16
Annex B District Building Name Work Type Greening Area (m 2 ) Expenditure ($M) Southern Stanley Prison - Dog Kennel Complex Roof Greening 270 0.36 Eastern Clementi Secondary School Roof Greening 918 1.70 Government Dockyard at Stonecutters Island Roof Greening 200 0.27 Stonecutters Island Sewage Treatment Works Roof Greening 498 0.72 Cheung Sha Wan Estate Roof Greening 430 1.10 Construction of an Annex Building at the Ko Shan Theatre Roof Greening & Vertical Greening 1294 3.6 Construction of Local Open Space at Chung Yee Street, Kowloon City District Vertical Greening 165 0.04 Kai Tak Development - Stage 2 Infrastructure Works at North Apron Area - Kai Tak No. 5 Sewage Pumping Station Roof Greening 350 0.51 Kowloon Bay Sewage Interception Station and Pumping Station Roof Greening 1934 * Lung Cheung Government Secondary School Roof Greening 600 0.70 Wong Tai Sin Government Primary School Roof Greening 80 0.40 Mei Tung Estate Roof Greening 470 * District Open Space, Sports Centre and Library in Area 74, Tseung Kwan O Roof Greening & Vertical Greening 2356 6.33 Indoor Velodrome-cum-Sports Centre Podium Greening 2152 * Sheung Shui Government Secondary School Roof Greening 140 0.19 Fanling Government Secondary School Roof Greening 370 0.56 Greening Works Implemented on Government Buildings 2014 Sham Shui Po Kowloon City Wong Tai Sin Sai Kung North 1

Greening Works Implemented on Government Buildings Annex B ... · Redevelopment of Victoria Park Swimming Pool Complex (Phase 2 Works - Site B) Vertical Greening 178 0.05 North Point

  • Upload
    others

  • View
    3

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Greening Works Implemented on Government Buildings Annex B ... · Redevelopment of Victoria Park Swimming Pool Complex (Phase 2 Works - Site B) Vertical Greening 178 0.05 North Point

Annex B

District Building Name Work Type Greening

Area (m2)

Expenditure

($M)

Southern Stanley Prison - Dog Kennel

Complex

Roof Greening 270 0.36

Eastern Clementi Secondary School Roof Greening 918 1.70

Government Dockyard at

Stonecutters Island

Roof Greening 200 0.27

Stonecutters Island Sewage

Treatment Works

Roof Greening 498 0.72

Cheung Sha Wan Estate Roof Greening 430 1.10

Construction of an Annex Building

at the Ko Shan Theatre

Roof Greening

& Vertical

Greening

1294 3.6

Construction of Local Open Space at

Chung Yee Street, Kowloon City

District

Vertical

Greening

165 0.04

Kai Tak Development - Stage 2

Infrastructure Works at North Apron

Area - Kai Tak No. 5 Sewage

Pumping Station

Roof Greening 350 0.51

Kowloon Bay Sewage Interception

Station and Pumping Station

Roof Greening 1934 *

Lung Cheung Government

Secondary School

Roof Greening 600 0.70

Wong Tai Sin Government Primary

School

Roof Greening 80 0.40

Mei Tung Estate Roof Greening 470 *

District Open Space, Sports Centre

and Library in Area 74, Tseung

Kwan O

Roof Greening

& Vertical

Greening

2356 6.33

Indoor Velodrome-cum-Sports

Centre

Podium

Greening

2152 *

Sheung Shui Government Secondary

School

Roof Greening 140 0.19

Fanling Government Secondary

School

Roof Greening 370 0.56

Greening Works Implemented on Government Buildings

2014

Sham

Shui Po

Kowloon

City

Wong Tai

Sin

Sai Kung

North

1

Page 2: Greening Works Implemented on Government Buildings Annex B ... · Redevelopment of Victoria Park Swimming Pool Complex (Phase 2 Works - Site B) Vertical Greening 178 0.05 North Point

Annex B

District Building Name Work Type Greening

Area (m2)

Expenditure

($M)

2014

Tai Po Shuen Wan Stormwater Pumping

Station

Roof Greening 580 0.79

Open Space in Area 117, Tin Shui

Wai

Roof Greening 630 0.33

Ping Shan Tin Shui Wai Leisure and

Cultural Building

Roof Greening

&

Podium

Greening

986 *

Tuen

Mun

Pillar Point Sewage Treatment

Works

Roof Greening 1921 3.61

Kwai

Tsing

Kwai Luen Estate Roof Greening 442 0.70

*Expenditure on maintenance and repairs of greening works is subsumed under the total

expenditure on maintenance and repairs for buildings. Breakdown is not available.

Yuen

Long

2

Page 3: Greening Works Implemented on Government Buildings Annex B ... · Redevelopment of Victoria Park Swimming Pool Complex (Phase 2 Works - Site B) Vertical Greening 178 0.05 North Point

Annex B

District Building Name Work Type Greening

Area (m2)

Expenditure

($M)

Southern Hong Kong Southern District

Government Primary School - Hall

building

Roof Greening 210 0.64

Central &

Western

Relocation of Part of the Offices of

the Department of Justice to the

Main and East Wings of the Former

Central Government Offices

Roof Greening 962 4.49

Wan Chai Wan Chai Development Phase II,

Engineering Works - Wan Chai

Ferry Pier

Roof Greening

& Vertical

Greening

57 0.113

Relocation of the Printing Workshop

of Government Logistics Department

Vertical

Greening

5 0.12

Community Green Stations (HK

East)

Vertical

Greening

400 0.14

Redevelopment of Victoria Park

Swimming Pool Complex (Phase 2

Works - Site B)

Vertical

Greening

178 0.05

North Point Government Primary

School - New Block

Roof Greening 85 0.20

Mong Kok Fire Station Roof Greening 740 1.62

Tai Kok Tsui Municipal Services

Building

Roof Greening 20 0.05

Tai Kok Tsui Municipal Service

Building

Roof Greening 9 2.30

Cheung Shun Street Public Toilet Vertical

Greening

19 0.01

Yee Kuk Street Refuse Collection

Point

Roof Greening 82 0.15

Sham Shui Po Nos. 1 and 2 Sewage

Screening Plants

Roof Greening 1200 0.28

Stonecutters Island Sewage

Treatment Works (Sludge

Dewatering Building)

Roof Greening 986 0.20

2015

Eastern

Yau Tsim

Mong

Sham

Shui Po

3

Page 4: Greening Works Implemented on Government Buildings Annex B ... · Redevelopment of Victoria Park Swimming Pool Complex (Phase 2 Works - Site B) Vertical Greening 178 0.05 North Point

Annex B

District Building Name Work Type Greening

Area (m2)

Expenditure

($M)

2015

Trade and Industry Tower Roof Greening

& Vertical

Greening

1874 4.49

Ma Tau Chung Fire Station Roof Greening 99 0.63

Kwei Chow Street Sitting-out-Area -

Toilet Block

Roof Greening 55 0.10

A 30-classroom primary school at

Site 1A-4, Kai Tak Development,

Kowloon

Roof Greening

& Vertical

Greening

913 0.25

A 30-classroom primary school at

Site 1A-3, Kai Tak Development,

Kowloon

Roof Greening

& Vertical

Greening

548 0.76

Kai Tak No. 4 Dry Weather Flow

Interceptor

Roof Greening 32 0.17

Redevelopment of Kwun Tong

Swimming Pool Complex and Kwun

Tong Recreation Ground

Vertical

Greening

186 0.15

Lower Ngau Tau Kok Estate Phase 2 Roof Greening

& Vertical

Greening

630 0.8

Redevelopment of Kwun Tong

Swimming Pool Complex and Kwun

Tong Recreation Ground

Roof Greening 160 *

District open space adjoining Lower

Ngau Tau Kok public housing

redevelopment

Roof Greening 290 *

Tseung Kwan O Preliminary

Treatment Works

Roof Greening 900 3.17

Tiu Keng Leng Sports Centre Roof

Greening,

Vertical

Greening &

Podium

Greening

1493 *

Kowloon

City

Kwun

Tong

Sai Kung

4

Page 5: Greening Works Implemented on Government Buildings Annex B ... · Redevelopment of Victoria Park Swimming Pool Complex (Phase 2 Works - Site B) Vertical Greening 178 0.05 North Point

Annex B

District Building Name Work Type Greening

Area (m2)

Expenditure

($M)

2015

Community Green Stations (NT

East)

Vertical

Greening

82 0.03

Shui Chuen O Estate Phase 1 Roof Greening

& Vertical

Greening

1600 1.501

Shui Chuen O Estate Phase 2 Roof Greening

& Vertical

Greening

4767 2.4

Sheung Shui Fire Station Roof Greening 305 0.44

North District Government Offices Roof Greening 350 0.77

Construction of an ambulance depot

at Choi Shun Street, Sheung Shui

Roof Greening

& Vertical

Greening

520 0.77

Cheung Lung Wai Estate Roof Greening

& Vertical

Greening

1545 3.17

Yuen

Long

Hung Fuk Estate Phase 3 Roof Greening 1600 2.88

Custom and Excise Training School Roof Greening 150 0.30

Disciplined services quarters in Fu

Tei, Tuen Mun

Roof Greening

& Vertical

Greening

215 0.38

Pillar Point Sewage Treatment

Works

Roof Greening 237 0.44

T · PARK Roof Greening 12154 *

Islands Hei Ling Chau Correctional

Institution, 18C Workshop

Roof Greening 120 0.72

*Expenditure on maintenance and repairs of greening works is subsumed under the total

expenditure on maintenance and repairs for buildings. Breakdown is not available.

North

Tuen

Mun

Sha Tin

5

Page 6: Greening Works Implemented on Government Buildings Annex B ... · Redevelopment of Victoria Park Swimming Pool Complex (Phase 2 Works - Site B) Vertical Greening 178 0.05 North Point

Annex B

District Building Name Work Type Greening

Area (m2)

Expenditure

($M)

Central &

Western

Macau Ferry Terminal - outer pier Roof Greening 990 1.86

Hennessy Road Government Primary

School (Causeway Bay)

Vertical

Greening

40 0.06

Happy Valley Underground

Stormwater Storage Scheme

Roof Greening 1010 1.30

Happy Valley Recreation Ground Roof Greening 843 *

Reprovisioning of Cape Collinson

Crematorium

Roof Greening 1110 2.90

Shau Kei Wan Preliminary

Treatment Works

Roof Greening 50 *

Wa Ha Estate Roof Greening

& Vertical

Greening

2393 1.8

Mong Kok District Police

Headquarters and Mong Kok Police

Station

Roof Greening 570 1.25

Reprovisioning of Yau Ma Tei

Police Station

Roof Greening

& Vertical

Greening

1170 2.82

Reprovisioning of Yaumatei

Specialist Clinic at Queen Elizabeth

Hospital

Roof Greening

& Vertical

Greening

1087 1.69

Hung Hom Bay Sewage Pumping

Station

Roof Greening 290 *

West Kowloon Law Courts Building Roof Greening

& Vertical

Greening

1912 5

Kowloon Technical School Vertical

Greening

155 1.80

Stonecutters Island Sewage

Treatment Works (Main Pumping

Station)

Roof Greening 1190 2.00

2016

Wai Chai

Eastern

Yau Tsim

Mong

Sham

Shui Po

6

Page 7: Greening Works Implemented on Government Buildings Annex B ... · Redevelopment of Victoria Park Swimming Pool Complex (Phase 2 Works - Site B) Vertical Greening 178 0.05 North Point

Annex B

District Building Name Work Type Greening

Area (m2)

Expenditure

($M)

2016

So Uk Estate Phase 1 Roof Greening

& Vertical

Greening

2525 2.45

Ma Tau Chung Government Primary

School

Vertical

Greening

13 0.20

Kwei Chow Street / Yut Yat Street

Sitting-out Area

Roof Greening 31 0.40

Wong Tai

Sin

Po Kong Village Road Sports Centre Roof Greening 100 *

Kwun Tong Intermediate Sewage

Pumping Station

Roof Greening 105 *

Lei Yue Mun Estate Phase 3 Roof Greening 600 1.20

Redevelopment of Fire Services

Training School

Roof Greening

& Vertical

Greening

9520 14.92

Tiu Keng Leng Public Library Roof Greening 1070 *

Sports centre, community hall and

district library in Area 14B, Sha Tin

Roof Greening

& Vertical

Greening

1965 4.29

Lok Wo Sha Sewage Pumping

Station

Roof Greening 85 *

Chinese University Sewage Pumping

Station

Roof Greening 40 *

Shatin Main Sewage Pumping

Station

Roof Greening 180 *

Sports centre, community hall and

district library in Area 14B, Sha Tin

Roof

Greening、Vertical

Greening &

Podium

Greening

2565 *

Sai Kung

Sha Tin

Sham

Shui Po

Kowloon

City

Kwun

Tong

7

Page 8: Greening Works Implemented on Government Buildings Annex B ... · Redevelopment of Victoria Park Swimming Pool Complex (Phase 2 Works - Site B) Vertical Greening 178 0.05 North Point

Annex B

District Building Name Work Type Greening

Area (m2)

Expenditure

($M)

2016

Fanling Government Secondary

School

Roof Greening

& Vertical

Greening

118 0.17

Ping Kong Sewage Pumping Station

(Sewerage in Ping Kong, Fu Tei Pai

and Tai Wo

Roof Greening

& Vertical

Greening

105 *

Tai Wo Village Sewage Pumping

Station (Sewerage in Ping Kong, Fu

Tei Pai and Tai Wo)

Roof Greening

& Vertical

Greening

190 *

Tong Min Tsuen Sewage Pumping

Station (Lam Tsuen Valley Sewerage

Stage 1)

Lam Tsuen Valley Sewage Pumping

Station (Lam Tsuen Valley Sewerage

Stage 1)

Tin Liu Ha Sewage Pumping Station

(Lam Tsuen Valley Sewerage Stage

1)

Roof Greening 440 2.57

Po Heung Estate Roof Greening

& Vertical

Greening

320 0.33

Tin Shui Wai Hospital Roof Greening

& Vertical

Greening

3660 14.79

Public Library and Indoor

Recreation Centre in Area 3, Yuen

Long

Roof Greening 1600 2.99

Lau Fau Shan Sewage Pumping

Station

Roof Greening 60 *

Long Ching Estate Roof Greening

& Vertical

Greening

800 1.1

North

Tai Po

Yuen

Long

8

Page 9: Greening Works Implemented on Government Buildings Annex B ... · Redevelopment of Victoria Park Swimming Pool Complex (Phase 2 Works - Site B) Vertical Greening 178 0.05 North Point

Annex B

District Building Name Work Type Greening

Area (m2)

Expenditure

($M)

2016

Redevelopment of Tai Lam Centre

for Women

Roof Greening 1467 2.02

Tuen Mun Government Secondary

School

Vertical

Greening

10 0.05

Tuen Mun Western Trunk Sewer

Sewage Pumping Station

Roof Greening 620 *

Tsuen

Wan

Tsuen Wan District Headquarters &

Divisional Police Station

Vertical

Greening

10 0.06

Indoor Recreation Centre in Area 4,

Tsing Yi

Roof Greening

& Vertical

Greening

1694 0.71

Sports Centre in Tsing Yi Roof Greening

& Podium

Greening

1265 *

*Expenditure on maintenance and repairs of greening works is subsumed under the total

expenditure on maintenance and repairs for buildings. Breakdown is not available.

Kwai

Tsing

Tuen

Mun

9

Page 10: Greening Works Implemented on Government Buildings Annex B ... · Redevelopment of Victoria Park Swimming Pool Complex (Phase 2 Works - Site B) Vertical Greening 178 0.05 North Point

Annex B

District Building Name Work Type Greening

Area (m2)

Expenditure

($M)

Signature Project Scheme (Central

and Western District) - Harbourfront

enhancement and revitalization at the

Western Wholesale Food Market

Vertical

Greening

312 0.28

Central Preliminary Treatment

Works

Roof Greening 1200 0.30

Wan Chai Wan Chai East Preliminary

Treatment Works

Roof Greening 950 0.30

Eastern North Point Preliminary Treatment

Works

Roof Greening 790 0.25

Sham

Shui Po

Stonecutters Island Sewage

Treatment Works (Sludge

Dewatering Facility)

Roof Greening 1074 0.95

Establishment of the Centre of

Excellence in Paediatrics

Roof Greening

& Vertical

Greening

5479 16.23

Two special schools at Sung On

Street, To Kwa Wan

Roof Greening

& Vertical

Greening

781 1.96

King Tai Court Roof Greening

& Vertical

Greening

949 2.19

New EMSD Headquarters Vertical

Greening

400 2.20

A school for social development for

girls

Roof Greening

& Vertical

Greening

1033 0.99

Jordan Valley Park Vertical

Greening

33 *

Shui Chuen O Estate Roof Greening 1800 1.80

2017

Central &

Western

Kowloon

City

Kwun

Tong

Sha Tin

10

Page 11: Greening Works Implemented on Government Buildings Annex B ... · Redevelopment of Victoria Park Swimming Pool Complex (Phase 2 Works - Site B) Vertical Greening 178 0.05 North Point

Annex B

District Building Name Work Type Greening

Area (m2)

Expenditure

($M)

2017

Mei Ying Court Roof Greening

& Vertical

Greening

623 0.9

Mei Pak Court Roof Greening

& Vertical

Greening

846 *

A 36-classroom primary school in

Area 36, Fanling

Roof Greening 329 2.65

Shek Chung Au Sewage Pumping

Station

Roof Greening

& Vertical

Greening

240 *

Ma Po Mei Sewage Pumping Station

(Lam Tsuen Valley Sewerage,

Stage 2)

Pak Ngau Shek Sewage Pumping

Station (Lam Tsuen Valley

Sewerage, Stage 2)

She Shan Tsuen Sewage Pumping

Station (Lam Tsuen Valley

Sewerage, Stage 2)

Tai Po Waterfront Park Vertical

Greening

48 0.05

Long Sin Estate Roof Greening 823 1.23

Improvement to the green roof at

Dragon Park

Roof Greening 224 0.70

Customs and Excise Training School

Dormitory

Roof Greening 88 0.15

Sewerage Pumping Station in Area

54, Tuen Mun

Roof Greening

& Vertical

Greening

793 1.25

258 0.9Tai Po

Sha Tin

North

Roof Greening

& Vertical

Greening

Yuen

Long

Tuen

Mun

11

Page 12: Greening Works Implemented on Government Buildings Annex B ... · Redevelopment of Victoria Park Swimming Pool Complex (Phase 2 Works - Site B) Vertical Greening 178 0.05 North Point

Annex B

District Building Name Work Type Greening

Area (m2)

Expenditure

($M)

2017

Yan Tin Estate Roof Greening

& Vertical

Greening

3044 2.3

Tsuen Wan Sewage Pumping Station Roof Greening 280 0.16

Sheung Chui Court Roof Greening

& Vertical

Greening

1469 0.12

Portable Emission Measurement

System Laboratory for

Environmental Protection

Department at Tam Kon Shan Road,

Tsing Yi

Roof Greening 48 0.12

Ching Tsun Court Roof Greening

& Vertical

Greening

415 0.64

*Expenditure on maintenance and repairs of greening works is subsumed under the total

expenditure on maintenance and repairs for buildings. Breakdown is not available.

Tuen

Mun

Tsuen

Wan

Kwai

Tsing

12

Page 13: Greening Works Implemented on Government Buildings Annex B ... · Redevelopment of Victoria Park Swimming Pool Complex (Phase 2 Works - Site B) Vertical Greening 178 0.05 North Point

Annex B

District Building Name Work Type Greening

Area (m2)

Expenditure

($M)

Central &

Western

Central - Wan Chai Bypass and

Island Eastern Corridor Link West

Ventilation Building

Roof Greening 1379 3.38

Harbour Road Sports Centre Roof Greening

& Vertical

Greening

661 *

Wan Chai Swimming Pool Vertical

Greening

20 *

Eastern Lin Tsui Estate Vertical

Greening

45 0.10

Open space at Hing Wah Street

West, Sham Shui Po

Roof Greening

& Vertical

Greening

1214 0.2

Tai Nan Street Public Toilet Vertical

Greening

48 0.43

A 12-classroom special school for

children with mild intellectual

disability near Hoi Lai Estate

Roof Greening

& Vertical

Greening

169 0.23

Stonecutters Island Sewage

Treatment Works (Polymer Storage

Building)

Roof Greening 630 0.75

Pak Tin Community Centre Roof Greening 250 *

Toilet block of Hing Wah Street

West Playground

Roof Greening 96 0.03

Kai Tai Development -

Reconstruction and Upgrading of

Kai Tak Nullah - Desilting

Compounds

Roof Greening 3460 3.70

Stage 4 infrastructure works at north

apron area of Kai Tai Airport -

Sewage Pumping Station

Roof Greening 1298 0.80

Kai Long Estate Roof Greening

& Vertical

Greening

651 *

2018

Wan Chai

Sham

Shui Po

Kowloon

City

13

Page 14: Greening Works Implemented on Government Buildings Annex B ... · Redevelopment of Victoria Park Swimming Pool Complex (Phase 2 Works - Site B) Vertical Greening 178 0.05 North Point

Annex B

District Building Name Work Type Greening

Area (m2)

Expenditure

($M)

2018

Beacon Hill Fresh Water Pumping

Station

Roof Greening 203 *

Construction of staff quarters for

Immigration Department at Heng

Lam Street, Kowloon

Roof Greening 100 0.13

Enhancement of leisure facilities of

Morse Park

Vertical

Greening

50 0.02

Hoi Ying Estate Roof Greening

& Vertical

Greening

608 *

On Tai Estate Roof Greening

& Vertical

Greening

1030 *

Hoi Lok Court Roof Greening

& Vertical

Greening

608 *

Sai Kung Rank and file quarters for Customs

and Excise Department at Yau Yue

Wan Village Road, Tseung Kwan O

Roof Greening 168 0.71

Ma On Shan Development - Lok Wo

Sha Sewage Pumping Station

Roof Greening 150 0.60

Ka Shun Court Roof Greening

& Vertical

Greening

357 0.1

North Fanling Government Secondary

School

Vertical

Greening

20 0.12

Tai Po Nam Wa Po Village Sewage

Pumping Station (Tolo Harbour

Sewerage of Unsewered Areas Stage

2 – Phase 1 and Sewerage in Nam

Wa Po and Wai Tau)

Roof Greening

& Vertical

Greening

188 0.91

Yuen Long Police Station Vertical

Greening

7 0.07

Kowloon

City

Wong Tai

Sin

Kwun

Tong

Sha Tin

Yuen

Long

14

Page 15: Greening Works Implemented on Government Buildings Annex B ... · Redevelopment of Victoria Park Swimming Pool Complex (Phase 2 Works - Site B) Vertical Greening 178 0.05 North Point

Annex B

District Building Name Work Type Greening

Area (m2)

Expenditure

($M)

2018

New Territories West Regional

Office and Water Resources

Education Centre of Water Supplies

Department

Roof Greening

& Vertical

Greening

751 1.93

Yuen Long Vehicle Depot Roof Greening 260 0.34

Yuen Long Leisure and Cultural

Building

Roof Greening

& Vertical

Greening

1694 *

WEEE·PARK Roof

Greening,

Vertical

Greening &

Podium

Greening

9200 *

Ping Yan Court Roof Greening

& Vertical

Greening

1345 *

Yan Tin Estate Roof Greening 1825 2.00

O•PARK Roof

Greening,

Vertical

Greening &

Podium

Greening

1260 8.99

Tsuen Wan Sports Centre Roof Greening

& Vertical

Greening

1013 *

Redevelopment of Kwai Chung

Hospital - phase 1

Roof Greening

& Vertical

Greening

580 1.45

Yuen

Long

Tuen

Mun

Tsuen

Wan

Kwai

Tsing

15

Page 16: Greening Works Implemented on Government Buildings Annex B ... · Redevelopment of Victoria Park Swimming Pool Complex (Phase 2 Works - Site B) Vertical Greening 178 0.05 North Point

Annex B

District Building Name Work Type Greening

Area (m2)

Expenditure

($M)

2018

Kwai Tsui Estate Roof Greening

& Vertical

Greening

274 *

Mung Tung Estate Roof Greening

& Vertical

Greening

3783 6.6

Ngan Wai Court & Ngan Ho Court Roof Greening

& Vertical

Greening

1263 *

Ying Tung Estate Roof Greening

& Vertical

Greening

1357 0.9

Improvement Works at Silvermine

Bay Beach, Block A, Mui Wo

Roof Greening 136 0.15

Improvement Works at Silvermine

Bay Beach, Block C, Mui Wo

Roof Greening 58 0.08

*Expenditure on maintenance and repairs of greening works is subsumed under the total

expenditure on maintenance and repairs for buildings. Breakdown is not available.

Islands

Kwai

Tsing

16