COMPRES 2007 Annual COMPRES 2007 Annual Meeting Meeting GSECARS Update GSECARS Update Now have 3 beamlines running 100% of the time: 13- Now have 3 beamlines running 100% of the time: 13- ID-D (undulator), 13-BMD (bending magnet end ID-D (undulator), 13-BMD (bending magnet end station), 13-BMC (bending magnet side station, station), 13-BMC (bending magnet side station, commissioning) commissioning) Techniques available to the scientific community Techniques available to the scientific community Diamond Anvil Cell: Diamond Anvil Cell: energy-dispersive and energy-dispersive and monochromatic diffraction and spectroscopy monochromatic diffraction and spectroscopy Multi-anvil Press: Multi-anvil Press: energy-dispersive and energy-dispersive and monochromatic diffraction and imaging (250 ton and monochromatic diffraction and imaging (250 ton and 1000 ton press; acoustics, tomography) 1000 ton press; acoustics, tomography) Microprobe: Microprobe: XRF, XRF, XAFS, XAFS, CMT, CMT, XRD XRD Microtomography: Microtomography: absorption and edge CMT absorption and edge CMT Surface scattering and spectroscopy: Surface scattering and spectroscopy: CTR, CTR, XSW, XSW, reflectivity, GIXAFS. reflectivity, GIXAFS. Extended X-ray Absorption Fine Structure Extended X-ray Absorption Fine Structure (EXAFS) (EXAFS) Microcrystal and powder diffraction Microcrystal and powder diffraction Inelastic scattering in the DAC Inelastic scattering in the DAC Brillouin spectroscopy in the DAC Brillouin spectroscopy in the DAC

GSECARS Update

  • Upload
    miyoko

  • View
    38

  • Download
    0

Embed Size (px)

DESCRIPTION

GSECARS Update. Now have 3 beamlines running 100% of the time: 13-ID-D (undulator), 13-BMD (bending magnet end station), 13-BMC (bending magnet side station, commissioning) Techniques available to the scientific community - PowerPoint PPT Presentation

Citation preview

Page 1: GSECARS Update

COMPRES 2007 Annual MeetingCOMPRES 2007 Annual Meeting

GSECARS UpdateGSECARS UpdateNow have 3 beamlines running 100% of the time: 13-ID-D Now have 3 beamlines running 100% of the time: 13-ID-D (undulator), 13-BMD (bending magnet end station), 13-BMC (undulator), 13-BMD (bending magnet end station), 13-BMC (bending magnet side station, commissioning)(bending magnet side station, commissioning)

Techniques available to the scientific communityTechniques available to the scientific community

Diamond Anvil Cell: Diamond Anvil Cell: energy-dispersive and monochromatic diffraction energy-dispersive and monochromatic diffraction and spectroscopyand spectroscopy Multi-anvil Press: Multi-anvil Press: energy-dispersive and monochromatic diffraction energy-dispersive and monochromatic diffraction and imaging (250 ton and 1000 ton press; acoustics, tomography)and imaging (250 ton and 1000 ton press; acoustics, tomography)Microprobe: Microprobe: XRF, XRF, XAFS, XAFS, CMT, CMT, XRDXRD Microtomography: Microtomography: absorption and edge CMTabsorption and edge CMTSurface scattering and spectroscopy: Surface scattering and spectroscopy: CTR,CTR, XSW, reflectivity, XSW, reflectivity, GIXAFS.GIXAFS.Extended X-ray Absorption Fine StructureExtended X-ray Absorption Fine Structure (EXAFS) (EXAFS)Microcrystal and powder diffractionMicrocrystal and powder diffractionInelastic scattering in the DACInelastic scattering in the DACBrillouin spectroscopy in the DACBrillouin spectroscopy in the DAC

Page 2: GSECARS Update

COMPRES 2007 Annual MeetingCOMPRES 2007 Annual Meeting

GSECARS allocates 100% of available beam time on the basis of reviewed proposals through web-based forms (both GSECARS and APS ratings).

• All GSECARS proposals are submitted through the APS General User Program.

Productivity Summary Most Recent 12 months

ID Experiments 103 BM Experiments 105 Total Experiments 208 Beam Time Proposals Received

248

Oversubscription rate (ID) 2.5 Oversubscription rate (BM) 1.8 Outside Users (unique) 221 (2006) User visits 406 (2006) Publications: 2006 70 Publications 2007 to date 12 Publications total 530

GSECARS User ProgramGSECARS User Program

Page 3: GSECARS Update

COMPRES 2007 Annual MeetingCOMPRES 2007 Annual Meeting

GSECARS FundingGSECARS Funding NSF-EARNSF-EAR

Operations funding for FY2007 is $1.81M. Grant was fully funded with Operations funding for FY2007 is $1.81M. Grant was fully funded with increase to $2.05M in FY2008. However, in February we were told to increase to $2.05M in FY2008. However, in February we were told to submit flat budget ($1.81M)submit flat budget ($1.81M)

Essentially no money for equipment in FY2007Essentially no money for equipment in FY2007 NSF-Major Research InstrumentationNSF-Major Research Instrumentation

X-ray optics to complete the 13-BM-C side station ($550K; $88K match; X-ray optics to complete the 13-BM-C side station ($550K; $88K match; 2004 – 2007)2004 – 2007)

Another MRI grant to UNLV for single-crystal diffraction in DAC has $225 Another MRI grant to UNLV for single-crystal diffraction in DAC has $225 for CCD detector for GSECARS, received.for CCD detector for GSECARS, received.

COMPRES Infrastructure Projects COMPRES Infrastructure Projects CO2 Laser Heating: Postdoc and laser system supportCO2 Laser Heating: Postdoc and laser system support Gas Loading Facility: $118K equipmentGas Loading Facility: $118K equipment Multi-anvil Module Project: $68KMulti-anvil Module Project: $68K equipmentequipment Johnson Noise Thermometry Project: $36KJohnson Noise Thermometry Project: $36K

Page 4: GSECARS Update

COMPRES 2007 Annual MeetingCOMPRES 2007 Annual Meeting

GSECARS Funding (cont)GSECARS Funding (cont) NSF-GeophysicsNSF-Geophysics

Rheology Grand Challenge project recently funded, contains Rheology Grand Challenge project recently funded, contains $270K for post-doc and supplies for GSECARS.$270K for post-doc and supplies for GSECARS.

DOE – Midscale Instrumentation ProposalDOE – Midscale Instrumentation Proposal $864K mostly detector-related equipment in main NSF/DOE $864K mostly detector-related equipment in main NSF/DOE

renewal proposal submitted in Aug. 2006 at request of DOE renewal proposal submitted in Aug. 2006 at request of DOE program manager.program manager.

No funds in FY2007. Proposals will be held over for FY2008 when No funds in FY2007. Proposals will be held over for FY2008 when program should be funded.program should be funded.

NSF-EAR Nanoscale Research (NIRT)NSF-EAR Nanoscale Research (NIRT) Award to U. Alaska (T. Trainor, PI; $1.3M, 2004-2008; $310K Award to U. Alaska (T. Trainor, PI; $1.3M, 2004-2008; $310K

subcontract to UofC (P. Eng, PI) supports postdocsubcontract to UofC (P. Eng, PI) supports postdoc

Page 5: GSECARS Update

13ID-C13ID-D13ID-B 13ID-A

13BM-D

13BM-C13BM-B

13ID-C213ID-D13ID-B 13ID-A

13BM-D

13BM-C13BM-B13ID-C1

LVP Laser Heated DAC

Microprobe

Horz. Focusing Mirror

Existing Mono. ID-C2 / DDiffractometer

Vert. Focusing Mirror

New Mono. ID-C1

New Horz. Deflecting Mirrors

ID Mono.

New Wall

Horz. Focusing Mirror

A.

B. Vert. Focusing Mirror

New Door

New Beam Center Line

New Shutters:C2/D& C1Shielded Beam Pipe

13ID-C13ID-D13ID-B 13ID-A

13BM-D

13BM-C13BM-B

13ID-C13ID-D13ID-B 13ID-A

13BM-D

13BM-C13BM-B

13ID-C213ID-D13ID-B 13ID-A

13BM-D

13BM-C13BM-B13ID-C1

13ID-C213ID-D13ID-B 13ID-A

13BM-D

13BM-C13BM-B13ID-C1

LVP Laser Heated DAC

Microprobe

Horz. Focusing Mirror

Existing Mono. ID-C2 / DDiffractometer

Vert. Focusing Mirror

New Mono. ID-C1

New Horz. Deflecting Mirrors

ID Mono.

New Wall

Horz. Focusing Mirror

A.

B. Vert. Focusing Mirror

New Door

New Beam Center Line

New Shutters:C2/D& C1Shielded Beam Pipe

Canted Undulator UpgradeCanted Undulator UpgradeProposal submitted to APS SAC Dec. 2006, waiting Proposal submitted to APS SAC Dec. 2006, waiting for responsefor responseGreatly increases time for high-pressure, Greatly increases time for high-pressure, microprobe is separated and runs 100% of timemicroprobe is separated and runs 100% of time

Page 6: GSECARS Update

COMPRES 2007 Annual MeetingCOMPRES 2007 Annual Meeting

Detector HighlightsDetector Highlights• MAR-165 CCD detectors (2)

One funded by GSECARS-NSF and second by NSF-MRI UNLV/Dera single-crystal diamond cell grant.

• MAR-345 online image plate

GSECARS now has 2, new one funded by GSECARS-NSF

• Roper visible light CCDs

4 new cameras for LVP, tomography, diagnostics

Page 7: GSECARS Update

COMPRES 2007 Annual MeetingCOMPRES 2007 Annual Meeting

Detector HighlightsDetector Highlights• Silicon Drift Diode detectors for energy-dispersive spectroscopy

GSECARS has 4-element detector on 6-month loan from SII under SBIR grant, being used right now.

Second 8-element (?) detector to be funded by grant to Kathy Kitts at NIU.

• Pilatus Pixel Array detector

State of the art detector. 500x200 array of 170x170 micron pixels. Each pixel has energy discriminator and 20-bit counter. Can count 2MHz/pixel, more than 200 frames/second.

Revolutionary for surface diffraction.

Could be used for very fast diffraction studies

Page 8: GSECARS Update

COMPRES 2007 Annual MeetingCOMPRES 2007 Annual Meeting

Hardware Development HighlightsHardware Development HighlightsBM-C Development (interface diffraction and single-

crystal diffraction at high pressure): •Mirror tank, vertical focusing mirror installed. •Unfocussed monochromator being used, bender being

fabricated.•In commissioning for surface diffraction this week, DAC

experiments soon•Proposals in 2008-1

BM-D Brillouin Spectroscopy Instrument • Upgrade to diamond cell apparatus• COMPRES infrastructure project led by UIUC (J. Bass)• Two cycles now run in “user mode”• Report at this meeting

Page 9: GSECARS Update

COMPRES 2007 Annual MeetingCOMPRES 2007 Annual Meeting

Hardware Development Highlights (cont.)Hardware Development Highlights (cont.)

ID-D CO2 heating laser• Being installed in 13-ID-D. Alexei Kuznetsov talk at this meeting.

Gas loading facility for DAC• Gas loading system being built by GSECARS with COMPRES funds, will be available to all high-pressure users at the APS.•Progress report at this meeting.

•Multianvil•Tomography•D-DIA30•Torroidal cell

Page 10: GSECARS Update

COMPRES 2007 Annual MeetingCOMPRES 2007 Annual Meeting

Hardware Development Highlights (cont.)Hardware Development Highlights (cont.)

ID-D Diode Laser Upgrade• Fiber laser replacements for YLF heating lasers received and installed. Higher power and stability. 3 fiber lasers received, one will be for offline heating in laser lab, 2 for online use in ID-D.

•YLF lasers could be moved to X17 to replace old YAG laser there

Microprobe Stage Upgrade• Sample stage has been upgraded with a second X-Y-θ tier with 10 nm precision equipped with encoders.

Page 11: GSECARS Update

COMPRES 2007 Annual MeetingCOMPRES 2007 Annual Meeting

Page 12: GSECARS Update

COMPRES 2007 Annual MeetingCOMPRES 2007 Annual Meeting

B: DIA C: D-DIA D: T-Cup E: T-10

F: Hi-P Tomogr.

A: T-25

Multiple LVP Techniques

G: Torroidal cell

Page 13: GSECARS Update

COMPRES 2007 Annual MeetingCOMPRES 2007 Annual Meeting

GSECARS Personnel NewsGSECARS Personnel News• Przemek Dera began as beamline scientist for the

DAC program on June 15.

• Norimasa Nishiyama, beamline scientist for the LVP has returned to Japan.

• Alexei Kuznetsov, post-doc for CO2 laser heating development; COMPRES and GSECARS funding

• Atsushi Kubo, post-doc for DAC

• Takeshi Sanehira, post-doc for Johnson noise thermometry project, COMPRES and GSECARS funding.

Page 14: GSECARS Update

COMPRES 2007 Annual MeetingCOMPRES 2007 Annual Meeting

GSECARS Near Term GoalsGSECARS Near Term Goals Bring the 13-BM-C station fully online with scientific Bring the 13-BM-C station fully online with scientific

programs in interface diffraction and single-crystal programs in interface diffraction and single-crystal diffraction at high pressurediffraction at high pressure

Further develop the D-DIA apparatus for deformation Further develop the D-DIA apparatus for deformation experiments in the multi-anvil pressexperiments in the multi-anvil press

Further develop the high-pressure tomography Further develop the high-pressure tomography technique in the multi-anvil presstechnique in the multi-anvil press

Expand user program on the Brillouin spectroscopy Expand user program on the Brillouin spectroscopy system in 13-BM-Dsystem in 13-BM-D

Install and commission COInstall and commission CO22 laser heating for the DAC laser heating for the DAC in 13-ID-Din 13-ID-D

Install and commission gas loading system for DACInstall and commission gas loading system for DAC If APS SAC approves proposal for simultaneous If APS SAC approves proposal for simultaneous

operation of 13-ID-C and D with canted undulators operation of 13-ID-C and D with canted undulators then submit NSF-MRI proposal for upgrades then submit NSF-MRI proposal for upgrades downstream of shield wall. downstream of shield wall.