40
Greening Rocket Town’s Downtown while Reducing Pollutants to the IRL

Greening Rocket Town’s Downtown · Minutemen Stormwater LID Improvement • capture rain where it falls • impervious surfaces • green space/infrastructure • discharge volume

  • Upload
    others

  • View
    6

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Greening Rocket Town’s Downtown · Minutemen Stormwater LID Improvement • capture rain where it falls • impervious surfaces • green space/infrastructure • discharge volume

Greening Rocket Town’s Downtown

while Reducing Pollutants to the IRL

Page 2: Greening Rocket Town’s Downtown · Minutemen Stormwater LID Improvement • capture rain where it falls • impervious surfaces • green space/infrastructure • discharge volume

Minutemen Stormwater LID Improvement

• capture rain where it falls

• impervious surfaces

• green space/infrastructure

• discharge volume to lagoon

• pollutant load to lagoon

• protect groundwater resources

• abate saltwater intrusion

• beautify a 1950 urban corridor

• sustainable streetscape design

Protecting the IRL with LID

Page 3: Greening Rocket Town’s Downtown · Minutemen Stormwater LID Improvement • capture rain where it falls • impervious surfaces • green space/infrastructure • discharge volume

Minutemen Stormwater LID Improvement

Page 4: Greening Rocket Town’s Downtown · Minutemen Stormwater LID Improvement • capture rain where it falls • impervious surfaces • green space/infrastructure • discharge volume

Minutemen Stormwater LID Improvement

Page 5: Greening Rocket Town’s Downtown · Minutemen Stormwater LID Improvement • capture rain where it falls • impervious surfaces • green space/infrastructure • discharge volume

Downtown Cocoa Beach Back in the Day

1956

Urbanization Infrastructure . . . Impervious Creep

green turns gray

Page 6: Greening Rocket Town’s Downtown · Minutemen Stormwater LID Improvement • capture rain where it falls • impervious surfaces • green space/infrastructure • discharge volume

1940s

1920s

1930s

Downtown Cocoa Beach Back in the Day

Page 7: Greening Rocket Town’s Downtown · Minutemen Stormwater LID Improvement • capture rain where it falls • impervious surfaces • green space/infrastructure • discharge volume

1950s

Downtown Cocoa Beach Back in the Day

Page 8: Greening Rocket Town’s Downtown · Minutemen Stormwater LID Improvement • capture rain where it falls • impervious surfaces • green space/infrastructure • discharge volume

early 1950s

Downtown Cocoa Beach Back in the Day

Page 9: Greening Rocket Town’s Downtown · Minutemen Stormwater LID Improvement • capture rain where it falls • impervious surfaces • green space/infrastructure • discharge volume

Downtown Cocoa Beach Back in the Day

Page 10: Greening Rocket Town’s Downtown · Minutemen Stormwater LID Improvement • capture rain where it falls • impervious surfaces • green space/infrastructure • discharge volume

1950s/1960s

Downtown Cocoa Beach Back in the Day

Page 11: Greening Rocket Town’s Downtown · Minutemen Stormwater LID Improvement • capture rain where it falls • impervious surfaces • green space/infrastructure • discharge volume

1960s

Downtown Cocoa Beach Back in the Day

Page 12: Greening Rocket Town’s Downtown · Minutemen Stormwater LID Improvement • capture rain where it falls • impervious surfaces • green space/infrastructure • discharge volume

1960/1970s

Downtown Cocoa Beach Back in the Day

Page 13: Greening Rocket Town’s Downtown · Minutemen Stormwater LID Improvement • capture rain where it falls • impervious surfaces • green space/infrastructure • discharge volume

Redevelopment & Impervious

“Developed” Cocoa Beach Land Use Private Public R/W 2104.2 acres 55.1 acres

97% 3%

3% Public Roadway cannot mitigate large areas of

private development that have

no stormwater management

or compromised/insufficient stormwater management

Page 14: Greening Rocket Town’s Downtown · Minutemen Stormwater LID Improvement • capture rain where it falls • impervious surfaces • green space/infrastructure • discharge volume

Pre-Project Condition

• Cocoa Beach “main street”

• oldest section of town

• very little “green”

• storm runoff to lagoon

• business struggling

• not inviting/not walkable

Page 15: Greening Rocket Town’s Downtown · Minutemen Stormwater LID Improvement • capture rain where it falls • impervious surfaces • green space/infrastructure • discharge volume

• Cocoa Beach Main St program

• upgraded infrastructure

• green infrastructure

• stormwater management

• business renovations

• more foot traffic

through downtown

Post-Project Condition

Page 16: Greening Rocket Town’s Downtown · Minutemen Stormwater LID Improvement • capture rain where it falls • impervious surfaces • green space/infrastructure • discharge volume

• tree canopy

• urban planters/rain gardens

• permeable pavers

• rain tanks

• bioactive media/BAM

Minutemen Corridor LID Treatment Train

Page 17: Greening Rocket Town’s Downtown · Minutemen Stormwater LID Improvement • capture rain where it falls • impervious surfaces • green space/infrastructure • discharge volume

tree canopy – on average intercepts 15% of rain/less runoff

Minutemen Corridor LID Treatment Train

Page 18: Greening Rocket Town’s Downtown · Minutemen Stormwater LID Improvement • capture rain where it falls • impervious surfaces • green space/infrastructure • discharge volume

urban planters/rain gardens with 12” of BAM under soil

Minutemen Corridor LID Treatment Train

Page 19: Greening Rocket Town’s Downtown · Minutemen Stormwater LID Improvement • capture rain where it falls • impervious surfaces • green space/infrastructure • discharge volume

permeable parking pavers with 2” of BAM beneath stone

Minutemen Corridor LID Treatment Train

Page 20: Greening Rocket Town’s Downtown · Minutemen Stormwater LID Improvement • capture rain where it falls • impervious surfaces • green space/infrastructure • discharge volume

stormwater tanks with 12” BAM beneath stone

Minutemen Corridor LID Treatment Train

Page 21: Greening Rocket Town’s Downtown · Minutemen Stormwater LID Improvement • capture rain where it falls • impervious surfaces • green space/infrastructure • discharge volume

Project Challenges

asphalt thickness – decades of overlay

utility conflicts/surprises

business/storefront disruption

Page 22: Greening Rocket Town’s Downtown · Minutemen Stormwater LID Improvement • capture rain where it falls • impervious surfaces • green space/infrastructure • discharge volume

total roadway renovation

Project Challenges

Page 23: Greening Rocket Town’s Downtown · Minutemen Stormwater LID Improvement • capture rain where it falls • impervious surfaces • green space/infrastructure • discharge volume

total roadway renovation

old drainage infrastructure retrofit

Project Challenges

Page 24: Greening Rocket Town’s Downtown · Minutemen Stormwater LID Improvement • capture rain where it falls • impervious surfaces • green space/infrastructure • discharge volume

old drainage infrastructure retrofit

Project Challenges

Page 25: Greening Rocket Town’s Downtown · Minutemen Stormwater LID Improvement • capture rain where it falls • impervious surfaces • green space/infrastructure • discharge volume

2 storms – Hurricane Matthew (2016) and Hurricane Irma (2017)

Project Challenges

Page 26: Greening Rocket Town’s Downtown · Minutemen Stormwater LID Improvement • capture rain where it falls • impervious surfaces • green space/infrastructure • discharge volume

business storefront beautification

Project Benefits

Page 27: Greening Rocket Town’s Downtown · Minutemen Stormwater LID Improvement • capture rain where it falls • impervious surfaces • green space/infrastructure • discharge volume

upgraded FPL power lines

upgraded

water lines

Project Benefits

Page 28: Greening Rocket Town’s Downtown · Minutemen Stormwater LID Improvement • capture rain where it falls • impervious surfaces • green space/infrastructure • discharge volume

Pre

Post

Pre

2011

Page 29: Greening Rocket Town’s Downtown · Minutemen Stormwater LID Improvement • capture rain where it falls • impervious surfaces • green space/infrastructure • discharge volume

Pre

Post

2015

Page 30: Greening Rocket Town’s Downtown · Minutemen Stormwater LID Improvement • capture rain where it falls • impervious surfaces • green space/infrastructure • discharge volume

Pre

Post

Pre

2015

Page 31: Greening Rocket Town’s Downtown · Minutemen Stormwater LID Improvement • capture rain where it falls • impervious surfaces • green space/infrastructure • discharge volume

Pre

Post

Pre

2011

Page 32: Greening Rocket Town’s Downtown · Minutemen Stormwater LID Improvement • capture rain where it falls • impervious surfaces • green space/infrastructure • discharge volume

Pre

Post

Page 33: Greening Rocket Town’s Downtown · Minutemen Stormwater LID Improvement • capture rain where it falls • impervious surfaces • green space/infrastructure • discharge volume

retrofit matching grades

upgraded

water lines

sedimentation - sweeping

O&M Challenges & things not yet figured out . . .

Page 34: Greening Rocket Town’s Downtown · Minutemen Stormwater LID Improvement • capture rain where it falls • impervious surfaces • green space/infrastructure • discharge volume

rain garden foot traffic & curb flow bypass

O&M Challenges & things not yet figured out . . .

sediment catchbasins vs curb cuts

Page 35: Greening Rocket Town’s Downtown · Minutemen Stormwater LID Improvement • capture rain where it falls • impervious surfaces • green space/infrastructure • discharge volume

Erosion of rain garden soil/mulch

& performance of curb cuts

O&M Challenges & things not yet figured out . . .

Page 36: Greening Rocket Town’s Downtown · Minutemen Stormwater LID Improvement • capture rain where it falls • impervious surfaces • green space/infrastructure • discharge volume

landscape palette

O&M Challenges & things not yet figured out . . .

Page 37: Greening Rocket Town’s Downtown · Minutemen Stormwater LID Improvement • capture rain where it falls • impervious surfaces • green space/infrastructure • discharge volume

Minutemen Corridor LID Treatment Train

Vital Statistics/Leveraging Funds

Total Construction Cost $5,243,196

Terrific Funding Partners

FDEP/EPA (319/TMDL) $1,794,540

FDOT (Complete Streets) $1,395,000

IRLNEP/SJRWMD $50,000

City of Cocoa Beach $1,094,667

FDEP SRF Loan (< 1% interest) $1,131,131

FPL Power Pole Relocation $155,054

Design & Engineering $264,575

CEI (admin, engineering, inspection) $451,995

FDEP SRF Loan CEI - $222,142

Page 38: Greening Rocket Town’s Downtown · Minutemen Stormwater LID Improvement • capture rain where it falls • impervious surfaces • green space/infrastructure • discharge volume

1 of 30 projects chosen nationally – only 5 stormwater projects

unexpected cool extras

Page 39: Greening Rocket Town’s Downtown · Minutemen Stormwater LID Improvement • capture rain where it falls • impervious surfaces • green space/infrastructure • discharge volume

surface & groundwater monitoring challenges/results

Does it work?