Group Housing Complex “Parikrama”
At Sector-20, Panchkula, Haryana
Conceptual Plan
M/s Santur Developers Pvt. Ltd. 1
1.0 INTRODUCTION
M/s Santur Developers Pvt. Ltd. has established Group Housing Project “Parikrama” at Sec-20,
Panchkula, Haryana. License was obtained from DTCP, Haryana for development of the project and copy
of the license is attached as Annexure I. Project comprises of 5 nos. of residential blocks, 4 nos. of EWS
blocks, 3 nos. of convenient shopping blocks, primary school and nursery school. Built-up are of the
project was 2,40,000 sq m excluding basements. Building permission was obtained from HUDA for
development of the Project and copy of the approved layout is attached as Annexure II.
M/s Santur Developers Pvt. Ltd. had obtained prior environment clearance for the project from
MoEF&CC under activity 8 (b) and Category B in 2007 and copy of EC letter is attached as Annexure
III. Consent to establish was also obtained from HSPCB and copy is enclosed as Annexure IV.
Construction of the project was completed approx. 85% till 2012 and thereafter construction was stopped
due to some unavoidable circumstances. It was planned to resume the construction in 2014 and
accordingly, application was filed in 2014 for obtaining extension of validity to SEIAA, Haryana.
Then it was learnt from some sources that for construction project, EC is valid till the construction is
completed and there was nothing mentioned about the validity of the environmental clearance in the
environmental clearance letter also. Thus the application for extension was then withdrawn and remaining
construction was carried out at the site. Project is completed and copies of occupancy certificate are
attached as Annexure V.
Thereafter a letter was received from Regional Office, MoEF&CC in June, 2017 regarding the expiry of
validity and continued construction at the site after the expiry of validity of EC and declared the activity
(15% of construction) as violation. Thus, M/s Santur developers Pvt. Ltd. is herewith submitting an
application for obtaining the environmental clearance again for the project as per MoEF&CC Notification
SO 804 (E) dated 14.03.2017. M/s Santur developers Pvt. Ltd. is law abiding company and has taken all
necessary approvals as required prior the project development. M/s Santur developers Pvt. Ltd. also
submits the six monthly compliance on regular basis. A visit was carried out by Regional office,
MoEF&CC in December, 2014 and certified that all the conditions as given in EC letter are being
followed by M/s Santur Developers Pvt. Ltd. Copy of certified compliance report is attached as
Annexure VI. Application has been submitted to HSPCB for grant of Consent to Operate.
The referred violation has happened only due to confusion about the validity period of the environmental
clearance. M/s Santur developers Pvt. Ltd. commits not to repeat any such violation in future and abide by
all the terms and conditions of the environmental clearance and EIA Notification, 2006 as amended.
1.1 APPLICABLE LEGISLATIONS
Project site is spread over area of 111918.66 sq m and has built-up area of 3,14,627 sq m (Basement-
74627.197 sq m + Other built-up=2,40,000 sq m) . Project since has built-up area of more than 3,00,000
sq m thus the project will fall under activity 8(b) and Category A of Schedule I as per the Amendment in
EIA Notification, 2006 dated 09.12.2016. Further the project also involves violation of EIA Notification,
2006 thus the project will attract again the applicability of MoEF&CC Notification SO 804 (E) dated
14.03.2017 and as per the said notification, project falls under activity 8(b) and category A. The project
will be appraised at MoEF&CC under Category A for grant of environmental clearance. Other
legislations applicable on the project are listed below
Group Housing Complex “Parikrama”
At Sector-20, Panchkula, Haryana
Conceptual Plan
M/s Santur Developers Pvt. Ltd. 2
Environment Protection Act, 1986
EIA Notification, 2006 as amended
Air Act, 1981
Water Act, 1974
MSW Rules, 2016
Construction & Demolition Waste Management Rules, 2016
Plastic Waste Management Rules, 2016
Hazardous & Other Waste Management Rules, 2016
E-Waste Rules, 2011 as amended in 2016
HUDA Bye Laws
1.2 SITE LOCATION, LAND USE AND SURROUNDINGS OF PROJECT SITE
Project site is located at Sector-20, Panchkula, Haryana. Location map of the project site is given in
Figure 1. Site is spread over the area of 27.66 Acres (111918. 66 m2). Geographical coordinates of the
center of the project site are 30°39'52.72"N & 76°51'18.41"E. Geographical coordinates of all the corners
of the project site are given in Table 1 & Figure 2.
Land use of the project site is residential as per the Master Plan of Panchkula, 2025. Land use zoning plan
of the project site is attached as Annexure VII. Master plan of Panchkula showing the location of the
project site is given in Figure 3. Project site is surrounded by residential colonies majorly. Google map
depicting the project site and its surroundings within 500 m, 2 km, 5 km and 10 km are attached as
Annexure VIII. There is no forest area or environmentally sensitive area within 10 km of the project site.
NOC is also obtained from forest department for development of the project and copy of NOC is attached
as Annexure IX. Details of the surroundings of the project site are given in Table 2.
Group Housing Complex “Parikrama”
At Sector-20, Panchkula, Haryana
Conceptual Plan
M/s Santur Developers Pvt. Ltd. 3
Figure 1: Location Map of Project Site
Table 1: Geographical coordinates of Project site
Point as in
Map
Latitude Longitude
A 76°51'19.74"E 76°51'19.74"E
B 30°39'52.95"N 76°51'28.45"E
C 30°39'52.97"N 76°51'27.75"E
D 30°39'53.71"N 76°51'27.83"E
E 30°39'52.63"N 76°51'26.65"E
F 30°40'0.50"N 76°51'16.02"E
G 30°39'55.57"N 76°51'12.36"E
H 30°39'55.39"N 76°51'12.58"E
I 30°39'55.17"N 76°51'12.36"E
J 30°39'53.83"N 76°51'9.40"E
K 30°39'53.52"N 76°51'11.69"E
Group Housing Complex “Parikrama”
At Sector-20, Panchkula, Haryana
Conceptual Plan
M/s Santur Developers Pvt. Ltd. 4
L 30°39'51.15"N 76°51'11.65"E
M 30°39'51.35"N 76°51'12.01"E
N 30°39'48.94"N 76°51'15.18"E
O 30°39'48.77"N 76°51'15.83"E
P 30°39'47.10"N 76°51'17.62"E
Q 30°39'47.12"N 76°51'18.05"E
R 30°39'52.79"N 76°51'29.54"E
S 30°39'50.80"N 76°51'27.36"E
T 30°39'49.72"N 76°51'28.75"E
U 30°39'51.69"N 76°51'30.87"E
V (Centre of the
project site) 30°39'52.72"N 76°51'18.41"E
Figure 2: Geographical coordinates of the Project Site
Group Housing Complex “Parikrama”
At Sector-20, Panchkula, Haryana
Conceptual Plan
M/s Santur Developers Pvt. Ltd. 5
Figure 3: Master Plan of Panchkula, 2025
Table 2: Site Surroundings of the Project Site
S. No. Particulars Name Distance & Direction
1. Nearest Populated Area Kundi Village
Peer Machula
Sector 12A
Industrial Area Phase-1
Green City
Sector -21
Rally Village
Fatehpur
Saraswati Vihar
Dhakoli
Abuts Site
1.1 km, SE
1 km, NW
1.4 km, NW
900 m, NW
820 m, NE
1.29 km, N
650 m, NE
900 m, NE
1.33 km, SW
2. Nearest City/Town Panchkula (project site is within
Panchkula city)
3. Nearest School/
College Schools:
St. Xavier’s High School
St. Xavier’s Junior
Gurukul
The Nurtuary Preschool
Panchkula
250 m, NE
30 m, E
490 m, NE
740 m, SE
140 m, E
Group Housing Complex “Parikrama”
At Sector-20, Panchkula, Haryana
Conceptual Plan
M/s Santur Developers Pvt. Ltd. 6
The Mango Grove Preschool
Sanskriti Government School
The British School
The Sky World School
Colleges:
Westwood Institute of Hotel
Management
Government Girls Degree College
Allied Institute of Hotel
Management & Culinary Arts
Mata Gujari Institute Of
Paramedical Sciences
Puneet College
600 m, NE
3.7 km, SW
1.8 km, NE
950 m, SW
1.3 km, NW
2.2 km, NW
2.4 km, N
2.7 km, NW
4. Nearest Hospital Kaushal Gynae and Medical
Centre
Doctor Vinay's ENT Clinic
Government Dispensary
Alchemist Hospital Panchkula
Lifecare Hospital
Madhuban Acupresure &
Naturopathy Centre
440 m, SE
400 m, NE
350 m, NE
1.27 km, NE
510 m, SE
10 m, W
5. Place of worship Shri Hari Har Temple
Raghunath Mandir
Ruhani Masjid
Arya Samaj Temple
Juma Masjid
Jadha Sahib Gurudwara
Peer
900 m, NW
2.2 km, NW
5.2 km, NW
8.1 km, NW
2.1 km, NE
4.1 km, NE
5.2 km, N
6. Eco-Sensitive Zones Bir Shikargah Wild Life
Sanctuary
Dariya Reserve Forest
Sukhna Wildlife Sanctuary*
Kolhai Ratan RF
14.5 km, NE
4.5 km, W
8.6 km, NW
4.9 km, NE
7. Water Bodies Ghaggar River
Sukhna Lake
1.3 km, E
8.2 km, NW
*Project site is outside the defined ESZ of the sanctuary
1.3 CONNECTIVITY OF PROJECT SITE
Project site is well connected with rail and roads network. A 25 m wide road abuts the project site in East
direction which is at the entrance of the project site. Further, National Highway-64, National Highway-22
and National Highway-73, at distance of 3.2 km, SW, 3.1 km, SW, km, 3 km, E direction, respectively,
from the project site. Chandigarh Railway Station is at distance of 5 km in North-West direction from the
site. Chandigarh International Airport is at distance of 4.3 km in South-West direction. Connectivity map
of the project site is given in Figure 4. Details of the connectivity of the project site are given in Table 3.
Group Housing Complex “Parikrama”
At Sector-20, Panchkula, Haryana
Conceptual Plan
M/s Santur Developers Pvt. Ltd. 7
Table 3: Connectivity of the Project Site
S. No. Particulars Name Distance & Direction
1. Nearest Railway
Station Chandigarh Railway Station 5 km, NW
2. Nearest Airport Chandigarh International
Airport
4.3 km, SW
3. Nearest Highway Ambala Chandigarh
Expressway
National Highway-64
National Highway-22
National Highway-73
3.1 km, SW
3.2 km, SW
3.1 km, SW
3 km, E
4. Nearest Road 25 M, Wide Road
Zirakpur Panchkula Kalka
Highway
Sector 20 Road
Old Kalka Ambala Road
Amartex Road
Golf Course Road
Baltana Main Road
Abuts site, E
620 m, W
820 m, N
780 m, NW
2 km, NW
2.2 km,NE
1.59 km, NW
Figure 4: Connectivity Map of the Project Site
Group Housing Complex “Parikrama”
At Sector-20, Panchkula, Haryana
Conceptual Plan
M/s Santur Developers Pvt. Ltd. 8
1.4 PROJECT COST
Total cost of the project including land and development cost is INR 862 Crores.
1.5 LAND REQUIREMENTS AND AREA SUMMARY
The total plot area of the project site is 111918.66 m2 (11.19 ha). Project comprises of 5 nos. of residential
blocks (24 towers), 4 nos. of EWS blocks, 3 nos. of convenient shopping block, primary school and
nursery school. Area statement summary for the project is given in Table 4. Site layout plan is attached as
Annexure X.
Table 4: Area Summary
S.
No.
Description Area (sq m)
1. Total Plot Area 111918. 66
2. Permissible Ground Coverage (@35 % of net
plot area)
39,171.531
3. Proposed Ground Coverage (@ 14.4 % of plot
area)
16110.523
4. Permissible FAR (@1.75 of Plot area) 195857.655
5. Purchased FAR 2963.65
6. Total permissible FAR 198821.305
7. Proposed FAR 198821.305
Proposed FAR (Residential Tower of general
+EWS)
198286.239
Proposed FAR (Shopping) 535.066
8. Non-FAR
Basement
Community Centre
Stilt
Mumty Machine Room
Primary School
Nursery School
Non FAR-Towers
115806
74627.197
2152.139
3247.11
2692.42
755.95
4046.05
28225
9. Total Built-up Area 314627.305
10. Green Area (@30.78% of plot area) 34449.70
11. Height of building (m) 57.25 m
12. Dwelling Units (Nos.) 1321 (1113
General + 208
EWS)
13. Staff units 152 nos.
Group Housing Complex “Parikrama”
At Sector-20, Panchkula, Haryana
Conceptual Plan
M/s Santur Developers Pvt. Ltd. 9
1.6 ESITIMATED POPULATION
Estimated population at the site 9425 includes residents, visitors, students and staff. Detailed estimates are
given below in Table 5.
Table 5: Estimated Population
Category No. of DUs/ Area (sq m) Standard Population
Group Housing
Residents-General 1113 5 Person per DUs 5565
Staff-Resident 152 units 1 Person per unit 152
Staff
~2 % of population 126
Visitors -- 5 % of population 278
Total-Group Housing 6121
EWS
Residents-General 208 5 Person per DUs 1040
Staff -- 5 % of population 52
Visitors -- 5 % of population 52
Total-EWS 1144
Convenient Shopping
Staff -- -- 30
Community Centre (for 900 visitors occupancy)
Staff -- -- 30
Visitors -- -- 900
Total Community Centre 930
School (Nursery School + Primary School)
Total Population 4802 sq m 1 person/ 4 sq m 1200
Staff -- -- 100
Student -- -- 1100
Total Population 9425
1.7 WATER REQUIREMENT AND SEWAGE GENERATION
Water demand during construction phase is 20-30 KLD. Source of water during construction phase is
HUDA supply and private water tankers. Letter from HUDA for water supply is attached as Annexure
XI. Total water requirement of the project is 1159 KLD out of which domestic water requirement is 1046
KLD. Fresh water requirement of the project is 732 KLD. Recycled water requirement is 427 KLD.
Source of water during operation phase is HUDA supply. Daily water requirement calculation and
wastewater generation for the project is given in Table 6 and 7 respectively. Water balance diagram for
dry & monsoon season are given below in Figure 5 & 6.
Group Housing Complex “Parikrama”
At Sector-20, Panchkula, Haryana
Conceptual Plan
M/s Santur Developers Pvt. Ltd. 10
Table 6: Calculations for Daily Water Demand
Category Population Standard Water
Requirement-
KLD
Fresh Water
Requirement-
KLD
Recycled
Water
Requirement-
KLD
Residents 6605 135 LPCD 892 624 268
Staff-residents 152 135 LPCD 21 15 6
Staff &
Students
1438 45 LPCD
65 45 20
Visitors 330 15 LPCD 5 4 1
Visitors-
community
centre
900 70 LPCD
63 44 19
Total Domestic Water Requirement 1046 732 314
Landscape 34449.70 3 l/day 103 0 103
DG cooling 1350 kVA 0.9l/kVA/hr
10 0 10
Total Water
Requirement
-- --
1159 732 427
Table 7: Wastewater Calculations
Description Quantity (KLD)
Sewage Generation (80% of domestic water
requirement)
834
STP Capacity 1100
Treated Water (@80% of the sewage) 669
Flushing 314
Landscaping 103
DG Cooling 10
Sewer 242
Sewage generation from the project is approx. 834 KLD of sewage. A STP of 1100 KLD with MBBR
technology is provided for treatment of sewage at the site. Treated water from STP is used for flushing,
DG cooling and horticulture purpose. Excess treated sewage water i.e. 242 KLD during non rainy season
and 345 KLD during rainy season is disposed off into sewer. Sewerage layout is attached as Annexure
XII. STP feasibility report is attached as Annexure XIII.
Group Housing Complex “Parikrama”
At Sector-20, Panchkula, Haryana
Conceptual Plan
M/s Santur Developers Pvt. Ltd. 11
Figure 5: Water Balance Diagram during Dry Season
Total Water Requirement
1159 KLD
Fresh Water Requirement
732 KLD
Recycled Water Requirement
427 KLD
Flushing
314 KLD
Domestic Consumption
732 KLD
Sewage
834 KLD
80%
STP
1100 KLD 427 KLD
Sewer
242 KLD
Municipal Supply
732 KLD
Landscape
103 KLD DG Cooling
10 KLD
Group Housing Complex “Parikrama”
At Sector-20, Panchkula, Haryana
Conceptual Plan
M/s Santur Developers Pvt. Ltd. 12
Figure 6: Water Balance Diagram during Monsoon Season
Total Water Requirement
1056 KLD
Fresh Water Requirement
732 KLD
Recycled Water Requirement
324 KLD
Flushing
314 KLD
Domestic Consumption
732 KLD
Sewage
834 KLD
80%
STP
1100 KLD 324 KLD
Sewer
345 KLD
Municipal Supply
732 KLD
Landscape
0 KLD DG Cooling
10 KLD
Group Housing Complex “Parikrama”
At Sector-20, Panchkula, Haryana
Conceptual Plan
M/s Santur Developers Pvt. Ltd. 13
1.8 STORM WATER MANAGEMENT
Storm water generation increased with increase in generation of paved surfaces. Prior project
development storm water generation was approx. 23032.86 cum. However the generation increased due to
development of paved surfaces. Available run-off from the site after project development is given in
Table 8. Thus it is required to manage the excess run-off. To manage the run-off proper storm water
management system is provided. Rainwater is collected through piped drains and conveyed into rainwater
harvesting pits. Entire storm water is recharged into the ground. This not only prevents the flooding at site
during the rains but also augments the ground water level of the aquifer system in area. Average rainfall
of Panchkula is 1029 mm which if harvested can become a useful resource
Ground water level in district during pre-monsoon is 8.11-29.44 mbgl and post-monsoon is 6.78-29.0
mbgl. An underlain stratum is also feasible for artificial recharge. Stage of ground water development in
project area is app. 85%. Out of 3 blocks, 1 is over exploited, 1 is safe and 1 is semi critical. Thus this
makes rain water harvesting more essential. Rain water harvesting pits are designed for peak hourly
rainfall of the area. In Panchkula, peak hourly rainfall recoded by IMD is 79 mm. Calculations for rain
water harvesting pits are given below in Table 9. Schematic diagram of RWH pit is attached as
Annexure XIV a. Layout showing location for RWH pits is attached as Annexure XIV b.
Table 8: Available Run-off from Site
S. No. Catchment Area (sq m) Run-off
Coefficient
Average
Annual
Rainfall
(mm)
Available
Annual
Run-off
(cum)
1. Roof 16110.52 0.9 1029 14919.96
2. Green 34449.70 0.1 1029 3544.761
3. Paved 61358.44 0.7 1029 44197.27
Total Run-off 62661.99
Table 9: Calculation for RWH Pits
S. No. Catchment Area (m2) Run-off
Coefficient
Peak
Hourly
Rainfall
(m)
Available
Annual
Run-off
(cum)
1. Roof 16110.52 0.9 0.079 1145.5
2. Green 34449.70 0.1 0.079 272.1
3. Paved 61358.44 0.7 0.079 3393.2
Total Run-off 4810.785
Retention Time 15 min
Available Run-off in 15 min 1202.7
Size of RWH Pit & Desilting Chamber 92.6
Nos. of RWH Pit 13
Nos. of Pits proposed 13
Group Housing Complex “Parikrama”
At Sector-20, Panchkula, Haryana
Conceptual Plan
M/s Santur Developers Pvt. Ltd. 14
1.9 VEHICLE PARKING FACILITIES
Parking facility is provided as per HUDA Bye Laws. Parking required and proposed for the project are
given below in Table 10 & 11.
Table 10: Parking Required As Per HUDA Norms
Category Standard Units Parking
Required (ECS)
Residential 1 ECS/Unit 1113 1113
Required Parking 1113
Table 11: Parking Provided
S. No. Parking Type Parking Provided (ECS)
Basement
1. Covered single parking 1117
2. Covered back to back parking 202
3. Covered mechanical parking 172
Total Parking Provided in Basement 1551
4. Surface parking 176
Total Parking Provided 1727
1.10 POWER REQUIREMENT
Power requirement for the entire project is 8967 KW (11208.8 kVA) and is sourced from UHBVN.
Approval letter from UHBVN for power supply is attached as Annexure XV. Area reserved for
substation is approx. 2400 sq m. 33 KV substation is established within the project site and is connected
to nearest UHBVN substation. Two nos. of DG set of total capacity 1350 kVA (600 kVA+ 750 kVA) are
installed at the site as power back for providing essential load only. DG sets are provided with a acoustic
enclosure.
1.11 SOLID WASTE GENERATION & MANAGEMENT
Solid waste is generated both during construction as well as during operation phase. Solid waste
generated during construction phase comprised of excavated materials, used bags, bricks, concrete, MS
rods, tiles, wood etc. Table 12 details the solid waste management plan followed during construction
phase.
Table 12: Solid Waste Management during Construction Phase
S. No. Solid Waste Solid Waste Management
1. Waste materials like MS Rods,
bricks, concrete, broken tiles,
wood pieces, cement bags etc.
Construction waste was segregated into recyclable/reusable
and discarded material. Recyclable material was sold to
authorize dealers. Re-usable material was stored under
covered conditions at site and reject were disposed off
through authorized vendors
2. Excavated Soil
Top soil was stripped off and stored in covered condition.
Top soil was used for landscaping within the project site.
Remaining excavated soil was used within the site for
filling and leveling and construction of roads. Excess muck
was disposed off through authorized vendors. Total muck
generation was 336000 cum.
Group Housing Complex “Parikrama”
At Sector-20, Panchkula, Haryana
Conceptual Plan
M/s Santur Developers Pvt. Ltd. 15
3. Domestic Waste Domestic waste generated by labour at the site was
disposed off through local agencies in the area on daily
basis.
During operation phase, waste is majorly municipal waste and is approx. 4100 kg per day (@0.5 kg per
capita per day for the residents, 0.25 kg per capita per day for the staff, students & visitors of community
centre, 0.15 kg per capita per day for the visitors and 0.2 kg/acres/day is considered for landscape wastes)
is generated from project site. Estimations for solid waste generation during operation phase are given in
Table 13. Municipal Waste is managed as MSW Rules, 2016.
Table 13: Calculation of Solid Waste Generation
Category Population/Area Standard Waste
Generation
(Kg/day)
Recyclable
Waste
(Kg/day)
Non
Recyclable
Waste
(Kg/day)
Residents 6605 0.5 3302.5 990.8 2311.8
Staff-
residents 152 0.5 76.0 22.8 53.2
Staff &
Students 1438 0.25 359.5 107.9 251.7
Visitors 330 0.15 49.5 14.9 34.7
Visitors-
community
centre 900 0.25 225.0 67.5 157.5
Landscape 8.5
0.2
kg/acre/day 1.7 0.0 1.7
STP -- -- 85.0 0 85.0
Total Waste Generated 4099.2
~4100
1203.8
~1204
2895.5
~2896
Collection and Segregation of waste
a. Door to door collection system is provided for collection of domestic waste
b. Local vendors are hired for waste collection, management and disposal
c. Separate colored bins for dry recyclables and rejected waste are provided in residential units as
well as in common and open areas
Disposal
a. Rejected fraction of the waste is collected and disposed by local agencies on daily basis
b. Recyclable waste and E-waste is sold to authorized vendors
c. Used oil from DG sets is sold to authorized vendors
1.12 GREEN AREA
Total green area measures 34449.70 m2 i.e. 30.78 % of the plot area is kept under green cover. Species
planted at the site are Anthocephalus cadamba, Alstonia scholaris, Ficus infectoria, Euginia jumbolana,
Group Housing Complex “Parikrama”
At Sector-20, Panchkula, Haryana
Conceptual Plan
M/s Santur Developers Pvt. Ltd. 16
Azadiracta indica, Ficus retusa, Cassia fistula, Mimusops elengi, Peltoforum ferruginnum, Acacia
auriculiformis, Chorisia speciosa, Cassia renigera, Delonix regia, Terminalia arjuna, Terminalia arjuna,
Cassia siamea, Plumeria alba, Erythrina indica, Bombax malabaricum, Ficus benjamina. Landscape
Plan for the project site is attached as Annexure XVI. Details of Green area is provided below in Table
14
Table 14: Detail of Green Area
S. No. Particular Areas (sq m)
1 Total Green Area 34449.70
2 Peripheral Green Belt and soft green (@10% of the
green area)
11483.7
3 Hard Green Area 229966
4 Nos. of trees provided (@1 tree/80 sq m) 1400
1.13 MATERIALS USED FOR CONSTRUCTION
Construction material used for the project construction is given in Table 15. Construction material was
purchased from local area majorly. Table 16 below lists the construction material with their U value
Table 15: Details of Construction Material S. No. Material Quantity (MT)
1 Cement 50340.4
2 Steel 18877.6
3 Sand 128997.2
4 Aggregate 195068.9
Table 16: List of Construction Materials
Type of Construction U values (in W/m2deg C)
Walls:
Brick:
Plastered both sides 3.24
Solid Unplastered 2.67
Plastered both sides 2.24
Concrete, Ordinary, Dense:
-152mm 3.58
-203mm 3.18
Concrete block:
CLC Fly ash block 1.19
Hollow Concrete block, 220mm, single skin, outside rendered, inside plastered:
CLC Fly ash block 1.70
Roofs Flat
Reinforced concrete slab, 100mm, scered 63-12
mm, 3 layers bituminous felt
3.35
Floors:
Concrete on ground or hardcore fill 1.13
+ Grano, Terrazze or tile finish 1.13
Group Housing Complex “Parikrama”
At Sector-20, Panchkula, Haryana
Conceptual Plan
M/s Santur Developers Pvt. Ltd. 17
+ Wood block finish 0.85
Exposure South Shelterd:
Single glazing 3.97
Double glazing 6 mm space 2.67
LIST OF MACHINERY USED DURING CONSTRUCTION
Dumper
Concrete mixer with hopper
Excavator
Concrete Batching Plant
Cranes
Road roller
Bulldozer
Tower Cranes
Hoist
Labor Lifts
Concrete pressure pumps
Mobile transit mixer