Greening Southeast Asia : Enablers and Barriers
Pierre Noel & Antoine Guardiola
SIEW Think Tank Roundtable
Singapore, 1 November 2018
1
2
A gas-intensive region, but ‘golden age of gas’ is behind us …
Source: BP
2017
0%
5%
10%
15%
20%
25%
30%
35%
40%
45%
50%
1980 1990 2000 2010
Natural Gas Share of TPES
ASEAN-6
2017
0
20
40
60
80
100
120
140
1980 1990 2000 2010
Mtoe Natural Gas Consumption MNR
MYS
VNM
PHP
THAI
IDN
3
…while coal is on the rise…
Source: BP
0%
10%
20%
30%
40%
50%
60%
70%
80%
1970 1980 1990 2000 2010
Primary Fuel Mix (ASEAN-5)
Natural Gas
Coal
Oil
Renewables
2017
0%
10%
20%
30%
40%
50%
60%
1980 1990 2000 2010
Coal share (ASEAN-5)
IDN THA
MYS VNM
PHP MNR
2017
Natural gas versus coal
4
0
10
20
30
40
2018
Coal-based
LNG-based
0
10
20
30
40
10% 30% 50% 70% 90%
c/kWh2014
Enabler: much cheaper LNG
0
1
2
3
4
5
6
7
Jan
-01
Jan
-04
Jan
-07
Jan
-10
Jan
-13
Jan
-16
LNG/coal ratio
Jan
-18
Plant load factor
Cost of electricity generation (LCoE)
Barrier: no carbon taxLCoE and Carbon tax in Malaysia
7
8
9
10
11
12
0 5 10 15 20 25 30 35 40 45 50
Carbon tax ($/tCo2)
20180
1
2
3
4
5
6
7
Jan
-01
Jan
-04
Jan
-07
Jan
-10
Jan
-13
Jan
-16
LNG/coal ratio
Jan
-18
“Minister Yeo Bee Yin today confirmed there are no plans to introduce a "carbon tax" in the upcoming Budget 2019.”
malaysiakini.com, 20 Oct 2018
8
12
16
20
24
0 20 40 60 80 100 120 140
c$/kWh
Carbon tax ($/tCo2)
2014
Barrier: competition with China in manufacturingA
pr-
15
Jul-
15
Oct
-15
Jan
-16
May
-16
Au
g-1
6
No
v-1
6
Mar
-17
Jun
-17
0
2
4
6
8
10
12
14
-20%
0%
20%
40%
60%
80%
100%
120%
140%
$/mmbtuNatural gas (supplied by CGDs)
vs ‘furnace oil’
IPNG Premium to FO=RHS FO Price IPNG PriceSource: IISS based on data courtesy of Philip Capital
Deployment of renewables
8
Sources: EPPO, Bloomberg, ST, PLN
0
2
4
6
8
2009 2012 2015 2018
Baht/kWh
FiT PV farmLCoE PV farm (Bloomberg)Biomass (bid)Solar/Biomass (bid)Solar/ESS (bid)Solar/Biogas (bid)Gas (10$/MMTbu)Gas (7.85$/MMtbu)Gas (15.5$/MMTbu)
Enabler: cheap renewables
Thailand Malaysia
02468
101214161820
Jaka
rta
Jate
ng
Lam
pu
ng
Sth
. Su
mat
ra
Suls
elra
ba
Sum
ut
Kal
tim
Kka
lbar
Bab
el
NTB
NTT
cUSD/kWh
FiT
Average cost of electricity generation
LCoE Solar+battery (1-hr) ASEAN[Poyry consulting]LCoE Solar+battery (2-hr) ASEAN[Poyry consulting]
Akuo Solar 50 MW
Sidrap Wind 75 MW
Indonesia
0.0
0.1
0.2
0.3
0.4
0.5
0.6
0.7
0.8
2015 2016 2017 2018
MYR/kWh
Lowest large-scale bidding auction
Generation cost per unit
LCoE Bloomberg PV Crystalline Base
FiT Solar PV non-individual [72kW, 1MW]
Lowest large-scale solar bidding auction 2016
Barrier: electricity subsidies
“we will not deprive the people just because we want to drive the green agenda.”
Minister Yeo Bee Yin, 20 Oct 2018
malaysiakini.com
0
200
400
600
800
1000
1200
1400
1600
2008 2009 2010 2011 2012 2013 2014 2015 2016
Rp/kWh Indonesia
Basic Cost of Electricity Production
Average Electricity Sales Price
Politicians want this low
MinFinwants this
down
Strong pressure to keep costs downs
11 Source: PLN, MEMR
46%
48%
50%
52%
54%
56%
58%
60%
62%
2003 2008 2013
Coal plants average capacity factor
120
170
220
270
320
370
420
470
520
570
620
2008 2011 2014 2017 2020 2023 2026
TWh
Tho
usa
nd
s
Power demand revised down
RUPTL 2009-2018RUPTL 2011-2020RUPTL 2013-2022RUPTL 2015-2024
Barrier : overcapacity
2017
• Overcapacity aggravates the threat from renewables
• Stranded assets and contracts
• Power monopolies block (or delay) renewables
• Governments face dilemma
12
Conclusion: three key issues
1. Tax carbon, or coal
• Lest renewables displace gas, with little impact on emissions
2. Phase-out subsidies
• Reduce direct barrier to ‘greening’
• …and pressure to keep cost down
3. Address stranded assets
• One-off cost to unlock the transition