Make 600mm dia and 3000mm long deep bore Insert the 3 m long earth-rod in the center of the deep bore. Make slurry of 3 kg of Curec+ and Water in 1:1 ratio. Pour this slurry into the deep bore. Make slurry of 5 kg Earthcon and Water in 1:1 ratio Pour this slurry into the deep bore. Step-1 Step-3 Step-4 Step-4 Fill remaining empty bore with agriculture soil Step-6 Make slurry of 12.5 kg Curecon and Water in 1:1 ratio Pour this slurry into the deep bore. Step-5 Make slurry of 5 kg Earthcon and Water in 1:1 ratio Pour this slurry into the deep bore. Step-4 Make slurry of 2.5 kg Curecon and water in 1:1 ratio Pour this slurry into the deep bore. Step-2 This Hi-tech earthing kit includes unique earth enhancing compounds & molecularly-bonded earth-rod. Each Kit Contains: 1. One bag of Curec+ earth enhancing compound in 3 kg packaging. 2. Three bags of Curecon in 5 kg packaging. 3 One earth-Rod 3 m long, 250 microns copper molecularly bonded over 17mm steel rod. * Slurry proportions should be maintained as indicated to get required results. * Curec+ and Curecon have to be properly mixed to create a homogeneous slurry before pouring the slurry. The earth-rod gathers fault energy from operating systems. Curec+ or equivalent artificial treatment compound as per IEEE 80:2000 (14.5d) collects the fault energy from the rod and transfers it to Curecon or equivalent compounds. The Curecon and equivalent compound then transfers the fault energy to the virgin soil effectively. TM TM The earth-rod gathers fault energy from operating systems. Curec+ or equivalent artificial treatment compound as per IEEE 80:2000 (14.5d) collects the fault energy from the rod and transfers it to Curecon or equivalent compounds. The Curecon and equivalent compound then transfers the fault energy to the virgin soil effectively. TM TM MANAV ENERGY PVT. LTD. Bangalore-560041, India. Contact no. +91 9611378007 www.manavenergy.com Technology Provider: MANAV ENERGY PVT. LTD. Fix the HDPVC Earth-pit cover (To Purchase locally) to the earth-rod and make required connections. Step-7 Fig-1 Curecon Curec+ Curecon GREEN EARTHING KIT Industrial purpose Contact: VIDIT ENTERPRISE 402, 4th Floor, Shivalik high Street, Vastrapur, AHMEDABAD, GUJARAT.PIN 380015 Contact no. - +91 79-26747767 / 94267-43382

GREEN EARTHING KIT - Kendriya bhandar - Gandhinagar ·  · 2017-07-03Permanent Earthing Solution as per IEEE 80 : 2000 clause 14.5(d) I Eco friendly, Non corrosive and Non leaching

Embed Size (px)

Citation preview

Make 600mm dia and 3000mm long deep bore

Insert the 3 m long earth-rod in the center ofthe deep bore.

Make slurry of 3 kg of Curec+ and Water in 1:1ratio. Pour this slurry into the deep bore.

Make slurry of 5 kg Earthcon and Water in 1:1ratio Pour this slurry into the deep bore.

Step-1

Step-3

Step-4

Step-4

Fill remaining empty bore with agriculture soilStep-6

Make slurry of 12.5 kg Curecon and Water in 1:1ratio Pour this slurry into the deep bore.

Step-5

Make slurry of 5 kg Earthcon and Water in 1:1ratio Pour this slurry into the deep bore.

Step-4Make slurry of 2.5 kg Curecon and water in 1:1

ratio Pour this slurry into the deep bore.

Step-2

This Hi-tech earthing kit includes unique earth enhancing compounds &molecularly-bonded earth-rod.

Each Kit Contains:

1. One bag of Curec+ earth enhancing compoundin 3 kg packaging.

2. Three bags of Curecon in 5 kg packaging.

3 One earth-Rod 3 m long, 250 microns coppermolecularly bonded over 17mm steel rod.

* Slurry proportions should be maintained asindicated to get required results.

* Curec+ and Curecon have to be properlymixed to create a homogeneous slurry before pouring the slurry.

The earth-rod gathers fault energy from operating systems.

Curec+ or equivalent artificial treatment compound as per

IEEE 80:2000 (14.5d) collects the fault energy from the

rod and transfers it to Curecon or equivalent compounds.

The Curecon and equivalent compound then transfers the

fault energy to the virgin soil effectively.

TM

TM

The earth-rod gathers fault energy from operating systems.

Curec+ or equivalent artificial treatment compound as per

IEEE 80:2000 (14.5d) collects the fault energy from the

rod and transfers it to Curecon or equivalent compounds.

The Curecon and equivalent compound then transfers the

fault energy to the virgin soil effectively.

TM

TM

MANAV ENERGY PVT. LTD.Bangalore-560041, India.Contact no. +91 9611378007 www.manavenergy.com

Technology Provider:

MANAV ENERGY PVT. LTD.

Fix the HDPVC Earth-pit cover (To Purchaselocally) to the earth-rod and make required

connections.

Step-7

Fig-1

Curecon

Curec+

Curecon

GREEN EARTHING KITIndustrial purpose

Contact:

VIDIT ENTERPRISE402, 4th Floor, Shivalik high Street, Vastrapur,AHMEDABAD, GUJARAT.PIN 380015Contact no. - +91 79-26747767 / 94267-43382

Permanent Earthing Solution as per IEEE 80 : 2000 clause 14.5(d)

I

Eco friendly, Non corrosive and Non leaching.

Designed to lower STEP & TOUCH Potentials during fault condition

mproves electrical conductivity of soil

Product Specification:

COPPER BONDED EARTH ROD

Permanent Earthing Solution as per IEEE 80 : 2000 clause 14.5(b).

I

Eco friendly & Non corrosive.

Transfers fault energy to virgin soil effectively.

Reduces pit resistance.

mproves electrical conductivity of soil when used with Curec+.

250 micron copper molecularly bonded over 17mm dia and 3 m long Steel rod.

CUREC+TM

CURECONTM

Note:- PVC earth chamber shown in the fig.-1 is not included in this kit.

GREEN EARTHING KITIndustrial purpose