89
APPLICATION OF OPERATIONS RESEARCH IN HRM

GROUP 5 PALLAV SUDHIR PRITY BALA ANUP SARANSH RAJAT HIRNI ANTHONY CHETNA ROGER

Embed Size (px)

Citation preview

Page 1: GROUP 5 PALLAV SUDHIR PRITY BALA ANUP SARANSH RAJAT HIRNI ANTHONY CHETNA ROGER

APPLICATION OF OPERATIONS RESEARCH IN HRM

Page 2: GROUP 5 PALLAV SUDHIR PRITY BALA ANUP SARANSH RAJAT HIRNI ANTHONY CHETNA ROGER

GROUP 5PALLAVSUDHIRPRITY BALAANUPSARANSHRAJATHIRNIANTHONYCHETNAROGER

Page 3: GROUP 5 PALLAV SUDHIR PRITY BALA ANUP SARANSH RAJAT HIRNI ANTHONY CHETNA ROGER

History Linear Programming During the 1940’s and the army needed a way to plan

expenditures and returns in order to reduce costs and increase losses for the enemy. George B. Dantzig is the founder of the simplex method of linear programming, but it was kept secret and was not published until 1947 since it was being used as a war-time strategy. But once it was released, many industries also found the method to be highly valuable. Another person who played a key role in the development of linear programming is John von Neumann, who developed the theory of the duality and Leonid Kantorovich, a Russian mathematician who used similar techniques in economics before Dantzig and won the Nobel prize in 1975 in economics.

Page 4: GROUP 5 PALLAV SUDHIR PRITY BALA ANUP SARANSH RAJAT HIRNI ANTHONY CHETNA ROGER

History Linear Programming Dantzig's original example of finding the best assignment of 70

people to 70 jobs emphasizes the practicality of linear programming. The computing power required to test all possible combinations to select the best assignment is quite large. However, it takes only a moment to find the optimum solution by applying the simplex algorithm. The theory behind linear programming is to drastically reduce the number of possible optimal solutions that must be checked. In the years from the time when it was first proposed in 1947 by Dantzig, linear programming and its many forms have come into wide use worldwide. Fourier in 1823 wrote a paper describing today's linear programming methods, but it never made its way into mainstream use. A paper by Hitchcock in 1941 on a transportation problem was also overlooked until the early 1950s. It seems the reason linear programming failed to catch on in the past was lack of interest in optimizing.

Page 5: GROUP 5 PALLAV SUDHIR PRITY BALA ANUP SARANSH RAJAT HIRNI ANTHONY CHETNA ROGER

Linear Programming: A methodology for identifying underutilized resources Identifying underutilized resources is crucial for

evaluating the economic feasibility of downsizing. However, identification of these resources is perhaps one of the most difficult and critical aspects of downsizing. A quantitative technique that may be used to identify potentially unproductive resources is linear programming (LP). LP may be used to measure resource utilization and other economic attributes of the firm's operations. For firms not contemplating downsizing, this information may also be potentially useful for making management aware of an organization's underutilized resources as well as their cost to the firm.

Page 6: GROUP 5 PALLAV SUDHIR PRITY BALA ANUP SARANSH RAJAT HIRNI ANTHONY CHETNA ROGER

Linear Programming: A methodology for identifying underutilized resources LP is used to model a firm's goals and its operating

constraints. An algorithm is then used to find an allocation of the firm's scarce resources that maximizes the goal specified in the LP model. Diminished product demand is a constraint facing many firms today and is one of the primary reasons firms decide to downsize. LP may also be used to determine departments that are currently understaffed. Identifying these departments should help to prevent work force reductions that would be harmful to the firm. Equally important, identifying understaffed departments represents opportunities for reallocating the unproductive resources of other departments to applications that enhance the firm's financial performance.

Page 7: GROUP 5 PALLAV SUDHIR PRITY BALA ANUP SARANSH RAJAT HIRNI ANTHONY CHETNA ROGER

Linear Programming: A methodology for identifying underutilized resources LP may be used to model a firm's business opportunities and

resources. The solution to the resulting set of equations may be used to identify departments with unused resources. Equally important, the LP solution aids in identifying areas within the firm's operations where slack resources may be reallocated to use them productively. Finally, it may be used to measure the profitability and resource utilization from alternative marketing, financing, and production scenarios. Identification of underutilized resources and measurement of their cost is a starting point for evaluating the economic feasibility of downsizing. While LP may be used to measure these variables, downsizing involves much more than the mechanistic computation of the benefits and cost of terminating the firm's employees. It involves the future direction and capabilities of the corporation. However, LP can serve as a useful technique for developing information for making this critical decision.

Page 8: GROUP 5 PALLAV SUDHIR PRITY BALA ANUP SARANSH RAJAT HIRNI ANTHONY CHETNA ROGER

HISTORY CPM/PERT CPM was developed by M.R.Walker of E.I.Du

Pont de Nemours & Co. and J.E.Kelly of Remington Rand, circa 1957, for the UNIVAC-I computer.

first test was made in 1958, when CPM was applied to the construction of a new chemical plant.

In March 1959, the method was applied to a maintenance shut-down at the Du Pont works in Louisville, Kentucky. Unproductive time was reduced from 125 to 93 hours.

Page 9: GROUP 5 PALLAV SUDHIR PRITY BALA ANUP SARANSH RAJAT HIRNI ANTHONY CHETNA ROGER

PERT was developed primarily to simplify the planning and scheduling of large and complex projects.

It was developed by Bill Pocock of Booz Allen Hamilton and Gordon Perhson of the U.S. Navy Special Projects Office in 1957 to support the U.S. Navy's Polaris nuclear submarine project.

Page 10: GROUP 5 PALLAV SUDHIR PRITY BALA ANUP SARANSH RAJAT HIRNI ANTHONY CHETNA ROGER

PERT

PERT is a method to analyze the involved tasks in completing a given project, especially the time needed to complete each task, and identifying the minimum time needed to complete the total project.

Page 11: GROUP 5 PALLAV SUDHIR PRITY BALA ANUP SARANSH RAJAT HIRNI ANTHONY CHETNA ROGER

ConventionsA PERT chart is a tool that facilitates decision making; The

first draft of a PERT chart will number its events sequentially in 10s (10, 20, 30, etc.) to allow the later insertion of additional events.

Two consecutive events in a PERT chart are linked by activities, which are conventionally represented as arrows (see the diagram above).

The events are presented in a logical sequence and no activity can commence until its immediately preceding event is completed.

The planner decides which milestones should be PERT events and also decides their “proper” sequence.

A PERT chart may have multiple pages with many sub-tasks.PERT is valuable to manage where multiple tasks are

occurring simultaneously to reduce redundancy

Page 12: GROUP 5 PALLAV SUDHIR PRITY BALA ANUP SARANSH RAJAT HIRNI ANTHONY CHETNA ROGER

Uncertainty in project schedulingDuring project execution, however, a real-life project will never

execute exactly as it was planned due to uncertainty. It can be ambiguity resulting from subjective estimates that are prone to human errors or it can be variability arising from unexpected events or risks. And Project Evaluation and Review Technique (PERT) may provide inaccurate information about the project completion time for main reason uncertainty. This inaccuracy is large enough to render such estimates as not helpful.

One possibility to maximize solution robustness is to include safety in the baseline schedule in order to absorb the anticipated disruptions. This is called proactive scheduling. A pure proactive scheduling is an utopia, incorporating safety in a baseline schedule that allows to cope with every possible disruption would lead to a baseline schedule with a very large make-span. A second approach, reactive scheduling, consists of defining a procedure to react to disruptions that cannot be absorbed by the baseline schedule.

Page 13: GROUP 5 PALLAV SUDHIR PRITY BALA ANUP SARANSH RAJAT HIRNI ANTHONY CHETNA ROGER

APPLICATIONThe PERT/cost system was developed to gain tighter control

over actual costs of any project. PERT\cost relates actual costs to project costs. Job cost estimates are established from an activity or a group of activities on the basis of a time network. Labor and nonlabor estimates are developed for the network targeting the control of time and costs and identifying potential areas where time and cost can be traded off—all aimed at more effective, efficient project management.

As with all aspects of business, the Internet has become a powerful tool with respect to PERT. Managers can now locate PERT applications on the World Wide Web and apply them directly to the appropriate manufacturing project. In most instances, PERT diagrams are available that eliminate the estimating process and make PERT a more useful and convenient tool

Page 14: GROUP 5 PALLAV SUDHIR PRITY BALA ANUP SARANSH RAJAT HIRNI ANTHONY CHETNA ROGER

CPMCPM is commonly used with all forms of

projects, including construction, aerospace and defense, software development, research projects, product development, engineering, and plant maintenance, among others. Any project with interdependent activities can apply this method of mathematical analysis

Page 15: GROUP 5 PALLAV SUDHIR PRITY BALA ANUP SARANSH RAJAT HIRNI ANTHONY CHETNA ROGER

Basic technique The essential technique for using CPM is to

construct a model of the project that includes the following:

A list of all activities required to complete the project (typically categorized within a work breakdown structure),

The time (duration) that each activity will take to completion, and

The dependencies between the activities

Page 16: GROUP 5 PALLAV SUDHIR PRITY BALA ANUP SARANSH RAJAT HIRNI ANTHONY CHETNA ROGER

Using these values, CPM calculates the longest path of planned activities to the end of the project, and the earliest and latest that each activity can start and finish without making the project longer. This process determines which activities are "critical" (i.e., on the longest path) and which have "total float" (i.e., can be delayed without making the project longer).

In project management, a critical path is the sequence of project network activities which add up to the longest overall duration. This determines the shortest time possible to complete the project. Any delay of an activity on the critical path directly impacts the planned project completion date (i.e. there is no float on the critical path). A project can have several, parallel, near critical paths. An additional parallel path through the network with the total durations shorter than the critical path is called a sub-critical or non-critical path.

Page 17: GROUP 5 PALLAV SUDHIR PRITY BALA ANUP SARANSH RAJAT HIRNI ANTHONY CHETNA ROGER

SIMULATION MODELING

Page 18: GROUP 5 PALLAV SUDHIR PRITY BALA ANUP SARANSH RAJAT HIRNI ANTHONY CHETNA ROGER

Overview

Is the process of building a mathematical or logical model of a system or a decision problem, andexperimenting with the model to obtain

insight into the system’s behavior or to assist in solving the decision problem.

Page 19: GROUP 5 PALLAV SUDHIR PRITY BALA ANUP SARANSH RAJAT HIRNI ANTHONY CHETNA ROGER

It is an analysis tool used for the purpose of designing planning and control of manufacturing systems.

Simulation modeling may be defined as the concise framework for the analysis and understanding of a system.

It is an abstract framework of a system that facilitates imitating the behavior of the system over a period of time.

In contrast to mathematical models, simulation models do not need explicit mathematical functions to relate variables

Page 20: GROUP 5 PALLAV SUDHIR PRITY BALA ANUP SARANSH RAJAT HIRNI ANTHONY CHETNA ROGER

Simulation modeling techniques are powerful for manipulation of time system inputs, and logic.

They are cost effective for modeling a complex system, and with visual animation capabilities they provide an effective means of learning, experimenting and analyzing real-life complex systems.

They enable the behavior of the system as a whole to be predicted

Page 21: GROUP 5 PALLAV SUDHIR PRITY BALA ANUP SARANSH RAJAT HIRNI ANTHONY CHETNA ROGER

Therefore ,they are suitable for representing complex systems to get a feeling of real system.

One of the greatest advantage of a simulation model is that it can compress or expand time.

Simulation models can also be used to observe a phenomenon that cannot be observed at very small intervals of time.

Simulation can also stops continuity of the experiment.

Page 22: GROUP 5 PALLAV SUDHIR PRITY BALA ANUP SARANSH RAJAT HIRNI ANTHONY CHETNA ROGER

A Brief History of SimulationSimulation has been around for some time.Early simulations were event-driven and

frequently military applications.In the 1960’s Geoffrey Gordon developed the

transaction (process) based orientation that we are now familiar with.

Gordon’s software was called General Purpose Simulation System (GPSS).

GPSS was originally intended for analyzing time sharing options on mainframe computers.

The software was included as a standard library on IBM 360s and its use was quite widespread.

Page 23: GROUP 5 PALLAV SUDHIR PRITY BALA ANUP SARANSH RAJAT HIRNI ANTHONY CHETNA ROGER

SIMULATION MODELUsually, a simulation model is a computer

model that imitates a real-life situation. It is like other mathematical models, but it

explicitly incorporates uncertainty in one or more input quantities

When we run simulation, we allow these random quantities to take various values, and we keep track of any resulting output quantities of interest

In this way, we are able to see how the outputs vary as a function of the varying inputs

Page 24: GROUP 5 PALLAV SUDHIR PRITY BALA ANUP SARANSH RAJAT HIRNI ANTHONY CHETNA ROGER

BENEFITS LIMITATIONSDoes not require

simplifying assumptionsCan deal with problems

not possible to solve analytically

Provides an experimental laboratory: possible to evaluate decisions/systems without implementing them

Generally easier to understand than analytical models

Building models and simulating is time-consuming for complex systems

Simulation results / simulated systems are always approximations of the real ones

Does not guarantee an optimal solution - lack of precise answers

Should not be used indiscriminately in place of sound analytical models.

Page 25: GROUP 5 PALLAV SUDHIR PRITY BALA ANUP SARANSH RAJAT HIRNI ANTHONY CHETNA ROGER

APPLICATIONS OF SIMULATIONAL MODELING

Simulation enables the study of, and experimentation with, the internal interactions of a complex system, or of a subsystem within a complex system.

Informational, organizational, and environmental changes can be simulated, and the effect of these alterations on the model’s behavior can be observed.

Page 26: GROUP 5 PALLAV SUDHIR PRITY BALA ANUP SARANSH RAJAT HIRNI ANTHONY CHETNA ROGER

TrendsVirtual reality animations.Advanced statistical functions

Curve fitting for input data. Automatic detection of warm up Output analysis modules (including replication).

Bolt on “Optimizers” – Tools to search for optimal settings of parameters.

Page 27: GROUP 5 PALLAV SUDHIR PRITY BALA ANUP SARANSH RAJAT HIRNI ANTHONY CHETNA ROGER

APPLICATIONS IN HRMWith the OB Representation model and

simulation system it is possible to simulate the organisational performance under different conditions like varying workload or unexpected critical incidents.

The human resource planning and development can be connected to organisational structure or tasks. It makes possible the performance measurements of employees in an organisations.

Page 28: GROUP 5 PALLAV SUDHIR PRITY BALA ANUP SARANSH RAJAT HIRNI ANTHONY CHETNA ROGER

From the results of the simulation process, the decisions for the personnel planning process could be made. Decision support could be realized through different aspects.

The user of the simulation are able to vary input parameters for identifying critical levels of operation experience, personnel skills or fit between expected staff and necessary competencies.

Page 29: GROUP 5 PALLAV SUDHIR PRITY BALA ANUP SARANSH RAJAT HIRNI ANTHONY CHETNA ROGER

Research and applications of mathematical and statistical models are the core of this program's activities, whether the models represent structural descriptions of human abilities, interests, or temperaments; dynamic simulations of skill acquisition, retention, and performance; or more global models of human systems

Page 30: GROUP 5 PALLAV SUDHIR PRITY BALA ANUP SARANSH RAJAT HIRNI ANTHONY CHETNA ROGER

In addition, it makes possible to develop and evaluate prescriptive models, including models that optimize person-job matching based on aptitudes and interests, or that guide the design of training systems to maximize effectiveness within cost constraints.

An important aspect is the evaluation of modeling and simulation technology for competency mapping & training

Page 31: GROUP 5 PALLAV SUDHIR PRITY BALA ANUP SARANSH RAJAT HIRNI ANTHONY CHETNA ROGER

Simulation Modeling is used in determination of the steady-state manpower situation that would be attained if a certain policy were to be maintained for a prolonged period of time.

It helps a manpower planner accurately identify the age and rank structure that fits the organisational framework required to fulfil the organizational goals.

Page 32: GROUP 5 PALLAV SUDHIR PRITY BALA ANUP SARANSH RAJAT HIRNI ANTHONY CHETNA ROGER

HR FORECASTERA computer simulation such as HR Forecaster

can model a real-life or hypothetical situation on your computer so that you can study how the system works. By changing variables, predictions may be made about the behavior of your workforce.  The software packages for running computer-based simulation modeling makes the process modeling almost effortless.

Page 33: GROUP 5 PALLAV SUDHIR PRITY BALA ANUP SARANSH RAJAT HIRNI ANTHONY CHETNA ROGER

HR Forecaster's simulation methods are especially useful in studying systems with a large number of coupled degrees of freedom and are useful for modeling phenomena with significant uncertainty in inputs, such as the calculation of risk.

Page 34: GROUP 5 PALLAV SUDHIR PRITY BALA ANUP SARANSH RAJAT HIRNI ANTHONY CHETNA ROGER

HR Forecaster uses computational algorithms for simulating the behavior of various workforce variables, either actual or scenario. It is distinguished from other simulation methods by being nondeterministic in some manner – usually by using random numbers (in practice, pseudo-random numbers) – as opposed to deterministic algorithms.

Page 35: GROUP 5 PALLAV SUDHIR PRITY BALA ANUP SARANSH RAJAT HIRNI ANTHONY CHETNA ROGER

Markov Chains

Page 36: GROUP 5 PALLAV SUDHIR PRITY BALA ANUP SARANSH RAJAT HIRNI ANTHONY CHETNA ROGER

Markov AnalysisOverviewMarkov analysis is a probabilistic technique.

- It provides information about a decision situation.

- It is a descriptive, not an optimizing technique.

- Specifically applicable to systems that exhibit probabilistic movements from one state (or condition) to another.

Page 37: GROUP 5 PALLAV SUDHIR PRITY BALA ANUP SARANSH RAJAT HIRNI ANTHONY CHETNA ROGER

History Markov analysis analyzes the current behaviour of some variables.

This was first used by the Russian mathematician A. Markov to describe and predict the behavior of gas particles in a closed container.

In operations research, it has been successfully applied to a wide variety of situations-

It has been used in examining and predicting the behaviour of customers in terms of their brand loyalty and their changing from one brand to another.

It has also been used to the study the life of newspaper subscriptions.

Recently it has been used to study the customer’s account behaviour i.e. to the study the customers as they change from ‘current account’ through ‘one month overdue’ to ‘two months over due’ to ‘bad debt’. In all these applications, future behaviour has been predicted by analyzing the present one.

Page 38: GROUP 5 PALLAV SUDHIR PRITY BALA ANUP SARANSH RAJAT HIRNI ANTHONY CHETNA ROGER

Application in HRM Determining Labor Supply Predicting Worker Flows and

Availabilities Succession or Replacement ChartsWho has been groomed/developed and is ready for promotion right

NOW? Human Resource Information Systems (HRIS)An employee database that can be searched when vacancies occur. Transition Matrices (Markov Analysis)A chart that lists job categories held in one period and shows the

proportion of employees in each of those job categories in a future period.

It answers two questions:1. “Where did people in each job category go?”2. “Where did people now in each job category come from? Personnel / Yield Ratios How much work will it take to recruit one new accountant?

Page 39: GROUP 5 PALLAV SUDHIR PRITY BALA ANUP SARANSH RAJAT HIRNI ANTHONY CHETNA ROGER

SUCCESSION PLANNING

REPLACEMENT CHARTFOR EXECUTIVE POSITIONS

POSITION REPLACEMENT CARDSFOR EACH INDIVIDUAL POSITION

- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -

POSITION WESTERN DIVISION SALES MANAGER

DANIEL BEALER Western Division Sales Mgr Outstanding Ready Now

PRESENT PROMOTIONPOSSIBLE CANDIDATES CURRENT POSITION PERFORMANCE

POTENTIAL

SHARON GREEN Western Oregon Sales Manager Outstanding Ready NowGEORGE WEI N. California Sales Manager Outstanding Needs TrainingHARRY SHOW Idaho/Utah Sales Manager Satisfactory Needs TrainingTRAVIS WOOD Seattle Area Sales Manager Satisfactory Questionable

Page 40: GROUP 5 PALLAV SUDHIR PRITY BALA ANUP SARANSH RAJAT HIRNI ANTHONY CHETNA ROGER

HUMAN RESOURCE INFORMATION SYSTEMS (HRIS)PERSONAL DATA

Age, Gender, Dependents, Marital status, etcEDUCATION & SKILLS

Degrees earned, Licenses, CertificationsLanguages spoken, Specialty skillsAbility/knowledge to operate specific machines/equipment/software

JOB HISTORYJob Titles held, Location in Company, Time in each position, etc.Performance appraisals, Promotions received, Training & Development

MEMBERSHIPS & ACHIEVEMENTSProfessional Associations, Recognition and Notable accomplishments

PREFERENCES & INTERESTSCareer goals, Types of positions soughtGeographic preferences

CAPACITY FOR GROWTHPotential for advancement, upward mobility and growth in the company

Page 41: GROUP 5 PALLAV SUDHIR PRITY BALA ANUP SARANSH RAJAT HIRNI ANTHONY CHETNA ROGER

Transition Matrix

Example for an Auto Parts Manufacturer

Page 42: GROUP 5 PALLAV SUDHIR PRITY BALA ANUP SARANSH RAJAT HIRNI ANTHONY CHETNA ROGER

MARKOV ANALYSIS(STATISTICAL REPLACEMENT ANALYSIS)

TO: A TRANSITION MATRIXFROM: TOP MID LOW SKILLED ASSY EXIT

TOP .80 .02 .18

MID .10 .76 .04 .10

LOW .06 .78 .01 .15

SKILL .01 .84 .15

ASSY .05 .88 .07

Page 43: GROUP 5 PALLAV SUDHIR PRITY BALA ANUP SARANSH RAJAT HIRNI ANTHONY CHETNA ROGER

MARKOV ANALYSIS – 2(Captures effects of internal transfers)(Start = 3500) A TRANSITION MATRIXFROM/ TO: TOP MID LOW SKILLED ASSY EXIT

TOP 100 .80 .02

.18

MID 200 .10 .76 .04 .10

LOW 600 .06 .78 .01 .15

SKILL 600 .01 .84 .15

ASSY 2000 .05 .88 .07- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -

- - - - -END YR WITH: 100 190 482 610 1760 [358

left]NEED RECRUITS ? 0 10 118 240*

368 totNEED LAYOFFS ? (10)*

(10) totKEEP STABLE 100 200 600 600 2000 = 3500

Tot

Page 44: GROUP 5 PALLAV SUDHIR PRITY BALA ANUP SARANSH RAJAT HIRNI ANTHONY CHETNA ROGER

MARKOV ANALYSIS – 3(Anticipates Changes in Employment Levels)Employment needs are changing. We need a 10% increase in skilled workers

(660), and a 15% decrease in assembly workers (1700) by year’s end. - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - (Start = 3500) A TRANSITION MATRIXFROM/ TO: TOP MID LOW SKILLED ASSY EXIT TOP 100 .80 .02 .18 MID 200 .10 .76 .04 .10LOW 600 .06 .78 .01 .15SKILL 600 .01 .84 .15ASSY 2000 .05 .88 .07- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -END YR WITH: 100 190 482 610 1760 [358 left]NEED RECRUITS ? 0 10 118 50* NEED LAYOFFS ? (60)* NEW LEVELS 100 200 600 600 1700 = 3260 tot

Page 45: GROUP 5 PALLAV SUDHIR PRITY BALA ANUP SARANSH RAJAT HIRNI ANTHONY CHETNA ROGER

Determining Labor Surplus or ShortageBased on the forecasts for labor demand and

supply, the planner can compare the figures to determine whether there will be a shortage or surplus of labor for each job category.

Determining expected shortages and surpluses allows the organization to plan how to address these challenges.

Page 46: GROUP 5 PALLAV SUDHIR PRITY BALA ANUP SARANSH RAJAT HIRNI ANTHONY CHETNA ROGER

PERSONNEL / YIELD RATIOSPast experience has developed these yield ratios for recruiting a Cost

Accountant:

FOR EVERY 12 APPLICATIONS RECEIVED, ONLY 1 LOOKS PROMISING ENOUGH TO INVITE FOR AN INTERVIEW

OF EVERY 5 PERSONS INTERVIEWED, ONLY 1 IS ACTUALLY OFFERED A POSITION IN THE ORGANIZATION

OF EVERY 3 JOB OFFERS MADE, ONLY 2 ACCEPT THE POSITION

OF EVERY 10 NEW WORKERS WHO BEGIN THE TRAINING PROGRAM, ONLY 9 SUCCESSFULLY COMPLETE THE PROGRAM

THUS: 100 APPLICATIONS MUST BE RECEIVED, so that8.33 JOB INTERVIEWS CAN BE HELD, so that1.67 JOB OFFERS CAN BE MADE, and1.11 PEOPLE MUST BE TRAINED, so that we getONE NEW COST ACCOUNTANT!!!

Page 47: GROUP 5 PALLAV SUDHIR PRITY BALA ANUP SARANSH RAJAT HIRNI ANTHONY CHETNA ROGER

Queuing Systems

Page 48: GROUP 5 PALLAV SUDHIR PRITY BALA ANUP SARANSH RAJAT HIRNI ANTHONY CHETNA ROGER

The word queue comes, via French, from the Latin cauda, meaning tail.

Page 49: GROUP 5 PALLAV SUDHIR PRITY BALA ANUP SARANSH RAJAT HIRNI ANTHONY CHETNA ROGER

Queuing theory is the mathematical study of waiting lines, or queues. The theory enables mathematical analysis of several related processes, including arriving at the (back of the) queue, waiting in the queue (essentially a storage process), and being served at the front of the queue.

Page 50: GROUP 5 PALLAV SUDHIR PRITY BALA ANUP SARANSH RAJAT HIRNI ANTHONY CHETNA ROGER

Queuing theory is generally considered a branch of operations research because the results are often used when making business decisions about the resources needed to provide service. It is applicable in a wide variety of situations that may be encountered in business, commerce, industry, healthcare, public service and engineering.

 The theory permits the derivation and calculation of several

performance measures including the average waiting time in the queue or the system, the expected number waiting or receiving service, and the probability of encountering the system in certain states, such as empty, full, having an available server or having to wait a certain time to be served.

 

Page 51: GROUP 5 PALLAV SUDHIR PRITY BALA ANUP SARANSH RAJAT HIRNI ANTHONY CHETNA ROGER

APPLICATION IN HRM Example: A Call Centre is a Queue. In call centres, human resource costs account between 60% to 70%

of operating expenses. The managers have to reduce the labour cost, but not to the detriment of the customers.

  A call centre uses queuing systems to queue their customers'

requests until free resources become available. This means that if traffic intensity levels exceed available capacity, customer's calls are not lost; customers instead wait until they can be served. This method is used in queuing customers for the next available operator.

  A queuing discipline determines the manner in which the exchange

handles calls from customers. It defines the way they will be served, the order in which they are served, and the way in which resources are divided among the customers. Here are details of four queuing disciplines:

Page 52: GROUP 5 PALLAV SUDHIR PRITY BALA ANUP SARANSH RAJAT HIRNI ANTHONY CHETNA ROGER

First in first out This principle states that customers are served one at a time and that

the customer that has been waiting the longest is served first.  Last in first out This principle also serves customers one at a time, however the

customer with the shortest waiting time will be served first. Also known as a stack.

  Processor sharing Customers are served equally. Network capacity is shared between

customers and they all effectively experience the same delay.  Priority Customers with high priority are served first.

Page 53: GROUP 5 PALLAV SUDHIR PRITY BALA ANUP SARANSH RAJAT HIRNI ANTHONY CHETNA ROGER

LIMITATIONSThe assumptions of classical queuing theory

may be too restrictive to be able to model real-world situations exactly. The complexity of production lines with product-specific characteristics cannot be handled with those models.

Page 54: GROUP 5 PALLAV SUDHIR PRITY BALA ANUP SARANSH RAJAT HIRNI ANTHONY CHETNA ROGER

Goal Programming

Page 55: GROUP 5 PALLAV SUDHIR PRITY BALA ANUP SARANSH RAJAT HIRNI ANTHONY CHETNA ROGER

Goal programming is a branch of multiobjective optimization, which in turn is a branch of multi-criteria decision analysis (MCDA), also known as multiple-criteria decision making (MCDM). This is an optimization programme. It can be thought of as an extension or generalisation of linear programming to handle multiple, normally conflicting objective measures. Each of these measures is given a goal or target value to be achieved. Unwanted deviations from this set of target values are then minimised in an achievement function. This can be a vector or a weighted sum dependent on the goal programming variant used.

Page 56: GROUP 5 PALLAV SUDHIR PRITY BALA ANUP SARANSH RAJAT HIRNI ANTHONY CHETNA ROGER

History

Goal programming was first used by Charnes, Cooper and Ferguson in 1955, although the actual name first appear in a 1961 text by Charnes and Cooper. Seminal works by Lee,Ignizio, Ignizio and Cavalier, and Romero followed. Schniederjans gives in a bibliography of a large number of pre-1995 articles relating to goal programming, and Jones and Tamiz give an annotated bibliography of the period 1990-2000. A recent textbook by Jones and Tamiz  gives a comprehensive overview of the state-of-the-art in goal programming.

The first engineering application of goal programming, due to Ignizio in 1962, was the design and placement of the antennas employed on the second stage of the Saturn V. This was used to launch the Apollo space capsule that landed the first men on the moon.

Page 57: GROUP 5 PALLAV SUDHIR PRITY BALA ANUP SARANSH RAJAT HIRNI ANTHONY CHETNA ROGER

Strengths and weaknessesA major strength of goal programming is its simplicity and ease of

use. This accounts for the large number of goal programming applications in many and diverse fields. Linear Goal programmes can be solved using linear programming software as either a single linear programme, or in the case of the lexicographic variant, a series of connected linear programmes.

Goal programming can hence handle relatively large numbers of variables, constraints and objectives. A debated weakness is the ability of goal programming to produce solutions that are not Pareto efficient. This violates a fundamental concept of decision theory, that is no rational decision maker will knowingly choose a solution that is not Pareto efficient. However, techniques are available. to detect when this occurs and project the solution onto the Pareto efficient solution in an appropriate manner.

The setting of appropriate weights in the goal programming model is another area that has caused debate, with some authors 

suggesting the use of the Analytic Hierarchy Process or interactive methods for this purpose.

Page 58: GROUP 5 PALLAV SUDHIR PRITY BALA ANUP SARANSH RAJAT HIRNI ANTHONY CHETNA ROGER

APPLICATION IN HRMA Scoring Model for Job SelectionA graduating college student with a double

major in Finance and Accounting has received the following three job offers:financial analyst for an investment firm in

Chicagoaccountant for a manufacturing firm in Denverauditor for a CPA firm in Houston

Page 59: GROUP 5 PALLAV SUDHIR PRITY BALA ANUP SARANSH RAJAT HIRNI ANTHONY CHETNA ROGER

The student made the following comments:“The financial analyst position provides the

best opportunity for my long-run career advancement.”

“I would prefer living in Denver rather than in Chicago or Houston.”

“I like the management style and philosophy at the Houston CPA firm the best.”

Clearly, this is a multicriteria decision problem.

Page 60: GROUP 5 PALLAV SUDHIR PRITY BALA ANUP SARANSH RAJAT HIRNI ANTHONY CHETNA ROGER

Considering only the long-run career advancement criterion:The financial analyst position in Chicago is the

best decision alternative.Considering only the location criterion:

The accountant position in Denver is the best decision alternative.

Considering only the style criterion:The auditor position in Houston is the best

alternative.

Page 61: GROUP 5 PALLAV SUDHIR PRITY BALA ANUP SARANSH RAJAT HIRNI ANTHONY CHETNA ROGER

Steps Required to Develop a Scoring Model Step 1: List the decision-making criteria. Step 2: Assign a weight to each criterion. Step 3: Rate how well each decision

alternative satisfies each criterion. Step 4: Compute the score for each decision

alternative. Step 5: Order the decision alternatives from

highest score to lowest score. The alternative with the highest score is the recommended alternative.

Page 62: GROUP 5 PALLAV SUDHIR PRITY BALA ANUP SARANSH RAJAT HIRNI ANTHONY CHETNA ROGER

Mathematical Model

Sj = S wi rij

i

where:rij = rating for criterion i and decision alternative jSj = score for decision alternative j

Page 63: GROUP 5 PALLAV SUDHIR PRITY BALA ANUP SARANSH RAJAT HIRNI ANTHONY CHETNA ROGER

Step 1: List the criteria (important factors).Career advancement LocationManagementSalaryPrestigeJob SecurityEnjoyable work

Page 64: GROUP 5 PALLAV SUDHIR PRITY BALA ANUP SARANSH RAJAT HIRNI ANTHONY CHETNA ROGER

Five-Point Scale Chosen for Step 2

Importance Weight Very unimportant 1 Somewhat unimportant 2 Average importance 3 Somewhat important 4 Very important 5

Page 65: GROUP 5 PALLAV SUDHIR PRITY BALA ANUP SARANSH RAJAT HIRNI ANTHONY CHETNA ROGER

Step 2: Assign a weight to each criterion.

Criterion Importance WeightCareer advancement Very important 5Location Average importance 3Management Somewhat important 4Salary Average importance 3Prestige Somewhat unimportant

2Job security Somewhat important 4Enjoyable work Very important 5

Page 66: GROUP 5 PALLAV SUDHIR PRITY BALA ANUP SARANSH RAJAT HIRNI ANTHONY CHETNA ROGER

Nine-Point Scale Chosen for Step 3

Level of Satisfaction Rating Extremely low 1 Very low 2 Low 3 Slightly low 4 Average 5

Slightly high 6 High 7 Very high 8 Extremely high 9

Page 67: GROUP 5 PALLAV SUDHIR PRITY BALA ANUP SARANSH RAJAT HIRNI ANTHONY CHETNA ROGER

Step 3: Rate how well each decision alternative satisfies each criterion.

Decision Alternative Analyst Accountant Auditor Criterion Chicago Denver Houston

Career advancement 8 6 4Location 3 8 7Management 5 6 9Salary 6 7 5Prestige 7 5 4Job security 4 7 6Enjoyable work 8 6 5

Page 68: GROUP 5 PALLAV SUDHIR PRITY BALA ANUP SARANSH RAJAT HIRNI ANTHONY CHETNA ROGER

Step 4: Compute the score for each decision alternative.

Decision Alternative 1 - Analyst in Chicago

Criterion Weight (wi ) Rating (ri1) wiri1

Career advancement 5 x 8 = 40Location 3 3 9Management 4 5 20Salary 3 6 18Prestige 2 7 14Job security 4 4 16Enjoyable work 5 8 40

Score 157

Page 69: GROUP 5 PALLAV SUDHIR PRITY BALA ANUP SARANSH RAJAT HIRNI ANTHONY CHETNA ROGER

Step 4: Compute the score for each decision alternative.

Sj = S wi rij

i

S1 = 5(8)+3(3)+4(5)+3(6)+2(7)+4(4)+5(8) = 157

S2 = 5(6)+3(8)+4(6)+3(7)+2(5)+4(7)+5(6) = 167

S3 = 5(4)+3(7)+4(9)+3(5)+2(4)+4(6)+5(5) = 149

Page 70: GROUP 5 PALLAV SUDHIR PRITY BALA ANUP SARANSH RAJAT HIRNI ANTHONY CHETNA ROGER

Step 4: Compute the score for each decision alternative.

Decision Alternative Analyst Accountant Auditor

Criterion Chicago Denver Houston

Career advancement 40 30 20Location 9 24 21Management 20 24 36Salary 18 21 15Prestige 14 10 8Job security 16 28 24Enjoyable work 40 30 25

Score 157 167 149

Page 71: GROUP 5 PALLAV SUDHIR PRITY BALA ANUP SARANSH RAJAT HIRNI ANTHONY CHETNA ROGER

Step 5: Order the decision alternatives from highest score to lowest score. The alternative with the highest score is the recommended alternative.

The accountant position in Denver has the highest score and is the recommended decision alternative.

Note that the analyst position in Chicago ranks first in 4 of 7 criteria compared to only 2 of 7 for the accountant position in Denver.

But when the weights of the criteria are considered, the Denver position is superior to the Chicago job.

Page 72: GROUP 5 PALLAV SUDHIR PRITY BALA ANUP SARANSH RAJAT HIRNI ANTHONY CHETNA ROGER

Fuzzysets

Page 73: GROUP 5 PALLAV SUDHIR PRITY BALA ANUP SARANSH RAJAT HIRNI ANTHONY CHETNA ROGER

Operations Research present state and future trends are analyzed from the Fuzzy-Sets-based methodologies Every researcher in OR models knows that data in this

field of human science are deterministic or random or uncertain. Of course, if measurements are available, the scientist must use such strong data but, in many case, a lot of data are weaker and subjectivity is necessary. To combine in a good way, at the best, taking account the present level of knowledge, it is what we can do. Fuzzy sets—and specially, fuzzy numbers—is a good tool for the OR analyst facing partial uncertainty and subjectivity. We are able to associate with several hybrid operators, probabilistic and uncertain data.

The goal: to build a model faithful at the best and intelligible for the decision maker

Page 74: GROUP 5 PALLAV SUDHIR PRITY BALA ANUP SARANSH RAJAT HIRNI ANTHONY CHETNA ROGER

Fuzzy-Sets-based models in Operations Researchfuzzy optimization, preference modelling, linguistic modelling and decision models 

Page 75: GROUP 5 PALLAV SUDHIR PRITY BALA ANUP SARANSH RAJAT HIRNI ANTHONY CHETNA ROGER

The role of Fuzzy-Sets-based models The role played by Fuzzy Sets in the field of OR is absolutely

essential, they allow us to model more than adequately those situations in which certain ambiguity arises of a non-probabilistic type, as well as in a large part of human beings' reasoning mechanisms.

  In fact, as Prof. L.A. Zadeh pointed out : "A fundamental contribution of fuzzy logic is a methodology

for computing with words (CW) which mimics human reasoning. It is this methodology that in one form or another is already used in most of the applications of fuzzy logic. In coming years, however, computing with words, based on fuzzy logic, is likely to emerge as a field of key importance in its own right".

From this point of view, with which we all agree, and provided that OR, and the interface OR-IT, is a rather wide field of work, it is very difficult to forecast to any extent what will be the future for each of the OR key topics

Page 76: GROUP 5 PALLAV SUDHIR PRITY BALA ANUP SARANSH RAJAT HIRNI ANTHONY CHETNA ROGER

APPLICATION IN HRMJob assignment is one of most important functions in

human resource management. It presents a new model which optimizes the multi-

objectives allocation problem by using fuzzy logic strategic. The fuzzy experience evaluation matrix indicates the score

of certain employee on certain task. The values in the matrix are based on the employee’s experience.

Fuzzy appraisal decision-making method provides fuzzy synthesis appraisal matrix referring to individual experience value.

Then Task-Arrange or Hungarian Algorithm provides the final solution with the help of our proposed experience matrix.

Page 77: GROUP 5 PALLAV SUDHIR PRITY BALA ANUP SARANSH RAJAT HIRNI ANTHONY CHETNA ROGER

ADVANTAGE OF FUZZYSETS OVER PREVIOUS MATHEMATICAL MODELS

The review of existing human resource allocation models for a CPA firm shows that there are major shortcomings in the previous mathematical models.

linear programming models cannot handle multiple objective human resource allocation problems for a CPA firm.

goal programming or multiple objective linear programming (MOLP) cannot deal with the organizational differentiation problems. To reduce the complexity in computing the trade-offs among multiple objectives

The fuzzy solution can help the CPA firm make a realistic decision regarding its human resource allocation problems as well as the firm''s overall strategic resource management when environmental factors are uncertain.

Page 78: GROUP 5 PALLAV SUDHIR PRITY BALA ANUP SARANSH RAJAT HIRNI ANTHONY CHETNA ROGER

Forecasting techniques for HRM

Page 79: GROUP 5 PALLAV SUDHIR PRITY BALA ANUP SARANSH RAJAT HIRNI ANTHONY CHETNA ROGER

WHAT IS FORECASTING ?

Forecasting is the process of making statements about events whose actual outcomes (typically) have not yet been observed. A commonplace example might be estimation of the expected value for some variable of interest at some specified future date

Page 80: GROUP 5 PALLAV SUDHIR PRITY BALA ANUP SARANSH RAJAT HIRNI ANTHONY CHETNA ROGER

Human Resource Management has critical role to play in corporate strategic plan. All the HR functions contribute positively to achieving the objective. The main task of HR is to support other departments to have the best people. Forecasting helps to match the requirements and the availabilities of employees. Matching Human resources with planned organizational activities for the present and the future is one of the main problems faced by an organization. Human resources have a certain degree of inflexibility, both in terms of their development and their utilization. It takes several months to recruit, select, place, and train the average employee; in the case of higher-echelon Management personnel in large organizations, the process may take years. Decisions on personnel recruitment and development are strategic and produce long-lasting effects. Therefore, Management must forecast the demand and supply of Human resources as part of the organization’s business and functional planning processes. Long-term business requirements, promotion policies, and recruitment (supply) possibilities have to be matched so that Human resources requirements and availability estimates (from both internal and external sources) correspond sufficiently

WHY DO WEE NEED FORECASTING IN HRM?

Page 81: GROUP 5 PALLAV SUDHIR PRITY BALA ANUP SARANSH RAJAT HIRNI ANTHONY CHETNA ROGER

Factors that an organization considers before choosing a technique

Organization's environment Organization size.Organization's budget Perceived uncertainty in labor markets and

economy Competition

Page 82: GROUP 5 PALLAV SUDHIR PRITY BALA ANUP SARANSH RAJAT HIRNI ANTHONY CHETNA ROGER

THERE TWO BASIC DIFFERENTIATION IN FORECASTING TECHNIQUES UESD

Qualitative Forecasting TechniquesQualitative forecasts are essentially educated guesses or estimates by individuals who have some knowledge of previous HR availability’s or utilization

Page 83: GROUP 5 PALLAV SUDHIR PRITY BALA ANUP SARANSH RAJAT HIRNI ANTHONY CHETNA ROGER

Technique Description

1. Nominal GroupA group of four or five participants is asked to present their views regarding labor forecasts. These views are written down, with no discussion until all of the members have advanced their positions. The group then discusses the information presented and, subsequently, a final ballot is taken to determine its judgment.

2. Delphi TechniqueThis technique calls for a facilitator to solicit and collate Written, expert opinions on labor forecasts. After answers are received, a summary of the information is developed and distributed t the experts, who are then requested to submitted revised forecasts. experts never meet face-to-face, but rather communicate through the facilitator.

3. Replacement PlanningForecasting estimates are based on charting techniques, which identify current job incumbents and relevant information about each of them. This information typically includes a brief assessment of performance and potential, age length of time in current position, and overall length of service.

4. Allocation PlanningThis technique involves judgments about labor supply or demand by observing the movement of employees through positions at the same organizational level.

Page 84: GROUP 5 PALLAV SUDHIR PRITY BALA ANUP SARANSH RAJAT HIRNI ANTHONY CHETNA ROGER

Quantitative Forecasting TechniquesThere are several quantitative methods for determining labor supply and demand

Page 85: GROUP 5 PALLAV SUDHIR PRITY BALA ANUP SARANSH RAJAT HIRNI ANTHONY CHETNA ROGER

Technique Description

1. Regression ModelFluctuations in labor levels are projected using relevant variables, such as sales.

2. Time-Series ModelFluctuations in labor levels are projected by isolating trend, seasonal, cyclical, and irregular effects.

3. Economic ModelFluctuations in labor levels are projected using a specified form of the production function.4. Linear Programming ModelFluctuations in labor levels are analyzed using an objective function as well as organizational and environmental constraints.5. Markov ModelFluctuations in labor levels are projected using historical transition rates.

Page 86: GROUP 5 PALLAV SUDHIR PRITY BALA ANUP SARANSH RAJAT HIRNI ANTHONY CHETNA ROGER

Other modelsManagerial Judgment :- This techniques is very simple.

In this, manager sit together, discuss and arrive at a figure which would be the future demand for labor. The technique may involve a ‘bottom-to-top’ or ‘top-to-bottom’ approach

Trend Analysis:- Method which forecast employments requirements on the basis of some organizational index

Ratio Analysis :- Another approach , Ratio analysis , means making forecasts based on the ratio between.

Scatter Plot:- A graphical method used to help identify the relationship between two variables. A scatter plot is another option.

Computerized Forecast:- The determination of future staff needs by projecting a firm’s sales, volume of production, and personnel required to maintain this required volume of output, using computers and software packages.

Page 87: GROUP 5 PALLAV SUDHIR PRITY BALA ANUP SARANSH RAJAT HIRNI ANTHONY CHETNA ROGER

Econometric Models:- Econometric models for estimation Past statistical data are analyzed in the hope that it will prove possible to describe precisely the relationships between a number of variables in mathematical and statistical terms.

Nominal Group Technique :- The nominal group technique is a decision making method for use among groups of many sizes, who want to make their decision quickly, as by a vote, but want everyone’s opinions taken into traditional voting.

H R Budget and Planning Analysis :- this approach is through budget and planning analysis. When new ventures complicate employment planning.

Scenario Forecasting :-Scenario techniques is used to explore the likelihood of possible future developments and changes and to identify the interaction of uncertain future trends and events.

Page 88: GROUP 5 PALLAV SUDHIR PRITY BALA ANUP SARANSH RAJAT HIRNI ANTHONY CHETNA ROGER

Work Study Technique :- Work study technique is based on the volume operation and work efficiency of personnel.

Delphi Technique:- This technique calls for a facilitator to solicit and collate written, expert opinion on labor forecast. After answer are received, a summary of the information is developed and distributed to the expert, who are than requested to submit revised forecast

Regression Analysis:- Regression analysis identifies the movement of two or more inter-related series. It is used to measure the changes in a variable as a result of changes in other variables

Workload Analysis :- It is a method that uses information about the actual content of work based on a job analysis of the work.

Job Analysis :- Job analysis helps in finding out the abilities or skil9ls required to do the jobs efficiently.

Page 89: GROUP 5 PALLAV SUDHIR PRITY BALA ANUP SARANSH RAJAT HIRNI ANTHONY CHETNA ROGER

THANK YOU!