GROUP HOUSING PROJECT AT SECTOR - 109, VILLAGE – BABUPUR, GURGAON, HARYANA. Dec’14
M/s CHINTELS INDIA LTD.
CHAPTER 3- ENVIRONMENTAL COMPLIANCE STATUS
S.No. Environmental Clearance Conditions Environmental Compliance
1) “Consent for Establishment” shall be
obtained from Haryana State Pollution
Control Board under Air and Water Act
and a copy shall be submitted to the
SEIAA, Haryana before the start of any
construction work at site.
Consent to Establishments has
been obtained prior to
construction. A copy of same is
enclosed as Annexure-I
2) A first aid room as proposed in the
project report shall be provided both
during construction and operation
phase of the project.
First Aid Room is being Provided
at site for Laborers as well as at
Hutments outside the project
site. Please refer Chapter 2B for
Photographs.
3) Adequate drinking water and sanitary
facilities should be provided for
construction workers at the site.
Provision should be made for mobile
toilets. Open defecation by the labors is
strictly prohibited. The safe disposal of
waste water and solid wastes generated
during the construction phase should
be ensured.
Water as drinking for laborers is
being provided by private water
tankers. Waste water is being
disposed using soak pits. Steel
Scrap, Tin, Cement Bags are
being sold to local vendor.
4) All the top soil excavated during
construction activities should be stored
for use in horticulture/landscape
development within the project site.
All the topsoil excavated during
construction phase has been
stored at isolated place and
utilized in Backfilling.
5) The Project proponent shall ensure that
the building material required during
construction phase is properly stored
a) A temporary store room
has been constructed for
storing the construction
GROUP HOUSING PROJECT AT SECTOR - 109, VILLAGE – BABUPUR, GURGAON, HARYANA. Dec’14
M/s CHINTELS INDIA LTD.
within the project area and disposal of
construction waste should not create
any adverse effect on the neighboring
communities and should be disposed of
after taking necessary precautions for
general safety and health aspects of
people, only in approved sites with the
approval of competent authority.
material.
b) Construction waste
includes empty cement
bags; broken bricks, etc.
are being segregated
properly by the labor on
site.
c) Construction waste are
being sold to local vendors
6) Construction spoils, including
bituminous material and other
hazardous materials, must not be
allowed to contaminate watercourses
and the dump sites for such material
must be secured so that they should
not leach into the ground water and any
hazardous waste generated during
construction phase, should be disposed
off as per applicable rules and norms
with necessary approval of the Haryana
State Pollution Control Board.
a) No bituminous material
has been generated from
construction projects.
Small amount of
hazardous waste is being
generated due to used Oil
for DG sets and which is
stored in drums in
earmarked locations.
b) It is being handled as per
The Manufacture, Storage
and Import of Hazardous
Chemical Rules, 1989 and
Material Safety Data Sheet.
7) The diesel generator sets to be used
during construction phase should be
low sulphur diesel type and should
conform to Environment (Protection)
Rules prescribed for air and noise
emission standards.
Agreed. DG sets are being
utilized in case of power failure.
Noise Abatement: DG sets are
enclosed with acoustic enclosure
type
Fuel: Low Sulphur diesel will be
GROUP HOUSING PROJECT AT SECTOR - 109, VILLAGE – BABUPUR, GURGAON, HARYANA. Dec’14
M/s CHINTELS INDIA LTD.
used in DG sets.
8) The diesel required for operating DG
sets shall be stored in underground
tanks and if required, clearance from
Chief Controller of Explosives shall be
taken.
DG Sets are being used for
backup purpose
The diesel required for the DG
sets is being purchased on daily
basis. If Storage is required,
permission from Explosive
Department will be taken.
9) Ambient noise levels should conform to
residential standards both during day
and night. Incremental pollution loads
on the ambient air and noise quality
should be closely monitored during
construction phase. Adequate measures
should be taken to reduce ambient air
and noise level during construction
phase, so as to conform to the
stipulated standards.
a) Incremental pollution loads
on the ambient air and
noise quality are being
closely monitored and test
reports are within the
permissible limits.
b) Test Result is enclosed as
Annexure II.
10) Fly ash should be used as building
material in the construction as per the
provisions of Fly Ash Notification of
September, 1999 and amended as on
27th August, 2003.
The fly ash mix cement and fly
ash bricks will be used in the
project as per the provisions of
Fly Ash Notification of
September, 1999 and amended
as on 27th August, 2003.
11) Storm Water Control and its re-use as
per CGWB and BIS Standards for
various applications should be ensured.
Strom Water control and its re-
use as per CGWB and BIS
standards are ensured.
12) Water demand during construction
should be reduced by use of pre-mixed
RMC is being used for preparing
Ready mix Concrete which uses
GROUP HOUSING PROJECT AT SECTOR - 109, VILLAGE – BABUPUR, GURGAON, HARYANA. Dec’14
M/s CHINTELS INDIA LTD.
concrete, curing agents and other best
practices.
optimum water as required for
construction and water used for
curing used to re-circulate again
and again in order to reduce
water usage. Curing agents like
Aquamine 721, 427 will be used
for fast curing of concrete and to
reduce the water demand.
13) In view of the severe constrains in water
supply augmentation in the region and
sustainability of water resources, the
developer will submit the NOC from
CGWA specifying water extraction
quantities and assurance from HUDA/
utility provider indicating source of
water supply and quantity of water with
details of intended use of water- potable
and non- potable. Assurance is required
for both construction and operation
stages separately. It shall be submitted
to SEIAA and RO, MoEF, Chandigarh,
before the start of construction.
Assurance of water supply has
been submitted along with the
proposal. STP water from
Authority is being utilized in
construction activities.
Dual Plumbing lines will be used
in order to prevent the water loss
and to provide a solution for
reuse of water in flushing and
gardening.
14) Roof should meet prescriptive
requirement as per Energy Conservation
Building Code by using appropriate
thermal insulation material.
Agreed. While preparing the roof
of the building during
construction phase it will be kept
in mind that prescriptive
requirement as per Energy
Conservation Building Code will
be adopted and appropriate
GROUP HOUSING PROJECT AT SECTOR - 109, VILLAGE – BABUPUR, GURGAON, HARYANA. Dec’14
M/s CHINTELS INDIA LTD.
thermal insulation materials will
be used.
15) Opaque wall should meet prescriptive
requirement as per Energy Conservation
Building Code which is proposed to be
mandatory for all air conditioned spaces
while it is desirable for non-air-
conditioned spaces by use of
appropriate thermal insulation material
to fulfil requirement.
Opaque wall will be made as
such to meet prescriptive
requirement of maximum U
Factor and minimum R factor for
maximum insulation.
16) The approval of the competent authority
shall be obtained for structural safety of
the building on account of earthquake,
adequacy of firefighting equipment, etc.
as per National Building Code including
protection measures from lightening etc.
If any forestland is involved in the
proposed site, clearance under Forest
Conservation Act shall be taken from
the competent Authority.
a) To deal with any fire
related accident,
firefighting facility of single
handed hydrant valve, long
hose reel, and portable fire
extinguisher will be
provided.
b) The project falls under
seismic active Zone IV
indicating high damage
risk zone. The buildings
will be designed as
earthquake resistant and
comply with the required
IS specifications.
Structural safety of the
building due to
earthquake, adequacy of
firefighting equipment, etc.
GROUP HOUSING PROJECT AT SECTOR - 109, VILLAGE – BABUPUR, GURGAON, HARYANA. Dec’14
M/s CHINTELS INDIA LTD.
as per the National
Building Code 2005
including protection
measures from lightening
etc.
c) Certificate from Structural
engineer will be submitted
in next compliance report
17) Overexploited groundwater and
impending severe shortage of water
supply in the region requires the
developer to redraw the water and
energy conservation plan. Developer
shall reduce the overall footprint of the
proposed development. Project
proponent shall incorporate water
efficiency/ saving measures as well as
water reuse/ recycling within 3 months
and before start of construction to the
SEIAA, Haryana and RO, MoEF, GOI,
Chandigarh.
We have already been submitted
the water efficiency/saving
measure with water balance
diagram to SEIAA, Haryana.
18)
The project proponent as stated in the
proposal shall construct 21 nos. rain
water harvesting pits for recharging the
ground water within the project
premises. Rain water harvesting pits
shall be designed to make provisions for
silting chamber and removal of floating
matter before entering harvesting pit.
a) Total of 21 rain water
harvesting pits is
proposed. Construction of
RWH pit will be started
soon.
b) Silting chamber will be
constructed for removal of
floating matter before
GROUP HOUSING PROJECT AT SECTOR - 109, VILLAGE – BABUPUR, GURGAON, HARYANA. Dec’14
M/s CHINTELS INDIA LTD.
Maintenance budget and persons
responsible for maintenance must be
provided. Care shall also be taken care
that contaminated water do not enter
any RWH pit.
entering harvesting pit.
c) Persons will be hired for
maintenance of rain water
harvesting pits.
d) Provision will be made for
contaminated water does
not enter any RWH pit.
19) The project proponent shall provide for
adequate Fire Safety measures and
equipments as required by Haryana
Service Act, 2009 and instruction
issued by the local
Authority/Directorate of fire from time
to time. Further the project proponent
shall take necessary permission
regarding fire safety scheme/NOC from
competent Authority as required.
This will be followed.
20) The project proponent shall submit
assurance from DHBVN for supply of
6414 KW of power supply before the
start of construction. In no case project
will be operational solely on generators
without any power supply from any
external power utility.
Temporary Power requirement is
being provided by DHBVN.
Assurance from DHBVN
regarding assurance of power
supply during Operation phase
will be sent with forthcoming
compliance report.
21) Detail calculation of power load and
ultimate power load of the project shall
be submitted to DHBVN under
intimation to SEIAA, Haryana before the
start of construction. Provisions shall be
This will be followed. The
Ultimate Power load will be
known after development/
construction of colony/ building
as per the approved building
GROUP HOUSING PROJECT AT SECTOR - 109, VILLAGE – BABUPUR, GURGAON, HARYANA. Dec’14
M/s CHINTELS INDIA LTD.
made for electrical infrastructure in the
project area.
plans by the Director General,
Town and Country Planning,
Chandigarh, Haryana.
22) The Project Proponent shall not raise
any construction in the natural land
depression/ Nallah/ water course and
shall ensure that the natural flow from
the Nallah/ Water course is not
obstructed.
There is no natural land
depression/ Nallah/ water
course in the project site. Natural
flow during rainy season will not
be obstructed as weep holes will
be provided to avoid any such
obstruction.
23) The project proponent shall keep the
plinth level of the building blocks
sufficiently above the level of the
approach road to the project as per
prescribed by-laws. Levels of the other
areas in the projects shall also be kept
suitably so as to avoid flooding.
Plinth level of the building blocks
will be made sufficiently above
the level of the approach road.
Level of the other areas will be
kept suitably above the approach
road level.
24) Construction shall be carried out so
that density of population doesn’t
exceed norms approved by Director
General Town and Country Planning
Department, Haryana.
It will be followed.
25) The Project Proponent shall submit an
affidavit with the declaration that
ground water will not be used for
construction and only treated water
should be used for construction.
No ground water is being utilized
in construction phase. Affidavit
regarding this will be submitted
with forthcoming compliance
report.
26) The Project Proponent shall not cut any
existing tree and project landscaping
No any tree was existing in
project site.
GROUP HOUSING PROJECT AT SECTOR - 109, VILLAGE – BABUPUR, GURGAON, HARYANA. Dec’14
M/s CHINTELS INDIA LTD.
plan should be modified to include
those trees in green area.
27) The Project Proponent shall provide 3
meter high barricade around the project
area, dust screen for every floor above
the ground, proper sprinkling and
covering of stored material to restrict
dust and air pollution during
construction.
At present, the site is enclosed by
3 m fencing.
Sprinkling of water is being done
to suppress the fugitive dust
28) The project proponent shall construct a
sedimentation basin in the lower level of
the project site to trap pollutant and
other wastes during rains.
It will be followed and rain water
harvesting will be done through
these.
29) The project proponent shall provide
mobile sulabh toilets instead of soak pit
during construction phase for disposal
of sullage.
Mobile toilets at the site is being
provide at the site while in
hutment Soak Pit type of toilet is
being provided.
30) The project proponent shall ensure that
the U- value of the glass is less than
3.177 and maximum solar heat gain co-
efficient is 0.25 for vertical fenestration.
This will be followed at the time
of glass work of the towers.
31) The project proponent shall adequately
control construction dusts like silica
dust, non-silica dust, wood dust. Such
dust shall not spread outside project
premises. Project proponent shall
provide respiratory protective
equipment to all construction workers.
STP water is being used to
suppress the dust from site. No
wood work will be carried out at
the site. At project site proper
respiratory protective equipment
will be provided to all
construction workers
32) The project proponent shall ensure The plinth level of Building
GROUP HOUSING PROJECT AT SECTOR - 109, VILLAGE – BABUPUR, GURGAON, HARYANA. Dec’14
M/s CHINTELS INDIA LTD.
plinth level of the building block is 1.5
meter above 100 years flood level of the
said Najafgarh Jheel.
Blocks is above to flood level of
the said Najafgarh Jheel
33) The project proponent shall obtain NOC
from HUDA as well as Irrigation
Department before the start of
construction, regarding possible adverse
effect of the project proposal on the said
Najafgarh Jheel.
The NOC from HUDA and
Irrigation department will be
submitted with forthcoming
compliance report.
34) The project proponent shall develop
complete civic infrastructure of the
Group Housing Colony including
internal roads, green belt development,
sewerage line, Rain Water recharge
arrangements, Storm Water drainage
system, Solid Waste Management Site
and provision for treatment of bio-
degradable waste, STP, water supply
line, dual plumbing line, electric supply
lines etc. And shall offer possession of
the units/ flats thereafter.
All the amenities and facilities
will be provided as mentioned in
proposal and commitment made
during presentation before
SEIAA, Haryana.
35) The project proponent shall provide one
refuse area till 24 meter, one till 39
meter and one after every 15 meter as
per National Building Code.
Not Required as each flats have
own balcony.
36) The project proponent shall provide fire
control room and fire officer for building
above 30 meter as per National Building
Code.
It will be followed. Provision for
separate fire control room will be
insured.
GROUP HOUSING PROJECT AT SECTOR - 109, VILLAGE – BABUPUR, GURGAON, HARYANA. Dec’14
M/s CHINTELS INDIA LTD.
37) The project proponent shall obtain
permission of Mines and Geology
Department for excavation of Soil before
the start of construction.
All the excavated soil has been
stored in the campus only.
38) The project proponent shall seek
specific prior approval from concerned
local Authority/ HUDA regarding
provision of Storm Drainage and
sewerage system including their
integration with external services of
HUDA/ Local Authorities beside other
required services before taking up any
construction activity.
All the necessary approval from
concerned local Authority/
HUDA regarding provision of
Storm Drainage and sewerage
system including their
integration with external services
of HUDA/ Local Authorities will
be taken.
39) The site for solid waste management
plant be earmarked on the layout plan
and the detailed project for setting up
the solid waste management plant shall
be submitted to the authority within
one month.
Solid waste will be collected by
using door to door network.
Collection will be done in the
campus and will be sent to the
municipal solid waste
management site. Biodegradable
waste produced at site will be
given to authorized recycler for
vermicomposting.
40) The project proponent ensures that no
construction activity is undertaken
either on surface or below or above
surface of revenue rasta passing
through the project area.
It is ensured that no
construction activity will be
undertaken either on or below or
above revenue rasta passing
through the project area.
41) The project proponent shall indicate the
width and length of revenue rasta
This will be followed.
GROUP HOUSING PROJECT AT SECTOR - 109, VILLAGE – BABUPUR, GURGAON, HARYANA. Dec’14
M/s CHINTELS INDIA LTD.
stretch, for awareness of public, Sign
boards shall also display the message
that this is public rasta/road and any
citizen can use it. There shall not be
any gate with or without guards on
revenue rasta.
42) The project proponent shall submit the
copy of fire safety plan duly approved by
Fire Department before the start of
construction.
Copy of fire safety plan has
already been submitted to SEIIA,
Haryana.
43) The project proponent shall provide
helipad facility as required under NBC
Norms and shall seek permission of
helipad from AAI accordingly
This will be followed as the
maximum height of building will
be 95.50 meters.
44) The project proponent shall not raise
any construction activity in the ROW
reserved/ acquired for High Tension
Wire Passing through the project area
and shall maintain horizontal and
vertical ROW as required under Indian
Electricity Rules, 1956/DHBVN latest
instruction.
This is being followed.
45) The project proponent shall provide rain
water pumping system in the project
area to avoid water logging in the
project area.
However water logging at the site
is rare but at some moment
water may be logged mostly
during rainy season. At this
moment water logging will be
prevented by using water
pumping system.
GROUP HOUSING PROJECT AT SECTOR - 109, VILLAGE – BABUPUR, GURGAON, HARYANA. Dec’14
M/s CHINTELS INDIA LTD.
OPERATION PHASE
a) “Consent to Operate” shall be
obtained from Haryana State
Pollution Control Board under Air
and Water Act and a copy shall be
submitted to SEIAA, Haryana.
This will be followed after
completion of construction phase
and prior to Operation Phase of
the project.
b) The Sewage Treatment Plant (STP)
shall be installed for the treatment
of the sewage to the prescribed
standards including odor and
treated effluent shall be recycled.
The installation of the STP should
be certified by an independent
expert and a report in this regard
shall be submitted to the SEIAA,
Haryana before the project is
commissioned for operation.
Tertiary treatment of waste water is
mandatory. Tertiary treatment of
waste water is mandatory. The
project proponent shall remove not
only ortho phosphorus but total
phosphorus to the extent of less
than 2 mg/liter. Similarly total
Nitrogen level shall conform to the
norms and standards of
CPCB/HSPCB, whichever is
environmentally better, Project
Proponent shall implement such
a) STP of capacity 790 KLD
(450 KLD of STP in Phase-i
while 340 KLD of STP in
Phase-II) will be installed
at the site. Civil work of
phase-I STP is being done.
b) Persons will be deputed for
handling and managing of
STP.
c) Treated effluent will be
reused in flushing,
horticulture and
recreational activities like
sprinkling on road etc.,
dual plumbing plan will be
adopted for the same.
d) All the parameters are
measure by HSPCB and
are under prescribed limit
of CPCB
GROUP HOUSING PROJECT AT SECTOR - 109, VILLAGE – BABUPUR, GURGAON, HARYANA. Dec’14
M/s CHINTELS INDIA LTD.
STP technology which does not
require filter backwash.
c) Separation of the grey and black
water should be done by the use of
dual plumbing line. Treatment of
100% grey water by decentralized
treatment should be done ensuring
that the re-circulated water should
have BOD less than 10 mg/ltr and
the recycled water will be used for
flushing, gardening and DG set
cooling etc. achieve zero exit
discharge.
Dual Plumbing line will be
provided for the separation of the
grey and black water generated
from site. Dual Plumbing Plan
Already has been submitted to
SEIAA, Haryana. Treated water
from In-house STP will be
recirculated through dual
plumbing system to achieve zero
exit discharge.
d) For disinfection of the treated
wastewater ultra-violet radiation of
ozonization process should be used.
This will be followed during
installation of STP at site.
e) Diesel power generating sets
proposed as source of back-up
power for lifts, common area
illumination and for domestic use
should be enclosed type and
conform to rules made under the
Environmental (Protection) Act,
1986. The location of the DG sets
shall be in the basement as
promised by the project proponent
with appropriate stack height above
the highest roof level of the project
as per the CPCB norms. The diesel
Proposed Diesel Generator will be
used only in case of normal
power Failure.
GROUP HOUSING PROJECT AT SECTOR - 109, VILLAGE – BABUPUR, GURGAON, HARYANA. Dec’14
M/s CHINTELS INDIA LTD.
used for DG sets shall be ultra-low
Sulphur diesel ( 0.05 % sulphur),
instead of low Sulphur diesel.
g) The project proponent as stated in
the proposal should maintain at
least 32.86% green cover area for
tree plantation especially all around
the periphery of the project and on
the road sides preferably with local
species which can provide
protection against noise and
suspended particulate matter. The
open spaces inside the plot should
be preferably landscaped and
covered with vegetation/grass,
herbs and shrubs. Only locally
available plant species shall be
used.
This will be followed. Greenbelt
will be developed as per plan
submitted to SEIAA and will be
32.86 % of the total Plot Area.
h) The project proponent shall strive to
minimize water in irrigation of
landscape by minimizing grass
area, using native variety,
xeriscaping and mulching utilizing
efficient irrigation system,
scheduling irrigation only after
checking evapo- transpiration data.
Agreed. Irrigation of landscape by
minimizing grass area, using
native variety, xeriscaping and
mulching utilizing efficient
irrigation system will be used to
minimize the water demand.
Irrigation will be scheduled only
after checking evapo-
transpiration data.
i) Rainwater harvesting for roof run-
off and surface run-off, as per plan
a) Total 21 RWH pits will be
constructed as per the plan
GROUP HOUSING PROJECT AT SECTOR - 109, VILLAGE – BABUPUR, GURGAON, HARYANA. Dec’14
M/s CHINTELS INDIA LTD.
submitted should be implemented.
Before recharging the surface run-
off, pre-treatment through
sedimentation tanks must be done
to remove suspended matter, oil
and grease. The bore well for
rainwater recharging shall be kept
at least 5 mts. above the highest
ground water table. Care should be
taken that the contaminated water
does not enter any RWH pit. The
project proponent shall avoid
Rainwater Harvesting of first 10
minutes of rainfall. Roof top of the
building shall be without any toxic
material or paint which can
contaminate rain water. Wire mess
and filters should be used wherever
required.
submitted to SEIAA,
Haryana.
b) Rainwater harvesting as
per plan for roof run-off
and surface run-off will be
implemented
c) Suspended matter, oil and
grease will be removed by
treatment before
recharging with surface
run-off.
d) The bore well for recharge
will be kept at least 5 mts.
above the highest ground
water table.
j) The ground water level and its
quality should be monitored
regularly in the consultation with
Central Ground Water Authority.
This will be followed.
k) There should be no traffic
congestion near the entry and exit
points from the roads adjoining the
proposed project site. Parking
should be fully internalized and no
public should be utilized.
Parking will be fully internalized.
Entry and exit point will be bell
shaped to minimize the traffic
congestion at the entry and exit
gate.
GROUP HOUSING PROJECT AT SECTOR - 109, VILLAGE – BABUPUR, GURGAON, HARYANA. Dec’14
M/s CHINTELS INDIA LTD.
l) A report on the energy conservation
measures conforming to energy
conservation norms finalize by
Bureau of Energy Efficiency should
be prepared incorporating details
about building materials &
technology; R & U factors etc. and
submit to the SEIAA in three
month’s time.
Report on Energy conservation
measures and details about
building materials & technology;
R & U factors etc. have been
submitted with proposal.
m Energy conservation measures like
installation of LED for lighting the
areas outside the building should
be integral part of the project design
and should be in place before
project commissioning. Use of solar
panels must be adapted to the
maximum extent possible for energy
conservation.
a) LEDs will be used wherever
possible as a measure of
energy conservation.
b) Use of T-5 and solar lighting
in open spaces, common
area, and landscape area for
lighting outside the building
will be the integral part of the
project design.
c) Used CFLs and TFLs will be
properly collected and
disposed of properly and will
be sent to authorized dealers
and recyclers so as to avoid
mercury contamination.
n) The project proponent shall use
zero ozone depleting potential
material in insulation, refrigeration,
air conditioning and adhesive.
Project proponent shall also provide
Agreed. We will encourage and
aware resident to use zero ozone
depleting potential material in
insulation, refrigeration, air
conditioning and adhesive.
GROUP HOUSING PROJECT AT SECTOR - 109, VILLAGE – BABUPUR, GURGAON, HARYANA. Dec’14
M/s CHINTELS INDIA LTD.
Halcon free fire suspension system.
0) The solid waste generated should be
properly collected and segregated as
per the requirement of the MSW
Rules, 2000 and as amended from
time to time. The bio-degradable
waste should be treated by
appropriate technology at the site
earmarked within the project area
and dry/inert solid waste should be
disposed off to the approved sites
for land filling after recovering
recyclable material.
This will be followed during
operation phase as:
a) The solid waste will be
collected and segregated as
per the requirement of the
MSW Rules, 2000.
b) The bio-degradable waste
will be composted by using
organic waste converter at
the site earmarked within
the project area, and this
will be implemented in the
near future.
c) Dry/inert solid waste will
be disposed off to the
approved sites for land
filling after recovering
recyclable material.
p) The provision of solar water heating
system shall be as per norms
specified by HAREDA and shall be
made operational in each building
block.
Each tower will be equipped with
solar water heating system as per
HAREDA norms.
q) The traffic plan and the parking
plan proposed by the project
proponent should be adhered to
meticulously with further scope of
additional parking for future
Traffic plan and Parking will be
developed as per plan submitted
to SEIAA, Haryana.
GROUP HOUSING PROJECT AT SECTOR - 109, VILLAGE – BABUPUR, GURGAON, HARYANA. Dec’14
M/s CHINTELS INDIA LTD.
requirement. There should be no
traffic congestion near the entry
and exit points from the road
adjoining the proposed project site.
Parking should be fully internalized
and no public space should be
used.
r) The project shall be operationalized
only when HUDA/ public authority
will provide domestic water supply
system in the area.
This will be followed.
s) Operation and maintenance of STP,
solid waste management and
Electrical Infrastructure, pollution
control measures shall be ensured
even after the completion of the
Project.
Agreed. Operation and
maintenance of STP, solid waste
management and Electrical
Infrastructure will be ensured for
lifetime as contract will be done
by various agencies and all these
conditions will be mentioned in
the MOU signed with RWA at the
time of handing over the project
t) Different types of Wastes should be
disposed off as per the provisions of
Municipal Solid Waste, biomedical
waste, Hazardous waste, e- waste,
batteries and plastic rules made
under Environment Protection Act,
1986. Particularly e-waste and
battery waste shall be disposed of
as per existing E-waste
a) Different type of solid
waste will be generated
and collected in colored
bins (green, blue and dark
grey) separate for bio-
degradable and non-
biodegradable are proposed
to be provided at the
strategic locations within
GROUP HOUSING PROJECT AT SECTOR - 109, VILLAGE – BABUPUR, GURGAON, HARYANA. Dec’14
M/s CHINTELS INDIA LTD.
Management Rules 2011 and
Batteries Management Rules 2001.
The project proponent should
maintain a collection center for E-
waste and it should be disposed of
to only registered and authorized
dismantler/ recycler.
the site and will be done
according to solid waste
management plan
mentioned in Report.
b) Biodegradable waste will
be subjected to
composting. The inert solid
waste will be transported
to a local Solid Waste
dumping site.
c) E-waste will be collected by
the authorized recycler and
MoU for the same will be
done and submitted to the
office.
u) Standards for discharge of
Environmental pollutants as
enshrined in various schedules of
rule 3 of Environment Protection
Rule 1986 shall be strictly complied
with.
Air Pollution: Only source of Air
Pollution will be DG Set, stack
height will be maintained 6m
above the highest roof level for
better dispersion of Pollutant
generated from DG sets.
Noise Pollution: Only source of
Noise Pollution will be DG Set,
Enclosure and silencers will be
provided on the DG Set to reduce
the noise to impact the
surroundings.
Soil Pollution: Landscaping will
be done properly with the start of
GROUP HOUSING PROJECT AT SECTOR - 109, VILLAGE – BABUPUR, GURGAON, HARYANA. Dec’14
M/s CHINTELS INDIA LTD.
construction work to prevent soil
pollution.
Water Pollution: STP of capacity
550 KLD has been installed and
treated effluent is reused in
Horticulture and Flushing
through Dual Plumbing Lines.
v) Water Supply shall be metered to
different residential units and
different utilities.
Separate meter will be provided
to the STP for measuring and
calculation of water demand.
w) The project proponent shall ensure
that the stack height of DG Sets is
as per the CPCB guidelines and
also ensure that the emission
standards of noise and air are
within the CPCB prescribed limits.
Noise and Emission level of DG Sets
greater than 800 KVA shall be as
per CPCB latest standards for high
capacity DG Sets.
Stack Height of DG Sets will be
maintained 6m above the height
of the tallest building and as per
CPCB norms
x) All electric supply exceeding 100
amps, 3 phases shall maintain the
power factor between 0.98 lag to 1
at the time of connection.
It will be followed.
y) The project proponent shall not use
fresh water for HVAC and DG
cooling. Air based HVAC system
should be adopted and only treated
water shall be used by project
a) Treated water from STP
will be reused in DG Set
Cooling.
b) Coil type cooling DG Sets
shall be used for saving
GROUP HOUSING PROJECT AT SECTOR - 109, VILLAGE – BABUPUR, GURGAON, HARYANA. Dec’14
M/s CHINTELS INDIA LTD.
proponent for cooling, if it is all
needed. . The project Proponent
shall also use evaporative cooling
technology and double stage cooling
system for HVAC in order to reduce
water consumption. Further,
temperature, relative humidity
during summer and winter seasons
should be kept in optimal level.
Variable speed drive, best co-
efficient of Performance, as well as
optimal integrated point load value
and minimum outside fresh air
supply may be restored for
conservation of power and water.
Coil type cooling DG Sets shall be
used for saving cooling water
consumption for water cooled DG
Sets.
cooling water consumption
for water cooled DG Sets
c) It will be followed
z. The project proponent shall ensure
that the transformer is constructed
with high quality grain oriented, low
loss silicon steel and virgin
electrolyte grade copper. The project
proponent shall obtain
manufacturer’s certificate also for
that.
This will be followed at the time
of transformer installation.
aa) The project Proponent shall that
exit velocity from the stack should
We ensure the better quality of
drinking/domestic water to
GROUP HOUSING PROJECT AT SECTOR - 109, VILLAGE – BABUPUR, GURGAON, HARYANA. Dec’14
M/s CHINTELS INDIA LTD.
be sufficiently high. Stack shall be
designed in such a way that there is
no stack down-water under any
meteorological condition.
resident as per prescribed
standard.
ab) The project proponent shall provide
water sprinkling system in the
project area to suppress the dust in
addition to the already suggested
mitigation measures in the Air
Environment Chapter of EMP.
Water Sprinkling System will be
provided in lawn area and open
area for the suppression of dust.
PART-B. GENERAL CONDITIONS
i) The project Proponent shall ensure
the commitments made in Form -1,
Form- 1A, EIA/ EMP and other
documents submitted to SEIAA for
the protection of environment and
proposed environmental safeguards
are complied with in letter and
spirit. In case of contradiction
between two or more documents on
any point, the most environmentally
friendly commitment on the point
shall be taken by the project
proponent.
Commitments made in Form-1,
Form- 1A, EIA/ EMP and other
documents submitted to SEIAA
will be complied with.
ii) Six monthly compliance reports
should be submitted to the HSPCB
and Regional Office MoEF, GoI,
Northern Region, Chandigarh and a
copy to SEIAA Haryana.
Agreed.
GROUP HOUSING PROJECT AT SECTOR - 109, VILLAGE – BABUPUR, GURGAON, HARYANA. Dec’14
M/s CHINTELS INDIA LTD.
iii) STP Outlet after stabilization and
stack emission shall be monitored
monthly. Other environmental
parameters and green belt shall be
monitored on quarterly basis. After
every 3(three) month, the project
proponent shall conduct
environmental audit and shall take
corrective measures, if required,
without delay.
a) This monitoring schedule
will be implemented in
EMP and all the audit
findings will be
incorporated without delay.
b) The same will be added in
MOU signed with RWA.
iv) The SEIAA, Haryana reserves the
right to add additional safeguard
measure subsequently, if found
necessary. Environmental
Clearance granted will be revoked if
it is found that false information
has been given for getting approval
of this project. SEIAA reserves the
right to revoke the clearance if
conditions stipulated are not
implemented to the satisfaction of
SEIAA/ MoEF.
Agreed.
v) The project Proponent shall not
violate any judicial orders/
pronouncements issued by any
court/ tribunal.
It will be followed.
vi) All other statutory clearances such
as the approvals for storage of
diesel from Chief Controller of
All the required and necessary
permission are under process
while some has obtained as
GROUP HOUSING PROJECT AT SECTOR - 109, VILLAGE – BABUPUR, GURGAON, HARYANA. Dec’14
M/s CHINTELS INDIA LTD.
Explosives, Fire Department, Civil
Aviation Department, Forest
Conservation Act, 1980 and Wildlife
(Protection) Act, 1972, PLPA, 1900,
Forest Act, 1927 etc. shall be
obtained, as applicable by project
proponents from the respective
authorities prior to construction of
the project.
follows:
A) AAI NOC is enclosed as
Annexure-III.
B) Forest NOC is enclosed as
Annexure-IV.
C) Fire Scheme NOC is enclosed
as Annexure-V.
vii) The project Proponent should
inform the public that the project
has been accorded Environment
Clearance by the SEIAA and copies
of the clearance letter are available
with State Pollution Control Board
and SEIAA. This should be
advertised within 7 days from the
date of issue of the Environment
Clearance Letter at least in 2 local
newspapers that are widely
circulated in the region and the
copy of the same should be
forwarded to SEIAA Haryana. A
copy of Environment Clearance
conditions shall also be put on
project proponent’s website for
public awareness.
It will be followed and will be
submitted along with next
compliance report.
viii) Under the Provision of
Environmental (Protection) Act,
Agreed. Construction has been
started after obtaining
GROUP HOUSING PROJECT AT SECTOR - 109, VILLAGE – BABUPUR, GURGAON, HARYANA. Dec’14
M/s CHINTELS INDIA LTD.
1986, legal action shall be initiated
against the project proponent if it
was found that the construction of
project has been started before the
obtaining prior environmental
clearance.
Environmental Clearance vide
letter no. SEIAA/HR/2013/1079
dated 23-10-2013 and consent
to establish vide letter no.-
HSPCB/Consent/2821214GUN
OCTE408046 dated
18/02/2014.
ix) Any appeal against this
Environment Clearance shall lie
with the National Green Tribunal, if
preferred, within a period of 30
days as prescribed under section 16
of the National Green Tribunal Act,
2010.
Agreed.
x) The project Proponent shall put in
place Corporate Environment Policy
as mentioned in MoEF, GoI OM No.
J-11013/41/2006-IA II (I) dated
26.4.2012 within 3 months period.
Latest Corporate Environment
Policy should be submitted to
SEIAA within 3 months of issue of
this letter.
Corporate Environment Policy
will be Submitted to SEIAA in
forthcoming compliance report.
xi) The fund ear-marked for
environmental protection measures
should be kept in separate account
and should not be diverted for other
purposes and year wise expenditure
shall be reported to the SEIAA/RO
It will be followed.
GROUP HOUSING PROJECT AT SECTOR - 109, VILLAGE – BABUPUR, GURGAON, HARYANA. Dec’14
M/s CHINTELS INDIA LTD.
MoEF GoI under rules prescribed
for Environment Audit.
xi) The project proponent shall obtain
NOC under Aravali Notification from
CEC of Hon’ble Supreme Court
regarding coverage under Aravali
Notification before start of
construction.
Aravali NOC will be submitted
with next compliance report.
xii) The project Proponent shall ensure
the compliance of Forest
Department, Haryana Notification
No. S.O.121/PA2/1900/S.4/97
dated 28.11.1997.
project is Group Housing Project
only the Environmental Friendly
and Ornamental Plant will be
planted at site under Greenbelt
Development however point in
notification will be complied.
xiii) The project Proponent shall ensure
that no vehicle during
construction/operation phase enter
the project premises without valid
“Pollution Under Control”
It is ensured that only vehicle
with valid Pollution Under
Control certificate will be allowed
to the site.
xiv) The Project Proponent is
responsible for compliance of all
condition in Environment Clearance
letter and project Proponent cannot
absolve himself/herself of the
responsibility by shifting it to any
engaged by project proponent.
Agreed.
xv) The Project Proponent shall seek
fresh Environment Clearance if any
stage there is change in the
Agreed.
GROUP HOUSING PROJECT AT SECTOR - 109, VILLAGE – BABUPUR, GURGAON, HARYANA. Dec’14
M/s CHINTELS INDIA LTD.
planning of the proposed project.
xvi) Besides the developers/ Applicant,
the responsibility to ensure the
compliance of Environment
safeguard/condition imposed in the
Environmental Clearance letter
shall also lie on the license in
whose name/nemes the
License/CLU has been granted by
the Town & Country Planning
Department, Haryana.
Agreed.