38
HALON IRRIGATION PROJECT, VILLAGE – KARANJIYA TEHSIL BICHHIYA DISTRICT – MANDLA (M.P.). STATEMENT OF THE ISSUES RAISED BY THE PUBLIC DURING PUBLIC HEARING ON DATED 31-07-2009 AND COMMENTS ON THE APPLICANTS POINTS S. No. Name and Address Raised issues Comments on applicants points 1 2 3 4 Village – Karanjiya 1. Shri Ashok Village, Karanjiya Construction of Halon Dam will snatch the habitation of people and will have negative impact on education, health etc. due to accumulation of water insects will die which eventually prevent the flow of river water and spread diseases. Village Karanjiya is only 10% submergence affected village, hence displaced family will get land free of cost in the same village and compensation of property will also be given hence there is no separation of family takes place. As the resettlement is in the same village the education of children will not be affected and there will not be any adverse hygienic effect. Flow of Halon River will remain continue due to seepage water of dam. 2. Shri Santulal Jhariya Village-Karanjiya Project should be started earlier Adequate compensation of land should be given apart from it habitation, employment and fertile land to be given. Dam Should be constructed. As soon as the project is sanctioned construction work will be started. The compensation of acquired land will be given by the collector as per prevalent rate .In addition to that 30% more solesium compensation will be given and provision of 12% per annum interest will be given for the period from Date of Award to date of payment. Such affected families whose both land and house comes under submergence ,they will be given free residential plot as well as compensation for property will be given. Rs.20000/- or a house will be given under Indira Awas yojana(para 6.7),or grant amount under Indira

HALON IRRIGATION PROJECT, VILLAGE – KARANJIYA …halon irrigation project, village – karanjiya tehsil bichhiya district – mandla (m.p.). statement of the issues raised by the

  • Upload
    others

  • View
    3

  • Download
    0

Embed Size (px)

Citation preview

Page 1: HALON IRRIGATION PROJECT, VILLAGE – KARANJIYA …halon irrigation project, village – karanjiya tehsil bichhiya district – mandla (m.p.). statement of the issues raised by the

HALON IRRIGATION PROJECT, VILLAGE – KARANJIYA

TEHSIL BICHHIYA DISTRICT – MANDLA (M.P.).

STATEMENT OF THE ISSUES RAISED BY THE PUBLIC DURING PUBLIC

HEARING ON DATED 31-07-2009 AND COMMENTS ON THE APPLICANTS

POINTS

S. No.

Name and Address Raised issues Comments on applicants points

1 2 3 4

Village – Karanjiya

1. Shri Ashok Village,

Karanjiya

Construction of Halon Dam

will snatch the habitation of

people and will have

negative impact on

education, health etc. due to

accumulation of water

insects will die which

eventually prevent the flow

of river water and spread

diseases.

Village Karanjiya is only 10%

submergence affected village, hence

displaced family will get land free of

cost in the same village and

compensation of property will also

be given hence there is no

separation of family takes place.

As the resettlement is in the same

village the education of children will

not be affected and there will not be

any adverse hygienic effect. Flow of

Halon River will remain continue due

to seepage water of dam.

2. Shri Santulal Jhariya

Village-Karanjiya

Project should be started

earlier Adequate

compensation of land

should be given apart from

it habitation, employment

and fertile land to be given.

Dam Should be

constructed.

As soon as the project is sanctioned

construction work will be started.

The compensation of acquired land

will be given by the collector as per

prevalent rate .In addition to that

30% more solesium compensation

will be given and provision of 12%

per annum interest will be given for

the period from Date of Award to

date of payment. Such affected

families whose both land and house

comes under submergence ,they will

be given free residential plot as well

as compensation for property will be

given. Rs.20000/- or a house will be

given under Indira Awas yojana(para

6.7),or grant amount under Indira

Page 2: HALON IRRIGATION PROJECT, VILLAGE – KARANJIYA …halon irrigation project, village – karanjiya tehsil bichhiya district – mandla (m.p.). statement of the issues raised by the

Awas yojana at that time of payment

which ever is more will be paid to the

affected family who are below

poverty level.By the construction of

dam extra employment will be

generated. As per Para 5.2(gh)

(Compensation will be given for

encroached land . In addition to that

30% more solesium compensation

will be given and provision of 12%

per annum intrest will be given for

the period from Date of Award to

date of payment in the form of ex

Garcia )

3. Shri Rohan Prasad

Sahu Village

Karanjiya

Adequate rate of land and

house or fertile land should

be given .

The compensation of acquired land

will be given by the collector as per

prevalent rate .In addition to that

30% more compensation will be

given and provision of 12% per

annum interest will be given for the

period from Date of Award to date of

payment .Such affected families

whose both land and house comes

under submergence ,they will be

given free residential plot as well as

compensation for property will be

given, And if in place of acquired

land, agricultural land will be given

then, also extra Rs.10000/- per

hectare will be paid for agricultural

product.

4. Shri Sunil Kumar

Village-Karanjiya

Land will be given in place

of land, adequate

compensation to be given

and employment to be given

to the family members of

affected family. And

construction of dam should

be done earlier.

The compensation of acquired land

will be given by the collector as per

prevalent rate .In addition to that

30% more solesium compensation

will be given and provision of 12%

per annum interest will be given for

the period from Date of Award to

date of payment .Such affected

families whose both land and house

comes under submergence ,they will

be given free residential plot as well

Page 3: HALON IRRIGATION PROJECT, VILLAGE – KARANJIYA …halon irrigation project, village – karanjiya tehsil bichhiya district – mandla (m.p.). statement of the issues raised by the

as compensation for property will be

given, There is a provision to give

employment to the displaced family

with priority . As soon as the project

is sanctioned construction work will

be started.

5. Shri Swaresh Kumar

Dhanyajal Village –

Karanjiya

Due to construction of

Halon irrigation project we

have no any objection. So

work should be started

earlier by giving

compensation to affected

family.

The compensation of acquired land

will be given by the collector as per

prevalent rate .In addition to that

30% more solesium compensation

will be given and provision of 12%

per annum interest will be given for

the period from Date of Award to

date of payment . As soon as the

project is sanctioned construction

work will be started.

6. Shri Bashirudin Khan

Divakar Village –

Karanjiya

Halon Project will leads to

the development of the

area. Ground water level

will increase. Possibility of

agriculture & employment

will increase. There will be

no any adverse effect on

animals & insects.

According to Govt. Policy the works

on project will be started soon and

after the completion of project 13040

hectare of land will be irrigated. And

there will be possibility of

employment. There is an

environment management

programme of Rs. 765.10 Millions to

protect the environmental balance.

7. Shri Shiv Charan

Jhariya Village –

Karanjiya

Works should be started

immediately. In place of

land, land & house should

be given to the affected

families.

As soon as the project is sanctioned

construction work will be started.

The compensation of acquired land

will be given by the collector as per

prevalent rate .In addition to that

30% more solesium compensation

will be given and provision of 12%

Page 4: HALON IRRIGATION PROJECT, VILLAGE – KARANJIYA …halon irrigation project, village – karanjiya tehsil bichhiya district – mandla (m.p.). statement of the issues raised by the

per annum interest will be given for

the period from Date of Award to

date of payment . Such affected

families whose house comes under

submergence, compensation for

their house will be given, In addition

to that, There is a provision for 250

sqm. Free residential plot.

8. Shri Gopal Prashad

Sahu Village –

Karanjiya

Employment should be

given to unemployed and

construction of Dam should

be started soon.

As soon as the project is sanctioned

construction work will be started.

There is a provision to give

employment to the displaced family

with priority.

9. Shri Kailash Prashad

Village – Karanjiya

Adequate compensation

and employment should be

given. Land should be given

in place of land. Dam

should not be constructed.

The compensation of acquired land

will be given by the collector as per

prevalent rate .In addition to that

30% more solesium compensation

will be given and provision of 12%

per annum interest will be given for

the period from Date of Award to

date of payment. Such affected

families whose both land and house

comes under submergence ,they will

be given free residential plot as well

as compensation for property will be

given. There is a provision to give

employment to the displaced family

with priority. By the construction of

Dam 13040 Hectares of land will be

irrigated in 46 Nos. of villages of

Page 5: HALON IRRIGATION PROJECT, VILLAGE – KARANJIYA …halon irrigation project, village – karanjiya tehsil bichhiya district – mandla (m.p.). statement of the issues raised by the

command, due to which increasing

in National productivity & will be

beneficial for thousands of formers.

10. Shri Pitam Lal Jhariya

Village-Karanjiya

Adequate compensation of

land to be given. I am 75

years of age & not in a

position to work.

The compensation of acquired land

will be given by the collector as per

prevalent rate .In addition to that

30% more solesium compensation

will be given and provision of 12%

per annum interest will be given for

the period from Date of Award to

date of payment. Such affected

families whose both land and house

comes under submergence ,they will

be given free residential plot as well

as compensation for property will be

given. Under Para 6.7 (g) there is a

provision for life time pension of

Rs.500/-per month for disabled and

old person.

11. Shri Dayaram Jhariya Adequate compensation

and employment to

unemployed person should

be given.

The compensation of acquired land

will be given by the collector as per

prevalent rate .In addition to that

30% more solesium compensation

will be given and provision of 12%

per annum interest will be given for

the period from Date of Award to

date of payment. Such affected

families whose both land and house

comes under submergence ,they will

be given free residential plot as well

as compensation for property will be

given. There is a provision to give

employment to the displaced family

with priority. As soon as the project

is sanctioned construction work will

be started.

12. Shri Bhupendra

Jhariya Village-

Karanjiya

Construction of dam will

leads to environmental un

balance.

There is an environment

management programme of Rs.

765.10 Millions to protect the

Page 6: HALON IRRIGATION PROJECT, VILLAGE – KARANJIYA …halon irrigation project, village – karanjiya tehsil bichhiya district – mandla (m.p.). statement of the issues raised by the

environmental balance

13. Shri Rajesh Kumar

Prajapati Village-

Karanjiya.

No objection .Due to

construction of halon Dam

there will be irrigation as

well as employment too.

According to Govt. Policy the works

on project will be started soon and

after the completion of project 13040

hectare of land will be irrigated. And

there will be possibility of

employment.

14. Shri Manjodh Village-

Karanjiya

Adequate compensation of

land & employment should

be given.Dam should be

constructed.

The compensation of acquired land

will be given by the collector as per

prevalent rate .In addition to that

30% more solesium compensation

will be given and provision of 12%

per annum interest will be given for

the period from Date of Award to

date of payment. Such affected

families whose both land and house

comes under submergence ,they will

be given free residential plot as well

as compensation for property will be

given. There is a provision to give

employment to the displaced family

with priority. As soon as the project

is sanctioned construction work will

be started.

15. Shri Mohammodin

Khan Village-

Karanjiya.

Adequate compensation of

land & employment should

be given.

The compensation of acquired land

will be given by the collector as per

prevalent rate .In addition to that

30% more solesium compensation

will be given and provision of 12%

per annum interest will be given for

the period from Date of Award to

date of payment. Such affected

families whose both land and house

comes under submergence ,they will

be given free residential plot as well

as compensation for property will be

given. There is a provision to give

employment to the displaced family

with priority. As soon as the project

is sanctioned construction work will

Page 7: HALON IRRIGATION PROJECT, VILLAGE – KARANJIYA …halon irrigation project, village – karanjiya tehsil bichhiya district – mandla (m.p.). statement of the issues raised by the

be started.

16. Shri Rohani Prasad

Sahu Village-

Karanjiya.

Land will be given in place

of land, adequate

compensation to be given

and employment to be given

to the family members of

affected family. And

construction of dam should

be done earlier.

The compensation of acquired land

will be given by the collector as per

prevalent rate .In addition to that

30% more solesium compensation

will be given and provision of 12%

per annum interest will be given for

the period from Date of Award to

date of payment .Such affected

families whose both land and house

comes under submergence ,they will

be given free residential plot as well

as compensation for property will be

given, There is a provision to give

employment to the displaced family

with priority . As soon as the project

is sanctioned construction work will

be started.

17. Shri Jagdish Prasad

Jhariya Village-

Karanjiya.

Due to construction of Dam

our all land will be

submerged.How will we

survive our lives. We are

not going to get the

advantage of irrigation.

Nothing is clear as where

we are going to be sent

after displacement

compensation is less. Dam

should not be constructed

Village Karanjiya is only 10%

submergence affected village, hence

displaced family will get land free of

cost in the same village .All villagers

of Karanjiya will get irrigation facility.

The compensation of acquired land

will be given by the collector as per

prevalent rate .In addition to that

30% more solesium compensation

will be given and provision of 12%

per annum interest will be given for

the period from Date of Award to

date of payment .Such affected

families whose both land and house

comes under submergence, they will

be given free residential plot as well

as compensation for property will be

given. And if agricultural land is to be

given in place of acquired land then

Page 8: HALON IRRIGATION PROJECT, VILLAGE – KARANJIYA …halon irrigation project, village – karanjiya tehsil bichhiya district – mandla (m.p.). statement of the issues raised by the

extra Rs.10000/-per hectare will be

given as agricultural produce (as per

Para 6.6). By the construction of

Dam 13040 Hectares of land will be

irrigated in 46 Nos. of villages of

command, due to which increasing

in National productivity & will be

beneficial for thousands of formers.

And there will be possibility of

employment too.

18. Shri Phralad Kumar

Jhariya Village-

Karanjiya.

Agree with the construction

of dam adequate

compensation should be

given.

The compensation of acquired land

will be given by the collector as per

prevalent rate .In addition to that

30% more solesium compensation

will be given and provision of 12%

per annum interest will be given for

the period from Date of Award to

date of payment .Such affected

families whose both land and house

comes under submergence, they will

be given free residential plot as well

as compensation for property will be

given. And if agricultural land is to be

given in place of acquired land then

extra Rs.10000/-per hectare will be

given as agricultural produce (as per

Para 6.6).

19. Shri Amrat Lal

Jhariya Village-

Karanjiya.

Dam should not be

constructed, compensation

for Gaushala which is

15000/- and for house

construction which is

20000/-is not adequate.

Compensation for submerged

property (like Land, tree, House, well

.Gaushala etc.) will be given by the

collector as per prevalent rate, In

addition to that 30% more solesium

compensation will be given and

provision of 12% per annum intrest

will be given for the period from Date

of Award to date of payment in the

form of ex Garcia ),Out of above

Page 9: HALON IRRIGATION PROJECT, VILLAGE – KARANJIYA …halon irrigation project, village – karanjiya tehsil bichhiya district – mandla (m.p.). statement of the issues raised by the

owners of cattle will get Rs.15000/-

for the construction of Gaushala and

Rs.20000/- or a house will be given

under Indira Awas yojana (Para

6.7),or grant amount under Indira

Awas yojana at that time of payment

which ever is more will be paid to the

affected family who are below

poverty level. Also a grant

Rs.10000/- will be given to transport

their house materials. By the

construction of Dam there will be

irrigation facility in 46 Nos. of

villages of command, due to which

increasing in National productivity &

will be beneficial for thousands of

formers. And there will be possibility

of employment too.

20. Shri Brijendra Jiaswal

Village-Karanjiya.

Adequate compensation of

land, agricultural land and

Govt. job should be given.

Displaced family should be

provided adequate facility.

The compensation of acquired land

will be given by the collector as per

prevalent rate .In addition to that

30% more solesium compensation

will be given and provision of 12%

per annum interest will be given for

the period from Date of Award to

date of payment .Such affected

families whose both land and house

comes under submergence, they will

be given free residential plot as well

as compensation for property will be

given. And if agricultural land is to be

given in place of acquired land then

extra Rs.10000/-per hectare will be

given as agricultural produce (as per

Para 6.6). There is a provision to

give employment to the displaced

family with priority.

Page 10: HALON IRRIGATION PROJECT, VILLAGE – KARANJIYA …halon irrigation project, village – karanjiya tehsil bichhiya district – mandla (m.p.). statement of the issues raised by the

21. Shri Naresh Kumar

Tiwari Village-

Karanjiya.

Dam should not be

constructed, if Dam is to be

constructed then adequate

compensation of land and

employment should be

given.

The compensation of acquired land

will be given by the collector as per

prevalent rate .In addition to that

30% more solesium compensation

will be given and provision of 12%

per annum interest will be given for

the period from Date of Award to

date of payment .Such affected

families whose both land and house

comes under submergence, they will

be given free residential plot as well

as compensation for property will be

given. And if agricultural land is to be

given in place of acquired land then

extra Rs.10000/-per hectare will be

given as agricultural produce (as per

Para 6.6). There is a provision to

give employment to the displaced

family with priority.

Village – Birsa

22. Shri Sudhir Tiwari

Village-Birsa.

No any objection by the

Construction of dam.

Construction of Dam is to

be done immediately &

adequate compensation

and employment should be

given.

As soon as the project is sanctioned

construction work will be started.

The compensation of acquired land

will be given by the collector as per

prevalent rate .In addition to that

30% more solesium compensation

will be given and provision of 12%

per annum interest will be given for

the period from Date of Award to

date of payment. Such affected

families whose both land and house

comes under submergence ,they will

be given free residential plot as well

as compensation for property will be

Page 11: HALON IRRIGATION PROJECT, VILLAGE – KARANJIYA …halon irrigation project, village – karanjiya tehsil bichhiya district – mandla (m.p.). statement of the issues raised by the

given And if agricultural land is to be

given in place of acquired land then

extra Rs.10000/-per hectare will be

given as agricultural produce (as per

Para 6.6). There is a provision to

give employment to the displaced

family with priority.

23. Shri Anil Tiwari

Village-Birsa.

2 Acre of land is coming

under submergence area

out of which in 1 Acre there

are trees, kindly give the

information regarding the

compensation of land and

tree.

Compensation for submerged

property (like Land, tree, House,

.Gaushala, well etc.) will be given by

the collector as per prevalent rate,

In addition to that 30% more

solesium compensation will be given

and provision of 12% per annum

interest will be given for the period

from Date of Award to date of

payment .Compensation amount can

not be given at present.

24. Shri Anil Tiwari

Village-Birsa.

Adequate compensation

and rate should be given

and Project should be

started earlier.

The compensation of acquired land

will be given by the collector as per

prevalent rate .In addition to that

30% more solesium compensation

will be given and provision of 12%

per annum interest will be given for

the period from Date of Award to

date of payment .Such affected

families whose both land and house

comes under submergence, they will

be given free residential plot as well

as compensation for property will be

given. And if agricultural land is to be

given in place of acquired land then

extra Rs.10000/-per hectare will be

given as agricultural produce (as per

Para 6.6). As soon as the project is

sanctioned construction work will be

started.

Page 12: HALON IRRIGATION PROJECT, VILLAGE – KARANJIYA …halon irrigation project, village – karanjiya tehsil bichhiya district – mandla (m.p.). statement of the issues raised by the

25. Shri Vijaykant Tiwari

Village-Birsa

Adequate compensation

and rate should be given.

Employment & good land

should be given.

The compensation of acquired land

will be given by the collector as per

prevalent rate .In addition to that

30% more solesium compensation

will be given and provision of 12%

per annum interest will be given for

the period from Date of Award to

date of payment .Such affected

families whose both land and house

comes under submergence, they will

be given free residential plot as well

as compensation for property will be

given. And if agricultural land is to be

given in place of acquired land then

extra Rs.10000/-per hectare will be

given as agricultural produce (as per

Para 6.6). There is a provision to

give employment to the displaced

family with priority.

26. Shri Jinesh Kumar

Village-Birsa

Dam should be constructed.

No objection.

As soon as the project is sanctioned

construction work will be started. By

the construction of Dam 13040

Hectares of land will be irrigated in

46 Nos. of villages of command, due

to which increasing in National

productivity & will be beneficial for

thousands of formers. And there will

be possibility of employment too.

27. Shri Radhe Jhariya

Village -Birsa

Dam should be constructed.

No objection. Adequate

compensation and

Employment should be

given. Every adult member

of displaced family should

be considered as separate

As soon as the project is sanctioned

construction work will be started. By

the construction of Dam 13040

Hectares of land will be irrigated in

46 Nos. of villages of command, due

to which increasing in National

productivity & will be beneficial for

Page 13: HALON IRRIGATION PROJECT, VILLAGE – KARANJIYA …halon irrigation project, village – karanjiya tehsil bichhiya district – mandla (m.p.). statement of the issues raised by the

family. thousands of formers. And there will

be possibility of employment too.

The compensation of acquired land

will be given by the collector as per

prevalent rate .In addition to that

30% more solesium compensation

will be given and provision of 12%

per annum interest will be given for

the period from Date of Award to

date of payment .Such affected

families whose both land and house

comes under submergence, they will

be given free residential plot as well

as compensation for property will be

given. And if agricultural land is to be

given in place of acquired land then

extra Rs.10000/-per hectare will be

given as agricultural produce (as per

Para 6.6). There is a provision to

give employment to the displaced

family with priority. As mentioned in

chapter 3( kh) only husband , wife &

children are counted in one family.

28. Shri Birju Lal Village-

Birsa

Dam should not be

constructed, we have

objection in dam.

By the construction of Dam 13040

Hectares of land will be irrigated in

46 Nos. of villages of command, due

to which increasing in National

productivity & will be beneficial for

thousands of formers. And there will

be possibility of employment too.

29. Shri Mahendra

Village -Birsa

Since house and land area

completely submerging,

dam should be abandoned.

Compensation for submerged

property will be given by the

collector as per prevalent rate, In

addition to that 30% more solesium

compensation will be given and

provision of 12% per annum intrest

Page 14: HALON IRRIGATION PROJECT, VILLAGE – KARANJIYA …halon irrigation project, village – karanjiya tehsil bichhiya district – mandla (m.p.). statement of the issues raised by the

will be given for the period from Date

of Award to date of payment. In

addition to that Rs.15000/- for the

construction of Gaushala .and

Rs.10000/ -for transportation of

house material will be paid as a one

time grant (Para 6.7 gh & d). By the

construction of Halon Dam 13040

Hectares of land will be irrigated in

46 Nos. of villages of command, due

to which increasing in National

productivity & will be beneficial for

thousands of formers. And there will

be possibility of employment too.

30. Shri Sunil Kumar

Tiwari Village- birsa

Dam should be constructed

earlier.One lac rupee per

acre should be given Pacca

house to be constructed

and employment to be

given.

As soon as the project is sanctioned

construction work will be started.

Compensation for submerged

property will be given by the

collector as per prevalent rate. There

is a provision to give employment to

the displaced family with priority.

31. Shri Vijaykant Tiwari

Village - Birsa

Dam should be constructed,

area will be benefited.

Request to give adequate

compensation with officers.

As soon as the project is sanctioned

construction work will be started. By

the construction of Halon Dam

13040 Hectares of land will be

irrigated in 46 Nos. of villages of

command, due to which increasing

in National productivity & will be

beneficial for thousands of formers.

And there will be possibility of

employment too. The compensation

of acquired land will be given by the

collector as per prevalent rate .In

addition to that 30% more solesium

compensation will be given and

provision of 12% per annum interest

will be given for the period from Date

Page 15: HALON IRRIGATION PROJECT, VILLAGE – KARANJIYA …halon irrigation project, village – karanjiya tehsil bichhiya district – mandla (m.p.). statement of the issues raised by the

of Award to date of payment .Such

affected families whose both land

and house comes under

submergence, they will be given free

residential plot as well as

compensation for property will be

given. And if agricultural land is to be

given in place of acquired land then

extra Rs.10000/-per hectare will be

given as agricultural produce (as per

Para 6.6).

32. Shri Dinesh Tiwari

Village- Birsa

No any objection. By the construction of Dam 13040

Hectares of land will be irrigated in

46 Nos. of villages of command, due

to which increasing in National

productivity & will be beneficial for

thousands of formers. And there will

be possibility of employment too.

33. Shri Mangilal Jhariya

Village-Birsa

Construction of dam should

be started earlier, and one

member of family should get

employment.

As soon as the project is sanctioned

construction work will be started.

The compensation of acquired land

will be given by the collector as per

prevalent rate .In addition to that

30% more solesium compensation

will be given and provision of 12%

per annum interest will be given for

the period from Date of Award to

date of payment .Such affected

families whose both land and house

comes under submergence, they will

be given free residential plot as well

as compensation for property will be

given. And if agricultural land is to be

given in place of acquired land then

extra Rs.10000/-per hectare will be

given as agricultural produce (as per

Para 6.6). There is a provision to

give employment to the displaced

family with priority.

34. Shri Ratu lal Jhariya Good quality of land and Compensation for submerged

Page 16: HALON IRRIGATION PROJECT, VILLAGE – KARANJIYA …halon irrigation project, village – karanjiya tehsil bichhiya district – mandla (m.p.). statement of the issues raised by the

Village -Birsa Brick house to be provided.

And favorable employment

to my son should be given.

property (like Land, tree, House, well

.Gaushala etc.) will be given by the

collector as per prevalent rate ,And if

agricultural land is to be given in

place of acquired land then extra

Rs.10000/-per hectare will be given

as agricultural produce (as per Para

6.6).Rs.20000/- or a house will be

given under Indira Awas yojana

(Para 6.7),or grant amount under

Indira Awas yojana at that time of

payment which ever is more will be

paid to the affected family who are

below poverty level. There is a

provision to give employment to the

displaced family with priority.

35. Shri Sanjay Tiwari

Village-Birsa

Adequate compensation of

land, employment and

house to be given.

Education & heath facility

should be given

The compensation of acquired land

will be given by the collector as per

prevalent rate .In addition to that

30% more solesium compensation

will be given and provision of 12%

per annum interest will be given for

the period from Date of Award to

date of payment .Such affected

families whose both land and house

comes under submergence, they will

be given free residential plot as well

as compensation for property will be

given. Rs.20000/- or a house will be

given under Indira Awas yojana

(Para 6.7),or grant amount under

Indira Awas yojana at that time of

payment which ever is more will be

paid to the affected family who are

below poverty level. By the

construction of Dam there will be

possibility of employment too. As per

Page 17: HALON IRRIGATION PROJECT, VILLAGE – KARANJIYA …halon irrigation project, village – karanjiya tehsil bichhiya district – mandla (m.p.). statement of the issues raised by the

Para 5.2(gh) (Compensation will be

given for encroached land. In

addition to that 30% more solesium

compensation will be given and

provision of 12% per annum intrest

will be given for the period from Date

of Award to date of payment in the

form of ex Garcia ).At every 100

Displaced family there is a provision

for a primary school and at every

500 Displaced family there is also

provision for construction of Health

centre too. In addition to that there

will be other public facility like

Community hall, Provision is made

for one well per 100 Displaced

family, one pond for per 500

Displaced family, Also provision is

made for Temple ,Opening of Shops

of Fertilizers, Seed store etc.(as per

R& R plan 2008)

36. Sarpanch and other

villagers of Village -

Birsa

On 30-07-2009 a proposal

is being passed in Gram

Sabha according to which

complete land of village

Birsa is coming under

submerged area, hence

construction to be

abandoned.

Village Birsa and Mangabeli comes

under Grampanchyat Karanjiya.

Under above panchyat a Meeting

(Gran Sabha) was held on Dated 06-

04-2004 and panchayat have

approved the Halon Project and

given a no objection certificate

regarding construction. Instead of

above the Panchayat of 15 villages,

which comes under submergence

,had also given no objection

certificate. Under Halon Project

,area under submergence is total

1570.31 Ha. Including private and

Govt. land. Out of that only 330.56

Page 18: HALON IRRIGATION PROJECT, VILLAGE – KARANJIYA …halon irrigation project, village – karanjiya tehsil bichhiya district – mandla (m.p.). statement of the issues raised by the

Ha. land comes under submergence

of Birsa village which is only 14.68%

of total submergence .There is total

420.25 Ha. Land is available in Birsa

village and under submergence only

230.56 Ha. Land comes, which is

54.86% of420.25 Ha. Of land. The

displaced persons of Birsa village

will be resettled at Karanjiya village.

Which is only 2 Km. away from Birsa

village.

The compensation of acquired land

will be given by the collector as per

prevalent rate .In addition to that

30% more solesium compensation

will be given and provision of 12%

per annum interest will be given for

the period from Date of Award to

date of payment .Such affected

families whose both land and house

comes under submergence, they will

be given free residential plot as well

as compensation for property will be

given. Rs.20000/- or a house will be

given under Indira Awas yojana

(Para 6.7),or grant amount under

Indira Awas yojana at that time of

payment which ever is more will be

paid to the affected family who are

below poverty level. By the

construction of Dam there will be

possibility of employment too. As per

Para 5.2(gh) (Compensation will be

given for encroached land. In

addition to that 30% more solesium

compensation will be given and

Page 19: HALON IRRIGATION PROJECT, VILLAGE – KARANJIYA …halon irrigation project, village – karanjiya tehsil bichhiya district – mandla (m.p.). statement of the issues raised by the

provision of 12% per annum intrest

will be given for the period from Date

of Award to date of payment in the

form of ex Garcia ).At every 100

Displaced family there is a provision

for a primary school and at every

500 Displaced family there is also

provision for construction of Health

centre too. In addition to that there

will be other public facility like

Community hall, Provision is made

for one well per 100 Displaced

family, one pond for per 500

Displaced family, Also provision is

made for Temple ,Opening of Shops

of Fertilizers ,Seed store etc.(as per

R&R plan 2008) By the construction

of Halon Dam 13040 Hectares of

land will be irrigated in 46 Nos. of

villages of command, due to which

increasing in National productivity &

will be beneficial for thousands of

formers. And there will be possibility

of employment too.

37. Shri Ramkumar

Jhariya Village-Birsa

Dam should not be

constructed; it is harmful for

the resident of village Birsa.

Village Birsa and Mangabeli comes

under Grampanchyat Karanjiya.

Under above panchyat a Meeting

(Gran Sabha) was held on Dated 06-

04-2004 and panchayat have

approved the Halon Project and

given a no objection certificate

regarding construction. Instead of

above the Panchayat of 15 villages,

which comes under submergence

,had also given no objection

certificate. Under Halon Project

Page 20: HALON IRRIGATION PROJECT, VILLAGE – KARANJIYA …halon irrigation project, village – karanjiya tehsil bichhiya district – mandla (m.p.). statement of the issues raised by the

,area under submergence is total

1570.31 Ha. Including private and

Govt. land. Out of that only 330.56

Ha. land comes under submergence

of Birsa village which is only 14.68%

of total submergence .There is total

420.25 Ha. Land is available in Birsa

village and under submergence only

230.56 Ha. Land comes, which is

54.86% of420.25 Ha. Of land. The

displaced persons of Birsa village

will be resettled at Karanjiya village.

Which is only 2 Km. away from Birsa

village.

The compensation of acquired land

will be given by the collector as per

prevalent rate .In addition to that

30% more solesium compensation

will be given and provision of 12%

per annum interest will be given for

the period from Date of Award to

date of payment .Such affected

families whose both land and house

comes under submergence, they will

be given free residential plot as well

as compensation for property will be

given. Rs.20000/- or a house will be

given under Indira Awas yojana

(Para 6.7),or grant amount under

Indira Awas yojana at that time of

payment which ever is more will be

paid to the affected family who are

below poverty level. By the

construction of Dam there will be

possibility of employment too. As per

Page 21: HALON IRRIGATION PROJECT, VILLAGE – KARANJIYA …halon irrigation project, village – karanjiya tehsil bichhiya district – mandla (m.p.). statement of the issues raised by the

Para 5.2(gh) (Compensation will be

given for encroached land. In

addition to that 30% more solesium

compensation will be given and

provision of 12% per annum intrest

will be given for the period from Date

of Award to date of payment in the

form of ex Garcia ).At every 100

Displaced family there is a provision

for a primary school and at every

500 Displaced family there is also

provision for construction of Health

centre too.In addition to that there

will be other public facility like

Community hall, Provision is made

for one well per 100 Displaced

family, one pond for per 500

Displaced family, Also provision is

made for Temple ,Opening of Shops

of Fertilizers ,Seed store etc.(as per

R&R plan 2008) By the construction

of Halon Dam 13040 Hectares of

land will be irrigated in 46 Nos. of

villages of command, due to which

increasing in National productivity &

will be beneficial for thousands of

formers. And there will be possibility

of employment too.

38. Shri Ruden Lal

Jhariya and other

villagers Village-Birsa

Construction of Dam to be

abandoned. We don’t get

any benefit, If the dam is to

be constructed under

following condition :-

(1) Dam rule 2007-08

should be modified

(1) R & R plan 2007-2008 is revised

up to date 30/04/2009.There is a

provision to give employment with

priority to displaced persons(Para

9.4.1)

(2) Survey of property will be done in

front of effected family whose Award

Page 22: HALON IRRIGATION PROJECT, VILLAGE – KARANJIYA …halon irrigation project, village – karanjiya tehsil bichhiya district – mandla (m.p.). statement of the issues raised by the

for company and

govt . employment

.

(2) Every man of

submerged area is

to be called to give

adequate

compensation in

front of them at site

accoeding to his

own

valuation.Which

should be

accepted by

Government.

(3) For the

rehabilitation of

persons forest

department should

give permission

and forest

department should

give patta to his

hitgrahi beside

canal,so that we

can get canal

water.

(4) Every person of

submerged area

should be given

Govt. service, and

income from dam

should be given to

effected family as

a bonus.

(5) children of sub

will be passed by Collector. In

addition to that 30% more solesium

compensation will be given and

provision of 12% per annum intrest

will be given for the period from Date

of Award to date of payment.

(3) The compensation of acquired

land will be given by the collector as

per prevalent rate .In addition to that

30% more solesium compensation

will be given and provision of 12%

per annum interest will be given for

the period from Date of Award to

date of payment .Such affected

families whose both land and house

comes under submergence, they will

be given free residential plot as well

as compensation for property will be

given. Rs.20000/- or a house will be

given under Indira Awas yojana

(Para 6.7),or grant amount under

Indira Awas yojana at that time of

payment which ever is more will be

paid to the affected family who are

below poverty level. By the

construction of Dam there will be

possibility of employment too. As per

Para 5.2(gh) (Compensation will be

given for encroached land. In

addition to that 30% more solesium

compensation will be given and

provision of 12% per annum interest

will be given for the period from Date

of Award to date of payment in the

form of ex Garcia ).At every 100

Displaced family there is a provision

Page 23: HALON IRRIGATION PROJECT, VILLAGE – KARANJIYA …halon irrigation project, village – karanjiya tehsil bichhiya district – mandla (m.p.). statement of the issues raised by the

mussed elleebed

family free

education up to 20

years of age and

for adult persons

free health check

up for lifetime

period showed

begiven

(6) Power should be

given to purchase

& registry the land

of scheduled cast,

and registration of

land should be

free.

(7) After the dryness

of dam free land

should be given for

cultivation to

submerged area’s

person. And water

for irrigation should

be given free of

cost lifetime.

for a primary school and at every

500 Displaced family there is also

provision for construction of Health

centre too. In addition to that there

will be other public facility like

Community hall, Provision is made

for one well per 100 Displaced

family, one pond for per 500

Displaced family, Also provision is

made for Temple ,Opening of Shops

of Fertilizers ,Seed store etc.(as per

R&R plan 2008)

(4)As per (Para 6.7 gh) for more

than 50 years of age old

person/Divorce/separated woman,

and unmarried girls case there is a

provision for remarriage or up to

remarriage all above able person will

get pension of Rs.500/-per month.

(5) At every 500 Displaced families

there is also provision for

construction of Health centre and at

every 100 Displaced family there is a

provision for a primary school too.

(6) Chapter 9 as per Para 9.4.3

there is a provision for exemption

related facility in Registration.

(7) Priority will be given in giving the

tank bed cultivation land in lease to

displaced person. And as per Para

9.3 other civilian facilities will be

given.

39. Shri Ravi Shanker

Jhariya Village -Birsa

Dam should not be

constructed because there

will be loss of men & money

if constructed then the

By the construction of Dam 13040

Hectares of land will be irrigated in

46 Nos. of villages of command, due

to which increasing in National

Page 24: HALON IRRIGATION PROJECT, VILLAGE – KARANJIYA …halon irrigation project, village – karanjiya tehsil bichhiya district – mandla (m.p.). statement of the issues raised by the

village topography and

management should be

same as previous. Every

family’s unemployed person

should be given

employment.

productivity & will be beneficial for

thousands of formers. And there will

be possibility of employment too.

The compensation of acquired land

will be given by the collector as per

prevalent rate .In addition to that

30% more solesium compensation

will be given and provision of 12%

per annum interest will be given for

the period from Date of Award to

date of payment .Such affected

families whose both land and house

comes under submergence, they will

be given free residential plot as well

as compensation for property will be

given. Rs.20000/- or a house will be

given under Indira Awas yojana

(Para 6.7),or grant amount under

Indira Awas yojana at that time of

payment which ever is more will be

paid to the affected family who are

below poverty level. By the

construction of Dam there will be

possibility of employment too. As per

Para 5.2(gh) (Compensation will be

given for encroached land. In

addition to that 30% more solesium

compensation will be given and

provision of 12% per annum interest

will be given for the period from Date

of Award to date of payment in the

form of ex Garcia ).At every 100

Displaced family there is a provision

for a primary school and at every

500 Displaced family there is also

provision for construction of Health

centre too. In addition to that there

Page 25: HALON IRRIGATION PROJECT, VILLAGE – KARANJIYA …halon irrigation project, village – karanjiya tehsil bichhiya district – mandla (m.p.). statement of the issues raised by the

will be other public facility like

Community hall, Provision is made

for one well per 100 Displaced

family, one pond for per 500

Displaced family, Also provision is

made for Temple ,Opening of Shops

of Fertilizers ,Seed store etc.(as per

R&R plan 2008). There is a

provision to give employment to the

displaced family with priority.

40. Shri Ravi Shanker

Jhariya Village-

Mangaveli

Adequate compensation of

land, land in place of land

and employment should be

given. Dam should be

constructed.

The compensation of acquired land

will be given by the collector as per

prevalent rate .In addition to that

30% more solesium compensation

will be given and provision of 12%

per annum interest will be given for

the period from Date of Award to

date of payment .Such affected

families whose both land and house

comes under submergence, they will

be given free residential plot as well

as compensation for property will be

given. Rs.20000/- or a house will be

given under Indira Awas yojana

(Para 6.7),or grant amount under

Indira Awas yojana at that time of

payment which ever is more will be

paid to the affected family who are

below poverty level. By the

construction of Dam there will be

possibility of employment too. As per

Para 5.2(gh) (Compensation will be

given for encroached land. In

addition to that 30% more solesium

compensation will be given and

provision of 12% per annum interest

Page 26: HALON IRRIGATION PROJECT, VILLAGE – KARANJIYA …halon irrigation project, village – karanjiya tehsil bichhiya district – mandla (m.p.). statement of the issues raised by the

will be given for the period from Date

of Award to date of payment in the

form of ex Garcia). By the

construction of Dam 13040 Hectares

of land will be irrigated in 46 Nos. of

villages of command, due to which

increasing in National productivity &

will be beneficial for thousands of

formers. And there will be possibility

of employment too.

41. Shri Lallu Sing

Village-Mangaveli

Adequate compensation of

land, irrigated land in place

of land and employment

should be given at least one

person of family and

adequate compensation for

fruitful trees should be

given, employment should

be given.

The compensation of acquired land

will be given by the collector as per

prevalent rate .In addition to that

30% more solesium compensation

will be given and provision of 12%

per annum interest will be given for

the period from Date of Award to

date of payment .Such affected

families whose both land and house

comes under submergence, they will

be given free residential plot as well

as compensation for property will be

given. Rs.20000/- or a house will be

given under Indira Awas yojana

(Para 6.7),or grant amount under

Indira Awas yojana at that time of

payment which ever is more will be

paid to the affected family who are

below poverty level. By the

construction of Dam there will be

possibility of employment too. As per

Para 5.2(gh) (Compensation will be

given for encroached land. In

addition to that 30% more solesium

compensation will be given and

provision of 12% per annum interest

will be given for the period from Date

Page 27: HALON IRRIGATION PROJECT, VILLAGE – KARANJIYA …halon irrigation project, village – karanjiya tehsil bichhiya district – mandla (m.p.). statement of the issues raised by the

of Award to date of payment in the

form of ex Garcia). ). There is a

provision to give employment to the

displaced family with priority.

42. Pratapi Lal Jhariya

Village-mangaveli

Height of the dam to be

reduced from 31 m to 29 m

it will benefit the formers.

Height of the dam is as per technical

specification for sufficient storage of

water. If Height is reduced to 29m

required water for irrigation will not

be available.

43. Bhura Lal Jhariya

Village-mangaveli

Existence of Halon river will

be wiped off valuable herbal

will be extinct. No people

representative was present.

No written provision of land

for the displaced, land to be

given in place of land. If the

land is liked by farmers then

discussion on land should

be done.

At present river is also dry in the

summer season. Flow of Halon river

will remain go water due to seepage

of dam. For the protection of

valuable herbal etc. there is a

provision of Rs. 197 Lacks so that

valuable herbal will not be extinct.

During public hearing Shri Naryan

Singh Patta MLA Bichhiya was

present.

As per Para 6.1,such submergence

effected families whose total land is

acquired or misplaced of account

holder/account holders

,compensation of total real losses of

land will be given in form of

agricultural land or agriculturable

barren land will be allotted but,

compensation of land will be

maximum up to 1 hectare Irrigated

land or 2 Ha. Non irrigated land or

agriculturable barren land, under

condition if, there is availability of

government land at resettlement

place.

Page 28: HALON IRRIGATION PROJECT, VILLAGE – KARANJIYA …halon irrigation project, village – karanjiya tehsil bichhiya district – mandla (m.p.). statement of the issues raised by the

44. Shri Ramakant Tiwari

Village-Rajo

Adequate compensation

should be given displaced

person should given

adequate facilities &

employment .

The compensation of acquired land

will be given by the collector as per

prevalent rate .In addition to that

30% more solesium compensation

will be given and provision of 12%

per annum interest will be given for

the period from Date of Award to

date of payment .Such affected

families whose both land and house

comes under submergence, they will

be given free residential plot as well

as compensation for property will be

given. And if agricultural land is to be

given in place of acquired land then

extra Rs.10000/-per hectare will be

given as agricultural produce (as per

Para 6.6). There is a provision to

give employment to the displaced

family with priority.

45. Shri Rajesh Jhariya

Village-Birsa

No objection by construction

of Dam. Adequate

compensation should be

given, there is no any effect

on environment.

The compensation of acquired land

will be given by the collector as per

prevalent rate .In addition to that

30% more solesium compensation

will be given and provision of 12%

per annum interest will be given for

the period from Date of Award to

date of payment .Such affected

families whose both land and house

comes under submergence, they will

be given free residential plot as well

as compensation for property will be

given. Rs.20000/- or a house will be

given under Indira Awas yojana

Page 29: HALON IRRIGATION PROJECT, VILLAGE – KARANJIYA …halon irrigation project, village – karanjiya tehsil bichhiya district – mandla (m.p.). statement of the issues raised by the

(Para 6.7),or grant amount under

Indira Awas yojana at that time of

payment which ever is more will be

paid to the affected family who are

below poverty level. By the

construction of Dam there will be

possibility of employment too. There

is an environment management

programme of Rs. 765 Millions to

protect the environmental balance

46. Shri Suresh Kumar

Jhariya

Appropriate land to be given

and one member of a family

should get employment

house and pure drinking

water to be managed land

to be given a side the canal.

The compensation of acquired land

will be given by the collector as per

prevalent rate .In addition to that

30% more solesium compensation

will be given and provision of 12%

per annum interest will be given for

the period from Date of Award to

date of payment .Such affected

families whose both land and house

comes under submergence, they will

be given free residential plot as well

as compensation for property will be

given. Rs.20000/- or a house will be

given under Indira Awas yojana

(Para 6.7),or grant amount under

Indira Awas yojana at that time of

payment which ever is more will be

paid to the affected family who are

below poverty level. By the

construction of Dam there will be

possibility of employment too. As per

Para 5.2(gh) (Compensation will be

given for encroached land. In

addition to that 30% more solesium

compensation will be given and

provision of 12% per annum interest

will be given for the period from Date

of Award to date of payment in the

form of ex Garcia).At every 100

Displaced family there is a provision

for a primary school and at every

500 Displaced family there is also

Page 30: HALON IRRIGATION PROJECT, VILLAGE – KARANJIYA …halon irrigation project, village – karanjiya tehsil bichhiya district – mandla (m.p.). statement of the issues raised by the

provision for construction of Health

centre too. In addition to that there

will be other public facility like

Community hall, Provision is made

for one well per 100 Displaced

family, one pond for per 500

Displaced family, Also provision is

made for Temple ,Opening of Shops

of Fertilizers ,Seed store etc.(as per

R&R plan 2008). There is a

provision to give employment to the

displaced family with priority.

47. Shri Rajaram Jhariya

Village -Birsa

Before the construction of

dam Adequate

compensation, House, land

should be given as per

today’s rate, We should be

rehabilitated at Sijhora

depot, Educated labors one

member employment,

house and Gaushala should

be given.

The compensation of acquired land

will be given by the collector as per

prevalent rate .In addition to that

30% more solesium compensation

will be given and provision of 12%

per annum interest will be given for

the period from Date of Award to

date of payment .Such affected

families whose both land and house

comes under submergence, they will

be given free residential plot as well

as compensation for property will be

given. Rs.20000/- or a house will be

given under Indira Awas yojana

(Para 6.7),or grant amount under

Indira Awas yojana at that time of

payment which ever is more will be

paid to the affected family who are

below poverty level. By the

construction of Dam there will be

possibility of employment too. At

new place Rs.15000/- grant will be

given for the construction of

Gaushala.

Page 31: HALON IRRIGATION PROJECT, VILLAGE – KARANJIYA …halon irrigation project, village – karanjiya tehsil bichhiya district – mandla (m.p.). statement of the issues raised by the

48. Shri Vinod Kumar

Jhariya Village -Birsa

Construction to be started

soon.

According to Govt. Policy the works

on project will be started soon and

after the completion of project 13040

hectare of land will be irrigated. And

there will be possibility of

employment.

49. Shri Gondlal Dhurve

Village -Rajo

Land in place of land. The compensation of acquired land

will be given by the collector as per

prevalent rate .In addition to that

30% more solesium compensation

will be given and provision of 12%

per annum interest will be given for

the period from Date of Award to

date of payment .Such affected

families whose both land and house

comes under submergence, they will

be given free residential plot as well

as compensation for property will be

given. Rs.20000/- or a house will be

given under Indira Awas yojana

(Para 6.7),or grant amount under

Indira Awas yojana at that time of

payment which ever is more will be

paid to the affected family who are

below poverty level.

50. Shri Lalif Khan and

other villagers.

Permission should not be

granted for construction of

dam because animal’s

charagah (grass land) and

fire wood will submerge and

problem of grass for animal

and fruit trees will also

submerge resulting

environmental loss.

Village Rajo is only 10%

submergence affected village, hence

displaced family will get land free of

cost in the same village and

compensation of property will also

be given hence there is no

separation of family takes place.

As the resettlement is in the same

village the education of children will

not be affected and there will not be

any adverse hygienic effect. By the

Page 32: HALON IRRIGATION PROJECT, VILLAGE – KARANJIYA …halon irrigation project, village – karanjiya tehsil bichhiya district – mandla (m.p.). statement of the issues raised by the

any adverse hygienic effect. By the

construction of Dam 13040 Hectares

of land will be irrigated in 46 Nos. of

villages of command, due to which

increasing in National productivity &

will be beneficial for thousands of

formers. And there will be possibility

of employment too. There is an

environment management

programme of Rs. 765.10 Millions to

protect the environmental balance,

hence there will not be any adverse

effect on environmental balance.

51. Shri Gyani and others

Village-Rajo

Permission should not be

granted for construction of

Dam.

By the construction of Dam 13040

Hectares of land will be irrigated in

46 Nos. of villages of command, due

to which increasing in National

productivity & will be beneficial for

thousands of formers. And there will

be possibility of employment too.

Village Ratjo is only 10%

submergence affected village, hence

displaced family will get land free of

cost in the same village and

compensation of property will also

be given hence there is no

separation of family takes place.

As the resettlement is in the same

village the education of children will

not be affected and there will not be

any adverse hygienic effect.

There is an environment

management programme of Rs.

765.10 Millions to protect the

environmental balance, hence, there

will not be any adverse effect on

Page 33: HALON IRRIGATION PROJECT, VILLAGE – KARANJIYA …halon irrigation project, village – karanjiya tehsil bichhiya district – mandla (m.p.). statement of the issues raised by the

environmental balance.

52. Shri Latif Khan Permission should not be

granted for construction of

dam because animal’s

charagah (grass land) and

fire wood will submerge and

problem of grass for animal

and fruit trees will also

submerge resulting

environmental loss. dam

should be abandoned. If our

problems are not solved we

will go for strike.

Village Rajo is only 10%

submergence affected village, hence

displaced family will get land free of

cost in the same village and

compensation of property will also

be given hence there is no

separation of family takes place.

As the resettlement is in the same

village the education of children will

not be affected and there will not be

any adverse hygienic effect. By the

construction of Dam 13040 Hectares

of land will be irrigated in 46 Nos. of

villages of command, due to which

increasing in National productivity &

will be beneficial for thousands of

formers. And there will be possibility

of employment too. There is an

environment management

programme of Rs. 765.10 Millions to

protect the environmental balance.

Hence, there will not be any adverse

effect on environmental balance.

53. Shri Latif Khan and

other villagers. Village

-Rajo

Permission should not be

granted for construction of

dam. As our agricultural

land comes under

submergence ,without

cultivation our life will not be

survived. Due to

submergence of trees &

plants there is

environmental loss. Halon

project should be

Village Rajo is only 10%

submergence affected village, hence

displaced family will get land free of

cost in the same village and

compensation of property will also

be given hence there is no

separation of family takes place.

As the resettlement is in the same

village the education of children will

not be affected and there will not be

any adverse hygienic effect. By the

construction of Dam 13040 Hectares

Page 34: HALON IRRIGATION PROJECT, VILLAGE – KARANJIYA …halon irrigation project, village – karanjiya tehsil bichhiya district – mandla (m.p.). statement of the issues raised by the

abandoned. of land will be irrigated in 46 Nos. of

villages of command, due to which

increasing in National productivity &

will be beneficial for thousands of

formers. And there will be possibility

of employment too. There is an

environment management

programme of Rs. 765.10 Millions to

protect the environmental balance,

hence there will not be any adverse

effect on environmental balance.

54. Shri Latif Khan Permission should not be

granted for construction of

Dam.Because due to

increase of water level in

Bud budinala our traffic will

be effected. If the dam is

constructed then Rajo

village should be added in

Balaghat District.

Village Rajo is only 10%

submergence affected village, hence

displaced family will get land free of

cost in the same village and

compensation of property will also

be given hence there is no

separation of family takes place.

As the resettlement is in the same

village the education of children will

not be affected and there will not be

any adverse hygienic effect. After

the construction of dam height of

Budbudi nala bridge will be

increased so that there will not be

any effect on traffic.

55. Shri Vijay Kumar

Tamrakar village

Sijhora

Dam should be constructed.

Resulting increase in

ground water level of

surrounding villages takes

place. Irrigation facility will

be available. And no any

adverse effect on

environment.

As soon as the project is sanctioned

construction work will be started. By

the construction of Halon Dam

13040 Hectares of land will be

irrigated in 46 Nos. of villages of

command, due to which increasing

in National productivity & will be

beneficial for thousands of formers.

And there will be possibility of

Page 35: HALON IRRIGATION PROJECT, VILLAGE – KARANJIYA …halon irrigation project, village – karanjiya tehsil bichhiya district – mandla (m.p.). statement of the issues raised by the

employment too.

56. Shri Gokul Prasad

Jhariya Village-

Sanjhari

Dam should be constructed.

Resulting increase in

ground water level of

surrounding villages takes

place. Irrigation facility will

be available. As per ability

employment and land

compensation on high rate

should be given to formers.

As soon as the project is sanctioned

construction work will be started. By

the construction of Halon Dam

13040 Hectares of land will be

irrigated in 46 Nos. of villages of

command, due to which increasing

in National productivity & will be

beneficial for thousands of formers.

And there will be possibility of

employment too. The compensation

of acquired land will be given by the

collector as per prevalent rate .In

addition to that 30% more solesium

compensation will be given and

provision of 12% per annum interest

will be given for the period from Date

of Award to date of payment .Such

affected families whose both land

and house comes under

submergence, they will be given free

residential plot as well as

compensation for property will be

given. And if agricultural land is to be

given in place of acquired land then

extra Rs.10000/-per hectare will be

given as agricultural produce (as per

Para 6.6).

57.

Shri Alam Das Village

-Boda

Halon Dam should be

constructed. Adequate

compensation for land,

employment ,and house,

drinking water, education

health centre etc .should be

As soon as the project is sanctioned

construction work will be started. By

the construction of Halon Dam

13040 Hectares of land will be

irrigated in 46 Nos. of villages of

command, due to which increasing

in National productivity & will be

Page 36: HALON IRRIGATION PROJECT, VILLAGE – KARANJIYA …halon irrigation project, village – karanjiya tehsil bichhiya district – mandla (m.p.). statement of the issues raised by the

given in National productivity & will be

beneficial for thousands of formers.

And there will be possibility of

employment too. The compensation

of acquired land will be given by the

collector as per prevalent rate .In

addition to that 30% more solesium

compensation will be given and

provision of 12% per annum interest

will be given for the period from Date

of Award to date of payment .Such

affected families whose both land

and house comes under

submergence, they will be given free

residential plot as well as

compensation for property will be

given. Rs.20000/- or a house will be

given under Indira Awas yojana

(Para 6.7),or grant amount under

Indira Awas yojana at that time of

payment which ever is more will be

paid to the affected family who are

below poverty level. By the

construction of Dam there will be

possibility of employment too. As per

Para 5.2(gh) (Compensation will be

given for encroached land. In

addition to that 30% more solesium

compensation will be given and

provision of 12% per annum interest

will be given for the period from Date

of Award to date of payment in the

form of ex Garcia).At every 100

Displaced family there is a provision

Page 37: HALON IRRIGATION PROJECT, VILLAGE – KARANJIYA …halon irrigation project, village – karanjiya tehsil bichhiya district – mandla (m.p.). statement of the issues raised by the

for a primary school and at every

500 Displaced family there is also

provision for construction of Health

centre too. In addition to that there

will be other public facility like

Community hall, Provision is made

for one well per 100 Displaced

family, one pond for per 500

Displaced family, Also provision is

made for Temple ,Opening of Shops

of Fertilizers ,Seed store etc.(as per

R&R plan 2008). There is a

provision to give employment to the

displaced family with priority.

58. Shri Monoher singh

Margvi other Villagers

Village-Alna

Public hearing of Halon

irrigation project has been

done at Village Pandutala

on dated 12/02/2009 in

which villagers have taken

objection on construction of

Dam. But Government is

doing public hearing without

any information .This public

hearing is objectionable for

persons of submerged area.

Halon project should be

abandoned. There could be

adverse effect on

environment and natural

disaster may takes place.

The applicants are of Alna of

Balaghat District. Where public

hearing is already done on dated

12/02/2009, in this Public hearing

also prior information and

advertisement in newspaper was

given. Many people of concerned

villages of Distt. balaghat had

attended In the above Public hearing

.The Ministry of environment and

forest of Government of India New

Delhi has directed to do separate

Public hearing in Distt. Mandla,

hence in this connection on

31/07/2009 Public hearing in Distt.

Mandla is done by giving information

and advertisement in newspapers to

concerned villages of Diatt. Mandla

,hence saying of applicant’s that not

got any information about Public

Page 38: HALON IRRIGATION PROJECT, VILLAGE – KARANJIYA …halon irrigation project, village – karanjiya tehsil bichhiya district – mandla (m.p.). statement of the issues raised by the

hearing is wrong. Keeping in point of

view for natural disaster like

earthquake etc. India’s largest

research centre for disaster

management pune (C.W.P.R.S.

Pune ) has studied and given his

seismic parameter report, In which

they have considered all disaster

related to earthquake etc. for Halon

Dam & provision for the same has

been made. Thus, There is an

environment management

programme of Rs. 765.10 Millions to

protect the environmental balance.,

so there will be no any adverse

effect on environmental balance.

Executive Engineer

N.D. Holan Division

Bchhiya, Dist. Mandla.

Superintending Engineer

Canalcell R.A.B.L.S.

Project

Bargi Hills, Jabalpur

Chief Engineer

R.A.B.L.S. Project

Bargi Hills, Jabalpur