A better railway for a better Britain
Great Western Route Modernisation
Andy Haynes Project Director – West of England Area
/ 15-Jun-15 2
Agenda
Electrification – project overview and benefits
Pre application process
Consents and communications
/
Pre application – next steps
• Complete design validation • Continued public engagement • LB applications – split into 4 categories:
• Parapets • Tunnels • Viaducts
• Stations
• LB applications can be subject to the Council’s scheme of delegation as normal and some or all may go to planning committee.
15-Jun-15 8
/ 15-Jun-15 9
Consents Bridges * excl Sydney Gardens LBC required PD rights
Hampton Mill Lane Yes
Meadow Lane Yes
Hampton Row footbridge No
Beckford Road (A36) Yes
Sydney Road (A36) Yes
Brougham Hayes No
Brook Road Yes
Bellotts Road Yes
Somerset & Dorset railway bridge No
Twerton Tunnels, short & long, Portals only Yes
Stoney Lane Yes
A4 Crosspost No
Saltford tunnel, Portals only Yes
Clay bridge Yes
Pixash Lane Yes
Park Cutting footbridge No
A4174 Ring Road No
/
Consents cont
15-Jun-15 10
Structure LBC required
PD rights
Sydney Gardens – Low balustrade wall, high balustrade wall, pedestrian overbridge, iron bridge, canal retaining wall
Yes
Sydney Wharf /Raby Villas Yes
Sydney Gardens East, parapet and tunnel portal Yes
Sydney Garden West, parapet and tunnel portal Yes
Stations and other elements LBC required
PD rights
Bath Spa Station Yes
Oldfield Park Station Yes
Keynsham Station No
Overhead Line Equipment (OLE) and associated works Yes
Power and distribution sites – Bathampton & Saltford
Yes (in current proposed locations)
/
Consents