Green building at ANU – A ‘warts and all’ assessment Warren Overton Manager, Energy and Sustainability Office Facilities and Services

Green building at ANU – A ‘warts and all’ assessment Warren Overton

  • Upload
    allan

  • View
    28

  • Download
    0

Embed Size (px)

DESCRIPTION

Green building at ANU – A ‘warts and all’ assessment Warren Overton Manager, Energy and Sustainability Office Facilities and Services. Content of Presentation. Construction at the ANU ESD Policy Development ESD Policy Implementation Building Fabric and Interior Comfort (HVAC) Lighting - PowerPoint PPT Presentation

Citation preview

Page 1: Green building at ANU – A ‘warts and all’ assessment Warren Overton

Green building at ANU – A ‘warts and all’ assessment

Warren OvertonManager, Energy and Sustainability Office

Facilities and Services

Page 2: Green building at ANU – A ‘warts and all’ assessment Warren Overton

Content of Presentation

Construction at the ANU ESD Policy Development ESD Policy Implementation Building Fabric and Interior Comfort (HVAC) Lighting Water Saving Materials and Waste Biodiversity Future Directions

Page 3: Green building at ANU – A ‘warts and all’ assessment Warren Overton

Construction at the ANU

Current period of increased construction activity

External design teams External project managers Internal stakeholder

comment on design Fixed budgets ‘Value Management’

Page 4: Green building at ANU – A ‘warts and all’ assessment Warren Overton

Recent ‘Green’ Buildings

Ian Ross Building – Natural ventilation (1999) NCEPH/CMHR Extensions – Natural ventilation (2003) Medical School – Hybrid (2003) Coombs Extension – Natural Ventilation (2004) JCSMR – ‘Adaptive’ Airconditioning (Construction) AITC – Hybrid (Design) Copland Extension – Hybrid (Design)

Page 5: Green building at ANU – A ‘warts and all’ assessment Warren Overton

ESD Policy development

Review of other standards – LEED, BREEAM, etc.

Simple Defensible – 10 yr payback Measurable Proven Stakeholder input High level endorsement Potential move to a

national rating system

Page 6: Green building at ANU – A ‘warts and all’ assessment Warren Overton

ESD Policy

Short & simple – 4 pages Specific requirements rather than a rating Uses adapted PCA energy guidelines Design teams are required to submit responses

against each criteria – submissions vary greatly in detail and quality

Page 7: Green building at ANU – A ‘warts and all’ assessment Warren Overton

ESD Policy implementation

Get involved early in the project

Become part of the design team

Agree on methods of assessment (payback, other lifecycle issues)

Follow up on project after completion - POE

Page 8: Green building at ANU – A ‘warts and all’ assessment Warren Overton

Building Fabric

Designed to provide a comfortable and productive workplace

Majority of energy use in ANU buildings is space conditioning

Space conditioning requirements are dictated by the building fabric

Policy to discourage air conditioning wherever possible whilst still maintaining comfort

Page 9: Green building at ANU – A ‘warts and all’ assessment Warren Overton

What is comfort?

Air temperature Radiant surfaces Air movement Humidity Glare Air quality Views Colour Noise User control

Comfort is different for everybody

Page 10: Green building at ANU – A ‘warts and all’ assessment Warren Overton

Designing for comfort

What metrics should we use?

ASHRAE and OH&S standards

Psychometric charts Predicted mean vote

(PMV) Explaining to the clients Measuring comfort Productivity benefits

10.0

15.0

20.0

25.0

30.0

35.0

40.0

18/0

2/04

00:

50

18/0

2/04

09:

50

18/0

2/04

18:

50

19/0

2/04

03:

50

19/0

2/04

12:

50

19/0

2/04

21:

50

20/0

2/04

06:

50

20/0

2/04

15:

50

21/0

2/04

00:

50

21/0

2/04

09:

50

21/0

2/04

18:

50

22/0

2/04

03:

50

22/0

2/04

12:

50

22/0

2/04

21:

50

23/0

2/04

06:

50

23/0

2/04

15:

50

24/0

2/04

00:

50

24/0

2/04

09:

50

24/0

2/04

18:

50

25/0

2/04

03:

50

25/0

2/04

12:

50

25/0

2/04

21:

50

Rm 115OutsideReception

Page 11: Green building at ANU – A ‘warts and all’ assessment Warren Overton

Natural Ventilation Systems

Perfect for the ACT climate Mass, mass, mass Demonstrated to work – most of

the time Require user interaction and or

BMS control A different kind of comfort No immediate, direct control Have yet to get one 100% Hybrid options

Page 12: Green building at ANU – A ‘warts and all’ assessment Warren Overton

User Reactions

Variable You only ever hear from those who are unhappy ‘First class citizens get air-conditioning’ ‘It is not my job to control the temperature’ ‘Why do we have to be the guinea pigs?’ ‘This is the best building I have ever worked in’

Page 13: Green building at ANU – A ‘warts and all’ assessment Warren Overton

Lighting

Maximising daylighting Photoelectric control Motion sensors T5 and electronic ballasts Single tube fittings Recycling fluorescent

tubes Contribution to passively

cooled buildings

Page 14: Green building at ANU – A ‘warts and all’ assessment Warren Overton

Water Saving

Drought & pricing has caught people’s attention

Waterless Urinals (UTS) 6 l/min showerheads Rainwater capture Process cooling Grey and Blackwater

capture- Living Machines Recycled effluent use on

ovals

Page 15: Green building at ANU – A ‘warts and all’ assessment Warren Overton

Materials and Waste

Demolition waste – 80% recycling target

Construction waste – much harder (training & policing)

Low VOC materials Recycled content materials How to specify Finding suppliers Lifecycle assessment Waste facilities in buildings

Page 16: Green building at ANU – A ‘warts and all’ assessment Warren Overton

Biodiversity

Biodiversity Survey to define ‘BMA’s

Explaining what biodiversity is and what value it has

Preservation of existing habitat

Using new landscape to create habitat

Encouraging aquatic habitats

Page 17: Green building at ANU – A ‘warts and all’ assessment Warren Overton

Future Directions

Revision of current guidelines – adoption of another standard such as Green Star

Assessment of projects undertaken to learn from our experiences – write case studies, POE

Improvement of internal processes to ensure involvement – design teams

Constant ongoing learning to improve our designs Shift the culture of users to embrace ‘green buildings’