Group of companies «CNO-Himmash»

Page 2: Group of companies «CNO-Himmashen.cnohim.com/Presentatciya.pdf · 2018-04-02 · certified according to the international standard ISO 900: 2008 and STO Gazprom 9001 - 2012. 11 Procurement

2

О компанииО компанииThe structure of the company

“AC Spetskonstruktsiya”

LLC “Genborg” LLC

“GMBP” LLC

“EC–Teplogazstroy”

LLC

TH “GMBP” LLC

“Vega” LLC

“PC ENVET”LLC

«Enterprise «CNO-Himmash» LLC

Page 3: Group of companies «CNO-Himmashen.cnohim.com/Presentatciya.pdf · 2018-04-02 · certified according to the international standard ISO 900: 2008 and STO Gazprom 9001 - 2012. 11 Procurement

3

Design, development and coordination of design documentation for manufactured products with engineering organizations;

Production of equipment for gas and oil refining, chemical and other industries;

Delivery of equipment by own motor transport;;

Conducting of installation supervision and pre-commissioning works;

Designer’s technical supervision;

Servicing and warranty maintenance.

Main directions

Page 4: Group of companies «CNO-Himmashen.cnohim.com/Presentatciya.pdf · 2018-04-02 · certified according to the international standard ISO 900: 2008 and STO Gazprom 9001 - 2012. 11 Procurement

4

Approval documents

Page 5: Group of companies «CNO-Himmashen.cnohim.com/Presentatciya.pdf · 2018-04-02 · certified according to the international standard ISO 900: 2008 and STO Gazprom 9001 - 2012. 11 Procurement

«Enterprise «CNO-Himmash» LLC

5

About the Company

The Limited Liability Company “Gribanovskiy machine-building plant” isthe fabrication yard.The enterprise specializes in the manufacturing of heat-exchangingequipment: air-cooled heat exchangers of different types, shell-and-tubeheat exchangers, plate heat exchangers, feed heat exchangers as well asspare parts for them.

Page 6: Group of companies «CNO-Himmashen.cnohim.com/Presentatciya.pdf · 2018-04-02 · certified according to the international standard ISO 900: 2008 and STO Gazprom 9001 - 2012. 11 Procurement

6

About the Company

“Gribanovskiy machine-building plant” LLC

Page 7: Group of companies «CNO-Himmashen.cnohim.com/Presentatciya.pdf · 2018-04-02 · certified according to the international standard ISO 900: 2008 and STO Gazprom 9001 - 2012. 11 Procurement

The enterprise today

7

History

Leadership

Environment protection

Confidence

Scope of supply

Innovation

In 2016 the plant celebrated its 80 anniversary

More than 5000 supplies for the last 10 years

One of the leading companies of the Russian Federation

Supplies for all the refineries of Russia

We do not do any harm to the environment.

Page 8: Group of companies «CNO-Himmashen.cnohim.com/Presentatciya.pdf · 2018-04-02 · certified according to the international standard ISO 900: 2008 and STO Gazprom 9001 - 2012. 11 Procurement

Purpose of our work

8

Efficiency improving

Accuracy increase

Resource-saving

Excluding of human factor

Safety control

Automation the workflow will reduce the time of work.

The programmable equipment allows identical execution of cyclic tasks.

High-tech equipment can reduce the number of workers.

Automation and robotization of production will avoid accidents caused by the human factor.

The exclusion of human physical labor provides a reduction of injuries in work.

Page 9: Group of companies «CNO-Himmashen.cnohim.com/Presentatciya.pdf · 2018-04-02 · certified according to the international standard ISO 900: 2008 and STO Gazprom 9001 - 2012. 11 Procurement

9

Work space

Land property – 13 haProduction area – 27 582 sq.mTotal area of buildings –Four machining centers with CNC and more than 50 units of metalworkingequipment.More than 50 welding semiautomatic machines, welding portal, rolls,scissors, sheet benders, presses, etc.Plasma and gas cuttingCranes with carrying capacity of 5, 10, 50 tonsFive special cars with semi-trailers for delivery of products to consumers.Number of workers – 573 persons

Page 10: Group of companies «CNO-Himmashen.cnohim.com/Presentatciya.pdf · 2018-04-02 · certified according to the international standard ISO 900: 2008 and STO Gazprom 9001 - 2012. 11 Procurement

10

Work space

Production facilities of the plant allow producing up to 60 units of heat exchanging equipment with a pipe length of up to 16,000 mm and a total weight of up to 800 tons per month.The quality of the products is ensured by the quality management system certified according to the international standard ISO 900: 2008 and STO Gazprom 9001 - 2012.

Page 11: Group of companies «CNO-Himmashen.cnohim.com/Presentatciya.pdf · 2018-04-02 · certified according to the international standard ISO 900: 2008 and STO Gazprom 9001 - 2012. 11 Procurement

11

Procurement and assembly workshop № 1 with an area of 10 000 square meters

The beginning of construction – March 2014The start-up – December 2015

The workshop consists of 3 aisles, each 24 meters long. The first aisle isoccupied by an automated straight-procuring line with advanced importedequipment. In two aisles of the workshop, there are two cranes with alifting capacity of 50 tons installed, what makes it possible to collectlarge-sized equipment with a weight of up to one hundred tons..

Page 12: Group of companies «CNO-Himmashen.cnohim.com/Presentatciya.pdf · 2018-04-02 · certified according to the international standard ISO 900: 2008 and STO Gazprom 9001 - 2012. 11 Procurement

12

Tube finning workshop № 2

Finning of monometallic and bimetallic pipes, production of rolling discs and louvered devices are performed in the workshop.

Page 13: Group of companies «CNO-Himmashen.cnohim.com/Presentatciya.pdf · 2018-04-02 · certified according to the international standard ISO 900: 2008 and STO Gazprom 9001 - 2012. 11 Procurement

13

Machine workshop № 3

The workshop is designed for machining of parts with length of up to 4 meters and width of up to 2 meters. The machinery equipment of the workshop consists of modern machining centers, which are multi-operational software with automatic tool change.

Page 14: Group of companies «CNO-Himmashen.cnohim.com/Presentatciya.pdf · 2018-04-02 · certified according to the international standard ISO 900: 2008 and STO Gazprom 9001 - 2012. 11 Procurement

14

Assembly workshop № 4

The workshop is designed for assembling and painting ofair-cooled heat exchangers and heat exchanging units.In 2012 the workshop produced air-cooled heatexchangers with operating pressure of 16 MPa for thefirst time, in 2015 - air-cooled heat exchangers withoperating pressure of 32 MPa, as well as shell-and-tubeheat exchangers weighing over 40 tons.

Page 15: Group of companies «CNO-Himmashen.cnohim.com/Presentatciya.pdf · 2018-04-02 · certified according to the international standard ISO 900: 2008 and STO Gazprom 9001 - 2012. 11 Procurement

15

Welding workshop № 9

Welding works are conducted in the workshop. Weldingequipment of the world's leading manufacturers isinstalled in it: LincolnElectric, KEMPPI, Migatronic,Noboruder. To ensure the compliance of the properties ofmetal and welded joints with standard parameters, athermal chamber furnace is installed in the workshop.There is an x-ray camera for quality control of products.All welders are certified by NAKS (National Agency forWelding Control) and have got all the necessarycertificates.

Page 16: Group of companies «CNO-Himmashen.cnohim.com/Presentatciya.pdf · 2018-04-02 · certified according to the international standard ISO 900: 2008 and STO Gazprom 9001 - 2012. 11 Procurement

Produced equipment

Air-cooled heat exchangers

16

Vessels are designed for cooling and condensation ofgas, vapor and liquid media in the technologicalprocesses of oil refining, petrochemical and relatedindustries.

Page 17: Group of companies «CNO-Himmashen.cnohim.com/Presentatciya.pdf · 2018-04-02 · certified according to the international standard ISO 900: 2008 and STO Gazprom 9001 - 2012. 11 Procurement

17

Produced equipment

Heat exchanging units

Heat exchanging equipment with a diameter of up to3000 mm, operating pressure up to 21 MPa and atotal weight of up to 100 tons in assembled units ofvarious types is produced:

- with fixed tubesheet- with temperature compensator on the shell- with floating head- with U-type pipes- tube-in-tube

Page 18: Group of companies «CNO-Himmashen.cnohim.com/Presentatciya.pdf · 2018-04-02 · certified according to the international standard ISO 900: 2008 and STO Gazprom 9001 - 2012. 11 Procurement

1

2

3

18

“Lukoil-Volgogradneftepererabotka” LLC“Lukoil-Nizhegorodnefteorgsintez” LLС“Lukoil-Permnefteorgsintez” LLС“Lukoil – WesternSiberia” LLC“Korobkovskiy gas processing plant” LLC

«LUKOIL» PJSC

Supplies of equipment within the country's main construction projects

Page 19: Group of companies «CNO-Himmashen.cnohim.com/Presentatciya.pdf · 2018-04-02 · certified according to the international standard ISO 900: 2008 and STO Gazprom 9001 - 2012. 11 Procurement

Supplies of equipment within the country's main construction projects

1

2

3

19

“Achinsk Refinery” OJSC“Syzran Refinery” OJSC“Kuibyshev Refinery” OJSC“RN-Tuapse Refinery” LLC“RN-KomsomolskRefinery” LLC“Novokuibyshev Refinery” OJSC“Saratov Refinery” OJSC“Angarsk Polymer Plant” OJSC“Angarsk Petrochemical Company” OJSC“Ryzan Refinery Company” CJSC“Novokuibyshev Lubricants and Additives Plant” OJSC

«NC Rosneft» PJSC

Page 20: Group of companies «CNO-Himmashen.cnohim.com/Presentatciya.pdf · 2018-04-02 · certified according to the international standard ISO 900: 2008 and STO Gazprom 9001 - 2012. 11 Procurement

20

“Voronezhsintezkauchuk”OJSC“Tomskneftekhim” LLC“Sibur Tumengas” OJSC“Tobolsk - neftekhim” LLC“ZapSibNeftekhim” LLC“Korobkovskiy gas processing plant” LLC“Yuzhno-Priobskiy gas processing plant” LLC

«Sibur Holding» PJSC

Supplies of equipment within the country's main construction projects

Page 21: Group of companies «CNO-Himmashen.cnohim.com/Presentatciya.pdf · 2018-04-02 · certified according to the international standard ISO 900: 2008 and STO Gazprom 9001 - 2012. 11 Procurement

1

2

3

21

“Ufimskiy Refinery” OJSC“Novoil” OJSC“Ufaneftekhim” OJSC“Bashneft - Polus” LLC

«Bashneft» PJSC

Supplies of equipment within the country's main construction projects

Page 22: Group of companies «CNO-Himmashen.cnohim.com/Presentatciya.pdf · 2018-04-02 · certified according to the international standard ISO 900: 2008 and STO Gazprom 9001 - 2012. 11 Procurement

22

“GazpromNeft – Omsk Refinery” OJSC“GazpromNeft –Lubricants and Additives Plant” OJSC“GazpromNeft – Moscow refinery” OJSC“Slavneft – Yaroslavnefteorgsintez” OJSC

“Gazprom - Neft” PJSC

Supplies of equipment within the country's main construction projects

Page 23: Group of companies «CNO-Himmashen.cnohim.com/Presentatciya.pdf · 2018-04-02 · certified according to the international standard ISO 900: 2008 and STO Gazprom 9001 - 2012. 11 Procurement

“GazpromNeft – Yamal” LLC

23

air-cooled heat exchanger of high pressure up to 32 MPa

Supplies of equipment within the country's main construction projects

Complex of facilities for gas and condensate comprimering and preparing in the Novoportovskoye oil, gas and condensate field.

Page 24: Group of companies «CNO-Himmashen.cnohim.com/Presentatciya.pdf · 2018-04-02 · certified according to the international standard ISO 900: 2008 and STO Gazprom 9001 - 2012. 11 Procurement

ПАО «Газпром»

24

Supplies of equipment within the country's main construction projects

Boosting compressor station for gas treating unit – 3S of Zapolyarnoe oil, gas and condensate field (1st stage)

The unit for gas preparation of deethanization of Urengoy condensate pre-transportation preparation plant.

Reconstruction of boosting compressor station in the Urengoy condensate pre-transportation preparation plant for providing the Novy Urengoy gas chemical comlexwith raw materials.

42 units of gas air-cooled heat exchanger were brought into operation under the project of compressor station “Pikalevskaya” for the object “Development of gas transportation capacity of unified gas supply system of North-West Region”.

Page 25: Group of companies «CNO-Himmashen.cnohim.com/Presentatciya.pdf · 2018-04-02 · certified according to the international standard ISO 900: 2008 and STO Gazprom 9001 - 2012. 11 Procurement

Thank you for the attention!