5910
5910 5900
5900
5890
5880
5870
5870
5860
5860
5850
5860
ROCKWALL
MEADOW MTN.SKI LIFT
GOOD LUCKSKI LIFT
RAWHIDE GULCH ROAD
MT. BELMONTSKI LIFT
MIDDLE DITCH CONSTRUCTION,SEE SHEET GD-15 AND
SKI LODGELOWER ROAD AND RUN-OFF CONTROL DITCH RECONSTRUCTION,SEE SHEET GD-14 AND
SITE ACCESSBELMONT DRIVE
UPPER ROAD AND RUN-OFF CONTROL DITCHRECONSTRUCTION,
SEE SHEET GD-13 AND COLLAPSEDADIT
COLLAPSEDADIT
CABIN
POWER DISTRIBUTION SHED
UPPER HILLDITCH
JENNIE'S FORKOF SILVER CREEK
TO REPOSITORY
201
E. B
RO
ADW
AY, S
UITE
C
(406
) 457
-825
2
\\192.168.253.15\PROJECT$\HELENADATA\DEQ\BALD BUTTE - GREAT DIVIDE\CONSTRUCTION\DRAWINGS\AS-BUILT\SHEET SET - GREAT DIVIDE\GD-F-CO-PLN-001-11.DWG4/2/2013 4:35:24 PM
DRAWN BY:
DESIGNED BY:
CHECKED BY:
APPROVED BY:
PROJECT NO:
DATE:
DISPLAYED AS:
COORD SYS/ZONE:
DATUM:
UNITS:
SOURCE:
DATE: BY: DESC:REVISION:
\\192.168.253.15\PROJECT$\HELENADATA\DEQ\BALD BUTTE - GREAT DIVIDE\CONSTRUCTION\DRAWINGS\AS-BUILT\SHEET SET - GREAT DIVIDE\GD-F-CO-PLN-001-11.DWG4/2/2013 4:35:24 PM
TA
ILIN
GS
EX
CA
VA
TIO
NSI
TE
OV
ER
VIE
W
BL
M/D
EQ
-AM
LB
GR
EA
T D
IVID
E S
AN
D T
AIL
ING
SR
EC
LA
MA
TIO
N P
RO
JEC
T
04-05-2013
MSP
NAD83
FEET
PIONEER
CA/CR
JJM
MCB
TR
10162
HEL
ENA,
MT
5960
120
1 E.
BR
OAD
WAY
, SUI
TE C
(406
) 457
-825
2
0+00
1+00
2+00
3+00
4+00
5+00
6+00
7+00
8+00
9+00
10+0
0
11+0
0
12+0
0
13+0
0
13+5
0
2+00
3+00
4+00
5+00
6+00
1+00
2+00
3+00
4+00
4+70
1+00
2+00
3+00
4+00
5+00
5+86
0+00
1+00
2+00
3+00
4+00
5+00
6+00
7+00
8+00
8+25
6070
60606060
60506050
60406040
60306030
60206020
6010
6000
5990
5980
5980
5970
5960
5950
5940
5930
5920
5910
5910
6110
6100
6090
6080
60606060
59605960
5950
5950
5940
5930
5920
59
20
5910
5910
5900
5900
5890
5880
5870
5870
5860
ROCKWALL
NOTE:1. SEE SHEETS GD-17 TO GD-19 FOR UTILITY RELOCATION AND REPLACEMENT.
UPPER ROAD AND RUN-OFF CONTROL DITCH RECONSTRUCTION,
SEE SHEET GD-13 AND DETAIL
TOWER 6,SEE SHEET GD-D2
MIDDLE DITCH,SEE SHEET GD-15 AND DETAIL
TOWER 5,SEE SHEET GD-D1
LOWER ROAD AND RUN-OFFCONTROL DITCH
RECONSTRUCTION,SEE SHEET GD-14 AND DETAIL
EXCAVATION BOUNDARY,SEE CROSS SECTIONSHEETS GD-10 AND GD-11
BACKFILL BACKFILLED COLLAPSEDADIT
POWERDISTRIBUTION SHED
GOOD LUCKSKI LIFT
MEADOW MTN.SKI LIFT
SKI LODGE
CABIN
5885589058955900590559105915592059255930593559405945595059555960596559705975598059855990599560006005601060156020602560306035604060456050605560606065607060756080608560906095
5885589058955900590559105915592059255930593559405945595059555960596559705975598059855990599560006005601060156020602560306035604060456050605560606065607060756080608560906095
2+50
60
78
.6
6076
.83
3+00
60
69
.9
6066
.77
3+50
60
60
.5
6058
.22
4+00
60
52
.0
6051
.16
4+50
60
44
.9
6042
.26
5+00
60
36
.0
6033
.70
5+50
60
27
.0
6024
.31
6+00
60
17
.6
6015
.03
6+50
60
07
.1
6003
.58
7+00
59
97
.1
5995
.68
7+50
59
86
.9
5985
.82
8+00
59
75
.7
5975
.54
8+50
59
64
.5
5963
.71
9+00
59
53
.5
5952
.52
9+505
94
3.0
5942
.74
10+00
59
32
.5
5932
.74
10+50
59
22
.0
5921
.53
11+00
59
10
.9
5910
.17
11+50
58
98
.8
5898
.28
TOWER #6 BASE,SEE SHEET GD-D2
PROPOSED TAILINGSEXCAVATION LIMITFINISHED GROUND
EXISTING GROUND
\\192.168.253.15\PROJECT$\HELENADATA\DEQ\BALD BUTTE - GREAT DIVIDE\CONSTRUCTION\DRAWINGS\AS-BUILT\SHEET SET - GREAT DIVIDE\GD-F-CO-PLP-004-11.DWG4/2/2013 4:35:48 PM
DRAWN BY:
DESIGNED BY:
CHECKED BY:
APPROVED BY:
PROJECT NO:
DATE:
DISPLAYED AS:
COORD SYS/ZONE:
DATUM:
UNITS:
SOURCE:
DATE: BY: DESC:REVISION:
\\192.168.253.15\PROJECT$\HELENADATA\DEQ\BALD BUTTE - GREAT DIVIDE\CONSTRUCTION\DRAWINGS\AS-BUILT\SHEET SET - GREAT DIVIDE\GD-F-CO-PLP-004-11.DWG4/2/2013 4:35:48 PM
TA
ILIN
GS
EX
CA
VA
TIO
NPL
AN
AN
D P
RO
FIL
E
BL
M/D
EQ
-AM
LB
GR
EA
T D
IVID
E S
AN
D T
AIL
ING
SR
EC
LA
MA
TIO
N P
RO
JEC
T
04-05-2013
MSP
NAD83
FEET
PIONEER
CA/CR
JJM
MCB
TR
10162
HEL
ENA,
MT
5960
120
1 E.
BR
OAD
WAY
, SUI
TE C
(406
) 457
-825
2
STA 2+00
6080
6090
6100
6110
6120
6080
6090
6100
6110
6120
0 50 100
150
200
250
3000-50
-100
-150
-200
-250
STA 2+50
6070
6080
6090
6100
6110
6120
6070
6080
6090
6100
6110
6120
0 50 100
150
200
250
3000-50
-100
-150
-200
-250
STA 3+00
6060
6070
6080
6090
6100
6060
6070
6080
6090
6100
0 50 100
150
200
250
3000-50
-100
-150
-200
STA 3+50
6030
6040
6050
6060
6070
6080
6090
6100
6030
6040
6050
6060
6070
6080
6090
6100
0 50 100
150
200
250
300
350
4000-50
-100
-150
-200
STA 4+00
6040
6050
6060
6070
6080
6090
6040
6050
6060
6070
6080
6090
0 50 100
150
200
250
300
3500-50
-100
-150
-200
STA 4+50
6030
6040
6050
6060
6070
6080
6090
6030
6040
6050
6060
6070
6080
6090
0 50 100
150
200
250
300
3500-50
-100
-150
-200
STA 5+00
6030
6040
6050
6060
6070
6080
6030
6040
6050
6060
6070
6080
0 50 100
150
200
250
300
3500-50
-100
-150
-200
STA 5+50
6020
6030
6040
6050
6060
6070
6080
6020
6030
6040
6050
6060
6070
6080
0 50 100
150
200
250
3000-50
-100
-150
-200
STA 6+00
6010
6020
6030
6040
6050
6060
6070
6010
6020
6030
6040
6050
6060
6070
0 50 100
150
200
250
3000-50
-100
-150
-200
STA 6+50
6000
6010
6020
6030
6040
6050
6060
6000
6010
6020
6030
6040
6050
6060
0 50 100
150
200
250
3000-50
-100
-150
-200
EXISTING GROUND (TYP.)PROPOSED TAILINGS
EXCAVATION LIMITFINISHED GROUND (TYP)
TOWER #6 BASE,SEE SHEET GD-D2
\\192.168.253.15\PROJECT$\HELENADATA\DEQ\BALD BUTTE - GREAT DIVIDE\CONSTRUCTION\DRAWINGS\AS-BUILT\SHEET SET - GREAT DIVIDE\GD-F-CO-XSF-001-11.DWG4/2/2013 4:36:55 PM
DRAWN BY:
DESIGNED BY:
CHECKED BY:
APPROVED BY:
PROJECT NO:
DATE:
DISPLAYED AS:
COORD SYS/ZONE:
DATUM:
UNITS:
SOURCE:
DATE: BY: DESC:REVISION:
\\192.168.253.15\PROJECT$\HELENADATA\DEQ\BALD BUTTE - GREAT DIVIDE\CONSTRUCTION\DRAWINGS\AS-BUILT\SHEET SET - GREAT DIVIDE\GD-F-CO-XSF-001-11.DWG4/2/2013 4:36:55 PM
TA
ILIN
GS
EX
CA
VA
TIO
NC
RO
SS S
EC
TIO
NS
2+50
TO
7+
00
BL
M/D
EQ
-AM
LB
GR
EA
T D
IVID
E S
AN
D T
AIL
ING
SR
EC
LA
MA
TIO
N P
RO
JEC
T
04-05-2013
MSP
NAD83
FEET
PIONEER
CA/CR
JJM
MCB
TR
10162
HEL
ENA,
MT
5960
120
1 E.
BR
OAD
WAY
, SUI
TE C
(406
) 457
-825
2
STA 7+00
5990
6000
6010
6020
5990
6000
6010
6020
0 50 100
150
200
2500-50
-100
STA 7+50
5980
5990
6000
6010
5980
5990
6000
6010
0 50 100
150
200
2500-50
-100
STA 8+00
5970
5980
5990
6000
5970
5980
5990
6000
0 50 100
1500-50
-100
STA 8+50
5960
5970
5980
5990
5960
5970
5980
5990
0 50 100
1500-50
-100
STA 9+00
5940
5950
5960
5970
5940
5950
5960
5970
0 50 1000-50
-100
STA 9+50
5930
5940
5950
5960
5930
5940
5950
5960
0 50 1000-50
-100
STA 10+00
5920
5930
5940
5950
5920
5930
5940
5950
0 50 1000-50
-100
STA 10+50
5910
5920
5930
5940
5910
5920
5930
5940
0 50 1000-50
-100
STA 11+00
5900
5910
5920
5930
5900
5910
5920
5930
0 50 1000-50
-100
STA 11+50
5890
5900
5910
5890
5900
5910
0 50 1000-50
-100
STA 7+60
5980
5990
6000
6010
5980
5990
6000
6010
0 50 100
150
200
2500-50
-100
EXISTING GROUND (TYP.)
PROPOSED TAILINGSEXCAVATION LIMITFINISHED GROUND (TYP.)
TOWER #5 BASE,SEE SHEET GD-D1
TOWER #5 BASE,SEE SHEET GD-D1
\\192.168.253.15\PROJECT$\HELENADATA\DEQ\BALD BUTTE - GREAT DIVIDE\CONSTRUCTION\DRAWINGS\AS-BUILT\SHEET SET - GREAT DIVIDE\GD-F-CO-XSF-001-11.DWG4/2/2013 4:36:58 PM
DRAWN BY:
DESIGNED BY:
CHECKED BY:
APPROVED BY:
PROJECT NO:
DATE:
DISPLAYED AS:
COORD SYS/ZONE:
DATUM:
UNITS:
SOURCE:
DATE: BY: DESC:REVISION:
\\192.168.253.15\PROJECT$\HELENADATA\DEQ\BALD BUTTE - GREAT DIVIDE\CONSTRUCTION\DRAWINGS\AS-BUILT\SHEET SET - GREAT DIVIDE\GD-F-CO-XSF-001-11.DWG4/2/2013 4:36:58 PM
TA
ILIN
GS
EX
CA
VA
TIO
NC
RO
SS S
EC
TIO
NS
7+50
TO
11+
50
BL
M/D
EQ
-AM
LB
GR
EA
T D
IVID
E S
AN
D T
AIL
ING
SR
EC
LA
MA
TIO
N P
RO
JEC
T
04-05-2013
MSP
NAD83
FEET
PIONEER
CA/CR
JJM
MCB
TR
10162
HEL
ENA,
MT
5960
120
1 E.
BR
OAD
WAY
, SUI
TE C
(406
) 457
-825
2
2% MIN.
SEE NOTES
EXISTING RIPRAPDO NOT DISTURB (TYP.)LEFT IN PLACE
PARKING LOT EXCAVATION DETAILN.T.S.
NOTES:
1. EXCAVATE, LOAD, HAUL, AND DISPOSE EXCAVATED, LOADED, HAULED, ANDDISPOSED TAILINGS MATERIAL TO REPOSITORY.
2. EXCAVATE EXCAVATED PARKING LOTS TO A MAXIMUM DEPTH OF 12 INCHES.
3. GRADE, SLOPE, AND COMPACT GRADED, SLOPED, AND COMPACTEDSUBGRADE TO A MINIMUM 2% SLOPE.
4. BACKFILL BACKFILLED 6" MINIMUM CRUSHED TOP SURFACING MATERIALOVER ENTIRE EXCAVATED AREA, GRADE AND SMOOTH GRADED ANDSMOOTHED TO MATCH EXISTING TOPOGRAPHY.
5. COMPACT COMPACTED SUBGRADE AND CRUSHED TOP SURFACING MATERIALTO ATTAIN 95% OF STANDARD PROCTOR (AASHTO T-99) MAXIMUM DRYDENSITY AT ±4% OPTIMUM MOISTURE CONTENT.
\\192.168.253.15\PROJECT$\HELENADATA\DEQ\BALD BUTTE - GREAT DIVIDE\CONSTRUCTION\DRAWINGS\AS-BUILT\SHEET SET - GREAT DIVIDE\GD-F-CO-PLP-006-11.DWG4/2/2013 4:37:18 PM
DRAWN BY:
DESIGNED BY:
CHECKED BY:
APPROVED BY:
PROJECT NO:
DATE:
DISPLAYED AS:
COORD SYS/ZONE:
DATUM:
UNITS:
SOURCE:
DATE: BY: DESC:REVISION:
\\192.168.253.15\PROJECT$\HELENADATA\DEQ\BALD BUTTE - GREAT DIVIDE\CONSTRUCTION\DRAWINGS\AS-BUILT\SHEET SET - GREAT DIVIDE\GD-F-CO-PLP-006-11.DWG4/2/2013 4:37:18 PM
PAR
KIN
G L
OT
SE
XC
AV
AT
ION
PL
AN
AN
D D
ET
AIL
BL
M/D
EQ
-AM
LB
GR
EA
T D
IVID
E S
AN
D T
AIL
ING
SR
EC
LA
MA
TIO
N P
RO
JEC
T
04-05-2013
MSP
NAD83
FEET
PIONEER
CA/CR
JJM
MCB
TR
10162
HEL
ENA,
MT
5960
120
1 E.
BR
OAD
WAY
, SUI
TE C
(406
) 457
-825
2
2% MIN.
2% MIN.
2% MIN.
TIE TIED RECONSTRUCTED DITCH INTO EXISTING CULVERT INLET
TAILINGS EXCAVATIONBOUNDARY
RECONSTRUCTED UPPER RUN-OFF DITCH AND ROAD,SEE TYPICAL CROSS-SECTIONAND DETAIL
CONSTRUCTED UPPER ROAD SWALESEE DETAIL
RECONSTRUCT RECONSTRUCTED
EXISTINGUPPER HILL DITCH,
SEE DETAIL
NOTE:
1. SEE SHEETS GD-17 TO GD-19 FOR UTILITY RELOCATION AND REPLACEMENT.
RELOCATED 2400V MAIN(BY NORTHWESTERN ENERGY)
RELOCATED TELEPHONE LINE(BY QWEST)
\\192.168.253.15\PROJECT$\HELENADATA\DEQ\BALD BUTTE - GREAT DIVIDE\CONSTRUCTION\DRAWINGS\AS-BUILT\SHEET SET - GREAT DIVIDE\GD-F-CO-PLP-001-11.DWG4/2/2013 4:38:04 PM
DRAWN BY:
DESIGNED BY:
CHECKED BY:
APPROVED BY:
PROJECT NO:
DATE:
DISPLAYED AS:
COORD SYS/ZONE:
DATUM:
UNITS:
SOURCE:
DATE: BY: DESC:REVISION:
\\192.168.253.15\PROJECT$\HELENADATA\DEQ\BALD BUTTE - GREAT DIVIDE\CONSTRUCTION\DRAWINGS\AS-BUILT\SHEET SET - GREAT DIVIDE\GD-F-CO-PLP-001-11.DWG4/2/2013 4:38:04 PM
UPP
ER
RO
AD
AN
D R
UN
-OF
F D
ITC
HR
EC
ON
STR
UC
TIO
NPL
AN
AN
D P
RO
FIL
E
BL
M/D
EQ
-AM
LB
GR
EA
T D
IVID
E S
AN
D T
AIL
ING
SR
EC
LA
MA
TIO
N P
RO
JEC
T
04-05-2013
MSP
NAD83
FEET
PIONEER
CA/CR
JJM
MCB
TR
10162
HEL
ENA,
MT
5960
120
1 E.
BR
OAD
WAY
, SUI
TE C
(406
) 457
-825
2
ABANDONED ACCESS ROAD(BY SKI AREA OPERATOR)
APPROX. LOCATION OF RE-ROUTED ACCESS ROAD(BY SKI AREA OPERATOR)
TIE TIED RECONSTRUCTED DITCH INTOEXISTING CULVERT INLET
STA 1+71 TO 4+46 LOWER ROAD,SEE TYPICAL LOWER ROAD INSLOPE DETAIL ANDRIPRAP DITCH DETAILS
SKI LODGE
TAILINGS EXCAVATION BOUNDARY
EXISTING GROUNDPROFILE
UPPERPARKING LOT
STA 0+07 TO 1+71TYPE I RIPRAP RUN-OFF DITCH,SEE DETAIL
\\192.168.253.15\PROJECT$\HELENADATA\DEQ\BALD BUTTE - GREAT DIVIDE\CONSTRUCTION\DRAWINGS\AS-BUILT\SHEET SET - GREAT DIVIDE\GD-F-CO-PLP-003-11.DWG4/2/2013 4:38:26 PM
DRAWN BY:
DESIGNED BY:
CHECKED BY:
APPROVED BY:
PROJECT NO:
DATE:
DISPLAYED AS:
COORD SYS/ZONE:
DATUM:
UNITS:
SOURCE:
DATE: BY: DESC:REVISION:
\\192.168.253.15\PROJECT$\HELENADATA\DEQ\BALD BUTTE - GREAT DIVIDE\CONSTRUCTION\DRAWINGS\AS-BUILT\SHEET SET - GREAT DIVIDE\GD-F-CO-PLP-003-11.DWG4/2/2013 4:38:26 PM
LO
WE
R R
OA
DA
ND
RU
N-O
FF
DIT
CH
RE
CO
NST
RU
CT
ION
PLA
N A
ND
PR
OF
ILE
BL
M/D
EQ
-AM
LB
GR
EA
T D
IVID
E S
AN
D T
AIL
ING
SR
EC
LA
MA
TIO
N P
RO
JEC
T
04-05-2013
MSP
NAD83
FEET
PIONEER
CA/CR
JJM
MCB
TR
10162
HEL
ENA,
MT
5960
120
1 E.
BR
OAD
WAY
, SUI
TE C
(406
) 457
-825
2
MIDDLE DITCH,SEE DETAIL
PROPOSED TAILINGSEXCAVATION LIMITFINISHED GROUND
INVERT PROFILE OF DITCH
CONSTRUCTED ENERGY DISSIPATOR,SEE DETAIL
TAILINGS EXCAVATIONBOUNDARY
EXISTING DRAINAGEDITCH
EXISTING CULVERT(BURIED)
NOTE:
1. SEE SHEETS GD-17 TO GD-19 FOR UTILITYRELOCATION AND REPLACEMENT.
\\192.168.253.15\PROJECT$\HELENADATA\DEQ\BALD BUTTE - GREAT DIVIDE\CONSTRUCTION\DRAWINGS\AS-BUILT\SHEET SET - GREAT DIVIDE\GD-F-CO-PLP-002-11.DWG4/2/2013 4:38:53 PM
DRAWN BY:
DESIGNED BY:
CHECKED BY:
APPROVED BY:
PROJECT NO:
DATE:
DISPLAYED AS:
COORD SYS/ZONE:
DATUM:
UNITS:
SOURCE:
DATE: BY: DESC:REVISION:
\\192.168.253.15\PROJECT$\HELENADATA\DEQ\BALD BUTTE - GREAT DIVIDE\CONSTRUCTION\DRAWINGS\AS-BUILT\SHEET SET - GREAT DIVIDE\GD-F-CO-PLP-002-11.DWG4/2/2013 4:38:53 PM
MID
DL
E D
ITC
HC
ON
STR
UC
TIO
NPL
AN
AN
D P
RO
FIL
E
BL
M/D
EQ
-AM
LB
GR
EA
T D
IVID
E S
AN
D T
AIL
ING
SR
EC
LA
MA
TIO
N P
RO
JEC
T
04-05-2013
MSP
NAD83
FEET
PIONEER
CA/CR
JJM
MCB
TR
10162
HEL
ENA,
MT
5960
120
1 E.
BR
OAD
WAY
, SUI
TE C
(406
) 457
-825
2
EXTENDED EXISTING GABIONDITCH WITH 64 LF TYPE IIGROUTED RIPRAP DITCH.
61806180
6170
61606160
61506150
61406140
61306130
6120
61106110
6100
6090
60806080
6070
60606060
60506050
60406040
60306030
60206020
6010
6000
5990
5980
5980
5970
5960
5950
5940
5930
5920
5910
5910
6090
6080
60706070
60606060
60506050
60406030
6030 6020
6010
6000
6000
5990
5980 5970
597059605960
5950
5950
5940
5930
5920
59
20
5910
5910
5900
5900
5890
5880
5870
5870
5860
5860 5850
5860
ROCKWALL
SKI LODGE
MIDDLE DITCH,SEE SHEET GD-15
BACKFILLED ADIT
BACKFILLED ADIT
UPPER DITCH,SEE SHEET GD-13
UPPER ROAD,SEE SHEET GD-13
UPPER HILL DITCH
UPPER ROAD SWALE,SEE DETAIL
ENERGY DISSIPATOR,SEE DETAIL
PARKING LOT,SEE SHEET GD-12
SKI TOWER #6,SEE SHEET GD-D2
LOWER ROAD, SEE SHEET GD-14
LOWER DITCH,SEE SHEET GD-14
SKI TOWER #5,SEE SHEET GD-D1
18" EXISTING CULVERT
LEGEND
RIPRAP LINED DITCHES
COMPACTED DIRT ROAD SURFACE
12" COVER SOIL WITH EROSION CONTROL MAT
ROADWAY CRUSHED TOP SURFACING MATERIAL
NOTE: FERTILIZE AND SEED COVER SOIL AREAS AND GRASS LINEDDITCHES PRIOR TO PLACING EROSION CONTROL MAT.
\\192.168.253.15\PROJECT$\HELENADATA\DEQ\BALD BUTTE - GREAT DIVIDE\CONSTRUCTION\DRAWINGS\AS-BUILT\SHEET SET - GREAT DIVIDE\GD-F-CO-PLN-002-11.DWG4/2/2013 4:39:12 PM
DRAWN BY:
DESIGNED BY:
CHECKED BY:
APPROVED BY:
PROJECT NO:
DATE:
DISPLAYED AS:
COORD SYS/ZONE:
DATUM:
UNITS:
SOURCE:
DATE: BY: DESC:REVISION:
\\192.168.253.15\PROJECT$\HELENADATA\DEQ\BALD BUTTE - GREAT DIVIDE\CONSTRUCTION\DRAWINGS\AS-BUILT\SHEET SET - GREAT DIVIDE\GD-F-CO-PLN-002-11.DWG4/2/2013 4:39:12 PM
CO
VE
R S
OIL
INST
AL
LA
TIO
NPL
AN
BL
M/D
EQ
-AM
LB
GR
EA
T D
IVID
E S
AN
D T
AIL
ING
SR
EC
LA
MA
TIO
N P
RO
JEC
T
04-05-2013
MSP
NAD83
FEET
PIONEER
CA/CR
JJM
MCB
TR
10162
HEL
ENA,
MT
5960
120
1 E.
BR
OAD
WAY
, SUI
TE C
(406
) 457
-825
2
\\192.168.253.15\PROJECT$\HELENADATA\DEQ\BALD BUTTE - GREAT DIVIDE\CONSTRUCTION\DRAWINGS\AS-BUILT\SHEET SET - GREAT DIVIDE\GD-F-CO-PLP-005-11.DWG4/2/2013 4:40:27 PM
DRAWN BY:
DESIGNED BY:
CHECKED BY:
APPROVED BY:
PROJECT NO:
DATE:
DISPLAYED AS:
COORD SYS/ZONE:
DATUM:
UNITS:
SOURCE:
DATE: BY: DESC:REVISION:
\\192.168.253.15\PROJECT$\HELENADATA\DEQ\BALD BUTTE - GREAT DIVIDE\CONSTRUCTION\DRAWINGS\AS-BUILT\SHEET SET - GREAT DIVIDE\GD-F-CO-PLP-005-11.DWG4/2/2013 4:40:27 PM
SNO
W P
RO
DU
CT
ION
WA
TE
R L
INE
PLA
N A
ND
PR
OF
ILE
BL
M/D
EQ
-AM
LB
GR
EA
T D
IVID
E S
AN
D T
AIL
ING
SR
EC
LA
MA
TIO
N P
RO
JEC
T
04-05-2013
MSP
NAD83
FEET
PIONEER
CA/CR
JJM
MCB
TR
10162
HEL
ENA,
MT
5960
120
1 E.
BR
OAD
WAY
, SUI
TE C
(406
) 457
-825
2
SKI LODGE
TELEPHONE LINE, COORDINATE COORDINATED W/QWEST COMMUNICATIONSTO RELOCATE. SEE SPECIALPROVISIONS AND SHEET GD-19
MEADOW MOUNTAINSKI CHAIR LIFT
REMOVE REMOVED LIGHT POLE, FIXTURE, CONDUITAND CONDUCTORS AND SALVAGE SALVAGED TO OWNER.
#3 SNOW PRODUCTION POWER PEDESTAL.REMOVE & SALVAGE REMOVED AND SALVAGEDTO OWNER.
2" HYDRANT
WATER LINE,SEE SHEET GD-17
ADIT
2" HYDRANT
REMOVE REMOVED LIGHT POLE, FIXTURE, CONDUIT AND CONDUCTORSAND SALVAGE SALVAGED TO OWNER.
LIGHTPOLE
TELEPHONEPEDESTAL
STORAGE SHEDAND POWER
DISTRIBUTION
TOWER COMMUNICATIONS LINE,REMOVE REMOVED LINE BETWEEN TOWER
#4 #3 AND 133 FEET BELOWTOWER #7. SALVAGE SALVAGED
CONDUCTORS TO OWNER
REMOVE REMOVED LIGHT POLE, FIXTURE,CONDUIT AND CONDUCTORS ANDSALVAGE SALVAGED TO OWNER.
LIGHT POLE
2400V MAIN, COORDINATE COORDINATED W/NORTHWESTERN ENERGYTO RELOCATE. SEE SPECIALPROVISIONS AND SHEET GD-19
TOWER #5
TOWER #6
TOWER #4
TOWER #32" HYDRANT
#2 SNOW PRODUCTIONPOWER PEDESTAL
LIGHT POLE
ADIT
MOUNT BELMONTSKI CHAIR LIFT
SKI MAINTENANCE SHOP
#4 SNOW PRODUCTIONPOWER PEDESTAL. REMOVE REMOVEDAND SALVAGE SALVAGED TO OWNER.REMOVE REMOVED ELECTRICAL FEED BACKTO POWER PANEL IN STORAGE SHED.SALVAGE SALVAGED CONDUCTORS TO OWNER
REMOVE REMOVED LIGHTING CIRCUITELECTRICAL FEED BACK TOFIRST LIGHT POLE BEYONDEXCAVATION BOUNDARY.SALVAGE SALVAGED CONDUCTORS TO OWNER
DISCONNECT DISCONNECTED AND REMOVEREMOVED ELECTRICAL FEED TO TOWER#5 AND UPHILL LIGHT POLE,SALVAGE SALVAGED CONDUCTORS TO OWNER
EXCAVATION BOUNDARY
TOWER #7
TELEPHONEPEDESTAL
1 Engineering Place
Helena, MT 59602
Phone: (406) 442-3050
Fax: (406) 442-7862
COPYRIGHT MORRISON-MAIERLE, INC., 2013
PREPARED BY:
\\192.168.253.15\PROJECT$\HELENADATA\DEQ\BALD BUTTE - GREAT DIVIDE\CONSTRUCTION\DRAWINGS\AS-BUILT\SHEET SET - GREAT DIVIDE\GDMM-F-CO-PLN-002-11.DWG4/2/2013 4:41:21 PM
DRAWN BY:
DESIGNED BY:
CHECKED BY:
APPROVED BY:
PROJECT NO:
DATE:
DISPLAYED AS:
COORD SYS/ZONE:
DATUM:
UNITS:
SOURCE:
DATE: BY: DESC:REVISION:
\\192.168.253.15\PROJECT$\HELENADATA\DEQ\BALD BUTTE - GREAT DIVIDE\CONSTRUCTION\DRAWINGS\AS-BUILT\SHEET SET - GREAT DIVIDE\GDMM-F-CO-PLN-002-11.DWG4/2/2013 4:41:21 PM
EL
EC
TR
IAC
L D
EM
OSI
TE
PL
AN
BL
M/D
EQ
-AM
LB
GR
EA
T D
IVID
E S
AN
D T
AIL
ING
SR
EC
LA
MA
TIO
N P
RO
JEC
T
04-05-2013
MSP
NAD83
FEET
PIONEER
CA/CR
JJM
MCB
TR
10162
HEL
ENA,
MT
5960
120
1 E.
BR
OAD
WAY
, SUI
TE C
(406
) 457
-825
2
SKI LODGE
MEADOW MOUNTAINSKI CHAIR LIFT
#3 SNOW PRODUCTION POWER PEDESTAL.LOCATE IN PREVIOUS LOCATION PER OWNERSLOCATED PER SKI AREA OPERATOR'S DIRECTION.PROVIDE PROVIDED SNOW MAKERS, INC. 60A,3-POLE, 480VAC PEDESTAL WITH CIRCUIT BREAKERAND HUBBLE RECEPTACLE. CONTACT SMI AT 800-248-6600.
EXISTING LIGHT POLE,INSTALL INSTALLED
JUNCTION BOX ATBOTTOM OF POLE FOR
FEED TO DOWNHILLLIGHT POLES
SEE DETAIL .
TELEPHONEPEDESTAL
STORAGE SHEDAND POWER
DISTRIBUTION
TOWER COMMUNICATIONS LINE, CONTRACTOR TO PROVIDE PROVIDED ANDINSTALL INSTALLED CABLE, AND CONDUIT SWEEPS INTO JUNCTION BOXES AT
EACH TOWER, SEE DETAIL .
CABLE IS 18 25 PAIR, CORRUGATED COPPER SHIELD, DIRECT BURIALCOMMUNICATIONS CABLE, BELDEN #603569 OR EQUAL
GENERAL CABLE #7528789.
LIGHT POLE
RELOCATED(BY NORTHWESTERN ENERGY)2400V MAIN,SEE TRENCH DETAIL
TOWER #5
TOWER #6
TOWER #4
TOWER #32" HYDRANT
#2 SNOW PRODUCTIONPOWER PEDESTAL
EXISTING LIGHT POLE,INSTALL INSTALLED JUNCTION BOX ATBOTTOM OF POLE FORFEED TO TOWER #5 AND UPHILLLIGHT, SEE DETAIL .
MOUNT BELMONTSKI CHAIR LIFT
TOWER #7
LIGHT POLE WITH (2) FIXTURES,LOCATE IN PREVIOUS LOCATIONLOCATED PER SKI AREA OPERATOR'S DIRECTIONWITH FIXTURES AND JUNCTION BOXFACING DOWNHILL PER OWNERSSKI AREA OPERATOR'SDIRECTION. INSTALL INSTALLED JUNCTION BOXAT BOTTOM OF POLE,SEE DETAIL
USE USED EXISTINGCONDUIT TO FUSED
DISCONNECT SWITCH
TRENCH SECTION(TYP OF ALL)
LIGHTING FEED,ALUMINUM, 600V,
2 #2, 1 #4 GND,DIRECT BURIALTRIPLEX CABLE
LIGHTING FEED,ALUMINUM, 600V,
2 #2, 1 #4 GND,DIRECT BURIALTRIPLEX CABLE
SNOW PRODUCTION FEED, ALUMINUM, 600V,3 #4/0, 1 #2/0 GND, DIRECT BURIAL
QUADRUPLEX CABLE FROM POWERDISTRIBUTION PANEL IN STORAGE SHED.
CONNECT CONNECTED TO EXISTING 100ACIRCUIT BREAKER
INSTALLEDWATER LINE,SEE SHEET GD-17
INSTALLED JUNCTION BOX ATBOTTOM OF EXISTING LIGHT POLE
TO SPLICE NEW COMMUNICATIONSLINE TO EXISTING LINE.
RE-ROUTED EXISTINGCOMMUNICATION LINE
TO LIGHT POLE
LIGHT POLE WITH (2) FIXTURES, LOCATE IN PREVIOUS LOCATIONLOCATED PER SKI AREA OPERATOR'S DIRECTIONWITH FIXTURES AND JUNCTION BOX FACING DOWNHILL PER OWNERSSKI AREA OPERATOR'S DIRECTION. INSTALL INSTALLED JUNCTION BOXAT BOTTOM OF POLE,SEE DETAIL
LIGHT POLE WITH (2) FIXTURES,LOCATE IN PREVIOUS LOCATIONLOCATED PER SKI AREA OPERATOR'S DIRECTIONWITH FIXTURES AND JUNCTION BOXFACING DOWNHILL PER OWNERSSKI AREA OPERATOR'SDIRECTION. INSTALL INSTALLED JUNCTION BOXAT BOTTOM OF POLE,SEE DETAIL
#4 SNOW PRODUCTION POWER PEDESTAL.LOCATE IN PREVIOUS LOCATION PER OWNERSLOCATED PER SKI AREA OPERATOR'S DIRECTION.PROVIDE PROVIDED SNOW MAKERS, INC. 60A,3-POLE, 480VAC PEDESTAL WITH CIRCUIT BREAKERAND HUBBLE RECEPTACLE. CONTACT SMI AT 800-248-6600.
INSTALLED ADDITIONAL #3A SNOW PRODUCTION POWER PEDESTAL.AS REQUESTED AND SUPPLIED BY SKI AREA OPERATOR. SNOW MAKERS, INC. 60A, 3-POLE, 480VAC PEDESTAL WITH CIRCUITBREAKER AND HUBBLE RECEPTACLE.
RELOCATED TELEPHONE LINE(BY QUEST).
1 Engineering Place
Helena, MT 59602
Phone: (406) 442-3050
Fax: (406) 442-7862
COPYRIGHT MORRISON-MAIERLE, INC., 2013
PREPARED BY:
\\192.168.253.15\PROJECT$\HELENADATA\DEQ\BALD BUTTE - GREAT DIVIDE\CONSTRUCTION\DRAWINGS\AS-BUILT\SHEET SET - GREAT DIVIDE\GDMM-F-CO-PLN-001-11.DWG4/2/2013 4:41:57 PM
DRAWN BY:
DESIGNED BY:
CHECKED BY:
APPROVED BY:
PROJECT NO:
DATE:
DISPLAYED AS:
COORD SYS/ZONE:
DATUM:
UNITS:
SOURCE:
DATE: BY: DESC:REVISION:
\\192.168.253.15\PROJECT$\HELENADATA\DEQ\BALD BUTTE - GREAT DIVIDE\CONSTRUCTION\DRAWINGS\AS-BUILT\SHEET SET - GREAT DIVIDE\GDMM-F-CO-PLN-001-11.DWG4/2/2013 4:41:57 PM
EL
EC
TR
ICA
L S
ITE
PLA
N
BL
M/D
EQ
-AM
LB
GR
EA
T D
IVID
E S
AN
D T
AIL
ING
SR
EC
LA
MA
TIO
N P
RO
JEC
T
04-05-2013
MSP
NAD83
FEET
PIONEER
CA/CR
JJM
MCB
TR
10162
HEL
ENA,
MT
5960
120
1 E.
BR
OAD
WAY
, SUI
TE C
(406
) 457
-825
2
TOWER 5SECTION A-A
TOWER 5SECTION B-B
EXISTING GROUND
PROPOSED TAILINGSEXCAVATION LIMIT
COMPACTED ENGINEEREDSTRUCTURAL BACKFILLSEE SPECIAL PROVISIONS
EXISTING FOUNDATION
12"
6" PER ANSI B77.1-2006SECTION 4.1.1.6.2 FOR AERIAL CONVEYANCES
AND SKI LIFTS
13
2%
EXISTING GROUND
12"
6" PER ANSI B77.1-2006SECTION 4.1.1.6.2 FOR AERIAL CONVEYANCES
AND SKI LIFTS
COMPACTED ENGINEEREDSTRUCTURAL BACKFILLSEE SPECIAL PROVISIONS
EXISTING FOUNDATION
PROPOSED TAILINGSEXCAVATION LIMIT
NATIVE SOIL
NATIVE SOIL
13
2%
12' COVER SOIL
12" COVER SOIL
SEE NOTE 1
EXCAVATED 27" (WEST FOOTING)EXCAVATED 34" (EAST FOOTING)
EXCAVATED 21" (WEST FOOTING)EXCAVATED 27" (EAST FOOTING)
EXCAVATED 21"-27"ALONG WEST FOOTING
EXCAVATED 27"-34"ALONG EAST FOOTING
7+00
NOTE:1. SEE SHEETS GD-18 AND GD-19 FORUTILITY RELOCATION AND REPLACEMENT
AA
BB
SCALE: 1"=20'
NOTES:1. AREA BETWEEN FOUNDATION WALLS SHALL BE EXCAVATED AND BACKFILLED BY HAND.
\\192.168.253.15\PROJECT$\HELENADATA\DEQ\BALD BUTTE - GREAT DIVIDE\CONSTRUCTION\DRAWINGS\AS-BUILT\SHEET SET - GREAT DIVIDE\GD-F-CO-DET-007-11.DWG4/2/2013 4:42:28 PM
DRAWN BY:
DESIGNED BY:
CHECKED BY:
APPROVED BY:
PROJECT NO:
DATE:
DISPLAYED AS:
COORD SYS/ZONE:
DATUM:
UNITS:
SOURCE:
DATE: BY: DESC:REVISION:
\\192.168.253.15\PROJECT$\HELENADATA\DEQ\BALD BUTTE - GREAT DIVIDE\CONSTRUCTION\DRAWINGS\AS-BUILT\SHEET SET - GREAT DIVIDE\GD-F-CO-DET-007-11.DWG4/2/2013 4:42:28 PM
TO
WE
R 5
EX
CA
VA
TIO
N A
ND
BA
CK
FIL
L S
EC
TIO
NS
BL
M/D
EQ
-AM
LB
GR
EA
T D
IVID
E S
AN
D T
AIL
ING
SR
EC
LA
MA
TIO
N P
RO
JEC
T
04-05-2013
MSP
NAD83
FEET
PIONEER
CA/CR
JJM
MCB
TR
10162
HEL
ENA,
MT
5960
120
1 E.
BR
OAD
WAY
, SUI
TE C
(406
) 457
-825
2
TOWER 6SECTION A-A
TOWER 6SECTION B-B
12"
6" PER ANSI B77.1-2006SECTION 4.1.1.6.2 FOR AERIAL CONVEYANCES
AND SKI LIFTS
12"
6" PER ANSI B77.1-2006SECTION 4.1.1.6.2 FOR AERIAL CONVEYANCES
AND SKI LIFTS
EXISTING FOUNDATION
EXISTING FOUNDATION
EXISTING GROUND
EXISTING GROUND
COMPACTED ENGINEEREDSTRUCTURAL BACKFILL,
SEE SPECIAL PROVISIONS
PROPOSED TAILINGSEXCAVATION LIMIT
COMPACTED ENGINEEREDSTRUCTURAL BACKFILL,SEE SPECIAL PROVISIONS
PROPOSED TAILINGSEXCAVATION LIMIT
NATIVE SOIL
NATIVE SOIL
13
2%
13
2%12" COVER SOIL
12" COVER SOIL
SEE NOTE 1
EXCAVATED 14" (WEST FOOTING)EXCAVATED 26" (EAST FOOTING)
EXCAVATED 14"ALONG WEST FOOTING
EXCAVATED 26"ALONG EAST FOOTING
NOTE:1. SEE SHEETS GD-18 AND GD-19 FORUTILITY RELOCATION AND REPLACEMENT
AA
BB
SCALE: 1"=20'
NOTES:1. AREA BETWEEN FOUNDATION WALLS SHALL BE EXCAVATED AND BACKFILLED BY HAND.
\\192.168.253.15\PROJECT$\HELENADATA\DEQ\BALD BUTTE - GREAT DIVIDE\CONSTRUCTION\DRAWINGS\AS-BUILT\SHEET SET - GREAT DIVIDE\GD-F-CO-DET-008-11.DWG4/2/2013 4:42:49 PM
DRAWN BY:
DESIGNED BY:
CHECKED BY:
APPROVED BY:
PROJECT NO:
DATE:
DISPLAYED AS:
COORD SYS/ZONE:
DATUM:
UNITS:
SOURCE:
DATE: BY: DESC:REVISION:
\\192.168.253.15\PROJECT$\HELENADATA\DEQ\BALD BUTTE - GREAT DIVIDE\CONSTRUCTION\DRAWINGS\AS-BUILT\SHEET SET - GREAT DIVIDE\GD-F-CO-DET-008-11.DWG4/2/2013 4:42:49 PM
TO
WE
R 6
EX
CA
VA
TIO
N A
ND
BA
CK
FIL
L S
EC
TIO
NS
BL
M/D
EQ
-AM
LB
GR
EA
T D
IVID
E S
AN
D T
AIL
ING
SR
EC
LA
MA
TIO
N P
RO
JEC
T
04-05-2013
MSP
NAD83
FEET
PIONEER
CA/CR
JJM
MCB
TR
10162
HEL
ENA,
MT
5960
120
1 E.
BR
OAD
WAY
, SUI
TE C
(406
) 457
-825
2
INSLOPE -3% (TYP) VARIES
EXISTING GROUND
2:1 MAX
12' (MIN)
SEE NOTE 2
EXISTING GROUND
6" MIN. COMPACTEDCRUSHED TOP SURFACING
TYPICAL LOWER ROAD INSLOPE DETAILTYPE I RIPRAP LINED DITCH : STA 1+71 TO 2+10
STA 3+00 TO STA 4+46
TYPE I GROUTED RIPRAP LINED DITCH: STA 2+10 TO STA 3+00
N.T.S.
INSLOPE -3% (TYP)INSLOPE/OUTSLOPE VARIES
2H:1V MAX FILL SLOPE
12' (MIN)
EXISTING GROUND
TYPICAL UPPER ROAD AND DITCH INSLOPE DETAILTYPE I RIPRAP DITCH: STA 0+05 TO STA 1+50
STA 5+00 TO STA 6+92
GRASS LINED DITCH: STA 1+50 TO STA 5+00
N.T.S.
2:1 MAX
2' MIN
1' MIN
2:1 MAX
PROPOSED TAILINGSEXCAVATION LIMIT
RUN-OFF CONTROL DITCH TYPEWILL VARY ALONG UPPER ROAD , SEE SHEET GD-D5
CL
CL
2'
12" THICK TYPE I RIPRAP OR TYPE I GROUTED RIPRAP,SEE NOTE 1
12" COVER SOIL LAYER
PREPARED SUBGRADE,SEE NOTE 2 ANDSPECIAL PROVISIONS
SEE NOTE 2
2:1 MAX
NOTES:1. CONTRACTOR SHALL SHAPE AND SMOOTH SHAPEDAND SMOOTHED RIPRAP AS DIRECTED BY ENGINEERALONG LOWER ROAD FROM STA 1+71 TO 4+46.
2. COMPACT COMPACTED EXISTING SUBGRADE ANDSURFACE AGGREGATE TO 95% OF STANDARDPROCTOR (AASHTO T-99) MAXIMUM DRY DENSITY OF±4% MOISTURE.
\\192.168.253.15\PROJECT$\HELENADATA\DEQ\BALD BUTTE - GREAT DIVIDE\CONSTRUCTION\DRAWINGS\AS-BUILT\SHEET SET - GREAT DIVIDE\GD-F-CO-DET-005-11.DWG4/2/2013 4:43:11 PM
DRAWN BY:
DESIGNED BY:
CHECKED BY:
APPROVED BY:
PROJECT NO:
DATE:
DISPLAYED AS:
COORD SYS/ZONE:
DATUM:
UNITS:
SOURCE:
DATE: BY: DESC:REVISION:
\\192.168.253.15\PROJECT$\HELENADATA\DEQ\BALD BUTTE - GREAT DIVIDE\CONSTRUCTION\DRAWINGS\AS-BUILT\SHEET SET - GREAT DIVIDE\GD-F-CO-DET-005-11.DWG4/2/2013 4:43:11 PM
UPP
ER
AN
D L
OW
ER
RO
AD
TY
PIC
AL
CR
OSS
SE
CT
ION
S
BL
M/D
EQ
-AM
LB
GR
EA
T D
IVID
E S
AN
D T
AIL
ING
SR
EC
LA
MA
TIO
N P
RO
JEC
T
04-05-2013
MSP
NAD83
FEET
PIONEER
CA/CR
JJM
MCB
TR
10162
HEL
ENA,
MT
5960
120
1 E.
BR
OAD
WAY
, SUI
TE C
(406
) 457
-825
2
EXISTINGROAD
RUN-OFF CONTROL DITCH
RECONSTRUCTED UPPERROAD
RECONSTRUCT RECONSTRUCTED EXISTING UPPER HILL RUN-OFF CONTROLDITCH. REMOVE REMOVED EXISTING GRAVEL ANDREPLACE REPLACED WITH TYPE I RIPRAP.
ROAD STATION7+00
UPPER ROAD SWALEN.T.S. EXISTING ROAD
41
41
RECONSTRUCTED UPPERROAD
2' 1' MIN.
8' 4' APPROX.
12" THICK TYPE I RIPRAP,SEE SPECIAL PROVISIONS
A A'
B
B'
UPPER ROAD SWALE SECTION A-A'N.T.S.
EXISTING GROUND
EXISTING GROUND
UPPER ROAD SWALE SECTION B-B'N.T.S.
31
2'
20' 12' APPROX.
12" THICK TYPE I RIPRAP,SEE SPECIAL PROVISIONS
31
EXISTING UPPER HILL RUN-ONCONTROL DITCH
COMPACT COMPACTED SUBGRADE TO 95% MAXIMUMDRY DENSITY AT ±4% MOISTURE
COMPACT COMPACTED SUBGRADE TO 95% MAXIMUMDRY DENSITY AT ±4% MOISTURE
MATCH MATCHED RECONSTRUCTED ROAD GRADE
MATCH MATCHED EXISTING ROAD GRADE
\\192.168.253.15\PROJECT$\HELENADATA\DEQ\BALD BUTTE - GREAT DIVIDE\CONSTRUCTION\DRAWINGS\AS-BUILT\SHEET SET - GREAT DIVIDE\GD-F-CO-DET-006-11.DWG4/2/2013 4:43:28 PM
DRAWN BY:
DESIGNED BY:
CHECKED BY:
APPROVED BY:
PROJECT NO:
DATE:
DISPLAYED AS:
COORD SYS/ZONE:
DATUM:
UNITS:
SOURCE:
DATE: BY: DESC:REVISION:
\\192.168.253.15\PROJECT$\HELENADATA\DEQ\BALD BUTTE - GREAT DIVIDE\CONSTRUCTION\DRAWINGS\AS-BUILT\SHEET SET - GREAT DIVIDE\GD-F-CO-DET-006-11.DWG4/2/2013 4:43:28 PM
UPP
ER
RO
AD
SW
AL
ED
ET
AIL
AN
DC
RO
SS S
EC
TIO
NS
BL
M/D
EQ
-AM
LB
GR
EA
T D
IVID
E S
AN
D T
AIL
ING
SR
EC
LA
MA
TIO
N P
RO
JEC
T
04-05-2013
MSP
NAD83
FEET
PIONEER
CA/CR
JJM
MCB
TR
10162
HEL
ENA,
MT
5960
120
1 E.
BR
OAD
WAY
, SUI
TE C
(406
) 457
-825
2
2'
12 2
1
12" THICK TYPE I RIPRAP LINING, SEESPECIAL PROVISIONS
2'
1.0'1
2
21 12"
COVER SOIL
8" MIN GROUT
INSTALL EROSION CONTROL MAT,SEE DETAIL
1.0'
PREPARED SUBGRADE,SEE SPECIAL PROVISIONS2'
1.0'
12 2
1
12" THICK TYPE I RIPRAP LINING, SEESPECIAL PROVISIONS
TYPE I RIPRAP DITCH DETAILUPPER ROAD: STA 0+05 TO 1+50 STA 5+00 TO 6+92
UPPER HILL DITCH: STA 6+92 TO 8+36MIDDLE DITCH: STA 2+69 TO 5+79LOWER DITCH: STA 0+07 TO 1+71 LOWER ROAD: STA 1+71 TO 2+10 STA 3+00 TO 4+46
N.T.S.
PREPARED SUBGRADE,SEE SPECIAL PROVISIONS
TYPE I GROUTED RIPRAP DITCH DETAILLOWER ROAD: STA 2+10 TO 3+00
N.T.S.
GRASS LINED DITCH DETAIL UPPER ROAD: STA 1+50 TO STA 5+00
MIDDLE DITCH: STA 2+35 TO 5+20N.T.S.
2' MIN.
12 2
1
18" THICK TYPE II RIPRAP LINING,SEE SPECIAL PROVISIONS
12" MIN GROUT
PREPARED SUBGRADE,SEE SPECIAL PROVISIONS
18"
MIDDLE DITCH TYPE II GROUTED RIPRAP DETAIL STA 0+50 TO 2+69
N.T.S.
PREPARED SUBGRADE,SEE SPECIAL PROVISIONS
DITCH TYPE NOT USED
DITCH TYPE NOT USED
\\192.168.253.15\PROJECT$\HELENADATA\DEQ\BALD BUTTE - GREAT DIVIDE\CONSTRUCTION\DRAWINGS\AS-BUILT\SHEET SET - GREAT DIVIDE\GD-F-CO-DET-010-11.DWG4/2/2013 4:44:02 PM
DRAWN BY:
DESIGNED BY:
CHECKED BY:
APPROVED BY:
PROJECT NO:
DATE:
DISPLAYED AS:
COORD SYS/ZONE:
DATUM:
UNITS:
SOURCE:
DATE: BY: DESC:REVISION:
\\192.168.253.15\PROJECT$\HELENADATA\DEQ\BALD BUTTE - GREAT DIVIDE\CONSTRUCTION\DRAWINGS\AS-BUILT\SHEET SET - GREAT DIVIDE\GD-F-CO-DET-010-11.DWG4/2/2013 4:44:02 PM
RU
N-O
FF
CO
NT
RO
LD
ITC
H D
ET
AIL
S
BL
M/D
EQ
-AM
LB
GR
EA
T D
IVID
E S
AN
D T
AIL
ING
SR
EC
LA
MA
TIO
N P
RO
JEC
T
04-05-2013
MSP
NAD83
FEET
PIONEER
CA/CR
JJM
MCB
TR
10162
HEL
ENA,
MT
5960
120
1 E.
BR
OAD
WAY
, SUI
TE C
(406
) 457
-825
2
21 VARIES
1
MIN 1' DEPTH OVER TOP OF CULVERT
NATIVE GROUND
4" (MIN.)BEDDING MATERIAL
6" (MIN) BEDDING MATERIAL
SEE SCHEDULE THIS SHEETFOR CULVERT SIZE AND LENGTH.
NOTE:1. USED CULVERT TYPES AS DESIGNATED IN CULVERT SCHEDULE.2. INSTALLED CULVERT PER MANUFACTURER'S RECOMMENDATIONS.
18" TYPE 2 RIPRAP OUTLETAPRON, SEE DETAIL
18" TYPE 2 RIPRAPINLET APRON, SEE
DETAIL
1.5'
18" TYPE 2RIPRAPPREPARED
SUBGRADE
MATCHED WIDTHOF DOWNGRADIENTCHANNEL (3' MIN)
2:1
2:1
2:1
2:1
2
1
(TYP)
2% MINIMUM SLOPE
3'
TYPICAL CULVERT INSTALLATION DETAILN.T.S.
RIPRAP APRON FOR OUTLET WORKS DETAILN.T.S.
CULVERTOUTLET
SECTIONN.T.S.
FINAL ROAD SURFACE CONFIGURATION
2% SLOPE2% SLOPE
EXISTING GROUND
Culvert Schedule
Culvert No. Type Size (in.) Length* (ft.)
1 RCP ARCH 13x22 40
2 RCP ARCH 13x22 40
3 RCP ARCH 13x22 48
4 RCP ARCH 18x28 40
5 RCP ARCH 13x22 40
6 RCP ARCH 13x22 32
7 RCP ARCH 13x22 40
8 RCP ARCH 13x22 32
9 RCP ARCH 13x22 32
Total Length* = 344
* LENGTHS OF CULVERTS ARE ESTIMATED BASED ON EXISTING CONDITIONS AND MAY VARY VARIED ACCORDINGLYTO THE FINAL WIDTH AND SLOPE OF FINISHED ROAD. CONTRACTOR SHALL FIELD VERIFY VERIFIED LENGTHS PRIOR TOINSTALLATION
10'
MATCHED EXISTINGDITCH WIDTH
2:1
2:1
1' MIN.
2:1 2:1
3' MIN.
ROAD SHOULDER
EXISTING DITCH LINE
CULVERT INLET
EXISTING DITCH LINE18" TYPE 2 RIPRAP
EXISTING GROUND
INLET APRON DETAIL PLAN VIEWN.T.S.
INLET APRON DITCH PROFILE B-BN.T.S.
CULVERT INLET
10'
MATCHED WIDTH OFDOWNGRADIENT CHANNEL
(3' MIN)
CULVERT INSTALLATIONS COMPLETEDDURING 2012 CONSTRUCTION SEASON
48
48
48
40
40
224
DRAWN BY:
DESIGNED BY:
CHECKED BY:
APPROVED BY:
PROJECT NO:
DATE:
DISPLAYED AS:
COORD SYS/ZONE:
DATUM:
UNITS:
SOURCE:
DATE: BY: DESC:REVISION:
\\192.168.253.15\PROJECT$\HELENADATA\DEQ\BALD BUTTE - GREAT DIVIDE\CONSTRUCTION\DRAWINGS\AS-BUILT\SHEET SET - GREAT DIVIDE\GD-F-CO-DET-012-11.DWG4/2/2013 4:44:28 PM
CU
LV
ER
T A
ND
DR
AIN
AG
E D
ET
AIL
S
BL
M/D
EQ
-AM
LB
GR
EA
T D
IVID
E S
AN
D T
AIL
ING
SR
EC
LA
MA
TIO
N P
RO
JEC
T
04-05-2013
MSP
NAD83
FEET
PIONEER
CA/CR
JJM
MCB
TR
10162
HEL
ENA,
MT
5960
120
1 E.
BR
OAD
WAY
, SUI
TE C
(406
) 457
-825
2
\\192.168.253.15\PROJECT$\HELENADATA\DEQ\BALD BUTTE - GREAT DIVIDE\CONSTRUCTION\DRAWINGS\AS-BUILT\SHEET SET - GREAT DIVIDE\GD-F-CO-DET-009-11.DWG4/2/2013 4:44:41 PM
DRAWN BY:
DESIGNED BY:
CHECKED BY:
APPROVED BY:
PROJECT NO:
DATE:
DISPLAYED AS:
COORD SYS/ZONE:
DATUM:
UNITS:
SOURCE:
DATE: BY: DESC:REVISION:
\\192.168.253.15\PROJECT$\HELENADATA\DEQ\BALD BUTTE - GREAT DIVIDE\CONSTRUCTION\DRAWINGS\AS-BUILT\SHEET SET - GREAT DIVIDE\GD-F-CO-DET-009-11.DWG4/2/2013 4:44:41 PM
CA
TT
LE
GU
AR
DD
ET
AIL
S
BL
M/D
EQ
-AM
LB
GR
EA
T D
IVID
E S
AN
D T
AIL
ING
SR
EC
LA
MA
TIO
N P
RO
JEC
T
04-05-2013
MSP
NAD83
FEET
PIONEER
CA/CR
JJM
MCB
TR
10162
HEL
ENA,
MT
5960
120
1 E.
BR
OAD
WAY
, SUI
TE C
(406
) 457
-825
2
RIPRAP ENERGY DISSIPATOR DETAIL
43'
MIDDLEDITCH
MIDDLE DITCH
COMPACTED SUBGRADE,SEE SPECIAL PROVISIONS
PLAN VIEW
18" THICK TYPE II GROUTED RIPRAPSEE SPECIAL PROVISIONS
212
1
21'
12
31
31
COMPACTED SUBGRADE,SEE SPECIAL PROVISIONS
18" THICK TYPE II GROUTED RIPRAPSEE SPECIAL PROVISIONS
EXCAVATE, PLACE EXCAVATED AND PLACEDTYPE II GROUTED RIPRAPTO DIMENSIONS SHOWN INCROSS SECTIONS BELOW
1.5'
3
1
EXISTING CMP CULVERTFROM DRAINAGE DITCH
EXISTING GROUND
EXISTING 18" CMP CULVERTUNDER ROAD
FLOW
FLOW
EXISTING 18" CMP CULVERTUNDER ROAD
EXISTING CMP CULVERTFROM DRAINAGE DITCH
1.5'
SECTION A-AN.T.S
SECTION B-BN.T.S
EXISTING GROUND
A A
B
B
INSTALLED INLET GRATE ONEXISTING 18" CMP DROPTO CULVERT
FRENCH DRAIN FOUNDIN PLACE OF EXISTINGCULVERT.CONSTRUCTED TYPE IIGROUTED RIPRAP DITCHTO END OF EXISTINGGABION DITCH.
EXISTING DROP INLET FROM FRENCH DRAIN
7'
\\192.168.253.15\PROJECT$\HELENADATA\DEQ\BALD BUTTE - GREAT DIVIDE\CONSTRUCTION\DRAWINGS\AS-BUILT\SHEET SET - GREAT DIVIDE\GD-F-CO-DET-004-11.DWG4/2/2013 4:44:53 PM
DRAWN BY:
DESIGNED BY:
CHECKED BY:
APPROVED BY:
PROJECT NO:
DATE:
DISPLAYED AS:
COORD SYS/ZONE:
DATUM:
UNITS:
SOURCE:
DATE: BY: DESC:REVISION:
\\192.168.253.15\PROJECT$\HELENADATA\DEQ\BALD BUTTE - GREAT DIVIDE\CONSTRUCTION\DRAWINGS\AS-BUILT\SHEET SET - GREAT DIVIDE\GD-F-CO-DET-004-11.DWG4/2/2013 4:44:53 PM
EN
ER
GY
DIS
SIPA
TO
RD
ET
AIL
S
BL
M/D
EQ
-AM
LB
GR
EA
T D
IVID
E S
AN
D T
AIL
ING
SR
EC
LA
MA
TIO
N P
RO
JEC
T
04-05-2013
MSP
NAD83
FEET
PIONEER
CA/CR
JJM
MCB
TR
10162
HEL
ENA,
MT
5960
120
1 E.
BR
OAD
WAY
, SUI
TE C
(406
) 457
-825
2
NATURAL GROUND
REGRADED GROUND SURFACE
COVER SOIL
FERTILIZED, SEEDED
6"
ANCHOR TRENCH
6"SIDE BY SIDE
OVERLAP DETAIL
BIODEGRADABLE STAKES
6"
SHINGLE STYLE
OVERLAP DETAIL
4'-0"
4'-0"
2'-0"
3'-0" 3'-0"
BIODEGRADABLE STAKE PATTERN DETAILTWO (2) BIODEGRADABLE STAKES PER SQUARE YARD
NATURAL GROUND
EROSION CONTROL MAT
BIODEGRADABLE STAKES
N.T.S.
1'-0"
6"
6"
STORM WATER FLOW DIRECTION
TYPE B GEOTEXTILE - EROSION CONTROL MAT INSTALLATION DETAIL
TYPE B GEOTEXTILE
1. OVERLAP ROLLS ON DOWNHILL SIDE ANDDOWNSTREAM DIRECTION AS REQUIREDBY SITE-SPECIFIC CONDITIONS AND ASDIRECTED BY THE ENGINEER.
6"
ANCHOR TRENCH
6"
\\192.168.253.15\PROJECT$\HELENADATA\DEQ\BALD BUTTE - GREAT DIVIDE\CONSTRUCTION\DRAWINGS\AS-BUILT\SHEET SET - GREAT DIVIDE\GD-F-CO-DET-011-11.DWG4/2/2013 4:45:06 PM
DRAWN BY:
DESIGNED BY:
CHECKED BY:
APPROVED BY:
PROJECT NO:
DATE:
DISPLAYED AS:
COORD SYS/ZONE:
DATUM:
UNITS:
SOURCE:
DATE: BY: DESC:REVISION:
\\192.168.253.15\PROJECT$\HELENADATA\DEQ\BALD BUTTE - GREAT DIVIDE\CONSTRUCTION\DRAWINGS\AS-BUILT\SHEET SET - GREAT DIVIDE\GD-F-CO-DET-011-11.DWG4/2/2013 4:45:06 PM
ER
OSI
ON
CO
NT
RO
LM
AT
DE
TA
ILS
BL
M/D
EQ
-AM
LB
GR
EA
T D
IVID
E S
AN
D T
AIL
ING
SR
EC
LA
MA
TIO
N P
RO
JEC
T
04-05-2013
MSP
NAD83
FEET
PIONEER
CA/CR
JJM
MCB
TR
10162
HEL
ENA,
MT
5960
120
1 E.
BR
OAD
WAY
, SUI
TE C
(406
) 457
-825
2
8" MIN
STEEL FENCE POSTS
SILT FENCE SECTION
2" X 2" X 14 GA WIREFABRIC OR EQUIVALENT
2.5'
6"
SILT FENCEMATERIAL
SEE NOTE 1
12"
SILT FENCE DETAIL
SILT FENCE MATERIAL. USE STAPLES ORWIRE RINGS TO ATTACH FABRIC TO WIRE.
2" X 2" X 14 GA WIREFABRIC OR EQUIVALENT
STEEL FENCE POSTS
6' MAX
5'
2.5'
2'
BURY BOTTOM OF FILTERMATERIAL IN 8" X 12" TRENCH
TOP OF FABRIC
NOTE:1. FOR SILT FENCE USE NORTH AMERICAN
GREEN C-125 MATERIAL (OR EQUIVALENT).2. FOR STRAW WATTLE USE AMERICAN
EXCELSIOR PREMIUM (OR EQUIVALENT).5'
2" MIN.4" MAX.
12" MIN. 34" X 34" WOOD STAKESMAX. 4' SPACING
STRAW WATTLES8" MIN. DIAMETER
FLOW
VERTICAL SPACINGMEASURED ALONG THE FACE
OF THE SLOPE VARIES BETWEEN 8' AND 20'
INSTALL STRAW WATTLES NEARSLOPE WHERE IT TRANSITIONSINTO A STEEPER SLOPE
INSTALL STRAW WATTLES ALONG A LEVEL CONTOUR.
STRAW WATTLES
4' MAX.
STRAW WATTLES (FIBER ROLLS) DETAILS
4' MAX.
4' MAX.
4' MAX.
N.T.S.
\\192.168.253.15\PROJECT$\HELENADATA\DEQ\BALD BUTTE - GREAT DIVIDE\CONSTRUCTION\DRAWINGS\AS-BUILT\SHEET SET - GREAT DIVIDE\GD-F-CO-DET-002-11.DWG4/2/2013 4:45:24 PM
DRAWN BY:
DESIGNED BY:
CHECKED BY:
APPROVED BY:
PROJECT NO:
DATE:
DISPLAYED AS:
COORD SYS/ZONE:
DATUM:
UNITS:
SOURCE:
DATE: BY: DESC:REVISION:
\\192.168.253.15\PROJECT$\HELENADATA\DEQ\BALD BUTTE - GREAT DIVIDE\CONSTRUCTION\DRAWINGS\AS-BUILT\SHEET SET - GREAT DIVIDE\GD-F-CO-DET-002-11.DWG4/2/2013 4:45:24 PM
GE
NE
RA
L B
MP
CO
NST
RU
CT
ION
DE
TA
ILS
BL
M/D
EQ
-AM
LB
GR
EA
T D
IVID
E S
AN
D T
AIL
ING
SR
EC
LA
MA
TIO
N P
RO
JEC
T
04-05-2013
MSP
NAD83
FEET
PIONEER
CA/CR
JJM
MCB
TR
10162
HEL
ENA,
MT
5960
120
1 E.
BR
OAD
WAY
, SUI
TE C
(406
) 457
-825
2
12" MIN.
VARIES,SEE TABLE
UTILITY LINE TRENCH DETAILN.T.S.
6" MIN.
GENERAL BACKFILL,SEE SPECIAL PROVISIONS AND NOTE 1
SELECT BACKFILL,SEE SPECIAL PROVISIONS AND NOTE 1
VARIESSEE
TABLE
UTILITY LINE
EXISTING GROUND
UTILITY TRENCH WIDTH LINE DEPTH
QWEST TELEPHONELINE 4" MIN. 30" MIN.
NORTHWESTERNPOWER LINE 30" MIN. 36" MIN./40" MAX
WATER LINE 30" MIN 36" MIN
LIGHTING FEEDSNOW MAKING FEED
TOWERCOMMUNICATIONS
4" MIN 24" MIN
NOTES:1. SELECT BACKFILL SHALL BE PLACED IN6" MAX. LIFTS. GENERAL BACKFILL SHALLBE PLACED IN 9" MAX. LIFTS. ALLBACKFILL SHALL BE COMPACTED TO A95% MINIMUM DRY DENSITY, AT ± 4%MOISTURE.
EXISTING GROUND
2"Ø X 90° ASTM CL2000 GALVANIZED THREADED ELBOW.POINT TOWARDS CENTERLINE OF GOOD LUCK SKI LIFT.
2"Ø STEEL ASTM A106 GRADE B SCH. 40GALVANIZED THREADED STAND PIPE.INSTALL PLUMB ALL DIRECTIONS
3' MIN.
SEE DETAIL FOR CONNECTION TOWATERLINE
HYDRANT INSTALLATION DETAILN.T.S.
2"Ø THREADED STANDPIPEFOR HYDRANT, SEE DETAIL
2"Øx45° ASTM CL2000 GALVANIZEDTHREADED ELBOW
2"Ø STEEL ASTM A106 GRADE BSCH. 40 GALVANIZED THREADED NIPPLE
2" ASTM A105 CL3000 THREADED OLET
WELD TO PIPE USING A METHOD CONFORMING TO ASME BOILERAND PRESSURE VESSEL CODE SECTION IX.
SEE NOTES 3 AND 5
4" STEEL WATER LINE,SEE DETAIL
±45°
HYDRANT CONNECTION DETAILN.T.S.
BUTT WELD WELDED USING A METHOD CONFORMING TOASME BOILER AND PRESSURE VESSEL CODE SECTION IXAND ASME B1625-1997-BUTT WELDING ENDS,SEE NOTES 1-5.
PIPE SUPPLIED WITH V-BEVEL PREPARATION ON PIPE ENDS BEFORE WELDING.BEVELED ENDS MUST CONFORM TO ASME B16.25 AND PREPARATION SHALL COMPLYCOMPLIED WITH ASME B31.3
4" STEEL PIPE,SEE NOTE 4
NOTES:1. NEW PIPE SHALL BE CONNECTED TO EXISTING PIPE AT LOWER AND UPPER END OF
INSTALLED RUN.
2. SPECIFIED PIPE GRADES SHALL BE MAINTAINED TO ELIMINATE LOW SPOTS IN THE INSTALLED PIPE RUN.
3. WELDING SHALL BE COMPLETED BY A WELDER CERTIFIED FOR 1G, 2G, 5G, AND6G POSITIONS.
4. ACCEPTABLE PIPE SHALL BE 4-INCH STEEL ASTM A106 GRADE B SCHEDULE 40 PIPE MUST BE APPROVED BY ENGINEER. PIPE MUST HAVE INSTALLED WITH A BITUMINOUS ASPHALT COATING MEETING ANSI-A21.4
5. WRAP WRAPPED ALL JOINTS WITH APPROVED BITUMINOUS PIPE WRAP IN ACCORDANCE WITH MANUFACTURER SPECIFICATIONS.
WELDED PIPE CONNECTION DETAIL
WARNING TAPE,SEE TECHNICAL SPECIFICATIONS
2"Ø STEEL ASTM A106 GRADE B SCH. 40GALVANIZED THREADED NIPPLE.
INSTALL QUICK DISCONNECT FITTINGAS SPECIFIED BY ENGINEER.
PRE-ASSEMBLED HYDRANTASSEMBLY SUPPLIED BY SKIAREA OPERATOR
4" STEEL WATER LINE,SEE DETAIL
WELD WELDED TO PIPE USING A METHODCONFORMING TO ASME BOILER
AND PRESSURE VESSEL CODE SECTION IX.SEE NOTES 3 AND 5
2" Ø THREADED STANDPIPEON HYDRANT ASSEMBLY
2" ASTM A105 CL3000THREADED OLET
\\192.168.253.15\PROJECT$\HELENADATA\DEQ\BALD BUTTE - GREAT DIVIDE\CONSTRUCTION\DRAWINGS\AS-BUILT\SHEET SET - GREAT DIVIDE\GD-F-CO-DET-001-11.DWG4/2/2013 4:45:31 PM
DRAWN BY:
DESIGNED BY:
CHECKED BY:
APPROVED BY:
PROJECT NO:
DATE:
DISPLAYED AS:
COORD SYS/ZONE:
DATUM:
UNITS:
SOURCE:
DATE: BY: DESC:REVISION:
\\192.168.253.15\PROJECT$\HELENADATA\DEQ\BALD BUTTE - GREAT DIVIDE\CONSTRUCTION\DRAWINGS\AS-BUILT\SHEET SET - GREAT DIVIDE\GD-F-CO-DET-001-11.DWG4/2/2013 4:45:31 PM
UT
ILIT
Y T
RIE
NC
HA
ND
WA
TE
RL
INE
DE
TA
ILS
BL
M/D
EQ
-AM
LB
GR
EA
T D
IVID
E S
AN
D T
AIL
ING
SR
EC
LA
MA
TIO
N P
RO
JEC
T
04-05-2013
MSP
NAD83
FEET
PIONEER
CA/CR
JJM
MCB
TR
10162
HEL
ENA,
MT
5960
120
1 E.
BR
OAD
WAY
, SUI
TE C
(406
) 457
-825
2
FINISHED GRADE
NEMA 4 CAST AL JUNCTION BOX, SIZED FOR NECFILL REQUIREMENTS. PLACE ON DOWNHILL SIDE OF POLE.NOTCH POLE TO PROVIDE A FLAT MOUNTING SURFACE FORTHE JUNCTION BOX. USE (2) 7
16" X 3" LAG SCREWS TO MOUNTBOX TO POLE.
(2 #2, 1 #4G, 1 14" C)TO FIXTURES
NEW 35' 30' CLASS 4 WOOD POLE,6' BURIAL DEPTH (TYP.)
DIRECT BURIALCABLE FROM
SOURCE ORPREVIOUS
LIGHT POLE
SECOND CONDUITIF REQUIRED
DIRECT BURIALCABLE TO NEXTLIGHT POLE
2'-0
"M
IN. B
URY
SEALING BUSHING(TYP)
114" SCH. 40 PVC
(TYP)
1 14" TWO HOLE CONDUIT STRAPS,MINERALLAC SERIES 200, ZINC
PLATED STEEL. USE 1 12" SCREWSMIN. SPACE EVERY 48" ABOVE
JUNCTION BOX UP TO WEATHERHEAD.
PROVIDE WEATHERPROOF SPLICESPROVIDE WEATHERHEAD
AT TOP OF CONDUIT
400W HPS FLOODLIGHT, 480VAC, 1Ø,DOUBLE FUSE, 2' PRE-WIRED SEO CORD
AND WOOD POLE BRACKET, LITHONIA P/NTFA-400S-TA-480-SCWA-DF-C22-FWPB-LPI
OR EQUAL (TYP.)
EXISTING CONCRETEFOUNDATION
DIRECT BURIALCABLE FROM
PREVIOUS TOWER
DIRECT BURIALCABLE TO NEXTTOWER
2'-0
"M
IN. B
URY
SEALING BUSHING(TYP)
EXISTING TOWERBRACE STRUCTURE
2" SCH. 40 PVC(TYP)
NEMA 4 CAST AL JUNCTION BOX,SIZED FOR NEC FILL REQUIREMENTS.
MOUNT MOUNTED ON INSIDE OF TOWER BRACE STRUCTURE.
USE USED REVERSIBLE WATER-PROOFCONNECTORS FOR EACH SPLICE.
BOND CABLE SHIELDS TOGETHER.
WEATHER-PROOF CORDGRIP SIZED FOR CABLE
SEALED WITH SILICONE.
EXISTING DE-ROPE SWITCH CABLE
LIGHT POLE JUNCTION BOX DETAIL
SCALE: N.T.S.
PREPARED BY:
TOWER COMMUNICATION LINE JUNCTION BOX DETAIL
SCALE: N.T.S.
\\192.168.253.15\PROJECT$\HELENADATA\DEQ\BALD BUTTE - GREAT DIVIDE\CONSTRUCTION\DRAWINGS\AS-BUILT\SHEET SET - GREAT DIVIDE\GDMM-F-CO-DET-001-11.DWG4/2/2013 4:45:44 PM
1 Engineering Place
Helena, MT 59602
Phone: (406) 442-3050
Fax: (406) 442-7862
COPYRIGHT MORRISON-MAIERLE, INC., 2013
DRAWN BY:
DESIGNED BY:
CHECKED BY:
APPROVED BY:
PROJECT NO:
DATE:
DISPLAYED AS:
COORD SYS/ZONE:
DATUM:
UNITS:
SOURCE:
DATE: BY: DESC:REVISION:
\\192.168.253.15\PROJECT$\HELENADATA\DEQ\BALD BUTTE - GREAT DIVIDE\CONSTRUCTION\DRAWINGS\AS-BUILT\SHEET SET - GREAT DIVIDE\GDMM-F-CO-DET-001-11.DWG4/2/2013 4:45:44 PM
EL
EC
TR
ICA
L D
ET
AIL
SB
LM
/DE
Q-A
ML
BG
RE
AT
DIV
IDE
SA
ND
TA
ILIN
GS
RE
CL
AM
AT
ION
PR
OJE
CT
04-05-2013
MSP
NAD83
FEET
PIONEER
CA/CR
JJM
MCB
TR
10162
HEL
ENA,
MT
5960
120
1 E.
BR
OAD
WAY
, SUI
TE C
(406
) 457
-825
2
GD2
GD3
GD4
GD6
GD1
GD5
BACKFILLED SUBSIDENCE ATBOTTOM OF FENCE WITHSURROUNDING MATERIAL.INSTALL 240 LF OF TOP RAILON EXISTING FENCE(COMPLETED IN 2012).
INSTALLED FOAM PLUG ANDBACKFILLED OPEN HOLE ATBOTTOM OF FENCE WITHSURROUNDING MATERIAL.INSTALL 600 LF OF TOP RAILON EXISTING FENCE. REPLACEDTWO POSTS(COMPLETED IN 2012).
BACKFILLED SUBSIDENCE WITHSURROUNDING MATERIAL.
BACKFILLED 5 TRENCHESWITH SURROUNDING MATERIAL.
PARTIALLY BACKFILLED SUBSIDENCEWITH IMPORTED MATERIAL.
INSTALLED FOAM PLUG ANDBACKFILLED OPEN HOLE WITHSURROUNDING MATERIAL.BACKFILLED 2 SUBSIDENCES WITHSURROUNDING MATERIAL.
DRAWN BY:
DESIGNED BY:
CHECKED BY:
APPROVED BY:
PROJECT NO:
DATE:
DISPLAYED AS:
COORD SYS/ZONE:
DATUM:
UNITS:
SOURCE:
DATE: BY: DESC:REVISION:
\\192.168.253.15\PROJECT$\HELENADATA\DEQ\BALD BUTTE - GREAT DIVIDE\CONSTRUCTION\DRAWINGS\AS-BUILT\SHEET SET - GREAT DIVIDE\GD-MC01&02.DWG4/2/2013 4:51:41 PM
GR
EA
T D
IVID
EM
INE
CO
LL
ASP
EF
EA
TU
RE
LO
CA
TIO
NS
BL
M/D
EQ
-AM
LB
GR
EA
T D
IVID
E S
AN
D T
AIL
ING
SR
EC
LA
MA
TIO
N P
RO
JEC
T
04-05-2013
MSP
NAD83
FEET
NAIP 2011
CR
DEQ
JJM
TR
10162
HEL
ENA,
MT
5960
120
1 E.
BR
OAD
WAY
, SUI
TE C
(406
) 457
-825
2
GD8
GD13
GD14
GD16
GD17
GD7
GD10
BACKFILLED TWO TRENCHESAND TWO SUBSIDENCES WITHSURROUNDING MATERIAL.
BACKFILLED SUBSIDENCEWITH SURROUNDING MATERIAL.
PARTIALLY BACKFILLED ONE SUBSIDENCEAND BACKFILLED ONE TRENCHWITH SURROUNDING MATERIAL. INSTALLED532 LF OF 8 FOOT CHAIN LINE FENCE AROUNDUPPER SUBSIDENCE.
INSTALLED 275 LF OF 8 FOOT CHAINLINK FENCE AROUND TWO SUBSIDENCES(COMPLETED IN 2012).
INSTALLED 500 LF OF 8 FOOT CHAINLINK FENCE AROUND OPEN HOLE/SUBSIDENCE.
INSTALLED 124 LF OF 8 FOOT CHAINLINK FENCE TO CLOSE GAP INEXISTING FENCE(COMPLETED IN 2012).
INSTALLED 200 LF OF 8 FOOT CHAINLINK FENCE AROUND OPEN HOLE.
DRAWN BY:
DESIGNED BY:
CHECKED BY:
APPROVED BY:
PROJECT NO:
DATE:
DISPLAYED AS:
COORD SYS/ZONE:
DATUM:
UNITS:
SOURCE:
DATE: BY: DESC:REVISION:
\\192.168.253.15\PROJECT$\HELENADATA\DEQ\BALD BUTTE - GREAT DIVIDE\CONSTRUCTION\DRAWINGS\AS-BUILT\SHEET SET - GREAT DIVIDE\GD-MC01&02.DWG4/2/2013 4:51:44 PM
GR
EA
T D
IVID
EM
INE
CO
LL
APS
EF
EA
TU
RE
LO
CA
TIO
NS
BL
M/D
EQ
-AM
LB
GR
EA
T D
IVID
E S
AN
D T
AIL
ING
SR
EC
LA
MA
TIO
N P
RO
JEC
T
04-05-2013
MSP
NAD83
FEET
NAIP 2011
CR
DEQ
JJM
TR
10162
HEL
ENA,
MT
5960
120
1 E.
BR
OAD
WAY
, SUI
TE C
(406
) 457
-825
2