Upload
others
View
3
Download
0
Embed Size (px)
Citation preview
HALON IRRIGATION PROJECT, VILLAGE – KARANJIYA
TEHSIL BICHHIYA DISTRICT – MANDLA (M.P.).
STATEMENT OF THE ISSUES RAISED BY THE PUBLIC DURING PUBLIC
HEARING ON DATED 31-07-2009 AND COMMENTS ON THE APPLICANTS
POINTS
S. No.
Name and Address Raised issues Comments on applicants points
1 2 3 4
Village – Karanjiya
1. Shri Ashok Village,
Karanjiya
Construction of Halon Dam
will snatch the habitation of
people and will have
negative impact on
education, health etc. due to
accumulation of water
insects will die which
eventually prevent the flow
of river water and spread
diseases.
Village Karanjiya is only 10%
submergence affected village, hence
displaced family will get land free of
cost in the same village and
compensation of property will also
be given hence there is no
separation of family takes place.
As the resettlement is in the same
village the education of children will
not be affected and there will not be
any adverse hygienic effect. Flow of
Halon River will remain continue due
to seepage water of dam.
2. Shri Santulal Jhariya
Village-Karanjiya
Project should be started
earlier Adequate
compensation of land
should be given apart from
it habitation, employment
and fertile land to be given.
Dam Should be
constructed.
As soon as the project is sanctioned
construction work will be started.
The compensation of acquired land
will be given by the collector as per
prevalent rate .In addition to that
30% more solesium compensation
will be given and provision of 12%
per annum interest will be given for
the period from Date of Award to
date of payment. Such affected
families whose both land and house
comes under submergence ,they will
be given free residential plot as well
as compensation for property will be
given. Rs.20000/- or a house will be
given under Indira Awas yojana(para
6.7),or grant amount under Indira
Awas yojana at that time of payment
which ever is more will be paid to the
affected family who are below
poverty level.By the construction of
dam extra employment will be
generated. As per Para 5.2(gh)
(Compensation will be given for
encroached land . In addition to that
30% more solesium compensation
will be given and provision of 12%
per annum intrest will be given for
the period from Date of Award to
date of payment in the form of ex
Garcia )
3. Shri Rohan Prasad
Sahu Village
Karanjiya
Adequate rate of land and
house or fertile land should
be given .
The compensation of acquired land
will be given by the collector as per
prevalent rate .In addition to that
30% more compensation will be
given and provision of 12% per
annum interest will be given for the
period from Date of Award to date of
payment .Such affected families
whose both land and house comes
under submergence ,they will be
given free residential plot as well as
compensation for property will be
given, And if in place of acquired
land, agricultural land will be given
then, also extra Rs.10000/- per
hectare will be paid for agricultural
product.
4. Shri Sunil Kumar
Village-Karanjiya
Land will be given in place
of land, adequate
compensation to be given
and employment to be given
to the family members of
affected family. And
construction of dam should
be done earlier.
The compensation of acquired land
will be given by the collector as per
prevalent rate .In addition to that
30% more solesium compensation
will be given and provision of 12%
per annum interest will be given for
the period from Date of Award to
date of payment .Such affected
families whose both land and house
comes under submergence ,they will
be given free residential plot as well
as compensation for property will be
given, There is a provision to give
employment to the displaced family
with priority . As soon as the project
is sanctioned construction work will
be started.
5. Shri Swaresh Kumar
Dhanyajal Village –
Karanjiya
Due to construction of
Halon irrigation project we
have no any objection. So
work should be started
earlier by giving
compensation to affected
family.
The compensation of acquired land
will be given by the collector as per
prevalent rate .In addition to that
30% more solesium compensation
will be given and provision of 12%
per annum interest will be given for
the period from Date of Award to
date of payment . As soon as the
project is sanctioned construction
work will be started.
6. Shri Bashirudin Khan
Divakar Village –
Karanjiya
Halon Project will leads to
the development of the
area. Ground water level
will increase. Possibility of
agriculture & employment
will increase. There will be
no any adverse effect on
animals & insects.
According to Govt. Policy the works
on project will be started soon and
after the completion of project 13040
hectare of land will be irrigated. And
there will be possibility of
employment. There is an
environment management
programme of Rs. 765.10 Millions to
protect the environmental balance.
7. Shri Shiv Charan
Jhariya Village –
Karanjiya
Works should be started
immediately. In place of
land, land & house should
be given to the affected
families.
As soon as the project is sanctioned
construction work will be started.
The compensation of acquired land
will be given by the collector as per
prevalent rate .In addition to that
30% more solesium compensation
will be given and provision of 12%
per annum interest will be given for
the period from Date of Award to
date of payment . Such affected
families whose house comes under
submergence, compensation for
their house will be given, In addition
to that, There is a provision for 250
sqm. Free residential plot.
8. Shri Gopal Prashad
Sahu Village –
Karanjiya
Employment should be
given to unemployed and
construction of Dam should
be started soon.
As soon as the project is sanctioned
construction work will be started.
There is a provision to give
employment to the displaced family
with priority.
9. Shri Kailash Prashad
Village – Karanjiya
Adequate compensation
and employment should be
given. Land should be given
in place of land. Dam
should not be constructed.
The compensation of acquired land
will be given by the collector as per
prevalent rate .In addition to that
30% more solesium compensation
will be given and provision of 12%
per annum interest will be given for
the period from Date of Award to
date of payment. Such affected
families whose both land and house
comes under submergence ,they will
be given free residential plot as well
as compensation for property will be
given. There is a provision to give
employment to the displaced family
with priority. By the construction of
Dam 13040 Hectares of land will be
irrigated in 46 Nos. of villages of
command, due to which increasing
in National productivity & will be
beneficial for thousands of formers.
10. Shri Pitam Lal Jhariya
Village-Karanjiya
Adequate compensation of
land to be given. I am 75
years of age & not in a
position to work.
The compensation of acquired land
will be given by the collector as per
prevalent rate .In addition to that
30% more solesium compensation
will be given and provision of 12%
per annum interest will be given for
the period from Date of Award to
date of payment. Such affected
families whose both land and house
comes under submergence ,they will
be given free residential plot as well
as compensation for property will be
given. Under Para 6.7 (g) there is a
provision for life time pension of
Rs.500/-per month for disabled and
old person.
11. Shri Dayaram Jhariya Adequate compensation
and employment to
unemployed person should
be given.
The compensation of acquired land
will be given by the collector as per
prevalent rate .In addition to that
30% more solesium compensation
will be given and provision of 12%
per annum interest will be given for
the period from Date of Award to
date of payment. Such affected
families whose both land and house
comes under submergence ,they will
be given free residential plot as well
as compensation for property will be
given. There is a provision to give
employment to the displaced family
with priority. As soon as the project
is sanctioned construction work will
be started.
12. Shri Bhupendra
Jhariya Village-
Karanjiya
Construction of dam will
leads to environmental un
balance.
There is an environment
management programme of Rs.
765.10 Millions to protect the
environmental balance
13. Shri Rajesh Kumar
Prajapati Village-
Karanjiya.
No objection .Due to
construction of halon Dam
there will be irrigation as
well as employment too.
According to Govt. Policy the works
on project will be started soon and
after the completion of project 13040
hectare of land will be irrigated. And
there will be possibility of
employment.
14. Shri Manjodh Village-
Karanjiya
Adequate compensation of
land & employment should
be given.Dam should be
constructed.
The compensation of acquired land
will be given by the collector as per
prevalent rate .In addition to that
30% more solesium compensation
will be given and provision of 12%
per annum interest will be given for
the period from Date of Award to
date of payment. Such affected
families whose both land and house
comes under submergence ,they will
be given free residential plot as well
as compensation for property will be
given. There is a provision to give
employment to the displaced family
with priority. As soon as the project
is sanctioned construction work will
be started.
15. Shri Mohammodin
Khan Village-
Karanjiya.
Adequate compensation of
land & employment should
be given.
The compensation of acquired land
will be given by the collector as per
prevalent rate .In addition to that
30% more solesium compensation
will be given and provision of 12%
per annum interest will be given for
the period from Date of Award to
date of payment. Such affected
families whose both land and house
comes under submergence ,they will
be given free residential plot as well
as compensation for property will be
given. There is a provision to give
employment to the displaced family
with priority. As soon as the project
is sanctioned construction work will
be started.
16. Shri Rohani Prasad
Sahu Village-
Karanjiya.
Land will be given in place
of land, adequate
compensation to be given
and employment to be given
to the family members of
affected family. And
construction of dam should
be done earlier.
The compensation of acquired land
will be given by the collector as per
prevalent rate .In addition to that
30% more solesium compensation
will be given and provision of 12%
per annum interest will be given for
the period from Date of Award to
date of payment .Such affected
families whose both land and house
comes under submergence ,they will
be given free residential plot as well
as compensation for property will be
given, There is a provision to give
employment to the displaced family
with priority . As soon as the project
is sanctioned construction work will
be started.
17. Shri Jagdish Prasad
Jhariya Village-
Karanjiya.
Due to construction of Dam
our all land will be
submerged.How will we
survive our lives. We are
not going to get the
advantage of irrigation.
Nothing is clear as where
we are going to be sent
after displacement
compensation is less. Dam
should not be constructed
Village Karanjiya is only 10%
submergence affected village, hence
displaced family will get land free of
cost in the same village .All villagers
of Karanjiya will get irrigation facility.
The compensation of acquired land
will be given by the collector as per
prevalent rate .In addition to that
30% more solesium compensation
will be given and provision of 12%
per annum interest will be given for
the period from Date of Award to
date of payment .Such affected
families whose both land and house
comes under submergence, they will
be given free residential plot as well
as compensation for property will be
given. And if agricultural land is to be
given in place of acquired land then
extra Rs.10000/-per hectare will be
given as agricultural produce (as per
Para 6.6). By the construction of
Dam 13040 Hectares of land will be
irrigated in 46 Nos. of villages of
command, due to which increasing
in National productivity & will be
beneficial for thousands of formers.
And there will be possibility of
employment too.
18. Shri Phralad Kumar
Jhariya Village-
Karanjiya.
Agree with the construction
of dam adequate
compensation should be
given.
The compensation of acquired land
will be given by the collector as per
prevalent rate .In addition to that
30% more solesium compensation
will be given and provision of 12%
per annum interest will be given for
the period from Date of Award to
date of payment .Such affected
families whose both land and house
comes under submergence, they will
be given free residential plot as well
as compensation for property will be
given. And if agricultural land is to be
given in place of acquired land then
extra Rs.10000/-per hectare will be
given as agricultural produce (as per
Para 6.6).
19. Shri Amrat Lal
Jhariya Village-
Karanjiya.
Dam should not be
constructed, compensation
for Gaushala which is
15000/- and for house
construction which is
20000/-is not adequate.
Compensation for submerged
property (like Land, tree, House, well
.Gaushala etc.) will be given by the
collector as per prevalent rate, In
addition to that 30% more solesium
compensation will be given and
provision of 12% per annum intrest
will be given for the period from Date
of Award to date of payment in the
form of ex Garcia ),Out of above
owners of cattle will get Rs.15000/-
for the construction of Gaushala and
Rs.20000/- or a house will be given
under Indira Awas yojana (Para
6.7),or grant amount under Indira
Awas yojana at that time of payment
which ever is more will be paid to the
affected family who are below
poverty level. Also a grant
Rs.10000/- will be given to transport
their house materials. By the
construction of Dam there will be
irrigation facility in 46 Nos. of
villages of command, due to which
increasing in National productivity &
will be beneficial for thousands of
formers. And there will be possibility
of employment too.
20. Shri Brijendra Jiaswal
Village-Karanjiya.
Adequate compensation of
land, agricultural land and
Govt. job should be given.
Displaced family should be
provided adequate facility.
The compensation of acquired land
will be given by the collector as per
prevalent rate .In addition to that
30% more solesium compensation
will be given and provision of 12%
per annum interest will be given for
the period from Date of Award to
date of payment .Such affected
families whose both land and house
comes under submergence, they will
be given free residential plot as well
as compensation for property will be
given. And if agricultural land is to be
given in place of acquired land then
extra Rs.10000/-per hectare will be
given as agricultural produce (as per
Para 6.6). There is a provision to
give employment to the displaced
family with priority.
21. Shri Naresh Kumar
Tiwari Village-
Karanjiya.
Dam should not be
constructed, if Dam is to be
constructed then adequate
compensation of land and
employment should be
given.
The compensation of acquired land
will be given by the collector as per
prevalent rate .In addition to that
30% more solesium compensation
will be given and provision of 12%
per annum interest will be given for
the period from Date of Award to
date of payment .Such affected
families whose both land and house
comes under submergence, they will
be given free residential plot as well
as compensation for property will be
given. And if agricultural land is to be
given in place of acquired land then
extra Rs.10000/-per hectare will be
given as agricultural produce (as per
Para 6.6). There is a provision to
give employment to the displaced
family with priority.
Village – Birsa
22. Shri Sudhir Tiwari
Village-Birsa.
No any objection by the
Construction of dam.
Construction of Dam is to
be done immediately &
adequate compensation
and employment should be
given.
As soon as the project is sanctioned
construction work will be started.
The compensation of acquired land
will be given by the collector as per
prevalent rate .In addition to that
30% more solesium compensation
will be given and provision of 12%
per annum interest will be given for
the period from Date of Award to
date of payment. Such affected
families whose both land and house
comes under submergence ,they will
be given free residential plot as well
as compensation for property will be
given And if agricultural land is to be
given in place of acquired land then
extra Rs.10000/-per hectare will be
given as agricultural produce (as per
Para 6.6). There is a provision to
give employment to the displaced
family with priority.
23. Shri Anil Tiwari
Village-Birsa.
2 Acre of land is coming
under submergence area
out of which in 1 Acre there
are trees, kindly give the
information regarding the
compensation of land and
tree.
Compensation for submerged
property (like Land, tree, House,
.Gaushala, well etc.) will be given by
the collector as per prevalent rate,
In addition to that 30% more
solesium compensation will be given
and provision of 12% per annum
interest will be given for the period
from Date of Award to date of
payment .Compensation amount can
not be given at present.
24. Shri Anil Tiwari
Village-Birsa.
Adequate compensation
and rate should be given
and Project should be
started earlier.
The compensation of acquired land
will be given by the collector as per
prevalent rate .In addition to that
30% more solesium compensation
will be given and provision of 12%
per annum interest will be given for
the period from Date of Award to
date of payment .Such affected
families whose both land and house
comes under submergence, they will
be given free residential plot as well
as compensation for property will be
given. And if agricultural land is to be
given in place of acquired land then
extra Rs.10000/-per hectare will be
given as agricultural produce (as per
Para 6.6). As soon as the project is
sanctioned construction work will be
started.
25. Shri Vijaykant Tiwari
Village-Birsa
Adequate compensation
and rate should be given.
Employment & good land
should be given.
The compensation of acquired land
will be given by the collector as per
prevalent rate .In addition to that
30% more solesium compensation
will be given and provision of 12%
per annum interest will be given for
the period from Date of Award to
date of payment .Such affected
families whose both land and house
comes under submergence, they will
be given free residential plot as well
as compensation for property will be
given. And if agricultural land is to be
given in place of acquired land then
extra Rs.10000/-per hectare will be
given as agricultural produce (as per
Para 6.6). There is a provision to
give employment to the displaced
family with priority.
26. Shri Jinesh Kumar
Village-Birsa
Dam should be constructed.
No objection.
As soon as the project is sanctioned
construction work will be started. By
the construction of Dam 13040
Hectares of land will be irrigated in
46 Nos. of villages of command, due
to which increasing in National
productivity & will be beneficial for
thousands of formers. And there will
be possibility of employment too.
27. Shri Radhe Jhariya
Village -Birsa
Dam should be constructed.
No objection. Adequate
compensation and
Employment should be
given. Every adult member
of displaced family should
be considered as separate
As soon as the project is sanctioned
construction work will be started. By
the construction of Dam 13040
Hectares of land will be irrigated in
46 Nos. of villages of command, due
to which increasing in National
productivity & will be beneficial for
family. thousands of formers. And there will
be possibility of employment too.
The compensation of acquired land
will be given by the collector as per
prevalent rate .In addition to that
30% more solesium compensation
will be given and provision of 12%
per annum interest will be given for
the period from Date of Award to
date of payment .Such affected
families whose both land and house
comes under submergence, they will
be given free residential plot as well
as compensation for property will be
given. And if agricultural land is to be
given in place of acquired land then
extra Rs.10000/-per hectare will be
given as agricultural produce (as per
Para 6.6). There is a provision to
give employment to the displaced
family with priority. As mentioned in
chapter 3( kh) only husband , wife &
children are counted in one family.
28. Shri Birju Lal Village-
Birsa
Dam should not be
constructed, we have
objection in dam.
By the construction of Dam 13040
Hectares of land will be irrigated in
46 Nos. of villages of command, due
to which increasing in National
productivity & will be beneficial for
thousands of formers. And there will
be possibility of employment too.
29. Shri Mahendra
Village -Birsa
Since house and land area
completely submerging,
dam should be abandoned.
Compensation for submerged
property will be given by the
collector as per prevalent rate, In
addition to that 30% more solesium
compensation will be given and
provision of 12% per annum intrest
will be given for the period from Date
of Award to date of payment. In
addition to that Rs.15000/- for the
construction of Gaushala .and
Rs.10000/ -for transportation of
house material will be paid as a one
time grant (Para 6.7 gh & d). By the
construction of Halon Dam 13040
Hectares of land will be irrigated in
46 Nos. of villages of command, due
to which increasing in National
productivity & will be beneficial for
thousands of formers. And there will
be possibility of employment too.
30. Shri Sunil Kumar
Tiwari Village- birsa
Dam should be constructed
earlier.One lac rupee per
acre should be given Pacca
house to be constructed
and employment to be
given.
As soon as the project is sanctioned
construction work will be started.
Compensation for submerged
property will be given by the
collector as per prevalent rate. There
is a provision to give employment to
the displaced family with priority.
31. Shri Vijaykant Tiwari
Village - Birsa
Dam should be constructed,
area will be benefited.
Request to give adequate
compensation with officers.
As soon as the project is sanctioned
construction work will be started. By
the construction of Halon Dam
13040 Hectares of land will be
irrigated in 46 Nos. of villages of
command, due to which increasing
in National productivity & will be
beneficial for thousands of formers.
And there will be possibility of
employment too. The compensation
of acquired land will be given by the
collector as per prevalent rate .In
addition to that 30% more solesium
compensation will be given and
provision of 12% per annum interest
will be given for the period from Date
of Award to date of payment .Such
affected families whose both land
and house comes under
submergence, they will be given free
residential plot as well as
compensation for property will be
given. And if agricultural land is to be
given in place of acquired land then
extra Rs.10000/-per hectare will be
given as agricultural produce (as per
Para 6.6).
32. Shri Dinesh Tiwari
Village- Birsa
No any objection. By the construction of Dam 13040
Hectares of land will be irrigated in
46 Nos. of villages of command, due
to which increasing in National
productivity & will be beneficial for
thousands of formers. And there will
be possibility of employment too.
33. Shri Mangilal Jhariya
Village-Birsa
Construction of dam should
be started earlier, and one
member of family should get
employment.
As soon as the project is sanctioned
construction work will be started.
The compensation of acquired land
will be given by the collector as per
prevalent rate .In addition to that
30% more solesium compensation
will be given and provision of 12%
per annum interest will be given for
the period from Date of Award to
date of payment .Such affected
families whose both land and house
comes under submergence, they will
be given free residential plot as well
as compensation for property will be
given. And if agricultural land is to be
given in place of acquired land then
extra Rs.10000/-per hectare will be
given as agricultural produce (as per
Para 6.6). There is a provision to
give employment to the displaced
family with priority.
34. Shri Ratu lal Jhariya Good quality of land and Compensation for submerged
Village -Birsa Brick house to be provided.
And favorable employment
to my son should be given.
property (like Land, tree, House, well
.Gaushala etc.) will be given by the
collector as per prevalent rate ,And if
agricultural land is to be given in
place of acquired land then extra
Rs.10000/-per hectare will be given
as agricultural produce (as per Para
6.6).Rs.20000/- or a house will be
given under Indira Awas yojana
(Para 6.7),or grant amount under
Indira Awas yojana at that time of
payment which ever is more will be
paid to the affected family who are
below poverty level. There is a
provision to give employment to the
displaced family with priority.
35. Shri Sanjay Tiwari
Village-Birsa
Adequate compensation of
land, employment and
house to be given.
Education & heath facility
should be given
The compensation of acquired land
will be given by the collector as per
prevalent rate .In addition to that
30% more solesium compensation
will be given and provision of 12%
per annum interest will be given for
the period from Date of Award to
date of payment .Such affected
families whose both land and house
comes under submergence, they will
be given free residential plot as well
as compensation for property will be
given. Rs.20000/- or a house will be
given under Indira Awas yojana
(Para 6.7),or grant amount under
Indira Awas yojana at that time of
payment which ever is more will be
paid to the affected family who are
below poverty level. By the
construction of Dam there will be
possibility of employment too. As per
Para 5.2(gh) (Compensation will be
given for encroached land. In
addition to that 30% more solesium
compensation will be given and
provision of 12% per annum intrest
will be given for the period from Date
of Award to date of payment in the
form of ex Garcia ).At every 100
Displaced family there is a provision
for a primary school and at every
500 Displaced family there is also
provision for construction of Health
centre too. In addition to that there
will be other public facility like
Community hall, Provision is made
for one well per 100 Displaced
family, one pond for per 500
Displaced family, Also provision is
made for Temple ,Opening of Shops
of Fertilizers, Seed store etc.(as per
R& R plan 2008)
36. Sarpanch and other
villagers of Village -
Birsa
On 30-07-2009 a proposal
is being passed in Gram
Sabha according to which
complete land of village
Birsa is coming under
submerged area, hence
construction to be
abandoned.
Village Birsa and Mangabeli comes
under Grampanchyat Karanjiya.
Under above panchyat a Meeting
(Gran Sabha) was held on Dated 06-
04-2004 and panchayat have
approved the Halon Project and
given a no objection certificate
regarding construction. Instead of
above the Panchayat of 15 villages,
which comes under submergence
,had also given no objection
certificate. Under Halon Project
,area under submergence is total
1570.31 Ha. Including private and
Govt. land. Out of that only 330.56
Ha. land comes under submergence
of Birsa village which is only 14.68%
of total submergence .There is total
420.25 Ha. Land is available in Birsa
village and under submergence only
230.56 Ha. Land comes, which is
54.86% of420.25 Ha. Of land. The
displaced persons of Birsa village
will be resettled at Karanjiya village.
Which is only 2 Km. away from Birsa
village.
The compensation of acquired land
will be given by the collector as per
prevalent rate .In addition to that
30% more solesium compensation
will be given and provision of 12%
per annum interest will be given for
the period from Date of Award to
date of payment .Such affected
families whose both land and house
comes under submergence, they will
be given free residential plot as well
as compensation for property will be
given. Rs.20000/- or a house will be
given under Indira Awas yojana
(Para 6.7),or grant amount under
Indira Awas yojana at that time of
payment which ever is more will be
paid to the affected family who are
below poverty level. By the
construction of Dam there will be
possibility of employment too. As per
Para 5.2(gh) (Compensation will be
given for encroached land. In
addition to that 30% more solesium
compensation will be given and
provision of 12% per annum intrest
will be given for the period from Date
of Award to date of payment in the
form of ex Garcia ).At every 100
Displaced family there is a provision
for a primary school and at every
500 Displaced family there is also
provision for construction of Health
centre too. In addition to that there
will be other public facility like
Community hall, Provision is made
for one well per 100 Displaced
family, one pond for per 500
Displaced family, Also provision is
made for Temple ,Opening of Shops
of Fertilizers ,Seed store etc.(as per
R&R plan 2008) By the construction
of Halon Dam 13040 Hectares of
land will be irrigated in 46 Nos. of
villages of command, due to which
increasing in National productivity &
will be beneficial for thousands of
formers. And there will be possibility
of employment too.
37. Shri Ramkumar
Jhariya Village-Birsa
Dam should not be
constructed; it is harmful for
the resident of village Birsa.
Village Birsa and Mangabeli comes
under Grampanchyat Karanjiya.
Under above panchyat a Meeting
(Gran Sabha) was held on Dated 06-
04-2004 and panchayat have
approved the Halon Project and
given a no objection certificate
regarding construction. Instead of
above the Panchayat of 15 villages,
which comes under submergence
,had also given no objection
certificate. Under Halon Project
,area under submergence is total
1570.31 Ha. Including private and
Govt. land. Out of that only 330.56
Ha. land comes under submergence
of Birsa village which is only 14.68%
of total submergence .There is total
420.25 Ha. Land is available in Birsa
village and under submergence only
230.56 Ha. Land comes, which is
54.86% of420.25 Ha. Of land. The
displaced persons of Birsa village
will be resettled at Karanjiya village.
Which is only 2 Km. away from Birsa
village.
The compensation of acquired land
will be given by the collector as per
prevalent rate .In addition to that
30% more solesium compensation
will be given and provision of 12%
per annum interest will be given for
the period from Date of Award to
date of payment .Such affected
families whose both land and house
comes under submergence, they will
be given free residential plot as well
as compensation for property will be
given. Rs.20000/- or a house will be
given under Indira Awas yojana
(Para 6.7),or grant amount under
Indira Awas yojana at that time of
payment which ever is more will be
paid to the affected family who are
below poverty level. By the
construction of Dam there will be
possibility of employment too. As per
Para 5.2(gh) (Compensation will be
given for encroached land. In
addition to that 30% more solesium
compensation will be given and
provision of 12% per annum intrest
will be given for the period from Date
of Award to date of payment in the
form of ex Garcia ).At every 100
Displaced family there is a provision
for a primary school and at every
500 Displaced family there is also
provision for construction of Health
centre too.In addition to that there
will be other public facility like
Community hall, Provision is made
for one well per 100 Displaced
family, one pond for per 500
Displaced family, Also provision is
made for Temple ,Opening of Shops
of Fertilizers ,Seed store etc.(as per
R&R plan 2008) By the construction
of Halon Dam 13040 Hectares of
land will be irrigated in 46 Nos. of
villages of command, due to which
increasing in National productivity &
will be beneficial for thousands of
formers. And there will be possibility
of employment too.
38. Shri Ruden Lal
Jhariya and other
villagers Village-Birsa
Construction of Dam to be
abandoned. We don’t get
any benefit, If the dam is to
be constructed under
following condition :-
(1) Dam rule 2007-08
should be modified
(1) R & R plan 2007-2008 is revised
up to date 30/04/2009.There is a
provision to give employment with
priority to displaced persons(Para
9.4.1)
(2) Survey of property will be done in
front of effected family whose Award
for company and
govt . employment
.
(2) Every man of
submerged area is
to be called to give
adequate
compensation in
front of them at site
accoeding to his
own
valuation.Which
should be
accepted by
Government.
(3) For the
rehabilitation of
persons forest
department should
give permission
and forest
department should
give patta to his
hitgrahi beside
canal,so that we
can get canal
water.
(4) Every person of
submerged area
should be given
Govt. service, and
income from dam
should be given to
effected family as
a bonus.
(5) children of sub
will be passed by Collector. In
addition to that 30% more solesium
compensation will be given and
provision of 12% per annum intrest
will be given for the period from Date
of Award to date of payment.
(3) The compensation of acquired
land will be given by the collector as
per prevalent rate .In addition to that
30% more solesium compensation
will be given and provision of 12%
per annum interest will be given for
the period from Date of Award to
date of payment .Such affected
families whose both land and house
comes under submergence, they will
be given free residential plot as well
as compensation for property will be
given. Rs.20000/- or a house will be
given under Indira Awas yojana
(Para 6.7),or grant amount under
Indira Awas yojana at that time of
payment which ever is more will be
paid to the affected family who are
below poverty level. By the
construction of Dam there will be
possibility of employment too. As per
Para 5.2(gh) (Compensation will be
given for encroached land. In
addition to that 30% more solesium
compensation will be given and
provision of 12% per annum interest
will be given for the period from Date
of Award to date of payment in the
form of ex Garcia ).At every 100
Displaced family there is a provision
mussed elleebed
family free
education up to 20
years of age and
for adult persons
free health check
up for lifetime
period showed
begiven
(6) Power should be
given to purchase
& registry the land
of scheduled cast,
and registration of
land should be
free.
(7) After the dryness
of dam free land
should be given for
cultivation to
submerged area’s
person. And water
for irrigation should
be given free of
cost lifetime.
for a primary school and at every
500 Displaced family there is also
provision for construction of Health
centre too. In addition to that there
will be other public facility like
Community hall, Provision is made
for one well per 100 Displaced
family, one pond for per 500
Displaced family, Also provision is
made for Temple ,Opening of Shops
of Fertilizers ,Seed store etc.(as per
R&R plan 2008)
(4)As per (Para 6.7 gh) for more
than 50 years of age old
person/Divorce/separated woman,
and unmarried girls case there is a
provision for remarriage or up to
remarriage all above able person will
get pension of Rs.500/-per month.
(5) At every 500 Displaced families
there is also provision for
construction of Health centre and at
every 100 Displaced family there is a
provision for a primary school too.
(6) Chapter 9 as per Para 9.4.3
there is a provision for exemption
related facility in Registration.
(7) Priority will be given in giving the
tank bed cultivation land in lease to
displaced person. And as per Para
9.3 other civilian facilities will be
given.
39. Shri Ravi Shanker
Jhariya Village -Birsa
Dam should not be
constructed because there
will be loss of men & money
if constructed then the
By the construction of Dam 13040
Hectares of land will be irrigated in
46 Nos. of villages of command, due
to which increasing in National
village topography and
management should be
same as previous. Every
family’s unemployed person
should be given
employment.
productivity & will be beneficial for
thousands of formers. And there will
be possibility of employment too.
The compensation of acquired land
will be given by the collector as per
prevalent rate .In addition to that
30% more solesium compensation
will be given and provision of 12%
per annum interest will be given for
the period from Date of Award to
date of payment .Such affected
families whose both land and house
comes under submergence, they will
be given free residential plot as well
as compensation for property will be
given. Rs.20000/- or a house will be
given under Indira Awas yojana
(Para 6.7),or grant amount under
Indira Awas yojana at that time of
payment which ever is more will be
paid to the affected family who are
below poverty level. By the
construction of Dam there will be
possibility of employment too. As per
Para 5.2(gh) (Compensation will be
given for encroached land. In
addition to that 30% more solesium
compensation will be given and
provision of 12% per annum interest
will be given for the period from Date
of Award to date of payment in the
form of ex Garcia ).At every 100
Displaced family there is a provision
for a primary school and at every
500 Displaced family there is also
provision for construction of Health
centre too. In addition to that there
will be other public facility like
Community hall, Provision is made
for one well per 100 Displaced
family, one pond for per 500
Displaced family, Also provision is
made for Temple ,Opening of Shops
of Fertilizers ,Seed store etc.(as per
R&R plan 2008). There is a
provision to give employment to the
displaced family with priority.
40. Shri Ravi Shanker
Jhariya Village-
Mangaveli
Adequate compensation of
land, land in place of land
and employment should be
given. Dam should be
constructed.
The compensation of acquired land
will be given by the collector as per
prevalent rate .In addition to that
30% more solesium compensation
will be given and provision of 12%
per annum interest will be given for
the period from Date of Award to
date of payment .Such affected
families whose both land and house
comes under submergence, they will
be given free residential plot as well
as compensation for property will be
given. Rs.20000/- or a house will be
given under Indira Awas yojana
(Para 6.7),or grant amount under
Indira Awas yojana at that time of
payment which ever is more will be
paid to the affected family who are
below poverty level. By the
construction of Dam there will be
possibility of employment too. As per
Para 5.2(gh) (Compensation will be
given for encroached land. In
addition to that 30% more solesium
compensation will be given and
provision of 12% per annum interest
will be given for the period from Date
of Award to date of payment in the
form of ex Garcia). By the
construction of Dam 13040 Hectares
of land will be irrigated in 46 Nos. of
villages of command, due to which
increasing in National productivity &
will be beneficial for thousands of
formers. And there will be possibility
of employment too.
41. Shri Lallu Sing
Village-Mangaveli
Adequate compensation of
land, irrigated land in place
of land and employment
should be given at least one
person of family and
adequate compensation for
fruitful trees should be
given, employment should
be given.
The compensation of acquired land
will be given by the collector as per
prevalent rate .In addition to that
30% more solesium compensation
will be given and provision of 12%
per annum interest will be given for
the period from Date of Award to
date of payment .Such affected
families whose both land and house
comes under submergence, they will
be given free residential plot as well
as compensation for property will be
given. Rs.20000/- or a house will be
given under Indira Awas yojana
(Para 6.7),or grant amount under
Indira Awas yojana at that time of
payment which ever is more will be
paid to the affected family who are
below poverty level. By the
construction of Dam there will be
possibility of employment too. As per
Para 5.2(gh) (Compensation will be
given for encroached land. In
addition to that 30% more solesium
compensation will be given and
provision of 12% per annum interest
will be given for the period from Date
of Award to date of payment in the
form of ex Garcia). ). There is a
provision to give employment to the
displaced family with priority.
42. Pratapi Lal Jhariya
Village-mangaveli
Height of the dam to be
reduced from 31 m to 29 m
it will benefit the formers.
Height of the dam is as per technical
specification for sufficient storage of
water. If Height is reduced to 29m
required water for irrigation will not
be available.
43. Bhura Lal Jhariya
Village-mangaveli
Existence of Halon river will
be wiped off valuable herbal
will be extinct. No people
representative was present.
No written provision of land
for the displaced, land to be
given in place of land. If the
land is liked by farmers then
discussion on land should
be done.
At present river is also dry in the
summer season. Flow of Halon river
will remain go water due to seepage
of dam. For the protection of
valuable herbal etc. there is a
provision of Rs. 197 Lacks so that
valuable herbal will not be extinct.
During public hearing Shri Naryan
Singh Patta MLA Bichhiya was
present.
As per Para 6.1,such submergence
effected families whose total land is
acquired or misplaced of account
holder/account holders
,compensation of total real losses of
land will be given in form of
agricultural land or agriculturable
barren land will be allotted but,
compensation of land will be
maximum up to 1 hectare Irrigated
land or 2 Ha. Non irrigated land or
agriculturable barren land, under
condition if, there is availability of
government land at resettlement
place.
44. Shri Ramakant Tiwari
Village-Rajo
Adequate compensation
should be given displaced
person should given
adequate facilities &
employment .
The compensation of acquired land
will be given by the collector as per
prevalent rate .In addition to that
30% more solesium compensation
will be given and provision of 12%
per annum interest will be given for
the period from Date of Award to
date of payment .Such affected
families whose both land and house
comes under submergence, they will
be given free residential plot as well
as compensation for property will be
given. And if agricultural land is to be
given in place of acquired land then
extra Rs.10000/-per hectare will be
given as agricultural produce (as per
Para 6.6). There is a provision to
give employment to the displaced
family with priority.
45. Shri Rajesh Jhariya
Village-Birsa
No objection by construction
of Dam. Adequate
compensation should be
given, there is no any effect
on environment.
The compensation of acquired land
will be given by the collector as per
prevalent rate .In addition to that
30% more solesium compensation
will be given and provision of 12%
per annum interest will be given for
the period from Date of Award to
date of payment .Such affected
families whose both land and house
comes under submergence, they will
be given free residential plot as well
as compensation for property will be
given. Rs.20000/- or a house will be
given under Indira Awas yojana
(Para 6.7),or grant amount under
Indira Awas yojana at that time of
payment which ever is more will be
paid to the affected family who are
below poverty level. By the
construction of Dam there will be
possibility of employment too. There
is an environment management
programme of Rs. 765 Millions to
protect the environmental balance
46. Shri Suresh Kumar
Jhariya
Appropriate land to be given
and one member of a family
should get employment
house and pure drinking
water to be managed land
to be given a side the canal.
The compensation of acquired land
will be given by the collector as per
prevalent rate .In addition to that
30% more solesium compensation
will be given and provision of 12%
per annum interest will be given for
the period from Date of Award to
date of payment .Such affected
families whose both land and house
comes under submergence, they will
be given free residential plot as well
as compensation for property will be
given. Rs.20000/- or a house will be
given under Indira Awas yojana
(Para 6.7),or grant amount under
Indira Awas yojana at that time of
payment which ever is more will be
paid to the affected family who are
below poverty level. By the
construction of Dam there will be
possibility of employment too. As per
Para 5.2(gh) (Compensation will be
given for encroached land. In
addition to that 30% more solesium
compensation will be given and
provision of 12% per annum interest
will be given for the period from Date
of Award to date of payment in the
form of ex Garcia).At every 100
Displaced family there is a provision
for a primary school and at every
500 Displaced family there is also
provision for construction of Health
centre too. In addition to that there
will be other public facility like
Community hall, Provision is made
for one well per 100 Displaced
family, one pond for per 500
Displaced family, Also provision is
made for Temple ,Opening of Shops
of Fertilizers ,Seed store etc.(as per
R&R plan 2008). There is a
provision to give employment to the
displaced family with priority.
47. Shri Rajaram Jhariya
Village -Birsa
Before the construction of
dam Adequate
compensation, House, land
should be given as per
today’s rate, We should be
rehabilitated at Sijhora
depot, Educated labors one
member employment,
house and Gaushala should
be given.
The compensation of acquired land
will be given by the collector as per
prevalent rate .In addition to that
30% more solesium compensation
will be given and provision of 12%
per annum interest will be given for
the period from Date of Award to
date of payment .Such affected
families whose both land and house
comes under submergence, they will
be given free residential plot as well
as compensation for property will be
given. Rs.20000/- or a house will be
given under Indira Awas yojana
(Para 6.7),or grant amount under
Indira Awas yojana at that time of
payment which ever is more will be
paid to the affected family who are
below poverty level. By the
construction of Dam there will be
possibility of employment too. At
new place Rs.15000/- grant will be
given for the construction of
Gaushala.
48. Shri Vinod Kumar
Jhariya Village -Birsa
Construction to be started
soon.
According to Govt. Policy the works
on project will be started soon and
after the completion of project 13040
hectare of land will be irrigated. And
there will be possibility of
employment.
49. Shri Gondlal Dhurve
Village -Rajo
Land in place of land. The compensation of acquired land
will be given by the collector as per
prevalent rate .In addition to that
30% more solesium compensation
will be given and provision of 12%
per annum interest will be given for
the period from Date of Award to
date of payment .Such affected
families whose both land and house
comes under submergence, they will
be given free residential plot as well
as compensation for property will be
given. Rs.20000/- or a house will be
given under Indira Awas yojana
(Para 6.7),or grant amount under
Indira Awas yojana at that time of
payment which ever is more will be
paid to the affected family who are
below poverty level.
50. Shri Lalif Khan and
other villagers.
Permission should not be
granted for construction of
dam because animal’s
charagah (grass land) and
fire wood will submerge and
problem of grass for animal
and fruit trees will also
submerge resulting
environmental loss.
Village Rajo is only 10%
submergence affected village, hence
displaced family will get land free of
cost in the same village and
compensation of property will also
be given hence there is no
separation of family takes place.
As the resettlement is in the same
village the education of children will
not be affected and there will not be
any adverse hygienic effect. By the
any adverse hygienic effect. By the
construction of Dam 13040 Hectares
of land will be irrigated in 46 Nos. of
villages of command, due to which
increasing in National productivity &
will be beneficial for thousands of
formers. And there will be possibility
of employment too. There is an
environment management
programme of Rs. 765.10 Millions to
protect the environmental balance,
hence there will not be any adverse
effect on environmental balance.
51. Shri Gyani and others
Village-Rajo
Permission should not be
granted for construction of
Dam.
By the construction of Dam 13040
Hectares of land will be irrigated in
46 Nos. of villages of command, due
to which increasing in National
productivity & will be beneficial for
thousands of formers. And there will
be possibility of employment too.
Village Ratjo is only 10%
submergence affected village, hence
displaced family will get land free of
cost in the same village and
compensation of property will also
be given hence there is no
separation of family takes place.
As the resettlement is in the same
village the education of children will
not be affected and there will not be
any adverse hygienic effect.
There is an environment
management programme of Rs.
765.10 Millions to protect the
environmental balance, hence, there
will not be any adverse effect on
environmental balance.
52. Shri Latif Khan Permission should not be
granted for construction of
dam because animal’s
charagah (grass land) and
fire wood will submerge and
problem of grass for animal
and fruit trees will also
submerge resulting
environmental loss. dam
should be abandoned. If our
problems are not solved we
will go for strike.
Village Rajo is only 10%
submergence affected village, hence
displaced family will get land free of
cost in the same village and
compensation of property will also
be given hence there is no
separation of family takes place.
As the resettlement is in the same
village the education of children will
not be affected and there will not be
any adverse hygienic effect. By the
construction of Dam 13040 Hectares
of land will be irrigated in 46 Nos. of
villages of command, due to which
increasing in National productivity &
will be beneficial for thousands of
formers. And there will be possibility
of employment too. There is an
environment management
programme of Rs. 765.10 Millions to
protect the environmental balance.
Hence, there will not be any adverse
effect on environmental balance.
53. Shri Latif Khan and
other villagers. Village
-Rajo
Permission should not be
granted for construction of
dam. As our agricultural
land comes under
submergence ,without
cultivation our life will not be
survived. Due to
submergence of trees &
plants there is
environmental loss. Halon
project should be
Village Rajo is only 10%
submergence affected village, hence
displaced family will get land free of
cost in the same village and
compensation of property will also
be given hence there is no
separation of family takes place.
As the resettlement is in the same
village the education of children will
not be affected and there will not be
any adverse hygienic effect. By the
construction of Dam 13040 Hectares
abandoned. of land will be irrigated in 46 Nos. of
villages of command, due to which
increasing in National productivity &
will be beneficial for thousands of
formers. And there will be possibility
of employment too. There is an
environment management
programme of Rs. 765.10 Millions to
protect the environmental balance,
hence there will not be any adverse
effect on environmental balance.
54. Shri Latif Khan Permission should not be
granted for construction of
Dam.Because due to
increase of water level in
Bud budinala our traffic will
be effected. If the dam is
constructed then Rajo
village should be added in
Balaghat District.
Village Rajo is only 10%
submergence affected village, hence
displaced family will get land free of
cost in the same village and
compensation of property will also
be given hence there is no
separation of family takes place.
As the resettlement is in the same
village the education of children will
not be affected and there will not be
any adverse hygienic effect. After
the construction of dam height of
Budbudi nala bridge will be
increased so that there will not be
any effect on traffic.
55. Shri Vijay Kumar
Tamrakar village
Sijhora
Dam should be constructed.
Resulting increase in
ground water level of
surrounding villages takes
place. Irrigation facility will
be available. And no any
adverse effect on
environment.
As soon as the project is sanctioned
construction work will be started. By
the construction of Halon Dam
13040 Hectares of land will be
irrigated in 46 Nos. of villages of
command, due to which increasing
in National productivity & will be
beneficial for thousands of formers.
And there will be possibility of
employment too.
56. Shri Gokul Prasad
Jhariya Village-
Sanjhari
Dam should be constructed.
Resulting increase in
ground water level of
surrounding villages takes
place. Irrigation facility will
be available. As per ability
employment and land
compensation on high rate
should be given to formers.
As soon as the project is sanctioned
construction work will be started. By
the construction of Halon Dam
13040 Hectares of land will be
irrigated in 46 Nos. of villages of
command, due to which increasing
in National productivity & will be
beneficial for thousands of formers.
And there will be possibility of
employment too. The compensation
of acquired land will be given by the
collector as per prevalent rate .In
addition to that 30% more solesium
compensation will be given and
provision of 12% per annum interest
will be given for the period from Date
of Award to date of payment .Such
affected families whose both land
and house comes under
submergence, they will be given free
residential plot as well as
compensation for property will be
given. And if agricultural land is to be
given in place of acquired land then
extra Rs.10000/-per hectare will be
given as agricultural produce (as per
Para 6.6).
57.
Shri Alam Das Village
-Boda
Halon Dam should be
constructed. Adequate
compensation for land,
employment ,and house,
drinking water, education
health centre etc .should be
As soon as the project is sanctioned
construction work will be started. By
the construction of Halon Dam
13040 Hectares of land will be
irrigated in 46 Nos. of villages of
command, due to which increasing
in National productivity & will be
given in National productivity & will be
beneficial for thousands of formers.
And there will be possibility of
employment too. The compensation
of acquired land will be given by the
collector as per prevalent rate .In
addition to that 30% more solesium
compensation will be given and
provision of 12% per annum interest
will be given for the period from Date
of Award to date of payment .Such
affected families whose both land
and house comes under
submergence, they will be given free
residential plot as well as
compensation for property will be
given. Rs.20000/- or a house will be
given under Indira Awas yojana
(Para 6.7),or grant amount under
Indira Awas yojana at that time of
payment which ever is more will be
paid to the affected family who are
below poverty level. By the
construction of Dam there will be
possibility of employment too. As per
Para 5.2(gh) (Compensation will be
given for encroached land. In
addition to that 30% more solesium
compensation will be given and
provision of 12% per annum interest
will be given for the period from Date
of Award to date of payment in the
form of ex Garcia).At every 100
Displaced family there is a provision
for a primary school and at every
500 Displaced family there is also
provision for construction of Health
centre too. In addition to that there
will be other public facility like
Community hall, Provision is made
for one well per 100 Displaced
family, one pond for per 500
Displaced family, Also provision is
made for Temple ,Opening of Shops
of Fertilizers ,Seed store etc.(as per
R&R plan 2008). There is a
provision to give employment to the
displaced family with priority.
58. Shri Monoher singh
Margvi other Villagers
Village-Alna
Public hearing of Halon
irrigation project has been
done at Village Pandutala
on dated 12/02/2009 in
which villagers have taken
objection on construction of
Dam. But Government is
doing public hearing without
any information .This public
hearing is objectionable for
persons of submerged area.
Halon project should be
abandoned. There could be
adverse effect on
environment and natural
disaster may takes place.
The applicants are of Alna of
Balaghat District. Where public
hearing is already done on dated
12/02/2009, in this Public hearing
also prior information and
advertisement in newspaper was
given. Many people of concerned
villages of Distt. balaghat had
attended In the above Public hearing
.The Ministry of environment and
forest of Government of India New
Delhi has directed to do separate
Public hearing in Distt. Mandla,
hence in this connection on
31/07/2009 Public hearing in Distt.
Mandla is done by giving information
and advertisement in newspapers to
concerned villages of Diatt. Mandla
,hence saying of applicant’s that not
got any information about Public
hearing is wrong. Keeping in point of
view for natural disaster like
earthquake etc. India’s largest
research centre for disaster
management pune (C.W.P.R.S.
Pune ) has studied and given his
seismic parameter report, In which
they have considered all disaster
related to earthquake etc. for Halon
Dam & provision for the same has
been made. Thus, There is an
environment management
programme of Rs. 765.10 Millions to
protect the environmental balance.,
so there will be no any adverse
effect on environmental balance.
Executive Engineer
N.D. Holan Division
Bchhiya, Dist. Mandla.
Superintending Engineer
Canalcell R.A.B.L.S.
Project
Bargi Hills, Jabalpur
Chief Engineer
R.A.B.L.S. Project
Bargi Hills, Jabalpur