14
Hall A collaboration meeting, Junr 21-22, 2007, 1 Operated by the Jefferson Science Associates for the U.S. Department Of Energy Thomas Jefferson National Accelerator Facility HALL-A STATUS REPORT Hall A Collaboration Meeting June 21-22, 2007 KEES DE JAGER JEFFERSON LABORATORY Because of the User Group Meeting we could not reserve the Great Room in the ResFac. Therefore, our wine-and cheese gathering is in A110 on Thursday evening, starting at 5:30 pm. Larry has graciously agreed to chaperone us. If you attend (most of you, I hope) please pay Shannon the standard 9 $ contribution

Hall A collaboration meeting, Junr 21-22, 2007, 1 Operated by the Jefferson Science Associates for the U.S. Department Of Energy Thomas Jefferson National

Embed Size (px)

Citation preview

Page 1: Hall A collaboration meeting, Junr 21-22, 2007, 1 Operated by the Jefferson Science Associates for the U.S. Department Of Energy Thomas Jefferson National

Hall A collaboration meeting, Junr 21-22, 2007, 1Operated by the Jefferson Science Associates for the U.S. Department Of Energy

Thomas Jefferson National Accelerator Facility

HALL-A STATUS REPORT

Hall A Collaboration MeetingJune 21-22, 2007

KEES DE JAGER

JEFFERSON LABORATORY

Because of the User Group Meeting we could not reserve the Great Room in the ResFac. Therefore, our wine-and cheese gathering is in A110 on Thursday evening, starting at 5:30 pm. Larry has graciously agreed to chaperone us.If you attend (most of you, I hope) please pay Shannon the standard 9 $ contribution

Page 2: Hall A collaboration meeting, Junr 21-22, 2007, 1 Operated by the Jefferson Science Associates for the U.S. Department Of Energy Thomas Jefferson National

Hall A collaboration meeting, Junr 21-22, 2007, 2Operated by the Jefferson Science Associates for the U.S. Department Of Energy

Thomas Jefferson National Accelerator Facility

Achievements 2007-I

•Successfully ran Feb Elastic scattering off 7Li, B R. Gilman, D.

Higinbotham Mar E06-007 208Pb(e,e’p) K. Aniol Oct-July E04-018 Elastic scattering off 3,4He M. Petratos June E03-101 proton pair R. Gilman

•10 proposals submitted to PAC31 for a total of 197 days with an allocation of 60 days

•3 proposals approved for a total beam time of 58 days

•2 proposals conditionally approved, need to come back to PAC

•Submitted two 12 GeV proposals to PAC-32

Page 3: Hall A collaboration meeting, Junr 21-22, 2007, 1 Operated by the Jefferson Science Associates for the U.S. Department Of Energy Thomas Jefferson National

Hall A collaboration meeting, Junr 21-22, 2007, 3Operated by the Jefferson Science Associates for the U.S. Department Of Energy

Thomas Jefferson National Accelerator Facility

Hall A Approved Proposals PAC 4-31

•44 Experiments completed •42(!) days scheduled for the next 12 months•Backlog ~3.5 years (annual average for Hall A is ~75 days at full

funding)

Number Approved

Days Approved

Polarized beam

A status

Number Completed

Days run

Number Jeopardized

Days to be run

Nucleon and Meson Form Factors/Sum Rules

12 235 10 9 11 212 2 23

Few Body Nuclear Properties

17 283 8 4 15 246 6 35

Properties of Nuclei 11 200 2 5 7 119 6 91

N* and Meson Properties 8 157 7 3 4 91 2 66

Strange Quarks and Parity Violation

8 196 5 7 5 130 1 66

Total 56 1071 32 28 44 798 17 273

Conditionally Approved

2

0

0

0

0

Page 4: Hall A collaboration meeting, Junr 21-22, 2007, 1 Operated by the Jefferson Science Associates for the U.S. Department Of Energy Thomas Jefferson National

Hall A collaboration meeting, Junr 21-22, 2007, 4Operated by the Jefferson Science Associates for the U.S. Department Of Energy

Thomas Jefferson National Accelerator Facility

Publications (incl. submissions) in 2007-I

• B. Anderson et al., Extraction of the Neutron Magnetic Form Factor from Quasi-elastic 3He(pol)(e(pol),e') at Q2 = 0.1 - 0.6 (GeV/c)2, PRC 75, 034003 (2007)

• Yi Qiang et al., A Search for Sigma05, N0

5 and Theta++ Pentaquark States, PRC 75, 055208 (2007) • J. Kelly et al., Recoil Polarization Measurement for Neutral Pion Electroproduction at Q2 = 1 (GeV/c)2 near the

Delta Resonance, PRC 75, 025201 (2007)• A. Danagoulian et al., Compton-scattering cross section on the proton at high momentum transfer, PRL 98,

152001 (2007)• X. Jiang et al., Recoil Proton Polarization in High-Energy Deuteron Photodisintegration with circularly Polarized

Photons, PRL 98, 182302 (2007)• M. Iodice et al., High Resolution Spectroscopy 12Bλ by Electroproduction, PRL, nucl-ex/0705.3332• R. Shneor et al., Investigation of proton-proton short-range correlations via the 12C(e,e’pp) reaction, PRL, nucl-

ex/0703023• G. Ron et al., The Proton Elastic Form Factor Ratio µpGE

p/GMp at Low Momentum Transfer, PRL,

nucl-ex/0706.0128• A. Shahinyan et al., The Electromagnetic calorimeter in JLab Real Compton Scattering Experiment,

arXiv:0704.1830

• Total number of Hall A publications: PRL+PLB 30(+3), PRC 16, NIM 14(+1).

• Average time from completion of experiment to submission 20 months with 75% within 3 years.

• At present 5 experiments that have not submitted a manuscript more than 3 years after completion

• Essential that more effort goes into publications, especially archival pubs• Hall A has been running now for 10 years!

• Please enter all publications into the JLab publication data base on submission

Page 5: Hall A collaboration meeting, Junr 21-22, 2007, 1 Operated by the Jefferson Science Associates for the U.S. Department Of Energy Thomas Jefferson National

Hall A collaboration meeting, Junr 21-22, 2007, 5Operated by the Jefferson Science Associates for the U.S. Department Of Energy

Thomas Jefferson National Accelerator Facility

PUBLICATIONS-II

• Archival papers promised to be completed LAST year:- E89-044 3He(e,e’p)- E91-026 deuteron A and B - E93-050 VCS- E94-010 GDH- E99-007 GE

p-II- E99-114 WACS

• Achievements to date: E89-003 16O(e,e’p) published E91-010 HAPPEx-I published E91-011 N-> submitted E93-027 GE

p-I published E94-012 H()πo published E94-104 n -> π-p published E95-001 GM

n accepted E99-117 A1

n published

Page 6: Hall A collaboration meeting, Junr 21-22, 2007, 1 Operated by the Jefferson Science Associates for the U.S. Department Of Energy Thomas Jefferson National

Hall A collaboration meeting, Junr 21-22, 2007, 6Operated by the Jefferson Science Associates for the U.S. Department Of Energy

Thomas Jefferson National Accelerator Facility

Scheduled Experiments in Hall AExp Title Contact persons

Jul-Sep down forced by FY07 budget restrictionsOct-Dec E05-110 Coulomb Sum Rule B. SawatzkyJan-Mar Installation of BigBite Mar-Apr E04-007 π0 electroproduction R. LindgrenApr-Jun Installation of Polarized 3He targetJul-Dec run BigBite plus polarized 3He experiments

FY09 HAPPEx-III, Lead Parity, DIS-Parity, 4He(e,e’p)

Schedule in FY08 delayed by another month, driven by need to install and commission(!) new cryo-moduyles, but otherwise it would have been limited by the budget available for 6 GeV operations.

This will remain for the outyears with possible additional constraints driven by the need for engineering and design manpower for 12 GeV and limitations in capital funds.

Page 7: Hall A collaboration meeting, Junr 21-22, 2007, 1 Operated by the Jefferson Science Associates for the U.S. Department Of Energy Thomas Jefferson National

Hall A collaboration meeting, Junr 21-22, 2007, 7Operated by the Jefferson Science Associates for the U.S. Department Of Energy

Thomas Jefferson National Accelerator Facility

Hall A Schedule (Very Tentative!)

Page 8: Hall A collaboration meeting, Junr 21-22, 2007, 1 Operated by the Jefferson Science Associates for the U.S. Department Of Energy Thomas Jefferson National

Hall A collaboration meeting, Junr 21-22, 2007, 8Operated by the Jefferson Science Associates for the U.S. Department Of Energy

Thomas Jefferson National Accelerator Facility

6 GeV Energy Recovery Plan

Today

Page 9: Hall A collaboration meeting, Junr 21-22, 2007, 1 Operated by the Jefferson Science Associates for the U.S. Department Of Energy Thomas Jefferson National

Hall A collaboration meeting, Junr 21-22, 2007, 9Operated by the Jefferson Science Associates for the U.S. Department Of Energy

Thomas Jefferson National Accelerator Facility

Long-Term Schedule

•Highly likely that CEBAF will be limited to ~30 weeks of beam on target in FY08 and following FYs as long as the budget continues as expected. This corresponds to a total of 4 months accelerator down per year.

•Based on these assumptions Hall A would still have a full year of running available for new proposals.

However, for the last 18+ months before the accelerator down we would have to run in parallel with Qweak at a fixed energy/pass of 1.1 GeV and possibly severe restrictions in the available current (I have suggested to Larry to run Qweak at 150 µA in stead of the requested 180 µA).

Also, resources, both capital and designers, will become scarcer as the 12 GeV activities increase.

•Larry has “predicted” that there will continue to be 6 GeV PACs until ~3 years prior to the 12 GeV shutdown. This would mean that there will be (at least) two more 6 GeV PACs (2008 and 2009).

Page 10: Hall A collaboration meeting, Junr 21-22, 2007, 1 Operated by the Jefferson Science Associates for the U.S. Department Of Energy Thomas Jefferson National

Hall A collaboration meeting, Junr 21-22, 2007, 10Operated by the Jefferson Science Associates for the U.S. Department Of Energy

Thomas Jefferson National Accelerator Facility

2004-2005 Conceptual Design (CDR) - finished

2004-2008 Research and Development (R&D) - ongoing

2006 Advanced Conceptual Design (ACD) - finished

2006-2008 Project Engineering & Design (PED) - ongoing

2009-2013 Construction – starts in ~18 months!

Accelerator shutdown start mid 2012

Accelerator commissioning mid 2013

2013-2015 Pre-Ops (beam commissioning)

Hall commissioning start late 2013

(based on funding guidance provided by DOE-NP in April 2007)

12 GeV Upgrade: Phases and Schedule

Page 11: Hall A collaboration meeting, Junr 21-22, 2007, 1 Operated by the Jefferson Science Associates for the U.S. Department Of Energy Thomas Jefferson National

Hall A collaboration meeting, Junr 21-22, 2007, 11Operated by the Jefferson Science Associates for the U.S. Department Of Energy

Thomas Jefferson National Accelerator Facility

12 GeV Schedule

Page 12: Hall A collaboration meeting, Junr 21-22, 2007, 1 Operated by the Jefferson Science Associates for the U.S. Department Of Energy Thomas Jefferson National

Hall A collaboration meeting, Junr 21-22, 2007, 12Operated by the Jefferson Science Associates for the U.S. Department Of Energy

Thomas Jefferson National Accelerator Facility

LRP Recommendations

1.We recommend the completion of the 12 GeV Upgrade at Jefferson Lab. The Upgrade will enable new insights into the structure of the nucleon, the transition between the hadronic and quark/gluon descriptions of nuclei, and the nature of confinement.2.We recommend the construction of the Facility for Rare Isotope Beams, FRIB, a world-leading facility for the study of nuclear structure, reactions and astrophysics. Experiments with the new isotopes produced at FRIB will lead to a comprehensive description of nuclei, elucidate the origin of the elements in the cosmos, provide an understanding of matter in the crust of neutron stars, and establish the scientific foundation for innovative applications of nuclear science to society.3.We recommend a targeted program of experiments to investigate neutrino properties and fundamental symmetries. These experiments aim to discover the nature of the neutrino, yet unseen violations of time-reversal symmetry, and other key ingredients of the new standard model of fundamental interactions. Construction of a Deep Underground Science and Engineering Laboratory is vital to US leadership in core aspects of this initiative.4.The experiments at the Relativistic Heavy Ion Collider have discovered a new state of matter at extreme temperature and density - a quark-gluon plasma that exhibits unexpected, almost perfect liquid dynamical behavior. We recommend implementation of the RHIC II luminosity upgrade, together with detector improvements, to determine the properties of this new state of matter.

Page 13: Hall A collaboration meeting, Junr 21-22, 2007, 1 Operated by the Jefferson Science Associates for the U.S. Department Of Energy Thomas Jefferson National

Hall A collaboration meeting, Junr 21-22, 2007, 13Operated by the Jefferson Science Associates for the U.S. Department Of Energy

Thomas Jefferson National Accelerator Facility

LRP Recommendation #1

We recommend the completion of the 12 GeV Upgrade at Jefferson Lab. The Upgrade will enable new insights into the structure of the nucleon, the transition between the hadronic and quark/gluon descriptions of nuclei, and the nature of confinement.

A fundamental challenge for modern nuclear physics is to understand the structure and interactions of nucleons and nuclei in terms of quantum chromodynamics. Jefferson Lab’s unique electron microscope has given the US leadership in addressing this challenge. Its first decade of research has already provided key insights into the structure of nucleons and the dynamics of finite nuclei.

Doubling the energy of this microscope will enable three-dimensional imaging of the nucleon, revealing hidden aspects of its internal dynamics. It will complete our understanding of the transition between the hadronic and quark/gluon descriptions of nuclei, and test definitively the existence of exotic hadrons, long-predicted by QCD as arising from quark confinement. Through the use of parity violation, it will provide low-energy probes of physics beyond the Standard Model, complementing anticipated measurements at the highest accessible energy scales.

Page 14: Hall A collaboration meeting, Junr 21-22, 2007, 1 Operated by the Jefferson Science Associates for the U.S. Department Of Energy Thomas Jefferson National

Hall A collaboration meeting, Junr 21-22, 2007, 14Operated by the Jefferson Science Associates for the U.S. Department Of Energy

Thomas Jefferson National Accelerator Facility

Summary

• Very successful outcome of LRP process, still a lot of work needed in writing the report. Provide all requested support.

• Running the 6 GeV program will continue under serious pressure. Vocalize your concerns when you feel the need.

• Have to start discussions about the form of the Hall A collaboration in the 12 GeV era

• Congratulations to Joe Katych and Xaohui Zhan for their winning posters

• All poster contributors are urged to provide copies of their posters• Please use your vote in the ongoing DNP nomination process

• Support Curtis Meyer and Joerg Reinhold