Gupta Power Infrasture Ltd

Embed Size (px)

Citation preview

  • 8/8/2019 Gupta Power Infrasture Ltd

    1/12

    SUMIT AGARWAL

    ROLL NO. 09SBCMA095

  • 8/8/2019 Gupta Power Infrasture Ltd

    2/12

    The aluminum wire industry was started in 1808 & inIndia its started in 1938.

    The aluminum wire industry presents one of thegrowth industry of India.

    Production of aluminum wire has been increased overthe last 20 years.

    The industry consumed 13.2% of total flues in

    manufacturing sector.

  • 8/8/2019 Gupta Power Infrasture Ltd

    3/12

    Gupta power infrastructure ltd. (GPIL) formerly known as Gupta cables

    private limited.

    GPIL established in 1961.

    GPIL is an ISO 9001 : 2008 certified company.

    GPIL has set up fully integrated plants in KASHIPUR (UTTARNCHAL),KHURDA

    (ORISSA), & GUMMIDI POONDU (TAMIL NAIDU).

    Best entrepreneur award from honble CM of ORISSA SHRI NAVEEN PATNAIK.

    National clients- 1) BHUSAN POWER & STEEL LTD.

    2) JINDAL STEEL & POWER LTD.

    International clients- 1) BHUTAN POWER CORPORATION

    2) NEPAL ELECTRICITY AUTHORITY

  • 8/8/2019 Gupta Power Infrasture Ltd

    4/12

    All aluminum conductor.

    Aluminum & alloy wire rod.

    Power & control cables.

    PSC poles.

  • 8/8/2019 Gupta Power Infrasture Ltd

    5/12

    VISION

    To attain market leadership.

    MISSION

    Offer best quality product at reasonable price.

    Satisfy our valued customer , our people & society at large.

    OBJECTIVE

    To maximize capacity utilization.

    To provide a steady growth of excellence in product quality, cost efficiency & customer service.

    QUALITY POLICY

    Detect & prevent any non conformance during production & implement the mean to prevent its

    occurrence.

    Upgrade & improve technology, technique, system, procedure & to carry out continuous innovation.

  • 8/8/2019 Gupta Power Infrasture Ltd

    6/12

    PRODUCTION PROCESSPRODUCTION PROCESS

    Casting wire rod

    Wire drawing

    Annealing 130c to 160c Inner covering

    Armoring

    PVC outer sheath

    Measuring & visual inspection Final testing

    Packing & dispatch

  • 8/8/2019 Gupta Power Infrasture Ltd

    7/12

    SALES YEAR TURNOVER

    (MILLION)

    CHANGE IN SALES

    VOLUME (MILLION)

    2004-2005 178.36 ------

    2005-2006 267.06 88.7

    2006-2007 473.05 205.99

    2007-2008 532.66 59.61

    2008-2009 702.32 169.66

    2009-2010 852.65 150.33

  • 8/8/2019 Gupta Power Infrasture Ltd

    8/12

    MARKETING OFFICES:

    1) Chennai

    2) Mumbai MARKETING CHANNEL:-

    3) Kolkata4) Ghaziabad

    Consumers

    Retailer

    Wholesalers

    Agents

    Manufacture(GPIL)

  • 8/8/2019 Gupta Power Infrasture Ltd

    9/12

    STRENGTH

    Strong cash reserve with no debt.

    It has its micro-processor based

    burner at its own power plant

    having automatic turbine run up

    system.

    WEAKNESS

    Difficult in obtaining highly

    skilled employees.

    Company work culture is poor

    due to strong trade union activities

    & political interferences.

    OPPORTUNITIES

    Growing skilled & technical human

    capital.

    Low per capita aluminum

    consumption compare with other

    countries offer a higher growth.

    THREATS

    Deficit infrastructure.

    Progressive reduction in aluminum

    import tariffs.

  • 8/8/2019 Gupta Power Infrasture Ltd

    10/12

    The company need young, talented & hard working people to

    attain its important goals.

    The company is better give more important towards the

    infrastructure.

    According to the skill & knowledge the company has to

    allocate the worker.

    By arranging get to get parties for between & the employer &

    employees.

  • 8/8/2019 Gupta Power Infrasture Ltd

    11/12

    Time management

    I understood the role of mgt. in the organization.

    Apply the marketing tactics.

    I learn the role of the technology on the business.

    How the external & internal factor affecting the organization.

    I learnt about new technology in related field.

  • 8/8/2019 Gupta Power Infrasture Ltd

    12/12

    THANK YOU