GSI Darmstadt Site report • FAIR project • Overview IT at GSI Helmut Kreiser

GSI Darmstadt

  • Upload
    travis

  • View
    68

  • Download
    1

Embed Size (px)

DESCRIPTION

Site report FAIR project Overview IT at GSI Helmut Kreiser. GSI Darmstadt. Das FAIR Projekt F acility for A ntiproton and I on R esearch Jürgen Eschke. Vortrag Wissenschaft für Alle, GSI, 12.5.2004. FAIR. V erbesserung gegenüber heute: Primärstrahlintensität 100 – 1000 x - PowerPoint PPT Presentation

Citation preview

Page 1: GSI Darmstadt

GSI Darmstadt

Site report

• FAIR project

• Overview IT at GSI

Helmut Kreiser

Page 2: GSI Darmstadt

Das FAIR Projekt

Facility for Antiproton and Ion Research

Jürgen Eschke

Vortrag Wissenschaft für Alle, GSI, 12.5.2004

Page 3: GSI Darmstadt

UNILAC

ESR

GSIAcceleratorFacilities

SIS100/SIS300

Plasma Physics

CBMHESR

NESR

Super- FRS

CR

Atomic Physics

PANDA

FLAIR

Verbesserung gegenüber heute: Primärstrahlintensität 100 – 1000 x

Sekundärstrahlintensitäten für radioaktive Kerne: bis 10 000x

Ionenenergie: 20 x

Neu: schnell gepulste supraleitende

Magnete

„gekühlte“ Antiprotonenstrahlen bis 15 GeV

Speziell: intensive „gekühlte“ Strahlen radioaktiver ‚exotischer‘ Kerne

effizienter Parallelbetrieb für mehrerer Experimente

FAIR

Page 4: GSI Darmstadt
Page 5: GSI Darmstadt
Page 6: GSI Darmstadt
Page 7: GSI Darmstadt

1.1.

1.2.

1.4.

1.5.

1.3.

SIS100

3.

SIS2006T4.

CR System

6.

3.1.

Simulat.5.1.

4.1. 9.1.

HESR

7.

PANDA

9.

NESR

8.

Working packages

SIS18Upgrade

1.

6.1. 7.1.

Super-FRS

11.

14.1.

CBM

10.

Plasma Phys. Exp.

12.

AtomicPhys. Exp.

13.

10.1.

11.1.

12.1.

Buildings +Infrastructure

14.

Installations2-4,6-13,

15.1.

Structure of the

FAIR project

Acc. SystemPhysics

5.

Integration

15.

P-Linac

2.

13.1.8.1.2.1.

Safety

Project OfficeAdvisory Committees PACs, TAC, EMAC,..

Beamlines5..2.

cryogenics

15.2.

alignement/surveillance

15.3.

IT media con.

15.4.

controls

15.5.

14.2.

14.3.

14.4.

Controlling

Accelerator Coordinator (Technical Boards) Research Coordinator (Technical Boards ) Civil Construction Coordinator (TB)

Integration Coordinator(TB)

Quality

Project Management

Project Director, Deputy Research Coordinator, Accelerator Coordinator,

Civil Construction Coordinator, Integration Coordinator,

Administrative Coordinator

FAIR Council (Representatives of Countries and/or Institutions)

 Finance Committee, Project Oversight Committee

Scientific Advisory Com.

Page 8: GSI Darmstadt

IT

• Linux (Debian) ~ 350– (SUSE) ~ few

• Windows ~ 800• AIX (reducing) ~ 10

– plus bio physics ~ 20• VMS ~ 15

– plus Accelerator controls (~30)

• Notebooks– Windows (XP)– Linux (SUSE)

• Mass storage (3 libraries, TSM, TSM-API access)– 2 SAN based (Storage Tek with LTO-2 tapes drives)

Page 9: GSI Darmstadt

What is new

• Firewall (Cisco PIXS)• Linux MTA (2-3) (migrate from AIX)

– Spam filtering (tagging) (Spamassassin)– Virus checking (Sophos, ClamAV)– Problems: Siesta (~20 min)– enforce GSI e-mail naming convention

([email protected])

• DNS Service migration to Linux (from AIX)– connection timeouts on AIX

Page 10: GSI Darmstadt

What is new

• new Fileservers with Serial ATA disc raids– 3 U boxes with up to 15 discs– Data– Scratch– Problems with old IDE disc raids

• new batchsystems (1 U boxes, Dual Xeon, 3.2 GHz)

• Windows migrate to XP, Server 2000/2003• phase out WinNT (this year)

Page 11: GSI Darmstadt

Systems

Page 12: GSI Darmstadt

What is new

• Debian 3.0 r2• non interactive daily security updates with

„out of the box“ debian tools• monitoring system (mon)

– processes

– disc status

– log host (syslog-ng)

– perhaps box status

• GRID, LCG -> need systems and support

Page 13: GSI Darmstadt

What is to be done

• Migration of services from AIX to Linux– radius– listserv– NIS (sign on, LDAP based)– …..

• Groupware (mailserver) discussion– Microsoft Exchange 2003– OCS (Oracle collaboration suite)

• separate discussion forum (FUD forum, open source)• Discussion: new Batch queueing system

– LSF production (money)– SGE– OpenPBS

• if money is available– replace old batchfarm boxes– new and much more storage systems (user, data, scratch) SAN/FC ?– ~ 10 TByte is too small– good Linux desktop support -> manpower ??