G.Alexeev for Dubna group ITEP, April 28, 2010 Muon System Status Report from Dubna Hardware : * Full Scale prototype - in preparation to be put in work position at COMPASS, expected start of long strips r/o studies – May- June 2010 * Range System prototype (degree of readiness) : - steel absorber /structure ~ 95% (Fe plates 100% ready -> to be welded) - MDT detectors ~ 50 % (all parts 100% ready, 10% of MDTs assembled) - strip boards, cables ~ few % (to be produced by summer 2010) - f/e electronics ~ few % (design 100% ready, mass production required)

Hardware : * Full Scale prototype - in preparation to be put in work position at COMPASS,

  • Upload
    gwen

  • View
    30

  • Download
    0

Embed Size (px)

DESCRIPTION

G.Alexeev for Dubna group ITEP , April 28 , 2010 Muon System Status Report from Dubna. Hardware : * Full Scale prototype - in preparation to be put in work position at COMPASS, expected start of long strips r/o studies – May-June 2010 - PowerPoint PPT Presentation

Citation preview

Page 1: Hardware :     * Full Scale prototype  -   in preparation to be put in work position at COMPASS,

G.Alexeev for Dubna group ITEP, April 28, 2010

Muon System Status Report from Dubna Hardware : * Full Scale prototype - in preparation to be put in work position at COMPASS, expected start of long strips r/o studies – May-June 2010 * Range System prototype (degree of readiness) : - steel absorber /structure ~ 95% (Fe plates 100% ready -> to be welded) - MDT detectors ~ 50 % (all parts 100% ready, 10% of MDTs assembled) - strip boards, cables ~ few % (to be produced by summer 2010) - f/e electronics ~ few % (design 100% ready, mass production required) ( see report of A.Piskun)

Software : * Acceptance studies for DY and J/ muon pairs (see report of V.Rodionov)

Page 2: Hardware :     * Full Scale prototype  -   in preparation to be put in work position at COMPASS,

Full Scale prototype mechanically assembled and stored in COMPASS area (park position)

It is now being equipped with HV,LV, gas lines, strip boards, f/e electronics and tested before the start of COMPASS run

Page 3: Hardware :     * Full Scale prototype  -   in preparation to be put in work position at COMPASS,

F S prototype position

COMPASS MF2

Full Scale prototype position in COMPASS area.

The prototype should be fixedat this point inMay 2010

Page 4: Hardware :     * Full Scale prototype  -   in preparation to be put in work position at COMPASS,

Wiring of MDT detectors

Page 5: Hardware :     * Full Scale prototype  -   in preparation to be put in work position at COMPASS,

Wiring machine for MDT detectors

Page 6: Hardware :     * Full Scale prototype  -   in preparation to be put in work position at COMPASS,

Assembled MDTs (in black envelops) and profiles prepared for wiring

Page 7: Hardware :     * Full Scale prototype  -   in preparation to be put in work position at COMPASS,

VME crate 6U VME crate 6U

STRIP R/O digital

RW-TDC QTC–16QTC–16

ASum-96

AAlexander.NagaytWIRE R/O analog & digital

[email protected] ander.Nagaytsev

@cern.ch

ADB-32 (A-32)

A2DB-32

analog

digital

COMPASS CATCH

DAQ VME crate 9U

MWDB units

to DAQ crate

Hot link cables

Range System Prototype Read Out Scheme

Page 8: Hardware :     * Full Scale prototype  -   in preparation to be put in work position at COMPASS,

Polar angle distribution of DY photons.

Geometrical acceptance study of muon system in case of: full PANDA setup (material)

Pythia as event generator (40K DY events) + PandaRoot.Option: with/without magnetic field in Solenoid/Dipole.

Page 9: Hardware :     * Full Scale prototype  -   in preparation to be put in work position at COMPASS,

Plans for 2010:

* FS prototype : - finish full assembly (HV, LV, cabling, gas lines, f/e electronics etc) - start running (r/o test with long 2-4 m strips) in summer 2010 - study of wave impedance for strip r/o

* RS prototype : - finish production (300 MDTs, absorber structure, strip boards, cables etc) - produce and test f/e electronics (292 boards of different types) - move to CERN - assemble (at COMPASS) and test with cosmic (debugging) - start running in late autumn 2010 at PS (subject to available resources)

* Software development in PANDAroot :

- finish acceptance studies for muons (DY, J/ , D-mesons) with high statistics - track finding algorithms for muons in Range System (together with Torino/INFN group) - pattern recognition algorithms – muons vs hadrons (together with Torino/INFN group)

Page 10: Hardware :     * Full Scale prototype  -   in preparation to be put in work position at COMPASS,

Backup slides

Page 11: Hardware :     * Full Scale prototype  -   in preparation to be put in work position at COMPASS,

G10 fiberglass strip board (1cm wide strips) at CERN/COMPASS

Page 12: Hardware :     * Full Scale prototype  -   in preparation to be put in work position at COMPASS,

Strip R/O from RS Prototype

MDTs strip (1cm) board

Fe absorber plate A-32 preamp. card

Page 13: Hardware :     * Full Scale prototype  -   in preparation to be put in work position at COMPASS,

RS prototype absorber plates manufactured in Dubna

Page 14: Hardware :     * Full Scale prototype  -   in preparation to be put in work position at COMPASS,

RS prototype absorber structure/frame

Page 15: Hardware :     * Full Scale prototype  -   in preparation to be put in work position at COMPASS,

RS prototype assembly process (start)

Page 16: Hardware :     * Full Scale prototype  -   in preparation to be put in work position at COMPASS,

RS prototype assembly process (close to finish)

Page 17: Hardware :     * Full Scale prototype  -   in preparation to be put in work position at COMPASS,

RS prototype assembly finished ( 60mm plates – black, 30mm plates – blue )